Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
Fire protection of structural steelFire protection design
• Canbeinstalledpriortothebuildingbeing sealedandmadewatertight,inall temperatureandhumidityconditions–this isincontrasttopaintandsprayswhichare oftenrestrictedbynormalUKwinter conditions,causingpotentialdelayto siteprograms
• Arefast,clean,anddrytoinstall,with negligibledustlevels,allowingothertrades toworkincloseproximity
• Arequickandeasytocheck(byvisual inspection)thatallrelevantareashave beenprotected
• Arefullycompatiblewithdryliningsystemsandalloweasyintegrationwithpartitioningschemes
Fire protectionAnysteelsectionwhichisanelementofstructureandisdeemedbyanyofthefollowingregulationstorequirefireresistancecanbeprotectedwithafireprotectionsystemofdenserockmineralwoolslabsorfibrereinforcedgypsumbasedboards.
1.TheBuildingRegulations(EnglandandWales)ApprovedDocumentB(FireSafety)–Volumes1and2(2006)
2.TheBuilding(Scotland)Regulations, TechnicalBooklets,Section2,2011
3.TheBuildingRegulations(NorthernIreland) TechnicalBookletE,2005
4.TheBuildingRegulations(RepublicofIreland) TechnicalGuidanceDocumentB(2006)
Structuralsteelrequiresfireprotectionbecauseitlosesstructuralstrengthattemperaturesthatcanberapidlyreachedinabuildingfire.Thiswillconsequentlyhaveanegativeimpactonthestructuralintegrityofthebuilding.Protectingthestructuralsteelfromtheheatofafirewilldelaytheonsetofthislossofstrengthandthepossiblecollapseofthebuilding.Thisisessentialbecauseitallowsextratimeforboththeoccupantsofthebuildingtoescapeandfireservicestotacklethefire.Itcouldalsopreventtheactualcollapseofthebuildingminimisinginsurancelosses.BuildingRegulationscoveringfiresafetyareconcernedwiththepreservationof life.
Withtheincreasinguseofstructuralsteelinconstruction,designersneedfireprotectionsolutionsthatprovideacombinationoffastinstallationandcost-effectivenesswhilstachievingthedesiredfinish.
WhatevertheapplicationKnaufInsulationhas arangeofboardproductsandsystemstocaterforanyproject.
Whenusedforthefireprotectionofstructuralsteelwork,boardsystemsofferseveralcompellingadvantagesoversiteappliedpaintandspraycoatingsystems.
Boardsystems:
•Aremanufacturedtofactorytolerances–this enablesthespecifiertobecertainthatthe correctthicknessoffireprotectionisbeing applied,bysimplycheckingthethicknessof materialssupplied
5.LossPreventionCouncilCodeofPracticefor ConstructionofBuildings
Steelsectionscanincludeuniversalbeams,columnsandjoists(plainandcastellated),structuralandrolledtees,angles,channelsandround,squareorrectangularhollowsections.
BenefitsBothrockmineralwoolslabsandfibrereinforcedgypsumboardsofferanumberofadvantagesforthefireprotectionofstructuralsteelworkthatmakethemidealforfasttrackprojects.
Rock mineral wool• Lightweightproduct–atlessthanhalfthe weightofcalciumsilicateslabs–rock mineralwoolfireprotectionboardsareeasy tohandleandfitonsiteparticularlyfor overheadwork
• Easeofcuttingandfixing:Rockmineralwool slabsareeasytocutwitheitherasawora sharpknife,furthermoretherearefourfixing methods,allinvolvesquareedgebuttjoints betweentheboardswhichenablesafastand simplesystemtobeinstalledwithoutdelaying othertradesandactivities
Fibre reinforced gypsum•Smoothsurface–onlyrequiresdecorative finishesforcompletion
•Robustandimpactresistant–idealfor columnsandallexposedsurfaces
•Easytocuttosize–canbescoredand snappedtospeedupcuttingandreduce dustlevels
KnaufInsulationaremembersoftheAssociationforSpecialistFireProtection,andourfireprotectionproductsarelistedintheYellowBook,whichpresentseconomicalmethodsforthefireprotectionofstructuralsteelworktoprovidecompliancewithBuildingRegulations
267
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
Fire protectionSolution optimiser and pathfinder
Fire protection
Period of fire resistance (mins)
Knauf Insulation solution
Mezzanine floorsProduct:RocksilkFireTechSlab
Seepage:280
0mins 30mins 60mins 90mins 120mins 150mins 180mins 210mins 240mins
Fp03
Key
Findonline.Visitknaufinsulation.co.ukandkeyinconstructioncodetofindthe
mostuptodateinformationonyourchosensolution.Pb01
Small cavity barriersProduct:EarthwoolCavityBarrier
Seepage:284
Fp04
Large cavity barriersProduct:RocksilkSmokeandFireBarrier
Seepage:286
Fp05
Refurbishment of timber separating/internal floorProduct:EarthwoolFlexibleSlab
Seepage:292
Fp06
Steel Duct EncasementProduct:RocksilkPyroductSlab
Seepage:294
Fp07
Structural steelworkProduct:RocksilkFireTechSlab
Seepage:274
Structural steelworkProduct:KnaufFireboard
Seepage:268
Fp01
Fp02
268
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
Fire protectionStructuralsteelwork
Knauf Fireboard
Typical constructionKnaufFireboardisusedinframelessencasements.Theproducthasbeenspeciallydevelopedtoacceptdirectedgefixings.CasingsconsistofKnaufFireboardscrewedorstapledtoitselfatabuttingcorners.
Forsteelworkencasedonallfoursides,KnaufFireboardisfixedateachcornerdirectlythroughthematerial,independentofthecolumnorbeam.Forpartialencasement,involvingwallorceilingabutments,KnaufFireboardisfixedtolightgaugesteelangles.
KnaufInsulationrecommendtheuseofKnaufDrywallScrews,essentialforfastconstruction,solidfixingandtightlyclosededgejoints.
ProductsKnauf Fireboardisagypsumbasedboardspeciallydevelopedforhighperformanceliningandencasement,providinguptotwohoursoffire protection.
KnaufFireboardhasahighqualitywhitesmoothsurfacefinishideallysuitedasaselffinish.Itssurfaceallowsdirectdecorationwithmostpaintfinishesoritcanbeplastered*.
Knauf Drywall Screwsaregoldpassivatedscrewswithspoontipsand‘hi-low’threads.
KnaufFireboardcanalsobeinstalledusingproprietarystaples.
*Consultplastermanufacturerpriortoapplicationofplasterfinish.
Fp01• Quickandeasytoinstall
• Dryfixsystemprovidingupto2 hours fire protection
• Combinedfireprotectionand aesthetic finish
Knauf Fireboard
• Non-combustiblewithaEuroclass A1 reaction to fire rating
• ZeroOzoneDepletionPotential(ODP)
• ZeroGlobalWarmingPotential(GWP)
Edgefixtheboardsusing eitherKnaufDrywallScrewsatmaximum150mmcentresorproprietarystaplesat120mmcentres.
KnaufFireboard
KnaufDrywallScrewsatmaximum 100mmcentresintobackingstrips
Abutmentangles:lightgauge steelangleprovidessupportat soffitandwalljunctions.Fixedto adjoiningsoffitorsectionflange.
REFURBNEW BUILD
269
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
TypicalspecificationKnaufFireboard,...…mmthick,tobeusedtoprovidefireprotectiontostructuralsteelwork.
Itistobeinstalledonbeam*/column*asacomplete4sided*/3sided*/2sided*encasement(*specifier’schoice)toprovide......minutesfireprotectionasdetailedintheInstallationsection.
Alternatively,consulttheNationalBuildingSpecifications,Standardversionclause/clauses…K10/265……………
KnaufInsulationspecificationclausescanbedownloadedfromknaufinsulation.co.uk/nbs
PerformanceFire performanceThesystemcanprovideupto2hoursfireprotection.Forprecisecalculationoffireprotectionperiods,pleasecontactKnaufInsulationTechnicalAdviceandSupportCentre.
KnaufFireboardisnon-combustible toBS476:Part4:1970(1984)andClass1surfacespreadofflametoBS476:Part7:1997.KnaufFireboardcomplieswiththeClass‘0’requirementsoftheBuildingRegulationswhentestedtoBS476:Part6:1989andPart7:1997andwiththelimitedcombustibilitydescribedintheBuildingRegulations.
