Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Second Five Year Review Report Hudson River PCBs Superfund Site
APPENDIX 14
BIBLIOGRAPHY
Prepared by:
Ecology and Environment, Inc.
May 2017
Appendix 14 Bibliography 1 Hudson River PCBs Superfund Site Five Year Review May 2017
A Alexander, G. 1977. “Food of vertebrate predators on trout waters in north central lower
Michigan.” In Michigan Academician 10: 181-185.
Arnold, T.W. and E.K. Fritzell. 1987a. “Food habits of prairie mink during the waterfowl
breeding season.” In Can.J.Zool. 65: 2322-2344
___________. 1987b. “Activity patterns, movements, and home ranges of prairie mink.” In
Prairie Nat. 19:25-32.
___________. 1990. “Habitat use by male mink in relation to wetland characteristics and
avian prey abundance.” In Can.J.Zool. 68:2205-2208.
Aulerich, R.J., R.K. Ringer, and S. Iwamoto. 1974. “Effects of dietary mercury on mink.” In
Arch. Environ. Contam. Toxicol. 2(1): 43-51
Auelrich, R.J. and R.K. Ringer. 1977. “A Current Status of PCB Toxicity to Mink and Effect
on their Reproduction.” In Arch. Environ. Contam. Toxicol. 6: 279-292.
Aulerich, R.J., R.K. Ringer, et al. 1986. “Assessment of Primary vs. Secondary Toxicity of
Aroclor 1254 to Mink.” In Arch. Environ. Contam. Toxicol. 15: 393-399.
Aulerich, R.J., S.J. Bursian, and A.C. Napolitano. 1990. “Subacute toxicity of dietary
heptachlor to mink (Mustela vison).” In Arch. Environ. Contam. Toxicol. 19(6):913-916.
AZA Small Carnivore TAG. 2000. Standardized Animal Care Guidelines for Otters
(lutrinae). Version 2. Silver Spring, MD: Association of Zoos and Aquariums.
Appendix 14 Bibliography 2 Hudson River PCBs Superfund Site Five Year Review May 2017
B Backlin, B.M. et al. 1998. “Expression of the insulin-like growth factor II gene in
polychlorinated biphenyl exposed female mink (Mustela vison) and their fetuses.” In J.Clin.
Pathol: Mol. Pathol. 51:43-47.
Baitchman, E.J. and G.V. Kallias. 2000. “Clinical Anatomy of the North American River
Otter (Lontra candensis).” In J. Zoo Willdl. Med. 31(4): 473-483.
Baker, Rollin H. 1983. Michigan Mammals. East Lansing: Michigan State University Press.
Distributed by Wayne State University Press.
Barbour, R.W. and W.H. Davis. 1974. Mammals of Kentucky. Lexington, KY: University of
Kentucky Press. 322 pp.
Barclay, B. 1993. “Hudson River Angler Survey.” Hudson River Sloop Clearwater, Inc.
Poughkeepsie, New York.
Blaha, Scott R. 2008. General Electric Company. Transmittal to Doug Garbarini (EPA
Region 2). Contract 4 and 5 – Final Plans & Specifications. February 15, 2008.
__________. 2009. General Electric Company. Transmittal to Doug Garbarini (EPA Region
2) Regarding Contract 4 Design Revisions for Near-Shore Areas (Revised 4-29-2009). May
4, 2009.
Bleavins, M. R. and R. J. Aulerich. 1981. “Feed consumption and food passage in mink
(Mustela vison) and European ferrets (Mustela putorious furo).” In Lab. Anim. Sci. 31: 268-
269.
Appendix 14 Bibliography 3 Hudson River PCBs Superfund Site Five Year Review May 2017
Blundell, G.M., R.T. Bowyer, et al. 2000. “Effects of food resources on spacing behavior of
river otters: does forage abundance control home range size?” In 15th International
Symposium on Biotelemetry. pp 325-333. International Society on Biotelemetry.
Wageningen, The Netherlands.
__________. 2001. “Linear home ranges: effects of smoothing, sample size, and
autocorrelation on kernel estimates.” In Ecological Monogr. 71: 469-489.
Blundell, G.M., M. Ben-David, and R.T. Bowyer. 2002. “Sociality in river otters:
cooperative foraging or reproductive strategies?” In Behavioral Ecology 13 (1): 134-141.
Blundell, G.M. et al. 2004. “Kinship and sociality in coastal river otters: are they related?” In
Behavioral Ecology 15(5): 705-714.
Boege-Tobin, D.D. 2005. “Ranging patterns and habitat utilization of northern river otters
(Lonta candensis) in Missouri: implications for the conservation of a re-introduced species.”
In Biology. St. Louis, MO: University of Missouri-St. Louis.”
Bowyer, R.T., G.M. Blundell, and J.B. Faro. 1995. “Habitat selection and home ranges of
river otters in a marine environment.” In J.Mamm. 76(1): 1-11.
Bowyer, R.T. et al. 2003. “Effects of the Exxon Valdex oil spill on river otters: injury and
recovery of a sentinel species.” In Wildlife Monographs 153: 1-53.
Breiman, L. 1996. Bagging Predictors. Machine Learning 26. pp. 123–140.
Bridges, T., Fox, R., Fuglevand, P., Hartman, G., Magar, V., Schroeder, P., Thompson, T.,
2010. Hudson River PCBs Site Peer Review of Phase 1 dredging, September 2010.
_________. 2001. Random Forests. Machine Learning 45. pp. 5-32.
http://www.stat.berkeley.edu/~breiman/RandomForests/
Appendix 14 Bibliography 4 Hudson River PCBs Superfund Site Five Year Review May 2017
Brunstrom, B., B. Lund, et al. 2001. “Reproductive toxicity in mink (Mustela vison)
chronically exposed to environmentally relevant polychlorinated biphenyl concentrations.” In
Environ. Toxicol. Chem. 20: 2318- 2327
Bucci, T., R.M. Parker, and W. Wustenberg. 1992. “A 90-day oral toxicity study and a 5-day
metabolism study of diisopropyl methylphosphonate (DIMP) in mink.” Health Effects
Research Division. U.S. Army Biomedical Research and Development Laboratory. AD-
A257 397.
Bursian, S. J. et al. 2006. “Dietary exposure of mink (Mustela vison) to fish from the
Housatonic River, Berkshire County, Massachusetts, USA: Effects on reproduction, kit
growth, and survival.” In Environ. Toxicol. Chem. 25(6): 1533-1540.
__________. 2013a. “Dietary exposure of mink (Mustel vison) to fish from the Upper
Hudson River, New York, USA: Effects on organ mass and pathology.” In Environ. Toxicol.
Chem. 32(4). 794-801.
__________. 2013b. “Dietary exposure of mink (Mustela vison) to fish from the upper
Hudson River, New York, USA: Effects on reproduction and offspring growth and
mortality.” In Environ. Toxicol. Chem. 32(4): 780-793.
Butcher, J.B., T.D. Gauthier, and E.A. Garvey, 1998. Use of Historical PCB Aroclor
Measurements: Hudson River Fish Data. In Environmental Toxicology and Chemistry, Vol.
16, No. 8, pp. 1618-1623.
Appendix 14 Bibliography 5 Hudson River PCBs Superfund Site Five Year Review May 2017
C Calder, W.A. and E.J. Braun. 1983. “Scaling of osmotic regulation in mammals and birds.”
In American Journal of Physiology 244:R601-R606
Cochran, W.G. 1977. Sampling Techniques. New York: John Wiley and Sons.
Clode, D., E.C. Halwell, and D.W. MacDonald. 1995. “A comparison of body condition in
riverine and coastal mink (Mustela vison).” In Journal of Zoology. 237: 686-689.
Conetta, Ben. 2010. USEPA Region 2. Letter to Scott Blaha (General Electric Company)
Regarding Phase 2 Data Gap Summary Report (DSR). June 22, 2010.
Connelly, N.A., B.A. Knuth, and C.A. Bisogni. 1992. Effect of the Health Advisory changes
on Fishing Habits and Fish Consumption in New York Sport Fisheries. September. Cornell
University: Ithaca, NY.
Cook, R. Dennis and S.Weisberg. 1982. Residuals and Influence in Regression. New York:
Chapman & Hall. ISBN 0-412-24280-X.
Crait, J.R., G.M. Blundell et al. 2006. “Late seasonal breeding of river otters in Yellowstone
National Park.” In Amer. Midl. Natur. 156(1): 189-192.
