19
SECTION 1 INTRODUCTION

SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

SECTION 1INTRODUCTION

Page 2: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

Wilpinjong Extension Project Environmental Impact Statement Section 1 - Introduction Document Number: 00659084 Version: A 1-i

CONTENTS 1 INTRODUCTION 1-1

1.1 PROJECT OVERVIEW 1-1 1.1.1 Purpose of this Report 1-1 1.1.2 Background 1-2 1.1.3 Project Summary 1-2 1.1.4 Site Location and Tenure 1-9 1.1.5 Interaction with Other

Operations and Projects in the Vicinity of the Site 1-9

1.1.6 Proponent 1-13 1.2 SECRETARY’S ENVIRONMENTAL

ASSESSMENT REQUIREMENTS 1-13 1.3 PROJECT CONSULTANTS 1-16 1.4 DOCUMENT STRUCTURE 1-16

LIST OF TABLES

Table 1-1 Project Summary

Table 1-2 Secretary’s Environmental Assessment Requirements – Reference Summary

Table 1-3 Content Requirements of an EIS – Clause 7 of Schedule 2 of the EP&A Regulation

Table 1-4 EPBC Act Controlling Provisions – Reference Summary

LIST OF FIGURES

Figure 1-1 Regional Location

Figure 1-2 Project Location

Figure 1-3 Aerial Photograph of the Wilpinjong Coal Mine and Surrounds

Figure 1-4 Project General Arrangement

Figure 1-5a Relevant Land Ownership Plan

Figure 1-5b Relevant Land Ownership Plan Wollar Inset

Figure 1-5c Relevant Landholder List

LIST OF PLATES

Plate 1-1 Wilpinjong Coal Mine

Plate 1-2 Front End Loader Handling Coal

Page 3: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

Wilpinjong Extension Project Environmental Impact Statement Section 1 - Introduction Document Number: 00659084 Version: A 1-1

1 INTRODUCTION This document is an Environmental Impact Statement (EIS) for the Wilpinjong Extension Project (the Project). The Project would involve the continuation and extension of open cut mining operations at the Wilpinjong Coal Mine (Plate 1-1). The Wilpinjong Coal Mine is located approximately 40 kilometres (km) north-east of Mudgee, near the Village of Wollar, within the Mid-Western Regional Local Government Area (LGA), in central New South Wales (NSW). The Wilpinjong Coal Mine is owned and operated by Wilpinjong Coal Pty Ltd (WCPL), a wholly owned subsidiary of Peabody Energy Australia Pty Limited (Peabody Energy).

1.1 PROJECT OVERVIEW

1.1.1 Purpose of this Report This EIS has been prepared to accompany a Development Application made for the Project, in accordance with Part 4 of the NSW Environmental Planning and Assessment Act, 1979 (EP&A Act). This EIS considers the potential environmental impacts of the Project in accordance with the Secretary’s Environmental Assessment Requirements (SEARs) issued by the NSW Department of Planning and Environment (DP&E) on 9 December 2014 (Attachment 1), the supplementary SEARs issued by the DP&E on 22 June 2015 (Attachment 1) and clauses 6 and 7 of Schedule 2 of the NSW Environmental Planning and Assessment Regulation, 2000 (EP&A Regulation). The SEARs were issued in accordance with the requirements of clause 3 of Schedule 2 of the EP&A Regulation. A summary of the SEARs is provided in Section 1.2.

Plate 1-1: Wilpinjong Coal Mine

Page 4: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

Wilpinjong Extension Project Environmental Impact Statement Section 1 - Introduction Document Number: 00659084 Version: A 1-2

1.1.2 Background The Wilpinjong Coal Mine extracts run-of-mine (ROM) coal that is either processed on site at the Coal Handling and Preparation Plant (CHPP) or bypassed directly to product stockpiles. Coal products are transported by rail on the existing Sandy Hollow Gulgong Railway to local energy generators and to the Port of Newcastle for export. The location of the existing Wilpinjong Coal Mine is shown on Figures 1-1 and 1-2, and Figure 1-3 provides an aerial photograph of the existing mine. A description of the existing mining operations and history of approvals is provided in Sections 2.1 and 2.2, respectively. WCPL is seeking approval from the NSW Minister for Planning for Development Consent under Division 4.1 of Part 4 of the EP&A Act for the Project, which would replace the existing Wilpinjong Coal Mine Project Approval (Project Approval 05-0021). The approved Wilpinjong Coal Project was referred to the Department of the Environment and Heritage in 2005, and was determined as not a controlled action (EPBC 2005/2309). The proposed action to extend open cut coal mining and processing operations at the Wilpinjong Coal Mine was referred to the Commonwealth Minister in February 2015 (EPBC 2015/7431) (the proposed action). A delegate of the Commonwealth Minister determined on 12 March 2015 that the proposed action is a ‘controlled action’ and therefore the action also requires approval under the Commonwealth Environment Protection and Biodiversity Conservation Act, 1999 (EPBC Act). The proposed action is to be assessed pursuant to the assessment bilateral agreement with the NSW Government. Therefore, this EIS provides an assessment of potential impacts (in accordance with the supplementary SEARs) to the following controlling provisions considered by the Commonwealth Minster to be relevant to the action: • EPBC Act listed threatened species and

communities; and

• water resources.

A summary indicating where the supplementary SEARs have been addressed in the EIS is provided in Attachment 2.