Humidity Constanthumidityover95%orsubjectiontocontinuouswaterwillreducetheserviceabilityoftheboards.
OperatingtemperaturesContinuouslongtermexposuretotemperaturesover50ºCcaninduceachangeofstatewhichwouldreducethephysicalperformanceandserviceabilityoftheboards.
Health and safetyKnaufFireboardmustbeinstalledwithcare.Ensureadequateventilationduringinstallation,particularlywhencuttingboards.Avoidharshbodycontactwithsharpcutedgesofmetalcomponents.RefertoKnaufInsulationMaterialSafetyDataSheetsandtotheHealthandSafetyExecutivepublications.
ForHp/Atablespleasevisit knaufinsulation.co.uk
KnaufFireboardcasing
Staggerjointsby300mmminimum
Directedge-fixingwithKnaufDrywallScrewsat200mmcentresorproprietarystaplesat120mmcentres
270
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
1 2 Holdinplacethe first2boards
withclamps.3 Aftermeasuringthe
sizeoftheremaining2sides,cutanothertwotothedepthofthecolumnplustwicethethickness oftheboard.
4 Applytheremainingboards,adjusting thelengthofadjoiningboardstoensurethatboardjointsarestaggeredbyatleast300mm.
5 Edge-fixtheboards usingeitherself
drillingKnauf FireboardGripper Screwsat200mm centresorproprietary staplesat120mm centres.Knauf FireboardGripper Screwsshould penetrate into the casingbyatleast 30mm
Installationsequence
Fire protectionInstallation of column system
Partial column encasementAssumingatypicalthree-sidedencasementwhereoneofthecolumnflangesstraddlesawall,followthesameprocedureasoutlined forfour-sidedencasementwiththefollowingdifferences:
•Fix25x25mmlightgaugesteelangles, incontinuouslengths,toeithertheabuttingwallfaceortheinnerflangeofthecolumn.Useappropriateproprietaryfixingsat600mmcentres
Double layer applicationInstallthefirstlayerasdescribedforeitherfullorpartialencasement.Securethesecondlayertothefirstwithfixingsspacedasforthefirstlayerbutavoidcoincidentfixingpositions.
Itisgoodpracticethatboardjointsarestaggered–aswiththefirstlayer–betweenadjoiningboardsandalsobetweenthetwolayers.Inthecaseofstructuralsteelwork,doublelayerencasementwillobviatetheneedforjointbackingstrips.
InstallationSteelworkencasementsmustbeinstalledinfullaccordancewithKnaufInsulation’srecommendationsandincompliancewith BS8212:1995andBS8000:Part8:1994.Theinstallationproceduresoutlinedhererelatetonormalsinglelayerapplications.
Knauf Drywall ScrewsKnaufDrywallScrewsshouldpenetrateintothecasingbyatleast30mm.
Four-sidedcolumnencasement•Cuttwoboardstothewidthofthecolumn
flange.Cutanothertwotothedepthofthecolumnplustwicethethicknessoftheboard
•Adjustthelengthofadjoiningboardstoensurethatboardjointsarestaggeredbyatleast300mm
•Edge-fixtheboardsusingeitherKnaufDrywallScrewsat200mmcentresorproprietarystaplesat120mmcentres
Cuttwoboardsto thewidthofthe columnflange.
271
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
Fire protectionInstallation of beam system
Beam encasementAssumingatypicalthree-sidedencasement,whereabeamisexposeddirectlybelowalevelsoffit,fixlightgaugesteelanglestoeithertheadjoiningsoffitorthetopflangeofthebeam.Installcontinuouslengthsof25x25mmangleusingappropriateproprietaryfixingsat600mmcentres.
•Fixfurtherlengthsof25x25mmangleatanyendabutment
•Cuttwoboardstothedepthofthesectionplustwicethethicknessoftheboardplusl0mm.Screw-fixthesetotheanglesat150mmcentreswith35mmKnaufDrywallScrews
•Cutasoffitboardtothewidthofthesteelflange.Thelengthofthisboardmustdifferfromthesideboardstoensureadjacentboardjointsarestaggeredbyatleast300mm.Edge-fixthishorizontalboardtothetwoverticalboardsusingeitherself-drillingKnaufDrywallScrewsat150mmcentresorstaplesat120mmcentres
•Cutboardoff-cuts100mmwideasjointbackingstrips.Fitthese,half-lapped,behindallbuttjointsatthesidesandsoffitofthebeamfixedwithKnaufDrywallScrewsatmaximum100mmcentres
Double layer applicationInstallthefirstlayerasdescribedforeitherfullorpartialencasement.Securethesecondlayertothefirstwithfixingsspacedasforthefirstlayerbutavoidcoincidingfixingpositions.
Itisgoodpracticethatboardjointsarestaggered–aswiththefirstlayer–betweenadjoiningboardsandalsobetweenthetwolayers.Inthecaseofstructuralsteelwork,doublelayerencasementwillobviatetheneedforjointbackingstrips.
Thesecondlayerofboardsacrossthewebsarefixedtotheangleattachedtotheupperflangeusing55mmlongKnaufDrywallScrewsat150mmcentresandthesecondlayeracrossthebottomflangeusingKnaufDrywallScrewsat
Installationsequence
1 Installcontinuouslengthsof 25x25mmangleusing
appropriateproprietary fixingsat600mmcentres,fix furtherlengthsof25x25mm angleatanyendabutment.
2 Cuttwoboardstothedepth ofthesectionplustwicethe
boardthicknessplusl0mm.
Screw-fixthesetotheangles at150mmcentreswith
35mmKnaufDrywall Screws.
3 Cutasoffitboardtothe widthofthesteelflange.
Thelengthofthisboardmust differfromthesideboardsto ensureadjacentboardjoints arestaggeredbyatleast 300mm.
Edge-fixhorizontalboardto thetwoverticalboardsusing
eitherKnaufFireboard GripperScrewsat150mm centresorproprietarystaples at120mmcentres.
4 Cutboardoff-cuts100mm wideasjointbackingstrips.
Fitthese,halflapped,behind allbuttjointsatthesides andsoffitofthebeam.
FixwithKnaufFireboard GripperScrewsatmaximum
100mmcentres.
6.1
nominal150mmcentres,screwlengthsshouldbeequaltothethicknessofthesecondlayer,plus30mm.WheretwodifferentthicknessesofFireboardareapplied,thethickerlayerisinstalledfirst.
272
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
Fire protectionApplication details for beams
25x25mmanglesecuredtotopflangeofbeam,oralternativelytosoffit
Beamwithpartitionabutment
Beamwithwallabutment
25x25mmanglesecuredtotopflangeofbeam,oralternativelytosoffit
KnaufDrywallScrewsatmaximum100mmcentres
Fireboardcasing
Backingstrip
10mmgap
DirectedgefixingwithKnaufDrywallScrewsatmaximum150mmcentresorstaplesat120mmcentres
C-StudpartitionwithstandardU-Channelheadtrack
KnaufDrywallScrewsatmaximum100mmcentres
Fireboardcasing
DirectedgefixingwithKnaufFireboardGripperScrewsatmaximum150mmcentresorstaplesat120mmcentres
Continuous25x25mmKnaufFireboardAnglesecuredtosubstrateusingappropriatefixings
Masonrywall
273
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
Columnwithpartitionabutment
KnaufC-Studtoggle-fixedtoKnaufFireboardcasing
KnaufWallboardnotfixedtothisC-Stud
DirectedgefixingwithKnaufDrywallScrewsatmaximum200mmcentresorstaplesat120mmcentres
Continuous25x25mmKnaufFireboardangleateachcorner
KnaufWallboardnotfixedtothisC-Stud
DirectedgefixingwithKnaufDrywallScrewsatmaximum200mmcentresorstaplesat120mmcentres
Columnwithwallliningabutment
274
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
Fire protectionStructuralsteelwork
Rocksilk FireTech Slab
NogginofRocksilkFireTechSlab orRocksilkFireTechDryFixNogginSlab
RocksilkFireTechSlab
InstallationRocksilkFireTechSlabcanbeusedwithfourtypesoffixingmethodsforthefireprotectionofstructuralsteelworkandeachsystemhasitsownperformancecharacteristics.
Fixingmethods:
•DryFixNogginSystem
•AdhesiveNogginFixingSystem
•CombinationFixingSystem
•WeldedPinFixingSystem
Typical constructionTheexposedsurfacesofanysteelsectionarefullyenclosedinRocksilkFireTechSlab,usinganyofthefixingsystemsshownonthefollowingpages.