D Davis, H.G., et al. 1992. “Feed consumption and food transit time in northern river otters
(Lutra canadensis).” In Journal of Zoo and Wildlife Medicine. 23(2): 241-244.
de Bruyn, A.M.H, and F.A.P.C. Gobas . 2007. “The sorptive capacity of animal protein.” In
Environ Tox Chem 26(9):1803-1808.
Appendix 14 Bibliography 6 Hudson River PCBs Superfund Site Five Year Review May 2017
Dekar, M.P. et al. 2010. “Bioenergetics assessment of fish asnd crayfish consumption by
river otter (Lontra candensis): Integrating prey availability, diet and field metabolic rate. In
Can.J. Fish Aquat. Sci. 67(9): 1439-1448.
DeSantis, Liane. 2011. Results of Baseline Surface Sediment and Downstream PCB
Deposition Special Studies. Anchor QEA Technical Memorandum to Bob Gibson, General
Electric Company, January 27, 2011.
Duffy, L.K. et al. 1994. “Evidence for recovery of body mass and haptoglobin values of river
otters following the Exxon Valdex oil spill.” In J.Wild.Dis. 30(3): 421-425.
Dunstone, N. and J.D.S. Birks. 1983. “Activity budget and habitat usage by coasatal-living
mink (Mustela vison Schrerber). In Acta Zool. Fennica. 174: 189-191.
E Eastern Research Group, Inc. 2000. Report on the Peer Review of the Revised Baseline
Modeling Report for the Hudson River PCBs Superfund Site. Final. Prepared for U.S.
Environmental Protection Agency, Region II, Emergency and Remedial Response Division.
EPA Contract No. 68-W6-0022, Work Assignment No. 4-12, May 10.
Efron, B. 1987. “Better bootstrap confidence intervals.” In Journal of the American
Statistical Association. 82: (397): 171-185. doi:10.2307/2289144
Environmental Standards. Inc. 2010. Letter to USEPA Region 2 regarding General Electric
Company’s response to EPA Region 2 comments on the Phase 2 Data Gap Summary Report
(2009). January 27, 2010.
EPA (United States Environmental Protection Agency). 1984. Superfund Record of Decision:
Hudson River PCBs Site, NY.
Appendix 14 Bibliography 7 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 1989a. Exposure Factors Handbook. Office of Health and Environmental
Assessment. Washington, D.C. EPA/600/8-89/043, July.
__________. 1989b. Risk Assessment Guidance for Superfund (RAGS), Volume I. Human
Health Evaluation Manual (Part A). USEPA, Office of Emergency and Remedial Response.
Washington, D.C. USEPA/540/I-89/002, December.
__________.1993. Wildlife Exposure Factors Handbook, Volume I of II. Washington, D.C.
United States Environmental Protection Agency, Office of Research and Development.
EPA/600/4-93/187a.
__________. 1994. Memorandum from M.D. Mullin of the U.S. EPA Environmental
Research Laboratory - Duluth, Large Lakes Research Station to G. Frame of GE Corporate
Research and Development. November 21, 1994.
________1995. Reassessment Remedial Investigation and Feasibility Study: Phase 2 Report
– Further Site Characterization and Analysis Database Report, Hudson River PCBs Site
Volume 2A, Prepared for USEPA by TAMS Consultants.Work Assignment No. 013-2N84.
__________. 1996. “PCBs: Cancer Dose-Response Assessment and Application to
Environmental Mixtures.” Office of Research and Development, National Center for
Environmental Assessment, Washington Office. Washington, D.C. EPA/600/P-96/001F.
__________.1997a. “Health Effects Assessment Summary Tables (HEAST).” Washington
Office. Washington, D.C.
_________. 1997b. “Policy for Use of Probabilistic Analysis in Risk Assessment at the U.S.
Environmental Protection Agency.” Office of Research and Development, Washington, D.C.
EPA/630/R-97/001.
Appendix 14 Bibliography 8 Hudson River PCBs Superfund Site Five Year Review May 2017
_________. 1997c. Exposure Factors Handbook, Volume I-III, Office of Research and
Development. USEPA/600/P-95/002Fa, August.
__________. 1997d. Phase 2 Report - Review Copy Further Site Characterization and
Analysis Volume 2C - Data Evaluation and Interpretation Report Hudson River PCBs
Reassessment RI/FS. Vol. 2C-A. Prepared for U.S. Environmental Protection Agency Region
2 and U.S. Army Corps of Engineers Kansas City District by TAMS Consultants, Inc, The
Cadmus Group, Inc, and Gradient Corporation. February 1997.
1998a. Phase 2 Report - Review Copy Further Site Characterization and Analysis Volume
2C-A Low Resolution Sediment Coring Report Addendum to the Data Evaluation and
Interpretation Report Hudson River PCBs Reassessment RI/FS. Vol. 2C-A. Prepared for the
U.S. Environmental Protection Agency Region 2 and U.S. Army Corps of Engineers Kansas
City District by TAMS Consultants, Inc., Gradient Corporation, and Tetra Tech, Inc. July
1998.
__________. 1998. Exposure Factors Handbook. Office of Health and Environmental
Assessment, Washington, DC. EPA/600/8-89/043. July 1998.
__________. 1999a. Phase 2 Report, Further Site Characterization and Analysis, Volume 2E,
Baseline Ecological Risk Assessment, Hudson Riverr PCBs Reassessment RI/FS. August
1999. Prepared for EPA and USACE by TAMS Consultants, Inc. and Menzie-Cura &
Associates, Inc.
_________. 1999b. Further Site Characterization and Analysis, Volume 2D – Baseline
Modeling Report (BMRA), Hudson River PCBs Reassessment RI/FS. Prepared by Limno-
Tech, Inc., Menzie-Cura & Associates, Inc. and Tetra-Tech, Inc for EPA and USACE.
November 1999.
__________. 1999c. Phase 2 Report- Review Copy Further Site Characterization and
Analysis Volume 2F-A Human Health Risk Assessment for the Mid-Hudson River Hudson
Appendix 14 Bibliography 9 Hudson River PCBs Superfund Site Five Year Review May 2017
River PCBs Reassessment RI/FS. Vol. 2F-A. U.S. Environmental Protection Agency Region
2 and U.S. Army Corps of Engineers Kansas City District. December 1999.
__________. 2000a. Revised Baseline Modeling Report, Hudson River PCBs Reassessment
RI/FS, Volume 2D/ Book 1 of 4, Fate and Transport Models. Prepared for EPA and USACE
by TAMS Consultants, Inc. and Menzie-Cura & Associates, Inc. January 2000.
________. 2000b. Database for the Hudson River PCBs Reassessment RI/FS. Release 5.0
(Compact Disk). Prepared for USEPA Region 2 and the USACE, Kansas City District by
TAMS Consultants, Inc. October 2000.
_________. 2000c. Phase 2 Report, Further Site Characterization and Analysis Volume 2E –
Revised Baseline Ecological Risk Assessment, Hudson River PCBs Reassessment.
November 2000.
__________. 2000d. Hudson River PCBs Reassessment RI/FS - Book 1 of 6: Report Text
and Book 2 of 6: Figures and Tables. Prepared for EPA and USACE by TAMS Consultants,
Inc. December 2000.
__________. 2000e. Hudson River PCBs Reassessment RI/FS Phase 3 Report: Feasibility
Study. Prepared by TAMS Consultants, Inc. December 2000.
__________. 2000f. Hudson River PCBs Reassessment RI/FS Phase 3 Report: Feasibility
Study. Book 1 of 6: Report Text, Book 2 of 6: Figures and Tables, Book 5 of 6: Appendix D
through Appendix H. Prepared by TAMS Consultants, Inc., for EPA and USACE, December
2000.
__________. 2000g. Phase 2 Report Further Site Characterization and Analysis Volume 2F -
Revised Human Health Risk Assessment Hudson River PCBs Reassessment RI/FS - Upper
Hudson River and Mid-Hudson River. Vol. 2F. November 2000.
Appendix 14 Bibliography 10 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2001. Comprehensive Five-Year Review Guidance. June 2001.
__________. 2002. Record of Decision for the Hudson River PCBs Superfund Site. U.S.
Environmental Protection Agency. February 2002.
__________. 2003. Human Health Toxicity Values in Superfund Risk Assessment, Office of
Superfund Remediation and Technology Innovation. OSWER Directive 9285.7-53.
December 2003.
___________. 2004. Hudson River PCBS Superfund Site Quality of Life Performance
Standards. Prepared for the U.S. Environmental Protection Agency by Ecology and
Environment, Inc. May 2004.
__________. 2004a. Hudson River PCBs Site New York. Engineering Performance
Standards. April 2004.
