6
Seawater Desal for Texas Thursday, September 21 Can Texas be the lowest cost producer of Desalinated seawater in the World? 1

Seawater Desal for Texas€¦ · •Engage an owners engineering company that has experience in managing teams in constructing comparable facilities. •Don’t build the Taj Mahal

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Seawater Desal for Texas€¦ · •Engage an owners engineering company that has experience in managing teams in constructing comparable facilities. •Don’t build the Taj Mahal

SeawaterDesalforTexasThursday,September21

CanTexasbethelowestcostproducerofDesalinatedseawaterintheWorld?

1

Page 2: Seawater Desal for Texas€¦ · •Engage an owners engineering company that has experience in managing teams in constructing comparable facilities. •Don’t build the Taj Mahal

1. FirstwherearesomeofthelowestcostDesalplantsintheworld?

2. WhatmakesupthecostofaDesalplant?

Agenda

2

Page 3: Seawater Desal for Texas€¦ · •Engage an owners engineering company that has experience in managing teams in constructing comparable facilities. •Don’t build the Taj Mahal

ProjectExamples– SWRO

WateReuse,WhitePaper“SeawaterDesalinationCosts”RevisedJanuary2012

Page 4: Seawater Desal for Texas€¦ · •Engage an owners engineering company that has experience in managing teams in constructing comparable facilities. •Don’t build the Taj Mahal

WhatMakesuptheCostofaDesalPlant?• Scope - 25MGDseawaterreverseosmosis(SWRO)desalinationplantfullturn-keywithanopenintake,DAF,mediafiltration/ultrafiltration,cartridgefiltrationaspre-treatment,building,post-treatment,storageanddischargepiping.

• Energyconsumption – 3.5kWh/m3or13.23kWh/1,000• Energycost - $0.035/kWh

1. ERCOTreported“Average“ERCOTHubAverage345kVHub”SettlementPointPriceinReal-Time($/MWh)”– 2016Avg.$23.51($0.0235/kWh)

2. ERCOTreported“Average“ERCOTHubAverage345kVHub”SettlementPointPriceinDay-AheadMarket($/MWh)”– 2016Avg.$24.56($0.02456/kWh)

• CAPEX- $181M(WDRcomparisonofarecenttenderinSaudiforcomparablesizedplant,36MGD)• OPEX - For1st year$9.5M(basedonindustryinformation)• OtherAssumptions:

• Costofleaseofland,permittingandlegalisnotincluded• Capitalrecovery1/3,power1/6($0.035/kWh),directstaff1/12,maintenance,includingchemicals,consumables1/4,misc.1/6(basedonindustryinformation).

4

Page 5: Seawater Desal for Texas€¦ · •Engage an owners engineering company that has experience in managing teams in constructing comparable facilities. •Don’t build the Taj Mahal

Summary– CostAnalysisCost

Capex(costper1,000gal)* $1.22Opex(costper1,000gal) $1.04Power(costper1,000gal) $0.46

Totals $2.72/1,000gal

5

• Usingasimplemortgagecalculatortodevelopthepaybackofthecapitalcostovera30yearterm*

• Ratesused– 4.5%• TWDBSwiftFunds– 3%

HybridfinancingthroughaP3orP4

Page 6: Seawater Desal for Texas€¦ · •Engage an owners engineering company that has experience in managing teams in constructing comparable facilities. •Don’t build the Taj Mahal

Conclusion

TexascanbethelowestcostproducerofDesalinatedSeawaterby:

• Managingandmitigatingriskbyusingexperiencedandknowledgeableteamsthathaveatrackrecordofdeveloping,permitting,designing,constructing,financingandoperatingsimilarDesalfacilities.• ThiscanbedonebyusingaP3/P4modelandhavingtheselectedteamput“skininthegame”.• Engageanownersengineeringcompanythathasexperienceinmanagingteamsinconstructingcomparablefacilities.• Don’tbuildtheTajMahaloraTrumpTower!• Don’ttakeariskontheprocesstrain.Gowitharobustprovenandpiloteddesign.• Useamixofprivateandpublicfundstofinancetheproject.

6