RocksilkFireTechSlabcanbeusedtoprovideupto4hoursfireprotectiontostructuralsteelandcastironcolumns,beamsandtrusses.Steelsectionsmayincludeuniversalbeams,columnsandjoists(plainandcastellated),structuralandrolledtees,angles,channelsandround,squareorrectangularhollowsections.
Product Rocksilk FireTech Slabisadenserockmineralwoolslab.ItisavailableunfacedorfacedwithabrightClass‘0’reinforcedaluminiumfoil,forapplicationsabovecleanrooms,withinairplenums,orforaestheticpurposes.
Plastermanufacturersadviceandguidanceshouldbefollowedregardingpre-treatmentofRocksilkFireTechSlabsbeforeapplicationofplasterfinishes
RocksilkFireTechDryFixNogginSlabisanultrahighdensityrockmineralwoolslabusedforthenogginintheRocksilkFireTechDryFixNogginSystem.
Fp02• Flexiblesystemwithfourinstallation methods
• Maintenancefree,passivesystem
• Cleaninstallationprocesswith negligible dust generation
Rocksilk FireTech Slab
• Non-combustiblewithaEuroclassA1 reaction to fire rating
• ZeroOzoneDepletionPotential(ODP)
• ZeroGlobalWarmingPotential(GWP)
Pigtailscrews
REFURB
275
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
TechnicalspecificationRocksilkFireTechSlab,...…mmthick,tobeusedtoprovidefireprotectiontostructuralsteelwork.
Itistobeinstalledusingthedryfixnogginsystem*/adhesivenogginfixingsystem*/combinationfixingsystem*/weldedpinfixingsystem*(*specifier’schoice)asdetailedintheInstallationsection.
Alternatively,consulttheNationalBuildingSpecifications,Standardversionclause/clauses…K11/885……………
KnaufInsulationspecificationclausescanbedownloadedfromknaufinsulation.co.uk/nbs
PerformanceFire performanceRocksilkFireTechSlabisclassifiedasnon-combustibletoBS476:Part4:1970(1984),Class1surfacespreadofflametoBS476:Part7:1997,andClass‘0’totheBuildingRegulations.RocksilkFireTechSlabisdesignedtoprovideupto4hoursfireprotectiontostructuralsteelwork,therebysatisfyingtheBuildingRegulationsandinsurancedemandsforperiodsoffireresistance.
DurabilityRocksilkFireTechSlabisrotproof,doesnotsustainverminandwillnotencouragethegrowthoffungi,mouldorbacteria.
RocksilkFireTechSlabisodourlessand non-hygroscopic.
RocksilkFireTechSlabisnon-wickingwhentestedtoBS2972:1989:Section12.
Whenexposedto90%relativehumidityand20ºC,RocksilkFireTechSlababsorbslessthan0.004%ofmoisture.
ForHp/Atablespleasevisit knaufinsulation.co.uk
NogginofRocksilkFireTechSlabor RocksilkFireTechDryFixNogginSlab
PigTailScrews
RocksilkFireTechSlab
276
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
Fire protectionInstallation of Rocksilk FireTech Slab
AdhesiveNogginFixingSystemUpto2hoursfireprotection
Attachwebpiecestonogginswithpigtailscrewsat100mmcentres.
DryFixNogginSystemUpto2hoursfireprotection
WeldedPinFixingSystemUp to 4 hours fire protection
CombinationFixingSystemUp to 3 hours fire protection
Attachwebpiecestonogginswithpigtailscrewsat100mmcentres.
Theuseofadenserockmineralwoolslab requiresnospecialveecuts,drillingor sub-frames,makingitfastandeasytoinstall.Rockmineralwoolslabscanbeeasilycutusinghandorpowertools.
Note:RocksilkFireTechDryFixNogginSlabhasadensityof200kg/m3.
TheCombinationFixingSystemCanbeusedtoprovideupto2hoursfireprotectiontoallsizesofstructuralsteelwork,andupto3hoursfireprotectiontosteelworkwithsectionfactors(Hp/A)ofupto133m-1 for columnsand143m-1forbeams.
TheWeldedPinFixingSystem Canbeusedtoprovideupto3hoursfireprotectiontoallsizesofstructuralsteelwork,andupto4hoursfireprotectiontosteelworkwithsectionfactors(Hp/A)ofupto172m-1 for columnsand184m-1forbeams.
Ifsectionfactorsareabove260m-1 contact our Technical Advice and Support Centre.
Alternative installation methodsTheDryFixNogginSystem Isafastandefficientfrictionfitnogginsystemthatdoesnotrequireadhesive.Itcangiveupto2hoursfireprotectiontoBS476:Part21.Wheninstalling20,25and30mmRocksilkFireTechSlab,nogginsshouldbecutfroma30mmRocksilkFireTechDryFixNogginSlab.WhengreaterthicknessesofRocksilkFireTechSlabareused,thenogginsarecutfromacorrespondingthicknessofRocksilkFireTechDryFixNogginSlab.
TheAdhesiveNogginFixingSystem Canbeusedtoprovideupto2hoursfireprotectiontoallsizesofstructuralsteelwork.
100mmwidenogginsofRocksilkFireTechDryFixNogginSlabfrictionfittedbetweentheflanges.
Attachflangepiecestowebpiecesusingpigtailscrewspositioned25mminfromeachendandat150mmcentres.
Attachflangepiecestowebpiecesusingpigtailscrewspositioned25mminfromeachendandat150mmcentres.
100mmwidenogginofRocksilkFireTechSlabgluedintoplaceusingsuitableadhesive
AttachtheRocksilkFireTechSlabwebpiecesbyimpalingovertheweldedpinsandsecuringinplacewith38mmspringsteelwashers.
Attachflangepiecestowebpiecesusingpigtailscrewsat150mmcentres.
Adhesiveshouldbeusedatthejointbetweensubsequentwebpieces.
AttachtheRocksilkFireTechSlabwebandflangepiecesbyimpalingoverthe3mmdiameterweldedmildsteelpinsandsecuringinplacewith38mmspringsteelwashers.
Adhesiveshouldbeusedatthejointbetweensubsequentwebpieces.
277
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
Adhesive noggin fixing systemNogginsarecut100mmwidefrom20mmthickRocksilkFireTechSlab.Theyshouldbecuttoasuitablelengthrelativetothewebsizetogive atightcompressionfit.
Nogginsaregluedtopandbottomusingatypicaladhesivethicknessof0.5mmandfrictionfittedbetweentheflangesat600mmcentres.
Thenogginsshouldbeinstalledinsuchawaythattheyareslightly'proud'oftheflange(byabout2mm)andsuchthattheycoincidewithjointsbetweentheboards.
Itispreferabletoleavethenogginsinpositionfor4hourstoallowtheadhesivetocure.However,wherethisisimpracticalRocksilkFireTechSlabcanstillbefittedbeforetheadhesivecuressincethenogginsareessentiallyfriction fitted.
Forwebdepthsgreaterthan500mm,T-shapedorsolidnogginsshouldbeused,formedfromRocksilkFireTechSlab,andscrewedtogetherusingpigtailscrews.
Attachwebpiecestonogginsusingpigtailscrewsat100mmcentres
Solidnogginformedfromoneormorepieces ofRocksilkFireTechSlab
Greaterthan
500mmFull
depth
100mm
T-shapednogginformedfromtwopiecesofRocksilkFireTechSlabjoinedatrightanglesusingpigtailscrews
Insertnogginsasdescribedat600mm centresandifpracticableleavefor4hours foradhesivetocure.
CutRocksilkFireTechSlabtosizeasfollows:
Beams:flangepiecestodimensionX,webpiecestodimensionY+t(t=thicknessofboard)
Columns:flangepiecestodimensionX, webpiecestodimensionY+2t
100mm
Greaterthan
500mm
Y
X
Attachflangepiecestowebpiecesusingpigtailscrewspositioned25mminfromeach endat150mmcentres.
Note:Forflangesgreaterthan400mmuseweldedpin andspringsteelwasherstoprovideextraretentionof theflangepieceofinsulation.Theweldedpinsshould belocatedalongthecentrelineoftheflangeat300mmcentres.
