Presented to: 

MTA Capital Construction, Planning and Real Estate Committee 

May 20, 2009 

Resul t s o f Com prehensive

Pro jec t Review s

Sec ond Avenue Subw ay&

East Side Ac c ess

Presented to: 

MTA Capital Construction, Planning and Real Estate Committee 

July 22, 2009 

Page 2: Second Avenue Subway Review

8/14/2019 Second Avenue Subway Review

http://slidepdf.com/reader/full/second-avenue-subway-review 2/8

Marc h 2008 30-Day Review

Short t ime f rame t o meet legis lat ive

requi rem ent s for subm iss ion of 2008-13 Plan inant ic ipat ion o f Congest ion Pr ic ing

Input t o proposed 2008-13 Plan

Budget s and sc hedules w ere rev ised

SAS -- $ 4.347 b i l l ion; J une 2015

ESA -- $ 7.244 bi l l ion; Februar y 2015 As a resu l t o f ac c e lera ted review , m arket

unc ert a in t ies w ere acc oun ted fo r ou ts ide theind ividua l pro jec t budget s

Page 3: Second Avenue Subway Review

8/14/2019 Second Avenue Subway Review

http://slidepdf.com/reader/full/second-avenue-subway-review 3/8

Marc h 2008 Risk Reserve

$747 mi l l ion Risk Reserve w as es tab l ished t o

address pro jec t and m arket uncer t a int ies

Funds w ould be al loc at ed to pro jec t s pendingfurt her com prehens ive review s

Page 4: Second Avenue Subway Review

8/14/2019 Second Avenue Subway Review

http://slidepdf.com/reader/full/second-avenue-subway-review 4/8

Done in c lose c onsu l ta t ion w i t h Of f i ce o f  

Const ruc t ion Overs ight (OCO)/IndependentEngineer ing Consul t ant (IEC)

Risk s exam ined in a m ore c om prehens ivemanner  

Consensus reac hed on c ost and sc hedule

Reserves rea l loc at ed t o ind iv idua l pro jec tbudgets

J uly 2009 Com prehensive Review

Page 5: Second Avenue Subway Review

8/14/2019 Second Avenue Subway Review

http://slidepdf.com/reader/full/second-avenue-subway-review 5/8

Est ab l ish ranges o f c os t s and sc hedules for  

best and w orst c ase scenar ios fo r bo t hpro jec ts

Ident i fy t a rge t budgets and schedu les w i t h int he ranges based on ab il i t y t o m i t igat e r isk s

Manage projec t s t o t he ta rge ted budget and

schedule

Guiding Pr inc ip les of J uly 2009 Review

Page 6: Second Avenue Subway Review

8/14/2019 Second Avenue Subway Review

http://slidepdf.com/reader/full/second-avenue-subway-review 6/8

Sec ond Avenue Subw ay– Budget & Sc hedu le

* MTA costs assume $222 million in immediate savings opportunities, including meeting rollingstock needs through a small reduction to NYC Transit’s existing spare fleet. For consistency with

MTA estimates, deleted $222 million in mitigations from FTA estimates; these opportunities arestill under review by FTA.

$ Billions

Page 7: Second Avenue Subway Review

8/14/2019 Second Avenue Subway Review

http://slidepdf.com/reader/full/second-avenue-subway-review 7/8

East Side Ac c ess – Budget & Sc hedu le

* $463 million for ESA rolling stock (above the $202 million included in the project budget) is nowincluded in a reserve pending completion of a simulation of opening day service and fleet need. For

consistency with MTA estimates, the FTA estimates assume these costs are carried in a reserve aswell; still under review by FTA.

$ Billions

Page 8: Second Avenue Subway Review

8/14/2019 Second Avenue Subway Review

http://slidepdf.com/reader/full/second-avenue-subway-review 8/8

Ex pand OCO/IE r isk rev iew s t o a l l m ajor  

c ont rac t s to iden t i f y m i t iga t ion st rat egies Im p lem ent r i sk ident i f i ca t ion, ra t ing and

projec t exec ut ion s t ra teg ies recom m ended by

FTA Moni t o r r i sk m i t igat ion imp lem enta t ion and

resu l ts

St rengt hen pro jec t c ont ro ls p roc esses Enhanc ed Governanc e In i t ia t ive (EGI)

Provide regular and c om prehensive report ing

t o Board on s t a t us of each pro jec t

Management Plan