Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
ALTERATIONS
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 1
Location Description:Key:
BT Block T
BM Block M
BN Block N
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
VISIT TO SITE
Tenderers are to visit the site and satisfy themselves as to the nature of the work to be done, extent of the works on site and making good to be done, the conditions of the existing buildings, working conditions, etc., as no liability whatsoever will be admitted in respect of errors in the Contractor's tender due to the foregoing.
WORK AND MATERIALS
The work to be done and materials to be used in the works on site are to be similar to those specified in the new work in so far as they apply.
All rubble and debris from the pulling down are to be carted away without delay and the site is to be left clean and unencumbered.
Where existing items of work is to be removed or demolished, those items of work should be deemed to be discarded unless otherwise stated.
DEMOLITIONS
All demolition work shall be carried out in accordance with the local By-laws and to the requirements of the Local Health Authorities.
Where walls are described as being demolished, doors, door frames and the finishes to both sides shall be deemed to be included. Where floor finishes are described as being removed the mortar bed under or screed shall be deemed to be included.
Section No. 1
Carried to Collection R
Bill No. 1
Alterations
1
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
WATER, ETC.
The Contractor shall allow for watering the works with a jet or spray from a hose sufficiently to prevent any nuisance from dust.
TEMPORARY COVERINGS, SCREENS, ETC.
The Contractor shall supply, erect and maintain in position as required any temporary coverings to protect the existing work and property from damage and inclement weather during the progress of the works. The Contractor will be held responsible for any damage to property or goods in the existing buildings due to his not having taken adequate precautions, and all damage caused shall be made good at his own expense. He must allow for providing all necessary plastic or wood framed screens, partitions, tarpaulin, barriers, etc., to protect the work and prevent any nuisance from dust as may be required or directed.
DAMAGE TO PERSONS OR PROPERTY
The Contractor will be held responsible for any damage to persons or property and for the safety of the structures and he shall allow for protecting and indemnifying persons using the existing buildings from injury and by virtue of building operations, including providing necessary barriers, signs, etc.
MAKING GOOD
Prices of all work described throughout these Bills of Quantities shall include for making good, in all trades except Painting, unless otherwise described.
The Contractor must make good to existing work damaged or disturbed through alterations and to existing work remaining after doors, windows, screens, fittings, walls, etc., are removed, by fitting in short lengths of skirtings, architraves, etc., and making good suspended ceilings and floors on necessary joists, etc., plaster finishes to walls and ceilings and rendering floor tiles, etc., to floors and for facing up walls, with brickwork, cut, toothed and bonded to existing work with facing bricks, quarry tiles or common brickwork to receive finishings, unless otherwise described.
All new materials used in making good are to match existing and the works shall be left complete and perfect in every respect.
Section No. 1
Carried to Collection R
Bill No. 1
Alterations
2
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
PULLING DOWN
Pulling down walls, piers, etc., shall include for dead shoring under existing concrete slabs, beams, roof members, etc., for pulling down face brick, tiled or plastered walls and concrete beams or lintols occuring in same, for removing skirtings, quadrants, cornices, etc., fixed to same for hacking up flooring in openings and making good as previously described to walls, floors, ceilings, etc., unless otherwise described.
CUTTING THROUGH, ETC.
Cutting away from, breaking or cutting through shall include for neatly cutting through brick or concrete walls, floors, skirtings, etc., leaving ends fair or preparing ends for extensions, for facing up jambs, reveals, etc., with brickwork cut toothed and bonded to existing and for flushing up concrete jambs, reveals, etc., in cement mortar.
BUILDING IN
Building in new or reused doors, windows, etc., into formed openings in existing brick or concrete walls shall include for wedging up, cutting mortices for and running in lugs in 3:1 cement mortar or for plugging and screwing as necessary, and bedding and pointing all round frame in cement mortar.
JUNCTION OF NEW AND EXISTING
Making good at the junction of new and existing work shall include for piercing out, cutting through or removing short lengths of existing material, for supplying short lengths of new material and for jointing to match existing.
EXISTING AND ADJOINING BUILDINGS, ETC.
In taking down and removing existing work the utmost care must be observed to avoid any structural or other damage to the remaining portions of the building or adjoining buildings, boundary walls, pavings, roadways, etc., and the Contractor shall provide all shoring, needling, strutting, etc., to ensure the stability of all structures during demolition or alteration work. The Contractor must cover up and protect from damage all work not removed and must make good at his own expense any damage that may occur.
HOARDING
Tenders are reffered to the specification for Hoarding before pricing the following items:
The following temporary hoarding shall be erected in sections as required and removed on instruction of the Principal Agent.
Section No. 1
Carried to Collection R
Bill No. 1
Alterations
3
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
The erected hoarding is to be maintained in a condition acceptable to the Principal Agent throughout the duration of the contract.
On completion of this contract, the hoarding must be handed over to the main contractor.
0.5mm Galvanized IBR sheeting including priming and painting to an approved colour, 2,40m high fixed to and including 51 x 76mm sawn South African Pine top, middle and bottom rails with 150mm diameter trimmed gumpole posts at 3000mm centres, fixed into movable concrete bases, including all vehicular and pedestrian access gates.
1
m 294
Carefully take down and re-erect hoarding (previosuly measured) where instructed, comprising painted IBR sheeting, etc., including making good paintwork, etc.
2
m 294
Carefully take down and remove IBR hoarding (previously measured).
3m 342
Shade cloth hoarding, 2.8m high, fixed to and including 51 x 76mm sawn South African Pine top, middle and bottom rails with 150mm diameter trimmed gumpole posts at 3000mm centres, fixed into movable concrete bases including all vehicular and pedestrian access gates.
4
m 147
Carefully take down and re-erect hoarding (previosuly measured) where instructed, comprising shade cloth hoarding, etc., including making good where necessary, etc.
5
m 147
Carefully take down and remove shade cloth hoarding (previously measured)..
6m 147
Drywall barrier of galvanised steel channel section rails and studs covered on one side (Outside) with 12,7mm Gypsum plasterboard and finished with two (2) coats interior quality PVA emulsion paint, including corners, ends, access doors etc. (Merchandising will be applied to the barrier) Remove after completion.
7
m² 165
Carefully take down and re-erect hoarding (previosuly measured) where instructed, comprising drywall hoarding, etc., including making good where necessary, etc.
8
m 165
Carefully take down and remove drywall hoarding (previously measured).
9m 165
Section No. 1
Carried to Collection R
Bill No. 1
Alterations
4
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
DEMOLITIONS
Demolish and remove:
Gut complete exisitng L-shaped single storey building (BLOCK T), size overall approximately 44,103mm x 28,075mm on plan, comprising of all internal structures: brickwork, parititions, ceiling, floor covering etc, to include roof sheeting and structural roof members complete, include Asbestos which must comply with all regulations, including sealing off all electrical, fire and plumbing services and making good facebrick of perimeter walls where necessary, all in accordance with the Architects drawing no. 21363 00 – 101.01 Rev A.
10
No 1
Gut complete exisitng rectangular shaped single storey building (BLOCK M) size overall approximately 47,407mm x 14,084mm on plan, comprising of all internal structures: brickwork, parititions, ceiling, floor covering etc, and include Asbestos which must comply with all regulations, including sealing off all electrical, fire and plumbing services and making good facebrick of perimeter walls where necessary, all in accordance with the Architects drawing no. 21363 00 – 101.01 Rev A.
11
No 1
Gut complete exisitng rectangular shaped single storey building (BLOCK N) size overall approximately 47,400mm x 14,066mm on plan, comprising of all internal structures: brickwork, parititions, ceiling, floor covering etc, and include Asbestos which must comply with all regulations, including sealing off all electrical, fire and plumbing services and making good facebrick of perimeter walls where necessary, all in accordance with the Architects drawing no. 21363 00 – 101.01 Rev A.
12
No 1
REMOVAL OF EXISTING WORK
Breaking up and removing concrete components,etc, carting away broken material and making good surface to receive new surface.
Steps, etc.13 m³ 6
650mm High x 2200mm wide x 1080mm long reinforced concrete staircases attached to loading bay platform, executed complete.
14
No 3
Concrete plinths, bases, etc.15 m³ 6
200mm Thick aprons, paving, etc.16 m² 15
Surface beds.17 m³ 2 204
Slabs.18 m³ 12
Section No. 1
Carried to Collection R
Bill No. 1
Alterations
5
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Beams.19 m³ 9
Breaking down and removing brickwork, etc.:
Half brick walls.20 m² 72
One brick walls.21 m² 36
Chasing 50mm wide into brickwork.22 m² 438
Chasing 100mm wide into brickwork.23 m² 345
Taking out and removing sundry metalwork:
Steel single door frame for door size 813mm x 2032mm high in one brick wall.
24No 15
Ditto, but for double door, size approximately 1500 x 2032mm.
25No 6
Taking out and removing doors, windows, etc., from brickwork:
Timber single door and frame, size 813 x 2032mm high overall from one brick wall including all ironmongery, etc.
26No 12
Timber double door and frame, size 1800 x 2032mm high overall from one brick wall including all ironmongery, etc.
27
No 3
Steel windows including glazing not exceeding 2.5m2.28 No 24
Ditto, exceeding 2.5m2 but not exceeding 5m2.29 No 9
Airbricks.30 No 18
Take out and remove doors, windows, sills, etc and build up openings in brick walls including making good cement plaster on both sides (making good paintwork elsewhere) :
Timber single leaf door and steel frame 813 x 2032mm high overall from one brick wall.
31No 6
Ditto but steel door and frame.32 No 3
Timber double leaf door and steel frame 1800 x 2032mm high overall from one brick wall.
33No 6
Take out and remove doors, windows, sills, etc and build up openings in brick walls including making good face brickwork on one side and cement plaster on other side (making good paintwork elsewhere) :
Timber single leaf door and frame 813 x 2032mm high from one brick wall.
34No 12
Section No. 1
Carried to Collection R
Bill No. 1
Alterations
6
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Ditto, but steel door and frame. 35 No 6
Glazed steel windows not exceeding 2,5m² from one brick wall.
36No 138
Ditto, exceeding 2,5m² but not exceeding 5m².37 No 12
Taking down and removing roofs, floors, panelling, ceilings, partitions, etc.:
Plasterboard ceilings including cornices from brandering, preparing branders for new, etc. (New elsewhere)
38m² 776
Acoustic tile suspended ceilings, including cornices, suspension grid, hangers, etc.
39m² 60
Drywall partitions upt to 3m high, including doors, glazed borrowed lights, etc.
40m 45
Take out and remove fitted joinery fittings, etc.:
Timber floor unit, size approximately, 1100mm high x 600mm deep, including bearers, cleats, shelves, doors and countertops.
41
m 3
Taking out and removing sundry joinery work:
75mm Timber skirtings from brickwork.42 m 620
Hacking up/off and removing floor and wall tile finishes, including removing mortar bed or backing:
Ceramic tiles from walls including preparing wall surface for new finish.
43m² 710
Ceramic tiles from floor including preparing floor surface for new finish.
44m² 36
CUTTING THROUGH FLOORS AND CEILINGS
Chasing 50mm wide x 40mm deep into concrete surface beds.
45m 144
Chasing 100mm wide x 40mm deep into concrete surface beds.
46m 108
CORE DRILLING, PENETRATIONS, OPENINGS, ETC.
Core drilling through exisitng reinforced concrete slabs, floors, etc., with and including making good surrounding finish:
Core drill 50mm diameter opening.47 No 15
Ditto, but opening size approximately 100mm diameter.48 No 9
Ditto, but opening size approximately 200mm diameter.49 No 6
Section No. 1
Carried to Collection R
Bill No. 1
Alterations
7
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Removal of roof coverings, structure, etc.:
Metal sheet vertical or horizontal cladding including all fixings, framework, etc.
50m² 300
Metal sheet profiled bargeboard including all fixings, framework, etc.
51m 144
Metal sheet profiled bullnose including all fixings, framework, etc.
52m 72
Gutters, and Down pipes etc.53 m 258
BUILDING UP OPENINGS
Close up opening in one brick wall in patches including all cutting of toothing and bonding in new brickwork, propping, making good to existing finishes, etc.:
Half brick walls.54 m² 54
One brick walls.55 m² 66
CREATING OPENINGS IN EXISTING WALLS
Breaking out for and forming openings through brick walls including necessary precast concrete lintels and making good plaster on both sides and into reveals and with concrete thresholds with steel trowelled finish and building in frames and new doors (making good paintwork elsewhere):
813mm Wide x 2032mm opening for single door and frame.
56No 12
Breaking out for and forming openings through brick walls including necessary precast concrete lintels and making good plaster on both sides and into reveals and with concrete thresholds with steel trowelled finish and building in frames and new doors, making good plaster on one side and reveals, face brickwork on other side (paintwork elsewhere):
1788mm Wide x 2120mm opening for double door and frame including face brick to external facade.
57No 6
4000mm Wide x 3200mm opening for roller shutter door and frame including face brick to external facade.
58No 3
PREPARATORY WORK TO EXISTING SURFACES
Cutting out joints of existing brickwork to receive plaster.59 m² 165
Clean and apply cement mixture (1 part water + 3 parts cement) to existing facebrick surface to receive new plaster (Measured elsewhere).
60
m² 90
Section No. 1
Carried to Collection R
Bill No. 1
Alterations
8
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Hack out brickwork and cut toothing to bond new half brickwall to existing brickwork.
61m 69
Hack out brickwork and cut toothing to bond new one brickwall to existing brickwork.
62m 108
MAKING GOOD OF FINISHES, ETC
Make good existing mortar joints in brickwork by re-jointing and pointing in cement mortar between existing brick joints to an average depth of 15mm (provisional).
63
m 42
Rake out existing mortar to a depth of 15mm around 20mm diameter overflow pipe and point in new mortar.
64No 33
Making good cement screeds:
Floors where half brick walls removed.65 m 24
Floors where one brick walls removed.66 m 12
Making good internal cement plaster:
Walls in patches.67 m² 117
Walls where one brick walls removed.68 m² 192
Sundries:
Remove stop ends, clean and realign existing galvanised sheet iron gutters including making good any defective joints to junction of new and existing gutters from addition (measured elsewhere).
69
No 30
Section No. 1
Carried to Collection R
Bill No. 1
Alterations
9
Obp Vaccine Plant - Principal Contract
BTK606
Amount
ALTERATIONS
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 1
Page No
COLLECTION
1Brought Forward from Page
2
3
4
5
6
7
8
9
Section No. 1
Carried To Section Summary R
Bill No. 1
Alterations
10
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
EARTHWORKS
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 2
Location Description:Key:
BT Block T
BM Block M
BN Block N
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
EXCAVATION OTHER THAN BULK
Excavate in earth not exceeding 2m deep below filled, reduced or formed ground level for:
Reduced levels under floors1 m³ 8
Holes for column bases, etc.2 m³ 6
Ground beams, footings, etc.3 m³ 13
Ground beams, footings (in confined spaces).4 m³ 153
Channel, ducts, etc.5 m³ 9
Excavate in earth exceeding 2m and not exceeding 4m deep below filled, reduced or formed ground level for:
Holes for column bases, etc.6 m³ 9
Extra over excavation in earth for excavation in:
Soft rock.7 m³ 19
Hard rock.8 m³ 10
In concrete.9 m³ 9
Allow for the risk of collapse to sides of excavations in earth for:
Trench and hole excavations not exceeding 1,5m deep.10 m² 281
Section No. 1
Carried to Collection R
Bill No. 2
Earthworks
11
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
CARTING AWAY
Extra over all excavations for loading, carting and dumping surplus excavated material (no allowance made for increase in bulk):
Off site to a dumping site to be located by the Contractor.
11 m³ 90
EARTH FILLING, ETC.
Filling with selected material from the excavations (stock piled on site) and compacted in 150mm thick layers to a density of at least 93% Mod. AASHTO maximum density at +/- 1% OMC for:
Filling under holes, etc.12 m³ 15
Filling with selected material from the excavations and compacted in 150mm thick layers to a density of at least 95% Mod. AASHTO maximum density for:
Backfilling to trenches, holes, etc. 13 m³ 108
Filling with approved material supplied and carted onto site by the Contractor, compacted to a density of at least 95% Mod. AASHTO maximum density in:
150mm Thick sub-base layer of G7 material under surface beds, etc.
14m³ 98
Surface Preparation:
Compaction of ground surface, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod. AASHTO density.
15
m² 2 060
KEEPING EXCAVATIONS FREE OF WATER
Allow for keeping excavations free of all water, mud, etc. by hand or machinery.
16Item
Soil Poisoning:
Treat base course with an approved insecticide including forming and poisoning shallow furrows against foundation walls, etc. filling in furrows and ramming, all in accordance with the manufacturer's instructions.
17
m² 2 213
Section No. 1
Carried to Collection R
Bill No. 2
Earthworks
12
Obp Vaccine Plant - Principal Contract
BTK606
Amount
EARTHWORKS
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 2
Page No
COLLECTION
11Brought Forward from Page
12
Section No. 1
Carried To Section Summary R
Bill No. 2
Earthworks
13
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
CONCRETE, FORMWORK AND REINFORCEMENT
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 3
Location Description:Key:
BT Block T
BM Block M
BN Block N
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
SUPPLEMENTARY PREAMBLES
All work must be done in accordance to SABS 1200 and the structural engineers specifications.
Cost of tests:
The costs of making, storing and testing of concrete test cubes as required under clause 7 'Tests' of SABS 1200 G shall include the cost of providing cube moulds necessary for the purpose, for testing costs and for submitting reports on the tests to the Principal Agent. The testing shall be undertaken by an independent firm or institution nominated by the Contractor to the approval of the Principal Agent. (Test cubes are measured separately).
Formwork:
Descriptions of formwork shall be deemed to include use and waste only (except where described as left in or permanent), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for reconditioning as necessary before re-use.
The vertical strutting shall be carried down to such construction as is sufficiently strong to afford the required support without damage and shall remain in position until the newly constructed work is able to support itself.
Formwork to soffits of solid slabs etc., shall be deemed to be to slabs not exceeding 250mm thick unless otherwise described.
Section No. 1
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
14
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Formwork to sides of bases, pile caps, ground beams, etc., will only be measured where it is prescribed by the Engineer for design reasons. Formwork necessitated by irregularity or collapse of excavated faces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in Earthworks.
UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
10MPa/19mm Concrete in:
Surface blinding under footings and bases.1 m³ 12
Mass concrete under bases.2 m³ 6
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
25 MPa/19mm Concrete in:
Strip footings (in confined spaces).3 m³ 111
Ground beams.4 m³ 6
Raft foundations.5 m³ 12
Bases.6 m³ 6
Plinth.7 m³ 15
Floor channels.8 m³ 3
Floor slabs.9 m³ 300
Apron slabs to falls.10 m³ 33
Ramps.11 m³ 9
REINFORCED CONCRETE
25 MPa/19mm Concrete in:
Concrete infill to cavity.12 m³ 13
Stairs, landings, stair beams, etc.13 m³ 15
Slabs including beams and inverted beams.14 m³ 18
Roof slabs.15 m³ 6
Beams.16 m³ 14
30 MPa/19mm Concrete in:
Columns.17 m³ 9
Section No. 1
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
15
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
CONCRETE SUNDRIES
Test blocks:
Allow for making a set of three concrete test cubes in accordance with section 7 of SABS 1200G and sending to an approved testing authority for testing and paying all charges in connection therewith.
18
Sets 92
Finishing top surfaces of concrete smooth with a steel float to:
Surface beds laid in panels.19 m² 53
Apron slab laid in panels to falls.20 m² 219
Slabs.21 m² 53
Finishing top surfaces of concrete smooth with a wood float to:
Surface beds laid in panels. (accuracy 1).22 m² 2 007
Slabs (accuracy 1).23 m² 72
Grooves, channels, mortices, sinkings, etc. in concrete:
Thicken out edge of 85mm thick apron slab to a total thickness of 150mm and for a width of 250mm including one splayed side, all necessary excavation, surface preparation, additional concrete and formwork (formwork to exposed edges elsewhere measured).
24
m 147
Thicken out 170mm thick surface bed to a total thickness of 250mm and for a width of 760mm including one splayed side, all necessary excavation, surface preparation, additional concrete and formwork (formwork to exposed edges elsewhere measured).
25
m 219
20mm Diameter high tensile steel dowel bar 800mm long including drilling hole in existing concrete slab edge and grouting in with and including 'ABE Epidermix 395' epoxy adhesive.
26
No 48
25 MPa Non-shrink grout in:
Bedding approximately 50mm thick under 200 x 200mm base plate including chamfered edges all round, formwork, etc.
27
No 126
ROUGH FORMWORK (DEGREE OF ACCURACY II)
Rough Formwork to Sides of:
Ground beams.28 m² 66
Section No. 1
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
16
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Upstand beams.29 m² 35
Square or rectangular stub columns in foundations.30 m² 55
Sloping and stepped outer edges of stairs not exceeding 300mm high extreme.