__________. 2004b. Hudson River Superfund Site Facility Siting Report. Prepared by
Ecology and Environment, Inc. for USEPA Region 2 and USACE, Kansas City District.
December 2004.
__________. 2004c. Resolution of GE Disputed Issues since GE’s May 21, 2004 Presentation
to the Regional Administrator. July 22, 2004.
__________. 2005. Attachment E to Statement of Work, Operations, Maintenance and
Monitoring Scope. September 2005.
_________. 2006. Final Biological Assessment. Prepared for the U.S. Environmental
Protection Agency by Ecology and Environment, Inc. January 2006.
Appendix 14 Bibliography 11 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2009. Hudson River Community Involvement Plan. Prepared for the U.S.
Environmental Protection Agency by Ecology and Environment, Inc. June 2009.
_________. 2009a. Letter to John Haggard of General Electric Company regarding Phase 2
Intermediate Design Report. June 23, 2009.
__________. 2009b. Letter to General Electric Company, USEPA Region 2 Comments on
the Phase 2 Data Gap Summary Report to General Electric Company. December 23, 2009.
___________. 2010a. Hudson River PCBs Site EPA Phase I Evaluation Report. Prepared for
USEPA, Region 2 and the U.S. Army Corps of Engineers by the Louis Berger Group. March
2010
__________. 2010b. Hudson River PCBs Site Revised Engineering Performance Standards.
December 2010.
__________. 2010c. Recommended Toxicity Equivalence Factors (TEFs) for Human Health
Risk Assessments of 2,3,7,8-Tetrachlorodibenzo-p-dioxin and Dioxin-Like Compounds. Risk
Assessment Forum. Washington, D.C. EPA/600/R-10/005.
__________. 2010d. Attachment E to Statement of Work, Operations, Maintenance and
Monitoring Scope for Phase 2 of the Remedial Action. December 2010.
_________. 2010e. Technical Memorandum: Quality of Life Performance Standards.
Prepared by Ecology and Environment. December 2010.
_________. 2011a. Exposure Factors Handbook: 2011 Edition. Office of Research and
Development, National Center for Environmental Assessment. EPA/600/R-090/052F.
Washington, D.C. September 2011.
Appendix 14 Bibliography 12 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2011b. In the United States District Court for the Northern District of New
York. United States of America, Plaintiff, v. General Electric Co., Defendant, Civil Action
No. 1:05 CV-01270, Consent Decree Modification No. 2. Filed August 15, 2011.
__________. 2012. First Five-Year Review Report for Hudson River PCBs Superfund Site.
June 1, 2012.
__________. 2014. Human Health Evaluation Manual, Supplemental Guidance: Update of
Standard Default Expsoure Factors. Office of Superfund Remediation and Technology
Innovation. OSWER Directive 9200.1-120. February 2014.
__________. 2016. Responses to NOAA Manuscript Entitled: “Re‐Visiting Projections of
PCBs in Lower Hudson River Fish Using Model Emulation” (Field, Kern, Rosman, 2015).
https://www3.epa.gov/hudson/pdf/EPA%20White%20Paper%20-
%20Responses%20to%20NOAA%20Manuscript.pdf.
__________. 2017. PCB Data Collection and Analyses with Sediment Grain Size
Distribution: Results of Analyses of Sediment Samples Collected During EPA Oversight of
General Electric Contractors Performing 2016 Surface Sediment Data Collection. Data
Collected Fall 2016 and Analyzed January 2017. Prepared by Axys Analytical Services and
Louis Berger for USEPA (Filename: 2017-01-30 FINAL Hudson HRFO 20-16 - Master
Database [validated].xlsx). January 31, 2017.
Erickson, D.W., C.R. McCullough et al. 1984. “River Otter Investigations in Missouri.”
Missouri Department of Conservation: 47.
Appendix 14 Bibliography 13 Hudson River PCBs Superfund Site Five Year Review May 2017
F Farley, K., J. Thomann, R. V. Cooney, T. F. Damiani, and J.R. Wands, J. R. (1999). An
Integrated Model of Organic Chemical Fate and Bioaccumulation in the Hudson River
Estuary, Final Report to the Hudson River Foundation, Manhattan College, Riverdale, NY.
Faro, J.B. et al. 1994. “Assessment of injury to river otters in Prince William Sound, Alaska,
following the Exxon Valdez oil spill.” Exxon Valdez Oil Spill State/Federal Natural
Resource Damage Assessment Final Report. In Terrestrial Mammal Study Number 3.
Soldotna, AK, Alaska Department of Fish and Game, Wildlife Conservation Division.
Fealty, Irena. 2011. “Results of Special Study on PCB Release, Fate, and Transport.” Anchor
QEA Technical Memorandum to Bob Gibson, General Electric Company, December 21,
2011.
Fitzgerald, J.P. et al. 1994. Mammals of Colorado. University Press of Colorado and Denver
Museum of Natural History.
Folland, W.R. et al. 2016. “Growth and reproductive effects from dietary exposure to Aroclor
1268 in mink (Neovison), a surrogate for marine mammals.” In Environ. Toxicol. Chem.
35(3): 604-618.
Foy, M.K. 1984. “Seasonal movement, home range, and habitat use of river otter in
southeastern Texas.” M.S. Thesis. Texas A&M University.
Frame, G.M., R.E. Wagner, J.C. Carnahan, J.F. Brown, R.J. May, L.J. Smullen, and D.L.
Bedard. 1996. Comprehensive, Quantitative, Congener-Specific Analyses of Eight Aroclors
and Complete PCB Congener Assignments on DB-1 Capillary Columns. Chemosphere,
33(4):603-623.
Appendix 14 Bibliography 14 Hudson River PCBs Superfund Site Five Year Review May 2017
Fuchsman, P.C. et al. 2008. “Effectiveness of various exposure metrics in defining dose-
response relationships for mink (Mustela vison) exposed to polychlorinated biphenyls.” In
Arch. Environ. Contam. Toxicol. 54:130-144/
G Garvey, E. A., X. Wang, J. Atmadja, S. Gbondo-Tugbawa, J. Kern, and N. Richardson. 2016.
Prediction of Tissue Burdens of Chlorinated Organics and Heavy Metals Based on Sediment
Exposure: Development and Validation of Biota-Sediment Accumulation Factors for the
Lower 8.3 Miles of the Lower Passaic River Using Log-linear Regression. Presented at the
Passaic River Symposium VII, Passaic River Institute, Montclair State University College of
Science and Mathematics. Oct 13-14, 2016.
General Electric. 1997 Development of Corrections for Analytical Biases in the 1991-1997
GE Hudson River PCB Database. Prepared for General Electric by Hydroqual, Inc.
__________. 2002a. Design Support Sediment Sampling and Analysis Program, Field
Sampling Plan. Prepared for the General Electric Company by QEA, LLC.
__________. 2002b. Quality Assurance Project Plan for the Hudson River PCBs Site,
Revision 4. Prepared for the General Electric Company by Environmental Standards, Inc.
October 2002.
__________. 2003a. Data Interpretation Report – Side Scan Sonar Survey Investigation.
Hudson River – River Section 2, Spring 2003. OSI Report No. 02ES072 – DIR – S2003.
Prepared for the General Electric Company by Ocean Surveys, Inc. October 1, 2003.
__________. 2003b. Habitat Delineation and Assessment Work Plan. Prepared for General
Electric by Blasland, Bouck & Lee. August 2003.
Appendix 14 Bibliography 15 Hudson River PCBs Superfund Site Five Year Review May 2017
_________. 2003c. Data Interpretation Report – Side Scan Sonar Survey Investigation.
Hudson River – River Sections 1 and 3. OSI Report No. 02ES072 – DIR – F2002. Prepared
for the General Electric Company by Ocean Surveys, Inc. Fall 2002.
_________. 2004a. Quality Assurance Project Plan for the Hudson River PCBs Site.
Baseline Monitoring Program. Prepared for General Electric by Quantitative Environmental
Analysis, LLC, Montvale, NJ, in conjunction with Environmental Standards, Inc. Valley
Forge, PA. May 2004.
__________. 2004b. Phase 1 Target Area Identification Report. September 2004. Prepared
for the General Electric Company by QEA, LLC
_________. 2004c. Memo - Additional Analyses of Tri+ PCB Regression for use in the
Revised Phase 1 Dredge Area Delineation Report. Prepared by QEA for General Electric. June
14, 2004.
__________. 2004d. Supplemental Engineering Data Collection Work Plan. Prepared for
General Electric by Blasland, Bouck & Lee. February 2004.
__________. 2004e. Treatability Studies Work Plan. Prepared for General Electric by
Blasland, Bouck & Lee. February 2004.
