124
LARGE INDUSTRY ENERGY NETWORK ANNUAL REPORT 2011

SEAI LIEN

Embed Size (px)

DESCRIPTION

large industry energy network

Citation preview

Page 1: SEAI LIEN

Lar

ge in

du

stry en

erg

y n

etwo

rk

An

nu

Al Repo

Rt 2011

Large industry energy networkAnnuAl RepoRt 2011

t +353 1 808 2100f +353 1 808 2002

e [email protected] www.seai.ie

Sustainable Energy Authority of IrelandWilton park House Wilton place Dublin 2 Ireland

The Sustainable Energy Authority of Ireland is partly �nanced by Ireland’s EU Structural Funds Programme co-funded by the Irish Government and the European Union.

12mm

11603_LIEN_Cov_LR.indd 1 23/04/2013 11:29

Page 2: SEAI LIEN

11603_LIEN_Cov_LR.indd 2 23/04/2013 11:30

Page 3: SEAI LIEN

????????

LIENAnnuAl RepoRt 2011

Page 4: SEAI LIEN

Number of Members by Sector in 2011

2011 Overall Energy Performance

lIen total primary energy Requirement 2011 24,500 GWh

energy Gains (loss) due to energy performance (123) GWh

national total primary energy Requirement (tpeR) 2011

161,296 GWh

lIen as percentage of national tpeR 15%

total Co2 emissions 2011 5,559,020 tonnes

Co2 Avoided due to energy performance Gains (27,795) tonnes

Drivers for Energy Saving Projects (kWh)

PharmaChem 40%Food/Drinks 47%Healthcare 16%Electronics 9%Other 40%

Energy Management System 65%Other Driver 30%Not De�ned 5%

Page 5: SEAI LIEN

2011 At A GlAnCe

The following are the highlights from the analysis of the LIEN data:

• An estimated 585 GWh of energy savings were achieved through the implementation of specific energy-saving measures by LIEN members.

• The LIEN network as a whole recorded a loss in energy performance of 0.5%. However, when the data from a single large energy user which had a reduced energy performance is excluded, there was an average energy performance improvement within the network of 1.3%.

• With the exception of the electronics sector, the level of output increased across all sectors in 2011. This builds on the increase in output recorded in 2010 following the declines of 2009.

• The majority of sectors within the network have over the last two to three years recorded increased output levels; this coupled with improved energy performance levels has resulted in a significant and consistent reduction in the Total Primary Energy Requirement (TPER).

• A trend emerging from the categorisation of energy saving opportunities and projects highlights an increase in capital investment within the network.

• Energy Management Systems continue to be the most significant driver for actions undertaken.

• The LIEN grew to 160 companies in 2011 and now represents over 15% of national TPER.

pRojeCts RepoRted 585GWh of eneRGy use sAved

AveRAGe eneRGy peRfoRmAnCe ImpRoved by 1.3%

160 membeRs

RepResents 15% of All eneRGy use In IRelAnd

Page 6: SEAI LIEN
Page 7: SEAI LIEN

????????

Contents

Section 1 Introduction 7A message from the minister for Communications,

energy and natural Resources 8

Ceo Introduction 10

lIen membership, development and benefits 12

network Activities for lIen members 16

Section 2 energy Agreement programme 21overview 23

Section 3 Company profiles 311 largo foods’ Recipe for staying Competitive 32

2 Allergan lean six sigma powers energy management system 37

3 thermo King is Group leader in Achieving Iso 50001 43

4 diageo Achieves Great Results with eed 46

5 Kerry’s listowel plant transforms Wasted biogas into useful energy 50

6 Connacht Gold ‘milks’ energy system for Rich savings 54

7 servier success in energy saving projects 58

8 Astellas Renewable energy projects save €500,000 yearly 61

Section 4 Results and targets 65Results summary 66

members Results and targets 79

Section 5 About seAI 115members list 118

Page 8: SEAI LIEN
Page 9: SEAI LIEN

SEctIoN 1IntRoduCtIon

Page 10: SEAI LIEN

8 SEAI large Industry energy network Annual Report 2011

A messAGefRom the mInIsteR foR CommunICAtIons, eneRGy And nAtuRAl ResouRCes

It is heartening to see that the large Industry energy network (lIen) continues to make substantial progress, and contributes so strongly to our target of 20% energy savings across the economy by 2020. the benefits, however, are multiple; energy management provides further economic, environmental and social benefits, including competitiveness, operational cost savings, industrial productivity, sustained employment and job creation.

the experience developed in energy management over the last 17 years is clearly paying great dividends. Indeed, Ireland is now seen as one of the global leaders in energy management, as evidenced by the success of Irish companies abroad and our hosting of an international conference on energy management systems in may 2012.

the lIen data show efficiency gains across the network, with an increase in most sectors. In particular, the energy performance of the food sector – which comprises the greatest percentage of lIen membership – has improved every year for the past five years. In fact this sector, which represents indigenous industry, is the only sector to have achieved this, and is contributing strongly to Ireland’s economic recovery.

the medical, pharmachem and ICt sectors, mainly involving foreign direct investment, have also a very good track record in energy performance over the past few years. this enhances Ireland’s reputation as a good place in which to invest and locate.

the combination of energy policy, Government measures and seAI activities has led to increasing investment by the commercial and public sectors generally in energy efficiency upgrades. It has also supported the utility providers who, through voluntary agreements, will make important contributions to reducing energy demand into the future. meanwhile, energy service companies have benefited by winning new business and testing innovative service agreements in the form of energy performance contracts. the business case for energy investments is attractive and is leading to widespread capacity-building in the network.

pat Rabbitte, td

Minister for Communications, Energy and

Natural Resources

Page 11: SEAI LIEN

Section 1 Introduction 9

our future economic prosperity and wellbeing will depend to a large extent on how we face up to the challenges of the ongoing economic difficulties. the lIen, with seAI’s support, is setting a great example. In the industrial sector, Ireland is performing better than the european average in the area of energy efficiency and savings. We are continually reinforcing our reputation for energy expertise, while improving our competitiveness and – of prime importance – creating jobs. Congratulations to all concerned.

Pat Rabbitte, TD

Minister for Communications, Energy and Natural Resources

Page 12: SEAI LIEN

10 SEAI large Industry energy network Annual Report 2011

the large Industry energy network (lIen), formed in 1995, has developed into one of the world’s leading energy efficiency networks. It enables Ireland’s largest energy users to co-develop and share best practice in energy management. It is encouraging to see how, despite the tough economic circumstances, the lIen continues to progress.

While some members have been with us since 1995, membership has doubled in recent years. the lIen grew to 160 companies in 2011 and now represents over 15% of the country’s total primary energy requirement.

the lIen demonstrates clearly the benefits of an energy efficiency network. the combination of many activities – networking, sharing experiences, discussing challenges and new opportunities, making contacts, promoting, disseminating, encouraging and influencing – saves energy in more ways than one: many years of research time are saved and, as membership grows, the benefits are amplified.

the outcome can be shown in precisely measurable results. long-term members improved energy performance by over 32% since 1995 and the network has improved energy performance by 18% since 2005. this accelerated pace in energy performance improvement since 2005 is due to the introduction of the energy management systems and supported through our energy Agreements programme.

the scale and pace of energy agreements members’ energy performance improvement is exemplary in global terms, and their work on new initiatives benefits the lIen overall. It is impressive to see how lIen members have reduced operating costs and increased cost-competiveness, while improving other business processes. experience in energy management systems is being continually built up, and capabilities are being developed that will ensure further improvement into the future.

meanwhile, we plan, in collaboration with the national standards Authority of Ireland, to develop a new Irish standard in 2013

Ceo IntRoduCtIon

brian motherway

Chief Executive Officer, SEAI

Page 13: SEAI LIEN

Section 1 Introduction 11

concerning energy efficient design (eed) methodology. this follows the establishment of seAI’s eed methodology, developed by the energy Agreements programme.

In may 2012, we held the seAI 2nd International Conference on energy management systems, ‘Creating the Right environment for Iso 50001 to thrive’, at the mansion house in dublin. building on the first international conference in 2009 at farmleigh, dublin, this event provided a unique opportunity to hear international experts discuss policies and incentives to help businesses worldwide commit to, and benefit from, energy management systems. the conference was a resounding success.

It should be a source of great pride that the lIen has not only contributed strongly to national energy objectives but also established Ireland as a global leader in energy management.

We are very open to new members and anticipate that the lIen will grow to 200 members over the next few years. the network plays a crucial part in the achievement of our goals. I congratulate all those who have contributed to its success. however, the lIen does not rest on its laurels. year after year, it uncovers new savings opportunities – and I have no doubt it will continue to do so.

Brian Motherway

Chief Executive Officer, SEAI

Page 14: SEAI LIEN

12 SEAI large Industry energy network Annual Report 2011

Introduction

the large Industry energy network (lIen), established in 1995, is now well known as a unique, pragmatic and continually improving energy forum for Ireland’s leading industrial companies.

the network, which has grown rapidly over its 17 years, includes 160 of Ireland’s largest industrial and commercial companies. new members often come from the energy Agreements programme (eAp), launched in may 2006. the eAp focuses on adoption of the energy management standard Iso 50001 as the means for continuous and sustained improvements in energy efficiency.

members include companies from a wide range of sectors including industrial and commercial activities. members have the common goal of reducing energy, related costs and Co2 emissions. they know that energy management actions are cost-effective and reduce operating costs and improve competitiveness.

In 2011, the accumulated energy avoidance of long-term members, based on each company’s respective base year, was approx. 32%. lIen members are making strong contributions to the Co2 emission targets set out in the national energy efficiency Action plan.

Network development

membership is open to companies with an energy spend in excess of €1 million. In joining the lIen, companies commit to:

• develop a management programme for energy use.

• set and review energy targets.

lIen membeRshIp, development And benefIts

Page 15: SEAI LIEN

Section 1 Introduction 13

In 2011, the network welcomed 12 new members:

• CG power systems Ireland ltd

• ebay-paypal

• eps Group

• Glanbia Consumer foods ltd (ballitore)

• Glanbia Consumer foods ltd (drogheda)

• Glen dimplex

• Kepak

• msd Ireland (Carlow)

• p&s Civil Works

• Rosderra Irish meats (edenderry)

• Rosderra Irish meats (Roscrea)

• sanmina-sCI

the lIen accounts for over 15% of Ireland’s total primary energy requirement.

While support from industry peers contributes to in-house knowledge and expertise, seAI keeps expanding its support activities. A particularly successful example of this work is the energy Agreements programme (a subset of the lIen), which has built up a huge body of knowledge about a broad range of energy-saving opportunity and facilitates the replication of these through the lIen.

each year, seAI also organises workshops, seminars and site visits for lIen members. In this way, they learn from specialists, including energy experts, and also from fellow energy managers.

Page 16: SEAI LIEN

14 SEAI large Industry energy network Annual Report 2011

Network benefits for members

the lIen has developed into mature energy efficiency network. lIen members can benefitin many ways. the lIen’s accumulated energy expertise and knowledge base is a huge resource for both current and new members. the pooling of knowledge and experience saves an enormous amount of research time. members discover energy-saving opportunities and techniques at a faster rate and at a lower cost than if they were working individually. All this helps to ensure that any investments made will maximise returns. further, the publicising of the members’ achievements raises their reputation as environmentally responsible operators.

the transition to a more energy-efficient, low-carbon economy is one of the most important economic shifts of modern times. the volatile price of fossil fuels, rising demand for energy to support economic growth and pressure to reduce carbon emissions mean that energy use is crucial to a company’s cost structure and operating model.

energy efficiency can be seen as a huge, low-cost energy resource. by unlocking the value in energy savings, companies gain a strong cost advantage whether competing at home or globally. however, organisations will realise only a small proportion of their energy saving potential unless they take a systematic approach and set concrete goals for improvement. Companies are now more aware than ever that energy efficiency is crucial. Given the lIen’s success in facilitating it, up to 10 new members are expected to join the network in 2012.

Page 17: SEAI LIEN

Section 1 Introduction 15

Figure 1.1: Increase in LIEN Membership 1995-2011, with Members’ Total Primary Energy Requirement (TPER)

0

10

20

30

0

20

40

60

80

100

120

140

160

180

200

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

LIEN TPER

Mem

bers

hip TPER (G

Wh)

Page 18: SEAI LIEN

16 SEAI large Industry energy network Annual Report 2011

A wide range of events and activities were organised in 2011, from annual events such as the energy show and seAI sustainable energy Awards to seminars and workshops covering key issues and the launch of new networks.

liaising with lIen members, seAI makes sure that its support activities reflect their current needs as well as the practical needs of industry. these customised events and activities are closely integrated with seAI’s wider energy programmes. Including workshops, site visits, seminars and conferences, they have the combined aim and effect of achieving further energy savings in industry.

the fact that many of the events are hosted by network members increases their impact.

netWoRK ACtIvItIes foR lIen membeRs

Page 19: SEAI LIEN

Section 1 Introduction 17

Key events in 2011 were:

Energy Show, Seminars, Workshop

2011 Energy Show – April

the large Industry seminar at the 2011 energy show, Ireland’s national sustainable-energy exhibition, showcased developments in energy efficiency across Irish industry and featured the following seminar presentations:

• new business horizons through energy efficient design –  Con leddy.

• design and delivery of A-Rated Commercial buildings –  john burgess, Arup.

• monoclonal Antibodies small scale facility, Green building design – michael o’donnell, pfizer. 

LIEN Seminar: Free Cooling & Waste Heat Recovery Opportunities – June

Ireland’s climate favours free cooling for various sector and process applications. there are also opportunities to increase the efficiency of processes using heat recovery, thus decreasing costs and energy usage. seAI organised the seminar to provide insights, application solutions and case-study examples from industrial speakers. It included examples of new installations and the retrofitting of free cooling solutions. presentations included case studies from emC, Abbott, depuy and Kerry Ingredients. A site tour at emC highlighted the impressive measures undertaken to improve overall energy efficiency and the free fresh-air cooling project implemented.