1.1.3 Project Summary The proposed life of the Project is approximately 17 years and would extend the life of the approved Wilpinjong Coal Mine by approximately seven years (i.e. from approximately 2026 to 2033). The main activities associated with the Project would include: • open cut mining of ROM coal from the Ulan

Coal Seam and Moolarben Coal Member in Mining Lease (ML) 1573 and in new Mining Lease Application (MLA) areas in Exploration Licence (EL) 6169 and EL 7091;

• approximately 800 hectares (ha) of open cut extensions, including (Figure 1-4):

- approximately 500 ha of incremental extensions to the existing open cut pits in areas of ML 1573 and EL 6169; and

- development of a new open cut pit of approximately 300 ha in EL 7091 (Pit 8);

• continued production of up to 16 million tonnes per annum (Mtpa) of ROM coal (Plate 1-2);

• continued use of the approved Wilpinjong Coal Mine CHPP and general coal handling and rail loading facilities and other existing and approved supporting mine infrastructure;

• rail transport of approximately 13 Mtpa of thermal product coal to domestic and export customers (within existing maximum and annual average daily rail limits);

• relocation of a section of the TransGrid Wollar to Wellington 330 kilovolt (kV) electricity transmission line (ETL) to facilitate mining in Pit 8;

• various local infrastructure relocations to facilitate the mining extensions (e.g. realignment of Ulan-Wollar Road and associated rail level crossing, relocation of local ETLs and services);

• construction and operation of additional mine access roads to service new mining facilities located in Pits 5 and 8;

Page 5: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

=<

=<

WesternCoalf ie ld

G U N N E DA H B A S I N

S Y D N E Y B A S I N

G L O U C E S T E RB A S I N

N E W S O U T H W A L E S

A C T

Cootamundra

Temora

B

4

4Gulgong

WilpinjongCoal Mine

CANBERRA

Lithgow

Orange

Parkes

Forbes

Coonabarabran

Cowra

Gloucester

Dungog

NEWCASTLE

Goulburn

Yass

Tamworth

Young

Gunnedah

Gilgandra

Dunedoo

Dubbo

Mudgee

WOLLONGONG

Rylstone

Muswellbrook

Singleton

SYDNEY

Gosford

Regional Location

W I L P I N J O N G E X T E N S I O N P R O J E C T

Figure 1-1

0 100

KilometresMGA 94 ZONE 55

±

WIL

-12-

12_

WEP

_EI

S_Se

ction

1_

201B

LEGEND

Highway

Major Railway

Coalfield

Source: Geoscience Australia (2011)

Page 6: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

!

!

!

!

!

!

!

!

!

!

!

!

!

!