278
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
Fire protectionApplication details for beams
Partitionabutmentusinganogginfixingsystem
Wallabutmentusinganogginfixingsystem
Pigtailscrewsatmaximum100mmcentres
Directedgefixingwithpigtailscrewsatmaximum150mmcentres
Attachflangepiecetowebpiecebyimpalingoverweldedpinsandsecuringtheboardtoboardjointwithpigtailscrewsat150mmcentres.Springsteelwashersareusedovertheweldedpinstoretaintheinsulation,anyexcesspinlengthbeingtrimmedoff
RocksilkFireTechSlab
C-StudpartitionwithstandardU-Channelheadtrack
Pigtailscrewsatmaximum100mmcentres
Attachflangepiecetowebpiecebyimpalingoverweldedpinsandsecuringtheboardtoboardjointwithpigtailscrewsat150mmcentres.Springsteelwashersareusedovertheweldedpinstoretaintheinsulation,anyexcesspinlengthbeingtrimmedoff
Directedgefixingwithpigtailscrewsatmaximum150mmcentres
RocksilkFireTechSlab
Masonrywall
RocksilkFireTechnoggin
279
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
Columnwithwallliningabutment
Columnwithpartitionabutment
Adhesive detailTheadhesiveusedforgluingRocksilkFireTechSlabsshouldbeathixotropicpastetypebasedonsolublesolidsofsilicateandpotassiummixedwithclayorrefractorymineralfillertoanapproximateratioof70:30byweight.Steelworkshouldideallybedrybutthepresenceofcondensationwillmerelyprolongthecuretime,notweakenthebondstrength.
Sinceonlythetopandbottomsurfaceofeachnogginisgluedwithatypicaladhesivethicknessof0.5mm,excellentratesofusageareachievable.Note:Steelworkshouldbecleanandfreefromgreasepriortotheapplicationofadhesive.
*ForfurtherdetailscontactourTechnicalAdviceandSupport Centre.
RocksilkFireTechSlab
Masonrywall
KnaufWallboardnotfixedtothisC-Stud
Directedgefixingwithpigtailscrewsat maximum150mmcentres
Directedgefixingwithpigtailscrewsat maximum150mmcentres
RocksilkFireTechSlab
KnaufWallboardnotfixedtothisC-Stud
Pig tail screwsThespirallywoundorpigtailscrewsare madefrom16gaugegalvanisedwireand areavailablefromstockists.Aspecification isavailableonrequestfromourTechnicalAdvice and Support Centre.
Thescrewsshouldbeinstalledflushat150mmcentresonboardtoboardjointsand100mmcentresovernoggins,usingeitherpowerorhandtools.Thereisnoneedtocountersinkthescrewheads.
280
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
Fire protectionMezzaninefloors
Rocksilk FireTech Slab
• Simple,cleanandquicktoinstall • Providesupto3hoursfireresistance• Systemcoverssectionfactorsupto 310Hp/A-(A/V)
Rocksilk FireTech Slab
• Non-combustiblewithaEuroclassA1 reaction to fire rating
• ZeroOzoneDepletionPotential(ODP)
• ZeroGlobalWarmingPotential(GWP)
PerformanceFire performanceRocksilkFireTechSlabisclassifiedas non-combustibletoBS476:Part4:1970(1984).Class1SurfaceSpreadofFlametoBS476:Part7:1977,andClass‘O’totheBuildingRegulations.RocksilkFireTechSlabisdesignedtoprovideupto3hoursfireprotectiontothemezzaninefloorcolumnsupportsystem,therebysatisfyingthecurrentBuildingRegulationsandinsuranceindustryfireresistanceperformancestandards.
PerformanceRocksilkFireTechSlabisrotproof,doesnotsustainvermin,willnotencouragethegrowthoffungi,mouldorbacteriaandisodourlessandnon-hygroscopic.
ProductRocksilk FireTech Slab isadenserockmineralwoolslabspecificallydesignedforthefireprotectionofstructuralsteelwork.
Typical constructionTheexposedsurfaceofasteelsectionisfullyenclosedinRocksilkFireTechSlab,usingametalclip,snap-locksystem.
InstallationThecolumncaseispre-fabricatedtosuitthespecificbeamorcolumn.ItislinedwithRocksilkFiretechSlabwhichispre-bondedtothesteelskin.Notethatnoadhesiveisappliedtothejointsbetweenindividualslabs.ThecolumncaseismadeofgalvanizedorPVCcoatedsteelminimum0.7mmthick.Forcolumns,thecasingisnormallysuppliedintwopieceswiththeclosingfacefixedwithsnap-lockjoints.
Three-sidedencasementsaresecuredat300mmcentrestocontinuousgalvanizedsteelangles,ortheflangeofthesteelsection,ortothewallorfloorat500mmnominalcentres.Alternativelythecasingmaybesecuredusinganintegralliponthecasing.
Fp03
RocksilkFireTechSlab
REFURB
281
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
TechnicalspecificationRocksilkFireTechSlab….mmthick,tobe usedtoprovidefireprotectiontostructuralsteelworkinamezzaninefloorsystem.
Alternatively,consulttheNationalBuildingSpecifications,Standardversionclause/clauses…K11/885…………
KnaufInsulationspecificationclausescanbedownloadedfromknaufinsulation.co.uk/nbs
Table1-Mezzanine floors
Time-mins BoardThickness(mm) Hp/A
60 20 224
25 260
30 310
35 310
40 310
45 310
90 20 91
25 115
30 139
35 165
40 190
45 217
50 244
55 260
60 270
65 310
120 20 57
25 72
30 87
35 102
40 117
45 133
50 149
55 165
60 181
65 198
180 30 49
35 58
40 66
45 75
50 84
55 92
60 101
65 110
282
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
Cavity barriersCavitybarrierdesign
DesignconsiderationsEverybuildingmustbedesignedandconstructedinsuchawaythatintheeventofanoutbreakoffirewithinthebuilding,theunseenspreadoffireandsmokewithinconcealedcavitiesinitsstructureandfabricisinhibited.TheBuildingRegulationsrequirecavitybarrierstosub-dividevoidsiftheyextendbeyondcertaindimensions.
Inadditioncavitybarriersarealsorequiredtobeplacedabovefireresistingpartitions.Bothglassandrockmineralwoolproductsareidealtoactascavitybarriersduetotheirinherentnon-combustibility.
Inthecaseoffirestoppingminorimperfectionsoffitbetweenconstructionelementsorcomponents,itisacceptabletosealsmallgapswithunfacedglassorrockmineralwoolproducts.However,forspecificperiodsoffireresistanceinsmallandlargevoids(asrequiredbytheBuildingRegulations)itisnecessarytousespecificproductsthathavebeentestedandassessedtooffertherequiredperformancewheninstalledinaspecificway,ifnecessary,usingspecificfixingcomponents.
ConcealedcavitiesFireandsmokespreadinconcealedspacesisparticularlyhazardousbecausefirecanspreadquicklythroughoutabuildingandremainundetectedbytheoccupantsofthebuilding.
Cavitybarriersareusedtosubdivide cavitiesandsopreventsmokeandflamefromby-passingfire-resistingwallsandpartitions.Themaximumdistancebetweenbarriersmustbeappropriatetothelocationofeachcavity.Also,dueconsiderationmustbegiventotheclassofsurfaceexposedwithinthecavity.
Cavitybarriersshouldachieveatleast30minutesfireresistance,providingaminimumof30minutesintegrityand15minutesinsulation.
Detailedrequirementsarecomplex.ForfulldetailsaboutthepositionandspacingofcavityfirebarriersrefertotherelevantsectionsoftheappropriateBuildingRegulations.
SmallcavitybarriersSmallvoidsincludethecavitiesinexternalwallsandvoidsbeneathraisedaccessfloors.Largervoidsincludethespacesbetweensuspendedceilingsandsoffitsorroofs.
Incavitiesinexternalwallstheresilientpropertiesofglassmineralwoolmeanthatitcanbecompressionfitted,betweentheouterleafandtheinnerleaforframe.Thenon-combustiblenatureofglassmineralwoolallowsittoresisttheeffectsoffire,enablingittoremaininplaceduringthefireandeffectivelyblockthetransferoffirethroughthecavity.
LargecavitybarriersInEngland,WalesandNorthernIreland,allcavitybarriersshouldbeconstructedtoprovideatleast30minutesfireresistanceand15minutesinsulation.InScotlandlargecavitybarriers,whicharedefinedasbeinggreaterthan1mx1minsize,mustprovidethesame.
FixingsystemsAnyproductusedforfireprotectioncanonlybeconsideredtobeofferingaspecificperiodoffireprotectionwhenitisinstalledinthemannerspecifiedintheappropriatefiretestreport.Thisincludesthespecificationofallassociatedfixingsandsupportingframework.