31m 24
Edges, risers, ends and reavels not exceeding 300mm high or wide.
32m 411
Edges exceeding 300mm high.33 m² 18
Rough Formwork to Soffits of:
Slabs propped up exceeding 3.5m and not exceeding 5m high.
34m² 53
Slabs propped up exceeding 5m and not exceeding 6.5m high.
35m² 30
Slabs exceeding 250mm and not exceeding 500mm thick, propped up exceeding 1.5m and not exceeding 3.5m.
36
m² 15
Ditto, but propped up exceeding 3.5m and not exceeding 5m high.
37m² 24
Landing slabs.38 m² 12
Raking soffit of stairs.39 m² 18
SMOOTH FORMWORK (DEGREE OF ACCURACY 1)
Smooth formwork to sides of:
Square or rectangular columns exceeding 3.5m high but not exceeding 6.5m high.
40m² 9
MOVEMENT JOINTS, ETC.
10mm Thick isolation joint between concrete surface bed and walls or kerbs, filled in with 'Jointex' not exceeding 300mm high.
41
m 294
6mm Thick expansion joint between concrete slabs filled in with 'Jointex' not exceeding 300mm high including tacking to existing slab edge.
42
m 219
10mm Thick expansion joint in surface beds filled in with 'Jointex' not exceeding 300mm high including rounding top edges of joint to 3mm radius.
43
m 106
20mm Thick expansion joint in surface beds filled in with 'Jointex' not exceeding 300mm high including rounding top edges of joint to 3mm radius.
44
m 165
Section No. 1
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
17
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Machine cut open joint 3mm wide x 30mm deep in top of concrete surface bed including short lengths, etc.
45m 146
Toggle construction joint in 170mm thick concrete surface bed including all necessary formwork to edge, etc.
46
m 72
CONCRETE SUNDRIES
Stensons 'Tile Red Ferrafloor' methalic floor hardener at 13kg/m2 to surface bed area.
47m² 150
REINFORCEMENT
Mild steel reinforcement to structural concrete work in:
8mm Diameter bars.48 Tonnes 4,00
10mm Diameter bars.49 Tonnes 2,40
12mm Diameter bars.50 Tonnes 4,80
16mm Diameter bars.51 Tonnes 7,20
20mm Diameter bars.52 Tonnes 7,20
High tensile steel reinforcement to structural concrete work in:
10mm Diameter bars.53 Tonnes 3,60
12mm Diameter bars.54 Tonnes 7,20
16mm Diameter bars.55 Tonnes 7,20
20mm Diameter bars.56 Tonnes 7,20
25mm Diameter bars.57 Tonnes 7,20
32mm Diameter bars.58 Tonnes 7,20
Fabric reinforcement:
Type 193 fabric reinforcement in concrete surface beds, slabs, etc.
59m² 53
Type 395 fabric reinforcement in concrete surface beds, slabs, etc.
60m² 4 014
Section No. 1
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
18
Obp Vaccine Plant - Principal Contract
BTK606
Amount
CONCRETE, FORMWORK AND REINFORCEMENT
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 3
Page No
COLLECTION
14Brought Forward from Page
15
16
17
18
Section No. 1
Carried To Section Summary R
Bill No. 3
Concrete, Formwork And Reinforcement
19
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
MASONRY
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 4
Location Description:Key:
BT Block T
BM Block M
BN Block N
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
BRICKWORK IN FOUNDATIONS
Brickwork of NFX bricks (14 MPa nominal compressive strength) in Class I mortar in:
Half brick walls.1 m² 45
One brick walls.2 m² 60
BRICKWORK IN SUPERSTRUCTURE
Brickwork of NFX bricks (14 MPa nominal compressive strength) in Class I mortar in:
Half brick wall.3 m² 300
Half brick wall in lining to concrete.4 m² 90
One brick wall.5 m² 597
330mm Cavity wall formed of two half brick skins tied together with and including wire ties.
6m² 331
Piers.7 m³ 30
BRICKWORK SUNDRIES
Closing 50mm cavity of hallow wall horizontally with brickwork one brick wide at top of soffit for one course.
8m 144
Ditto, but on raking.9 m 40
Section No. 1
Carried to Collection R
Bill No. 4
Masonry
20
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Joint forming material in movement joints:
10mm Thick bitumen impregnated softboard expansion joint filling, built in vertically as the work proceeds, including all cutting and waste.
10
m² 366
10mm Thick 'Jointex' expansion joint filling not exceeding 300mm wide, built in vertically as the work proceeds, including all cutting and waste.
11
m 732
Brickwork reinforcement:
75mm Wide reinforcement built in horizontally.12 m 9 540
150mm Wide reinforcement built in horizontally.13 m 2 559
Galvanised hoop iron cramps, ties, etc.:
2mm Thick galvanised hoop iron tie 38 x 750mm long with one end shot pinned to concrete and the other end built into brickwork.
14
No 294
'Fabcon' prestressed fabricated lintels:
110 x 75mm Lintels in lengths not exceeding 3m.15 m 120
Pair of 110 x 75mm Lintels in lengths not exceeding 3m.16 m 75
FACE BRICKWORK
Face bricks (Allow a Prime Cost Amount of R4000,00/1000 NETT delivered to site) pointed with recessed horizontal and vertical joints as the work proceeds:
Extra over stock brickwork for facings in stretcher bond and pointing.
17m² 956
Extra over brickwork for brick-on edge header course lintel in 280mm cavity wall pointed on face.
18m 25
Extra over brickwork for 230mm wide projecting sill set sloping composed of one course of facings on edge, pointed on top, front edge and narrow projecting soffit including splay cutting, etc.
19
m 101
Bagging of 1:3 cement and sand mixture on:
Brick surfaces.20 m² 135
Section No. 1
Carried to Collection R
Bill No. 4
Masonry
21
Obp Vaccine Plant - Principal Contract
BTK606
Amount
MASONRY
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 4
Page No
COLLECTION
20Brought Forward from Page
21
Section No. 1
Carried To Section Summary R
Bill No. 4
Masonry
22
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
WATERPROOFING
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 5
Location Description:Key:
BT Block T
BM Block M
BN Block N
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
DAMPROOFING OF WALLS AND FLOORS
One layer of 375 micron 'Consol Plastics Brickgrip DPC' embossed damp proof course sealed at all edges and junctions:
Laid horizontally and built under walls, cills, etc.1 m² 558
One layer of 250 micron 'Consol Plastics USB Green' waterproof sheeting sealed at laps with 'Gunplas Pressure Sensitive Tape':
Laid on filling to receive concrete surface bed and maintaining in position during concreting.
2m² 2 060
WATERPROOFING OF CORRUGATED ROOFS:
Prepare existing corrugated iron roof sheeting and prime with ABE water based metal etch primer and apply "A.B.E. super laycryl" liquid waterproofing compound including approved saturation membrane, all in strict accordance with the manufacturers instructions, to corrugated roof sheeting for the sealing of joints, laps and roofing screws.
3
m² 2 703
Section No. 1
Carried to Collection R
Bill No. 5
Waterproofing
23
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
WATERPROOFING TO ROOFS, BASEMENT, ETC.
The Contractor shall allow in his rates for testing the waterproofing for water tightness by ponding the waterproofed surfaces for a period of at least 48 hours before application of the protection layer. Should any leaks occur the contractor shall remedy them at his own expense.
The Contractor shall furnish and lodge a 10 year maintenance-free waterproofing guarantee for all the waterproofing.
Prime and apply 4mm thick 'Derbigum SP' torch on fully bonded waterproofing membrane laid strictly in accordance with the manufaturer's instruction with 75mm side laps and 100mm end laps including all cutting and waste to:
On floors, channels, etc.4 m² 72
On screeded roof slabs to falls.5 m² 245
On vertical parapet walls, etc.6 m² 111
Flashing strip 150mm girth at turn-ups including sealing top edge into groove with mastic sealant.
7m 200
PROTECTIVE DRESSING AND PAINT
Two coats bituminous aluminium paint on:
Waterproofing to roofs, beams etc.8 m² 357
JOINT SEALANTS, ETC.
'ABE Flexothane G' two part polyurethane sealing compound including priming surfaces, backing strips, etc. all in accordance with the manufacturer's instructions to:
10 x 10mm expansion joints in floors including raking out expansion joint filler as necessary.
9m 294
20 x 20mm expansion joints in floors including raking out expansion joint filler as necessary.
10m 197
10 x 10mm isolation joints between surface beds and walls, columns, etc. including raking out expansion joint filler as necessary.
11
m 108
'Duraflex 2' component epoxy polysulphide sealant including priming surfaces, backing strips, etc. all in accordance with the manufacturers specification:
6 x 35mm thick vertical expansion joint in floors including raking out filler as necessary.
12m 69
Section No. 1
Carried to Collection R
Bill No. 5
Waterproofing
24
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
'Pro-Struct 748', non-moving epoxy joint sealant including cutting all existing concrete in the sub-base through the epoxy/polyurethane flooring system (elsewhere measured).
3 x 30mm Saw cut joints in floors.13 m 192
Section No. 1
Carried to Collection R
Bill No. 5
Waterproofing
25
Obp Vaccine Plant - Principal Contract
BTK606
Amount
WATERPROOFING
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 5
Page No
COLLECTION
23Brought Forward from Page
24
25
Section No. 1
Carried To Section Summary R
Bill No. 5
Waterproofing
26
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
ROOF COVERINGS
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 6
Location Description:Key:
BT Block T
BM Block M
BN Block N
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
Guarantees
Roof sheeting shall be laid in strict accordance with the manufacturer's specification by an approved contractor. A written and approved five year guarantee for workmanship and watertightness shall be issued after final inspection of the roofs by the manufacturer of the sheeting.
PROFILED METAL SHEETING AND ACCESSORIES
Flashings shall be manufactured from Chromadeck Zincalume AZ150 0.53mm coated steel with finishing to both sides (as above) and fixed by way of S10 brackets or, Sliding brackets at apex where roof sheets are 30m or longer, all in strict accordance with manufacturer’s specification.:
Roof covering with pitch not exceeding 25 degrees.1 m² 1 352
Labour bending down ends of roof sheeting.2 m 144
Section No. 1
Carried to Collection R
Bill No. 6
Roof Coverings
27
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
SHEET METAL FLASHINGS, LININGS, COPINGS, ETC.
Flashings shall be manufactured from Chromadeck Zincalume AZ150 0.53mm coated steel with finishing to both sides (as above) and fixed by way of S10 brackets or, Sliding brackets at apex where roof sheets are 30m or longer, all in strict accordance with manufacturer’s specification.:
Headwall flashing 375mm girth including counter flashing 185mm girth, stop ending sheeting and broad flute polycloser.
3
m 72
Corner trim 550mm girth at external angle fixed along both edges to vertical sheeting.
4m 58
Gable flashing 550mm girth, fixed along sheeting at 200mm centres.
5m 48
Valley flashing 550mm girth, fixed along sheeting at 200mm centres.
6m 40
Gutter flashing size overall 152mm girth and two times bent.
7m 144
Drip flashing size overall 231mm girth and three times bent.
8m 144
Ridge capping 500mm girth fixed to roof sheeting including flush stop ending sheeting, polyclosers and broad flute metal closers on both sides.
9
m 78
ROOF INSULATION
Non Combustible, lightweight "Factorylite" building insulation with reinforced foil face to both sides:
100mm Thick roof insulation laid taut over purlins including galvanised straining wire at 300mm centres and with overlapping foil edges to be stapled together, all in accordance with the manufacturer's specifications.
10
m² 2 724
RAINWATER DISPOSAL
2mm thick Galvanised mild steel:
300 x 125mm Deep gutter.11 m 195
125mm diameter rainwater downpipe.12 No 123
Extra over 125mm diameter cut out for and including outlet.
13No 26
Extra over gutter for stopped ends.14 No 28
Section No. 1
Carried to Collection R
Bill No. 6
Roof Coverings
28
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Extra over 125mm diameter rainwater downpipe for shoe.
15No 26
Extra over 125mm diameter rainwater downpipe for 90 degree bend.
16No 24
Apply one prime coat of Plascon epoxy tar EPD100, second coat of EPD112 and final coat EPD100, applied to a thickness of 90 microns or similar to SANS 1200H system index 080, in strict accordance with the manufacturer's instructions to:
Inside of gutters.17 m² 165
BUDGETARY ALLOWANCE
Allow the Budgetary Allowance of R 5000,00 (Five Thousand Rand) for Full Bores to Plant Rooms to be used as directed by the Principal Agent and to be deducted in whole or in part if not required.
18
Item 005 000
Section No. 1
Carried to Collection R
Bill No. 6
Roof Coverings
29
Obp Vaccine Plant - Principal Contract
BTK606
Amount
ROOF COVERINGS
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 6
Page No
COLLECTION
27Brought Forward from Page
28
29
Section No. 1
Carried To Section Summary R
Bill No. 6
Roof Coverings
30
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
CARPENTRY AND JOINERY
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 7
Location Description:Key:
BT Block T
BM Block M
BN Block N
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
DOORS
40mm Thick hollow core timber door suitable for painting hung to steel frames (elsewhere).
Door, size 813 x 2032mm high.1 No 12
40mm Thick semi solid timber door faced one side with tempered masonite and the other side, suitable for painting and hung to steel frames (elsewhere).
Door size 813 x 2032mm high.2 No 18
Ditto, but double door size 1800 x 2032mm high.3 No 9
40mm Thick solid core flush panel timber door with with a core of solidly packed chipboard or timber strips with 3mm thick tempered masonite both sides and concealed edges, suitable for painting and hung to steel frames (elsewhere).
Door size 813 x 2032mm high.4 No 6
Ditto, but double door size 1800 x 2032mm high.5 No 7
Section No. 1
Carried To Section Summary R
Bill No. 7
Carpentry And Joinery
31
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
IRONMONGERY
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 8
Location Description:Key:
BT Block T
BM Block M
BN Block N
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
P.C. AMOUNTS
Allow the Prime Cost Amount of R100 000.00 (One Hundred Thousand Rand) NETT, for Ironmongery, etc. supplied and delivered to site.
1
Item 00100 000
Allow for profit on above if required.2 Item
Take delivery, store and later fix complete the following ironmongery (Labour only):
Locks:
Cylinder lockset.3 No 51
Ditto, but including rebate conversion set.4 No 52
Handles:
Lever handles.5 Pairs 67
Push plates and kicking plates:
Kick plates.6 No 12
Push plates.7 No 12
BATHROOM FITTINGS
20mm Diameter chromium plated towel rail 600mm long including flanged end brackets plugged and screwed to wall.
8
No 6
Section No. 1
Carried to Collection R
Bill No. 8
Ironmongery
32
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
32mm Diameter stainless steel grab rail 600mm long twice bent with 5 x 75mm diameter flange welded at both ends three times holed for and rawl bolted to wall.
9
No 6
Chromium plated two roll toilet roll holder, plugged10 No 12
Soap dispenser, plugged11 No 6
Paper towel dispenser, plugged12 No 6
Chromium plated coat hook13 No 6
Sundries:
Padlocks.14 No 15
End of labour only items.
Section No. 1
Carried to Collection R
Bill No. 8
Ironmongery
33
Obp Vaccine Plant - Principal Contract
BTK606
Amount
IRONMONGERY
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 8
Page No
COLLECTION
32Brought Forward from Page
33
Section No. 1
Carried To Section Summary R
Bill No. 8
Ironmongery
34
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
METALWORK
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 9
Location Description:Key:
BT Block T
BM Block M
BN Block N
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
Descriptions of bolts shall be deemed to include nuts and washers.
Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete.
Metalwork described as holed for bolt(s) shall be deemed to exclude the bolts unless otherwise described.
SUNDRY STEELWORK
Slab bearing angles:
100 x 100 x 8mm Thick galvanised angle section mild steel bearer holed at 450mm centres and fixed with and including 16mm diameter rawl bolts to concrete.
1
m 180
Floor channels:
'Mentis RS40' Hot dipped galvanised storm water floor grating fully banded and formed of 50 x 4,5 bearers laid loose in framing.
2
m² 15
'Mentis RS40' Hot dipped galvanised storm water floor grating fully banded and formed of 30 x 4,5 bearers laid loose in framing.
3
m² 45
30 x 30 x 5mm Thick galvanised angle section mild steel framing complete with 25 x 5mm thick x 100mm long fishtail lugs welded on at 500mm centres including casting into concrete.
4
m 18
Section No. 1
Carried to Collection R
Bill No. 9
Metalwork
35
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
40 x 40 x 5mm Thick galvanised mild steel angle section framing complete with 25 x 3mm thick x 100mm long fishtail lugs welded on at 400mm centres including casting into concrete beam.
5
m 12
STEEL HANDRAILS, BALUSTRADES, ETC
Welded handrails to:
Balustrade with 50mm internal diameter top and bottom rail filled in with 20mm round bar baluster and hollow mild steel post on 100 x 100x 5mm base plate fixed to floor with four of 10mm rowl bolts and 25mm diamter horizontal section.
6
m 75
Ditto, but sloping.7 m 30
PRESSED STEEL DOORS FRAMES
1,6mm Thick double rebated frame suitable for 115mm brick wall 1 and 1/2 x pair standard mild steel hinges and shock absorbers in rebate:
Door size 813 x 2032mm high.8 No 12
1,6mm Thick double rebated frames suitable for 230mm brickwall 1 and 1/2 x pair standard mild steel hinges and shock absorbers in rebate:
Door size 813 x 2032mm high.9 No 24
Door size 1800 x 2032mm high10 No 16
ROLLER SHUTTERS, ETC.
Manually operated slatted roller shutter door with powdercoated mild steel 75mm x 1mm thick interlocking slats with 2.5mm holes x 4mm pitch to form curtain of roller shutter door complete, with powdercoated mild steel channel framing, with and including 'T' section fitted to bottom rail of roller shutter door and accessories fixed in accordance with manufacuterer's specification.
Opening size 3000mm x 4500mm high.11 No 3
FIRE DOORS AND FRAMES
Standard SABS 'Class A' fire door to provide 1hr stability with Masonite finish both sides and two concealed edges suitable for painting, including 1,6mm thick mild steel double rebate frame to suit 280mm thick cavity wall and standard mild steel hinges and shock absorbers in rebate with and including all ironmongery.
Door size 813 x 2032mm high.12 No 3
Section No. 1
Carried to Collection R
Bill No. 9
Metalwork
36
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Ditto, but double door size 1800 x 2032mm high.13 No 6
PRESSED STEEL TRANSFORMER ROOM DOORS AND FRAMES
Standard high pressed mild steel transformer room door and frame unit, type H.V., including vent and vermin proofing, and fitted with the manufacturers standard ironmongery.factory primed with one coat red oxide undercoat:
Standard single leaf door and frame, Type HV, size overall 914 x 2438mm high.
14No 1
Standard double leaf door and frame, Type DV, size overall 1829 x 2438mm high.
15No 1
STEEL STRONGROOM DOORS, VENTILATORS, ETC.
Two Hour fire rated strongroom doors etc suitable for 230mm walls fixed to brickwork.
The following door shall be provided with two keys which shall not be delivered with the door, but are to be properly labeled and handed to the Principal Agent.
'Mutual Model DS - 70mm SABS CAT 2 ADM' or similar approved strongroom door and frame with a mass of 630kg size overall 1050 x 1950mm high, built into brickwork complete with ironmongery and doorstop.
16
No 2
Double ended strongroom ventilator.17 No 8
LOUVRES
Fixed Natural anodized aluminium ventilation louvre grill units plugged and screwed to brick walls with and including vermin proofing:
Louvres size 3300 x 450mm high.18 No 18
Louvres size 2100 x 1000mm high.19 No 4
Louvres size 1075 x 3100mm high.20 No 2
Louvres size 3300 x 3300mm high.21 No 6
Section No. 1
Carried to Collection R
Bill No. 9
Metalwork
37
Obp Vaccine Plant - Principal Contract
BTK606
Amount
METALWORK
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 9
Page No
COLLECTION
35Brought Forward from Page
36
37
Section No. 1
Carried To Section Summary R
Bill No. 9
Metalwork
38
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
PLASTERING
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 10
Location Description:Key:
BT Block T
BM Block M
BN Block N
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
MAKING GOOD OF FINISHES, ETC.
Preparatory work to exisitng floors 'Pavelite' or similar approved, applied strictly in accordace with manufacturer's instructions:
On floors.1 m² 2 163
SCREEDS
Wood floated screeds on concrete:
25mm Thick on floors and landings.2 m² 156
25mm Thick on roofs to falls.3 m² 110
25mm Thick on treads and risers of stairs including reedings.