EAP Workshop, Energy Procurement Strategies for Large Industry – August

A market research workshop for energy Agreement members was held in advance of the annual energy market seminar. the workshop addressed energy procurement and the needs of the energy manager. the objective was to assess the current concerns and practices of industry, with the aim of delivering a focused energy market seminar in september to the wider lIen membership.

A tour of the molex facility also took place to showcase the energy performance improvements on the site.

LIEN Seminar, Ireland’s Energy Market – September

the annual seminar on Ireland’s energy market brought together some energy market leaders to provide insight into market trends, pricing for gas and electricity, regulatory considerations, energy procurement strategy and energy supplier updates.

Page 20: SEAI LIEN

18 SEAI large Industry energy network Annual Report 2011

LIEN Seminar, Energy Awareness and the ISO 50001 Transition – October

energy awareness is a continual improvement activity. It can be challenging to maintain employee engagement and create an environment that fosters a culture of opportunity generation and the upkeep of accomplishments. this combined seminar, held at pfizer in newbridge, Co. Kildare, showcased lIen company experiences and provided a forum for exchanging new ideas and approaches. It addressed the process of energy awareness and included techniques for staff engagement, together with insights on monitoring and evaluation.

the seminar focused on the transitioning process from the european energy management standard en 16001 to the international standard Iso 50001 (published in june 2011) that replaced it. It highlighted variations in the standards and the advantages or difficulties of the new standard. experiences of companies that have already gained certification to Iso 50001 were presented.

Launch of New Networks

New Initiative: Energy Clusters

In 2011, seAI initiated the development of smaller networking groups with specific sector focus. on the closure of special Working Groups (sWG’s), these clustered networks will facilitate ongoing contact and expand the group. they provide a forum for discussion topics, information sharing and exchange. Activities may include seminars, workshops, specialist external consultancy, special investigation development, grouped initiatives, desktop studies and commissioned case studies.

Page 21: SEAI LIEN

Section 1 Introduction 19

Launch of Data Centre Energy Network – June

As part of the development of the seAI energy Agreements programme, a data Centre energy network was established to follow on from the data Centre special Working Group and further disseminate its reports and outputs. the june meeting provided details on the 2011 energy efficiency fund as well as receiving feedback from organisations on their implementation of the 2010 energy efficiency Retrofit fund (eeRf).

Data Centre Energy Network (DCEN) Seminar – October

At a half-day dCen seminar, the pm Group presented on free Cooling in Ireland and tri-Generation. Ibm hosted the event in its facility in mulhuddart, Co. dublin

Launch of Commercial Buildings Energy Network – November

As part of the development of the seAI energy Agreements programme, a Commercial buildings energy network was established to follow on from the Commercial buildings sWG and to further disseminate its reports and outputs. the meeting was held at the tesco zero-carbon store in Cabra, dublin.

the participants presented an overview of their energy aspects (fuels, significant users, projects or investigations). the event also included a tour of the tesco zero-carbon store.

Energy Awards

SEAI Sustainable Energy Awards 2011 – November

since its establishment in 2004, the annual black-tie gala event for Irish industry has been growing each year in participation and significance. the 2011 award entrants reported energy savings of €23 million, based on their energy management initiatives.

lIen members were represented as follows;

Energy Efficiency Award – Small/Medium Energy User

Winner: Green Isle foods (Gurteen)

Energy Management Award – Small/Medium Energy User

finalist: Recordati Ireland ltd

Page 22: SEAI LIEN

20 SEAI large Industry energy network Annual Report 2011

Energy Efficiency Award – Major User

Winner: emC2 Information systems International

finalists: novartis Ringaskiddy ltd, electrical & pump services ltd t/a eps Group

Integrated Energy Management Award – Major User

Winner: GlaxosmithKline (GsK)

finalist: emC2 Information systems International

Energy Manager of the Year Award – Major User

Winner: micheál Cassidy, Astellas Ireland Company ltd (Kerry plant)

finalists: jim dunne, lisheen mine; mick hennessy, emC2 Information systems International

Energy Awareness Award

Winner: pfizer Ireland pharmaceuticals

finalists: dairygold food Ingredients, emC2 Information systems International

Page 23: SEAI LIEN

SEctIoN 2eneRGy AGReementpRoGRAmme

Page 24: SEAI LIEN
Page 25: SEAI LIEN

Section 2 energy Agreement programme 23

????????

An oveRvIeW

the energy Agreements programme (eAp) is Ireland’s voluntary agreements programme for large energy users. It is aimed at those who wish to take a strong, strategic and systematic approach to energy management in order to reduce energy-related costs and emissions. the programme stimulates energy efficiency activities above and beyond business-as-usual.

As part of the eAp, organisations enter into an agreement that requires them to implement and maintain a certified Iso 50001 energy management system (enms) and undertake an average of one special Investigation per year.

special Investigations are feasibility studies that focus on significant energy uses and are integrated into the enms through the process of registering energy efficiency opportunities. special Investigations supplement the enms process and do a “deep dive” on specific technologies, equipment or processes.

As part of the eAp, seAI provides tailored supports comprising direct advice, invitation to participate in project initiatives, networking and some financial supports. the programme has two tiers of engagement through those committed to the eAp and those to the lIen only.

Programme Strategy and Supports for Members

seAI maintains and develops supports through the eAp on an annual basis for its members’. the programme strategy is to ensure that each member organisation meets the requirements of their agreement and further stimulated by the additional programme activities.

A commitment of seAI is to develop programme activities and supports that are designed to stimulate the development of members energy management programmes over and beyond business as usual.

Page 26: SEAI LIEN

24 SEAI large Industry energy network Annual Report 2011

these programme supports include:

Relationship management provided through Agreements support managers. the support managers provide;

• Advice, mentoring and assessments.

• specific support for implementation and operation of an enms.

• proactively work with members to maximise supports and energy performance through engaging with their members work programmes.

• proactively disseminates opportunities and the programme developmental work.

Special project initiatives: are planned each year to support members to undertake activities around significant energy users. these focus on specific technologies, new methodologies and specific industry sectors. project activities and investigations are documented in the form of reports, guidance notes and case studies so that the knowledge developed can be replicated and applied.

Networking activities: tailored workshops, networking events, seminars and conferences are a core part of the eAp. the schedule varies each year according to topical interest or programme needs. seAI works closely with members to ensure that support activities reflect the practical needs of industry.

Special Investigations: these go beyond routine energy efficiency assessments and focus on significant energy uses. seAI continually develops processes, methodologies, projects or sector-specific approaches to ensure continued effectiveness in uncovering new energy efficiency opportunities. successful actions and approaches are then analysed, standardised and disseminated to the lIen.

Page 27: SEAI LIEN

Section 2 energy Agreement programme 25

Special Initiatives

since the launch of the energy Agreements programme in 2006, the annual special initiatives have taken an approach of development through stages from piloting to standardisation, as shown below;

Figure 2.1: Development stages

the outputs of these special initiatives have resulted in the development of the body of Knowledge by the programme. this distils the knowledge developed to members using a series of project reports, case studies, guidance documents, fact sheets or otherwise. these documents are available on the seAI large Industry website, accessible through a searchable timeline covering the period 2007 to date.

PILOT

IMPLEMENT

REPLICATE

STANDARDISE

Page 28: SEAI LIEN

26 SEAI large Industry energy network Annual Report 2011

Page 29: SEAI LIEN

Section 2 energy Agreement programme 27

the programme body of knowledge has developed through work across four areas, namely

• technology focus

• methodology focus

• sector focus

• Grant schemes

It collates the outputs of the special initiatives that have so far covered the following areas:

• hvAC

• Compressed Air

• data Centres

• Refrigeration

• energy efficient design

• Alternative methodologies

• Commercial buildings

• food, beverage & dairy

• data Centres

2011/2012 Replication Initiatives

the eAp programme strategy of pilot, implement, replicate and standardise has identified a number of energy management tools, methodologies and resources that are now available for replication. the focus is on replicating knowledge through application of the following tools have been through a pilot and implementation stage.

Page 30: SEAI LIEN

28 SEAI large Industry energy network Annual Report 2011

Key Focus Area Replication/Refinement Opportunity

Application of the seAI energy efficient design methodology for new or current design projects.

the energy efficient design methodology provides a framework for investors to design, construct and commission projects so that they consume the least amount of energy during their subsequent operation. energy management should be addressed at the earliest possible stage, to realise the greatest energy-saving potential with the shortest payback and to comply with the requirements of energy management standards during subsequent operational phases. the methodology addresses common failures and processes that prevent projects from achieving their full potential in energy efficiency throughout their lifecycle.

operations optimisations using the energy efficient design methodology.

operational optimisation using the eed methodology applies the same methodology in a fully operational system or process. the operation optimisation review identifies opportunity for energy reduction by looking at the operation of the system from first principals, define the energy saving opportunities and then follow through in a structured manner to full implementation. Where the eed methodology is applied to projects in an operational state, a fresh approach to auditing is utilised in contrast to the traditional energy audit.

Application of operational Control spreadsheets for hvAC, compressed air, steam and refrigeration.

the hvAC special Working group developed a successful procedure for the on-going monitoring and effective operational control of hvAC systems.

the operational Control spreadsheet examines the operation of the equipment and focuses the attention of personnel to review and record the critical operating parameters of the hvAC systems.

this has yielded significant benefits across the sites that have implemented it.

An operational Control spreadsheet tool would greatly aid companies in identifying erroneous settings and opportunities in the following areas:

• Refrigeration systems.• steam Generation and distribution.• Compressed Air Generation and distribution.

development of value stream maps with energy paradigm as an element of the energy review process of Iso50001 (vsme).

A vsme is a visual representation of a production process.

It plots the sequence of processes used to produce products or services and tracks energy consumption through those processes.

using lean vsm, energy consumption can be tracked across the value stream.

An energy line on the vsm map provides identification of energy saving opportunities.

It is an additional resource for the energy Review, to understand the link between energy usage and operations/material transformation process.

It is a method to identify opportunities to reduce energy intensity through understanding energy usage sensitivity to operation process and norms.

Page 31: SEAI LIEN

Section 2 energy Agreement programme 29

Key Focus Area Replication/Refinement Opportunity

energy management maturity assessments per energy management maturity model in development by seAI.

An energy management maturity model (em3) has been developed to provide a roadmap for progressive energy management within large organisations.

It promotes the development of energy management as a strategic goal, complements and integrates with corporate social responsibility and the carbon reduction agenda.

Applicable for engagement at all levels of energy management, from those organisations just starting out, to those who have maintained certification for a number of years and are asking, “what’s next?”

the model is composed of a series of statements, intended to motivate analysis of existing practices and to promote discussions as to how the energy management system can be further developed.

operation and maintenance investigations per Commercial building o&m reference manual.

o&m improvements can yield savings of 5 to 25% of a building’s annual utility bill. simple paybacks are generally less than 2 years.

understanding why building systems are operated and maintained the way they are, where and what improvements are most beneficial and cost-effective, is the first step to obtaining energy-efficient building performance.

An o&m assessment provides a systematic look at all aspects of the current o&m practices including the management structure, policies, and user requirements that influence them.

Investigations as identified in the food and dairy sWG report using eed venn diagram approach for saving identification and categorisation.

the food & dairy sWG investigations undertook a consistent approach based on the Challenge and Analyse phase of the energy efficient design (eed) methodology.

the energy venn diagram illustrates the different categories that should be considered when seeking to implement the optimum energy-efficient solution.

the principle of the methodology of the venn diagram is to challenge and examine the various layers that comprise the overall energy usage.

Investigations as identified and reported by the data Centre sWG.

special investigations by data-centre management can drive energy efficiency initiatives to reduce energy consumption and running costs. examples of energy efficiency initiatives in data Centres include:

• free Cooling• evaporative Cooling• Air management• Airflow Research and understanding• metering• Increased Cold Air operating temperatures• lighting

Page 32: SEAI LIEN

30 SEAI large Industry energy network Annual Report 2011

Energy Efficiency Clusters

during 2011 clustered energy networks were formed from the data Centres and Commercial buildings special working groups. the purpose of these sector focused energy networks is to facilitate the further dissemination and application of the outputs from the previous working groups.

Page 33: SEAI LIEN

SEctIoN 3 CompAny pRofIles

Page 34: SEAI LIEN

Largo is already leading the way in terms of energy management, being the first company within the group to achieve ISO 50001 Certification.

Page 35: SEAI LIEN

Section 3 Company profiles 33

Established in 1983, Largo Foods is an Irish company and is the leading manufacturer and distributor of premium snack foods (crisps, snacks, peanuts and popcorn) in Ireland, supplying branded and own-label products to Ireland, the UK, continental Europe, Australia, Asia and the Middle East.

Largo Foods has production facilities in Ashbourne, Co. Meath, Gweedore, Co. Donegal and Barnsley, UK. It represents iconic snack-food brands including Tayto, Hunky Dory, King and Perri. It is now part of the Intersnack Group, a food producer with over 20 manufacturing sites throughout Europe.

Largo is already leading the way in energy management within the group, being the first company to achieve ISO 50001 certification. Certification took over 18 months and involved individuals from many departments. Senior management support is a fundamental requirement to achieving the ISO 50001 and the system needs to be a working one, and not just a ‘tick the box’ exercise.

Through ISO 50001, Largo Foods has established a mechanism for managing its energy consumption. This structure is helping to reduce energy costs across the business, which will help to keep it competitive within its market. Knowledge developed within Largo Foods is being shared across the Intersnack group of companies, in which key benchmarking exercises take place within their European Energy Management Team.