283
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
DefinitionsThefollowingdefinitionsaretakenfromApprovedDocumentB(Firesafety)-Volume2:Buildingsotherthandwellinghouses(2006)
CavitybarrierAconstruction,otherthansmokecurtain,providedtocloseaconcealedspaceagainstpenetrationofsmokeorflame,orprovidedtorestrictthemovementofsmokeorflamewithinsuchaspace.
Fire stopSealprovidedtocloseanimperfectionof fitordesigntolerancebetweenelementsorcomponents,torestrictthepassageoffire orsmoke.Anyunfacedglassorrockmineralproductcanbeusedasafirestop.
50mmRocksilkSmokeandFireBarrier 50mmRocksilk
Smokeand Fire Barrier
50mmcavity
Suspendedceiling of12.5mmplasterboard
30minutesfireresistance 1hourfireresistance
Photograph courtesy of Henley Building Systems
Small cavity barriersProduct:EarthwoolCavityBarrier
Seepage:284
Large cavity barriersProduct:RocksilkSmokeandFireBarrier Seepage:286
Fp04
Fp05
Period of fire resistance (mins)
Knauf Insulation solution 0mins 30mins 60mins 90mins 120mins 150mins 180mins 210mins 240mins
284
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
• MeetsBuildingRegulation requirementsforfire,acousticsand party wall bypass applications
• Simple,cleanandquicktoinstall
• Colourcodedforeasyidentification
EarthwoolCavityBarrier
• Non-combustiblewithaEuroclassA1 reaction to fire rating
• A+GenericBREGreenGuiderating
• ZeroOzoneDepletionPotential(ODP)
• ZeroGlobalWarmingPotential(GWP)
Fire protectionSmallcavitybarriers
EarthwoolCavityBarrier
InstallationInverticalapplications,bothflangesoftheEarthwoolCavityBarriershouldbefixedtotheinner leaf.
Inhorizontalapplications,thetopflangeof thepolythenesleeveshouldbefixedtothe inner leaf.
AlljointsandintersectionsofEarthwoolCavityBarriersshouldbecloselybutted.
Typical constructionEarthwoolCavityBarriersareengineeredtopreventthespreadofsmokeandfirethroughwalls,floorsandcavitiesintimberframe,metalframeandmasonrybuildings.
Theyarealsosuitableforreducingflankingnoisetransmissionintheseconcealedcavities.
TheuseofthecorrectsizeofEarthwoolCavityBarrierisessential.EarthwoolCavityBarriersaredesignedtocompresstoatightfitincavitiesandintheeventoffirebreakingintothecavity,EarthwoolCavityBarriersdonotrelyonthepolytheneflangestoholdtheminplace,butontheircompressionbetweentheinnerandouter leaf.
Itis,therefore,essentialtospecifytheEarthwoolCavityBarrierbyreferencetotheactualconstructedcavitywidth.
ProductEarthwoolCavityBarrierismanufacturedfromacontinuouslengthofnon-combustibleglassmineralwoolwhichiscompressedwithinaresilientpolythenesleeveincorporatingtwoflangesdesignedforeaseoffixing.
Thepolythenesleeveiscolourcodedtosuitavarietyofcavitywidthsfrom50mmto100mmandeliminatestheneedforweatherprotectionduringinstallation.
Thebarriersare1200mmlongandcanbeusedinbothverticalandhorizontalapplications,andareavailableintwostandardwidths(100mmand300mm).100mmbarriersareusedfornormalfirestoppingandnoisereductionapplications.300mmbarriersareusedwherehigherperformancelevelsarespecifiedandatpartywall/externalwallcavityjunctions.
Fp04
EarthwoolCavityBarrierstapledthroughtopflangetosheathingtofullyfillthecavity
Brickouterleaf
NEW BUILD
285
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
TechnicalspecificationTimber frame constructionEarthwoolCavityBarrier100mm*/300mm*wide,colouredyellow*/blue*/white*tobefrictionfittedinthepositionsshownonthedrawings.EarthwoolCavityBarriertofullyfillthedepthofthecavity.
Polytheneflangestobestapledtothetimber*/sheathingboard*toholdthecavitybarrierinplace.
AlljointsandintersectionsofEarthwoolCavityBarriersshouldbecloselybuttedtogether.
Alternatively,consulttheNationalBuildingSpecifications,Standardversionclause/clauses…P10/420……………
KnaufInsulationspecificationclausescanbedownloadedfromknaufinsulation.co.uk/nbs
Masonry constructionEarthwoolCavityBarrier100mm*/300mm*wide,colouredyellow*/blue*/white*tobefrictionfittedinthepositionsshownon thedrawings.
EarthwoolCavityBarriertofullyfillthedepth ofthecavity.
AlljointsandintersectionsofEarthwoolCavityBarriersshouldbecloselybuttedtogether.
Alternatively,consulttheNationalBuildingSpecifications,Standardversionclause/clauses…P10/420……………
KnaufInsulationspecificationclausescanbedownloadedfromknaufinsulation.co.uk/nbs
PerformanceFire performanceEarthwoolCavityBarriersaremanufacturedfromglassmineralwoolwhichhasaEuroclassA1ratingwhenclassifiedinaccordancewithBSEN13501-1. EarthwoolCavityBarriershavebeentestedforfireresistanceinaccordancewithBS476:Part8:1972andwillprovide60minutesstability,integrityandinsulation.
Acoustic performance
BuildingRegulationsrequiretheuseofacavityclosertoreduceflankingnoisetransmissionalongpartywallcavitiesandexternalwallcavitiesinmasonryandtimberframeconstructions.
EarthwoolCavityBarriersmeetthegenericdescriptionforcavityclosersandwillthereforeensurecompliancewithPartEandRobustDetailsintimberframeandmasonrywallconstructions.
Table2-Colourcoding
Cavitywidth(mm) Colour
50-65 yellow
66-80 blue
81-100 white
Typicaljunctionwithpartywall
300mmwideEarthwoolCavityBarrier-stapledtosheathingboardeithersideofpartywall
EarthwoolTimberFramePartyWallSlab
EarthwoolFrameTherm
286
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
Fire protectionLargecavitybarrier
RocksilkSmokeandFireBarrier
• Simple,cleanandquicktoinstall
• Providesbothfireandacoustic performance
• Versatile,flexibleandadaptable system
RocksilkSmokeandFireBarrier
• Non-combustiblewithaEuroclass A1 reaction to fire rating
• ZeroOzoneDepletionPotential(ODP)
• ZeroGlobalWarmingPotential(GWP)
For one hour fire resistanceTwolayersof50mmRocksilkSmokeandFireBarrier,separatedbya50mmairspace,appliedasahangingcurtainwithwiremesh totheoutside,supportedcontinuouslyfrom aboveandbothsides,usingthefixingslistedin Table3.Atthebaseitiseitherlappedfreelyontothebackofasuspendedceiling,orfixedtoapartition head.
UsefoilfacedRocksilkSmokeandFireBarrierwhentheceilingvoidisusedasanairplenum.
InstallationSeepage288-291forinstallationdetails. SeeTable3forspecificationoffixingsandsupportingmetalwork.
Typical constructionFor half an hour fire resistanceAsinglelayerof50mmRocksilkSmokeandFireBarrier,appliedasahangingcurtain,supportedcontinuouslyfromaboveandbothsides,usingthefixingslistedintheTable3.
AtthebaseRocksilkSmokeandFireBarrieriseitherlappedfreelyontothebackofasuspendedceilingorfixedtoapartitionhead.Suitablefordropsupto7metres.
Product RocksilkSmokeandFireBarrierismadefromrockmineralwoolandformedintoaflexiblemattressfacedononesidewithgalvanised wiremeshstitchedinposition.
RocksilkSmokeandFireBarrierisalsoavailablefoilfacedononeorbothsides.
RocksilkSmokeandFireBarriermustbeinstalledinaccordancewiththespecificationsdetailedbelowandonthefollowingpages.Ifthesespecificationsarenotstrictlyfollowedtheinstallationcannotbedeemedtoofferanyspecificperiodoffireprotection.
Fixingcomponents:Angle:Mildsteel-50mmx50mmx2mmor60mmx40mmx2mm
Strip:Mildsteel-40mmx2mm
SeeTable3forsuitablemethodoffixinganglesandstripstosubstrate.