4m² 45
50mm Thick on floors.5 m² 2 163
75 x 75mm Triangular shaped fillet.6 m 366
Ditto, but size 100 x 100mm.7 m 120
EXTERNAL PLASTER
One coat cement plaster finished smooth with a wood float:
Brick vertical surfaces.8 m² 438
Plaster in patches.9 m² 180
In narrow widths.10 m² 15
Section No. 1
Carried to Collection R
Bill No. 10
Plastering
39
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
INTERNAL PLASTER
One coat cement plaster finished smooth with a steel trowel on:
Brick vertical surfaces.11 m² 1 536
One coat cement plaster and one coat gypsum plaster finished smooth with a steel trowel:
On brick vertical surfaces.12 m² 1 335
On concrete vertical surfaces.13 m² 90
On raking soffits of concrete stairs.14 m² 24
On soffits of landing slabs.15 m² 15
In narrow widths.16 m² 9
PLASTER SUNDRIES
Covings, skirtings, roundings, etc.:
1:3 Coved cement mortar rounding, at junction of walls (vertically), approximately 50 to 65mm radius all to smooth finish.
17
m 219
Ditto, but at junction of walls and ceilings.18 m 75
Ditto, but at junction of walls and floor and at approximately 100mm radius.
19m 36
Section No. 1
Carried to Collection R
Bill No. 10
Plastering
40
Obp Vaccine Plant - Principal Contract
BTK606
Amount
PLASTERING
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 10
Page No
COLLECTION
39Brought Forward from Page
40
Section No. 1
Carried To Section Summary R
Bill No. 10
Plastering
41
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
GLAZING
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 11
Location Description:Key:
BT Block T
BM Block M
BN Block N
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
MIRRORS, ETC:
6mm Silvered float glass copper backed mirrors with polished edges holed for and fixed with chromium plated dome capped mirror screws with rubber buffer to plugs in brickwork or concrete:
Mirror, size 600 X 1200mm high, with four chromium plated dome capped screws.
1No 12
BUDGETARY ALLOWANCES
Allow a budgetary allowance of R 150 000,00 (One Hundred and Fifty Thousand Rand) NETT, to repair exisitng windows to be used as directed by the Principal Agent and to be deducted as whole or in part if not required.
2
Item 00150 000
Section No. 1
Carried To Section Summary R
Bill No. 11
Glazing
42
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
PAINTWORK
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 12
Location Description:Key:
BT Block T
BM Block M
BN Block N
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
PAINT TO EXISTING WORK
Surfaces shall be thoroughly washed down and allowed to dry completely before any paint is applied. Blistered or peeling paint shall be completely removed.
All cracks and crevices in timber shall be primed and filled with a suitable filler and finished smooth.
CLEANING DOWN OF EXISTING FACEBRICK
Prepare and apply "Mortar Lift" or equal approved product and wash down with a high pressured water hose to:
External face brickwork.1 m² 1 026
Ditto, but internally. 2 m² 1 026
EXTERNAL WALLS, CEILINGS, ETC
Prepare as specified and apply one coat of fillercoat to newly plastered areas, apply two finishing coats acrylic PVA paint on:
Plastered walls, columns, fins etc.3 m² 2 553
Plastered cills.4 m² 90
Plastered soffits.5 m² 285
Concrete lintols.6 m² 492
Section No. 1
Carried to Collection R
Bill No. 12
Paintwork
43
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
ON METAL.
Spot priming and defects in pre-primed surfaces with 'Plascon Namelocate Synthetic Metal' and apply one coat 'Plascon Merit Universal Undercoat' and two coats 'Plascon Super Universal Enamel' paint on steel:
On door frames.7 m² 48
On Windows (both sides measured).8 m² 666
Burglar bars.9 m² 666
Louvres.10 m² 126
150mm diameter steel pipe.11 m² 108
Prepare surfaces and remove all loose material, dust, grease, salts and contamination with degreaser, rinse and apply one coat undercoat and two coats 'Plascon Roof Paint' (Colour TBA) high gloss enamel paint on steel on:
Roof sheeting.12 m² 1 710
Gutters, downpipes etc.13 m² 189
ON WOOD
Stop, fill, sand down and prepare wood surfaces and apply one coat wood primer, one coat universal undercoat and two coats matt polyurethene enamel paint on:
Doors.14 m² 180
PAINT TO NEW WORKS ETC
ON CONCRETE
Prepare concrete surface to remove laitance and provide a key, prime prepared areas with 'Pro-Struct 639', reprime 'dry' spots and apply 'Stonlux' SL/SA, self smoothing epoxy screed to a nominal thickness of 4mm all in accordance to the manufacture's detailed specification as supplied by 'Stonecor Africa (Pty) Ltd' (011) 254-5500 on:
Floors.15 m² 53
Section No. 1
Carried to Collection R
Bill No. 12
Paintwork
44
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
ON FLOATED PLASTER
Prepare and apply one coat approved primer, stop and apply two coats high gloss enamel paint applied in strict accordance with the manufacturers instructions on:
Plastered walls.16 m² 1 536
Ditto, but columns.17 m² 30
Plastered soffits.18 m² 36
Ditto, but raking soffits and sides.19 m² 18
Coved roundings at junctions of walls (vertical) not exceeding 300mm girth.
20m 102
Ditto, but at junction of walls and ceilings.21 m 66
One coat alkali resistance primer, one coat superior quality acrylic emulsion paint for interior and exterior use and one coat pure acrylic smooth ripple paint applied with a stipple roller on:
Plastered walls22 m² 96
Prepare and apply one coat approved primer, stop and apply two coats, epoxy paint applied in strict accordance with the manufacturers instructions on:
Plastered walls.23 m² 165
ON PLASTERBOARD
Prepare and apply one coat of Plascon Merit Plaster primer, stop and apply two coats Plascon Double Velvet (Vel)paint on:
Partitions.24 m² 180
Ceilings and bulkheads.25 m² 1 112
ON METAL
Prepare surfaces and remove all loose material, dust, grease, salts and contamination with degreaser, rinse and apply one coat red oxide metal primer, one coat universal undercoat and two coats matt polyurethane enamel on:
Pressed steel door frames.26 m² 75
Section No. 1
Carried to Collection R
Bill No. 12
Paintwork
45
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Spot priming defects in pre-primed surfaces with one coat calcium plumbate primer, one coat universal undercoat and two finishing coats Alkyd base enamel paint to Architects colour specification on:
Structural steel members.27 Tonnes 30,00
Prepare and apply one coat intumescent paint on:
Structural steel members.28 Tonnes 36,00
Prepare surfaces and remove all loose material, dust, grease, salts and contamination with degreaser, rinse and apply two coats Promorust and one coat universal undercoat and two coats Prosab Gloss enamel paint on:
Mesh screens, grilles, gates, balustrading, etc.29 m² 72
Prepare surfaces and remove all loose material, dust, grease, salts and contamination with degreaser, rinse and apply one coat undercoat and two coats 'Plascon Roof Paint' (Colour TBA) high gloss enamel paint on steel on:
Roof sheeting.30 m² 1 031
ON WOOD
Stop, fill, sand down and prepare wood surfaces and apply one coat wood primer, one coat universal undercoat and two coats matt polyurethene enamel paint on:
Doors.31 m² 273
Section No. 1
Carried to Collection R
Bill No. 12
Paintwork
46
Obp Vaccine Plant - Principal Contract
BTK606
Amount
PAINTWORK
SECTION NO. 1
Builders Work - Phase 1
BILL NO. 12
Page No
COLLECTION
43Brought Forward from Page
44
45
46
Section No. 1
Carried To Section Summary R
Bill No. 12
Paintwork
47
Obp Vaccine Plant - Principal Contract
BTK606
Amount
SECTION NO. 1
Builders Work - Phase 1
SECTION SUMMARY
Bill No.
Page
101 ALTERATIONS
132 EARTHWORKS
193 CONCRETE, FORMWORK AND REINFORCEMENT
224 MASONRY
265 WATERPROOFING
306 ROOF COVERINGS
317 CARPENTRY AND JOINERY
348 IRONMONGERY
389 METALWORK
4110 PLASTERING
4211 GLAZING
4712 PAINTWORK
Section No. 1
Carried to Final Summary R
SECTION SUMMARY
48
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
ALTERATIONS
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 1
Location Description:Key:
BL Block L
BO Block O
BS Block S
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
VISIT TO SITE
Tenderers are to visit the site and satisfy themselves as to the nature of the work to be done, extent of the works on site and making good to be done, the conditions of the existing buildings, working conditions, etc., as no liability whatsoever will be admitted in respect of errors in the Contractor's tender due to the foregoing.
WORK AND MATERIALS
The work to be done and materials to be used in the works on site are to be similar to those specified in the new work in so far as they apply.
All rubble and debris from the pulling down are to be carted away without delay and the site is to be left clean and unencumbered.
Where existing items of work is to be removed or demolished, those items of work should be deemed to be discarded unless otherwise stated.
DEMOLITIONS
Where walls are described as being demolished, doors, door frames and the finishes to both sides shall be deemed to be included. Where floor finishes are described as being removed the mortar bed under or screed shall be deemed to be included.
All demolition work shall be carried out in accordance with the local By-laws and to the requirements of the Local Health Authorities.
Section No. 2
Carried to Collection R
Bill No. 1
Alterations
49
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
WATER, ETC.
The Contractor shall allow for watering the works with a jet or spray from a hose sufficiently to prevent any nuisance from dust.
TEMPORARY COVERINGS, SCREENS, ETC.
The Contractor shall supply, erect and maintain in position as required any temporary coverings to protect the existing work and property from damage and inclement weather during the progress of the works. The Contractor will be held responsible for any damage to property or goods in the existing buildings due to his not having taken adequate precautions, and all damage caused shall be made good at his own expense. He must allow for providing all necessary plastic or wood framed screens, partitions, tarpaulin, barriers, etc., to protect the work and prevent any nuisance from dust as may be required or directed.
DAMAGE TO PERSONS OR PROPERTY
The Contractor will be held responsible for any damage to persons or property and for the safety of the structures and he shall allow for protecting and indemnifying persons using the existing buildings from injury and by virtue of building operations, including providing necessary barriers, signs, etc.
MAKING GOOD
Prices of all work described throughout these Bills of Quantities shall include for making good, in all trades except Painting, unless otherwise described.
The Contractor must make good to existing work damaged or disturbed through alterations and to existing work remaining after doors, windows, screens, fittings, walls, etc., are removed, by fitting in short lengths of skirtings, architraves, etc., and making good suspended ceilings and floors on necessary joists, etc., plaster finishes to walls and ceilings and rendering floor tiles, etc., to floors and for facing up walls, with brickwork, cut, toothed and bonded to existing work with facing bricks, quarry tiles or common brickwork to receive finishings, unless otherwise described.
All new materials used in making good are to match existing and the works shall be left complete and perfect in every respect.
Section No. 2
Carried to Collection R
Bill No. 1
Alterations
50
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
PULLING DOWN
Pulling down walls, piers, etc., shall include for dead shoring under existing concrete slabs, beams, roof members, etc., for pulling down face brick, tiled or plastered walls and concrete beams or lintols occuring in same, for removing skirtings, quadrants, cornices, etc., fixed to same for hacking up flooring in openings and making good as previously described to walls, floors, ceilings, etc., unless otherwise described.
CUTTING THROUGH, ETC.
Cutting away from, breaking or cutting through shall include for neatly cutting through brick or concrete walls, floors, skirtings, etc., leaving ends fair or preparing ends for extensions, for facing up jambs, reveals, etc., with brickwork cut toothed and bonded to existing and for flushing up concrete jambs, reveals, etc., in cement mortar.
BUILDING IN
Building in new or reused doors, windows, etc., into formed openings in existing brick or concrete walls shall include for wedging up, cutting mortices for and running in lugs in 3:1 cement mortar or for plugging and screwing as necessary, and bedding and pointing all round frame in cement mortar.
JUNCTION OF NEW AND EXISTING
Making good at the junction of new and existing work shall include for piercing out, cutting through or removing short lengths of existing material, for supplying short lengths of new material and for jointing to match existing.
EXISTING AND ADJOINING BUILDINGS, ETC.
In taking down and removing existing work the utmost care must be observed to avoid any structural or other damage to the remaining portions of the building or adjoining buildings, boundary walls, pavings, roadways, etc., and the Contractor shall provide all shoring, needling, strutting, etc., to ensure the stability of all structures during demolition or alteration work. The Contractor must cover up and protect from damage all work not removed and must make good at his own expense any damage that may occur.
HOARDING
Tenders are reffered to the specification for Hoarding before pricing the following items:
The following temporary hoarding shall be erected in sections as required and removed on instruction of the Principal Agent.
Section No. 2
Carried to Collection R
Bill No. 1
Alterations
51
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
The erected hoarding is to be maintained in a condition acceptable to the Principal Agent throughout the duration of the contract.
On completion of this contract, the hoarding must be handed over to the main contractor.
0.5mm Galvanized IBR sheeting including priming and painting to an approved colour, 2,40m high fixed to and including 51 x 76mm sawn South African Pine top, middle and bottom rails with 150mm diameter trimmed gumpole posts at 3000mm centres, fixed into movable concrete bases, including all vehicular and pedestrian access gates.
1
m 225
Carefully take down and re-erect hoarding (previosuly measured) where instructed, comprising painted IBR sheeting, etc., including making good paintwork, etc.
2
m 225
Carefully take down and remove IBR hoarding (previously measured).
3m 281
Shade cloth hoarding, 2.8m high, fixed to and including 51 x 76mm sawn South African Pine top, middle and bottom rails with 150mm diameter trimmed gumpole posts at 3000mm centres, fixed into movable concrete bases including all vehicular and pedestrian access gates.
4
m 113
Carefully take down and re-erect hoarding (previosuly measured) where instructed, comprising shade cloth hoarding, etc., including making good where necessary, etc.
5
m 113
Carefully take down and remove shade cloth hoarding (previously measured)..
6m 113
Drywall barrier of galvanised steel channel section rails and studs covered on one side (Outside) with 12,7mm Gypsum plasterboard and finished with two (2) coats interior quality PVA emulsion paint, including corners, ends, access doors etc. (Merchandising will be applied to the barrier) Remove after completion.
7
m² 126
Carefully take down and re-erect hoarding (previosuly measured) where instructed, comprising drywall hoarding, etc., including making good where necessary, etc.
8
m 126
Carefully take down and remove drywall hoarding (previously measured).
9m 126
Section No. 2
Carried to Collection R
Bill No. 1
Alterations
52
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Demolish and remove:
Gut complete exisitng rectangular shaped single storey building (BLOCK L) size overall approximately 47,400mm x 12,660mm on plan, comprising of all internal structures: brickwork, parititions, ceiling, floor covering etc, and include Asbestos which must comply with all regulations, including sealing off all electrical, fire and plumbing services and making good facebrick of perimeter walls where necessary, all in accordance with the Architects drawing no. 21363 00 – 201.02 Rev A.
10
No 1
Gut complete exisitng rectangular shaped single storey building (BLOCK O) size overall approximately 47,400mm x 13,030mm on plan, comprising of all internal structures: brickwork, parititions, ceiling, floor covering etc, and include Asbestos which must comply with all regulations, including sealing off all electrical, fire and plumbing services and making good facebrick of perimeter walls where necessary, all in accordance with the Architects drawing no. 21363 00 – 201.02 Rev A.
11
No 1
Gut complete exisitng rectangular shaped single storey building (BLOCK S) size overall approximately 15,080mm x 11,650mm on plan, comprising of all internal structures: brickwork, parititions, ceiling, floor covering etc, and include Asbestos which must comply with all regulations, including sealing off all electrical, fire and plumbing services and making good facebrick of perimeter walls where necessary, all in accordance with the Architects drawing no. 21363 00 – 201.02 Rev A.
12
No 1
Break up and remove:
80 x 150mm Concrete kerbs and haunching.13 m 5
Bituminous premix road surfacing including layerworks to a depth of 300mm deep.
14m² 10
Brick pavers including sub base.15 m² 14
REMOVAL OF EXISTING WORK
Breaking up and removing concrete components,etc, carting away broken material and making good surface to receive new surface.
Steps, etc.16 m³ 5
650mm High x 2200mm wide x 1080mm long reinforced concrete staircases attached to loading bay platform, executed complete.
17
No 2
Concrete plinths, bases, etc.18 m³ 4
Section No. 2
Carried to Collection R
Bill No. 1
Alterations
53
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
200mm Thick aprons, paving, etc.19 m² 35
Surface beds.20 m³ 1 580
Slabs.21 m³ 7
Beams.22 m³ 7
Breaking down and removing brickwork, etc.:
Half brick walls.23 m² 55
One brick walls.24 m² 34
Chasing 50mm wide into brickwork.25 m² 336
Chasing 100mm wide into brickwork.26 m² 264
Taking out and removing sundry metalwork:
Steel single door frame for door size 813mm x 2032mm high in one brick wall.
27No 12
Ditto, but for double door, size approximately 1500 x 2032mm.
28No 5
Taking out and removing doors, windows, etc., from brickwork:
Timber single door and frame, size 813 x 2032mm high overall from one brick wall including all ironmongery, etc.
29No 9
Timber double door and frame, size 1800 x 2032mm high overall from one brick wall including all ironmongery, etc.
30
No 2
Steel windows including glazing not exceeding 2.5m2.31 No 18
Ditto, exceeding 2.5m2 but not exceeding 5m2.32 No 7
Airbricks.33 No 14
Take out and remove doors, windows, sills, etc and build up openings in brick walls including making good cement plaster on both sides (making good paintwork elsewhere) :
Timber single leaf door and steel frame 813 x 2032mm high overall from one brick wall.
34No 5
Ditto but steel door and frame.35 No 2
Timber double leaf door and steel frame 1800 x 2032mm high overall from one brick wall.
36No 5
Glazed steel windows not exceeding 2,5m² from one brick wall.
37No 3
Section No. 2
Carried to Collection R
Bill No. 1
Alterations
54
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Ditto, exceeding 2,5m² but not exceeding 5m².38 No 3
Take out and remove doors, windows, sills, etc and build up openings in brick walls including making good face brickwork on one side and cement plaster on other side (making good paintwork elsewhere) :
Timber single leaf door and frame 813 x 2032mm high from one brick wall.
39No 9
Ditto, but steel door and frame. 40 No 5
Glazed steel windows not exceeding 2,5m² from one brick wall.
41No 106
Ditto, exceeding 2,5m² but not exceeding 5m².42 No 9
Taking down and removing roofs, floors, panelling, ceilings, partitions, etc.:
Plasterboard ceilings including cornices from brandering, preparing branders for new, etc. (New elsewhere)
43m² 69
Acoustic tile suspended ceilings, including cornices, suspension grid, hangers, etc.
44m² 46
Drywall partitions upt to 3m high, including doors, glazed borrowed lights, etc.
45m 35
Take out and remove fitted joinery fittings, etc.:
Timber floor unit, size approximately, 1100mm high x 600mm deep, including bearers, cleats, shelves, doors and countertops.
46
m 2
Taking out and removing sundry joinery work:
75mm Timber skirtings from brickwork.47 m 138
Hacking up/off and removing floor and wall tile finishes, including removing mortar bed or backing:
Ceramic tiles from walls including preparing wall surface for new finish.
48m² 18
Ceramic tiles from floor including preparing floor surface for new finish.
49m² 28
CUTTING THROUGH FLOORS AND CEILINGS
Chasing 50mm wide x 40mm deep into concrete surface beds.
50m 110
Chasing 100mm wide x 40mm deep into concrete surface beds.
51m 83
Section No. 2
Carried to Collection R
Bill No. 1
Alterations
55
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
CORE DRILLING, PENETRATIONS, OPENINGS, ETC.
Core drilling through exisitng reinforced concrete slabs, floors, etc., with and including making good surrounding finish:
Core drill 50mm diameter opening.52 No 12
Ditto, but opening size approximately 100mm diameter.53 No 7
Ditto, but opening size approximately 200mm diameter.54 No 5
Removal of roof coverings, structure, etc.:
Metal sheet vertical or horizontal cladding including all fixings, framework, etc.
55m² 345
Metal sheet profiled bargeboard including all fixings, framework, etc.
56m 46
Metal sheet profiled bullnose including all fixings, framework, etc.
57m 58
Gutters, and Down pipes etc.58 m 198
BUILDING UP OPENINGS
Close up opening in one brick wall in patches including all cutting of toothing and bonding in new brickwork, propping, making good to existing finishes, etc.:
Half brick walls.59 m² 41
One brick walls.60 m² 51
CREATING OPENINGS IN EXISTING WALLS
Breaking out for and forming openings through brick walls including necessary precast concrete lintels and making good plaster on both sides and into reveals and with concrete thresholds with steel trowelled finish and building in frames and new doors (making good paintwork elsewhere):
813mm Wide x 2032mm opening for single door and frame.
61No 9
Breaking out for and forming openings through brick walls including necessary precast concrete lintels and making good plaster on both sides and into reveals and with concrete thresholds with steel trowelled finish and building in frames and new doors, making good plaster on one side and reveals, face brickwork on other side (paintwork elsewhere):
1788mm Wide x 2120mm opening for double door and frame including face brick to external facade.