Largo Foods first started to focus on energy back in 2007, when Paul Fisher, Largo’s energy champion, attended the then SEAI EnergyMap Programme. Since then, and still using the techniques and templates acquired in the training programme, Largo has implemented sustainable energy-saving initiatives in procurement and consumption. Largo’s significant energy users include cooking oil burners and snack dryers, a large steam boiler and many electrical motors on extruders and general production plant.

lARGo foods’ ReCIpe foR stAyInG CompetItIve1

Page 36: SEAI LIEN

34 SEAI large Industry energy network Annual Report 2011

senIoR mAnAGement suppoRt Is A fundAmentAl RequIRement to AChIevInG the Iso 50001. the system needs to be A WoRKInG one, And not just A ‘tICK the box’ exeRCIse.

outlined below are key projects and milestones at largo since 2007:

2007 Ashbourne gap analysis

2007 Gweedore gap analysis

2007 energy usage analysis

2007 Install electrical energy metering on Ashbourne site

2008 Install capacitors on Ashbourne site

2008 Install mv transformer on Gweedore site

2008 purchase gas on open market

2008 Wind turbine feasibility project

2009 Install mv transformer on Ashbourne site

2009 purchase electricity on open market

2009 Install electrical metering in Gweedore

2010 Committed to lIen network and energy Agreements programme

2010 steam pipe insulation programme

2010 Gas metering installation – Ashbourne

2010 Water metering installation – Ashbourne

2010 Anaerobic digestion feasibility

2011 Gas metering installation – Gweedore

2011 Cooker stack heat recovery project

2011 Cooker energy optimisation project

2011 Iso 50001 certification

2012 Kettle process energy optimisation

2012 planned installation of Chp and other energy-efficient retrofits

Page 37: SEAI LIEN

Section 3 Company profiles 35

these projects have enabled largo foods to reduce its overall energy costs despite rising energy prices.

Key to largo’s continual focus on energy has been the relationship with seAI. this comes in the form of annual reminders to submit data for the lIen report, while involvement in the energy Agreements programme has led to the benefits of accelerated certification by an independent body, as well as keeping the continual improvement commitment alive.

largo foods’ plans for the future include the following projects:

Co-Generation (Phase 1)

this project will involve the installation of a gas-fired Chp plant. the electricity from this unit will supply around 70% of the Ashbourne site’s usage, based on the other energy efficiency measures in this proposal being implemented. the heat for the Chp will be matched to the site’s needs and be used in four separate applications.

Selected Motor Control Upgrades Using VSDs

this will involve fitting vsds to six of largo foods’ large motor drives, including the thermal oil circulating pump, three off vacuum pumps, the cooker extract motor, and the cooking oil main circulation pump. Another selection of fixed-speed motors will have energy saving controllers fitted. this will reduce the electrical load in the production area, in and around largo foods’ main electrical significant energy users.

Page 38: SEAI LIEN

36 SEAI large Industry energy network Annual Report 2011

these pRojeCts hAve enAbled lARGo foods to ReduCe Its oveRAll eneRGy Costs despIte RIsInG eneRGy pRICes.

Lighting Upgrade

this project will involve replacing selected lighting at Ashbourne and Gweedore, in both the production and admin areas, upgrading magnetically ballasted t8 fittings to led technology where applicable. metal halide fittings throughout will be replaced with induction fittings. extra savings will be achieved on top of energy savings by the reduction in maintenance requirements for the new lighting.

BEMS and Control Functionality

this project involves installing a new bems with a functionality to programme the logic control of motors and lighting in the process, as well as the admin buildings. this will function like a building management system. Where feasible, the energy service devices will react automatically to the prevailing conditions in the environment and consume energy only when necessary (e.g. cool-air fans reacting to internal temp, daylight sensing, etc).

Transport Fuel Economy Project

largo currently has no monitoring of transport energy consumption. this project involves fitting vehicle tracking devices to a fleet of 70 vehicles which distributes its products. these devices will allow web tracking and analysis of fuel usage, route efficiency and driver performance.

Page 39: SEAI LIEN

Section 3 Company profiles 37

AlleRGAn leAn sIx sIGmA poWeRs eneRGy mAnAGement system

Allergan Inc., headquartered in Irvine, California, is a global specialty pharmaceutical and medical device company that discovers, develops and commercialises innovative products for the ophthalmology, neurosciences, medical dermatology, medical aesthetics and other specialty markets.

Allergan Pharmaceuticals Ireland, a subsidiary of Allergan Inc., is based in Westport, Co. Mayo. It’s the corporation’s largest operations facility with the greatest concentration of employees in one location outside the US headquarters.

Established in 1977, the County Mayo facility has grown to over 600,000 sq ft on a 58-acre campus. It includes state-of-the-art laboratories and is responsible for manufacturing a broad range of the company’s products, including Botox, Ozurdex and other ophthalmic products.

In January 2012, Allergan announced a $350 million investment at the Westport site creating an additional 200 jobs and involving the construction of a new state-of-the-art Biologics facility which will happen over the next five years.

The Utility targets at Allergan Pharmaceuticals Ireland include a 50% reduction in energy consumption, water consumption and greenhouse-gas emissions by 2020 from a baseline year of 2000. To realise these goals, the Westport site has adopted an integrated energy management system in implementing aggressive energy reduction initiatives. Energy savings projects implemented at Westport over recent years have won Corporate Excellence Awards.

2

Page 40: SEAI LIEN

The utility targets at Allergan Pharmaceuticals Ireland include a 50% reduction in energy consumption, water consumption and greenhouse-gas emissions by 2020 from a baseline year of 2000.

Page 41: SEAI LIEN

Section 3 Company profiles 39

Role of Energy Team

natural gas and electricity usage are split approximately 50:50 at the site. directly measured energy data quantifying energy usage is reviewed on a daily basis by the site energy team at an energy review KpI meeting. this enables energy data for the previous 24 hours to be tracked and monitored, and if necessary, any anomalies or issues are dealt with there and then.

the energy team consists of cross functional members from utilities, facilities, technical services, lean six sigma, engineering, operations and the environment health and safety departments. the diversity of this group is key to its success as it permeates the organisation’s different functions. the site’s overall performance against agreed metrics is reviewed at the monthly energy team meeting.

the work of the energy team is evident in the fact that, between 2007 and 2011, as production increased by 25%, the Westport plant reduced its energy consumption by 52% and its water consumption by 38%.

Systematic Approach

It was recognised early on that a systematic approach to energy efficiency was needed. It was decided to integrate the energy management system with other systems on site – the environmental management system, the quality management system and the lean six sigma programme.

the continuous improvement approach of the energy system offered the ideal model to tackle energy issues, as it engages employees at all levels of the organisation.

Energy Awareness and Communication

It was important that all site employees are actively engaged in the energy management process. A targeted approach was used in training of employees, whereby the level of training depended on the individual’s potential impact on energy usage. At a minimum, all Allergan employees are aware of the energy policy and that there is an energy management system in place, while specific technical training was given to management, maintenance technicians, engineers, service contractors, etc.

plasma screens around the plant display monthly communications about energy performance, while posters with energy conservation messages are posted on noticeboards. employees are encouraged to suggest ‘Good Ideas’ for energy reduction through the site’s intranet portal.

Page 42: SEAI LIEN

40 SEAI large Industry energy network Annual Report 2011

Energy Review and SEUs

the site’s significant energy users (seus) were defined and include the heating, ventilation and air-conditioning systems, the chiller system and the air compressor system.

the principles of lean six sigma were applied to the energy review. A project prioritisation matrix and pareto analysis chart were developed to identify projects that would deliver the greatest benefits. energy performance indicators were developed so as to assess energy efficiency and identify scope for improvement.

While implementing the energy management system it was decided that data collected should be trended and analysed using the statistical and process management software package minitab. this allows for better tracking along with data analysis and understanding of energy usage at the site.

Projects Implemented

since 2008, Allergan Westport has implemented many energy conservation projects, including:

• Conversion of 3 large boilers from operating on fuel oil to natural gas;

• Installation of a boiler flue gas economiser on boiler 3;

• Installation of over 135 energy-efficient steam traps on the plant steam system;

• Comprehensive leak check of water and air distribution network and system efficiency modifications; and the

• Installation of vsd (variable speed drive) on the chiller system, hvAC and other motors.

Page 43: SEAI LIEN

Section 3 Company profiles 41

boiler conversion: Allergan decided to convert the three burners on the boilers to dual-fuel (natural gas/fuel oil) to avail of:

• Cheaper fuel (40% more cost-effective), with a return on the capital investment of approximately six months;

• Cleaner burning – a 30% reduction in carbon emissions;

• potential for installing a Chp plant, with a further energy reduction opportunity; and the

• opportunity to install a flue gas economiser on the boiler stack from boiler 3.

the fuel cost savings arising from this project amounted to approximately €750,000 annually.

boiler flue gas economiser: After a technical feasibility assessment, a decision was taken in 2010 to install an economiser on the lead boiler. the heat recovered from the flue gas goes to preheat the boiler feed water. total annual cost saving amounts to €40,000 per annum, with a payback period of 1.9 years.

efficient steam traps: A review determined that many of the originally installed steam traps were impaired, resulting in steam loss to the drain. In late 2009, 135 steam traps were installed. the steam and gas usage was monitored over three months. the results indicated that the plant steam system was up to 20% more efficient as a result. final savings of €110k per annum, equivalent to 1,000 tonnes of Co2 savings, were realised.

Water reduction: to reduce consumption of water and improve system efficiency, the site’s ring main was pressure-tested for leaks and leaks identified were repaired. Gemba walks were undertaken to find waste and improvement opportunities in the water system. finally,

Allergan Energy Team

Page 44: SEAI LIEN

42 SEAI large Industry energy network Annual Report 2011

a CdI (continuous deionization) upgrade led to reduced intake and wastewater emission, while less water was used for process filter flushes on the system.

other improvements include: cleanroom Ahu setback, warehouse temperature control, reverse osmosis water recycling on the purification waste systems, shutdown energy control measures and long-weekend energy management setbacks on Ahus and switch-offs of non-essential equipment, and plant steam generation improvement projects.

Development of Energy Management System

Allergan attributes much of its success in the area of energy optimization to joining seAI’s energy Agreements programme and as a result implementing a more effective energy management system at the site. Work evolved from a series of individual improvements to a portfolio of targeted lean six sigma Green belt improvement projects. With the assistance and encouragement from seAI, this portfolio developed into a full-blown energy management system and in 2010 Allergan was certified to en 16001 and in 2011 to Iso 50001.

overall, these energy improvements have resulted in a large reduction in energy consumption, reduced energy costs to the business and reduced the plant’s Co2

emissions.

Page 45: SEAI LIEN

Section 3 Company profiles 43

Thermo King, a brand of Ingersoll Rand, was founded in 1938 and leads the world in manufacturing and innovating transport temperature control systems for a variety of mobile applications, including trailers, truck bodies, buses, shipboard containers and rail cars.

Thermo King set up the Galway plant in 1976 to manufacture self-powered temperature control units for Truck bodies and Trailers, the plant was then acquired by Ingersoll Rand in 1997. The Galway plant employs approx. 450 people and has an annual turnover in excess of €400 million. Galway has operational responsibility for the other European functions such as customer service, finance and marketing. Its streamlined operation has been hailed as one of the success stories of Irish manufacturing for over three decades.

Thermo King signed up to SEAI’s Large Industry Energy Network in 2005. During this period Thermo King has reported annually on energy performance and their improvements in energy efficiency. In the past few years Thermo King has further increased the focus on energy efficiency and energy management. This has led to Thermo King transitioning to SEAI’s Energy Agreements Programme and becoming the first Ingersoll Rand Climate Solutions company in the world to be certified to ISO 50001 – The International Energy Management standard.

Energy Projects

R&D and facilities account for over 40% of the site’s overall energy consumption; therefore these have been areas that the organisation has focused on.

Energy Efficiency Projects

theRmo KInG,InGeRsoll RAnd ClImAte solutIons, GAlWAy

3

Page 46: SEAI LIEN

From January 1st to November 30th in 2012 there has been a reduction of 13% in lighting usage compared to the same period in 2011.

Page 47: SEAI LIEN

Section 3 Company profiles 45

CeRtIfICAtIon of the GAlWAy plAnt to Iso 50001 Is ReCoGnItIon thAt We hAve A system thAt enAbles ouR sIte to folloW A systemAtIC AppRoACh In AChIevInG ContInuAl ImpRovement of eneRGy peRfoRmAnCe, InCludInG eneRGy effICIenCy, eneRGy use And ConsumptIon. thIs Is AnotheR exCellent exAmple of teAm WoRK And the ‘CAn do’ AttItude by the people on thIs sIte. Gerry Moran, Manufacturing Manager

Thermal Optimization

the latest energy saving project involves a significant investment, with grant support provided by the seAI. the project includes the installation of heat exchangers to various exhaust stacks throughout the R&d and production areas. the heat recovered will be used to heat process water in our pre-treatment plants. new high efficiency boilers are also being installed to heat the factory floor. We expect this project to deliver a decrease of up to 40% in our fuel usage in the areas outlined.

Compressed Air Reduction

Compressed air is supplied to the site by 2 Ingersoll Rand variable speed compressors. the Compressors vary their speed to meet the plants requirements thus ensuring that no excess energy is used. A leak detection program, a controlled switch on/ shut down procedure as well as nightly checks from the security team has led to 13% year on year reduction in compressed air usage throughout the site.

Fan Usage Reduction

A very simple but effective energy saving within the R&d facility has been optimizing the fan speeds and run times used in the trailer bay test area. fans are used in the trailer bay area of the R&d facility to maintain a suitable temperature for the testing of units. by reducing the ‘soaking time’ and the fan speed, 14,000 kWh annually will be saved. the thermal optimisation project outlined above will provide heat for this area thus minimising the use of oil fired burners in 2013.

Lighting Usage Reduction

In december 2011, factory floor lighting was significantly upgraded by replacing existing 220W filament bulbs with 150W induction lights. from january 1st to november 30th in 2012 there has been a reduction of 13% in lighting usage compared to the same period in 2011. these savings can be attributed to lower wattage fittings and individual lux and pIR sensors that ensure that lights are only on when required.