__________. 2004f. Preliminary Design Report. Prepared for General Electric by Blasland,
Bouck & Lee. April 2004.
__________. 2004g. Supplemental Engineering Data Collection Work Plan Addendum No.1
– Year 2. Prepared for General Electric by Blasland, Bouck & Lee. October 2004.
__________. 2005a. Phase 1 Dredge Area Delineation Report. Prepared for GE by QEA,
LLC. February 2005.
Appendix 14 Bibliography 16 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2005b. Hudson River PCBs Site Baseline Monitoring Report Data Summary
Report for 2004. Prepared for General Electric Company by QEA, LLC. April 2005.
__________. 2005c. Hudson River PCBs Site, Supplemental Delineation Sampling Program
Data Summary Report. Prepared for the General Electric Company by QEA, LLC and ESI.
__________. 2005d. Data Summary Report: PCB Methods Comparison Study Congener
Analytical Standards. Prepared for General Electric by ESI and QEA, LLC. May 20, 2005.
__________. 2005e. Year 2 Supplemental Engineering Data Collection – Interim Data
Summary Report. March 2005. Prepared for General Electric by Blasland, Bouck & Lee.
__________. 2005f. Phase 1 Intermediate Design Report, Hudson River PCBs Superfund
Site. August 22, 2005. Prepared for General Electric by Blasland, Bouck & Lee.
__________. 2005g. Supplemental Engineering Data Collection Work Plan Addendum No.
2- Year 2. September 2005. Prepared for General Electric by Blasland, Bouck & Lee.
__________. 2005h. Supplemental Habitat Assessment Work Plan. September 2005.
Prepared for General Electric by Blasland, Bouck & Lee.
__________. 2005i. Habitat Assessment Report for Candidate Phase 1 Areas. November
2005. Prepared for General Electric by Blasland, Bouck & Lee.
__________. 2005j. GE presentation: “Equipment Shakedown and Analytical Method and
Verification Study. ‘L2005-545.ppt.’
__________. 2006a. Hudson River PCBs Site Baseline Monitoring Report Data Summary
Report for 2005. Prepared for General Electric Company by QEA, LLC. March 2006.
Appendix 14 Bibliography 17 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2006b. Hudson River PCBs Site Phase 1 Remedial Action Monitoring Program
Quality Assurance Project Plan. Prepared for General Electric Company by QEA, LLC.
December 2006.
__________. 2006c. Phase 1 Final Design Report. Prepared for General Electric by
Blasland, Bouck & Lee. March 21, 2006.
__________. 2006d. Phase 1 Final Design Report, Attachment A - Addendum to
Treatability Studies Report. Prepared for General Electric by Blasland, Bouck & Lee. March
2006.
__________. 2006e. Phase 1 Final Design Report, Attachment B - Year 2 Supplemental
Engineering Data Collection Data Summary Report. Prepared for General Electric by
Blasland, Bouck & Lee. March 2006.
__________. 2006f. Phase 1 Final Design Report, Attachment C – Geotechnical
Investigation Summary Report. Prepared for General Electric by Blasland, Bouck & Lee.
March 2006.
__________. 2006g. Hudson River Sediment Remediation Phase 1 Project Contract 1 –
Facility Site Work Construction Addendum No. 1. Prepared for General Electric by Blasland,
Bouck & Lee. April 2006
__________. 2006h. Hudson River Sediment Remediation Phase 1 Project Contract 1 –
Facility Site Work Construction Addendum No. 2. Prepared for General Electric by Blasland,
Bouck & Lee. April 2006.
__________. 2006i. Hudson River Sediment Remediation Phase 1 Project Contract 1 –
Facility Site Work Construction Addendum No. 3. Prepared for General Electric by Blasland,
Bouck & Lee. April 2006.
Appendix 14 Bibliography 18 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2006j. Hudson River Sediment Remediation Phase 1 Project Contract 1 –
Facility Site Work Construction Addendum No. 4. Prepared for General Electric by Blasland,
Bouck & Lee. April 2006.
__________. 2006k. Hudson River Sediment Remediation Phase 1 Project Contract 2 – Rail
Yard Construction Addendum No. 1. Prepared for General Electric by Blasland, Bouck &
Lee. April 2006.
__________. 2006l. Hudson River Sediment Remediation Phase 1 Project Contract 2 – Rail
Yard Construction Addendum No. 2. Prepared for General Electric by Blasland, Bouck &
Lee. April 2006.
__________. 2006m. Hudson River Sediment Remediation Phase 1 Project Contract 3 –
Process Facility Construction and Operation Addendum No. 1.. Prepared for General Electric
by Blasland, Bouck & Lee. April 2006.
__________. 2006n. Phase 2 Supplemental Engineering Data Collection Work Plan.
Prepared for General Electric by Blasland, Bouck & Lee. April 2006.
__________. 2006o. Hudson River Sediment Remediation Phase 1 Project Contract 3 –
Process Facility Construction and Operation Addendum No. 2. May 2006. Prepared for
General Electric by Blasland, Bouck & Lee.
__________. 2007a. Hudson River PCBs Site Baseline Monitoring Report Data Summary
Report for 2006. Prepared for General Electric Company by QEA, LLC. March 2007.
__________. 2007b. Supplemental Engineering Data Collection Work Plan for Shoreline
Sampling in Phase 1 Areas. Prepared for General Electric Company by QEA, LLC. October
2007.
Appendix 14 Bibliography 19 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2007c. Hudson River PCBs Site Phase 2 Dredge Area Delineation Report. .
Prepared for General Electric Company by QEA, LLC. December 17, 2007.
_________ 2007d. Phase 2 Supplemental Engineering Data Collection Data Summary
Report. Prepared for General Electric by Arcadis. March 2007.
__________. 2007e. Addendum No. 2, Phase 2 Supplemental Engineering Data Collection
Work Plan. Prepared for General Electrc by Arcadis. September 2007.
__________. 2008a. Phase 1 Adaptive Management Plan. Prepared for General Electric
Company by QEA, LLC. January 2008.
__________. 2008b. Baseline Monitoring Report – Data Summary Report for 2007. Prepared
for General Electric Company by QEA, LLC. March 2008.
__________. 2008d. Phase 2 Intermediate Design Report. Prepared for General Electric by
Arcadis.May 2008.
__________. 2008e. Habitat Delineation Report. Prepared for General Electric by Arcadis.
December 2008.
__________. 2009a. Far-Field and Near-Field Pilot Study Data Summary Report. Prepared
for General Electric Company by Anchor QEA, LLC. February 2009.
__________. 2009b. Hudson River PCBs Site Baseline Monitoring Report – Data Summary
Report for 2008. Prepared for General Electric Company by Anchor QEA, LLC. March
2009.
__________. 2009c. Phase 2 Data Gap Data Summary Report. Prepared for General Electric
Company by Anchor QEA, LLC. April 2009.
Appendix 14 Bibliography 20 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2009d. Phase 1 Remedial Action Monitoring Program Quality Assurance
Project Plan. Prepared for General Electric Company by Anchor QEA, LLC. May 2009.
__________. 2009e. Hudson River PCBs Site Remedial Action Work Plan Appendix D:
Phase 1 Performance Standards Compliance Plan. Prepared for General Electric by Arcadis.
May 2009.
__________. 2009f. Habitat Assessment Report for Phase 2 Areas. Prepared for General
Electric Company by Anchor QEA, LLC. June 2009.
__________. 2009g. Phase 1 Data Compilation Report. Prepared for General Electric
Company by Anchor QEA, LLC. November 2009.
__________. 2010a. 2009 Data Summary Report, Hudson River Water and Fish, Hudson
River PCBs Superfund Site. Prepared for General Electric Company by Anchor QEA, LLC.
May 2010.
__________. 2010b. Supplemental Engineering Data Collection Work Plan for Sediment
Sampling in Certification Units 09-16 and 19-30. Prepared for General Electric Company by
Anchor QEA, LLC. September 2010.
___________. 2010c. Phase 1 Evaluation Report, Hudson River PCBs Superfund Site.
Prepared for General Electric Company by Anchor QEA and ARCADIS. March 2010.
__________. 2011a. Phase 2 Performance Standards Compliance Plan For 2011. Appendix D
to Remedial Action Work Plan for Phase 2 Dredging and Facility Operations in 2011,
Hudson River PCBs Superfund Site. Revised April 2011
__________. 2011b. Wetland Delineation Report for Phase 2 Areas. J Prepared for General
Electric Company by Anchor QEA, LLC. January 2011.
Appendix 14 Bibliography 21 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2011c. 2010 Supplemental Engineering Data Collection Data Summary Report.