#

#

#

#

#

#

#

#

##

#

#

#

#

#

##

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

##

#

#

#

##

###

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

#

WollemiNational Park

RIVER

RIVER

Creek

GOULBURN RIVER

CreekCreek

Creek

RIVER

RIVER

Lake Windamere

Road

Road

Road

CASTLEREAGH

HIGHWAY

Wollar

Road

Avisford Nature Reserve

CopeState Forest

Moolarben CoalComplex

Bylong V

alley

Way

BariganCreek

WollarCreek

Cumbo

Creek

Wilpinjong Creek

Wollar Creek

GWABEGAR

RAILWAY

RAILWAY

GULGONG RAILWAY

Road

RoadUlan

CopeRoad

Ulan-Wollar Road

Wollar Road

Way

Bylong

Valley

HIGHWAY

HOLLOW

Road

Lue

Henry LawsonDrive HIGHWA

Y

Henry

Lawson

DriveBylong Coal

Project

WilpinjongCoal Mine

HIGHWAY

BYLONG RIVER

Wilpinjong Creek

B

B

Ulan Mine ComplexB

BowdensSilver ProjectB

DurridgereState Conservation Area

DurridgereState Conservation Area

Lue

Wollar

Cooyal

Bylong

Home Rule

Cooks Gap

Budgee Budgee

Ulan

MUDGEE

GULGONG

Turill

The Hulks

Comiala Flat

Meads Crossing

Goulburn RiverNational Park

Goulburn RiverNational Park

Munghorn Gap Nature Reserve

Avisford Nature Reserve

Durridgere State Conservation Area

BylongState Forest

CopeState Forest

DungereeState Forest

CopeState Forest

CUDGEGONG

GOULBURN

KRUI

Lawsons

GROWEE

Stony

Cooyal

Moolarben

Lue

Ulan

GOLDENCAST

LEREAGH

Barigan

GOLDEN

Botobolar

WARRUMBUNGLESHIRE COUNCIL

UPPER HUNTERSHIRE COUNCIL

MID-WESTERN REGIONAL COUNCIL

SANDY HOLLOW GULGONG RAILWAY

WALLERAWANG

GWABEGAR

SANDY HOLLOW GULGONG RAILWAYWALLERAWANG SANDY

GoatMountain

DairyMountain Coxs Crown

LionMountain

TongbongMountain RumkersPeakSailors Peak

BaldMountainMountGraham

BigOakys

Oz Mountain

Mt EchoeOak Hill

MudgeeMountain

Jimmy JimmyMountainHawkinsPinnacle

Box Hill

ElephantMountain

GroweeMountain

PorcupineMountainOakyMountain

BaldHill

MountPenny

LeesPinch

SummerHill

Tal TalMountain

MountStormy

MountMisery

Garrison Hill

Red Hill

DavidsMountain

SpringMountainMountMargaret

MountKnowles

MountFromeFlirtationHill ColliersHill

TaylorsHillMonkeyHill

MountMiseryCannibalHill

Box Hill

RoundHill

MountGalambine

MagpieHill

FlirtationHill

CockabuttaHill

Box Hill

MagazineHill

Round TopMountain

Bald Hill

LowesPeak

BetealweenMountain

Red HillMountBaraMountBuckarooBombira Hill

DexterMountain

BlackHill

Project LocationW I L P I N J O N G E X T E N S I O N P R O J E C T

Figure 1-2

0 10Kilometres

MGA 94 ZONE 55

±

WIL-12

-12_W

EP_EIS_

Section

1_202B

LEGENDMining Lease Boundary Exploration Licence BoundaryAuthorisation BoundaryLocal Government Boundary Mining Operation

Source: NSW Land & Property Information (2015); NSW Dept of Industry (2015); Geoscience Australia (2011) B

NSW State ForestNational Park, Nature Reserve or State Conservation Area

Page 7: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

ECA-B

ECA-A

ECA-C

vv

vv

v

v

v

v

v

v

v

vv

vv

vv

vv

v

v

v

v

v

v

vv

v

v

vv

v

v

v

v

v

v

v

v

v

v

v

v

v

v

v

vv

v

v

v

v

v

v

v

v

v

v

v

v

v

v

v v vv

v vv

vv

vv

vv

v

v

v

v

v

v

v

v

v

v

v

v

vv

EL 6169

EL 6169

EL 6169

EL 6169

EL 6169

EL 6169

EL 7091

EL 6288

CHPP

Mine Access Road

Mine Facilities Area

ROM Pad Product CoalStockpiles

ROM Pad

Rail Loop

Water TreatmentFacility

Light VehicleWorkshop

Pit 6

Pit 1Pit 2

Pit 3

Pit 4

Pit 7

Goulburn RiverNational Park

Munghorn GapNature Reserve

Munghorn GapNature Reserve

Goulburn RiverNational Park

Wilpinjong Creek

Spring

Creek

Planters Creek

Ulan-Wollar Road

Creek

ML 1573

Wollar Road

Cree

k

Wol

lar

Wilpinjong

Creek

Cum

bo

Cree

k

Cum

bo

Robi

nson

s R

oad

SANDY HOLLOW GULGONG RAILWAY

Ulan-Wollar Road

Uppe

r C

umbo

Ro

adWollar Road

Cree

k

Wol

lar

Mog

o Ro

ad

Approximate Extent ofApproved Local Roadand ETL Relocations

4

Approximate Extent ofApproved Local Roadand ETL Relocations

4

Pit 5

MOOLARBENCOAL COMPLEX

OPEN CUTMINING AREA

WOLLAR

Barig

an

Road

Wilp

injo

ng

Road

Slate

Gully

Road

WIL-12-12_WEP_EIS_Section 1_203D

Aerial Photograph of theWilpinjong Coal Mine and Surrounds

Figure 1-3

0 2

KilometresMGA 94 ZONE 55

W I L P I N J O N G E X T E N S I O N P R O J E C T±

LEGENDMining Lease BoundaryExploration Licence BoundaryApproved/Existing Open Cut and Contained Infrastructure AreaApproved Block Bank and Cumbo CreekRelocation Disturbance AreaApproved Elevated In-Pit Waste Rock Emplacement AreaExisting Local ETLExisting TransGrid 330 kV ETLEnhancement and Conservation Area

Source: WCPL (2015); NSW Dept of Industry (2015)Orthophoto: WCPL (Jun 2015; Jun 2014)

vv

Page 8: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

vv

vv

v

v

v

v

vv

vv

vv

vv

v

v

v

v

v

v

vv

v

v

v

v

v

v

v

v

v

v

v

v

v

v

v

v

v

v

v

v

v v vv

v vv

vv

vv

vv

v

v

v

v

v

v

v

v

v

v

v

vv

v

v

v

v

v

v

v

v

vv

v

v

v

v

vv

Ulan-Wollar Road

Mog

o Ro

ad

Cree

k

Wol

lar

WOLLAR

Munghorn GapNature Reserve

Goulburn RiverNational Park

Wollar Road

Cree

kW

olla

r

Cum

bo

ML 1573

Approximate Extent ofApproved Local Roadand ETL Relocations

4

Approximate Extent ofApproved Local Roadand ETL Relocations4

Creek

Wilpinjong

Pit 6

Pit 5

Pit 1

Pit 2

Pit 3

Pit 4

Pit 7

Pit 8

MLA 1MLA 1

MLA 1

MLA 2

MLA 2

MLA 1

MLA 3

MLA 2

MLA 1

MLA 1

Moolarben Coal Complex Stage 2Road and ETL Realignments

MOOLARBENCOAL COMPLEX

OPEN CUTMINING AREA

Wollar Road

Slate

Gully

Road

Uppe

r C

umbo

Ro

ad

Barig

an

Road

Wilp

injo

ng

Road

Robi

nson

s Roa

d

Ulan-Wollar Road

Goulburn RiverNational Park

Munghorn GapNature Reserve

Creek

Cum

bo

Planters

Wilpinjong

Spring

Creek

Creek

Cree

k

Creek

SANDY HOLLOW GULGONG RAILWAY

770000

7700

00

775000

7750

006415000 6415000

6420000 6420000

WIL-12-12_WEP_EIS_Section 1_207A

Project General Arrangement

Figure 1-4

0 2

KilometresMGA 94 ZONE 55

W I L P I N J O N G E X T E N S I O N P R O J E C T±

LEGENDMining Lease BoundaryMining Lease Application BoundaryApproved/Existing Open Cut and Contained Infrastructure AreaRelocated Block Bank and Cumbo CreekDisturbance AreaProposed Open Cut Extension AreaProposed Public Road RealignmentProposed Pit 3/8 Haul RoadProposed Service RoadProposed Local ETL Realignment/RelocationProposed Relocated TransGrid 330 kV ETLExisting Local ETLExisting TransGrid 330 kV ETL