Page 48: SEAI LIEN

By 2015, Diageo plans to reduce emissions of greenhouse gases (GHGs) from its production sites by 50%, against a 2007 baseline.

Page 49: SEAI LIEN

Section 3 Company profiles 47

dIAGeo AChIeves GReAt Results WIth eed

Diageo is one of Ireland’s leading companies, with a long and proud tradition of commercial success. It transforms premium local ingredients into some of Ireland’s most world-renowned brands, including Guinness, Baileys and Bushmills. In Ireland, Diageo employs more than 1,500 people directly and supports 19,000 jobs indirectly. It is the single largest purchaser of barley in Ireland, accounting for 13% of the national crop and using 300 tonnes of barley a day to make Guinness alone.

Around 90% of what Diageo produces in Ireland is exported, generating a total of over €1 billion in exports. At St James’s Gate in Dublin, 2.7 million pints of Guinness are produced every day, of which 70% is exported to over 130 countries around the world.

Challenging Targets Set

Sustainability is at the heart of Diageo’s business operations and is key to its future success. Diageo is dedicated to improving its environmental sustainability for its business and brands – from grain to glass. To this end, Diageo has set challenging environmental goals and has made significant progress against key metrics including carbon, water, waste and packaging. Working in partnership with stakeholders, Diageo will continue to make improvements and work towards achieving its goal of becoming a truly sustainable business.

By 2015, Diageo plans to reduce emissions of greenhouse gases (GHGs) from its production sites by 50%, against a 2007 baseline. Since 2007, it has reduced absolute levels of GHG emissions by 22%, having invested in carbon-reducing technologies across the business.

4

Page 50: SEAI LIEN

48 SEAI large Industry energy network Annual Report 2011

to AChIeve dIAGeo’s stRetChInG envIRonmentAl tARGets, the pRojeCt teAm Implemented eed ACRoss All WoRK pACKAGes, InCludInG utIlItIes, the bReWInG pRoCess And buIldInG seRvICes.

diageo is investing in the redevelopment of the site at st james’s Gate. backed by €153 million capital investment, this development is fundamental to delivering the competitiveness necessary for the long-term sustainability of diageo’s brewing in Ireland. on completion of this project, st james’s Gate will be one of the most modern and energy-efficient breweries in the world. It will combine over 250 years of brewing experience with the latest brewing technology.

EED in St James’s Gate Redevelopment

energy efficient design (eed) helps a company to design, construct and manage projects to achieve minimum energy consumption. It also addresses operational-phase energy management. the methodology was initially devised by the sustainable energy Authority of Ireland (seAI) and has been adopted and customised by diageo in anticipation of the methodology becoming an Irish standard next year.

to achieve diageo’s stretching environmental targets, the project team implemented eed across all work packages, including utilities, the brewing process and building services.

the eed process runs in parallel with a typical project lifecycle and does not affect project schedules. It is important that, early on in the project, both the project team and vendors become engaged with the process. the eed activities should, however, be driven predominantly by the appointed eed programme owner and technical expert.

Members of the Diageo team

celebrating being shortlisted

for the SEAI Sustainable Energy

Awards 2012

Page 51: SEAI LIEN

Section 3 Company profiles 49

the key eed activities are:

• baselining energy usage across current operations.

• Identifying the major energy users and challenging the energy requirements of each energy and water consuming process.

• developing a register of quantified energy saving opportunities.

• Carrying out a meter mapping exercise across all utilities.

• ensuring the validation and verification of implemented ideas.

Benefits of EED

eed has achieved the following results for st james’s Gate:

1. 21.4 mj/hl improvement on thermal requirements (25% reduction on baseline).

2. 5.3 mj/hl improvement on electrical requirements (16% reduction).

3. 0.89 hl/hl improvement on water requirements (22% reduction).

Innovations that helped to achieve these reductions include:

• Installation of the equitherm energy recovery system in the new brewhouse, which reduces the requirement for steam heating in the main brewing process to the wort boiling operation only, maximises the thermal energy recovered and minimises vapour losses from the brewhouse to atmosphere.

• Installation of vsds on 80% of all process drives.

• Installation of a hybrid refrigeration system aiming to use 0oC instead of -4oC glycol.

• use of ‘virtual’ meters throughout the brewing process; e.g. using existing instrumentation without the additional cost associated with metering hardware and installation – this results in increased sub-metering with minimal investment.

overall, the implementation of eed has been a resounding success for diageo. It plans to roll out the process across its global brewing network, with the experience and expertise being driven from Ireland.

Page 52: SEAI LIEN

Kerry Group transitioned to SEAI’s Energy Agreements Programme in 2009 and was the first Kerry Group site in the world to be certified to ISO 50001.

Page 53: SEAI LIEN

Section 3 Company profiles 51

The Kerry Group, with manufacturing facilities in 23 countries, supplies more than 15,000 food, ingredients and flavour products to customers in over 140 countries worldwide. Its current annualised sales total €4.5 billion.

Kerry Ingredients and Flavours, Listowel (KI&F) is the original site from which the Kerry Group developed. Built in 1972, it is a large milk-processing facility which produces a range of dried ingredients, spreads, butters and cheese.

Kerry Ingredients and Flavours (KI&F) signed up to the LIEN in 2005 and has since reported annually on energy performance. In the past few years it has increased its focus on energy efficiency and energy management. It transitioned to SEAI’s Energy Agreements Programme in 2009 and was the first Kerry Group site in the world to be certified to ISO 50001.

Energy Efficiency Projects

KI&F has addressed a number of areas in order to reduce powder drying and facilities energy consumption over the years, including:

• Heat recovery projects.

• Compressed-air reduction.

• Process steam reduction and improved drying efficiencies.

• Improvement in CIP processes and durations.

A major renewable energy project was carried out in 2011: the installation of an Aerobic Digester Biogas CHP (combined heat and power) plant.

KeRRy’s lIstoWel plAnt tRAnsfoRms WAsted bIoGAs Into useful eneRGy

5

Page 54: SEAI LIEN

52 SEAI large Industry energy network Annual Report 2011

Project to End Biogas Wastage

for many years KI&f was aware of the biogas being produced in the anaerobic digester that was being flared off wastefully into the atmosphere. the levels of biogas being burnt at the flare were measured and analysed throughout 2009 and 2010.

It was found that a significant portion of biogas was being generated with a methane content of 70-80%. It became clear that a 600 kW engine would be best for transforming this biogas into useful electrical and thermal energy, to be consumed within the manufacturing process.

the project began in 2011 with the supply and installation of a Chp system. A number of civil and mechanical works had to take place including the installation of a biogas distribution line to the Chp and gas storage bag, and of an 800 kvA step-up transformer.

the biogas consumed in the engine/generator produces an average of 600 kWe of electrical energy hourly and 612 kWth thermal energy hourly; this is used to preheat boiler feed water. the overall efficiency of the Chp unit is 86%. edina carries out remote monitoring via broadband.

Page 55: SEAI LIEN

Section 3 Company profiles 53

Savings and Payback

the project has been a major success, with excellent savings achieved to date.

Biogas engine 2012 output

electrical savings thermal savings

2.53 GWh 2.15 GWh

CO2 savings

1,244 tonnes Co2

723 tonnes Co2

Payback

3 years approx.

Page 56: SEAI LIEN

Through this commitment, employees engage in a more collaborative way with the other aspects of the standard, creating an energy-conscious culture in the organisation.

Page 57: SEAI LIEN

Section 3 Company profiles 55

Connacht Gold Dairy Ingredients at its plant in Ballaghaderreen, Co. Roscommon has always been energy-conscious as its energy spend on-site is significant. In 2011, before the implementation of ISO 50001, energy consumption was recorded and monitored at the overall site level. To tackle energy consumption strategically, specific areas or significant energy use needed to be identified.

The site implemented an EnMS, which has created a structure for analysing and controlling energy throughout the site. The key element in the successful implementation of the system and realisation of savings is considered to be the commitment of top management to the continuation and success of the programme. Without this commitment, as well as that of all people on-site, the impressive energy savings obtained by Connacht Gold would not have been possible.

Through this commitment, employees engage in a more collaborative way with the other aspects of the standard, creating an energy-conscious culture in the organisation. The building blocks of this energy-conscious mind-set are:

• The generation and site-wide communication of the company’s energy policy.

• The setting of specific energy targets.

• The creation of energy awareness through training in skills that affect energy on-site.

• Daily operational reporting on the energy performance of the significant energy users (SEUs) throughout the facility.

ConnACht Gold ‘mIlKs’ eneRGy system foR RICh sAvInGs

6

Page 58: SEAI LIEN

56 SEAI large Industry energy network Annual Report 2011

through the implementation of the energy management system and use of continuous improvement tools, the operational Control aspect of Iso 50001 has been the most beneficial to the organisation. this is realised in the low-cost savings achieved through improving the performance of the significant energy uses (seu’s). the enms enabled easy identification of and thus project focus on the seus.

two key steps were engaging people at all levels in the organisation and developing performance indicators for all seus. the opportunities for improvement were the careful operation and management of the seus through adhering to operational control, and lean improvement methodologies. the performance improvements can be clearly seen in the baseline analysis (see figure below) for electricity, which compares 2011 and 2012 energy performance. In summary the plant processed 18% more milk in 2012, and achieved a 5% efficiency improvement on the thermal system, an 18% efficiency improvement in electricity and a 40% improvement in water use.

Figure 3.1: Comparison of Energy Performance in 2011 and 2012

2011 2012

Elec

tric

ity (k

Wh)

Production (kg)

Site Electricity Vs Production Regression Analysis 2011

Page 59: SEAI LIEN

Section 3 Company profiles 57

ConnACht Gold dAIRy InGRedIents found thAt the ImplementAtIon of Iso 50001 CombIned WIth use of ContInuous ImpRovement tools hAs AChIeved substAntIAl effICIenCy ImpRovements on the sIte.

Connacht Gold dairy Ingredients found that the implementation of Iso 50001 combined with use of continuous improvement tools has achieved substantial efficiency improvements on the site. In today’s economic climate it is essential to strive for continual improvement in order to reduce operational costs and secure the future of the business. Key to this security is the strategic management of energy costs. the initial cost of implementing the enms was supported by seAI. the cost of implementation amounted to less than 5% of the savings achieved in the first year of operating the system.

Page 60: SEAI LIEN

The Arklow facility is making continuous efforts to reduce the energy impact of its operations and improve the site’s energy performance.

Page 61: SEAI LIEN

Section 3 Company profiles 59

The Servier Group is a leading French pharmaceutical company, employing 20,000 staff across 140 countries. Servier Ireland Industries, a secondary pharmaceutical manufacturing facility established in Arklow, Co. Wicklow in 1989, employs over 370 people. The facility serves a global market over 5 continents with products for treating cardio‐vascular disease, depression and diabetes.

Servier Ireland has been an active LIEN member since 2009. As part of the Group commitment to sustainable development, the Arklow facility is making continuous efforts to reduce the energy impact of its operations in a view to reduce its carbon footprint along with site’s performance, among which energy performance is a key element. The site is an active participant in the SEAI Heating Ventilation and Air-Conditioning (HVAC) Special Working Group. In June 2012 the Arklow facility became the first site within the Group to achieve ISO 50 001 certification.

Since joining the LIEN, the facility has implemented a number of energy efficiency projects supported by SEAI, including an Air Change Reduction Initiative and Natural Gas Consumption Optimisation Project.

Air Change Reduction Initiative

With the support of SEAI in the form of funding from Supports for Exemplar Energy Efficiency Projects (SEEEP) and technical support from the HVAC SWG, the Air Change Reduction Initiative was undertaken on six of the air-handling units (AHUs) in the new UPA2 High containment Process Building. Many particulate concentration tests were then carried out to ensure compliance with ISO 14644 (concerning air cleanliness) was maintained. The highest concentration levels recorded were significantly lower than the maximum permissible level for an ISO Class 8 facility.

seRvIeR suCCess In eneRGy sAvInG pRojeCts7

Page 62: SEAI LIEN

60 SEAI large Industry energy network Annual Report 2011

thIs m&v plAn hAs veRIfIed thAt AnnuAl theRmAl eneRGy sAvInGs of 12% hAve been ReAlIsed to dAte.

eleCtRICAl eneRGy ConsumptIon of the sIx Ahus beInG ReduCed by 76%.

the project resulted in the electrical energy consumption of the six Ahus being reduced by 76%. this reduction, through the tempering of the air passing through the units, represents a substantial energy saving. the return on investment for the project was less than three months. Additional benefits were realised with the reduced airflows, as extra capacity is now available in the Ahus for future room fit-outs, meaning future saving in capital investment.

Natural Gas Consumption Optimisation Project

servier Ireland has expanded over the past decade on line with the Group strategy and development of new products and markets. the facility has a series of production and support buildings that interconnect via pedestrian walkways and exterior pathways. the site expansion involved constructing two self-contained utilities. since each building operates in isolation, the steam and lphW boilers in both buildings were found not being as efficient as initially planned, for the required steaming rates – hence suffering elevated standing losses and operating to low firing efficiencies. this situation also inhibited further hvAC energy reduction programmes as further reductions in thermal loads would only exacerbate the low efficiencies arising from the sizing of boilers.

the natural Gas Consumption optimisation project, supported by a 2011 seAI better energy Workplace grant, involved:

• Cross-connecting the two steam and condensate headers between process buildings upA1 and upA2.

• Installing an lphW steam plate heat exchanger in the upA1 plant room for sustaining the building’s hvAC thermal load profile.

• taking offline two lphW boilers and the one-tonne/hour steam boiler in the upA1 boiler house.

• Installing a pressure-reducing station in the upA 1 plantroom for regulating the steam header pressure relative to building occupancy – steam header pressure reductions will be carried out during non-manufacturing hours to curb distribution losses.

