Our testing and commissioning team offers comprehensive testing services to the commercial and industrial solar installers. With the changes to AS/NZS 4777:2015 the grid connected solar systems above 30kW must install grid protection relays and requires secondary injection testing to prove that the correct operation of the protection relay as per the parameters set by the DNSP. Some DNSP’s also require power quality readings with the solar system connected and disconnected as part of their requirements to solar systems SECONDARY INJECTION AND POWER QUALITY TESTING Dara Custom Switchboards Production Plant and Head Office 5 Faigh Street, Mulgrave, VIC 3170 Tel - 0478 398 344 / 1300 327 279 www.testsolar.com.au www.electricalswitchboards.com.au 0478 398 344 or Email us at [email protected] We offer the most COMPETITIVE testing service to the Solar Installers FAST Book your next test with Dara , Call us Now SECONDARY PROTECTION INJECTION TESTING from $515.00 POWER QUALITY TESTING from $890.00

SECONDARY INJECTION AND POWER QUALITY TESTING

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SECONDARY INJECTION AND POWER QUALITY TESTING

Our testing and commissioning team offers comprehensive testing services to the commercial and industrial solar installers.

With the changes to AS/NZS 4777:2015 the grid connected solar systems above 30kW must install grid protection relays and requires secondary injection testing to prove that the correct operation of the protection relay as per the parameters set by the DNSP.

Some DNSP’s also require power quality readings with the solar system connected and disconnected as part of their requirements to solar systems

SECONDARY INJECTION AND POWER QUALITY TESTING

Dara Custom Switchboards Production Plant and Head Office

5 Faigh Street, Mulgrave, VIC 3170Tel - 0478 398 344 / 1300 327 279www.testsolar.com.auwww.electricalswitchboards.com.au

0478 398 344or Email us at

[email protected]

We offer the most COMPETITIVE testing service to the Solar Installers FASTBook your next test with Dara , Call us Now

SECONDARY PROTECTION INJECTION TESTING

from $515.00

POWER QUALITY TESTING

from $890.00

Page 2: SECONDARY INJECTION AND POWER QUALITY TESTING

WHY USE DARA

Dara Custom Switchboards Production Plant and Head Office

5 Faigh Street, Mulgrave, VIC 3170Tel - 0478 398 344 / 1300 327 279www.testsolar.com.auwww.electricalswitchboards.com.au

• Why pay more? We offer the BEST PRICING in the market

• We get it done FAST without the usual wait...• We visit sites anywhere in Australia

0478 398 344or Email us at

[email protected]

We offer the most COMPETITIVE testing service to the Solar Installers FASTBook your next test with Dara , Call us Now

Testing Prices EX GSTInhouse Secondary Injection Test with a PVDB order

$ 515.00

Melbourne Metro Secondary Injection Test with a PVDB order (within50 km from DARA head office@ Mulgrave) *

$ 825.00

Melbourne Metro Secondary Injection Test (within 50 km from DARAhead office@ Mulgrave) *

$ 980.00

Melbourne Metro Power Quality Test (within 50 km from DARA headoffice@ Mulgrave) *

$ 890.00

Thermal Testing with SI or PQ tests within Mel. Metro**/* (within 50 kmfrom DARA head office@ Mulgrave)

Free

SECONDARY PROTECTION INJECTION TESTING

POWER QUALITY TESTING

** Should be done on same day of SI or PQ test.*$5 per each extra km as a general guide for regional areas in Victoria