Prepared for General Electric Company by Anchor QEA, LLC. February 2011.
__________. 2011d. 2010 Data Summary Report Hudson River Water and Fish, Hudson
River PCBs Superfund Site. Prepared for General Electric Company by Anchor QEA, LLC.
April 2011.
__________. 2011e. Hudson River PCBs Site 2011 Remedial Action Monitoring Quality
Assurance Project Plan. Revision 1. Prepared for General Electric Company by Anchor
QEA, LLC. May 2011.
__________. 2011f. Supplemental Engineering Data Collection Work Plan for Sediment
Sampling in Certification Units 31 through 70. Prepared for General Electric Company by
Anchor QEA, LLC. July 2011.
__________. 2011g. Technical Memorandum: Dam Volatilization Special Study Results.
Prepared for General Electric Company by Anchor QEA, LLC. November 2011.
__________. 2011h. Technical Memorandum: Results of Special Study on Tributary Inputs
of Solids and PCs. Prepared for General Electric Company by Anchor QEA, LLC. November
2011.
__________. 2011i. Technical Memorandum: EoC, Residuals, and Missed Inventory Special
Study Results. Prepared for General Electric Company by Anchor QEA, LLC. December
2011.
__________. 2011j. Addendum to 2011 Supplemental Engineering Data Collection Work
Plan. Prepared for GE by Environmental Standards, Inc. September 28, 2011
Appendix 14 Bibliography 22 Hudson River PCBs Superfund Site Five Year Review May 2017
_________. 2011k. Remedial Action Work Plan for Phase 2 Dredging and Facility
Operations in 2011. Revision 1 – April 2011. Prepared for the General Electric Co. by
Parsons Corp.
_________. 2011l. Hudson River PCBs Superfund Site Operation, Maintenance, and
Monitoring Plan for Phase 1 Caps and Habitat Replacement/Reconstruction. Prepared for
the General Electric Co. by Parsons Corp. September 2011.
__________. 2011m. Hudson River PCBs Superfund Site Phase 1 Construction Completion
Report. Prepared for the General Electric Co. by Parsons Corp. October 2011.
__________. 2011n. Phase 2 Final Design Report for 2011. Prepared for General Electric by
Arcadis. Revised April 2011.
_________. 2011o. Corrective Action Memorandum (CAM) No. 3 – Modification of
Sediment Residual Monitoring Program – Discontinuing mGBM Analysis of Sediment
Samples and Updates of the Regression Coefficients. Memorandum from Emily Chen,
Anchor QEA, to Bob Gibson, General Electric. August 15, 2011.
__________. 2012a. Phase 2 Final Design Report for 2012. Prepared for General Electric by
Arcadis. May 2012.
__________. 2012b. Addendum #1 to Phase 2 Final Design Report for 2012: West Griffin
Island Area. October 2012. Prepared for General Electric by Arcadis.
__________. 2012c. Phase 2 Year 1 Cap Survey Results and Reference Surfaces. Prepared
for General Electric by CLE Engineering. November 2012.
__________. 2012d. Hudson River PCBs Superfund Site Phase 2 Year 1 Annual Progress
Report. Prepared for General Elecric by Parsons Corp. February 2012.
Appendix 14 Bibliography 23 Hudson River PCBs Superfund Site Five Year Review May 2017
_________. 2012e. Post-Closure Inspection Summary Report for Fort Edward PCB Remnant
Site Remediation Project Sites 2, 3, 4, and 5. Prepared for General Electric by O’Brien &
Gere. January 2012.
__________. 2012f. Technical Memorandum: Results of Diagnostic Testing Special Studies.
Prepared for General Electric Company by Anchor QEA, LLC. January 2012.
__________. 2012g. 2011 Supplemental Engineering Data Collection Data Summary Report
on Sediment Sampling. Prepared for General Electric Company by Anchor QEA, LLC and
ESI. January 2012.
__________. 2012h. 2011 Data Summary Report Hudson River Water and Fish, Hudson
River PCBs Superfund Site. Prepared for General Electric Company by Anchor QEA, LLC.
April 2012.
__________. 2012i. Supplemental Engineering Data Collection Work Plan for Sediment
Sampling in Certification Units 71-100. Prepared for General Electric Company by Anchor
QEA, LLC. April 2012.
__________. 2012j. Technical Memorandum: Using an Aroclor Method to Quantify Total
PCB Concentrations and Calculate Tri+ PCB Concentrations in Water. Prepared for
General Electric Company by Anchor QEA, LLC. May 2012.
__________. 2012k Technical Memorandum: Refinement of Water Column Tri+ PCB
Regressions for Far-field. Prepared for General Electric Company by Anchor QEA, LLC.
August 2012.
__________. 2012l. Technical Memorandum: Evaluation of Buoy-based Far-field
Monitoring Station in Stillwater. Prepared for General Electric Company by Anchor QEA,
LLC. December 2012.
Appendix 14 Bibliography 24 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2012m. Hudson River PCBs Site Phase 2 Remedial Action Monitoring
Program Quality Assurance Project Plan. Prepared for General Electric by Anchor QEA and
ESI. May 2012.
_________. 2012m.Operation, Maintenance, and Monitoring Plan for Phase 2 Year 1 Caps
and Habitat Replacement Reconstruction. April 2012. Prepared for General Electric by
Anchor QEA and Parsons Corp. April 2012.
__________. 2013a. Hudson River PCBs Superfund Site Phase 2 Year 2 Annual Progress
Report. Prepared for the General Electric Co. by Parsons Corp. January 2013.
__________. 2013b. Remedial Action Work Plan for Phase 2 Dredging and Facility
Operations in 2013. Hudson River PCBs Superfund Site. Prepared for General Electric
Corporation by Parsons Corp. February 2013.
___________. 2013c. Post-Closure Inspection Summary Report for Fort Edward PCB
Remnant Site Remediation Project Sites 2, 3, 4, and 5. Prepared for General Electric by
O’Brien & Gere. August 2013.
__________. 2013f. Technical Memorandum: Sample Preparation Error for Total Organic
Carbon (TOC) in Sediment. Prepared for GE by Environmental Standards, Inc. May 2013.
__________. 2013g. 2012 Supplemental Engineering Data Collection Sediment Sampling
Data Summary Report. Prepared for General Electric Company by Anchor QEA, LLC.
January 2013.
__________. 2013h. Phase 1 Adaptive Management Report for 2012. Prepared for General
Electric Company by Anchor QEA, LLC. February 2013.
__________. 2013i. 2012 Data Summary Report, Hudson River Water and Fish, Hudson
River PCBs Superfund Site. Prepared for General Electric Company by Anchor QEA, LLC.
March 2013.
Appendix 14 Bibliography 25 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2013k. PCB Loads and Percent Release. Prepared for General Electric
Company by Anchor QEA, LLC. July 2013.
__________. 2013l. MVP Sub-Area Delineation. Prepared for General Electric Company by
Anchor QEA, LLC. August 2013.
__________. 2013l. Technical Memorandum, Remnant Deposits Annual Sumary Report..
Prepared for General Electric Company by Anchor QEA, LLC. March 2013
__________. 2013n. Operation, Maintenance, and Monitoring Plan for 2012 Caps and
Habitat Replacement/Reconstruction. Prepared for General Electric Company by Anchor
QEA, LLC. August 2013.
__________. 2013o. Phase 2 Final Design Report for 2013. Prepared for General Electric by
Arcadis. April 2013.
__________. 2013p. Addendum No. 1 to Phase 2 Final Design Report for 2013. Prepared for
General Electric by Arcadis. May 2013.
__________. 2013q. Phase 2 Final Design Report for 2013 Addendum No. 4 – CU76 Design
Revisions. Prepared for General Electric by Arcadis. August 2013.
__________. 2013r. Phase 2 Final Design Report for 2013 Addendum No. 5 – CU79 through
CU84 in Reach 5. September 2013.
__________. 2013s. Phase 2 Final Design Report for 2013 Addendum No. 2 – Reaches 1 and
2. Prepared for General Electric by Arcadis. October 2013
Appendix 14 Bibliography 26 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2013t. Addendum No. 6 to Phase 2 Final Design Report for 2013 – Drawings
and Specifications for Habitat Planting in 2014. November 2013. Prepared for General
Electric by Arcadis.
__________. 2014a. Phase 2 Final Design Report for 2013 Addendum No. 3 – CU60 Design
Revisions. Prepared for General Electric by Arcadis. March 2014.
__________. 2014b. Addendum No. 8 to Phase 2 Final Design Report for 2013 – CUs 97
through 100. Prepared for General Electric by Arcadis. April 2014.