As per the seAI better energy Workplace grant requirements, a project measurement and verification plan was implemented; the International performance measurement and verification protocol (Ipmvp) methodology C was used. this m&v plan has verified that annual thermal energy savings of 12% have been realised to date. the project payback period is expected to be four years.

Page 63: SEAI LIEN

Section 3 Company profiles 61

Astellas Ireland Co Ltd (Kerry Plant) is a global pharmaceutical company headquartered in Japan. The Kerry plant serves the worldwide market as the production base for the formulation and packaging of Prograf and Advagraf, breakthrough drugs for treating organ rejection in transplant surgery.

In 2007 Astellas signed up to SEAI’s Energy Agreements Programme. In line with this the site implemented and was certified to IS 393, the Irish Energy Standard, followed by EN 16001, the European standard. In November 2011 Astellas was one of the first companies in Ireland to be certified to ISO 50001, the International Standard.

The Energy Management framework compelled Astellas to assess alternative energy sources. Energy prices (in particular, of electricity and oil) led Astellas towards renewable technologies, which will ensure sustainability long into the future.

AstellAs ReneWAble eneRGy pRojeCts sAve €500,000 yeARly

8

Page 64: SEAI LIEN

Energy prices (in particular, of electricity and oil) led Astellas towards renewable technologies, which will ensure sustainability long into the future.

Page 65: SEAI LIEN

Section 3 Company profiles 63

Renewable Energy Projects 2011

Astellas began two renewable energy projects in 2009 with construction starting in 2011. one involved installing an 800 kW enercon wind turbine, which supplies 20% of the site’s electrical requirement and reduces Co2 emissions by 1,000 tonnes per year. A key issue was getting buy-in from the local community. the Astellas site is located beside the town of Killorglin on the Ring of Kerry. Astellas met with all concerned locals and explained how the environmental benefits far outweigh any concerns. the turbine is monitored 24/7 by enercon in Germany, with a local service team based in tralee. the turbine operates on average at 27% of capacity, which results in annual savings of around €200,000. the project payback period is about six years.

the second project involved the installation of a Weiss woodchip boiler system. Astellas installed this 1.8 mW biomass boiler to meet the demand for steam at the Killorglin facility. the woodchip is fed to the boiler via an overhead crane that weighs the amount of woodchip delivered. the boiler consumes on average 10 tonnes of woodchip per day. the project offsets fossil fuel, providing Astellas with substantial energy savings and a reduction in Co2 emissions of 2,000 tonnes per year. this project provides annual savings of around €300,000. the project payback period is, as with the turbine, approximately six years.

the tuRbIne opeRAtes on AveRAGe At 27% of CApACIty, WhICh Results In AnnuAl sAvInGs of ARound €200,000. the pRojeCt pAybACK peRIod Is About sIx yeARs.

Micheál Cassidy being awarded ‘Energy

Manager of the Year’ at the SEAI

Sustainable Energy Awards 2011

Page 66: SEAI LIEN
Page 67: SEAI LIEN

SEctIoN 4 Results And tARGets

Page 68: SEAI LIEN

66 SEAI large Industry energy network Annual Report 2011

the following table summarises the overall energy performance of lIen members in 2011:

Table 4.1: LIEN Member’s Energy Performance – 2011

2011 Overall Energy Performance

lIen total primary energy Requirement 2011 24,500 GWh

energy Gains (loss) due to energy performance (123) GWh

national total primary energy Requirement (tpeR) 2011

161,296 GWh

lIen as percentage of national tpeR 15%

total Co2 emissions 2011 5,559,020 tonnes

Co2 Avoided due to energy performance Gains (27,795) tonnes

the reported energy performance loss of approximately 0.5% for the lIen as a whole in 2011 is somewhat misleading. on a member-by-member basis, on average, each company reported an energy performance gain of around 1.3%. this figure is almost identical to the average energy performance gain reported by each individual member. there is a small number of very large energy consumers in the lIen, and relatively large changes in these companies’ energy performance can influence overall performance to a large extent. In 2011, one very large energy consumer reported a big drop in output, and thus energy performance, which strongly affected the lIen’s overall energy performance. this case may be treated as an exception so as to better represent the lIen’s overall performance. If this company’s data is omitted, the lIen as a whole can report an energy performance gain of around 1.3% (310 GWh).

this 0.5% loss in performance equates to 123 GWh of additional primary energy consumption. however, based on the specific energy-saving projects reported by lIen members, it is estimated that energy savings of 575 GWh could have been realised in 2011 through the implementation of these projects. that is to say, if the energy saving projects had not been implemented, the losses in energy performance would have been even larger.

Results summARy

Page 69: SEAI LIEN

Section 4 Results and targets 67

1.3% eneRGy peRfoRmAnCe GAIn

on average over the last five years, the lIen has achieved year-on-year energy performance improvements of around 3%. since the inception of the lIen in 1995, the founding member companies have achieved, on average, energy savings of approximately 32%.

In comparison to 2010, in 2011 there was a drop in national tpeR of around 6.5%. there was also a drop in the tpeR of the lIen as a whole of about 2%. however, when the data is analysed on a member-by-member basis, on average, each company recorded a 1% increase in energy consumption. this apparent discrepancy can be explained again by the make-up of the lIen membership; a small number of the larger members reported a relatively large drop in energy consumption in comparison to 2010.

the energy requirement of the lIen accounts for over 15% of national tpeR. lIen members consist predominantly of large industrial energy users, but also include non-manufacturing companies that operate outside the ‘industrial’ sector.

those companies in the lIen which can be classified as being in the ‘industrial sector’ account for around 56% of the national industry primary energy requirement. this, however, omits the energy consumed by those members not classified as being in the ‘industry sector’.

Energy Performance

the change in energy performance of the lIen as a whole presented in this report accounts for all the influencing factors that either improve or erode energy performance. the methodology used is a top-down calculation based on the change in energy intensity with respect to the previous year or a baseline year.

to quantify the energy savings attributable to measures aimed specifically at improving energy performance and reducing energy spend, data on specific energy-saving projects was also collected in the lIen questionnaire. for 2011, 52 companies reported specific energy-saving projects for which the savings were quantified. In total, these projects saved a reported 200 GWh of primary energy. It should be noted that the lIen questionnaire facilitates the reporting of only five specific energy-saving projects. therefore, the projects reported do not represent a complete list of all energy-saving measures implemented by the companies.

Page 70: SEAI LIEN

68 SEAI large Industry energy network Annual Report 2011

however, if it is assumed that the data provided by the 52 companies on specific energy savings is representative of the energy-saving projects undertaken by all members, then an estimated energy saving of around 585 GWh could have been achieved by the lIen as a whole. this is similar to the energy savings calculated for 2010.

Energy Agreements v LIEN Only

the energy Agreements programme (eAp) members are typically larger energy consumers than the lIen-only members. In 2011, the 72 eAp members accounted for 47% of lIen membership and almost 75% of the energy consumption. thus their performance influences greatly the performance of the lIen as a whole. eAp members are committed to the implementation and operation of energy management systems (Iso 50001), which is considered a more effective means of finding, implementing and maintaining energy savings than pursuing an energy management programme, as is the case with the lIen-only members. eAp members also receive more support than lIen-only members. As Iso 50001 is central to the eAp, eAp members’ energy performance may be expected to be better than that of the lIen-only members. A comparison between those companies which reported in 2005 and 2011 shows that the eAp members, as a group, achieved energy performance gains of about 20% and the lIen-only group achieved gains of around 14%.

Historical Performance of the LIEN

the chart below illustrates the historical performance of the lIen over the 17-year period from 1995 to 2011. It comprises four datasets:

1. year-on-year energy performance change (illustrated by bar series).

2. energy performance of lIen members – 1995 baseline.

3. energy performance of lIen members – 2000 baseline.

4. energy performance of lIen members – 2005 baseline.

In the case of year-on-year performance, only those companies that reported in successive years are accounted for. for the remaining plots which illustrate the energy performance of the lIen members relative to a base year, again only those companies that reported in the base year and in the subsequent years are taken into account. this data is not affected by new companies joining the network as the calculations only take into account those companies that reported in 1995, 2000 and 2005.

Page 71: SEAI LIEN

Section 4 Results and targets 69

the following observations can be made on the chart data:

• the members who joined in 1995 have achieved an improvement in energy performance of 32%, in comparison to 1995. there was a notable decrease in 2009 resulting from reductions in output in that year. since 2009, the energy performance of this cohort of companies has remained relatively static.

• the group of members who reported in 2000 and 2011 achieved savings in excess of 18% over that period, when 2000 is taken as the baseline year. this cohort, which includes some of the companies that also reported in 1995, again reported a drop in output and thus energy performance in 2009. however, since then, this group has almost recovered to 2009 energy performance levels.

• the group of members who reported in 2005 and 2011 achieved savings of almost 18% over that period, when 2005 is taken as the baseline year. the group did not record any reduction in energy performance in 2009, unlike the other two groups, and even though the rate of increase has been relatively modest, it has steadily improved.

• the lIen group with 2005 as baseline year represents an important dataset. the eAp was launched in 2006 following the publication of the Irish energy management standard in 2005. during 2005–2010, many companies in this group would have transitioned from lIen-only to energy Agreements.

Page 72: SEAI LIEN

70 SEAI large Industry energy network Annual Report 2011

Figure 4.1: Historic Energy Performance of LIEN Members

Categorisation of Energy Savings

In addition to reporting the quantity of energy saved, lIen members are asked to categorise energy-saving projects in accordance with the categories listed in the energy venn diagram below. In 2011, most projects were categorised by members under the heading of equipment.

Figure 4.2: Energy-saving Projects by Category, 2011

-10

0

10

20

30

40

2%

9%

3%1% 1%

3%

5%

7%

5% 5% 5.1%

(2%) (1.3%)

-0.5%0.0%

0% 0%

-3%

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

% year on year Energy Saving* % year-on-year Energy Saving (exceptions omitted)

% Energy Saved where 1995 is taken as ‘base year’ % Energy Saved where 2005 is taken as ‘base year’% Energy Saved where 2000 is taken as ‘base year’

0.0%

10.2%

16%

36.8%

31.4%32.9%

31.7%

3%

19.7%

14%

18.8% 18.4%

0%

15.3%

17% 17.6% 17.6%

(kWh)Energy Service 3%Process Change 17%Equipment 43%Control 6%Operations & Maintenance 22%Housekeeping 5%Other 3%Not De�ned 1%

Page 73: SEAI LIEN

Section 4 Results and targets 71

historically, equipment-related projects have been the most popular. however, on average, they have a longer payback. for 2011, the following table provides the average payback reported for each category of energy-saving project.

Table 4.2: Average Payback for Energy-saving Projects, by Category

Category Average Payback (yrs)

energy service 1.7

process Change 1.1

equipment 1.7

Control 2.5

operations & maintenance 0.8

housekeeping 1.4

Highlights from 2011

the following are the highlights from the analysis of the lIen data:

• An estimated 585 GWh of energy savings were achieved through the implementation of specific energy-saving measures by lIen members.

• the lIen network as a whole recorded a loss in energy performance of 0.5%; however, when the data from a single large energy user which had a reduced energy performance is excluded, there was an average energy performance improvement within the network of 1.3%.

• With the exception of the electronics sector, the level of output increased across all sectors in 2011. this builds on the increase in output recorded in 2010 following the declines of 2009.

• the majority of sectors within the network have over the last two to three years recorded increased output levels; this coupled with improved energy performance levels has resulted in a significant and consistent reduction in the total primary energy Requirement (tpeR).

• A trend emerging from the categorisation of energy saving opportunities and projects highlights an increase in capital investment within the network.

• energy management systems continue to be the most significant driver for actions undertaken.

• the lIen grew to 160 companies in 2011 and now represents over 15% of national tpeR.

the following charts graphically summarise lIen energy performance in 2011.

Page 74: SEAI LIEN

72 SEAI large Industry energy network Annual Report 2011

Summary of LIEN Data Analysis

Attribute Performance

Membership

Commentary

the number of members grew modestly in 2011. food/drink and pharmaChem continued to be the two largest sectors in the lIen. the other sector has grown steadily and is made up of a mix of retail, technology and services industries, as well as some more traditional ‘heavy industries’, such as cement manufacture and refining. the lIen programme now has 152 members. A membership increase to over 160 is expected for 2012.

Attribute Performance

Response Rate

Commentary

there was a below-average response rate for 2011 (76% energy Agreements, 79% lIen-only). this follows a particularly strong response rate for 2010 when impressive energy performance gains were recorded.

PharmaChem 40%Food/Drinks 47%Healthcare 16%Electronics 9%Other 40%

1724%

No. of Companies Reporting Not Reporting

1721%

Energy Agreements5576%

LIEN Only63

79%

Page 75: SEAI LIEN

Section 4 Results and targets 73

Percentage Change in Energy Performance, by Sector

Attribute Performance

Energy Performance – sector trends

Commentary

It can be seen that in the majority of sectors, in the majority of years, energy performance gains have been achieved. on average over the last five years, each sector has seen a gain of between 2% and 6%.In 2009, the ICt sector was a notable exception. the magnitude of the loss in performance was such that it impacted on the lIen as a whole and resulted in an overall loss in energy performance in 2009. similarly in 2011, given the relative size of the other sector, the reduction in energy performance recorded by this sector has resulted in a loss of energy performance for the lIen as a whole.

Average 2007 2008 2009 2010 2011

-15%

Other

Electronics

Healthcare

Food/Drinks

PharmaChem

-10% -5% 0% 5% 10% 15% 20% 25%

1.99%

5.41%

5.67%

2.65%

6.33%

Page 76: SEAI LIEN

74 SEAI large Industry energy network Annual Report 2011

Percentage Change in Total Primary Energy Requirement, by Sector

Attribute Performance

Energy Consumption

Commentary

In most sectors, in most years, there has been a reduction in each sector’s energy requirement. notable exceptions are:

• The Healthcare sector has recorded more years of increases than decreases, and on average over the last five years has recorded an increase of around 3% in TPER.