Source: WCPL (2015); NSW Dept of Industry (2015)Orthophoto: WCPL (Jun 2015; Jun 2014)

v

vv

v

Page 9: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

Wilpinjong Extension Project Environmental Impact Statement Section 1 - Introduction Document Number: 00659084 Version: A 1-7

• construction and operation of new ancillary infrastructure in support of mining including: mine infrastructure areas, ROM pads, haul roads, electricity supply, communications installations, light vehicle roads, access tracks, remote crib huts, up-catchment diversions, dams, pipelines and other water management structures;

• extension of the approved mine life by approximately seven years (i.e. from approximately 2026 to 2033);

• a peak operational workforce of approximately 625 people;

• ongoing exploration activities; and

• other associated minor infrastructure, plant and activities.

Table 1-1 provides a summary comparison of the approved Wilpinjong Coal Mine and Project components.

It should be noted that the action that requires assessment under the EPBC Act relates to those aspects of the proposed Project that would include extension of open cut mining operations and consequent additional disturbance areas, and associated surface infrastructure that is necessary to support the extension of open cut mining. The action does not include the approved Wilpinjong Coal Mine that has either been previously referred and determined not to be a Controlled Action or previously determined not to require referral under the EPBC Act but has received all relevant State approvals. In addition, the elements of the Project which require EPBC Act approval exclude the continuation of mining operations in the open cut pits and associated activities which are currently authorised by existing approvals (including modifications and exploration activities).

Plate 1-2: Front End Loader Handling Coal

Page 10: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

Wilpinjong Extension Project Environmental Impact Statement Section 1 - Introduction Document Number: 00659084.docx Version: A 1-8

Table 1-1 Project Summary

Project Component

Summary of Existing/Approved Wilpinjong Coal Mine Summary of the Project

Mining Method • Open cut mining operation extracting ROM coal. • Unchanged.

Open Cut Extent

• Seven1 contiguous open cut pits and associated contained infrastructure area comprising approximately 1,990 ha.

• Eight open cut pits, including a new open cut pit in Slate Gully (Pit 8).

• Approximately 800 ha of open cut extensions.

Annual ROM Coal Production

• 16 Mtpa of ROM coal. • Unchanged.

Waste Rock Management

• Waste rock is placed predominantly within mine voids. • Unchanged.

Annual Waste Rock Production

• Annual waste rock production of approximately 34.1 million bank cubic metres (Mbcm).

• Approximately 43 Mbcm.

Coal Washing and Handling

• Beneficiation of ROM coal in the CHPP.

• Facilities for the handling and stockpiling of both washed and unwashed (bypass) coal.

• Unchanged.

Product Coal • Approximately 12.6 Mtpa of thermal product coal for domestic electricity generation and export.

• Approximately 13 Mtpa.

Coal Transport

• An average of six and a maximum of 10 laden trains per day leaving the mine.

• Unchanged (WCPL intends to retain current daily train movement limits but remove the current annual limit for total product coal railed [Section 2.9]).

• Transport via the Sandy Hollow Gulgong Railway. • Unchanged.

Coal Rejects (tailings and coarse rejects)

• Coal rejects placed predominantly within mine voids.

• Tailings filter press to allow co-disposal of the tailings with coarse rejects.

• Unchanged.

Water Supply • Make-up water demand to be met from runoff recovered from mine operational areas, recovery from tailings, open cut dewatering, advanced dewatering of pit areas and supply from a borefield.

• Recovery of water from tailings via tailings filter press.

• No change to key sources of water supply.

Water Disposal

• Mine water treated in a reverse osmosis plant/water treatment facility and discharged to Wilpinjong Creek in accordance with Environment Protection Licence (EPL) 12425.

• No change to key aspects of water disposal.

Mine Life • 21 years (from the date of grant of ML 1573). • 28 years (seven year extension).

Hours of Operation

• Open cut mining, handling and processing of ROM coal at the CHPP and train loading at the Wilpinjong Coal Mine is currently undertaken 24 hours per day, seven days per week.

• Unchanged.

Page 11: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

Wilpinjong Extension Project Environmental Impact Statement Section 1 - Introduction Document Number: 00659084 Version: A 1-9

Table 1-1 (Continued) Project Summary

Project Component

Summary of Existing/Approved Wilpinjong Coal Mine Summary of the Project

General Infrastructure

• Access roads, electricity supply and distribution, rail loop, CHPP, train loading infrastructure, ROM coal stockpiles, coal handling equipment, diesel storage, administration, workshop, ablution buildings, stores, heavy vehicle workshop, and parking and washdown facilities.