__________. 2014c. Phase 2 Final Design Report for 2013 Addendum No. 5 – CU79
through CU84 in Reach 5. Prepared for General Electric by Arcadis. April 2014.
__________. 2014d. Revised Addendum No. 7 to Phase 2 Final Design Report for 2013 –
CUs 79 through 84 in Reach 5. Prepared for General Electric by Arcadis. April 2014.
__________. 2014e. Phase 2 Final Design Report for CU85 through CU96. Prepared for
General Electric by Arcadis. June 2014.
__________. 2014f. Phase 2 Final Design Report for Reach 7 (the Landlocked Area).
Prepared for General Electric by Arcadis. June 2014.
__________. 2014g. Addendum No. 1 to Revised Phase 2 Final Design Report for CU85
through CU96. Prepared for General Electric by Arcadis. September 2014.
__________. 2014h. Addendum No. 9 to Phase 2 Final Design Report for 2013. Prepared for
General Electric by Arcadis. October 2014.
__________. 2014i. Revised Addendum No. 6 to Phase 2 Final Design Report for 2013 –
Drawings and Specifications for Habitat Planting in 2014. Prepared for General Electric by
Arcadis. December 2014.
Appendix 14 Bibliography 27 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2014j. Hudson River PCBs Site Monitoring, Maintenance, and Adaptive
Management Report for 2013. Prepared for General Electric Company by Anchor QEA and
Parsons. January 2014.
__________. 2014k. Phase 2 Year 3 Annual Progress Report. Prepared for General Elecric
by Parsons Corp. February 2014.
___________. 2014l. Post-Closure Inspection Summary Report for Fort Edward PCB
Remnant Site Remediation Project Sites 2, 3, 4, and 5. Prepared for General Electric by
O’Brien & Gere. January 2014.
___________. 2014m. Post-Closure Inspection Summary Report for Fort Edward PCB
Remnant Site Remediation Project Sites 2, 3, 4, and 5. Prepared for General Electric by
O’Brien & Gere. September 2014.
___________. 2014n. Post-Closure Inspection Summary Report for Fort Edward PCB
Remnant Site Remediation Project Sites 2, 3, 4, and 5. Prepared for General Electric by
O’Brien & Gere. December 2014.
__________. 2014p. 2013 Data Summary Report, Hudson River Water and Fish, Hudson
River PCBs Superfund Site. Prepared for General Electric Company by Anchor QEA, LLC.
March 2014.
__________. 2014q. Technical Memorandum: Annual Summary Report for the Post-
Construction Remnant Deposits Annual Monitoring Program. March 2014. Prepared for
General Electric Company by Anchor QEA, LLC.
__________. 2014r. Hudson River PCBs Site Operation, Maintenance, and Monitoring Plan
for 2013 Caps and Habitat Replacement/Reconstruction. Prepared for General Electric by
Anchor QEA and Parsons.March 2014.
Appendix 14 Bibliography 28 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2015a. 2014 Data Summary Report. Prepared for General Electric Company by
QEA, LLC. March 2015.
___________. 2015b. Post-Closure Inspection Summary Report for Fort Edward PCB
Remnant Site Remediation Project Sites 2, 3, 4, and 5. Prepared for General Electric by
O’Brien & Gere. September 2015.
___________. 2015c. Post-Closure Inspection Summary Report for Fort Edward PCB
Remnant Site Remediation Project Sites 2, 3, 4, and 5. Prepared for General Electric by
O’Brien & Gere. December 2015.
__________. 2015d. Phase 2 Year 4 Annual Progress Report. Prepared for General Electric
Corporation by Parsons Corp. June 2015.
__________. 2015e. Technical Memorandum, Annual Summary Report for the 2014-Post-
Construction Remnant Deposits Monitoring Program. March 2015. Prepared for General
Electric Company by QEA, LLC
__________. 2015f. Hudson River PCBs Site Monitoring, Maintenance, and Adaptive
Management Report for 2014. Prepared for General Electric by Anchor QEA and Parsons.
January 2015.
__________. 2015g. Hudson River PCBs Site Revised Operation, Maintenance, and
Monitoring Plan for 2014 Caps and Habitat Replacement/Reconstruction. Prepared for
General Electric by Anchor QEA and Parsons. September 2015.
__________. 2015h. Supplemental Design Revision for 2015. Prepared for General Electric
by Arcadis. February 2015.
Appendix 14 Bibliography 29 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2015i. Supplemental Design Revisions for 2015. Prepared for General Electric
by Arcadis. June 2015.
__________. 2015j. Addendum No. 1 to Final Revised Supplemental Design Revisions for
2015. Prepared for General Electric by Arcadis. September 2015.
__________. 2015k. Supplemental Design Revisions for 2015. Prepared for General Electric
by Arcadis. September 2015.
__________. 2015l. Sediment Processing Facility Demobilization and Restoration Plan.
Revised September 2015. Prepared for General Electric by Arcadis.
__________. 2016a. Phase 2 Year 5 Annual Progress Report. Prepared for General Electric
Corporation by Parsons Corp. April 2016.
__________. 2016b. Phase 2 Year 6 Annual Progress Report. Prepared for General Electric
Corporation by Parsons Corp. December 2016.
___________. 2016c. Post-Closure Inspection Summary Report for Fort Edward PCB
Remnant Site Remediation Project Sites 2, 3, 4, and 5. Prepared for General Electric by
O’Brien & Gere. October 2016.
__________. 2016e. Dredging Project Design Drawings and Specifications for 2016 Habitat
Construction. February 2016. Prepared for General Electric Company by QEA, LLC
__________. 2016f. 2015 Surface Water Data Summary Report. March 2016. Prepared for
General Electric Company by QEA, LLC
__________. 2016g. 2015 Data Summary Report Hudson River Water and Fish, Hudson
River PCBs Superfund Site. Prepared for General Electric Company by Anchor QEA, LLC.
March 2016.
Appendix 14 Bibliography 30 Hudson River PCBs Superfund Site Five Year Review May 2017
__________. 2016h. Addendum to 2015 Data Summary Report – Fish Sampling Data.
December 2016. Prepared for General Electric Company by Anchor QEA, LLC
__________. 2016i. Surface Sediment Sampling Work Plan for 2016. Revised October 2016.
Prepared for General Electric Company by Anchor QEA, LLC
__________. 2016j. Technical Memorandum, Annual Summary Report for the 2015 Post-
construction Remnant Deposits Monitoring Program. March 2016. Prepared for General
Electric Company by Anchor QEA, LLC
__________. 2016k. Hudson River PCBs Site Monitoring, Maintenance, and Adaptive
Management Report for 2015. Prepared for General Electric by Anchor QEA and Parsons.
February 2016.
__________. 2016l. Operation, Maintenance, and Monitoring Plan for 2015 Caps and
Habitat Replacement/Reconstruction. Prepared for General Electric by Anchor QEA and
Parsons. April 2016.
__________. 2017a. Draft Technical Memorandum, Annual Summary Report for the 2016
Post-Construction Remannt Deposits Monitoring Program. Prepared for General Electric
Company by Anchor QEA, LLC
__________. 2017b. 2016 Surface Sediment Sampling Data Summary Report. March 2017.
Prepared for General Electric Company by Anchor QEA, LLC. May 2017
__________. 2017c. Monitoring, Maintenance, and Adaptive Management Report for 2016.
Prepared for General Electric by Anchor QEA and Parsons. January 2017.
__________. 2005b. Hudson River PCB Site, Phase 1 Dredge Area Identification Report.
Prepared by QEA for General Electric Company. February 28, 2005.
Appendix 14 Bibliography 31 Hudson River PCBs Superfund Site Five Year Review May 2017
___________. 2005a. Work Plan for Ambient PCB Monitoring Method Study and Baseline
Data Collection. May 20, 2005.
__________. 2007. Hudson River PCB Site, Phase 2 Dredge Area Identification Report.
Prepared by QEA for General Electric Company, December 17, 2007.
_________. 2011b. 2011 Remedial Action Monitoring Quality Assurance Project Plan.
Prepared by Anchor QEA, LLC and Environmental Standards, Inc. for General Electric.
April 2011.
Godin, A.J. 1977. Wild Mammals of New England. Yarmouth: DeLorme Publishing Co.
Golley, F.B. 1962. “Mammals of Georgia: A study of their distribution and functional role in
the ecosystem.” Athens, GA: University of Georgia Press.
Gorman, T.S. et al. 2006. “Space use and sociality of river otters (Lontra candensis) in
Minnesota.” In J. Mamm. 87(4): 740-747.
