12
Secretary’s Corner

Secretary’s Corner - DOE · PDF filecoordinates of the tie-points used 4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using

Embed Size (px)

Citation preview

Page 1: Secretary’s Corner - DOE · PDF filecoordinates of the tie-points used 4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using

Secretary’s Corner

Page 2: Secretary’s Corner - DOE · PDF filecoordinates of the tie-points used 4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using

INFORMATION TECHNOLOGY AND MANAGEMENT SERVICES (ITMS)

PROCESSDURATION

(WORKING DAYS)

FROM TOTECHNICAL EVALUATION OF SMALL‐SCALE COAL MINING (SSCM) APPLICATION AREA

8 3

CONDUCT / TECHNICAL EVALUATION / APPROVAL OF COAL BLOCK BOUNDARY SURVEY

29 23

PROVISION OF GEOMATICS INFORMATION AND SERVICES 3 3

PROVISION OF CARTOGRAPHIC, INFOGRAPHIC AND OTHER MAPS

3 3

PROVISION OF ENERGY DATA & INFORMATION  THRU ENERGY DATA CENTER (RESEARCHERS)

3 0.5

PROVISION OF ENERGY DATA & INFORMATION THRU ENERGY DATA CENTER (SERVICE CONTRACTORS/INVESTORS)

3 1

PROVISION OF ENERGY DATA & INFORMATION  THRU THE DOE LIBRARY

3 0.5

UPLOADING / POSTING OF ENERGY INFORMATION THRU THE DOE WEBSITE / PORTAL

4.5 1.5

UPLOADING / POSTING OF PRESS RELEASES THRU THE DOE WEBSITE / PORTAL

1.5 0.75

Page 3: Secretary’s Corner - DOE · PDF filecoordinates of the tie-points used 4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using

LEGEND LIST OF REQUIREMENTS

TECHNICAL EVALUATION OF SMALL-SCALE COAL MINING (SSCM) APPLICATION AREA

SSMC – 3 DAYS

(8 Days)

CHARGES & FEES LEGAL BASESE.O. 197Administrative Order No. 31 dated October 1, 2012

Applicant

DOE

TL: 4792900Loc. 260

Loc. 254/391

GF, Data Bank Building

GF, Data Bank Building

1) Field verification survey – Php 1,000/man/day2) Verification of survey returns

• Tracing cloth/mylar - Php 300/plan• Fieldnotes, computations – Php 5/sheet

3) Boundary survey of contract area – Php 150/ha

1) Survey report, transmittal of survey returns2) Copy of Geodetic Engineer’s current registration and PTR3) Certification from Lands Management Bureau/Coast and Geodetic Survey Department of the geographic and/or grid

coordinates of the tie-points used4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using GPS

receivers5) Certification of GPS calibration and registration6) Certificate of transit inspection and tape inspection7) Fieldnotes and plans8) Computation for azimuth for latitude of observation and convergence correction of azimuth9) Coordinate conversion of principal corners and other tie points10) Traverse, setting and area computations

Office of the Director,Information Technology and Management Services (ITMS)

Evaluation of request / checking of survey returns computations

Chief / Assistant Chief, Information Services Division (ISD)

0.5

Approval of TD /  transmittal letter Director, ITMS

Endorsement for approval of TD / preparation of transmittal letter

Conduct of field verification of boundary monuments (as needed & simultaneous with 

CNMD field validation)

Geoinformatics Section(5)

Chief / Assistant Chief, ISD

Releasing /  transmittal of TD Administrative Assistant, ISD

Geoinformatics Section 2

Submission of request/survey returns 

Receive/Endorse application 

Processing of Request & preparationof technical description (TD)

0.5

RESPONSIBLE PERSONNEL/OFFICE / UNIT PROCEDURES NORMAL PROCESSING TIME

(WORKING DAYS)CONTACT NUMBERS

LOCATION OF OFFICE

Page 4: Secretary’s Corner - DOE · PDF filecoordinates of the tie-points used 4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using

LEGEND LIST OF REQUIREMENTS

CONDUCT / TECHNICAL EVALUATION / APPROVAL OF COAL BLOCK BOUNDARY SURVEY

23 DAYS

(29 Days)**CHARGES & FEES

LEGAL BASESE.O. 197Administrative Order No. 31 dated October 1, 2012Applicant

DOE

TL: 4792900Loc. 260

Loc. 254/391

GF, Data Bank Building

GF, Data Bank Building

1) Field verification survey – Php average ITO II to Carto 3/man/day2) Verification of survey returns