• Continued use of existing approved infrastructure and modifications/extensions to support the Project as required.

• Realignment of a 330 kV ETL, Ulan-Wollar Road and associated rail level crossing and local ETLs and services.

Operational Workforce

• Approximately 550 people. • Approximately 625 people at peak.

1 Note that for the purposes of WCPL internal mine planning, Pit 3 has been divided into two separate pits (Pit 3 in the north and Pit 7 in the south) (Figure 1-3).

1.1.4 Site Location and Tenure Operations at the approved Wilpinjong Coal Mine are covered by the existing ML 1573. Exploration activities for future operations are covered under EL 6169 and EL 7091. The Project would extend into three new MLA areas within both EL 6169 and EL 7091 (Figure 1-4). WCPL has lodged MLAs with the Division of Resources and Energy (DRE) (within the NSW Department of Industry, Skills and Regional Development [NSW Department of Industry]) for Project development areas outside of the existing ML. WCPL will also renew existing ELs and ML 1573 as required. Relevant land ownership information for land parcels within the immediate vicinity of the Project is provided on Figures 1-5a, 1-5b and 1-5c. The Project Development Application area (Figure 1-5a) includes those lands listed in the real property descriptions provided in support of the Development Application submitted to the DP&E (Attachment 3). The Project Development Application area is within the Mid-Western Regional LGA. A description of the land zoning under the Mid-Western Regional Council (MWRC) Local Environmental Plan (LEP) 2012 in the Development Application area is provided in Section 6.2.

1.1.5 Interaction with Other Operations and Projects in the Vicinity of the Site

Existing and proposed mining and processing operations and exploration activities in the vicinity of the Project that may potentially interact with the Project comprise: • The Ulan Mine Complex, operated by Ulan

Coal Mines Limited (UCML).

• The Moolarben Coal Complex, operated by Moolarben Coal Operations Pty Ltd on behalf of the Moolarben Joint Venture (Moolarben Coal Mines Pty Ltd, Sojitz Moolarben Resources Pty Ltd and a consortium of Korean power companies). For ease of reference in this EIS, Moolarben Coal Operations Pty Ltd and Moolarben Coal Mines Pty Ltd will be collectively referred to as Moolarben Coal. Moolarben Coal Operations Pty Ltd and Moolarben Coal Mines Pty Ltd are wholly owned subsidiaries of Yancoal Australia Limited.

• The Bowdens Silver Project, proposed by Kingsgate Bowdens Pty Limited.

• The Bylong Coal Project, proposed by KEPCO Bylong Australia Pty Ltd (KEPCO).

• The approved Cobbora Coal Project, owned by Cobbora Holding Company Pty Limited.

Descriptions of potential Project interactions and cumulative impacts with these other developments are provided in Section 2.5, and where relevant, Section 4 and supporting appendices.

Page 12: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

")

")

")

")

")

")

")

")")

")

") ")

")

")

")

")

")

")

")

")

")

")

")

")

")")

")")

")

")

")")

")

")

")

")

")

")

")

")

")")

")

")

")

")

")

")

")

")

")

")

")

")")")

")

")

")

")

")

")

")")")

")")

")

")")

")

")

")

")

")

")")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

32

214

214

908

908217

246

113

205

207

207

249

200

212212

212

114

233

252

224

224

247

69

69

105

206

245

248

248 248

274

274

167

221

209209209

209209

209209

258

213

104

265

169

61

219

227

227

227227227

262

236

208

208

208

208

208

225

32

32

240

281

281

170

211

211

239

109

32

32

32

32

32

32

32

32

32

32

32

32

32

32

32

32

32

103

270

101

223

223

223

223

108

251

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

80

80

8080

0

80

218

107

216

204

204

242

242

222

222

117

176

175

201

202

115

263

230

210

215

178

264

264

264

153

153

153

32

32

32

32

32

32

32

32

1021

1

1

1

1

1

1

1

1

1

1

1

1

1

1

203

255

153

246249

160

250

252

229

232

228

238

234

231

231

80

1

235226

218

218220

237

1

Goulburn RiverNational Park

Goulburn RiverNational Park

Munghorn GapNature Reserve

Munghorn GapNature Reserve

WIL-12-12_WEP_EIS_Section 1_204G

Relevant Land Ownership Plan*

Figure 1-5a

0 2.5

KilometresMGA 94 ZONE 55

W I L P I N J O N G E X T E N S I O N P R O J E C T±

LEGENDDevelopment Application Area

")

Landholder NumberPeabody Energy DwellingUlan/Moolarben DwellingPrivate DwellingCommunity Building

")

")

Source: WCPL (2015); NSW Dept of Industry (2015); NSW Land & Property Information (2015)

")

Peabody EnergyBylong Coal ProjectMoolarben Coal MineUlan Coal MineCrown Land (Special Lease)Crown LandTransGridRailway LandRelevant Private LandholderOther Land (Ownership not identified)National Parks and Wildlife Service

WOLLAR

1

Refer Figure 1-5c for List of Landholders.*

Refer Figure 1-5b

Page 13: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

")

")

")

")

")

")

")

")

")

")

")

")")

")

")

")")

")")

")

")")

")

")

")

")")

")

")

")

")

")

")

")