Grinell, J., and J.S. Dixon et al. 1937. Fur-Bearing Mammals of California. Their Natural
History, Systemic Status, and Relationship to Man. Vol 1. Berkeley, CA: University of
California Press.
Gy, P., and A. Royle. 1998. Sampling for Analytical Purposes. New York: John Wiley and
Sons.
Appendix 14 Bibliography 32 Hudson River PCBs Superfund Site Five Year Review May 2017
H Haggard, J. 2017. Correspondence with G. Klawinski re: Comments on Surface Sediment
Sampling Work Plan for 2016.
Haley, D. 1975. Sleek and Savage: North America’s Weasel Family. Seattle, WA: Pacific
Search Books.
Harding, A. R. 1934. Mink Trapping. Columbus, OH: A.R. Harding.
Heaton, S.N., S.J. Bursian, et al. 1995. “Dietary Exposure of Mink to Carp from Saginaw
Bay, Michigan. Effects on Reproduction and Survival, and the Potential Risks to
Wild Mink Populations.” In Arch. Environ. Contam. Toxicol. 334-343.
Hebert, C. and Keenleyside, K.A. 1995. “To normalize or not to normalize? Fat is the
question.” In Environ Tox Chem. 14(5):801-807.
Helon, D.A. et al. 2004. “Summer home range size and habitat use by river otters in Ohio.”
In IUCN Otter Spec. Group Bull. 21A:1-9.
Holland, P.W. and R.E. Welsch. 1977. “Robust regression using iterative reweighted least-
squares.” In Communications in Statistics – Theory and Methods, Vol 6(9): 813-827.
Hornshaw, T.C., R.J. Aulerich, and H.E. Johnson. 1983. “Feeding Great Lakes Fish to Mink:
Effects on Mink and Accumulation and Elimination of PCBs by Mink.” Journal of
Toxicology and Environmental Health, 11 (933-946).
Appendix 14 Bibliography 33 Hudson River PCBs Superfund Site Five Year Review May 2017
J Jackson, H.H.T. 1961. Mammals of Wisconsin. Madison WI: University of Wisconsin Press.
Jahnke A, J. Holmback, R.Argelia Andersson, A. Kierkegaard, P.Mayer, and M. MacLeod.
2015. “Differences between lipids extracted from five species are not sufficient to explain
biomagnification of nonpolar organic chemicals.” In Environ Sci Technol Lett. 2:193−197.
DOI: 10.1021/acs.estlett.5b00145.
Johnson, S.A. and K.A. Berkley. 1999. “Restoring river otters in Indiana.” In Wildl. Soc. Bull
27(2): 419-427.
Jones, J. Knox Jr. and E.C. Birney. 1988. Handbook of Mammals of the North-Central
States. Minneapolis, MN: University of Minnesota Press.
K Kidd, A.G. 2008. “Mink gone wild: hybridization between escaped farm and wild American
mink (Neovison) in a natural context.” Sudbury, Ontario: Laurentian University. M.S. thesis.
68 pp.
Kruppenbacher, Timothy A., P.E. 2009. General Electric Company. Letter to Dave King
(USEPA Region 2) Regarding Phase 1 Proposed Procedure for Bedrock Areas Encountered
in Dredge Areas. July 8, 2009.
__________. 2015. General Electric Company. Email correspondence to Gary Klawinski
(USEPA Region 2) Regarding Dredging Adjacent to CU-01. September 18, 2015.
Appendix 14 Bibliography 34 Hudson River PCBs Superfund Site Five Year Review May 2017
L Larson, D.N. 1984. “Feeding habits of river otters in coastal southeastern Alaska.” In Journal
of Wildlife Management 48(4): 1446-1452.
Lauhachinda, V. 1978. Life history of the river otter in Alabama with emphasis on food
habits. Ph.D. thesis. Auburn, AL: Auburn University
Linscombe, G.K.N. and R.J. Aulerich, eds. 1982. Wild Mammals of North America.
Baltimore, MD: Johns Hopkins University Press.
Linzey, A.V. 1987. “Effects of chronic polychlorinated biphenyls exposure on reproductive
success of white-footed mice (Peromyscus leucopus). In Arch. Environ. Contam. Toxicol.
16:455-460
_________. 1988. “Effects of chronic polychlorinated biphenyls on growth and reproduction
of second generation white-footed mice (Peromyscus leucopus). In Arch. Environ. Contam.
Toxicol. 17(1): 39-45.
Lowery, G.H. Jr. 1974. The Mammals of Louisiana and its Adjacent Waters. Baton Rouge:
Louisiana State University Press.
M Maenpaa, K., M.T. Leppanen, K. Figueiredo, F.Tigistu-Sahle, and R. Kakela. 2015.
“Sorptive capacity of membrane lipids, storage lipids, and proteins: A preliminary study of
partitioning of organochlorines in lean fish from a PCB-contaminated freshwater lake.” In
Arch. Environ. Contam. Toxicol. 68:193-203.
Marshall, W.H. 1936. “A study of the winter activities of the mink.” In J.Mamm. 17(4):382-
392.
Appendix 14 Bibliography 35 Hudson River PCBs Superfund Site Five Year Review May 2017
McCoy, G. et al. 1995. “Chronic polychlorinated biphenyls exposure on three generations of
oldfield mice (Peromyscus polionotus): Effects on reproduction, growth, and body residues.”
In Arch. Environ. Contam. Toxicol. 28:431-435.
McDaniel, J.C. 1965. “Otter population study.” In Proceedings of the 17th Annual
Conference, Southeastern Association of Game and Fish Commissioners. pp 163-168. Hot
Springs, Arkansas: Southeastern Association of Game and Fish Comissions
Melquist, W.E. and M.G. Hornocker. 1983. “Ecology of river otters in west central Idaho.”
In Wildlife Monographs 83: 1-60.
Merritt, J.F. 1987. Guide to the Mammals of Pennsylvania. Pittsburgh, PA: University of
Pennsylvania Press. 408 pp.
Millsap, S.D. et al. 2004. “Comparison of risk assessment methodologies for exposure of
mink to PCBs on the Kalamazoo Rivier, Michigan.” In Envi.Sci.and Tech. 38(24):6451-
6459.
Mitchell, J.L. 1961. Mink movements and populations on a Montana river. In J.Wildl.
Manage. 25:48-54.
Mortola, J.P. and M.J. Limoges. 2006. “Resting breathing frequency in aquatic mammals: A
comparative analysis with terrestrial species.” In Respir.Physiol.Neurobiol. 154: 500-514.
Mumford, R.E. and J.O Whitaker, Jr. 1982. Mammals of Indiana. Bloomington, IN: Indiana
University Press.
Appendix 14 Bibliography 36 Hudson River PCBs Superfund Site Five Year Review May 2017
N Nagy, K. A. 1987. “Field metabolic rate and food requirement scaling in mammals and
birds.” In Ecological Monographs 57: 111-128.
NOAA. 2016. “Re‐Visiting Projections of PCBs in Lower Hudson River Fish Using Model
Emulation.” March 25, 2016.
NYSDEC (New York State Department of Environmental Conservation). 2002. Record of
Decision: GE Hudson Falls Plant Site Outfall 004. Village of Hudson Falls, Town of
Kingsbury, Washington County, New York Site Number 5-58-013.
__________. 2004. Record of Decision: GE Hudson Falls Plant Site Operable Units No. 2A
- 2D. Village of Hudson Falls, Town of Kingsbury, Washington County, New York Site
Number 5-58-013.
_________. 2005. “Of Time, PCBs and the Hudson River.” Ronald J. Sloan, Michael W.
Kane, and Lawrence C. Skinner. Bureau of Habitat, Division of Fish, Wildlife and Marine
Resources, NYSDEC, Albany, New York. July 2005.
__________. 2007. “NYSDEC Hudson River Baseline PCB Air Monitoring Study.”
Presentation by Tom Gentile, Division of Air Resources Bureau of Air Quality Analysis and
Research to the Hudson River Community Advisory Group Meeting. May 24, 2007. (CAG 5-
24-07NYSDEC Hudson River Baseline PCB Air Monitoring Study.ppt.)
NYSDEC. 2012. Cumberland Bay Sludge Bed – Wilcox Dock Site # 5-10-017 Removal and
Disposal Project Pre-to Post-Dredging Monitoring (Volumes I of II and II of II) Ten Year
Review. Prepared by AECOM, Latham, NY. June 2012.
NYSDEC. 1998. Brown, M.P., M.B. Werner, C.R. Carusone, and M. Klein. Distribution of
PCBs in the Thompson Island Pool of the Hudson River, Final Report of the Hudson River
Appendix 14 Bibliography 37 Hudson River PCBs Superfund Site Five Year Review May 2017
PCB Reclamation Demonstration Project Survey. New York State Department of
Environmental Conservation, Albany, NY.
