Agenda for Today
• Progress Reports
• Review of Systems Lectures to this point
• TPS issues
• Systems Tools; Little’s Law, M/M/1, Buzacott
• TPS Cell design
Progress Reports: Wed. Nov 6
5 Teams 1: 05 − 2: 25 =80
5= 𝟏𝟔𝒎𝒊𝒏. 𝒆𝒂𝒄𝒉
1. Introduce Team
2. Work organization – who does what?
3. Central meeting time?
4. “Gantt Chart” – tasks to complete, timing
5. Evidence of progress – bring in something you have made
6. Issues – anything you might want to share
Robert H. Hayes andSteven C. Wheelwright1988
Early paper on mappingProduction SystemsProduct CharacteristicsFrom HBS
John Miltenburg1995ManufacturingStrategy
Ken Mackay, University of Waterloo, Oct 2019
7
Machining Systems Classification
Ref J T. BlackCh 2
How have these changed?
•Quality
•Cost
•Rate
•Flexibility
M/M/1 Queue withExponentially distributed Arrival times 60secAnd Service times 54 sec.
L = 𝜆
𝜇−𝜆= 9