1

1

1

1

1

1

908

952

1

959

933

150

921

903

1

933

1

1

1

1

1

11

1

1

1

1

1

1

1

942

914

1

1

900

1

1

1

1

1

1

1

Community Hall

St Luke'sAnglican Church

St Laurence O'TooleCatholic Church

WollarPublic School

SANDY HOLLOW GULGONG RAILWAYWollar Creek

1

WOLLAR

Road

Ulan - Wollar

Barig

an

R

oad

Barigan Road

Armstrong Street

Price Street

Phillip Street

Goulburn Street

Wolla

Maitland Street

Munghorn Street

Barn

ett

Stre

et

Wollar Road

W I L P I N J O N G E X T E N S I O N P R O J E C T

0 0.5

KilometresMGA 94 ZONE 55

±

Landholder Number

WIL

-12-

12_

WEP

_EI

S_Se

ction

1_

205I

Source: WCPL (2015); NSW Dept of Industry (2015); NSW Land & Property Information (2015)

Relevant Land Ownership PlanWollar Inset*

Figure 1-5b

1

LEGENDPeabody EnergyCrown Land (Special Lease)Crown LandRailway LandRelevant Private Landholder

") Peabody Energy Dwelling") Community Building") Private Dwelling

* Refer to Figure 1-5c for List of Landholders.

Page 14: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

* Refer to Figures 1-5a and 1-5b for Land Ownership Plan and Wollar Inset.

Source: WCPL ( 15); NSW Land & Property Information (2015)20

W I L P I N J O N G E X T E N S I O N P R O J E C T

Relevant Landholder List*

Figure 1-5c

WIL-

12-1

2 W

EP_E

IS_S

ectio

n 1_

001D

1 PEABODY ENERGY32 ULAN/MOOLARBEN/CASCADE COAL CONTROLLED LAND61 J SZYMKARCZUK69 DJ & JG STOKES80 RB COX101 NAB PIERCE102 W FILIPCZYK103 MR MOLLOY104 J & IBD HARTIG105 DL & EH TOOMBS107 RJ LEE108 PA CROSSE109 MO VAISEY113 AJ BRETT, S & D HILT114 C WARE, N PARKER115 T AUDRETSCH117 S MCHUGH150 E TINDALE, A MCDONALD & WS WILSON153 TW MARSKELL160 B SMILES & A SMILES-SCHMIDT167 GJ JAQUES169 J ASZTALOS170 MB COX175 SF & MR ANDREWS176 S RAYNER178 TRANSGRID200 BJ HUGHES, CA BEINSSEN, K ASLETT201 SJ CUTHBERT202 SV MCGUINESS & RL PRYOR203 WP PRATT, CB & EA TOBIN204 RON POTTER (FARMS) PTY LTD205 AJ O'BRIEN206 EA HUNT207 AL DUNN208 JUSTIN KENNEDY LEWIS PTY LIMITED209 ICELINK PTY LIMITED210 TIMNATH PTY. LIMITED211 MJ & BH PERRY212 BONGALONG PTY LTD213 IWI CATTLE CO.PTY.LIMITED214 A ISAAC215 TM LARKIN & ET MONAGHAN216 RJ WAUGH217 AE MCDONALD218 RE, MR & H LUESCHER219 JA LUCKETT220 V & N STANKOVIC

221 HC & E VON BISCHOFFSHAUSEN222 RT & JM BILES223 NAGERA PTY LIMITED224 CR & VK HARTAS225 JW CAMPBELL226 RD BALL227 JB & J BAKER228 KA ROSS229 DE & JI SMITH230 TA & RN STAIT231 MR FIELD232 J TAYLOR233 CDR & ASE MARTIN234 MP & KA REEDY235 PJ HOLLOW & SG MCNALLY236 JIM & CG STEVENSON238 M ANDONOVSKI239 MJ BRYANT240 KJ & SJ DUGGAN242 RR HOLLOW245 FS FAZIO246 AJ & JA BOLAND247 DA BOLAND248 GA, MA, CJ & CM LANG249 AP & DE BOLAND250 CJ WARD251 PD FRENCH & LE SATTLER252 CM POOLMAN, A&W CREIGHTON255 YR JONES258 ICI AUSTRALIA OPERATIONS PTY LIMITED262 JE MULLINS & CD IMRIE263 T NEVELL264 TURILL TC PTY LTD265 J & SJ HORVATH270 MT PENNY PROPERTIES PTY LTD274 GEBLE PTY LTD281 LOCAWAY PTY LTD900 THE TRUSTEES OF THE ROMAN CATHOLIC CHURCH FOR THE DIOCESE OF BATHURST903 MJ HARDIMAN & DM HOGAN908 AE & AW LYNCH914 S NICOD921 EH TOOMBS933 CR FAULKNER942 RWM & SM SCHNEIDER952 BJ & DM O'HARA959 CJ CLARKE

REF NO LANDHOLDER REF NO LANDHOLDER

Page 15: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

Wilpinjong Extension Project Environmental Impact Statement Section 1 - Introduction Document Number: 00659084 Version: A 1-13

1.1.6 Proponent The Project is being developed by WCPL (ABN: 87 104 594 694), a wholly owned subsidiary of Peabody Energy. The registered office for Peabody is:

Peabody Energy Australia Pty Ltd 100 Melbourne Street SOUTH BRISBANE QLD 4101

1.2 SECRETARY’S ENVIRONMENTAL ASSESSMENT REQUIREMENTS

The SEARs for the Project were issued by the DP&E on 9 December 2014 and 22 June 2015 (Attachment 1). A summary of the SEARs is provided in Tables 1-2 and 1-3, as well as the relevant section of the EIS where the SEARs are addressed. In addition, a summary indicating where controlling provisions under the EPBC Act have been addressed in the EIS is provided in Table 1-4, and a summary indicating where the supplementary SEARs have been addressed in the EIS is provided in Attachment 2.