_________.2016. “Recommendations to EPA for the ‘Five Year Review Report’ for Hudson
River PCBs Site.” December 2016.
New York State Department of Health (NYSDOH) 2006. PCBs and Health: the Hudson
River Community Project, Information Sheet #3: Detailed Summary of Outdoor Sampling.
August 2006.
__________. 2016. Hudson River Fish Advisory Outreach Project Update (2009-2016).
https://www.health.ny.gov/environmental/outdoors/fish/hudson_river/docs/2016_hudson_rep
ort.pdf Accessed December 2016.
___________. n.d. “Hudson Valley Region: Health Advice on Eating Fish You Catch.”
https://www.health.ny.gov/publications/6545.pdf April 2016
P Platanow, N.S. and L.H. Karstad. 1973. “Dietary Effects of Polychlorinated Biphenyls on
Mink.” In Can. J. Comp.Med. 37:391-400.
R Randall R.C., V. Lee, R.J Ozretich, J.L. Lake, and R.J. Pruell. 1991. “Evaluation of selected
lipid methods for normalizing pollutant bioaccumulation.” In Environ Toxicol Chem. 10
(11):1431-1436.
Reed-Smith, J. (ed.) 2009. North American River Otter Husbandry Notebook. 3rd ed.
Appendix 14 Bibliography 38 Hudson River PCBs Superfund Site Five Year Review May 2017
Reid, D.G., T.E. Code, and S.M. Herrero. 1994. “Spacing, movements, and habitat selection
of the river otter in boreal Alberta.” In Can.J. Zool. 72:1314-1324.
Restum, J. C. et al. (1998). “Multigenerational study of the effects of consumption of PCB-
contaminated carp from Saginaw Bay, Lake Huron, on mink: Effects on mink reproduction,
kit growth, and survival, and selected biological parameters.” In J. Toxicol. Environ. Health
54: 343-375
Rue, L.L., III. 1981. Furbearing Mammals of North America. New York: Crown Publishing
Co.
Rouvinen, K.I. et al. 1992. “Feeding devices reduce waste in mink feeding.” In Norwegian
Journal of Agricultural Sciences Suppl. No.9:332-335.
S Sauer, T.M., M. Ben-David, et al. 1999. “A new application of the adaptive-kernel method:
estimating linear home ranges of river otters (Lutra canadensis).” In Can. Field Naturalist
113(3): 3419-3424.
Schlechtriem C., A. Fliedner, and C. Schäfers. 2012. “Determination of lipid content in fish
samples from bioaccumulation studies: contributions to the revision of guideline OECD
305.” In Environ Sci Europe, 24:13. http://www.enveurope.com/content/24/1/13.
Schwartz, C.W. and E.R. Schwartz. 1981. The Wild Mammals of Missouri. Revised Edition.
Columbia, MO: University of Missouri Press and the Missouri Department of Conservation.
356 pp.
Selander, J.A. 1979. A Guide to Arkansas Mammals. Conway, AR: River Road Press.
Appendix 14 Bibliography 39 Hudson River PCBs Superfund Site Five Year Review May 2017
Serfass, T.L. et al. 1993. “River otter (Lutra Canadensis) reintroduction in Pennsylvania:
prerelease care and clinical evaluation.” In J.Zoo Wildl. Med. 24(1): 28-40.
Seston R., D. Powell, K. Woodburn, G. Kozerski, P. Bradley, and M. Zwiernik. 2015.
“Importance of lipid analysis and implications for bioaccumulation metrics.” In Integ
Environ Assess Manag. 10(1):138-144.
Soper, J.D. 1973. “The mammals of Waterton Lakes National Park, Alberta.” In Canadian
Wildlife Service Report 23: 1-57
Spencer, F. 1982. “An assessment of the reproductive toxic potential of Aroclor 1254 in
female Sprague-Dawley rats.” In Bull. Environ. Contam. Toxical. 28: 290-297.
Stevens, R.T., T.L. Ashwood, and J.M. Sleeman. 1997. “Fall-early winter home ranges,
movments, and den use of male mink (Mustela vison) in eastern Tennessee.” In Canadian
Field Naturalist 111:312-314.
Surette, Mark. 2012. Hudson River PCBs Superfund Site – Evaluation of Surface Sediment
PCB Concentrations. G. Lewinski, USEPA Region 2, June 1, 2012.
T Tauson, A.H. et al. 1998. “Energy metabolism, nutrient oxidation and water turnover in the
lactacting mink (Mustela vison). In J.Nutr 128: 26155S-2617S.
Taylor, C. et al. 2001. “Response of river otters to experimental exposure of weathered crude
oil: Fecal porphyrin profiles.” In Environ. Sci. Technol. 35: 747-752.
Tofflemire, T.J., and S.O. Quinn. 1979. “PCB in the Upper Hudson River: Mapping and
Sediment Relationships.” NYSDEC Technical Paper No. 56. March 1979. NYSDEC,
Albany, New York.
Appendix 14 Bibliography 40 Hudson River PCBs Superfund Site Five Year Review May 2017
U Consent Decree in United States of America v. General Electric Co., Civ. No. 1:05 CV-1270
(N.D.N.Y. November 2, 2006).
United States of America v. General Electric Co., Consent Decree Modification No. 1,
Civ.No. 1:05 CV-1270 (N.D.N.Y. March 23, 2009).
United States of America v. General Electric Co., Consent Decree Modification No. 2,
Civ.No. 1:05 CV-1270 (N.D.N.Y August 15, 2011).
In the Matter of the Hudson River PCBs Superfund Site, General Electric Company,
Respondent. 2002a. Administrative Order on Consent, Index No. CERCLA-02-2002-2023.
July 23, 2002.
In the Matter of the Hudson River PCBs Superfund Site, General Electric Company.
Respondent. 2003a. Administrative Order on Consent for Remedial Design and Cost
Recovery, Index No. CERCLA-02-2003-2027. August 13, 2003.
V van der Heijden, S.A. and M.T.O. Jonker. 2011. “Intra- and interspecies variation in
bioconcentration potential of polychlorinated biphenyls: Are all lipids equal?” In Environ
Sci Technol 45:10408–10414. dx.doi.org/10.1021/es2022158.
Appendix 14 Bibliography 41 Hudson River PCBs Superfund Site Five Year Review May 2017
W Wamberg, S. A.H. Tauson, and J. Elnif. 1996. “Effects of feeding and short-term fasting on
water and electrolyte turnover in femal mink (Mustela vison).” In Br.J. Nutr. 76: 711-725.
Watkins, B.E., J. Adair, and J.E. Oldfield. 1982. “Evaluation of shrimp and king crab
processing by-products as feed supplemnets for mink.” In J. Anim.Sci. 55:578-589.
Wendt, M.E. 1986. Low Income Families’ Consumption of Freshwater Fish Caught From
New York State Waters. Thesis, Cornell University. August.
White, S.C. et al. 2007. “Variation in digestive efficiency of captive North American river
otters (Lontra Canadensis) on various diets.” In Zoo Biology 26: 41-50.
Williamson, R.H. 2009. “Muskrat-river otter interactions in and adjacent to Mammoth Cave
National Park, Kentucky.” Masters thesis. University of Tennesse.
Wilson, K.A. 1959. “The Otter in North Carolina.” In Proc.Southeast Assoc. Game Fish
Comm. 13:267-276.
Woolington, J.D. 1984. “Habitat use and movements of river otters at Kelp Bay, Baranof
Island, Alaska.” University of Alaska. 133 pp.
Wren, C.D. et al. 1987a. “The effects of polychlorinated biphenyls and methyl mercury
singly and in combination on mink. I. Uptake and toxic responses.” In Arch. Environ.
Contam. Toxicol. 16: 441-447.
_________. 1997b. “The effects of polychlorinated biphenyls and methyl mercury singly and
in combination on mink. II. Reproduction and kit development.” Arch. Environ. Contam.
Toxicol. 16: 449-454.
Appendix 14 Bibliography 42 Hudson River PCBs Superfund Site Five Year Review May 2017
Y Yamaguchi, N., R.J. Sarnno, et al. 2004. “Multiple paternity and reproductive tactics of free-
ranging American minks (Mustela vison) in eastern Tennessee. In Canadian Field Naturalist.
111:312-314.
Z Zielinski, W.J. 1986. Orcadian rhythms of small carnivores and the effect of restricted
feeding on daily activity. In Physiol. Behav. 38: 613-620.