21
Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan http://www.wcdrr.org/

Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Embed Size (px)

Citation preview

Page 1: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Second meeting of the IAP in 201422-24 April 2014

Preparation for the UN World Conference on DRR 14-18 March 2015Sendai, Japan

http://www.wcdrr.org/

Page 2: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

WCDRR Outcomes

1. Complete assessment and review of the implementation of the HFA

2. Consider the experience gained through regional/national strategies and their recommendations as well as relevant regional agreements within implementation of HFA

3. Adopt a post-2015 framework for DRR (HFA+)

4. Identify modalities of cooperation based on commitments to implement HFA+

5. Determine modalities for periodically review

Page 3: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Process

Page 4: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Bureau

• 11 members: Thailand, Bangladesh, Switzerland, Finland, Russian Federation, Czech Republic, South Sudan, Egypt, Ecuador and Jamica with Japan as ex-officio

• Two meetings held. Six (6) meetings before first Prepcom in July

• Guide the secretariat (UNISDR) on WCDRR accreditation, programme, substance, and negotiations on the post-2015 framework for DRR

Page 5: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Prepcoms

• Prepcoms in Geneva at Palais 14-15 July and 17-18 November 2014 with an additional day in Sendai to be decided by prepcoms as necessary.

• 500 participants at prepcoms:

– 3-4 each Government delegation

– 12 for each Major Group

• Intergovernmental preparatory committee: review organization of Conference, approve programme of work, propose rules of procedure, present HFA2

• Program consists of Plenary, Chair’s dialogue, technical workshops

Page 6: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Prepare for Prepcoms

• Background documents to be circulated 6 weeks in advance

• 1st Prepcom, 14-15 July 2014:

– Draft Compilation of consultations post-2015 framework for DRR based on regional inputs and feedback on Proposed Elements of HFA2

– Organization of the WCDRR

Draft outcomes of Regional Platform (i.e Declaration, inputs for HFA2, statements of commitments) to be ready by mid May

• 2nd Prepcom, 17-18 November 2014

– Draft post-2015 framework for DRR

– Organization of the WCDRR

Page 7: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Who and How to Attend?

• UN GA Resolution 68/2011 intent is clear – all DRR stakeholders are welcome

• UN well-established procedures for facilitating participation at UN conference will be followed for both the Conference and the preparatory process (PrepComs).

• To attend the WCDRR you must register under one of these categories:

1. States 2. Inter-Governmental Organizations

3. UN System 4. Major Groups

5. Media

Page 8: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

States

• The SG will issue Note Verbale to UN Member States (193) and to States that are members of specialized agencies (Cook Islands, Holy See, Niue, State of Palestine).

• Separate Note Verbales will be issued for the PrepCom and Conference.

• States (through Permanent Missions) will be invited to share their delegation by Note Verbale to UNISDR for the PrepCom and online for the Conference (in case i-accredite system will be used)

• States can send as many delegates as they wish. States can include anyone they wish in their delegation.

• The SG and PM Japan can send co-signed letters to selected HoS/G personally requesting their presence at the Conference.

Page 9: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Inter-Governmental Organization

• Inter-Governmental Organizations (IGOs) with observer status at the GA will be copied to the SG’s Note Verable to States.

• Observer IGOs will follow the same process as States (i.e. advising UNISDR of their delegation by Note Verbale).

• There are over 80 observer IGOs including ASEAN, SAARC, Pacific Islands Forum, IFRC, IOM, IUCN, ADB, etc.

• Registered IGOs will sit behind their name plate and can make statements in their own name.

• An IGO can invite non-affiliated individuals to join their delegation i.e. a community leader.

Page 10: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

UN System

Specialised Agencies and related organizations (ILO, FAO, ICAO, WHO, World Bank, IMF, WMO...).

• Will be copied to the SG’s Note Verable to States.

• Will follow the same process as States (i.e. advising UNISDR of their delegation by Note Verbale).

UN funds, programmes and other entities includes: UN Secretariat (UN-HABITAT, ESCAP, UNDP, UNEP, UNICEF...).

• Will receive SRSG letter to principals inviting them to communicate their delegation to the PrepCom and Conference, separately.

• Will be required to advise of their delegation through one communication from their Executive Office

Page 11: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Media1. Media accreditation is strictly reserved for members of the

press who represent a bona fide media organization.

2. All members of the press will need an accreditation for the Conference, even those who already have UN media accreditation in New York or in Geneva.

3. Media accreditation for the PrepCom will be managed by UNOG.

4. Media accreditation for the Conference will be managed by either UNOG or UNHQ (MALU), tbc.

Page 12: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Major Groups: Overview

1. The ‘major groups’ structure was created by Member States at Agenda 21 (1992). It provides a mechanism for civil society to engage in UN inter-governmental processes.