Table 1-2 Secretary’s Environmental Assessment Requirements – Reference Summary1

Summary of EIS Requirements EIS Reference

General Requirements

The EIS must include:

• Form requirements in clause 6 of Schedule 2 of the EP&A Regulation. Front of EIS and Attachment 3

• Content requirements in clause 7 of Schedule 2 of the EP&A Regulation. Refer to Table 1-3

• Description of the Project, including staging of the Project. Section 2

• Plans of proposed surface infrastructure and facilities. Section 2

• A waste management strategy. Sections 2.10 and 2.15

• A water management strategy. Section 2.12

• A rehabilitation strategy. Section 5

• Interaction of the Project with existing, approved and proposed mining operations.

Section 2.5

• A list of approvals that must be obtained before the development may commence.

Section 6 and Attachments 5 and 6

• A description of the existing environment. Section 4

• Assessment of the potential environmental impacts of all stages of the Project, including cumulative impacts.

Section 4

Page 16: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

Wilpinjong Extension Project Environmental Impact Statement Section 1 - Introduction Document Number: 00659084 Version: A 1-14

Table 1-2 (Continued) Secretary’s Environmental Assessment Requirements – Reference Summary1

Summary of EIS Requirements EIS Reference

• A description of the measures that would be implemented to mitigate and/or offset the potential impacts of the Project including:

- whether the measures are consistent with industry best practice and represent the full range of reasonable and feasible mitigation measures;

- the likely effectiveness of the measures; and

- contingency plans.

Sections 4, 5 and 7

• A description of the measures that would be implemented to monitor and report on the environmental performance of the Project.

Sections 4, 5 and 7

• A consolidated summary of all proposed environmental management and monitoring measures.

Section 7

• Consideration of relevant environmental planning instruments. Section 6 and Attachments 5 and 6

• Project justification. Section 6.7

• An estimate of the capital investment value of the Project. Attachment 7

• An estimate of the jobs that would be created during each stage of the Project. Sections 2.17 and 4.16

Specific Issues

• Noise. Sections 4.3, 4.5 and 4.14 and Appendix A

• Air. Sections 4.4, 4.6 and 4.18 and Appendix B

• Water. Sections 4.7 and 4.8 and Appendices C and D

• Biodiversity. Section 4.9 and Appendices E and F

• Heritage. Sections 4.10 and 4.11 and Appendices G and H

• Land. Section 4.12, Appendices I, K, and L and Attachment 8

• Transport. Section 4.13 and Appendix J

• Visual. Section 4.15 and Appendix O

• Social and Economic. Sections 4.16 and 4.17 and Appendices M and N

• Public Safety. Section 4.19 and Appendices P and Q

Consultation

• Describe the consultation that was carried out, identify issues raised during this consultation, and explain how these issues have been addressed in the EIS.

Section 3

1 The complete version of the SEARs is presented in Attachment 1.

Page 17: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

Wilpinjong Extension Project Environmental Impact Statement Section 1 - Introduction Document Number: 00659084 Version: A 1-15

Table 1-3 Content Requirements of an EIS – Clause 7 of Schedule 2 of the EP&A Regulation

Summary of Clause 7 of Schedule 2 of the EP&A Regulation EIS Reference

The EIS must include:

• Summary of the EIS. Executive Summary

• Objectives of the Project. Section 6.7.1

• Analysis of any feasible alternatives to the Project, including the consequences of not carrying out the Project.

Section 6.7

• Description of the Project. Section 2

• Description of the environment likely to be affected by the Project. Section 4

• The likely impact on the environment of the Project. Section 4

• Description of the measures proposed to mitigate any adverse effects of the Project on the environment.

Sections 4, 5 and 7

• A list of any approvals that must be obtained under any other Act or law before the Project may lawfully be carried out.

Section 6.4

• Compilation (in a single section of the EIS) of the measures proposed to mitigate any adverse effects of the Project on the environment.

Section 7

• Justification of the Project, having regard to biophysical, economic and social considerations, including the principles of ecologically sustainable development (ESD).

Section 6.7

Table 1-4

EPBC Act Controlling Provisions – Reference Summary

EPBC Act Controlling Provisions1 EIS Reference

Threatened species and ecological communities, including:

• White Box-Yellow Box-Blakely’s Red Gum Grassy Woodland and Derived Native Grassland (Box-Gum Woodland).

Section 4.9 and Appendix E

• Anthochaera phrygia (Regent Honeyeater).

• Ozothamnus tesselatus.

• Lathamus discolor (Swift Parrot).

• Dasyurus maculatus maculatus (Spot-tailed Quoll, Spotted-tail Quoll, Tiger Quoll: south-eastern mainland population).

• Chalinolobus dwyeri (Large-eared Pied Bat, Large Pied Bat).

• Nyctophilus corbeni (South-eastern Long-eared Bat).

Water resources:

• Impacts to the surface water quality and/or hydrology of Wollar, Wilpinjong and Cumbo Creek.