Fp05
RocksilkSmokeand FireBarrierfixedto50mm timberspacer
Metalanglefixedtosoffit
RocksilkSmokeandFireBarrier
50mmairgap
REFURB
287
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
Metalanglesfixedtosoffit
RocksilkSmokeand Fire Barrier
RocksilkSmokeandFireBarrierfixedtotimberspacer
TechnicalspecificationHalf hour cavity barrierAsinglelayerof50mmRocksilkSmokeandFireBarrier(*foilfaced)tobeinstalledinthepositionsmarkedonthedrawings,andfixedinaccordancewiththemanufacturer’srecommendations.Alljointseithertightlybutted,overlapped,orwithedgesreturned,andstitchedinacontinuousspiralloopwith1mmdiametergalvanisedlacingwire. (*deleteasappropriate)
OnehourcavitybarrierTwolayersof50mmRocksilkSmokeand FireBarrier(*foilfaced),separatedbya50mmairspacetobeinstalledinthepositionsmarkedonthedrawings,and fixedinaccordancewiththemanufacturer’srecommendations.Alljointseithertightlybutted,overlapped,orwithedgesreturned,andstitchedinacontinuousspiralloopwith1mmdiametergalvanisedlacingwire.(*deleteasappropriate)
Alternatively,consulttheNationalBuildingSpecifications,Standardversionclause/clauses…K10/545……………
KnaufInsulationspecificationclausescanbedownloadedfromknaufinsulation.co.uk/nbs
PerformanceFire performanceRocksilkSmokeandFireBarrierismadefromrockmineralwoolandisclassifiedasnon-combustibletoBS476:Part4:1970.RocksilkSmokeandFireBarrierhasaClass1SurfaceSpreadofFlametoBS476:Part7:1997andisClass‘0’totheBuildingRegulations.
WhensubjectedtofullscalefireresistanceteststoBS476:Part22:1987,asystemcomprisingonelayerof50mmRocksilkSmokeandFireBarrier,fixedbyusingthecomponentsandmethodsdetailedonthefollowingpagesachieved19minutesinsulation,andretaineditsintegrityfor35minutes,afterwhichtimethetestwasdiscontinued.50mmRocksilkSmokeandFireBarriertherebysatisfiesthecriterialaiddownintheBuildingRegulationsforcavitybarriers,byexceedingtheminimumrequirementof15minutesinsulationand30minutesintegrity.
WhensubjectedtofullscalefireresistanceteststoBS476:Part22:1987,asystemcomprisingadoublelayerof50mmRocksilkSmokeandFireBarrier,fixedbyusingthecomponentsandmethodsdetailedonthefollowingpages,achieved61minutesinsulation,andretaineditsintegrityfor66minutes,afterwhichtimethetestwasdiscontinued.
Adoublelayerof50mmRocksilkSmokeandFireBarriertherebysatisfiesthecriterialaiddownintheBuildingRegulationsforonehourcavitybarriers.
Thesetestsincorporatedverticalandhorizontaljointsbetweenbarriers.Fireresistanceiseffectivefromeithersideofthebarrier.Whentested,thewiresidewasexposedtothefurnaceasthisisthesidemostvulnerabletofire.
288
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
Fire protectionInstallation of half hour cavity barrier
80mmminimum
1.Metalanglefixedtopurlin 2.Fixedtopurlin 3.Fixedtoribofcofferedslab
4.Fixedacrosscofferedceiling 5.Perimeterfixingwithsteelstrip 6.Junctionwithceiling
Attheceilingjunction,RocksilkSmokeandFireBarrieriscutanddrapedonandbetweenthejoists,andsecuredbyfixingtosteelangle,whichisitselffixedtothejoists(Figure6).Forsuspendedceilings,seeFigure11.
Atpartitionsorwallheads,ifasecurefixingisavailable,asatsoffits,RocksilkSmokeandFireBarriershouldbeclampedwithasteelstrip
Twolayersof50mmRocksilkSmokeandFireBarrierwitha50mmairspacebetweenthemareneededforonehourfireresistance.Ingeneraltwoseparatelayersshouldbeinstalledbacktoback,eachinamanneridenticaltothatshownforhalfhourfireresistance.ThejointsinthetwolayersshouldbestaggeredandRocksilkSmokeandFireBarrierreturnedoutwardatthetopandbottom.Thewirereinforcedsidesshouldbeplacedoutward,seeFigure7.
Concretedecks RocksilkSmokeandFireBarrierisclampedbetweenthedeckandsteelanglesecuredbyexpandingbolts.Ifthedeckiscoffereditshouldusuallybepossibletolocatethecavitybarrieralongoneoftheribs(Figure3).Iffittedacrossthecofferingitshouldbeclampedbysteelstrip,tothesteelanglewhichissecuredtotheribs.
Ifthedepthofcofferingislessthan100mm,RocksilkSmokeandFireBarriershouldbereturnedatthetopby300mm,toallowforcuttingattheribsandpushedsecurelyintothecoffering(Figure4).Ifthedepthofcofferingisgreaterthan100mm,RocksilkSmokeandFireBarriershouldbefixedaroundthecofferingusingsteelangle,asdescribedabove.Alternatively,proprietaryprofilefillersmaybeused.
Theperimeterofthebarriershouldbesecuredwithsteelstrip(Figure5).
InstallationThefollowinginformationandillustrationsoutlinetypicaldetailsfortheinstallationoflargecavitybarriers.Incaseofuncertainty,refertoKnaufInsulation.
Metal deck with overdeck insulation
IfRocksilkSmokeandFireBarrierrunswiththeslopeoftheroof,asupportingsteelangleshouldbefixedbetweenpurlinsandthesmokeandfirebarrierclampedtothiswithsteelstrip(Figure1).Theinsulationshouldproject80mmbeyondthestriptoensureagoodseal.
Iffittedacrossthesheetingprofile,RocksilkSmokeandFireBarriershouldbeboltedtothepurlins(Figure2).Itisreturnedatthetop,toalengthequivalentto3timestheprofiledepth,toallowforcuttingattroughsandpushingsecurelyintoprofiles.Alternatively,proprietaryprofilefillersmaybeused.
289
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
7.Fixedtoconcreteslab 8.Fixingtowallhead
10.Fixingatperimeter9.Fixingtotimberspacer
Partitions and wall heads Ifpossible,RocksilkSmokeandFireBarriershouldbesecuredwithsteelstriptothepartitionorwallheadsoastomaintainthe50mmairspace(Figure8).Ifthisisnotpossible,itshouldbedrapedwithareturnofatleast150mm,orfixedtoatimberspacerwhichisfixedtothepartitionorwallhead(Figures6and9).
PerimeterfixingRocksilkSmokeandFireBarriershouldbesecuredwithsteelstriptothesidesoftheperimeterwall,soastomaintainthe50mmairspace(Figure10).
Fire protectionInstallation of one hour cavity barrier
Steelstripfixings: Tomasonryandconcrete BuildexTapcon4Hmasonryanchors Totimber BuildexHTrangeoffixings Tosteelangle Steelbolts
MinimumreturnofRocksilkSmokeandFireBarrier-Whenclampedtoflatsurface(verticalorhorizontal)80mm.Whenlooselaidoverhorizontalsurface-150mm.
Fixing system specifications
Table3-Specification of angles and stripsAngle:Mildsteel-50mmx50mmx2mmor60mmx40mmx2mm Strip:Mildsteel-40mmx2mm
Anglefixingstoconcretedecksandsteelsections:angles50x50x2mmFireresistance Maximumspacingoffixings(m)forthefollowingdropheights(m)period(mins) 3 3.5 4 4.5 5 5.5 6 6.5 730 2 2 2 2 2 2 2 2 260 2 2 1.75 1.5 1.5 1 1 0.75 0.75Key: M8
boltsM6bolts
Anglefixingstotimberbeamsandtrusses:angles50x50x2mmFireresistance Maximumspacingoffixings(m)forthefollowingdropheights(m)period(mins) 3 3.5 4 4.5 5 5.5 6 6.5 730 2 2 2 2 2 2 2 2 260 2 2 1.75 1.5 1.5 1 1 0.75 0.75Key: BuildexHTscrews,minimum25mmthreadpenetrationintotimber
BuildexHTscrews,minimum40mmthreadpenetrationintotimber
290
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
Fire protectionJointing Rocksilk Smoke and Fire barrier
Suspended ceilingsWithsuspendedceilingswherepositivefixingtowallheadsorpartitionheadsisnotpossible,theweightofRocksilkSmokeandFireBarrierandthestiffnessofwirefacingaresuchthatitwillformaneffectivesealifitlapsthehorizontalsurfacebyaminimumof150mm.Lappedjointsareonlypermissiblewherethesuspendedceilinghasthesamefireresistanceasthecavitybarrier.RocksilkSmokeandFireBarriermustbeslitandfittedaroundanycrossingteestoeliminategapsandensurethatexcessiveloadsarenottransferredtotheceiling(Figure11).