62No 5
Section No. 2
Carried to Collection R
Bill No. 1
Alterations
56
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
4000mm Wide x 3200mm opening for roller shutter door and frame including face brick to external facade.
63No 2
PREPARATORY WORK TO EXISTING SURFACES
Cutting out joints of existing brickwork to receive plaster.64 m² 126
Clean and apply cement mixture ( 1 part water + 3 parts cement) to existing facebrick surface to receive new plaster (Measured elsewhere).
65
m² 69
Hack out brickwork and cut toothing to bond new half brickwall to existing brickwork.
66m 53
Hack out brickwork and cut toothing to bond new one brickwall to existing brickwork.
67m 83
MAKING GOOD OF FINISHES, ETC
Make good existing mortar joints in brickwork by re-jointing and pointing in cement mortar between existing brick joints to an average depth of 15mm (provisional).
68
m² 32
Rake out existing mortar to a depth of 15mm around 20mm diameter overflow pipe and point in new mortar.
69No 25
Making good cement screeds:
Floors where half brick walls removed.70 m 18
Floors where one brick walls removed.71 m 9
Making good internal cement plaster:
Walls in patches.72 m² 90
Walls where one brick walls removed.73 m² 147
Sundries:
Remove stop ends, clean and realign existing galvanised sheet iron gutters including making good any defective joints to junction of new and existing gutters from addition (measured elsewhere).
74
No 23
Section No. 2
Carried to Collection R
Bill No. 1
Alterations
57
Obp Vaccine Plant - Principal Contract
BTK606
Amount
ALTERATIONS
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 1
Page No
COLLECTION
49Brought Forward from Page
50
51
52
53
54
55
56
57
Section No. 2
Carried To Section Summary R
Bill No. 1
Alterations
58
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
EARTHWORKS
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 2
Location Description:Key:
BL Block L
BO Block O
BS Block S
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
EXCAVATION OTHER THAN BULK
Excavate in earth not exceeding 2m deep below filled, reduced or formed ground level for:
Reduced levels under floors1 m³ 30
Holes for column bases, etc.2 m³ 5
Ground beams, footings, etc.3 m³ 52
Ground beams, footings (in confined spaces).4 m³ 117
Channel, ducts, etc.5 m³ 7
Excavate in earth exceeding 2m and not exceeding 4m deep below filled, reduced or formed ground level for:
Holes for column bases, etc.6 m³ 7
Extra over excavation in earth for excavation in:
Soft rock.7 m³ 21
Hard rock.8 m³ 12
In concrete.9 m³ 7
Allow for the risk of collapse to sides of excavations in earth for:
Trench and hole excavations not exceeding 1,5m deep.10 m² 268
Section No. 2
Carried to Collection R
Bill No. 2
Earthworks
59
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
CARTING AWAY
Extra over all excavations for loading, carting and dumping surplus excavated material (no allowance made for increase in bulk):
Off site to a dumping site to be located by the Contractor.
11 m³ 116
EARTH FILLING, ETC.
Filling with selected material from the excavations (stock piled on site) and compacted in 150mm thick layers to a density of at least 93% Mod. AASHTO maximum density at +/- 1% OMC for:
Filling under holes, etc.12 m³ 12
Filling with selected material from the excavations and compacted in 150mm thick layers to a density of at least 95% Mod. AASHTO maximum density for:
Backfilling to trenches, holes, etc. 13 m³ 97
Filling with approved material supplied and carted onto site by the Contractor, compacted to a density of at least 95% Mod. AASHTO maximum density in:
150mm Thick sub-base layer of G7 material under surface beds, etc.
14m³ 222
Surface Preparation:
Compaction of ground surface, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod. AASHTO density.
15
m² 1 736
KEEPING EXCAVATIONS FREE OF WATER
Allow for keeping excavations free of all water, mud, etc. by hand or machinery.
16Item
Soil Poisoning:
Treat base course with an approved insecticide including forming and poisoning shallow furrows against foundation walls, etc. filling in furrows and ramming, all in accordance with the manufacturer's instructions.
17
m² 1 991
Section No. 2
Carried to Collection R
Bill No. 2
Earthworks
60
Obp Vaccine Plant - Principal Contract
BTK606
Amount
EARTHWORKS
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 2
Page No
COLLECTION
59Brought Forward from Page
60
Section No. 2
Carried To Section Summary R
Bill No. 2
Earthworks
61
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
CONCRETE, FORMWORK AND REINFORCEMENT
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 3
Location Description:Key:
BL Block L
BO Block O
BS Block S
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
SUPPLEMENTARY PREAMBLES
All work must be done in accordance to SABS 1200 and the structural engineers specifications.
Cost of tests:
The costs of making, storing and testing of concrete test cubes as required under clause 7 'Tests' of SABS 1200 G shall include the cost of providing cube moulds necessary for the purpose, for testing costs and for submitting reports on the tests to the Principal Agent. The testing shall be undertaken by an independent firm or institution nominated by the Contractor to the approval of the Principal Agent. (Test cubes are measured separately).
Formwork:
Descriptions of formwork shall be deemed to include use and waste only (except where described as left in or permanent), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for reconditioning as necessary before re-use.
The vertical strutting shall be carried down to such construction as is sufficiently strong to afford the required support without damage and shall remain in position until the newly constructed work is able to support itself.
Formwork to soffits of solid slabs etc., shall be deemed to be to slabs not exceeding 250mm thick unless otherwise described.
Section No. 2
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
62
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Formwork to sides of bases, pile caps, ground beams, etc., will only be measured where it is prescribed by the Engineer for design reasons. Formwork necessitated by irregularity or collapse of excavated faces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in Earthworks.
UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
10MPa/19mm Concrete in:
Surface blinding under footings and bases.1 m³ 9
Mass concrete under bases.2 m³ 5
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
25 MPa/19mm Concrete in:
Strip footings (in confined spaces).3 m³ 94
Ground beams.4 m³ 5
Raft foundations.5 m³ 24
Bases.6 m³ 5
Plinth.7 m³ 11
Floor channels.8 m³ 2
Floor slabs.9 m³ 244
Apron slabs to falls.10 m³ 25
Ramps.11 m³ 7
REINFORCED CONCRETE
25 MPa/19mm Concrete in:
Concrete infill to cavity.12 m³ 5
Stairs, landings, stair beams, etc.13 m³ 12
Slabs including beams and inverted beams.14 m³ 14
Roof slabs.15 m³ 17
Beams.16 m³ 34
30 MPa/19mm Concrete in:
Columns.17 m³ 7
Section No. 2
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
63
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
CONCRETE SUNDRIES
Test blocks:
Allow for making a set of three concrete test cubes in accordance with section 7 of SABS 1200G and sending to an approved testing authority for testing and paying all charges in connection therewith.
18
Sets 74
Finishing top surfaces of concrete smooth with a steel float to:
Surface beds laid in panels.19 m² 106
Apron slab laid in panels to falls.20 m² 168
Slabs.21 m² 106
Finishing top surfaces of concrete smooth with a wood float to:
Surface beds laid in panels. (accuracy 1).22 m² 1 721
Slabs (accuracy 1).23 m² 55
Grooves, channels, mortices, sinkings, etc. in concrete:
Thicken out edge of 85mm thick apron slab to a total thickness of 150mm and for a width of 250mm including one splayed side, all necessary excavation, surface preparation, additional concrete and formwork (formwork to exposed edges elsewhere measured).
24
m 113
Thicken out 170mm thick surface bed to a total thickness of 250mm and for a width of 760mm including one splayed side, all necessary excavation, surface preparation, additional concrete and formwork (formwork to exposed edges elsewhere measured).
25
m 168
20mm Diameter high tensile steel dowel bar 800mm long including drilling hole in existing concrete slab edge and grouting in with and including 'ABE Epidermix 395' epoxy adhesive.
26
No 37
25 MPa Non-shrink grout in:
Bedding approximately 50mm thick under 200 x 200mm base plate including chamfered edges all round, formwork, etc.
27
No 97
ROUGH FORMWORK (DEGREE OF ACCURACY II)
Rough Formwork to Sides of:
Ground beams.28 m² 51
Section No. 2
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
64
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Upstand beams.29 m² 122
Square or rectangular stub columns in foundations.30 m² 3
Sloping and stepped outer edges of stairs not exceeding 300mm high extreme.
31m 18
Edges, risers, ends and reavels not exceeding 300mm high or wide.
32m 315
Edges exceeding 300mm high.33 m² 14
Rough Formwork to Soffits of:
Slabs propped up exceeding 3.5m and not exceeding 5m high.
34m² 197
Slabs propped up exceeding 5m and not exceeding 6.5m high.
35m² 23
Slabs exceeding 250mm and not exceeding 500mm thick, propped up exceeding 1.5m and not exceeding 3.5m.
36
m² 12
Ditto, but propped up exceeding 3.5m and not exceeding 5m high.
37m² 18
Landing slabs.38 m² 9
Raking soffit of stairs.39 m² 14
SMOOTH FORMWORK (DEGREE OF ACCURACY 1)
Smooth formwork to sides of:
Square or rectangular columns exceeding 3.5m high but not exceeding 6.5m high.
40m² 7
MOVEMENT JOINTS, ETC.
10mm Thick isolation joint between concrete surface bed and walls or kerbs, filled in with 'Jointex' not exceeding 300mm high.
41
m 225
6mm Thick expansion joint between concrete slabs filled in with 'Jointex' not exceeding 300mm high including tacking to existing slab edge.
42
m 168
10mm Thick expansion joint in surface beds filled in with 'Jointex' not exceeding 300mm high including rounding top edges of joint to 3mm radius.
43
m 75
20mm Thick expansion joint in surface beds filled in with 'Jointex' not exceeding 300mm high including rounding top edges of joint to 3mm radius.
44
m 126
Section No. 2
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
65
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Machine cut open joint 3mm wide x 30mm deep in top of concrete surface bed including short lengths, etc.
45m 55
Toggle construction joint in 170mm thick concrete surface bed including all necessary formwork to edge, etc.
46
m 55
CONCRETE SUNDRIES
Stensons 'Tile Red Ferrafloor' methalic floor hardener at 13kg/m2 to surface bed area.
47m² 115
REINFORCEMENT
Mild steel reinforcement to structural concrete work in:
8mm Diameter bars.48 Tonnes 5,04
10mm Diameter bars.49 Tonnes 1,84
12mm Diameter bars.50 Tonnes 3,68
16mm Diameter bars.51 Tonnes 5,52
20mm Diameter bars.52 Tonnes 5,52
High tensile steel reinforcement to structural concrete work in:
10mm Diameter bars.53 Tonnes 4,76
12mm Diameter bars.54 Tonnes 5,52
16mm Diameter bars.55 Tonnes 5,52
20mm Diameter bars.56 Tonnes 5,52
25mm Diameter bars.57 Tonnes 5,52
32mm Diameter bars.58 Tonnes 5,52
Fabric reinforcement:
Type 193 fabric reinforcement in concrete surface beds, slabs, etc.
59m² 197
Type 395 fabric reinforcement in concrete surface beds, slabs, etc.
60m² 3 077
Section No. 2
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
66
Obp Vaccine Plant - Principal Contract
BTK606
Amount
CONCRETE, FORMWORK AND REINFORCEMENT
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 3
Page No
COLLECTION
62Brought Forward from Page
63
64
65
66
Section No. 2
Carried To Section Summary R
Bill No. 3
Concrete, Formwork And Reinforcement
67
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
MASONRY
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 4
Location Description:Key:
BL Block L
BO Block O
BS Block S
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
BRICKWORK IN FOUNDATIONS
Brickwork of NFX bricks (14 MPa nominal compressive strength) in Class I mortar in:
Half brick walls.1 m² 35
One brick walls.2 m² 84
BRICKWORK IN SUPERSTRUCTURE
Brickwork of NFX bricks (14 MPa nominal compressive strength) in Class I mortar in:
Half brick wall.3 m² 230
Half brick wall in lining to concrete.4 m² 69
One brick wall.5 m² 889
330mm Cavity wall formed of two half brick skins tied together with and including wire ties.
6m² 12
Piers.7 m³ 23
BRICKWORK SUNDRIES
Closing 50mm cavity of hallow wall horizontally with brickwork one brick wide at top of soffit for one course.
8m 9
Ditto, but on raking.9 m 9
Section No. 2
Carried to Collection R
Bill No. 4
Masonry
68
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Joint forming material in movement joints:
10mm Thick bitumen impregnated softboard expansion joint filling, built in vertically as the work proceeds, including all cutting and waste.
10
m² 281
10mm Thick 'Jointex' expansion joint filling not exceeding 300mm wide, built in vertically as the work proceeds, including all cutting and waste.
11
m 561
Brickwork reinforcement:
75mm Wide reinforcement built in horizontally.12 m 7 314
150mm Wide reinforcement built in horizontally.13 m 3 340
Galvanised hoop iron cramps, ties, etc.:
2mm Thick galvanised hoop iron tie 38 x 750mm long with one end shot pinned to concrete and the other end built into brickwork.
14
No 225
'Fabcon' prestressed fabricated lintels:
110 x 75mm Lintels in lengths not exceeding 3m.15 m 92
Pair of 110 x 75mm Lintels in lengths not exceeding 3m.16 m 77
FACE BRICKWORK
Face bricks (Allow a Prime Cost Amount of R4000,00/1000 NETT delivered to site) pointed with recessed horizontal and vertical joints as the work proceeds:
Extra over stock brickwork for facings in stretcher bond and pointing.
17m² 838
Extra over brickwork for brick-on edge header course lintel in 280mm cavity wall pointed on face.
18m 31
Extra over brickwork for 230mm wide projecting sill set sloping composed of one course of facings on edge, pointed on top, front edge and narrow projecting soffit including splay cutting, etc.
19
m 12
Bagging of 1:3 cement and sand mixture on:
Brick surfaces.20 m² 104
Section No. 2
Carried to Collection R
Bill No. 4
Masonry
69
Obp Vaccine Plant - Principal Contract
BTK606
Amount
MASONRY
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 4
Page No
COLLECTION
68Brought Forward from Page
69
Section No. 2
Carried To Section Summary R
Bill No. 4
Masonry
70
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
WATERPROOFING
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 5
Location Description:Key:
BL Block L
BO Block O
BS Block S
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
DAMPROOFING OF WALLS AND FLOORS
One layer of 375 micron 'Consol Plastics Brickgrip DPC' embossed damp proof course sealed at all edges and junctions:
Laid horizontally and built under walls, cills, etc.1 m² 439
One layer of 250 micron 'Consol Plastics USB Green' waterproof sheeting sealed at laps with 'Gunplas Pressure Sensitive Tape':
Laid on filling to receive concrete surface bed and maintaining in position during concreting.
2m² 1 736
WATERPROOFING OF CORRUGATED ROOFS:
Prepare existing corrugated iron roof sheeting and prime with ABE water based metal etch primer and apply "A.B.E. super laycryl" liquid waterproofing compound including approved saturation membrane, all in strict accordance with the manufacturers instructions, to corrugated roof sheeting for the sealing of joints, laps and roofing screws.
3
m² 1 923
Section No. 2
Carried to Collection R
Bill No. 5
Waterproofing
71
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
WATERPROOFING TO ROOFS, BASEMENT, ETC.
The Contractor shall allow in his rates for testing the waterproofing for water tightness by ponding the waterproofed surfaces for a period of at least 48 hours before application of the protection layer. Should any leaks occur the contractor shall remedy them at his own expense.
The Contractor shall furnish and lodge a 10 year maintenance-free waterproofing guarantee for all the waterproofing.
Prime and apply 4mm thick 'Derbigum SP' torch on fully bonded waterproofing membrane laid strictly in accordance with the manufaturer's instruction with 75mm side laps and 100mm end laps including all cutting and waste to:
On floors, channels, etc.4 m² 146
On screeded roof slabs to falls.5 m² 231
On vertical parapet walls, etc.6 m² 69
Flashing strip 150mm girth at turn-ups including sealing top edge into groove with mastic sealant.
7m 174
PROTECTIVE DRESSING AND PAINT
Two coats bituminous aluminium paint on:
Waterproofing to roofs, beams etc.8 m² 274
JOINT SEALANTS, ETC.
'ABE Flexothane G' two part polyurethane sealing compound including priming surfaces, backing strips, etc. all in accordance with the manufacturer's instructions to:
10 x 10mm expansion joints in floors including raking out expansion joint filler as necessary.
9m 225
20 x 20mm expansion joints in floors including raking out expansion joint filler as necessary.
10m 191
10 x 10mm isolation joints between surface beds and walls, columns, etc. including raking out expansion joint filler as necessary.
11
m 83
'Duraflex 2' component epoxy polysulphide sealant including priming surfaces, backing strips, etc. all in accordance with the manufacturers specification:
6 x 35mm thick vertical expansion joint in floors including raking out filler as necessary.
12m 53
Section No. 2
Carried to Collection R
Bill No. 5
Waterproofing
72
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
'Pro-Struct 748', non-moving epoxy joint sealant including cutting all existing concrete in the sub-base through the epoxy/polyurethane flooring system (elsewhere measured).
3 x 30mm Saw cut joints in floors.13 m 147
Section No. 2
Carried to Collection R
Bill No. 5
Waterproofing
73
Obp Vaccine Plant - Principal Contract
BTK606
Amount
WATERPROOFING
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 5
Page No
COLLECTION
71Brought Forward from Page
72
73
Section No. 2
Carried To Section Summary R
Bill No. 5
Waterproofing
74
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
ROOF COVERINGS
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 6
Location Description:Key:
BL Block L
BO Block O
BS Block S
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
Guarantees
Roof sheeting shall be laid in strict accordance with the manufacturer's specification by an approved contractor. A written and approved five year guarantee for workmanship and watertightness shall be issued after final inspection of the roofs by the manufacturer of the sheeting.
PROFILED METAL SHEETING AND ACCESSORIES
Roofing Cladding shall be a standing seam concealed fix profiled roof sheeting with transverse stiffener ribs roll-formed in continuous lengths from certified Chromadeck Zincalume , Klip Tite coated steel G550 0.53mm profile sheeting finished with a full top coat of silicone polyster and a half coat of grey to the reverse side (including resin coat) and fixed to steel purlins using KL700 clips and class 3 fasteners, in strict accordance with manufacturer’s specifications by an Approved Contractor. A written and approved five year guarantee of water-tightness shall be issued after approval of roofs by the manufacturer.
Roof covering with pitch not exceeding 25 degrees.1 m² 387
Labour bending down ends of roof sheeting.2 m 35
Section No. 2
Carried to Collection R
Bill No. 6
Roof Coverings
75
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
SHEET METAL FLASHINGS, LININGS, COPINGS, ETC.
Flashings shall be manufactured from Chromadeck Zincalume AZ150 0.53mm coated steel with finishing to both sides (as above) and fixed by way of S10 brackets or, Sliding brackets at apex where roof sheets are 30m or longer, all in strict accordance with manufacturer’s specification.:
Headwall flashing 375mm girth including counter flashing 185mm girth, stop ending sheeting and broad flute polycloser.
3
m 51
Corner trim 550mm girth at external angle fixed along both edges to vertical sheeting.
4m 41
Gable flashing 550mm girth, fixed along sheeting at 200mm centres.
5m 16
Valley flashing 550mm girth, fixed along sheeting at 200mm centres.
6m 32
Gutter flashing size overall 152mm girth and two times bent.
7m 46
Drip flashing size overall 231mm girth and three times bent.
8m 32
Ridge capping 500mm girth fixed to roof sheeting including flush stop ending sheeting, polyclosers and broad flute metal closers on both sides.
9
m 12
ROOF INSULATION
Non Combustible, lightweight "Factorylite" building insulation with reinforced foil face to both sides:
100mm Thick roof insulation laid taut over purlins including galvanised straining wire at 300mm centres and with overlapping foil edges to be stapled together, all in accordance with the manufacturer's specifications.
10
m² 1 965
RAINWATER DISPOSAL
2mm thick Galvanised mild steel:
300 x 125mm Deep gutter.11 m 183
125mm diameter rainwater downpipe.12 No 102
Extra over 125mm diameter cut out for and including outlet.
13No 22
Extra over gutter for stopped ends.14 No 26
Section No. 2
Carried to Collection R
Bill No. 6
Roof Coverings
76
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Extra over 125mm diameter rainwater downpipe for shoe.
15No 22
Extra over 125mm diameter rainwater downpipe for 90 degree bend.
16No 18
Apply one prime coat of Plascon epoxy tar EPD100, second coat of EPD112 and final coat EPD100, applied to a thickness of 90 microns or similar to SANS 1200H system index 080, in strict accordance with the manufacturer's instructions to:
Inside of gutters.17 m² 126
BUDGETARY ALLOWANCE
Allow the Budgetary Allowance of R 20,000,00 (Twenty Thousand Rand) for Full Bores to Plant Rooms and Passage to be used as directed by the Principal Agent and to be deducted in whole or in part if not required.