• Survey plan - Php 300/plan• Fieldnotes, computations – Php 5/sheet

1) Survey report, transmittal of survey returns2) Copy of Geodetic Engineer’s current registration and PTR3) Certification from Lands Management Bureau/Coast and Geodetic Survey Department of the geographic and/or grid coordinates of the

tie-points used4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using GPS receivers5) Certification of GPS calibration and registration6) Certificate of transit inspection and tape inspection7) Fieldnotes and plans8) Computation for azimuth for latitude of observation and convergence correction of azimuth9) Coordinate conversion of principal corners and other tie points10) Traverse, setting and area computations

Office of the Director,Information Technology and Management Services (ITMS)

Evaluation of request / checking of survey returns computations

Chief / Assistant Chief, Information Services Division (ISD)

0.5

Approval of TD /  transmittal letter Director, ITMS

Endorsement for approval of TD / preparation of transmittal letter

Conduct of field verification of boundary monuments (as needed & simultaneous with 

CNMD field validation)Geoinformatics Section 5

Chief / Assistant Chief, ISD

Releasing /  transmittal of TD Administrative Assistant, ISD

Geoinformatics Section 15 per coal block

Submission of request/survey returns 

Receive/Endorse application 

Processing & checking of survey returns computations & preparationof technical description (TD)

2.5

RESPONSIBLE PERSONNEL/OFFICE / UNIT PROCEDURES NORMAL PROCESSING TIME

(WORKING DAYS)CONTACT NUMBERS

LOCATION OF OFFICE

Page 5: Secretary’s Corner - DOE · PDF filecoordinates of the tie-points used 4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using

PROVISION OF GEOMATICS INFORMATION AND SERVICES

3 DAYS

TL: 4792900Loc. 260

Loc. 254/391

GF, Data Bank Building

GF, Data Bank Building

LEGEND LIST OF REQUIREMENTS CHARGES & FEES LEGAL BASESE.O. 197Administrative Order No. 31 dated October 1, 2012

Applicant

DOE

Cost of reproduction1)Letter of request2)Filled‐out Pro‐forma Terms and Conditions

Endorsement for approval of output / transmittal letter

Approval of output 

Geoinformatics Section

Director, ITMS0.5

Processing of request

Chief, ISD / Assist. Chief, ISD

Releasing / transmittal of output Administrative Assistant, ISD

Office of the Director,Information Technology and Management Services (ITMS)

Evaluation of requestChief / Assistant Chief, Information Services Division (ISD)

0.5

Submission of request*/survey returns 

Receive/Endorse application 

2

RESPONSIBLE PERSONNEL/OFFICE / UNIT PROCEDURES NORMAL PROCESSING TIME

(WORKING DAYS)CONTACT NUMBERS

LOCATION OF OFFICE

Page 6: Secretary’s Corner - DOE · PDF filecoordinates of the tie-points used 4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using

PROVISION OF CARTOGRAPHIC, INFOGRAPHIC AND OTHER MAPS

3 DAYS

TL: 4792900Loc. 260

Loc. 254/391

GF, Data Bank Building

GF, Data Bank Building

LEGEND LIST OF REQUIREMENTS CHARGES & FEES LEGAL BASESE.O. 197Administrative Order No. 31 dated October 1, 2012

Applicant

DOE

Cost of reproduction1)Letter of request2)Filled‐out Pro‐forma Terms and Conditions3)Receipt of payment

Endorsement for approval of output / transmittal letter

Approval of output 

Infographics Section

Director, ITMS 0.5

Processing of request

Chief, ISD / Assist. Chief, ISD

Releasing / transmittal of output Administrative Assistant, ISD

Office of the Director,Information Technology and Management Services (ITMS)

Evaluation of requestChief / Assistant Chief, Information Services Division (ISD)

0.5

Submission of request/survey returns 

Receive/Endorse application 

2

RESPONSIBLE PERSONNEL/OFFICE / UNIT PROCEDURES NORMAL PROCESSING TIME

(WORKING DAYS)CONTACT NUMBERS

LOCATION OF OFFICE

Page 7: Secretary’s Corner - DOE · PDF filecoordinates of the tie-points used 4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using

PROVISION OF ENERGY DATA & INFORMATION THRU ENERGY DATA CENTER(RESEARCHERS)

0.5 DAYS

(3 Days)