JointingThissectiondescribestheapprovedmethodsforjoiningadjacentpiecesofRocksilkSmokeandFireBarrier.Themethodsareapplicabletobothhalfandonehourlargecavitybarriers.
12.Verticalbuttjoint 13.Verticalreturnedjoint 14.Verticallapjoint
500mmminimumoverlap
15.Perpendicularjoint 16.Horizontaljointatadrop
VerticalandhorizontaljointsThreemethodsofsecuringthejointsbetweenadjacentpiecesofRocksilkSmokeandFireBarrier are approved.
Jointsaretightlybuttedtogetherandstitchedinacontinuousspiralloopwith1mmdiametergalvanisedlacingwire.Thestitchingshouldpassthroughthereinforcementmeshandthewooloneachsideofthebuttjointatcentresnotexceeding100mm(Figure12).
AlternativelytheRocksilkSmokeandFireBarrieredgesarereturnedatleast80mmandwiredtogether(Figure13),ortheymaybelappedatleast100mmandwiredtogether(Figure14).
PerpendicularjointsThejunctionbetweentwobarriersshouldbesecurelywiredtogether(Figure15)withareturnofatleast80mm.
DropsAllbarrierscanbeusedfordropheightsupto5mwithoutadditionalsupport.Fordropsbetween5mand7mitisnecessarytointroduceadditionalsupportingmembersinordertosupporttheweightofthefirebarriers(Figure16).
ServicesServiceswhicharepermittedbyBuildingRegulationstopenetratebarriers,should beprovidedwithcollarsofRocksilkSmokeandFireBarrieratleast300mmlong,sewntothemainbarrierandthenstrappedorwiredsoastoavoidanypossibilityofgaps(Figure17).
Ahalfhourbarrierrequiresacollaron onesideofthebarrier.Aonehourbarrierrequiresonecollaronbothsidesofthebarriersystem.
11.Junctionwithsuspendedceiling
291
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
Penetrating steelwork ThisshouldbeprovidedwithacollarofRocksilkSmokeandFireBarrieratleast300mmlong(Figure18).Thecollarisfixedtotheconcreteormetaldeckbyclampingagainstthesesurfacesbehindsteelangle.ThevoidsinthesteelworkarefilledwithRocksilkSmokeandFireBarrier(figure18).Ahalfhourbarrierrequiresacollarononesideofthebarrier.Aonehourbarrierrequiresonecollaronbothofthelayersofthebarriersystem.
AccessWherepermanentaccessisneededthroughthebarrier,afiredoorandframe,ratedtotheappropriatefireresistance,mustbeused.RocksilkSmokeandFireBarriershouldbefixedsecurelytotheframe.
300mmminimum
17.Penetratingpipe
19.Temporaryframeworktoeasehandling
18.Penetratingsteelwork
HandlingDependingonthesizeofthebarrierandtheworkingspaceavailable,itissometimesdifficulttoholdthematerialinplacewhiletopfixingsarebeingsecured.Itwillbefoundhelpfultomakeatemporarypropfrom,e.g.slottedangle.ThismaycompriseacrosspieceoflengthappropriatetothewidthoftheRocksilkSmokeandFireBarrier,withstudsonthetopwhichwillhookintothewiremeshoftheRocksilkSmokeandFireBarrier.Thismaybeswivelledonthetopofahandle,andsecuredhorizontallyortotheangleoftheroofbyanadjustablebrace.ItisusedtoholdtheRocksilkSmokeandFireBarrierup,100mmorsobehindthefixinglocation,whilefixingisbeingcarriedout.Whenfixingtoaslopingdeck,thetopoftheRocksilkSmokeandFireBarriershouldbetrimmedtothecorrectangletoensurethatjointsaretrulyvertical(Figure19).
Following tradesTheintegrityofbarriersmustberestoredifdisturbedbyfollowingtrades,eitherduringthebuildingprocessoraftercompletion.Thisinstructionshouldbeincorporatedintothebuildinghandbook.
Fire protectionPenetrating pipes and ducts
292
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
Internal floorRefurbishmentoftimberseparating/internalfloor
EarthwoolFlexibleSlab
Minimum18mmChipboardEarthwoolFlexibleSlab
Supportmeshstapledtojoists
Existingceiling
• Existingceilingcanbe retained,avoidingdisruption to rooms below
• Providesthermalandacoustic insulation as well as fire resistance
• Meetstherequirementsof Approved Document E for sound resistance of internal floors
EarthwoolFlexibleSlab
• Non-combustiblewithaEuroclassA1 reaction to fire rating
• A+GenericBREGreenGuiderating
• ZeroOzoneDepletionPotential(ODP)
• ZeroGlobalWarmingPotential(GWP)
InstallationAfterremovalofthefloordeck,linethevoidsinthefloorwith25mmwiremesh,toformasupporttrayfortheinsulation.Staplethewiremeshtothesidesofthejoists,atleast40mmupfromceilinglevel.
Cut100mmEarthwoolFlexibleSlabstosizeandlayontothewiremeshsupport,sothattherearenogapsbetweentheinsulationandthejoists.Buttjointtheinsulationslabssotherearenogapsbetweenthem.
Fixachipboardfloordeck,atleast18mmthick,over the entire floor area.
Typical constructionTheuseofEarthwoolFlexibleSlabinasuspendedtimberfloorachievesonehourfireresistance,whilstallowingtheexistingceilingtoberetained.
Toachieveonehoursfireresistance:
•Thefloordeckshouldbeatleast18mmthicktonguedandgroovedchipboardortimberboarding
•Thejoistsmustbeatleast200mmdeepand37mmwide
•Thewiremeshshouldbestapledtothesidesofthejoistsatleast40mmabovetheceilinglevel
•Anyceilingcanbeused
ProductsEarthwoolFlexibleSlabisamulti-purposerockmineralwoolslabdesignedtobefrictionfittedinawiderangeofacoustic,thermalandfireresistantapplications.
IntroductionWheretheloftspaceofatwostoreyhouseisconvertedintohabitableaccommodation,thefloortothenewroomsmusthave30minutesfireresistanceoveranypartoftheescaperoutedirectlybelow.Thisisoftenthecasewhen,forexample,thefloorofthenewroomextendsoveralandinginthestairwayenclosurebelow.Thesolutiononthispageprovidestherequiredperiodoffireprotectionwithouthavingtoupgradetheexistingceiling.
Fp06REFURB
293
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
TypicalspecificationLay100mmEarthwoolFlexibleSlabon25mmchickenwiremesh,stapledtosidesofjoistsatleast40mmupfromceilinglevelandat600mmcentres.Thejoistsshouldbeatleast200x37mmandspacedatnotmorethan600mmcentres.Theflooringboardtobeatleast18mmthick.
Alternatively,consulttheNationalBuildingSpecifications,Standardversionclause/clauses…P10/250……………
KnaufInsulationspecificationclausescanbedownloadedfromknaufinsulation.co.uk/nbs
PerformanceFire performanceEarthwoolFlexibleSlabisclassifiedasEuroclassA1toBSENISO13501-1andnon-combustibletoBS476:Part4:1970(1984),class1SurfaceSpreadofFlametoBS476:Part7:1997andClass‘0’totheBuildingRegulations.
AcousticTheacousticperformanceofaninternalfloorcontaining100mmofEarthwoolFlexibleSlab(and12.50mmstandardplasterboardceiling)willbeatleast40dBandtherefore,meettherequirementsofApprovedDocumentEoftheBuildingRegulations.
Existingwall
Minimum18mmchipboard
EarthwoolFlexibleSlab
WiremeshstapledtojoiststoprovidesupportforEarthwoolFlexibleSlab
Existingceiling
EarthwoolFlexibleSlabcutandfrictionfittedbetweenlastjoistandwall
Typicalwallfloorjunction
294
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
•Lightweight,mineralwoolhas approximatelyonehalftoonethirdof the weight of traditional silicate and vermiculite boards•Fastandsimplefixingsystemmakesthe slabsquickandeasytoinstall •Providesexcellentacousticandthermal performance insulation
Rocksilk Pyroduct Slab
•Non-combustiblewithaEuroclassA1 reaction to fire rating
•ZeroOzoneDepletionPotential(ODP)
•ZeroGlobalWarmingPotential(GWP)
ProductRocksilk PyroDuct Slabisa160kg/m3densityrockmineralwoolslab.TheslabsarefacedwithabrightClass‘O’reinforcedaluminiumfoil,makingitsuitableforapplicationsabovecleanrooms,withinairplenumsorforaestheticpurposes.