18
Item 0020 000
Section No. 2
Carried to Collection R
Bill No. 6
Roof Coverings
77
Obp Vaccine Plant - Principal Contract
BTK606
Amount
ROOF COVERINGS
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 6
Page No
COLLECTION
75Brought Forward from Page
76
77
Section No. 2
Carried To Section Summary R
Bill No. 6
Roof Coverings
78
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
CARPENTRY AND JOINERY
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 7
Location Description:Key:
BL Block L
BO Block O
BS Block S
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
DOORS
40mm Thick hollow core timber door suitable for painting hung to steel frames (elsewhere).
Door, size 813 x 2032mm high.1 No 10
40mm Thick semi solid timber door faced one side with tempered masonite and the other side, suitable for painting and hung to steel frames (elsewhere).
Door size 813 x 2032mm high.2 No 14
Ditto, but double door size 1800 x 2032mm high.3 No 7
40mm Thick solid core flush panel timber door with with a core of solidly packed chipboard or timber strips with 3mm thick tempered masonite both sides and concealed edges, suitable for painting and hung to steel frames (elsewhere).
Door size 813 x 2032mm high.4 No 5
Ditto, but double door size 1800 x 2032mm high.5 No 7
Section No. 2
Carried To Section Summary R
Bill No. 7
Carpentry And Joinery
79
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
IRONMONGERY
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 8
Location Description:Key:
BL Block L
BO Block O
BS Block S
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
P.C. AMOUNTS
Allow the Prime Cost Amount of R100 000.00 (One Hundred Thousand Rand) NETT, for Ironmongery, etc. supplied and delivered to site.
1
Item 00100 000
Allow for profit on above if required.2 Item
Take delivery, store and later fix complete the following ironmongery (Labour only):
Locks:
Cylinder lockset.3 No 39
Ditto, but including rebate conversion set.4 No 41
Handles:
Lever handles.5 Pairs 53
Push plates and kicking plates:
Kick plates.6 No 9
Push plates.7 No 9
BATHROOM FITTINGS
20mm Diameter chromium plated towel rail 600mm long including flanged end brackets plugged and screwed to wall.
8
No 5
Section No. 2
Carried to Collection R
Bill No. 8
Ironmongery
80
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
32mm Diameter stainless steel grab rail 600mm long twice bent with 5 x 75mm diameter flange welded at both ends three times holed for and rawl bolted to wall.
9
No 1
Chromium plated two roll toilet roll holder, plugged10 No 9
Soap dispenser, plugged11 No 5
Paper towel dispenser, plugged12 No 5
Chromium plated coat hook13 No 5
Sundries:
Padlocks.14 No 12
End of labour only items.
Section No. 2
Carried to Collection R
Bill No. 8
Ironmongery
81
Obp Vaccine Plant - Principal Contract
BTK606
Amount
IRONMONGERY
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 8
Page No
COLLECTION
80Brought Forward from Page
81
Section No. 2
Carried To Section Summary R
Bill No. 8
Ironmongery
82
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
METALWORK
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 9
Location Description:Key:
BL Block L
BO Block O
BS Block S
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
Descriptions of bolts shall be deemed to include nuts and washers.
Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete.
Metalwork described as holed for bolt(s) shall be deemed to exclude the bolts unless otherwise described.
SUNDRY STEELWORK
Slab bearing angles:
100 x 100 x 8mm Thick galvanised angle section mild steel bearer holed at 450mm centres and fixed with and including 16mm diameter rawl bolts to concrete.
1
m 138
Floor channels:
'Mentis RS40' Hot dipped galvanised storm water floor grating fully banded and formed of 50 x 4,5 bearers laid loose in framing.
2
m² 12
'Mentis RS40' Hot dipped galvanised storm water floor grating fully banded and formed of 30 x 4,5 bearers laid loose in framing.
3
m² 35
30 x 30 x 5mm Thick galvanised angle section mild steel framing complete with 25 x 5mm thick x 100mm long fishtail lugs welded on at 500mm centres including casting into concrete.
4
m 14
Section No. 2
Carried to Collection R
Bill No. 9
Metalwork
83
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
40 x 40 x 5mm Thick galvanised mild steel angle section framing complete with 25 x 3mm thick x 100mm long fishtail lugs welded on at 400mm centres including casting into concrete beam.
5
m 9
STEEL HANDRAILS, BALUSTRADES, ETC
Welded handrails to:
Balustrade with 50mm internal diameter top and bottom rail filled in with 20mm round bar baluster and hollow mild steel post on 100 x 100x 5mm base plate fixed to floor with four of 10mm rowl bolts and 25mm diamter horizontal section.
6
m 58
Ditto, but sloping.7 m 23
PRESSED STEEL DOORS FRAMES
1,6mm Thick double rebated frame suitable for 115mm brick wall 1 and 1/2 x pair standard mild steel hinges and shock absorbers in rebate:
Door size 813 x 2032mm high.8 No 9
1,6mm Thick double rebated frames suitable for 230mm brickwall 1 and 1/2 x pair standard mild steel hinges and shock absorbers in rebate:
Door size 813 x 2032mm high.9 No 19
Door size 1800 x 2032mm high10 No 14
ROLLER SHUTTERS, ETC.
Manually operated slatted roller shutter door with powdercoated mild steel 75mm x 1mm thick interlocking slats with 2.5mm holes x 4mm pitch to form curtain of roller shutter door complete, with powdercoated mild steel channel framing, with and including 'T' section fitted to bottom rail of roller shutter door and accessories fixed in accordance with manufacuterer's specification.
Opening size 3000mm x 4500mm high.11 No 2
FIRE DOORS AND FRAMES
Standard SABS 'Class A' fire door to provide 1hr stability with Masonite finish both sides and two concealed edges suitable for painting, including 1,6mm thick mild steel double rebate frame to suit 280mm thick cavity wall and standard mild steel hinges and shock absorbers in rebate with and including all ironmongery.
Door size 813 x 2032mm high.12 No 2
Section No. 2
Carried to Collection R
Bill No. 9
Metalwork
84
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Ditto, but double door size 1800 x 2032mm high.13 No 5
PRESSED STEEL TRANSFORMER ROOM DOORS AND FRAMES
Standard high pressed mild steel transformer room door and frame unit, type H.V., including vent and vermin proofing, and fitted with the manufacturers standard ironmongery.factory primed with one coat red oxide undercoat:
Standard single leaf door and frame, Type HV, size overall 914 x 2438mm high.
14No 2
Standard double leaf door and frame, Type DV, size overall 1829 x 2438mm high.
15No 2
STEEL STRONGROOM DOORS, VENTILATORS, ETC.
Two Hour fire rated strongroom doors etc suitable for 230mm walls fixed to brickwork.
The following door shall be provided with two keys which shall not be delivered with the door, but are to be properly labeled and handed to the Principal Agent.
'Mutual Model DS - 70mm SABS CAT 2 ADM' or similar approved strongroom door and frame with a mass of 630kg size overall 1050 x 1950mm high, built into brickwork complete with ironmongery and doorstop.
16
No 2
Double ended strongroom ventilator.17 No 8
LOUVRES
Fixed Natural anodized aluminium ventilation louvre grill units plugged and screwed to brick walls with and including vermin proofing:
Louvres size 3300 x 450mm high.18 No 14
Louvres size 2100 x 1000mm high.19 No 8
Louvres size 1075 x 3100mm high.20 No 4
Louvres size 3300 x 3300mm high.21 No 5
Section No. 2
Carried to Collection R
Bill No. 9
Metalwork
85
Obp Vaccine Plant - Principal Contract
BTK606
Amount
METALWORK
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 9
Page No
COLLECTION
83Brought Forward from Page
84
85
Section No. 2
Carried To Section Summary R
Bill No. 9
Metalwork
86
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
PLASTERING
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 10
Location Description:Key:
BL Block L
BO Block O
BS Block S
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
MAKING GOOD OF FINISHES, ETC.
Preparatory work to exisitng floors 'Pavelite' or similar approved, applied strictly in accordace with manufacturer's instructions:
On floors.1 m² 1 539
SCREEDS
Wood floated screeds on concrete:
25mm Thick on floors and landings.2 m² 211
25mm Thick on roofs to falls.3 m² 218
25mm Thick on treads and risers of stairs including reedings.
4m² 35
50mm Thick on floors.5 m² 1 539
75 x 75mm Triangular shaped fillet.6 m 281
Ditto, but size 100 x 100mm.7 m 92
EXTERNAL PLASTER
One coat cement plaster finished smooth with a wood float:
Brick vertical surfaces.8 m² 586
Plaster in patches.9 m² 138
In narrow widths.10 m² 12
Section No. 2
Carried to Collection R
Bill No. 10
Plastering
87
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
INTERNAL PLASTER
One coat cement plaster finished smooth with a steel trowel on:
Brick vertical surfaces.11 m² 1 178
One coat cement plaster and one coat gypsum plaster finished smooth with a steel trowel:
On brick vertical surfaces.12 m² 1 023
On concrete vertical surfaces.13 m² 69
On raking soffits of concrete stairs.14 m² 18
On soffits of landing slabs.15 m² 12
In narrow widths.16 m² 7
PLASTER SUNDRIES
Covings, skirtings, roundings, etc.:
1:3 Coved cement mortar rounding, at junction of walls (vertically), approximately 50 to 65mm radius all to smooth finish.
17
m 168
Ditto, but at junction of walls and ceilings.18 m 58
Ditto, but at junction of walls and floor and at approximately 100mm radius.
19m 28
Section No. 2
Carried to Collection R
Bill No. 10
Plastering
88
Obp Vaccine Plant - Principal Contract
BTK606
Amount
PLASTERING
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 10
Page No
COLLECTION
87Brought Forward from Page
88
Section No. 2
Carried To Section Summary R
Bill No. 10
Plastering
89
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
GLAZING
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 11
Location Description:Key:
BL Block L
BO Block O
BS Block S
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
MIRRORS, ETC:
6mm Silvered float glass copper backed mirrors with polished edges holed for and fixed with chromium plated dome capped mirror screws with rubber buffer to plugs in brickwork or concrete:
Mirror, size 600 X 1200mm high, with four chromium plated dome capped screws.
1No 9
BUDGETARY ALLOWANCES
Allow a budgetary allowance of R 150 000,00 (One Hundred and Fifty Thousand Rand) NETT, to repair exisitng windows to be used as directed by the Principal Agent and to be dedcted as whole or in part if not required.
2
Item 00150 000
Section No. 2
Carried To Section Summary R
Bill No. 11
Glazing
90
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
PAINTWORK
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 12
Location Description:Key:
BL Block L
BO Block O
BS Block S
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
PAINT TO EXISTING WORK
Surfaces shall be thoroughly washed down and allowed to dry completely before any paint is applied. Blistered or peeling paint shall be completely removed.
All cracks and crevices in timber shall be primed and filled with a suitable filler and finished smooth.
CLEANING DOWN OF EXISTING FACEBRICK
Prepare and apply "Mortar Lift" or equal approved product and wash down with a high pressured water hose to:
External face brickwork.1 m² 786
Ditto, but internally. 2 m² 786
EXTERNAL WALLS, CEILINGS, ETC
Prepare as specified and apply one coat of fillercoat to newly plastered areas, apply two finishing coats acrylic PVA paint on:
Plastered walls, columns, fins etc.3 m² 2 207
Plastered cills.4 m² 69
Plastered soffits.5 m² 219
Concrete lintols.6 m² 377
Section No. 2
Carried to Collection R
Bill No. 12
Paintwork
91
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
ON METAL.
Spot priming and defects in pre-primed surfaces with 'Plascon Namelocate Synthetic Metal' and apply one coat 'Plascon Merit Universal Undercoat' and two coats 'Plascon Super Universal Enamel' paint on steel:
On door frames.7 m² 37
On Windows (both sides measured).8 m² 511
Burglar bars.9 m² 133
Louvres.10 m² 97
150mm diameter steel pipe.11 m² 83
Prepare surfaces and remove all loose material, dust, grease, salts and contamination with degreaser, rinse and apply one coat undercoat and two coats 'Plascon Roof Paint' (Colour TBA) high gloss enamel paint on steel on:
Roof sheeting.12 m² 1 934
Gutters, downpipes etc.13 m² 145
ON WOOD
Stop, fill, sand down and prepare wood surfaces and apply one coat wood primer, one coat universal undercoat and two coats matt polyurethene enamel paint on:
Doors.14 m² 347
PAINT TO NEW WORKS ETC
ON CONCRETE
Prepare concrete surface to remove laitance and provide a key, prime prepared areas with 'Pro-Struct 639', reprime 'dry' spots and apply 'Stonlux' SL/SA, self smoothing epoxy screed to a nominal thickness of 4mm all in accordance to the manufacture's detailed specification as supplied by 'Stonecor Africa (Pty) Ltd' (011) 254-5500 on:
Floors.15 m² 197
Section No. 2
Carried to Collection R
Bill No. 12
Paintwork
92
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
ON FLOATED PLASTER
Prepare and apply one coat approved primer, stop and apply two coats high gloss enamel paint applied in strict accordance with the manufacturers instructions on:
Plastered walls.16 m² 1 178
Ditto, but columns.17 m² 23
Plastered soffits.18 m² 28
Ditto, but raking soffits and sides.19 m² 14
Coved roundings at junctions of walls (vertical) not exceeding 300mm girth.
20m 78
Ditto, but at junction of walls and ceilings.21 m 51
One coat alkali resistance primer, one coat superior quality acrylic emulsion paint for interior and exterior use and one coat pure acrylic smooth ripple paint applied with a stipple roller on:
Plastered walls22 m² 74
Prepare and apply one coat approved primer, stop and apply two coats, epoxy paint applied in strict accordance with the manufacturers instructions on:
Plastered walls.23 m² 127
ON PLASTERBOARD
Prepare and apply one coat of Plascon Merit Plaster primer, stop and apply two coats Plascon Double Velvet (Vel)paint on:
Partitions.24 m² 138
Ceilings and bulkheads.25 m² 816
ON METAL
Prepare surfaces and remove all loose material, dust, grease, salts and contamination with degreaser, rinse and apply one coat red oxide metal primer, one coat universal undercoat and two coats matt polyurethane enamel on:
Pressed steel door frames.26 m² 58
Section No. 2
Carried to Collection R
Bill No. 12
Paintwork
93
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Spot priming defects in pre-primed surfaces with one coat calcium plumbate primer, one coat universal undercoat and two finishing coats Alkyd base enamel paint to Architects colour specification on:
Structural steel members.27 Tonnes 23,00
Prepare and apply one coat intumescent paint on:
Structural steel members.28 Tonnes 27,60
Prepare surfaces and remove all loose material, dust, grease, salts and contamination with degreaser, rinse and apply two coats Promorust and one coat universal undercoat and two coats Prosab Gloss enamel paint on:
Mesh screens, grilles, gates, balustrading, etc.29 m² 55
Prepare surfaces and remove all loose material, dust, grease, salts and contamination with degreaser, rinse and apply one coat undercoat and two coats 'Plascon Roof Paint' (Colour TBA) high gloss enamel paint on steel on:
Roof sheeting.30 m² 345
Section No. 2
Carried to Collection R
Bill No. 12
Paintwork
94
Obp Vaccine Plant - Principal Contract
BTK606
Amount
PAINTWORK
SECTION NO. 2
Builders Work - Phase 2
BILL NO. 12
Page No
COLLECTION
91Brought Forward from Page
92
93
94
Section No. 2
Carried To Section Summary R
Bill No. 12
Paintwork
95
Obp Vaccine Plant - Principal Contract
BTK606
Amount
SECTION NO. 2
Builders Work - Phase 2
SECTION SUMMARY
Bill No.
Page
581 ALTERATIONS
612 EARTHWORKS
673 CONCRETE, FORMWORK AND REINFORCEMENT
704 MASONRY
745 WATERPROOFING
786 ROOF COVERINGS
797 CARPENTRY AND JOINERY
828 IRONMONGERY
869 METALWORK
8910 PLASTERING
9011 GLAZING
9512 PAINTWORK
Section No. 2
Carried to Final Summary R
SECTION SUMMARY
96
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
ALTERATIONS
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 1
Location Description:Key:
BD Block D
BE Block E
BF Block F
BK Block K
BR Block R
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
VISIT TO SITE
Tenderers are to visit the site and satisfy themselves as to the nature of the work to be done, extent of the works on site and making good to be done, the conditions of the existing buildings, working conditions, etc., as no liability whatsoever will be admitted in respect of errors in the Contractor's tender due to the foregoing.
WORK AND MATERIALS
The work to be done and materials to be used in the works on site are to be similar to those specified in the new work in so far as they apply.
All rubble and debris from the pulling down are to be carted away without delay and the site is to be left clean and unencumbered.
Where existing items of work is to be removed or demolished, those items of work should be deemed to be discarded unless otherwise stated.
DEMOLITIONS
All demolition work shall be carried out in accordance with the local By-laws and to the requirements of the Local Health Authorities.
Where walls are described as being demolished, doors, door frames and the finishes to both sides shall be deemed to be included. Where floor finishes are described as being removed the mortar bed under or screed shall be deemed to be included.
Section No. 3
Carried to Collection R
Bill No. 1
Alterations
97
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
WATER, ETC.
The Contractor shall allow for watering the works with a jet or spray from a hose sufficiently to prevent any nuisance from dust.
TEMPORARY COVERINGS, SCREENS, ETC.
The Contractor shall supply, erect and maintain in position as required any temporary coverings to protect the existing work and property from damage and inclement weather during the progress of the works. The Contractor will be held responsible for any damage to property or goods in the existing buildings due to his not having taken adequate precautions, and all damage caused shall be made good at his own expense. He must allow for providing all necessary plastic or wood framed screens, partitions, tarpaulin, barriers, etc., to protect the work and prevent any nuisance from dust as may be required or directed.
DAMAGE TO PERSONS OR PROPERTY
The Contractor will be held responsible for any damage to persons or property and for the safety of the structures and he shall allow for protecting and indemnifying persons using the existing buildings from injury and by virtue of building operations, including providing necessary barriers, signs, etc.
MAKING GOOD
Prices of all work described throughout these Bills of Quantities shall include for making good, in all trades except Painting, unless otherwise described.
The Contractor must make good to existing work damaged or disturbed through alterations and to existing work remaining after doors, windows, screens, fittings, walls, etc., are removed, by fitting in short lengths of skirtings, architraves, etc., and making good suspended ceilings and floors on necessary joists, etc., plaster finishes to walls and ceilings and rendering floor tiles, etc., to floors and for facing up walls, with brickwork, cut, toothed and bonded to existing work with facing bricks, quarry tiles or common brickwork to receive finishings, unless otherwise described.
All new materials used in making good are to match existing and the works shall be left complete and perfect in every respect.
Section No. 3
Carried to Collection R
Bill No. 1
Alterations
98
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
PULLING DOWN
Pulling down walls, piers, etc., shall include for dead shoring under existing concrete slabs, beams, roof members, etc., for pulling down face brick, tiled or plastered walls and concrete beams or lintols occuring in same, for removing skirtings, quadrants, cornices, etc., fixed to same for hacking up flooring in openings and making good as previously described to walls, floors, ceilings, etc., unless otherwise described.
CUTTING THROUGH, ETC.
Cutting away from, breaking or cutting through shall include for neatly cutting through brick or concrete walls, floors, skirtings, etc., leaving ends fair or preparing ends for extensions, for facing up jambs, reveals, etc., with brickwork cut toothed and bonded to existing and for flushing up concrete jambs, reveals, etc., in cement mortar.
BUILDING IN
Building in new or reused doors, windows, etc., into formed openings in existing brick or concrete walls shall include for wedging up, cutting mortices for and running in lugs in 3:1 cement mortar or for plugging and screwing as necessary, and bedding and pointing all round frame in cement mortar.
JUNCTION OF NEW AND EXISTING
Making good at the junction of new and existing work shall include for piercing out, cutting through or removing short lengths of existing material, for supplying short lengths of new material and for jointing to match existing.
EXISTING AND ADJOINING BUILDINGS, ETC.
In taking down and removing existing work the utmost care must be observed to avoid any structural or other damage to the remaining portions of the building or adjoining buildings, boundary walls, pavings, roadways, etc., and the Contractor shall provide all shoring, needling, strutting, etc., to ensure the stability of all structures during demolition or alteration work. The Contractor must cover up and protect from damage all work not removed and must make good at his own expense any damage that may occur.
HOARDING
Tenders are reffered to the specification for Hoarding before pricing the following items:
The following temporary hoarding shall be erected in sections as required and removed on instruction of the Principal Agent.
Section No. 3
Carried to Collection R
Bill No. 1
Alterations
99
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
The erected hoarding is to be maintained in a condition acceptable to the Principal Agent throughout the duration of the contract.