2. There are nine major groups:

Women Trade Unions

Children and Youth Local Authorities

Farmers Science and Technology

Indigenous Peoples Business and Industry

NGOs

Page 13: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Major Groups: Overview

3. A representative of each major group will address the plenary on behalf of the group, directly providing views and inputs into the process.

4. The only way for NGOs and other major group organizations to formally participate in the inter-governmental segment of the World Conference and its preparatory process is through a major group.

5. NGOs and other organizations self-identify which major group they wish to work with.

Page 14: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Major Groups: organizing partners

1. Each major group is ‘self-organized’ and coordinated by ‘organizing partner(s)’.

2. The main responsibilities of organizing partners include: Facilitate the participation of the major group representatives Facilitate the preparation of statements by coordinating and consulting

with stakeholders; Act as the main liaison between the major group and the Conference

secretariat and Bureau; Ensure the major group delegation comprises a range of diverse and

representative participants; and Oversee a transparent and fair distribution of secondary passes to

meetings and events where seating is limited.

3. Organizing partners are expected to include individuals in their delegation (i.e. mayors, CEOs, scientists etc.)

Page 15: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Major Groups: organizing partners

4. UNISDR, as Conference secretariat, has invited the following organizations to act as organizing partners:

Business & Industry International Chamber of Commerce

Children & Youth Rio+ twenties

Farmers La Via Campesina: International Peasant Movement (tbc)

Indigenous Peoples Tebtebba: Indigenous Peoples' International Centre

Local Authorities 1.ICLEI Local Governments for Sustainability2.United Cities and Local Governments (UCLG)

NGOs Pending

Science & Technology International Council for Science (ICSU)

Women 1. Women's Environment and Development Organization 2. Huairou Commission (tbc)

Workers & Trade Unions International Trade Union Confederation (tbc)

Page 16: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Major Groups: participation

1. NGOs and other non-state actors interested in participating as observers at the Conference and PrepCom are required to be accredited to the UN and register accordingly.

2. NGOs and other non-state actors with ECOSOC consultative status only need to register online through CSOnet. NGOs with status already have log-on credentials.

3. When registering, an NGO designates representatives of their delegation. This can include an individual from an NGO without status, or a community leader etc.

Page 17: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Major Groups: participation

4. NGOs and other non-state actors without ECOSOC consultative status need to apply for ‘special accreditation’ or seek inclusion in the delegation of an NGO with status.

5. To apply for special accreditation, an NGO must completed a questionnaire online. UNISDR will review applications and prepare a consolidated list recommending approval by the PrepCom.

6. The list will be shared with States in advance of each PrepCom. If no State objects, the list will be endorsed at the beginning of each PrepCom.

Page 18: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Major Groups: participation7. Once registered, NGOs and other non-state actors will be sent a

letter confirming their attendance and facilitating their entrance (visa, Palais de Nations etc.).

8. Each major group will be invited to address the plenary. The organizing partner will facilitate a joint statement and identify a speaker (not necessarily the organizing partner).

9. NGOs and other non-state actors cannot speak on behalf of their organization.

10. Depending on the rules of procedure and PrepCom chair, there may be additional time for major group interventions and/or informal interaction between major groups and States.

Page 19: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

What about…I’m a mayor… - National delegation

- Organizing partner delegation (ICLEI or UCLG)

I’m a CEO… - National delegation- Organizing partner delegation (ICC)- Seek special accreditation for organization

I’m a community leader…

- National delegation- Organizing partner delegation- ECOSOC accredited NGO- IGO delegation (IFRC, IUCN etc.)

I’m a scientist… - National delegation- Organizing partner delegation (ICSU)- ECOSOC accredited organizations

I’m an expert… - National delegation- Major group organizing partner- ECOSOC accredited NGO

I’m a parliamentarian… - National delegation- IPU delegation

Page 20: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

Timeline: PrepCom I

Date Issued Deadline

SG sends NV to States, cc IGOs & UN Spec Agencies

31 March no deadline for Member States

SRSG sends letter to UN Principals

April 15 June

Media accreditation opens

tbc -

Major Group registration (already accredited)

1 April 2014

Major Group accreditation(special accreditation)

1 April 2014 15 May 2014

Page 21: Second meeting of the IAP in 2014 22-24 April 2014 Preparation for the UN World Conference on DRR 14-18 March 2015 Sendai, Japan

For discussion

• Asia Pacific messages (6AMCDRR Declaration, Inputs for HFA2, Commitments) resulting from collaborative process

• How States, IGO, UN and Major Groups carry them through the PrepCom, WCDRR and UN General Assembly consistently and coherently Composition of States’ delegation – multi-sectoral and multi-

stakeholder NDMO/HFA Focal Point prepare the delegation Briefing for Permanent Missions i.e. Thailand, Bangladesh and Japan

organize a briefing for AP Regional Group on draft 6AMCDRR outcome?

Each state/a group of states focus on some messages of main interest/concern

• Similar briefing for members of the Open Working Group for SDGs?