• The Other and Food/Drink sectors recorded increases in 2010 and 2011.for companies in the other sector, a large decline in 2009 was caused primarily by a small number of very large energy consumers reporting reduced output, and thus energy requirement. this greatly affected the energy requirement of the sector and the lIen as a whole.

2007 2008 2009 2010 2011

-25%

Other

Electronics

Healthcare

Food/Drinks

PharmaChem

-20% -15% -10% -5% 0% 5% 10%

Page 77: SEAI LIEN

Section 4 Results and targets 75

Percentage Change in Output, by Sector

Attribute Performance

Output

Commentary

In general the trend across all sectors is an increase in output. In particular, the food, healthcare and pharmaChem sectors have increased output significantly.

-15%

Other

Electronics

Healthcare

Food/Drinks

PharmaChem

-10% -5% 5%0% 15%10% 20% 25% 30%

2007 2008 2009 2010 2011

Page 78: SEAI LIEN

76 SEAI large Industry energy network Annual Report 2011

Drivers for Energy Saving Projects (kWh)

Attribute Performance

Driver of Energy Saving Projects

Commentary

energy management systems and programmes were again identified as the primary driver for the implementation of energy savings projects. this is very similar to the findings from recent years.

Categorisation of Energy Saving Projects (kWh)

Attribute Performance

Project Categorisation

Commentary

project activity is categorised using the energy venn diagram. the largest reported category was equipment, which accounted for 43% of reported energy savings. this is an interesting finding as the average reported payback for equipment-related projects was 2.5 years –,on average, the longest payback period for any of the project categories. on average, housekeeping has the shortest payback, followed by energy service.

Energy Management System 65%Other Driver 30%Not De�ned 5%

Not De�ned 1%Operations & Maintenance 22%Energy Service 3%Process Change 17%Equipment 43%Housekeeping 5%Control 6%Other 3%

Page 79: SEAI LIEN

Section 4 Results and targets 77

Categorisation of Energy Saving Projects (kWh)

Attribute Performance

Historical Project Categorisation

Commentary

In 2011, there was a marked increase in the magnitude of the energy savings reported under the heading of equipment and operations & maintenance. there was a decrease in energy service projects. this marked change will be investigated, by examining the energy savings achieved by the implementation of special Investigations.

Methodology for LIEN energy performance calculation

energy performance indicators (epIs) are used to demonstrate the energy performance of each lIen member. the epI is a normalised number which is set to 100 in the year of joining (baseline year). the epI reflects the difference in energy intensity between the current year and the baseline year. An epI of less than 100 shows an improvement in energy intensity; an epI of greater than 100 shows an increase.

the year-on-year epI chart has been prepared for each member (shown later in this report). the chart shows the epI trend since the company joined the lIen and also the target epI set for the next year. It also includes some commentary on the factors that influenced the epI in the current year.

the year-to-year change in energy performance for the lIen as a whole is reported using principles of the paasche method. the change is calculated for each member by subtracting the actual energy consumed in the reporting year from the energy that would have been consumed to produce the same output if the previous year’s energy intensity had remained unchanged. the summation of the changes in members’ energy performance gives the overall year-on-year energy saving, or loss, for the lIen as a whole.

0

10

20

30

40

50

60

%

2007 2008 2009 2010 2011

Energy Service Process Change Equipment Control Operations & Maintenance

Page 80: SEAI LIEN

78 SEAI large Industry energy network Annual Report 2011

to calculate the cumulative energy savings achieved by the lIen as a whole since its inception, a similar methodology is used. the change in energy intensity is calculated for each member by subtracting the actual energy consumed in the reporting year from the energy that would have been consumed to produce the same output if each company’s baseline-year energy intensity had remained unchanged. Again, the summation of these changes gives the overall energy saving, or loss, for the lIen as a whole.

Calculating the energy performance of a company and the lIen as a whole means that all the factors which influence a member’s energy performance are captured, and not only specific energy-saving projects. for example, fluctuations in the level of output, changes in quality control, improvements in productivity and all operational conditions will influence overall energy demand and, thus, energy performance. While the lIen programme is focused on encouraging the implementation of energy-saving projects and special investigations of potential energy-saving projects, it recognises that improving or controlling energy performance through operational control and management of production-related variables can contribute substantially. these activities are within the scope of the Iso 50001 process, which is central to the energy Agreements programme

however, the calculation methodology does not provide transparency on the root causes of changes in the epI and on the drivers for the energy savings. therefore, data on specific energy-saving measures is also collected via the annual lIen questionnaire. this provides a bottom-up means of calculating the energy savings achieved by lIen and eAp members as a result of specific energy-saving measures.

Page 81: SEAI LIEN

membeRs Results And tARGets

Page 82: SEAI LIEN

80 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

0

50

100

150

1195 11 12

72

72.5

71.9

BASELINE YEAR 2007

Abbott Ireland Pharmaceutical Operation

Factors influencing 2012 target• An oil to lpG and steam to lphW

conversion is planned. more efficient delivery of space heating and process loads will contribute to 10% reduction in thermal Co2 emissions.

• project to eliminate running hvAC chillers during mfG peak times will be completed by june 2012.

• A major plant expansion will increase footprint of site, affecting electricity, kerosene and lpG usage.

TARGET: 71.9

Factors influencing 2011 results• A project-tracking checksheet, to ensure

energy projects are running in energy mode, has led to energy reduction via simple operational control.

• A dual-fuel summer boiler is delivering a max. of 1,500kg of steam, replacing two boilers’ rated 3,000kg of steam output each.

• phase 1 of the glycol project, whereby process chillers and hvAC chillers need not run simultaneously, has led to savings.

RESULTS: 72

Factors influencing 2012 target• A free cooling project is planned to

reduce electricity use for two hvAC systems.

• A small compressed air unit will be installed to supply weekend use.

TARGET: 9.3

Factors influencing 2011 results• the plant undertook an upgrade;

oversized steam boilers were replaced with a combination of smaller steam boilers and lphW boilers to optimise heat supply and improve efficiency.

• In addition lphW and Chilled Water systems were converted to variable volume systems.

RESULTS: 123

0

50

100

150

1195 11 12

11.2

11.3

9.3

BASELINE YEAR 2006

Abbott Ireland Ltd (Longford)

Factors influencing 2012 target2012 epI will be influenced by optimised product scheduling and energy projects including:• hvAC and chilled water modifications

and operational changes to monitoring of hvAC energy performance indicators.

• energy-efficient lighting and sensors upgrade.

TARGET: 108

Factors influencing 2011 results• In 2011 absolute reduction in energy

usage was achieved. 2011 epI was not achieved due to low production and the plant running under its operational capacity.

• energy reduction has been attained from various projects including installation of boiler economisers and dryer heat recovery technology.

RESULTS: 113.5

0

50

100

150

1195 11 12

113.5

108

108

BASELINE YEAR 1996

Abbott Ireland Ltd (Cootehill)

Factors influencing 2012 target• the 2011 upgrades on utility

systems improved efficiency. further improvements will be made on hvAC systems, incl. free cooling on most Ahu units and destratification fans in warehouses to allow shut-off of Ahu units during the year.

• An addition to AIdd’s enms will be a wireless energy monitoring system, allowing the site to track, check and verify all aspects of energy usage.

TARGET: 86.8

Factors influencing 2011 results• Abbott sligo aims to be a leader

in energy-efficient solutions and technology. It continually pursues opportunities for efficiency improvements and strives to upgrade/replace inefficient systems.

• In 2011, AIdd implemented a more structured approach to energy project implementation and set up systems to allow verification of savings on completion of projects.

RESULTS: 96.7

0

50

100

150

1195

BASELINE YEAR 2010

11 12

96.7

82 86.8

Abbott Ireland Diagnostics Division

Page 83: SEAI LIEN

Section 4 Results and targets 81

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Ahus upgrade (fresh air cooling).• Chillers upgrade (free air cooling).

TARGET: 95.5

Factors influencing 2011 results• energy-efficient lighting retrofit.• Ahus shut down in times of non-

production.• Reduced volumes had a negative

impact on epI.

RESULTS: 98.1

0

50

100

150

1195 11 12

82

98.1

95.5

BASELINE YEAR 2009

Arvato Digital Services Ireland

Factors influencing 2012 target• Aim to further reduce power usage in

production by upgrading insulation and controls.

• Additional savings are expected to be achieved through improved operational control in workshop.

TARGET: 90

Factors influencing 2011 results• use of the diesel-run generator for

supplying power to main crushing plant has ceased.

• savings have been achieved through reduction in mIC.

RESULTS: 123

0

50

100

150

1195 11 12

123

86 90

BASELINE YEAR 2009

Arkil Ltd

Factors influencing 2012 target• An alternative drying process for site-

generated sludge is to be trialled this year.

• R&d work is likely to drive up baseline energy consumptions for 6 to 12 months; this has not been added to our predicted usage models yet.

TARGET: 69.6

Factors influencing 2011 results• Capital investments brought 3 energy-

saving projects on line in the latter part of the year.

• migration from 16001 to 50001 undertaken in the latter part of 2011 diverted resources from further energy-saving projects.

RESULTS: 70.20

50

100

150

1195 11 12

98.2

111

85

BASELINE YEAR 2009

Arigna Fuels

Factors influencing 2012 target• Certification to Iso 50001 in late 2011

provides a good platform for effective energy management throughout 2012.

• Increases in production put pressure on existing systems to perform as well as historically.

TARGET: 69.6

Factors influencing 2011 results• the site epI, while not quite as good as

in 2010, is much improved compared to 2006-2009, partly due to increased production.

• Reason for lesser performance in 2010 is that system controls were somewhat underperforming as the focus was increased in production levels, and new plant installations.

RESULTS: 70.2

0

50

100

150

1195 11 1270.2

55.2

69.6

BASELINE YEAR 1998

Allergan Pharmaceuticals Ltd

Page 84: SEAI LIEN

82 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• 50% increase in production volumes

from 2011 to 2012. • Integration of scotland manufacturing

plant into Waterford with forecasted increase in electricity and gas of 40%.

• liquidity restrictions in terms of capital spend; with some projects being cancelled.

TARGET: 14.9

Factors influencing 2011 results• large thermal savings achieved by

replacing hot well tank with more efficient tank.

• Installing more energy-efficient air-cooled chillers (vsd type) enabled reduction of number of chillers on site

• pilot project on energy-efficient lighting (led & inductive types) was successful in payback and energy savings; larger project is being rolled out in 2012.

RESULTS: 25.8

Bausch & Lomb Ireland Ltd

0

50

100

150

1195 11 12

25.8

14.9

BASELINE YEAR 1995

Factors influencing 2012 target• Iso 50001.• It Centre m&e upgrade.• boI building strategy (Agile Working).

TARGET: 85.4

Factors influencing 2011 results• business operating hours.• Climate conditions.

RESULTS: 88.6

0

50

100

150

1195 11 12

BASELINE YEAR 2009

85.489

88.6

Bank of Ireland

Factors influencing 2012 target• no Influencing factors provided.

TARGET: 180

0

50

100

150

200

250

1195

BASELINE YEAR 1995

11 12

140.7

125

180

Factors influencing 2011 results• epI increased in 2011 due to less

product being made than in 2010 – all services like hvAC, boilers and chillers still need to run even when less product is made.

• magnatec installation saved approx. 8% on gas consumption.

RESULTS: 140.7

Astellas Ireland Co Ltd (Dublin)

Factors influencing 2012 target• site-wide energy awareness

programme.• Cooling coil frost protection on all

Ahus.• optimise external lighting.• hvAC control improvements.• enthalpy control on all Ahus.

TARGET: 61.7

Factors influencing 2011 results• Continued use of enms and overall site

energy awareness.• Insulation jackets fitted to steam lines.• lthW linked to outside temperature.• It energy consumption improved.• lighting control fitted.

RESULTS: 58.70

50

100

150

1195 11 12

58.7

68

61.7

BASELINE YEAR 2007

Astellas Ireland Co Ltd (Kerry)

Page 85: SEAI LIEN

Section 4 Results and targets 83

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Rainfall and drying conditions (incl.

temperature and sunshine) are the main influencing factor in number of crops produced and energy required to produce each crop.

• Rainfall also dictates the pumping requirements annually so the bog can be travelled and so peat stockpiles can be protected in winter.

TARGET: 104.1

Factors influencing 2011 results• Rainfall and drying conditions, incl.

temperature and sunshine, are the main influencing factor in number of crops produced and energy required to produce each crop.

• Rainfall also dictates pumping requirements in summer so the bog can be travelled and in winter so peat stockpiles can be protected.

RESULTS: 109.1

0

50

100

150

1195 11 12

104.1

98.3109.1

BASELINE YEAR 2009

Bord na Móna Energy Ltd

Factors influencing 2012 target• Infrastructure projects on mine

ventilation continuing. • underground transport and haulage

efficiency being assessed to reduce diesel consumption.

• site buildings being retrofitted to improve heating and lighting.

• focus on assessing energy efficiency of suppliers and contractors.

• Work in progress for Iso 50001 audit.

TARGET: 133.5

Factors influencing 2011 results• minerals extraction & production

deepening to access ore body means longer haul routes and higher ventilation demand, thus increased fuel and electricity use.

• effort focused on improving haulage efficiency and ensuring underground air quality and safety cost-effectively.

• Research is being carried out into diesel efficiency improvements.

RESULTS: 128.5

0

50

100

150

1195 11 12

128.5

122.2 133.5

BASELINE YEAR 1995

Boliden Tara Mines Ltd

Factors influencing 2012 target• the fixed plant energy portion is very

significant. As there was substantial growth in demand and productivity in one product, this was reflected in the epI index.

• In 2012 similar product growth is expected, combined with more aggressive targets in energy saving.