On completion of this contract, the hoarding must be handed over to the main contractor.
0.5mm Galvanized IBR sheeting including priming and painting to an approved colour, 2,40m high fixed to and including 51 x 76mm sawn South African Pine top, middle and bottom rails with 150mm diameter trimmed gumpole posts at 3000mm centres, fixed into movable concrete bases, including all vehicular and pedestrian access gates.
1
m 457
Carefully take down and re-erect hoarding (previosuly measured) where instructed, comprising painted IBR sheeting, etc., including making good paintwork, etc.
2
m 457
Carefully take down and remove IBR hoarding (previously measured).
3m 572
Shade cloth hoarding, 2.8m high, fixed to and including 51 x 76mm sawn South African Pine top, middle and bottom rails with 150mm diameter trimmed gumpole posts at 3000mm centres, fixed into movable concrete bases including all vehicular and pedestrian access gates.
4
m 228
Carefully take down and re-erect hoarding (previosuly measured) where instructed, comprising shade cloth hoarding, etc., including making good where necessary, etc.
5
m 228
Carefully take down and remove shade cloth hoarding (previously measured)..
6m 228
Drywall barrier of galvanised steel channel section rails and studs covered on one side (Outside) with 12,7mm Gypsum plasterboard and finished with two (2) coats interior quality PVA emulsion paint, including corners, ends, access doors etc. (Merchandising will be applied to the barrier) Remove after completion.
7
m² 257
Carefully take down and re-erect hoarding (previosuly measured) where instructed, comprising drywall hoarding, etc., including making good where necessary, etc.
8
m 257
Carefully take down and remove drywall hoarding (previously measured).
9m 257
Section No. 3
Carried to Collection R
Bill No. 1
Alterations
100
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Demolish and remove:
Gut complete exisitng rectangular shaped single storey building (BLOCK E) size overall approximately 32, 873mm x 13, 425mm on plan, comprising of all internal structures: brickwork, parititions, ceiling, floor covering etc, and include Asbestos which must comply with all regulations, including sealing off all electrical, fire and plumbing services and making good facebrick of perimeter walls where necessary, all in accordance with the Architects drawing.
10
No 1
Gut complete exisitng rectangular shaped single storey building (BLOCK D) size overall approximately 30,923mm x 13,000mm on plan, comprising of all internal structures: brickwork, parititions, ceiling, floor covering etc, and include Asbestos which must comply with all regulations, including sealing off all electrical, fire and plumbing services and making good facebrick of perimeter walls where necessary, all in accordance with the Architects drawing.
11
No 1
Gut complete exisitng rectangular shaped single storey building (BLOCK F) size overall approximately 32, 908mm x 13, 410mm on plan, comprising of all internal structures: brickwork, parititions, ceiling, floor covering etc, and include Asbestos which must comply with all regulations, including sealing off all electrical, fire and plumbing services and making good facebrick of perimeter walls where necessary, all in accordance with the Architects drawing.
12
No 1
Gut complete exisitng rectangular shaped single storey building (BLOCK K) size overall approximately 47., 500mm x 13, 000mm on plan, comprising of all internal structures: brickwork, parititions, ceiling, floor covering etc, and include Asbestos which must comply with all regulations, including sealing off all electrical, fire and plumbing services and making good facebrick of perimeter walls where necessary, all in accordance with the Architects drawing.
13
No 1
Gut complete exisitng rectangular shaped single storey building (BLOCK R) size overall approximately 45, 600mm x 27, 000mm on plan, comprising of all internal structures: brickwork, parititions, ceiling, floor covering etc, and include Asbestos which must comply with all regulations, including sealing off all electrical, fire and plumbing services and making good facebrick of perimeter walls where necessary, all in accordance with the Architects drawing.
14
No 1
Section No. 3
Carried to Collection R
Bill No. 1
Alterations
101
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
REMOVAL OF EXISTING WORK
Breaking up and removing concrete components,etc, carting away broken material and making good surface to receive new surface.
Steps, etc.15 m³ 9
650mm High x 2200mm wide x 1080mm long reinforced concrete staircases attached to loading bay platform, executed complete.
16
No 6
Concrete plinths, bases, etc.17 m³ 11
200mm Thick aprons, paving, etc.18 m² 61
Surface beds.19 m³ 1 910
Slabs.20 m³ 61
Beams.21 m³ 14
Breaking down and removing brickwork, etc.:
Half brick walls.22 m² 112
One brick walls.23 m² 56
Chasing 50mm wide into brickwork.24 m² 685
Chasing 100mm wide into brickwork.25 m² 537
Taking out and removing sundry metalwork:
Steel single door frame for door size 813mm x 2032mm high in one brick wall.
26No 23
Ditto, but for double door, size approximately 1500 x 2032mm.
27No 9
Taking out and removing doors, windows, etc., from brickwork:
Timber single door and frame, size 813 x 2032mm high overall from one brick wall including all ironmongery, etc.
28No 19
Timber double door and frame, size 1800 x 2032mm high overall from one brick wall including all ironmongery, etc.
29
No 6
Steel windows including glazing not exceeding 2.5m2.30 No 37
Ditto, exceeding 2.5m2 but not exceeding 5m2.31 No 14
Airbricks.32 No 29
Section No. 3
Carried to Collection R
Bill No. 1
Alterations
102
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Take out and remove doors, windows, sills, etc and build up openings in brick walls including making good cement plaster on both sides (making good paintwork elsewhere) :
Timber single leaf door and steel frame 813 x 2032mm high overall from one brick wall.
33No 9
Ditto but steel door and frame.34 No 6
Timber double leaf door and steel frame 1800 x 2032mm high overall from one brick wall.
35No 9
Take out and remove doors, windows, sills, etc and build up openings in brick walls including making good face brickwork on one side and cement plaster on other side (making good paintwork elsewhere) :
Timber single leaf door and frame 813 x 2032mm high from one brick wall.
36No 19
Ditto, but steel door and frame. 37 No 9
Glazed steel windows not exceeding 2,5m² from one brick wall.
38No 216
Ditto, exceeding 2,5m² but not exceeding 5m².39 No 19
Taking down and removing roofs, floors, panelling, ceilings, partitions, etc.:
Plasterboard ceilings including cornices from brandering, preparing branders for new, etc. (New elsewhere)
40m² 141
Acoustic tile suspended ceilings, including cornices, suspension grid, hangers, etc.
41m² 93
Drywall partitions upt to 3m high, including doors, glazed borrowed lights, etc.
42m 70
Take out and remove fitted joinery fittings, etc.:
Timber floor unit, size approximately, 1100mm high x 600mm deep, including bearers, cleats, shelves, doors and countertops.
43
m 6
Taking out and removing sundry joinery work:
75mm Timber skirtings from brickwork.44 m 280
Hacking up/off and removing floor and wall tile finishes, including removing mortar bed or backing:
Ceramic tiles from walls including preparing wall surface for new finish.
45m² 37
Section No. 3
Carried to Collection R
Bill No. 1
Alterations
103
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Ceramic tiles from floor including preparing floor surface for new finish.
46m² 1 204
Chasing 50mm wide x 40mm deep into concrete surface beds.
47m 61
Chasing 100mm wide x 40mm deep into concrete surface beds.
48m 45
Chasing 50mm wide x 40mm deep into concrete surface beds.
49m 32
Chasing 100mm wide x 40mm deep into concrete surface beds.
50m 24
CUTTING THROUGH FLOORS AND CEILINGS
Chasing 50mm wide x 40mm deep into concrete surface beds.
51m 132
Chasing 100mm wide x 40mm deep into concrete surface beds.
52m 99
CORE DRILLING, PENETRATIONS, OPENINGS, ETC.
Core drilling through exisitng reinforced concrete slabs, floors, etc., with and including making good surrounding finish:
Core drill 50mm diameter opening.53 No 23
Ditto, but opening size approximately 100mm diameter.54 No 14
Ditto, but opening size approximately 200mm diameter.55 No 9
Removal of roof coverings, structure, etc.:
Metal sheet vertical or horizontal cladding including all fixings, framework, etc.
56m² 703
Metal sheet profiled bargeboard including all fixings, framework, etc.
57m 70
Metal sheet profiled bullnose including all fixings, framework, etc.
58m 104
Gutters, and Down pipes etc.59 m 403
BUILDING UP OPENINGS
Close up opening in one brick wall in patches including all cutting of toothing and bonding in new brickwork, propping, making good to existing finishes, etc.:
Half brick walls.60 m² 85
One brick walls.61 m² 112
Section No. 3
Carried to Collection R
Bill No. 1
Alterations
104
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
CREATING OPENINGS IN EXISTING WALLS
Breaking out for and forming openings through brick walls including necessary precast concrete lintels and making good plaster on both sides and into reveals and with concrete thresholds with steel trowelled finish and building in frames and new doors (making good paintwork elsewhere):
813mm Wide x 2032mm opening for single door and frame.
62No 19
1800mm Wide x 2032mm opening for double door and frame.
63No 2
Breaking out for and forming openings through brick walls including necessary precast concrete lintels and making good plaster on both sides and into reveals and with concrete thresholds with steel trowelled finish and building in frames and new doors, making good plaster on one side and reveals, face brickwork on other side (paintwork elsewhere):
1788mm Wide x 2120mm opening for double door and frame including face brick to external facade.
64No 9
4000mm Wide x 3200mm opening for roller shutter door and frame including face brick to external facade.
65No 6
Cutting out joints of existing brickwork to receive plaster.66 m² 69
Clean and apply cement mixture ( 1 part water + 3 parts cement) to existing facebrick surface to receive new plaster (Measured elsewhere).
67
m² 38
Hack out brickwork and cut toothing to bond new half brickwall to existing brickwork.
68m 29
Hack out brickwork and cut toothing to bond new one brickwall to existing brickwork.
69m 45
Cutting out joints of existing brickwork to receive plaster.70 m² 37
Clean and apply cement mixture ( 1 part water + 3 parts cement) to existing facebrick surface to receive new plaster (Measured elsewhere).
71
m² 20
Hack out brickwork and cut toothing to bond new half brickwall to existing brickwork.
72m 15
Hack out brickwork and cut toothing to bond new one brickwall to existing brickwork.
73m 24
PREPARATORY WORK TO EXISTING SURFACES
Cutting out joints of existing brickwork to receive plaster.74 m² 151
Section No. 3
Carried to Collection R
Bill No. 1
Alterations
105
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Clean and apply cement mixture ( 1 part water + 3 parts cement) to existing facebrick surface to receive new plaster (Measured elsewhere).
75
m² 82
Hack out brickwork and cut toothing to bond new half brickwall to existing brickwork.
76m 63
Hack out brickwork and cut toothing to bond new one brickwall to existing brickwork.
77m 99
MAKING GOOD OF FINISHES, ETC
Make good existing mortar joints in brickwork by re-jointing and pointing in cement mortar between existing brick joints to an average depth of 15mm (provisional).
78
m 66
Rake out existing mortar to a depth of 15mm around 20mm diameter overflow pipe and point in new mortar.
79No 51
Making good cement screeds:
Floors where half brick walls removed.80 m 37
Floors where one brick walls removed.81 m 19
Making good internal cement plaster:
Walls in patches.82 m² 182
Walls where one brick walls removed.83 m² 300
Sundries:
Remove stop ends, clean and realign existing galvanised sheet iron gutters including making good any defective joints to junction of new and existing gutters from addition (measured elsewhere).
84
No 47
Section No. 3
Carried to Collection R
Bill No. 1
Alterations
106
Obp Vaccine Plant - Principal Contract
BTK606
Amount
ALTERATIONS
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 1
Page No
COLLECTION
97Brought Forward from Page
98
99
100
101
102
103
104
105
106
Section No. 3
Carried To Section Summary R
Bill No. 1
Alterations
107
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
EARTHWORKS
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 2
Location Description:Key:
BD Block D
BE Block E
BF Block F
BK Block K
BR Block R
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
EXCAVATION OTHER THAN BULK
Excavate in earth not exceeding 2m deep below filled, reduced or formed ground level for:
Reduced levels under floors1 m³ 28
Holes for column bases, etc.2 m³ 10
Ground beams, footings, etc.3 m³ 25
Ground beams, footings (in confined spaces).4 m³ 240
Channel, ducts, etc.5 m³ 14
Excavate in earth exceeding 2m and not exceeding 4m deep below filled, reduced or formed ground level for:
Holes for column bases, etc.6 m³ 13
Extra over excavation in earth for excavation in:
Soft rock.7 m³ 32
Hard rock.8 m³ 15
In concrete.9 m³ 13
Allow for the risk of collapse to sides of excavations in earth for:
Trench and hole excavations not exceeding 1,5m deep.10 m² 342
Section No. 3
Carried to Collection R
Bill No. 2
Earthworks
108
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
CARTING AWAY
Extra over all excavations for loading, carting and dumping surplus excavated material (no allowance made for increase in bulk):
Off site to a dumping site to be located by the Contractor.
11 m³ 152
EARTH FILLING, ETC.
Filling with selected material from the excavations (stock piled on site) and compacted in 150mm thick layers to a density of at least 93% Mod. AASHTO maximum density at +/- 1% OMC for:
Filling under holes, etc.12 m³ 23
Filling with selected material from the excavations and compacted in 150mm thick layers to a density of at least 95% Mod. AASHTO maximum density for:
Backfilling to trenches, holes, etc. 13 m³ 168
Filling with approved material supplied and carted onto site by the Contractor, compacted to a density of at least 95% Mod. AASHTO maximum density in:
150mm Thick sub-base layer of G7 material under surface beds, etc.
14m³ 159
Surface Preparation:
Compaction of ground surface, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod. AASHTO density.
15
m² 1 966
KEEPING EXCAVATIONS FREE OF WATER
Allow for keeping excavations free of all water, mud, etc. by hand or machinery.
16Item
Soil Poisoning:
Treat base course with an approved insecticide including forming and poisoning shallow furrows against foundation walls, etc. filling in furrows and ramming, all in accordance with the manufacturer's instructions.
17
m² 3 497
Section No. 3
Carried to Collection R
Bill No. 2
Earthworks
109
Obp Vaccine Plant - Principal Contract
BTK606
Amount
EARTHWORKS
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 2
Page No
COLLECTION
108Brought Forward from Page
109
Section No. 3
Carried To Section Summary R
Bill No. 2
Earthworks
110
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
CONCRETE, FORMWORK AND REINFORCEMENT
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 3
Location Description:Key:
BD Block D
BE Block E
BF Block F
BK Block K
BR Block R
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
SUPPLEMENTARY PREAMBLES
All work must be done in accordance to SABS 1200 and the structural engineers specifications.
Cost of tests:
The costs of making, storing and testing of concrete test cubes as required under clause 7 'Tests' of SABS 1200 G shall include the cost of providing cube moulds necessary for the purpose, for testing costs and for submitting reports on the tests to the Principal Agent. The testing shall be undertaken by an independent firm or institution nominated by the Contractor to the approval of the Principal Agent. (Test cubes are measured separately).
Formwork:
Descriptions of formwork shall be deemed to include use and waste only (except where described as left in or permanent), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for reconditioning as necessary before re-use.
The vertical strutting shall be carried down to such construction as is sufficiently strong to afford the required support without damage and shall remain in position until the newly constructed work is able to support itself.
Section No. 3
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
111
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Formwork to soffits of solid slabs etc., shall be deemed to be to slabs not exceeding 250mm thick unless otherwise described.
Formwork to sides of bases, pile caps, ground beams, etc., will only be measured where it is prescribed by the Engineer for design reasons. Formwork necessitated by irregularity or collapse of excavated faces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in Earthworks.
UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
10MPa/19mm Concrete in:
Surface blinding under footings and bases.1 m³ 16
Mass concrete under bases.2 m³ 9
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
25 MPa/19mm Concrete in:
Strip footings (in confined spaces).3 m³ 172
Ground beams.4 m³ 8
Raft foundations.5 m³ 29
Bases.6 m³ 8
Plinth.7 m³ 22
Floor channels.8 m³ 6
Floor slabs.9 m³ 276
Apron slabs to falls.10 m³ 51
Ramps.11 m³ 13
REINFORCED CONCRETE
25 MPa/19mm Concrete in:
Concrete infill to cavity.12 m³ 13
Stairs, landings, stair beams, etc.13 m³ 23
Slabs including beams and inverted beams.14 m³ 29
Roof slabs.15 m³ 15
Beams.16 m³ 33
Section No. 3
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
112
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
30 MPa/19mm Concrete in:
Columns.17 m³ 14
CONCRETE SUNDRIES
Test blocks:
Allow for making a set of three concrete test cubes in accordance with section 7 of SABS 1200G and sending to an approved testing authority for testing and paying all charges in connection therewith.
18
Sets 145
Finishing top surfaces of concrete smooth with a steel float to:
Surface beds laid in panels.19 m² 126
Apron slab laid in panels to falls.20 m² 342
Slabs.21 m² 126
Finishing top surfaces of concrete smooth with a wood float to:
Surface beds laid in panels. (accuracy 1).22 m² 3 131
Slabs (accuracy 1).23 m² 112
Grooves, channels, mortices, sinkings, etc. in concrete:
Thicken out edge of 85mm thick apron slab to a total thickness of 150mm and for a width of 250mm including one splayed side, all necessary excavation, surface preparation, additional concrete and formwork (formwork to exposed edges elsewhere measured).
24
m 228
Thicken out 170mm thick surface bed to a total thickness of 250mm and for a width of 760mm including one splayed side, all necessary excavation, surface preparation, additional concrete and formwork (formwork to exposed edges elsewhere measured).
25
m 342
20mm Diameter high tensile steel dowel bar 800mm long including drilling hole in existing concrete slab edge and grouting in with and including 'ABE Epidermix 395' epoxy adhesive.
26
No 75
25 MPa Non-shrink grout in:
Bedding approximately 50mm thick under 200 x 200mm base plate including chamfered edges all round, formwork, etc.
27
No 197
Section No. 3
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
113
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
ROUGH FORMWORK (DEGREE OF ACCURACY II)
Rough Formwork to Sides of:
Ground beams.28 m² 102
Upstand beams.29 m² 83
Square or rectangular stub columns in foundations.30 m² 1
Sloping and stepped outer edges of stairs not exceeding 300mm high extreme.
31m 37
Edges, risers, ends and reavels not exceeding 300mm high or wide.
32m 642
Edges exceeding 300mm high.33 m² 28
Rough Formwork to Soffits of:
Slabs propped up exceeding 3.5m and not exceeding 5m high.
34m² 126
Slabs propped up exceeding 5m and not exceeding 6.5m high.
35m² 47
Slabs exceeding 250mm and not exceeding 500mm thick, propped up exceeding 1.5m and not exceeding 3.5m.
36
m² 23
Ditto, but propped up exceeding 3.5m and not exceeding 5m high.
37m² 37
Landing slabs.38 m² 19
Raking soffit of stairs.39 m² 29
SMOOTH FORMWORK (DEGREE OF ACCURACY 1)
Smooth formwork to sides of:
Square or rectangular columns exceeding 3.5m high but not exceeding 6.5m high.
40m² 13
10mm Thick isolation joint between concrete surface bed and walls or kerbs, filled in with 'Jointex' not exceeding 300mm high.
41
m 123
6mm Thick expansion joint between concrete slabs filled in with 'Jointex' not exceeding 300mm high including tacking to existing slab edge.
42
m 92
10mm Thick expansion joint in surface beds filled in with 'Jointex' not exceeding 300mm high including rounding top edges of joint to 3mm radius.
43
m 43
Section No. 3
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
114
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
20mm Thick expansion joint in surface beds filled in with 'Jointex' not exceeding 300mm high including rounding top edges of joint to 3mm radius.
44
m 69
Machine cut open joint 3mm wide x 30mm deep in top of concrete surface bed including short lengths, etc.
45m 52
Toggle construction joint in 170mm thick concrete surface bed including all necessary formwork to edge, etc.
46
m 31
10mm Thick isolation joint between concrete surface bed and walls or kerbs, filled in with 'Jointex' not exceeding 300mm high.
47
m 65
6mm Thick expansion joint between concrete slabs filled in with 'Jointex' not exceeding 300mm high including tacking to existing slab edge.
48
m 49
10mm Thick expansion joint in surface beds filled in with 'Jointex' not exceeding 300mm high including rounding top edges of joint to 3mm radius.
49
m 25
20mm Thick expansion joint in surface beds filled in with 'Jointex' not exceeding 300mm high including rounding top edges of joint to 3mm radius.
50
m 37
Machine cut open joint 3mm wide x 30mm deep in top of concrete surface bed including short lengths, etc.
51m 43
Toggle construction joint in 170mm thick concrete surface bed including all necessary formwork to edge, etc.
52
m 16
MOVEMENT JOINTS, ETC.
10mm Thick isolation joint between concrete surface bed and walls or kerbs, filled in with 'Jointex' not exceeding 300mm high.