Typical constructionTheexposedsurfacesofsteelductworkarefullyenclosedinRocksilkPyroDuctSlabusingthefixingsystemshownonthefollowingpages.RocksilkPyroDuctSlabcanbeusedtoprovideupto2hoursfireprotectiontosteelductwork.
InstallationRocksilkPyroDuctSlabisappliedinasinglethickness,removingtheneedformultilayerapplications.Thisprovidesassuranceofauniformthicknessandthereforetheintegrityofthesystemandallowsforeasyverificationofcorrectinstallationonsite.
Individualslabsare1200mmlongand600mmwidemakingthemeasytocarryaroundsite.Theirlightweightnaturealsomakesthemeasytouse.Thefixingsystemofweldedpinsandsquareedgebuttjoints givesafastandsimplesystemwhichrequiresnospecialveecuts,drillingorsub-framesandalsomakestheslabsfastandeasytoinstall.
PerformanceFireRocksilkPyroDuctSlabisclassifiedasnon-combustibletoBS476:Part4:1970(1984),Class1surfacespreadofflametoBS476:Part7:1997andClass‘O’totheBuildingRegulations.
RocksilkPyroDuctSlabhasbeentestedinaccordancewithBS476:24:1987andcanprovideuptotwohoursfireresistanceforsteelductworkexposedtofireeitherinsideoroutsideof the duct.
Thermal RocksilkPyroDuctSlabhasathermalconductivityof0.035W/mK.
Moisture resistanceRocksilkPyroDuctSlabisnon-wickingwhentestedtoBS2972:1989:Section12.Whenexposedto90%relativehumidityand20ºC,RocksilkPyroDuctSlababsorbslessthan0.004%ofmoisture.
Fire protectionSteelDuctEncasement
Rocksilk Pyroduct Slab
NEW BUILD REFURB
Fp07 Blockworkcompartmentwall
RS33Slabaspacking
Steelanglerivettedat150mmcentres
RocksilkPyroductfixedtoduct
RocksilkPyroductgluedtowallandinsulation
295
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
TypicalspecificationRocksilkPyroDuctSlab...........mmthicktobeusedtoprovideupto2hoursfireprotectiontosteelductworkasdetailedinthisschedule(specifiertostatewhichductsrequirefireprotection).
Itistobeinstalledusingthefixingsystemasdetailed,andatathicknesswithdueregardtotheductsize,orientationandperiodoffireprotectionrequired.
Table4-RequiredthicknessofRocksilkPyroDuctSlab
Thicknessofinsulation(mm)
Periodoffire resistance(hours)
Verticalducts Horizontalducts Kitchenextractducts
0.5 - - 45
1.0 45 45 90
2.0 90 90 -
Table5-Weightofslabs
Thickness (mm)
Weight (kg/m2)
45 7.20
90 14.40
WeightTable5showstheweightpersquaremetreofRocksilkPyroDuctSlab.
Fire protectionAnyverticalorhorizontal,rectangularorsquaresteelductworkassociatedwithventilationand/orairconditioningsystems,includingductedsupplyandextractsystems(whetherthroughductsorplenums),mechanicallyassistedsystemsandthoserelyingonnaturalconvectioncanbeprotectedwithRocksilkPyroDuctSlabstoprovidetherequireddegreeoffireprotection.
Achieving the required fire performanceTherequiredthicknessofRocksilkPyroDuctSlabdependsupontheorientationoftheductandtheperiodoffireresistancerequired.Table4displaysthethicknessesrequiredforverticalandhorizontalductsandalsoforkitchenextractductsforthecommonestperiodsoffireresistance.
Foilfacingomittedforclarity
296
Fire Protection6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
Fire protectionSteel Duct Encasement
Greaterthan1000mm
350mm
350mm
50mm
500mmmax
350mm 50mm
500mmmax
X
Y
Greaterthan1000mm
350mm
350mm
50mm
500mmmax
350mm 50mm
500mmmax
Greaterthan1000mm
350mm
350mm
50mm
500mmmax
350mm 50mm
500mmmax
X
Y
X
Y1.Weld3mmdiametersteelpinsat350mmlongitudinalcentres alongthecentrelineoftheverticalsidesoftheductwork.
2.Wherethedimensionoftheverticalsidesexceed1000mm, thesteelpinsshouldbeinrowsstarting50mminfromtheedge andspacedapartatamaximumof500mmcentres.
3.Weld3mmdiametersteelpinsat350mmlongitudinalcentres alongthehorizontalsurfacesoftheductworkinrowsstarting 50mminfromthelongitudinaledgeandspacedapartata maximumof500mmcentres.
4.CutRocksilkPyroDuctSlabtosizeasfollows: horizontalsurfacestodimensionX, verticalsurfacestodimensionY+2t, wheret=thicknessofinsulation.
5.Attachtheinsulationbyimpalingovertheweldedpinsand securingwith38mmspringsteelwashers.
6.Glueallboardtoboardjointsusingathixotropicsilicate basedadhesive. 7.Trimoffpinlengthstoabout30mmexcessandbendthis excesstoformarightanglewiththeinsulation. 8.Althoughnotessential,itisgoodpracticetooffsetthejoints foreachsurface.
6
7
8
297
Fire Protection 6.1
Technical Advice and Support Centre 01744 766666 www.knaufinsulation.co.uk
6.1
Fire protectionSteel Duct Encasement
Vertical ductsTheinstallationdetailonthepreviouspagesforhorizontalductsisalsorelevantforverticalductwork,thoughthehorizontalandverticalsurfacesreferredtoforhorizontalductworkwillbethelongestandshortestsurfacesrespectivelyinverticalductwork.
Ductwork passing through compartmentwalls or floorsInaccordancewithTheBuildingRegulations,whenductworkpassesthroughanyelementofconstructionwhichhasadesignatedperiodoffireresistance,theintegrityofthatcompartmentshouldbemaintained.Inthesesituations,theductworkintheimmediatevicinityofthepenetrationshouldbestiffenedasfollows:
–
a) When the flange is within 100mm of the penetration then a50 x 50 x 3mm steel angle should be rivetted to the top edgeof the duct using a single row of rivets with washers starting50mm from the edge and at 150mm centres.
Rocksilk Universal Slab RS33 should be used to pack any gapbetween the main insulation and the blockwork.
120 x 90mm sections of Rocksilk Pyroduct Slab is glued to the wall and main Pyroduct insulation.
b) When the flange is greater than 100mm from the penetration,two angles should be used, fixed as described in a) above, and45mm Rocksilk Pyroduct Slab installed perpendicular to the duct at the penetration.
Ref: GB045012
Knauf Insulation LtdPO Box 10 Stafford RoadSt HelensMerseysideWA10 3NS
www.knaufinsulation.co.uk
Tel: 01744 766 600
DisclaimerKnauf Insulation have a policy of continuous product development, therefore product information may change without notice.
Wherever possible, products are manufactured to the appropriate British Standard (BS), or harmonised European Standards, (BS EN) and are supplied subject to our Terms and Conditions of Sale, a copy of which is available on request. Information within this bookThe designs and detailing shown in this publication are illustrative only, although every effort has been made to ensure the accuracy of all textual and pictorial content.
Knauf Insulation, its employees and authorised agents can accept no liability whatsoever, either indirectly or directly arising from the use of its products in connection with any information or advice contained in this book. It is the responsibility of Designers, Clients and Installers to check that installations achieve the appropriate standard and comply with the relevant Building Regulations. The most up to date British or European standards should be referenced at all times.
Knauf Insulation Ltd Customer Service (Sales) Technical Advice and Support Centre LiteraturePO Box 10 Tel: 0844 800 0135 Tel: 01744 766 666 Tel: 08700 668 660Stafford Road Fax: 01744 612007 Fax: 01744 766 667 Fax: 0870 400 5797St Helens Email: [email protected] Email: [email protected] Email: [email protected] www.knaufinsulation.co.ukWA10 3NS
Email: [email protected]