TARGET: 47.4

Factors influencing 2011 results• energy audits and benchmarking

identified hvAC as an opportunity.• unscheduled investment required rolling

projects on to 2012.• for installed hId lighting, change to t5

enabled intensity and occupation control, reducing quantity of new lamps.

• Ratio of fixed to variable energy input enabled energy index improvement with production growth.

RESULTS: 82.1

0

50

100

150

1195 11 12

BASELINE YEAR 2010

82.1

99

47.7

BD Medical

Factors influencing 2012 target• Insulation of condensate return lines.• Install economiser on main steam boiler.• upgrade water pumps.• upgrade lighting in specific area.• determine amount of condensate

returned on a monthly basis.

TARGET: 72.1

Factors influencing 2011 results• upgrade of production area contributed

to lower than normal production output, which adversely affected epI.

• eed used as part of the upgrade projects undertaken.

RESULTS: 74

0

50

100

150

1195 11 12

72.174

63.9

BASELINE YEAR 1995

Baxter Healthcare SA

Page 86: SEAI LIEN

84 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• energy assessments planned for 2012 on

energy-intensive equipment.• enms transition to Iso 50001 planned

for 2012.• expected increased output will reduce

the epI.• upgrade of some chiller systems will

improve their energy efficiency • Reviews of the site’s major gas users are

planned for 2012.

TARGET: 191

0

50

100

250

1195 11

150

200

12

150.4

248.1

191

BASELINE YEAR 1998

Factors influencing 2011 results• pump controls and vsd fitted to

solvent pumps, to reduce run times and minimise usage when running.

• process demand management to minimise energy usage when process equipment is in hold states.

• 2011 epI increased due to new products being introduced to site, some of which are more energy-intensive.

RESULTS: 248.1

Bristol-Myers Squibb (Swords)

0

50

100

150

1195 11 12

72.975.3

58.3

BASELINE YEAR 2005

Factors influencing 2012 target• further changes to product mix with

increased energy intensity will affect the site’s epI.

• Gas reduction projects are due for completion in late 2012.

• energy studies planned for 2012 of energy-intensive equipment.

• Iso 50001 transition to be completed.

TARGET: 72.9

Factors influencing 2011 results• 2011 epI increased due to changes in the

product mix on site. • Controls implemented on idle

equipment in production plant to minimise energy usage.

• overhauls of equipment due to be completed in 2012, which will improve energy usage on systems such as site chillers.

RESULTS: 58.3

Bristol-Myers Squibb (Cruiserath)

Factors influencing 2012 target• Increased output plan for 2012, but

targeting further epI improvement through programme of improvement projects.

• Continue to roll out energy monitoring and reporting system across the site to optimise placement of energy.

TARGET: 43.3

Factors influencing 2011 results• Improved energy performance

resulted in 7% kWhr reduction on 2010 consumption despite manufacturing output increase.

• energy costs increased due to prevailing market rates.

RESULTS: 45.10

50

100

150

1195 11 12

43.455

.5

45.1

BASELINE YEAR 1999

Boston Scientific Ireland Ltd (Galway)

Factors influencing 2012 target• production demand increased

considerably with transfer of new product from another plant. Compressed air control matched demand to supply.

• Air-change reduction proposal in manufacturing areas.

• energy monitoring and reporting to global facilities team maintains focus on energy reduction. number of thermal energy projects at feasibility phase.

TARGET: 23

Factors influencing 2011 results• Reviewed the operating hours of

the domestic heating and reduced it accordingly.

• Improved energy metering and reporting.

• major increase in manufacturing output.• Installed energy-efficient lighting in

warehouse area.• new cleanroom went into operation

mid-way through the year.

RESULTS: 23.9

0

50

100

150

1195 11 12

23

33.1

23.9

BASELINE YEAR 2004

Boston Scientific Ireland Ltd (Cork)

Page 87: SEAI LIEN

Section 4 Results and targets 85

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Completion of planned projects will

reduce site energy intensity projects will be prioritised in line with site objectives.

TARGET: 96.7

0

50

100

150

1195 11 12

100.7

103.7

96.7

BASELINE YEAR 2005

Factors influencing 2011 results• Reduced production volumes

negatively impacted on the site epI.• Initiatives undertaken as part of site-

wide lean/six sigma.

RESULTS: 100.7

Cara Partners

Factors influencing 2012 target• energy strategy agreed for 2012.• buy-in site-wide – every employee

playing a part.• monitoring and measurement.

TARGET: 80

Factors influencing 2011 results• employee awareness of energy costs.• Contract negotiation with suppliers

RESULTS: 83.9

0

50

100

150

1195 11 12

80

70

83.9

BASELINE YEAR 2003

Bulmers Ltd

Factors influencing 2012 target• further efficiency programmes have

been identified and are at business case stage.

• these will help ensure sustainable performance in line with emerging market demands.

TARGET: 91.6

Factors influencing 2011 results• Continuing growth in customer base

and denser technologies have increased critical loads.

• but the efficiencies programme has driven down the pue.

RESULTS: 94.4

0

50

100

150

1195 11 12

101

91.694.4

BASELINE YEAR 2010

BT

Factors influencing 2012 target• ongoing high level of management

commitment to energy reduction.• focus on high pressure Air generation –

sequencing of m/Cs is a key factor.• optimisation of the steam generation

and distribution system.

TARGET: 97.5

Factors influencing 2011 results• management of production lines to meet

target volumes of finished product – only power up the actual number of m/Cs required to meet production volumes.

• ongoing steam and air leak surveys and repair programme in place.

• Increased monitoring and management of baseload energy – specifically around utility equipment e.g. high pressure Air Compressors.

RESULTS: 97.8

0

50

100

150

1195 11 12

97.5

97.5

97.8

BASELINE YEAR 2010

Britvic Ireland

Page 88: SEAI LIEN

86 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Working with dCu to improve

performance of CRAC units which should contribute significantly to energy efficiency drive.

• Working on a free-cooling idea, which with seAI help could increase energy efficiency.

TARGET: 100

Factors influencing 2011 results• Working with dCu to improve the

performance of CRAC units which should contribute significantly to energy efficiency drive.

• Working on a free-cooling idea; with seAI help this could increase energy efficiency.

RESULTS: 111.40

50

100

150

1195 11 12

111.4

112

100

BASELINE YEAR 2008

CITADEL100 Datacentres Ltd

Factors influencing 2012 target• energy efficiency continues to be a high

priority; new projects identified through energy audits will be implemented throughout 2012.

• Continued energy awareness.

TARGET: 63.7

Factors influencing 2011 results• Weekly focus on energy usage – part of

KpI.• energy management team established,

with regular meetings.

RESULTS: 95.7

Charleville Foods

0

50

100

150

1195 11 12

95.7 99

63.7

BASELINE YEAR 2010

Factors influencing 2012 target• Actively seeking Iso 50001.• Identification of possible eCms.

TARGET: 97

0

50

100

150

1195 11 12

100

97

BASELINE YEAR 2011

Factors influencing 2011 results• began monitoring of energy

consumption.• Iso 50001 consideration.

RESULTS: 100

CG Power Systems Ireland Ltd

Factors influencing 2012 target• Carbery are in the process of installing

mes/mIs to drive down info to operators and achieve savings on energy use, water use, product loss and operation efficiency.

• Increased production of value added products v commodity products is ongoing at Carbery.

• seAI funded projects will reduce energy usage throughout the plant.

TARGET: 60.9

0

50

100

150

1195 11 12

60.963

61.8

BASELINE YEAR 1995

Factors influencing 2011 results• 2011 milk throughput up 5% on 2010. • energy recovery project from previous

years performed well.

RESULTS: 61.8

Carbery Milk Products Ltd

Page 89: SEAI LIEN

Section 4 Results and targets 87

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Increased monitoring and tuning of

furnaces to reduce energy giveaway.• Increased exchanger cleaning to increase

heat transfer, and reduce firing in furnaces.

TARGET: 108.4

Factors influencing 2011 results• Introduction of a condensate recovery

system reduced the volume of hydrocarbon gas being flared.

• Replacement of steam turbine with electric motor reduced steam demands and energy costs.

RESULTS: 106.10

50

100

150

1195 11 12

106.1

103.5

108.4

BASELINE YEAR 1996

ConocoPhillips Whitegate Refinery Ltd

Factors influencing 2012 target• dryer retrofit project.• high rainfall led to increased energy

usage due to high moisture content of grain.

TARGET: 97.5

0

50

100

150

1195 11 12

102.5

98.9

97.5

BASELINE YEAR 2010

Factors influencing 2011 results• A new pressline was fitted with 2 132 Kw

motors and associated routing, which had a large electricity consumption.

• other efficiencies were achieved through improved operational control of seus.

RESULTS: 102.5

Connolly’s Red Mills

Factors influencing 2012 target• Increased production volumes. • optimisation of dryers.• leAn programme expansion.

TARGET: 91.2

Factors influencing 2011 results• Certification to Iso 50001.• operational control of seus.• Air compressor system replacement

bagging line replacement.

RESULTS: 96.3

0

50

100

150

1195 11 12

96.3 100

91.2

BASELINE YEAR 2006

Connacht Gold Ltd (Shannonside)

Factors influencing 2012 target• Citi’s commitment to environmental

sustainability continues to grow. 5th environmental expo (27 sept) is great opportunity to raise awareness, enhance understanding, etc.

• Retrofit of in-house ups system; load matching proposed system and using latest in ups technology led to substantial energy savings and much more resilient system.

TARGET: 89.6

Factors influencing 2011 results• Citi environmental expo was run for its

3rd year; emphasis was on educating employees on achieving energy savings at work and transferring these habits to the home.

• In efforts to reduce energy and carbon, the restaurant and servery area was retrofitted in 2011. the latest technology in catering equipment was used, leading to substantial energy savings.

RESULTS: 95.7

0

50

100

150

1195 11 1295.7

89.6

BASELINE YEAR 2008

Citi

Page 90: SEAI LIEN

88 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• energy efficiency continues to be a high

priority; new projects identified through energy audits will be implemented throughout 2012.

• Continued energy awareness.

TARGET: 60.2

Factors influencing 2011 results• Weekly focus on energy usage – part of

KpI.• energy management team established,

with regular meetings.

RESULTS: 63.4

0

50

100

150

1195 11 12

63.4

99

60.2

BASELINE YEAR 2010

Dawn Meats (Grannagh)

Factors influencing 2012 target• transition from en 16001 to Iso 50001

in early 2012 will ensure continual improvement in energy performance.

• Installation of 45,000m3 low-rate anaerobic digester will result in a major reduction in effluent treatment energy use, as biogas will be used to heat the reactor.

TARGET: 56.1

Factors influencing 2011 results• optimisation of whey and casein process

lines, reduction in evaporator idle times.• energy Awareness programme on-site

and recognition in the 2011 seAI energy Awards has resulted in continued focus on energy reduction.

• energy intensity per unit product has continued to fall in 2011, with a 2.8% improvement over 2010.

RESULTS: 57.3

0

50

100

150

1195 11 12

57.3 66

.4

56.1

BASELINE YEAR 1995

Dairygold Co-Op Society

Factors influencing 2012 target• oil usage reduction due to Chp plant. • Replaced oil boiler with a more energy-

efficient natural gas condensing boiler.• Chiller for air handling system replaced

with a more energy-efficient unit.• Control systems upgraded for hvAC,

giving tighter temperature control and energy savings.

TARGET: 81.8

Factors influencing 2011 results• Chp plant installation completed and in

full operation.• low-energy lighting project completed

and in full use.• new energy-efficient trane Chiller

installed. lphW peak temperature reduced by 12.5%.

• Compressed air survey carried out and resulting leaks repaired. Reduced CA peak pressure by 6.5%.

RESULTS: 83.4

0

50

100

150

1195 11 12

83.4

97.7

81.8

BASE LINE YEAR RESET 2002PRIOR DATA

Covidien (Athlone)

Factors influencing 2012 target• preparation for implementation of

Iso50001.• establishing carbon footprint for site in

line with Group policy.• Reduction in use of compressed air in

waste water treatment plant.• Implementation of led technology

across site.

TARGET: 119

Factors influencing 2011 results• overhaul of heat pumps to improve

effecincy of heat recovery from refrigeration plant.

• optimisation of process conditions to improve energy consumption.

RESULTS: 126.7

0

50

100

150

1195 11 12

126.7

119

BASE LINE YEAR RESET 2010PRIOR DATA

Cuisine De France

Page 91: SEAI LIEN

Section 4 Results and targets 89

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• A programme of continuous

improvement has continued to deliver improvements in site energy performance.

• site systems and approach have been validated and assist site achieving Iso 50001 accreditation.

TARGET: 60

Factors influencing 2011 results• Continuous improvement in energy

consumption by using site-wide automation system to target high level of process repeatability and consistency.

• All energy recovery systems fitted with equipment enabling monitoring of recovery efficiency and easy identification of deviations from desired performance levels.

RESULTS: 61

0

50

100

150

1195 11 12

61 69.5

60

BASELINE YEAR 1995

Diageo Ireland (Dundalk)

Factors influencing 2012 target• new medium-temperature hot-water

boiler online.• expected improvement in site metering,

monitoring.

TARGET: 147

Factors influencing 2011 results• Increased site energy awareness.• Combination of energy-efficient projects

(such as lighting), continued progress on air leaks, and replacement of effluent treatment plant pumps with more efficient pumps contributed to reduction in site energy consumption.

RESULTS: 120.10

50

100

150

1195 11 12

120.1 130.5

147

BASELINE YEAR 2007

Diageo Bailey’s Global Supply

Factors influencing 2011 results• strategy is based on three pillars: Cost,

usage and sustainability.• kWh/unit shipped up last year due

to installation of new production equipment which had yet to come online, as well as new production techniques being used.

• Installation of a Chp system this year will aid future sustainability.

RESULTS: 105.9

Factors influencing 2012 target• energy efficiency continues to be a high

priority.• 2012 target is to reduce kWh per unit

shipped by 5% on 2011 consumption.