53
m 269
6mm Thick expansion joint between concrete slabs filled in with 'Jointex' not exceeding 300mm high including tacking to existing slab edge.
54
m 201
10mm Thick expansion joint in surface beds filled in with 'Jointex' not exceeding 300mm high including rounding top edges of joint to 3mm radius.
55
m 93
20mm Thick expansion joint in surface beds filled in with 'Jointex' not exceeding 300mm high including rounding top edges of joint to 3mm radius.
56
m 151
Section No. 3
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
115
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Machine cut open joint 3mm wide x 30mm deep in top of concrete surface bed including short lengths, etc.
57m 96
Toggle construction joint in 170mm thick concrete surface bed including all necessary formwork to edge, etc.
58
m 67
CONCRETE SUNDRIES
Stensons 'Tile Red Ferrafloor' methalic floor hardener at 13kg/m2 to surface bed area.
59m² 235
REINFORCEMENT
Mild steel reinforcement to structural concrete work in:
8mm Diameter bars.60 Tonnes 7,58
10mm Diameter bars.61 Tonnes 3,75
12mm Diameter bars.62 Tonnes 7,48
16mm Diameter bars.63 Tonnes 11,24
20mm Diameter bars.64 Tonnes 11,24
High tensile steel reinforcement to structural concrete work in:
10mm Diameter bars.65 Tonnes 5,61
12mm Diameter bars.66 Tonnes 11,24
16mm Diameter bars.67 Tonnes 11,24
20mm Diameter bars.68 Tonnes 11,24
25mm Diameter bars.69 Tonnes 11,24
32mm Diameter bars.70 Tonnes 11,24
Fabric reinforcement:
Type 193 fabric reinforcement in concrete surface beds, slabs, etc.
71m² 126
Type 395 fabric reinforcement in concrete surface beds, slabs, etc.
72m² 3 680
Section No. 3
Carried to Collection R
Bill No. 3
Concrete, Formwork And Reinforcement
116
Obp Vaccine Plant - Principal Contract
BTK606
Amount
CONCRETE, FORMWORK AND REINFORCEMENT
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 3
Page No
COLLECTION
111Brought Forward from Page
112
113
114
115
116
Section No. 3
Carried To Section Summary R
Bill No. 3
Concrete, Formwork And Reinforcement
117
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
MASONRY
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 4
Location Description:Key:
BD Block D
BE Block E
BF Block F
BK Block K
BR Block R
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
BRICKWORK IN FOUNDATIONS
Brickwork of NFX bricks (14 MPa nominal compressive strength) in Class I mortar in:
Half brick walls.1 m² 70
One brick walls.2 m² 93
BRICKWORK IN SUPERSTRUCTURE
Brickwork of NFX bricks (14 MPa nominal compressive strength) in Class I mortar in:
Half brick wall.3 m² 468
Half brick wall in lining to concrete.4 m² 141
One brick wall.5 m² 1 053
330mm Cavity wall formed of two half brick skins tied together with and including wire ties.
6m² 47
Piers.7 m³ 47
Closing 50mm cavity of hallow wall horizontally with brickwork one brick wide at top of soffit for one course.
8m 47
Ditto, but on raking.9 m 14
Section No. 3
Carried to Collection R
Bill No. 4
Masonry
118
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
BRICKWORK SUNDRIES
Closing 50mm cavity of hallow wall horizontally with brickwork one brick wide at top of soffit for one course.
10m 65
Ditto, but on raking.11 m 37
Joint forming material in movement joints:
10mm Thick bitumen impregnated softboard expansion joint filling, built in vertically as the work proceeds, including all cutting and waste.
12
m² 572
10mm Thick 'Jointex' expansion joint filling not exceeding 300mm wide, built in vertically as the work proceeds, including all cutting and waste.
13
m 1 141
Brickwork reinforcement:
75mm Wide reinforcement built in horizontally.14 m 14 880
150mm Wide reinforcement built in horizontally.15 m 4 351
Galvanised hoop iron cramps, ties, etc.:
2mm Thick galvanised hoop iron tie 38 x 750mm long with one end shot pinned to concrete and the other end built into brickwork.
16
No 457
'Fabcon' prestressed fabricated lintels:
110 x 75mm Lintels in lengths not exceeding 3m.17 m 188
Pair of 110 x 75mm Lintels in lengths not exceeding 3m.18 m 130
FACE BRICKWORK
Face bricks (Allow a Prime Cost Amount of R4000,00/1000 NETT delivered to site) pointed with recessed horizontal and vertical joints as the work proceeds:
Extra over stock brickwork for facings in stretcher bond and pointing.
19m² 703
Extra over brickwork for brick-on edge header course lintel in 280mm cavity wall pointed on face.
20m 36
Bagging of 1:3 cement and sand mixture on:
Brick surfaces.21 m² 211
Section No. 3
Carried to Collection R
Bill No. 4
Masonry
119
Obp Vaccine Plant - Principal Contract
BTK606
Amount
MASONRY
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 4
Page No
COLLECTION
118Brought Forward from Page
119
Section No. 3
Carried To Section Summary R
Bill No. 4
Masonry
120
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
WATERPROOFING
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 5
Location Description:Key:
BD Block D
BE Block E
BF Block F
BK Block K
BR Block R
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
DAMPROOFING OF WALLS AND FLOORS
One layer of 375 micron 'Consol Plastics Brickgrip DPC' embossed damp proof course sealed at all edges and junctions:
Laid horizontally and built under walls, cills, etc.1 m² 869
One layer of 250 micron 'Consol Plastics USB Green' waterproof sheeting sealed at laps with 'Gunplas Pressure Sensitive Tape':
Laid on filling to receive concrete surface bed and maintaining in position during concreting.
2m² 1 966
Prepare existing corrugated iron roof sheeting and prime with ABE water based metal etch primer and apply "A.B.E. super laycryl" liquid waterproofing compound including approved saturation membrane, all in strict accordance with the manufacturers instructions, to corrugated roof sheeting for the sealing of joints, laps and roofing screws.
3
m² 1 053
Prepare existing corrugated iron roof sheeting and prime with ABE water based metal etch primer and apply "A.B.E. super laycryl" liquid waterproofing compound including approved saturation membrane, all in strict accordance with the manufacturers instructions, to corrugated roof sheeting for the sealing of joints, laps and roofing screws.
4
m² 560
Section No. 3
Carried to Collection R
Bill No. 5
Waterproofing
121
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
WATERPROOFING OF CORRUGATED ROOFS:
Prepare existing corrugated iron roof sheeting and prime with ABE water based metal etch primer and apply "A.B.E. super laycryl" liquid waterproofing compound including approved saturation membrane, all in strict accordance with the manufacturers instructions, to corrugated roof sheeting for the sealing of joints, laps and roofing screws.
5
m² 2 299
WATERPROOFING TO ROOFS, BASEMENT, ETC.
The Contractor shall allow in his rates for testing the waterproofing for water tightness by ponding the waterproofed surfaces for a period of at least 48 hours before application of the protection layer. Should any leaks occur the contractor shall remedy them at his own expense.
The Contractor shall furnish and lodge a 10 year maintenance-free waterproofing guarantee for all the waterproofing.
Prime and apply 4mm thick 'Derbigum SP' torch on fully bonded waterproofing membrane laid strictly in accordance with the manufaturer's instruction with 75mm side laps and 100mm end laps including all cutting and waste to:
On floors, channels, etc.6 m² 112
On screeded roof slabs to falls.7 m² 411
On vertical parapet walls, etc.8 m² 118
Flashing strip 150mm girth at turn-ups including sealing top edge into groove with mastic sealant.
9m 327
PROTECTIVE DRESSING AND PAINT
Two coats bituminous aluminium paint on:
Waterproofing to roofs, beams etc.10 m² 557
JOINT SEALANTS, ETC.
'ABE Flexothane G' two part polyurethane sealing compound including priming surfaces, backing strips, etc. all in accordance with the manufacturer's instructions to:
10 x 10mm expansion joints in floors including raking out expansion joint filler as necessary.
11m 460
20 x 20mm expansion joints in floors including raking out expansion joint filler as necessary.
12m 334
Section No. 3
Carried to Collection R
Bill No. 5
Waterproofing
122
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
10 x 10mm isolation joints between surface beds and walls, columns, etc. including raking out expansion joint filler as necessary.
13
m 168
6 x 35mm thick vertical expansion joint in floors including raking out filler as necessary.
14m 29
'Duraflex 2' component epoxy polysulphide sealant including priming surfaces, backing strips, etc. all in accordance with the manufacturers specification:
6 x 35mm thick vertical expansion joint in floors including raking out filler as necessary.
15m 63
'Pro-Struct 748', non-moving epoxy joint sealant including cutting all existing concrete in the sub-base through the epoxy/polyurethane flooring system (elsewhere measured).
3 x 30mm Saw cut joints in floors.16 m 300
Section No. 3
Carried to Collection R
Bill No. 5
Waterproofing
123
Obp Vaccine Plant - Principal Contract
BTK606
Amount
WATERPROOFING
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 5
Page No
COLLECTION
121Brought Forward from Page
122
123
Section No. 3
Carried To Section Summary R
Bill No. 5
Waterproofing
124
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
ROOF COVERINGS
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 6
Location Description:Key:
BD Block D
BE Block E
BF Block F
BK Block K
BR Block R
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
Guarantees
Roof sheeting shall be laid in strict accordance with the manufacturer's specification by an approved contractor. A written and approved five year guarantee for workmanship and watertightness shall be issued after final inspection of the roofs by the manufacturer of the sheeting.
PROFILED METAL SHEETING AND ACCESSORIES
Flashings shall be manufactured from Chromadeck Zincalume AZ150 0.53mm coated steel with finishing to both sides (as above) and fixed by way of S10 brackets or, Sliding brackets at apex where roof sheets are 30m or longer, all in strict accordance with manufacturer’s specification.:
Roof covering with pitch not exceeding 25 degrees.1 m² 752
Labour bending down ends of roof sheeting.2 m 18
Section No. 3
Carried to Collection R
Bill No. 6
Roof Coverings
125
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
SHEET METAL FLASHINGS, LININGS, COPINGS, ETC.
Flashings shall be manufactured from Chromadeck Zincalume AZ150 0.53mm coated steel with finishing to both sides (as above) and fixed by way of S10 brackets or, Sliding brackets at apex where roof sheets are 30m or longer, all in strict accordance with manufacturer’s specification.:
Headwall flashing 375mm girth including counter flashing 185mm girth, stop ending sheeting and broad flute polycloser.
3
m 47
Corner trim 550mm girth at external angle fixed along both edges to vertical sheeting.
4m 1 133
Gable flashing 550mm girth, fixed along sheeting at 200mm centres.
5m 19
Valley flashing 550mm girth, fixed along sheeting at 200mm centres.
6m 61
Gutter flashing size overall 152mm girth and two times bent.
7m 51
Drip flashing size overall 231mm girth and three times bent.
8m 70
Ridge capping 500mm girth fixed to roof sheeting including flush stop ending sheeting, polyclosers and broad flute metal closers on both sides.
9
m 15
ROOF INSULATION
Non Combustible, lightweight "Factorylite" building insulation with reinforced foil face to both sides:
100mm Thick roof insulation laid taut over purlins including galvanised straining wire at 300mm centres and with overlapping foil edges to be stapled together, all in accordance with the manufacturer's specifications.
10
m² 3 963
RAINWATER DISPOSAL
2mm thick Galvanised mild steel:
300 x 125mm Deep gutter.11 m 455
125mm diameter rainwater downpipe.12 No 197
Extra over 125mm diameter cut out for and including outlet.
13No 42
Extra over gutter for stopped ends.14 No 47
Section No. 3
Carried to Collection R
Bill No. 6
Roof Coverings
126
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Extra over 125mm diameter rainwater downpipe for shoe.
15No 42
Extra over 125mm diameter rainwater downpipe for 90 degree bend.
16No 37
Apply one prime coat of Plascon epoxy tar EPD100, second coat of EPD112 and final coat EPD100, applied to a thickness of 90 microns or similar to SANS 1200H system index 080, in strict accordance with the manufacturer's instructions to:
Inside of gutters.17 m² 257
BUDGETARY ALLOWANCE
Allow the Budgetary Allowance of R 5000,00 (Five Thousand Rand) for Full Bores to Plant Rooms to be used as directed by the Principal Agent and to be deducted in whole or in part if not required.
18
Item 005 000
Section No. 3
Carried to Collection R
Bill No. 6
Roof Coverings
127
Obp Vaccine Plant - Principal Contract
BTK606
Amount
ROOF COVERINGS
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 6
Page No
COLLECTION
125Brought Forward from Page
126
127
Section No. 3
Carried To Section Summary R
Bill No. 6
Roof Coverings
128
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
CARPENTRY AND JOINERY
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 7
Location Description:Key:
BD Block D
BE Block E
BF Block F
BK Block K
BR Block R
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
DOORS
40mm Thick hollow core timber door suitable for painting hung to steel frames (elsewhere).
Door, size 813 x 2032mm high.1 No 19
40mm Thick semi solid timber door faced one side with tempered masonite and the other side, suitable for painting and hung to steel frames (elsewhere).
Door size 813 x 2032mm high.2 No 29
Ditto, but double door size 1800 x 2032mm high.3 No 14
40mm Thick solid core flush panel timber door with with a core of solidly packed chipboard or timber strips with 3mm thick tempered masonite both sides and concealed edges, suitable for painting and hung to steel frames (elsewhere).
Door size 813 x 2032mm high.4 No 9
Ditto, but double door size 1800 x 2032mm high.5 No 11
Section No. 3
Carried To Section Summary R
Bill No. 7
Carpentry And Joinery
129
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
IRONMONGERY
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 8
Location Description:Key:
BD Block D
BE Block E
BF Block F
BK Block K
BR Block R
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
P.C. AMOUNTS
Allow the Prime Cost Amount of R150 000.00 (One Hundred and Fifty Thousand Rand) NETT, for Ironmongery, etc. supplied and delivered to site.
1
Item 00150 000
Allow for profit on above if required.2 Item
Take delivery, store and later fix complete the following ironmongery (Labour only):
Locks:
Cylinder lockset.3 No 80
Ditto, but including rebate conversion set.4 No 83
Handles:
Lever handles.5 Pairs 106
Push plates and kicking plates:
Kick plates.6 No 19
Push plates.7 No 19
Chromium plated coat hook8 No 1
Chromium plated coat hook9 No 2
Section No. 3
Carried to Collection R
Bill No. 8
Ironmongery
130
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
20mm Diameter chromium plated towel rail 600mm long including flanged end brackets plugged and screwed to wall.
10
No 1
20mm Diameter chromium plated towel rail 600mm long including flanged end brackets plugged and screwed to wall.
11
No 2
32mm Diameter stainless steel grab rail 600mm long twice bent with 5 x 75mm diameter flange welded at both ends three times holed for and rawl bolted to wall.
12
No 5
Chromium plated two roll toilet roll holder, plugged13 No 3
Chromium plated two roll toilet roll holder, plugged14 No 5
Soap dispenser, plugged15 No 1
Soap dispenser, plugged16 No 2
Paper towel dispenser, plugged17 No 1
Paper towel dispenser, plugged18 No 2
32mm Diameter stainless steel grab rail 600mm long twice bent with 5 x 75mm diameter flange welded at both ends three times holed for and rawl bolted to wall.
19
No 3
BATHROOM FITTINGS
20mm Diameter chromium plated towel rail 600mm long including flanged end brackets plugged and screwed to wall.
20
No 6
32mm Diameter stainless steel grab rail 600mm long twice bent with 5 x 75mm diameter flange welded at both ends three times holed for and rawl bolted to wall.
21
No 4
Chromium plated two roll toilet roll holder, plugged22 No 11
Soap dispenser, plugged23 No 6
Paper towel dispenser, plugged24 No 6
Chromium plated coat hook25 No 6
Sundries:
Padlocks.26 No 23
End of labour only items.
Section No. 3
Carried to Collection R
Bill No. 8
Ironmongery
131
Obp Vaccine Plant - Principal Contract
BTK606
Amount
IRONMONGERY
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 8
Page No
COLLECTION
130Brought Forward from Page
131
Section No. 3
Carried To Section Summary R
Bill No. 8
Ironmongery
132
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
METALWORK
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 9
Location Description:Key:
BD Block D
BE Block E
BF Block F
BK Block K
BR Block R
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
Descriptions of bolts shall be deemed to include nuts and washers.
Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete.
Metalwork described as holed for bolt(s) shall be deemed to exclude the bolts unless otherwise described.
SUNDRY STEELWORK
Slab bearing angles:
100 x 100 x 8mm Thick galvanised angle section mild steel bearer holed at 450mm centres and fixed with and including 16mm diameter rawl bolts to concrete.
1
m 280
Floor channels:
'Mentis RS40' Hot dipped galvanised storm water floor grating fully banded and formed of 50 x 4,5 bearers laid loose in framing.
2
m² 23
'Mentis RS40' Hot dipped galvanised storm water floor grating fully banded and formed of 30 x 4,5 bearers laid loose in framing.
3
m² 70
30 x 30 x 5mm Thick galvanised angle section mild steel framing complete with 25 x 5mm thick x 100mm long fishtail lugs welded on at 500mm centres including casting into concrete.
4
m 29
Section No. 3
Carried to Collection R
Bill No. 9
Metalwork
133
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
40 x 40 x 5mm Thick galvanised mild steel angle section framing complete with 25 x 3mm thick x 100mm long fishtail lugs welded on at 400mm centres including casting into concrete beam.
5
m 19
STEEL HANDRAILS, BALUSTRADES, ETC
Welded handrails to:
Balustrade with 50mm internal diameter top and bottom rail filled in with 20mm round bar baluster and hollow mild steel post on 100 x 100x 5mm base plate fixed to floor with four of 10mm rowl bolts and 25mm diamter horizontal section.
6
m 118
Ditto, but sloping.7 m 47
PRESSED STEEL DOORS FRAMES
1,6mm Thick double rebated frame suitable for 115mm brick wall 1 and 1/2 x pair standard mild steel hinges and shock absorbers in rebate:
Door size 813 x 2032mm high.8 No 19
1,6mm Thick double rebated frames suitable for 230mm brickwall 1 and 1/2 x pair standard mild steel hinges and shock absorbers in rebate:
Door size 813 x 2032mm high.9 No 37
Door size 1800 x 2032mm high10 No 26
ROLLER SHUTTERS, ETC.
Manually operated slatted roller shutter door with powdercoated mild steel 75mm x 1mm thick interlocking slats with 2.5mm holes x 4mm pitch to form curtain of roller shutter door complete, with powdercoated mild steel channel framing, with and including 'T' section fitted to bottom rail of roller shutter door and accessories fixed in accordance with manufacuterer's specification.
Opening size 3000mm x 4500mm high.11 No 6
FIRE DOORS AND FRAMES
Standard SABS 'Class A' fire door to provide 1hr stability with Masonite finish both sides and two concealed edges suitable for painting, including 1,6mm thick mild steel double rebate frame to suit 280mm thick cavity wall and standard mild steel hinges and shock absorbers in rebate with and including all ironmongery.
Door size 813 x 2032mm high.12 No 6
Section No. 3
Carried to Collection R
Bill No. 9
Metalwork
134
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
PRESSED STEEL TRANSFORMER ROOM DOORS AND FRAMES
Ditto, but double door size 1800 x 2032mm high.13 No 9
Standard high pressed mild steel transformer room door and frame unit, type H.V., including vent and vermin proofing, and fitted with the manufacturers standard ironmongery.factory primed with one coat red oxide undercoat:
Standard single leaf door and frame, Type HV, size overall 914 x 2438mm high.
14No 6
Standard double leaf door and frame, Type DV, size overall 1829 x 2438mm high.
15No 6
STEEL STRONGROOM DOORS, VENTILATORS, ETC.
Two Hour fire rated strongroom doors etc suitable for 230mm walls fixed to brickwork.
The following door shall be provided with two keys which shall not be delivered with the door, but are to be properly labeled and handed to the Principal Agent.
'Mutual Model DS - 70mm SABS CAT 2 ADM' or similar approved strongroom door and frame with a mass of 630kg size overall 1050 x 1950mm high, built into brickwork complete with ironmongery and doorstop.
16
No 6
Double ended strongroom ventilator.17 No 10
LOUVRES
Fixed Natural anodized aluminium ventilation louvre grill units plugged and screwed to brick walls with and including vermin proofing:
Louvres size 3300 x 450mm high.18 No 29
Louvres size 2100 x 1000mm high.19 No 10
Louvres size 1075 x 3100mm high.20 No 5
Louvres size 3300 x 3300mm high.21 No 9
Section No. 3
Carried to Collection R
Bill No. 9
Metalwork
135
Obp Vaccine Plant - Principal Contract
BTK606
Amount
METALWORK
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 9
Page No
COLLECTION
133Brought Forward from Page
134
135
Section No. 3
Carried To Section Summary R
Bill No. 9
Metalwork
136
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
PLASTERING
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 10
Location Description:Key:
BD Block D
BE Block E
BF Block F
BK Block K
BR Block R
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
MAKING GOOD OF FINISHES, ETC.