TL: 4792900Loc. 257

Loc. 408

Loc. 260

Energy Data Center of the Philippines Building

GF, Data Bank Building

GF, Data Bank Building

LEGEND LIST OF REQUIREMENTS CHARGES & FEES LEGAL BASES

E.O. 197Administrative Order No. 31 dated October 1, 2012

Applicant

DOE

No Fees1)Letter of request2)Filled‐out data request form3)List of data/documents requested4)Receipt of payment5)Signed conforme/confidentiality/terms and conditions

NOTE: * ‐ For Petroleum Data    ** ‐ For Geothermal Data

0.5

Submission of request

Chief, IDMD / PRDD*/GEMD**Approval of request

Submission of signed conforme /confidentiality / terms and conditions

pro forma letter

Processing of request / preparation of data / transmittal letter

Supervising SRS, IDMD

Recording /  transmittal of dataSRA, IDMD

SR SRS, IDMD Evaluation of Request

SRA, IDMD Receive Request

Supervising SRS, IDMDEndorsement of Request

Approval of the Terms and ConditionsDirector, ITMS

RESPONSIBLE PERSONNEL/OFFICE / UNIT PROCEDURES NORMAL PROCESSING TIME

(WORKING DAYS)CONTACT NUMBERS

LOCATION OF OFFICE

Page 8: Secretary’s Corner - DOE · PDF filecoordinates of the tie-points used 4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using

PROVISION OF ENERGY DATA & INFORMATION THRU ENERGY DATA CENTER(SERVICE CONTRACTORS/INVESTORS)

1 DAY

(3 Days)

TL: 4792900Loc. 257

Loc. 408

Loc. 260

Loc. 233

Energy Data Center of the Philippines 

GF, Data Bank Building

GF, Data Bank Building

GF, DOE Annex Building

LEGEND LIST OF REQUIREMENTS CHARGES & FEES LEGAL BASES

E.O. 197Administrative Order No. 31 dated October 1, 2012

Applicant

DOE

1)Letter of request2)Filled‐out data request form3)List of data/documents requested4)Receipt of payment5)Signed conforme/confidentiality/terms and conditions

NOTE: * ‐ For Petroleum Data ** ‐ For Geothermal Data

0.5

Chief, IDMD / PRDD*/GEMD**

Supervising SRS, IDMD

SRA, IDMD

SR SRS, IDMD

SRA, IDMD

Supervising SRS, IDMD

Chief, Treasury Division

SR SRS, IDMD

Director, ITMS

Submission of request

Approval of request

Processing of request / preparation of data / transmittal letter

Recording /  transmittal of data

Evaluation of Request

Receive Request

Endorsement of Request

Payment of data / processing fee

Issuance of Order of Payment

Approval of Order of Payment

RESPONSIBLE PERSONNEL/OFFICE / UNIT PROCEDURES NORMAL PROCESSING TIME

(WORKING DAYS)CONTACT NUMBERS

LOCATION OF OFFICE

Refer to Information Services Division,Information Technology AndManagement Services (ISD‐ITMS)Schedule of Fees and Charges

Page 9: Secretary’s Corner - DOE · PDF filecoordinates of the tie-points used 4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using

PROVISION OF ENERGY DATA & INFORMATION THRU THE DOE LIBRARY

0.5 DAY

(3 Days)

TL: 4792900Loc. 257

Loc. 408

Loc. 260

Loc. 233

GF, Data Bank Building

GF, Data Bank Building

GF, Data Bank Building

GF, DOE Annex Building

LEGEND LIST OF REQUIREMENTS CHARGES & FEES LEGAL BASES

E.O. 197Administrative Order No. 31 dated October 1, 2012

Applicant

DOE

Refer to Information Services Division,Information Technology AndManagement Services (ISD‐ITMS)Schedule of Fees and Charges

1)Letter of request2)Filled‐out data request form3)List of data/documents requested4)Receipt of payment5)Signed conforme/confidentiality/terms and conditions

SDO IV, IDMD

SDO I, IDMD

0.5

Chief, Treasury Division

SDO I, IDMD

SDO I, IDMD

Chief, IDMD

Director, ITMS

Submission of request

Evaluation of Request

Payment of data / processing fee

Processing of request / Releasing of data

Issuance of order of payment

Receive Request

Approval of Request

Approval of Order of Payment

RESPONSIBLE PERSONNEL/OFFICE / UNIT PROCEDURES NORMAL PROCESSING TIME

(WORKING DAYS)CONTACT NUMBERS

LOCATION OF OFFICE

Page 10: Secretary’s Corner - DOE · PDF filecoordinates of the tie-points used 4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using