Section 4.8 and Appendix D

• Impacts to Groundwater, Groundwater Users and Groundwater Dependant Ecosystems (GDEs).

Sections 4.7 and 4.9 and Appendices C and E

• Cumulative impacts on water resources. Sections 4.7 and 4.8 and Appendices C and D

1 Refer to Attachment 1.

Page 18: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

Wilpinjong Extension Project Environmental Impact Statement Section 1 - Introduction Document Number: 00659084 Version: A 1-16

1.3 PROJECT CONSULTANTS This EIS was prepared by Resource Strategies Pty Ltd with specialist input provided by the following organisations: • Palaris (mine scheduling, sequencing and final

landform);

• WCPL (project design, alternatives and justification, preliminary hazard analysis, background data, resource economics, consultation, rehabilitation and environmental monitoring and management);

• SLR Consulting (noise and blasting assessment);

• Todoroski Air Sciences (air quality and greenhouse gas assessment);

• HydroSimulations (groundwater assessment);

• Groundwater Imaging Pty Ltd (transient electromagnetic [TEM] survey);

• Groundwater Exploration Services (groundwater investigations);

• WRM Water & Environment (surface water assessment);

• Hunter Eco (terrestrial flora baseline report [development site], terrestrial flora baseline report [potential offset areas] and biodiversity assessment report and biodiversity offset strategy);

• Biodiversity Monitoring Services (terrestrial fauna baseline report [development site], terrestrial fauna baseline report [potential offset areas]);

• Bio-Analysis (aquatic ecology assessment);

• South East Archaeology (Aboriginal cultural heritage assessment);

• Niche Environment and Heritage (Niche) (historical heritage assessment);

• McKenzie Soil Management (land and soil assessment);

• GTA Consultants (road transport assessment);

• Geo-Environmental Management (geochemistry assessment);

• Lloyd Consulting (land contamination assessment);

• Deloitte Access Economics (economic assessment);

• Elliott Whiteing (social impact assessment);

• Marc & Co (visual simulations);

• Safe Productions Solutions (environmental risk assessment); and

• McCullough Robertson (legal review). In addition to the above, peer review was undertaken by the following specialists (Attachment 4): • Mr Richard Heggie (noise and blasting);

• Mr Nigel Holmes (air quality);

• Dr Frans Kalf (groundwater);

• Emeritus Professor Thomas McMahon (surface water); and

• Dr Brian Fisher (economics).

1.4 DOCUMENT STRUCTURE This EIS comprises a main text component and supporting studies, which includes Appendices A through Q. An overview of the main text is presented below: Section 1 Provides an introduction to the

Project and the EIS.

Section 2 Describes the various components and stages of the Project.

Section 3 Describes the consultation undertaken in relation to the EIS and ongoing community involvement.

Section 4 Details the environmental assessment for the Project including a description of the existing environment, an assessment of potential impacts and a description of measures that would be implemented to avoid, minimise, mitigate, offset, manage and/or monitor the potential impacts of the Project.

Section 5 Describes the rehabilitation strategy for the Project.

Section 6 Outlines the statutory provisions relevant to the Project, describes the alternatives considered and provides a Project justification.

Page 19: SECTION 1 INTRODUCTION · Magazine Hill Round Top Mountain Bald Hill Lowes Peak Betealween Mountain Red Hill Mount Bara Mount Buckaroo Bombira Hill Dexter Mountain Black Hill Project

Wilpinjong Extension Project Environmental Impact Statement Section 1 - Introduction Document Number: 00659084 Version: A 1-17

Section 7 Provides a summary of the proposed environmental management, mitigation, monitoring and reporting in relation to the Project.

Section 8 Lists documents referenced in Sections 1 to 7 of this EIS.

Section 9 Defines abbreviations, acronyms and terms used in Sections 1 to 7 of this EIS.

Attachments to the main text are also provided as follows: Attachment 1 Secretary’s Environmental

Assessment Requirements.

Attachment 2 Matters of National Environmental Significance Cross Reference Table.

Attachment 3 Development Application Area and Real Property Descriptions.

Attachment 4 Peer Review Letters.

Attachment 5 Planning Instruments Addendum.

Attachment 6 Aquifer Interference Policy Considerations and Water Licensing Addendum.

Attachment 7 Capital Investment Value Estimate Report.

Attachment 8 Geotechnical Advice.

Attachment 9 Community Information.

Attachment 10 Site Verification Certificate.

Attachment 11 Relevant Division of Resources and Energy Correspondence.

Attachment 12 Aboriginal Cultural Heritage Assessment Additional Assessment Information.

Appendices A to Q contain supporting documentation, including a number of specialist reports: Appendix A Noise and Blasting Assessment.

Appendix B Air Quality and Greenhouse Gas Assessment.

Appendix C Groundwater Assessment.

Appendix D Surface Water Assessment.

Appendix E Biodiversity Assessment Report and Biodiversity Offset Strategy.

Appendix F Aquatic Ecology Assessment.

Appendix G Aboriginal Cultural Heritage Assessment.

Appendix H Historical Heritage Assessment.

Appendix I Land and Soil Assessment.

Appendix J Road Transport Assessment.

Appendix K Geochemistry Assessment.

Appendix L Land Contamination Assessment.

Appendix M Economic Assessment.

Appendix N Social Impact Assessment.

Appendix O Visual Assessment.

Appendix P Environmental Risk Assessment.

Appendix Q Preliminary Hazard Analysis.