Preparatory work to exisitng floors 'Pavelite' or similar approved, applied strictly in accordace with manufacturer's instructions:
On floors.1 m² 3 131
SCREEDS
Wood floated screeds on concrete:
25mm Thick on floors and landings.2 m² 1 321
25mm Thick on roofs to falls.3 m² 201
25mm Thick on treads and risers of stairs including reedings.
4m² 70
50mm Thick on floors.5 m² 3 131
75 x 75mm Triangular shaped fillet.6 m 572
Ditto, but size 100 x 100mm.7 m 188
EXTERNAL PLASTER
One coat cement plaster finished smooth with a wood float:
Brick vertical surfaces.8 m² 685
Plaster in patches.9 m² 280
Section No. 3
Carried to Collection R
Bill No. 10
Plastering
137
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
In narrow widths.10 m² 23
INTERNAL PLASTER
One coat cement plaster finished smooth with a steel trowel on:
Brick vertical surfaces.11 m² 1 977
One coat cement plaster and one coat gypsum plaster finished smooth with a steel trowel:
On brick vertical surfaces.12 m² 2 082
On concrete vertical surfaces.13 m² 141
On raking soffits of concrete stairs.14 m² 37
On soffits of landing slabs.15 m² 23
In narrow widths.16 m² 14
PLASTER SUNDRIES
Covings, skirtings, roundings, etc.:
1:3 Coved cement mortar rounding, at junction of walls (vertically), approximately 50 to 65mm radius all to smooth finish.
17
m 342
Ditto, but at junction of walls and ceilings.18 m 118
Ditto, but at junction of walls and floor and at approximately 100mm radius.
19m 56
Section No. 3
Carried to Collection R
Bill No. 10
Plastering
138
Obp Vaccine Plant - Principal Contract
BTK606
Amount
PLASTERING
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 10
Page No
COLLECTION
137Brought Forward from Page
138
Section No. 3
Carried To Section Summary R
Bill No. 10
Plastering
139
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
GLAZING
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 11
Location Description:Key:
BD Block D
BE Block E
BF Block F
BK Block K
BR Block R
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
MIRRORS, ETC:
6mm Silvered float glass copper backed mirrors with polished edges holed for and fixed with chromium plated dome capped mirror screws with rubber buffer to plugs in brickwork or concrete:
Mirror, size 600 X 1200mm high, with four chromium plated dome capped screws.
1No 19
BUDGETARY ALLOWANCES
Allow a budgetary allowance of R 150 000,00 (One Hundred and Fifty Thousand Rand) NETT, to repair exisitng windows to be used as directed by the Principal Agent and to be deducted as whole or in part if not required.
2
Item 00150 000
Section No. 3
Carried To Section Summary R
Bill No. 11
Glazing
140
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
PAINTWORK
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 12
Location Description:Key:
BD Block D
BE Block E
BF Block F
BK Block K
BR Block R
The Tenderer is referred to the relevant Clauses in the separate document 'Model Preambles for Trades' (2013 Edition) and the Supplementary Preambles which are incorporated hereunder before pricing this Bill.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
PAINT TO EXISTING WORK
Surfaces shall be thoroughly washed down and allowed to dry completely before any paint is applied. Blistered or peeling paint shall be completely removed.
All cracks and crevices in timber shall be primed and filled with a suitable filler and finished smooth.
CLEANING DOWN OF EXISTING FACEBRICK
Prepare and apply "Mortar Lift" or equal approved product and wash down with a high pressured water hose to:
External face brickwork.1 m² 1 960
Ditto, but internally. 2 m² 1 353
EXTERNAL WALLS, CEILINGS, ETC
Prepare as specified and apply one coat of fillercoat to newly plastered areas, apply two finishing coats acrylic PVA paint on:
Plastered walls, columns, fins etc.3 m² 3 981
Plastered cills.4 m² 141
Plastered soffits.5 m² 445
Concrete lintols.6 m² 768
Section No. 3
Carried to Collection R
Bill No. 12
Paintwork
141
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
ON METAL.
Spot priming and defects in pre-primed surfaces with 'Plascon Namelocate Synthetic Metal' and apply one coat 'Plascon Merit Universal Undercoat' and two coats 'Plascon Super Universal Enamel' paint on steel:
On door frames.7 m² 75
On Windows (both sides measured).8 m² 1 040
Burglar bars.9 m² 1 016
Louvres.10 m² 197
150mm diameter steel pipe.11 m² 168
Prepare surfaces and remove all loose material, dust, grease, salts and contamination with degreaser, rinse and apply one coat undercoat and two coats 'Plascon Roof Paint' (Colour TBA) high gloss enamel paint on steel on:
Roof sheeting.12 m² 3 999
Gutters, downpipes etc.13 m² 294
ON WOOD
Stop, fill, sand down and prepare wood surfaces and apply one coat wood primer, one coat universal undercoat and two coats matt polyurethene enamel paint on:
Doors.14 m² 707
PAINT TO NEW WORKS ETC
ON CONCRETE
Prepare concrete surface to remove laitance and provide a key, prime prepared areas with 'Pro-Struct 639', reprime 'dry' spots and apply 'Stonlux' SL/SA, self smoothing epoxy screed to a nominal thickness of 4mm all in accordance to the manufacture's detailed specification as supplied by 'Stonecor Africa (Pty) Ltd' (011) 254-5500 on:
Floors.15 m² 1 256
Section No. 3
Carried to Collection R
Bill No. 12
Paintwork
142
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
ON FLOATED PLASTER
Prepare and apply one coat approved primer, stop and apply two coats high gloss enamel paint applied in strict accordance with the manufacturers instructions on:
Plastered walls.16 m² 1 977
Ditto, but columns.17 m² 47
Plastered soffits.18 m² 56
Ditto, but raking soffits and sides.19 m² 29
Coved roundings at junctions of walls (vertical) not exceeding 300mm girth.
20m 160
Ditto, but at junction of walls and ceilings.21 m 104
One coat alkali resistance primer, one coat superior quality acrylic emulsion paint for interior and exterior use and one coat pure acrylic smooth ripple paint applied with a stipple roller on:
Plastered walls22 m² 149
Prepare and apply one coat approved primer, stop and apply two coats, epoxy paint applied in strict accordance with the manufacturers instructions on:
Plastered walls.23 m² 257
ON PLASTERBOARD
Prepare and apply one coat of Plascon Merit Plaster primer, stop and apply two coats Plascon Double Velvet (Vel)paint on:
Partitions.24 m² 280
Ceilings and bulkheads.25 m² 1 661
ON METAL
Prepare surfaces and remove all loose material, dust, grease, salts and contamination with degreaser, rinse and apply one coat red oxide metal primer, one coat universal undercoat and two coats matt polyurethane enamel on:
Pressed steel door frames.26 m² 118
Section No. 3
Carried to Collection R
Bill No. 12
Paintwork
143
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Spot priming defects in pre-primed surfaces with one coat calcium plumbate primer, one coat universal undercoat and two finishing coats Alkyd base enamel paint to Architects colour specification on:
Structural steel members.27 Tonnes 46,80
Prepare and apply one coat intumescent paint on:
Structural steel members.28 Tonnes 56,16
Prepare surfaces and remove all loose material, dust, grease, salts and contamination with degreaser, rinse and apply two coats Promorust and one coat universal undercoat and two coats Prosab Gloss enamel paint on:
Mesh screens, grilles, gates, balustrading, etc.29 m² 112
Prepare surfaces and remove all loose material, dust, grease, salts and contamination with degreaser, rinse and apply one coat undercoat and two coats 'Plascon Roof Paint' (Colour TBA) high gloss enamel paint on steel on:
Roof sheeting.30 m² 703
Section No. 3
Carried to Collection R
Bill No. 12
Paintwork
144
Obp Vaccine Plant - Principal Contract
BTK606
Amount
PAINTWORK
SECTION NO. 3
Builders Work - Phase 3
BILL NO. 12
Page No
COLLECTION
141Brought Forward from Page
142
143
144
Section No. 3
Carried To Section Summary R
Bill No. 12
Paintwork
145
Obp Vaccine Plant - Principal Contract
BTK606
Amount
SECTION NO. 3
Builders Work - Phase 3
SECTION SUMMARY
Bill No.
Page
1071 ALTERATIONS
1102 EARTHWORKS
1173 CONCRETE, FORMWORK AND REINFORCEMENT
1204 MASONRY
1245 WATERPROOFING
1286 ROOF COVERINGS
1297 CARPENTRY AND JOINERY
1328 IRONMONGERY
1369 METALWORK
13910 PLASTERING
14011 GLAZING
14512 PAINTWORK
Section No. 3
Carried to Final Summary R
SECTION SUMMARY
146
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
EXTERNAL WORKS
SECTION NO. 4
External Works
BILL NO. 1
EXTERNAL WORKS
External works will be phased as per the requirements as deemed necessary by the Principal Agent.
The Tenderer is advised that the quantities reflected is indicative and may not be descriptive of the actual works. The Tenderers are advised that this "BOQ" should be treated as a schedule of rates, as the works will be measured as the works progresses.
APRON SLABS
Breaking up and removing concrete, paving, etc, carting away broke material and making good surface to receive new surface.
200mm Thick Apron slabs to falls.1 m³ 638
Surface Preperation
Compaction of ground surface, including scarifying for a depth of 150mm, breaking down oversized material, adding suitable material where necessary and compacting to 95% Mod. AASHTO density.
2
m² 3 188
25 MPa/19mm Concrete in:
Apron slabs to falls.3 m³ 207
Yard hardstand.4 m³ 0
Finishing top surfaces of concrete smooth with a steel float to:
Apron slab laid in panels to falls.5 m² 3 188
Movement joints. Etc.:
10mm Thick expansion joint between concrete surface bed and walls or kerbs, filled in with 'Jointex' not exceeding 300mm high.
6
m 4 579
Grooves, channels, mortices, sinkings, etc. in concrete:
Thicken out edge of 85mm thick apron slab to a total thickness of 150mm and for a width of 250mm including one splayed side, all necessary excavation, surface preparation, additional concrete and formwork (formwork to exposed edges elsewhere measured).
7
m 500
Section No. 4
Carried to Collection R
Bill No. 1
External Works
147
Obp Vaccine Plant - Principal Contract
BTK606
Unit Quantity Rate Amount
Fabric reinforcement:
Type 395 fabric reinforcement in concrete surface beds, slabs, etc.
8m² 3 188
One layer 250 micron 'Consol Plastic USB Green' waterproof sheeting sealed at laps with 'Gunplas Pressure Sensitive Tape':
Laid on filling to receive concrete surface bed and maintaining in position during concreting.
9m² 3 188
Allow a budgetary allowance of R 1 000 000,00 (One Million Rand) NETT, for the making good external facades to surrounding buildings to be used as directed by the Principal Agent and to be deducted as whole or in part if not required.
10
Item 001 000 000
Allow a budgetary allowance of R 1 350 000,00 (One Million Three Hundred and Fifty Thousand Rand) NETT, for the making good external facades to surrounding buildings to be used as directed by the Principal Agent and to be deducted as whole or in part if not required..
11
Item 001 350 000
Section No. 4
Carried to Collection R
Bill No. 1
External Works
148
Obp Vaccine Plant - Principal Contract
BTK606
Amount
EXTERNAL WORKS
SECTION NO. 4
External Works
BILL NO. 1
Page No
COLLECTION
147Brought Forward from Page
148
Section No. 4
Carried To Section Summary R
Bill No. 1
External Works
149
Obp Vaccine Plant - Principal Contract
BTK606
Amount
SECTION NO. 4
External Works
SECTION SUMMARY
Bill No.
Page
1491 EXTERNAL WORKS
Section No. 4
Carried to Final Summary R
SECTION SUMMARY
150
Obp Vaccine Plant - Principal Contract
BTK606
Amount
SECTION NO. 5
Provisional Sums
PROVISIONAL AMOUNTS
NOTE:
1. The following sums and amounts are NET.
2. Under no circumstances may any Provisional Sum be extended at an amount lower than the amount given in the bill.
3. Unless a specific percentage mark-up for Attendance is indicated in a rate column, the amount priced by the Contractor for Attendance against each Provisional Sum shall be deemed to be the Lump Sum and shall not be adjusted unless the scope of the sub contract varies significantly.
4. Provisional Sums contained here-in may be omitted or reduced at the employer's sole discretion and the Contractor shall not be entitled to claim for any loss by way of reductions or omissions or any discount, or percentage relating to Provisional Sums or PC amounts or any loss of profit related thereto.
SIGNAGE INSTALLATION
Provide the sum of R 450,000.00 (Four Hundred and Fifty Thousand Rand) for signage installation executed complete.
1Item 00450 000
Profit on above item.2 Item
Attendance on ditto.3 Item
CEILINGS, PARTITIONS AND ACCESS FLOORING
Provide the sum of R 1,000,000.00 (One Million Rand) for ceilings partition's and access flooring executed complete.
4Item 001 000 000
Profit on above item.5 Item
Attendance on ditto.6 Item
GLAZED ALUMINIUM SHOPFRONTS, WINDOWS, DOORS, ETC
Provide the sum of R 1,200,000.00 (One Million Two Hundred Thousand Rand) for glazed aluminium shopfronts, windows, doors, etc., executed complete.
7
Item 001 200 000
Profit on above item.8 Item
Attendance on ditto.9 Item
TILING
Provide the sum of R 450,000.00 (Four Hundred and Fifty Thousand Rand) for tiling executed complete.
10Item 00450 000
Profit on above item.11 Item
Section No. 5
Carried To Section Summary R
Bill No. 1
Provisional Sums
151
Obp Vaccine Plant - Principal Contract
BTK606
Amount
Attendance on ditto.12 Item
STAINLESS STEEL WORK
Provide the sum of R 200,000 (Two Hundred Thousand Rand) for stainless steel work executed complete.
13Item 00200 000
Profit on above item.14 Item
Attendance on ditto.15 Item
METALWORK
Provide the sum of R750,000.00 (Seven Hundred and Fifty Thousand Rand) for metalwork executed complete.
16Item 00750 000
Profit on above item.17 Item
Attendance on ditto.18 Item
ELECTRICAL INSTALLATION
Provide the sum of R 15,000,000.00 (Fifteen Million Rand) for electrical installation executed complete.
19Item 0015 000 000
Profit on above item.20 Item
Attendance on ditto.21 Item
FIRE SERVICES INSTALLATION
Provide the sum of R 2,500,000.00 (Two Million Five Hundred Thousand Rand) for fire services installation executed complete.
22Item 002 500 000
Profit on above item.23 Item
Attendance on ditto.24 Item
AIRCONDITIONING INSTALLATION
Provide the sum of R 25,000,000.00 (Twenty Five Million Rand) for airconditioning installation executed complete.
25Item 0025 000 000
Profit on above item.26 Item
Attendance on ditto.27 Item
STRUCTURAL STEELWORK
Provide the sum of R 4,000,000.00 (Four Million Rand) for structural steelwork executed complete.
28Item 004 000 000
Profit on above item.29 Item
Attendance on ditto.30 Item
Section No. 5
Carried To Section Summary R
Bill No. 1
Provisional Sums
152
Obp Vaccine Plant - Principal Contract
BTK606
Amount
PLUMBING AND DRAINAGE
Provide the sum of R 8,000,000.00 (Eight Million Rand) for plumbing and drainage executed complete.
31Item 008 000 000
Profit on above item.32 Item
Attendance on ditto.33 Item
CARPENTRY AND JOINERY
Provide the sum of R 450,000.00 (Four Hundred and Fifty Thousand Rand) for carpentry and joinery executed complete.
34Item 00450 000
Profit on above item.35 Item
Attendance on ditto.36 Item
FLOWCRETE
Provide the sum of R 1,075,000.00 (One Million and Seventy Five Thousand Rand) for Flowcrete floor finishes executed complete.
37Item 001 075 000
Profit on above item. 38 Item
Attendance on ditto. 39 Item
FLOOR COVERINGS
Provide the sum of R 300,000.00 (Three Hundred Thousand Rand) for Floor Coverings executed complete.
40Item 00300 000
Profit on above item. 41 Item
Attendance on ditto. 42 Item
ELECTRONICS & CCTV INSTALLATION
Provide the sum of R 3,500,000.00 (Three Million Five Hundred Tousand Rand) for CCTV Installation executed complete.
43Item 003 500 000
Profit on above item. 44 Item
Attendance on ditto. 45 Item
CLEAN ROOM PANELS
Provide the sum of R 27,000,000.00 (Twenty Seven Million Rand) for Clean Room Panels executed complete.
46Item 0027 000 000
Profit on above item. 47 Item
Attendance on ditto. 48 Item
COLD ROOM
Provide the sum of R 1,500,000.00 (One Million Five Hundred Thousand Rand) for Cold Room executed complete.
49Item 001 500 000
Section No. 5
Carried To Section Summary R
Bill No. 1
Provisional Sums
153
Obp Vaccine Plant - Principal Contract
BTK606
Amount
Profit on above item. 50 Item
Attendance on ditto. 51 Item
FIRE DETECTION AND SMOKE EXTRACTION
Provide the sum of R 1,850,000.00 (One Million Eight Hundred and Fifty Thousand Rand) for Fire Detection and Smoke Extraction executed complete.
52Item 001 850 000
Profit on above item. 53 Item
Attendance on ditto. 54 Item
FIRE SIGNAGE
Provide the sum of R 100,000.00 (One Hundred Thousand Rand) for Fire Signage executed complete.
55Item 00100 000
Profit on above item. 56 Item
Attendance on ditto. 57 Item
VALVE STATIONS
Provide the sum of R 300,000.00 (Three Hundred Thousand Rand) for Valve Stations executed complete.
58Item 00300 000
Profit on above item. 59 Item
Attendance on ditto. 60 Item
GAS INSTALLATION INCLUDING TERICULATION & STORAGE
Provide the sum of R 250,000.00 (Two Hundred and Fifty Thousand Rand) for Gas Installation Including Tericulation & Storage executed complete.
61Item 00250 000
Profit on above item. 62 Item
Attendance on ditto. 63 Item
UNIVERSAL STORAGE SYSTEMS
Provide the sum of R 500,000.00 (Five Hundred Thousand Rand) for Universal Storage Systems executed complete.
64Item 00500 000
Profit on above item. 65 Item
Attendance on ditto. 66 Item
PROCESS, CIP AND AUTOMATION
Provide the sum of R 209,562,500.00 (Two Hundred and Nine Million, Five Hundred and Sixty Two Thousand and Five Hundred Rand Rand) for Process, CIP and Automation executed complete.
67
Item 00209 562 500
Profit on above item. 68 Item
Attendance on ditto. 69 Item
Section No. 5
Carried To Section Summary R
Bill No. 1
Provisional Sums
154
Obp Vaccine Plant - Principal Contract
BTK606
Amount
WAREHOUSE RACKING
Provide the sum of R 1,500,000.00 (One Million Five Hundred Thousand Rand) for Warehouse Racking executed complete.
70Item 001 500 000
Profit on above item. 71 Item
Attendance on ditto. 72 Item
VANITY TOPS
Provide the sum of R 200,000.00 (Two Hundred Thousand Rand) for Vanity Tops executed complete.
73Item 00200 000
Profit on above item. 74 Item
Attendance on ditto. 75 Item
Budgetary Allowance
Allow the budgetary amount of R 1,000,000.00 (One Million Rand) for rubber truck bumprails, wash areas, dual shutter system, isoboard cover and sundry piping for sundry builder's works to be used as directed by the Principal Agent and to be deducted in whole or in part if not required.
76
Item 001 000 000
Allow the budgetary amount of R500,000.00 (Five Hundred Thousand Rand) for process engineering installation for sundry builder's works to be used as directed by the Principal Agent and to be deducted in whole or in part if not required.
77
Item 00500 000
Allow the budgetary amount of R 1,000,000.00 (One Million Rand) for sundry builder's works to be used as directed by the Principal Agent and to be deducted in whole or in part if not required.
78
Item 001 000 000
Allow the budgetary amount of R 8,500,000.00 (Eight Million Five Hundred Thousand Rand) for a Validation Consultant to be used as directed by the Principal Agent and to be deducted in whole or in part if not required.
79
Item 008 500 000
Section No. 5
Carried To Section Summary R
Bill No. 1
Provisional Sums
155
Obp Vaccine Plant - Principal Contract
BTK606
Amount
SECTION NO. 5
Provisional Sums
SECTION SUMMARY
Page
151Brought forward from page
152Brought forward from page
153Brought forward from page
154Brought forward from page
155Brought forward from page
Section No. 5
Carried to Final Summary R
SECTION SUMMARY
156