UPLOADING / POSTING OF ENERGY INFORMATION THRU THE DOE WEBSITE / PORTAL

1.5 DAY

(4.5 Days)

TL: 4792900Loc. 260

Loc. 385

GF, Data Bank Building

3F, NPTL Building

LEGEND LIST OF REQUIREMENTS CHARGES & FEES LEGAL BASES

E.O. 197Administrative Order No. 31 dated October 1, 2012

Applicant

DOE

No Fees1)Letter of request for posting (written and/or emailed) with proof of clearance/approval from the OSEC/ULGA/UPMA

2)Copy of approved data, preferably in digital or PDF format and approved copy of graphics/pictures/flash videos, if available

Bureau/Service Directors,Assistant Secretary, Undersecretary

Receive, review and endorse request to technical staff

Director, ITMS

Receive RequestOD, ITMS

Upload approved information on the DOE website 

Endorse Request to ITD

ITO I, ITD

1.5

Submission of request

Information Technology Officer I / Information Systems Analyst II

RESPONSIBLE PERSONNEL/OFFICE / UNIT PROCEDURES NORMAL PROCESSING TIME

(WORKING DAYS)CONTACT NUMBERS

LOCATION OF OFFICE

Page 11: Secretary’s Corner - DOE · PDF filecoordinates of the tie-points used 4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using

UPLOADING / POSTING OF PRESS RELEASES THRU THE DOE WEBSITE / PORTAL

0.75 DAY

(1.5 Days)

TL: 4792900Loc. 255

Loc. 260

Loc. 385

GF, DOE Annex Building

GF, Data Bank Building

3F, NPTL Building

LEGEND LIST OF REQUIREMENTS CHARGES & FEES LEGAL BASES

E.O. 197Administrative Order No. 31 dated October 1, 2012

Applicant

DOE

No Fees1)Proof of approval from Chief, CWPO2)Copy of approved data, preferably in digital or PDF format and approved copy of graphics/pictures/flash videos, if available

Chief, CWPS / PAO

Director, ITMS

Chief, ITD

0.75

Information Technology Officer I /

Information Systems Analyst II

Receive, review and endorse request to technical staff

Upload approved information at the DOE website 

Endorsement request to ITD

Submission of request

Receive RequestOD, ITMS

RESPONSIBLE PERSONNEL/OFFICE / UNIT PROCEDURES NORMAL PROCESSING TIME

(WORKING DAYS)CONTACT NUMBERS

LOCATION OF OFFICE

Page 12: Secretary’s Corner - DOE · PDF filecoordinates of the tie-points used 4) Certification from the Coast and Geodetic Survey Department for the evaluation of the survey results using

INFORMATION TECHNOLOGY AND MANAGEMENT SERVICESINFORMATION SERVICES DIVISION

FEES AND CHARGES

INFOGRAPHICS SECTION Amount in Php

Reprographics ServicesEngineering CopierWhite Bond 140.00/sq.m..004 Double Matte Film

Maps/Graphics/Scanned Images/Printing/Plotting(Included map preparation)

Page SizeLetter size (8.5” x 11”) 125.00/sheetLegal Size (8.5” x 14”) 125.00/sheet

Large Format

30” x 40”Glossy 2,800.00/sheetBright White 1,800.00/sheet

24” x 32”Glossy 1,800.00/sheetBright White 1,150.00/sheet

For other maps sizes:

Glossy 3,500.00/sq.mBright White 2,300.00/sq.HP Special Paper (A0 size) 1,400.00/sheetHP Special Paper (A1 size) 720.00/sheetHP Special Paper (A3 size) 220.00/sheetHP Special Paper (A4 size) 110.00/sheetReproduction film (A0 size) 1,600.00/sheetCultural Data (Petroseis or Autocad format) 5,000.00/3.5” diskScanning 60.00/data item

Geomatics Section

Field Verification 3,400.00/man/dayVerification of Survey returnsTracing Cloth/Mylar Film Plan 600.00/planFieldnotes, Computations, etc. 15.00/sheetHorizontal Control Survey/Vertical Control Survey 25,000.00/km

*Note: For digital copies of maps, charges and fees are the same with paper copies. However, Terms of Use for Recipients of Electronic Data shall be conformed and signed by the Client.