TARGET: 106.9

0

50

100

150

1195 11 12

105.9

93.5 10

6.9

BASELINE YEAR 2007

DePuy (Ireland) Ltd

Factors influencing 2012 target• A 20% reduction in oil usage expected

for 2012, brought about by heat recovery projects on refrigeration plant and compressors.

TARGET: 51

Factors influencing 2011 results• even though 2011 was a difficult year

for the meat-processing industry, the efficiencies gained in 2010 were maintained.

• Given the increases in energy prices, focus has been on a number of energy savings projects in the last quarter of 2011. this will lead to a huge energy/carbon reduction in 2012.

RESULTS: 53.5

0

50

100

150

1195 11 1253.5

50 51

BASELINE YEAR 2000

Dawn Meats Ltd (Ballyhaunis)

Page 92: SEAI LIEN

90 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• planned increase in activity at airport

campus and development of existing buildings.

TARGET: 132

0

50

100

150

1195 11 12

127.6

85.8

132

BASELINE YEAR 1995

Factors influencing 2011 results• Increase in energy consumption

associated with opening of the new terminal 2 and acquisition of new properties.

• Consumption on a like-for-like basis was down 7% on 2010.

RESULTS: 127.6

Dublin Airport Authority

Factors influencing 2012 target• steam boiler is being replaced by lpG

fired water heater – savings should be seen for last five months of year use of high-pressure, low-volume water pumps will further reduce water and water heating costs.

• ongoing operational efficiencies are expected to deliver further improvements in electricity and gas usage.

TARGET: 98.5

Factors influencing 2011 results• Improved practices mean production

is more uniform, leading to improved efficiency in energy use as well as production in general.

• Water savings resulted in reduced oil usage towards year end – at least 40% reduction in water and oil.

RESULTS: 103.40

50

100

150

1195 11 12

103.4

103.5

98.5

BASELINE YEAR 2005

Donegal Meat Processors

Factors influencing 2012 target• no influencing factors provided.

TARGET: NOT SPECIFIED

Factors influencing 2011 results• no influencing factors provided.

RESULTS: 47.5

0

50

100

150

1195 11 12

47.5

48.5

BASELINE YEAR 1997

Diageo Ireland (St James’s Gate)

Factors influencing 2012 target• steam isolation initiative trialled late

2011. Gas consumption has fallen; main steam header isolated in times of no production and steam line distribution.

• Controls for sabroe compressors altered, to put machines in standby mode if not needed.

• number of Gem steam traps replaced by mechanical-type tlv traps, leading to thermal savings of c100,000 kWh pa.

TARGET: 98.6

Factors influencing 2011 results• Removal and closing of keg plant.

RESULTS: 98.5

0

50

100

150

1195 11 12

98.5

110

98.6

BASELINE YEAR 1996

Diageo Ireland (Kilkenny)

Page 93: SEAI LIEN

Section 4 Results and targets 91

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Audits carried out in largest buildings

to identify additional energy savings projects.

• sub metering installed in larger buildings to assist with monitoring and targeting of significant energy users.

• energy awareness campaign to continue.

TARGET: 86.7

Factors influencing 2011 results• energy savings projects in areas of

lighting, air conditioning, heating and It were implemented successfully.

• seAI grants received for air conditioning and lighting projects.

• energy awareness raised by a companywide intranet campaign and a roadshow in major sites.

RESULTS: 84.3

0

50

100

150

1195 11 12

84.3 91

86.7

BASELINE YEAR 2008

Eircom

Factors influencing 2012 target• Aim to increase energy efficiency by 10%

over the next 5 years.

TARGET: NOT SPECIFIED

Factors influencing 2011 results• new member in 2011.

RESULTS: 100

0

50

100

150

1195 11 12

100

BASELINE YEAR 2011

EPS Group

Factors influencing 2012 target• stack exit temperature reductions

Reduced Co2 emissions due to increased biomass co-firing.

TARGET: 125

Factors influencing 2011 results• Increasing wind penetration resulting

in reduced dispatch levels, overall plant efficiency affected.

• biomass co-fuelling levels increased to 15% in 2011.

• limited trials of 50% biomass co-fuelling carried out with reasonably positive results.

• epI revised during 2011.

RESULTS: 114.7

0

50

100

150

1195 11 12

114.7 12

5

BASELINE YEAR 2008

Edenderry Power Ltd

Factors influencing 2012 target• ebay/paypal upgraded building

management systems in 2012, with real-time metering to provide an accurate picture of energy consumption.

• Introduction of reusable ceramic mugs to each paypal employee, thus reducing dishwasher usage.

• Recent fuel zone refurbishment allowed upgrade of all fridges to ‘A’ energy rating.

TARGET: 94.2

Factors influencing 2011 results• ebay/paypal commenced a strategic

review to find ways of proactively reducing overall energy consumption.

• Rise in headcount in 2011 brought additional power requirements.

RESULTS: 100

0

50

100

150

1195 11 12100

94.2

BASELINE YEAR 2011

eBay/PayPal

Page 94: SEAI LIEN

92 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• lean initiative in place for 2012 to focus

on operational energy improvements and waste reductions.

• projects planned to improve utility plant performance in the areas of refrigeration and compressed air usage.

TARGET: 47

Factors influencing 2011 results• specific energy consumption continued

to improve – by over 2% in 2011.• Good progress made in the production

process areas to improve control and performance.

• Insulation projects in the boilerhouse condensate feed tanks and office have resulted in good savings.

RESULTS: 48.2

0

50

100

150

1195 11 12

48.2

49.1 47

BASELINE YEAR 1995

Glanbia Ingredients Ltd (Ballyragget)

Factors influencing 2012 target• Action plan items will be implemented

first.• Continued review of enms activities to

identify opportunities for improvement.

TARGET: 92

Factors influencing 2011 results• energy management became more

embedded in site culture in 2011 due to structured approach to energy management and savings achieved.

• enms introduction and en 16001 certification rewarded with Abbott Corporate Award. site was first in group globally to achieve certification to Iso 50001, in 2011.

RESULTS: 94.4

Fournier Laboratories Ireland Ltd

0

50

100

150

1195 11 12

94.4 10

5

92

BASELINE YEAR 2010

Factors influencing 2012 target• high-efficiency chiller upgrade.• hvAC and lphW optimisation.• further refining of meaningful epIs.

TARGET: 56

0

50

100

150

1195 11 12

55

51.8 56

BASELINE YEAR 2005

Factors influencing 2011 results• Aisle containment installed in labs and

data centres.• demand control ventilation of air

handling units.• operational control of hvAC.• energy programmes implemented by

energy team and seus.

RESULTS: 55

EMC Information Systems International

Factors influencing 2012 target• support from the seAI through the

conversion project .• support from epo (Richard morrison.• new tool box skills such as energy value

stream mapping.

TARGET: 45

Factors influencing 2011 results• seAI support through conferences and

advice.• Rising energy costs.• falling euro.

RESULTS: 52.7

0

50

100

150

1195 11 12

52.7

120

45BASELINE YEAR 2005

Element Six Ltd

Page 95: SEAI LIEN

Section 4 Results and targets 93

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Reduction of electricity consumption

(continued).• Reduction of natural gas consumption

(continued).

TARGET: 99.6

Factors influencing 2011 results• Reduction of electricity consumption.• Reduction of natural gas consumption.

RESULTS: 100

0

50

100

150

1195 11 12

100

99.6

BASELINE YEAR 2011

Glen Dimplex

Factors influencing 2012 target• energy consumption reporting/

targeting using new mm&t system is key tool for savings. Key targets are benchmarking/targeting of energy usage down to value-stream level; monitoring of key utilities systems.

• planned addition of new packaging and process equipment to increase consumption.

• hvAC remains a key focus of energy programme.

TARGET: 30

Factors influencing 2011 results• In 2011, c7% more production (by

weight) achieved with 7% less energy consumption than 2010.

• major upgrade of chilled water installations led to electricity savings.

• steam boilers conversion in otC plant in q2 2011 led to more efficient operation of energy-saving features of main boiler and economiser.

• Continued replacement of inefficient lights.

RESULTS: 49.2

0

50

100

150

1195 11 12

49.2 52.5

30

BASELINE YEAR 2001

GlaxoSmithKline Ltd (Dungarvan)

Factors influencing 2012 target• better performance management

planned. energy dashboards will allow building owners to monitor usage and identify saving opportunities. site will complete transition to Iso 50001.

• Work to continue on distributed Control system to automate shutdown of process equipment when not required.

• scheme design for 3 mW wind turbine to be progressed while awaiting planning decision.

TARGET: 99.2

Factors influencing 2011 results• Good progress in 2011: 8.5% energy

reduction on 2010. • en 16001 certification achieved. new

enms plus use of energy tiered metrics led to new energy savings opportunities being identified.

• planning application for 3 mW wind turbine lodged.

• site won an seAI Integrated energy management award for sustained work on energy reduction.

RESULTS: 119.3

0

50

100

150

200

1195 11 12

119.3

124.8

99.2

BASE LINE YEAR RESET 2009PRIOR DATA

GlaxoSmithKline Ltd (Cork)

Factors influencing 2012 target• Continuous monitoring and reporting

of usage plus awareness with managers have improved overall plant efficiencies.

• lean manufacture projects focusing on energy losses.

TARGET: 77.7

Factors influencing 2011 results• Continuous monitoring and reporting

of usage plus awareness with managers have improved overall plant efficiencies.

• Gradual improvements in energy reduction measures have resulted in an improved energy consumption per unit ratio.

RESULTS: 80.50

50

100

150

1195 11 12

BASELINE YEAR 1995

80.5

75 77.7

Glanbia Ingredients Ltd (Virginia)

Page 96: SEAI LIEN

94 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• energy efficiency in all areas of

operation will be examined. main steam boiler pressure reduced from 8.5 to 5.5 tons per hour.

• more efficient gas boiler installed.• transfer station on remarker line

upgraded to operate on mechanical mechanism that does not use compressed air; air pressure reduced from 7.5 to 6 barg.

TARGET: 98

Factors influencing 2011 results• based on plant review carried out on

steam requirement, boiler times for low fire were increased, thus decreasing oil usage.

• Refrigeration energy was reduced by identifying all sources where refrigeration is used and shutting down when not required.

RESULTS: 115.9

0

50

100

150

1195 11 12

115.9

108.2

98

BASELINE YEAR 2008

Green Isle Foods (Portumna)

Factors influencing 2012 target• Key energy users associated with the

baseload of the site were identified to help provide improved overall epI.

• Improvement programme for the refrigeration plant started, such as optimisation of energy usage of the refrigeration compressors.

TARGET: 95

Factors influencing 2011 results• drop in production tonnage in 2011 led

to lower energy usage; usage per tonne in kWhs was higher than in 2010.

• due to economies of scale, reduced production in plant in 2011 and taking baseload into account, energy efficiency per tonne decreased.

• Work on baseload will be main focus for energy efficiency improvement.

RESULTS: 106.2

0

50

100

150

1195 11 12

106.2

75

95

BASELINE YEAR 2008

Green Isle Foods (Longford)

Factors influencing 2012 target• upgrade of the aeration system with

the inclusion of a diffused process at the effluent treatment plant.

• variable-speed drives installed on the main water pumps supplying water to the plant.

TARGET: 90

Factors influencing 2011 results• Installation of condensing optimiser

control system had a huge influence on overall epI.

• Replacement of t8 light fittings also helped to achieve the reduction.

RESULTS: 98.3

0

50

100

150

1195 11 12

98.3 100

90

BASELINE YEAR 2008

Green Isle Foods (Gurteen)

Factors influencing 2012 target• Increased output due to headcount rise

from 2000 to 2150.• overall site energy reduction set at 4%

with increased output.• Additional energy reduction of 3% on

baseload during redesign of office space.

TARGET: 37.6

Factors influencing 2011 results• operating hours have increased in line

with a higher headcount in 2011.• Achieved en 16001 certification across

eight emeA sites.• energy reduction target of 4% for 2011

achieved.• expanded the operation to include

an extra 11,299 sqm across two extra buildings.

RESULTS: 62.3

0

50

100

150

1195 11 12

62.3

54.4

37.6

BASELINE YEAR 2007

Google Ireland

Page 97: SEAI LIEN

Section 4 Results and targets 95

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Implement energy action plans for the

site.• energy internal audits.• Air leaks audit.• energy awareness for employees and

contractors.• maintain top management commitment

to the energy policy.

TARGET: 63.3

Factors influencing 2011 results• Increase energy awareness and training

across the site.• Implementation of Iso 50001:2011.• strong commitment from top.

management to the energy policy.• energy internal audits.• Air leaks audit.

RESULTS: 62.50

50

100

150

1195 11 12

62.5

60.3

63.3

BASELINE YEAR 1997

HJ Heinz Frozen & Chilled Foods Ltd

0

50

100

150

1195 11 12

79.4 77

BASELINE YEAR 1997

Hewlett-Packard (Manufacturing) Ltd

Factors influencing 2011 results• focused on reduction in compressed

air usage and control strategy for production.

• site energy team initiated enms for non-manufacturing divisions on site.

RESULTS: 79.4

Factors influencing 2012 target• Chiller upgrade.• non-manufacturing-related energy

consumption expected to increase.• focus will be to reduce energy

consumption through monitoring and targeting all energy usage.

TARGET: 77

Factors influencing 2012 target• dust collectors will be isolated from

the air-handling system. this will allow the units to be switched off when not required.

• hvAC will be set back by 35% outside hours of production.

• new vsds will be installed in the air-handling units, for greater efficiency.

TARGET: 101

Factors influencing 2011 results• projects started to reduce usage of

Ahus. trials were run with Ahus at reduced rates, backed up with microbial testing.

• data gathered in 2011 enabled further work in 2012.

• epI based on commercial operations’ output; does not include energy used in R&d facility.

• R&d facility accounts for c15% of site energy usage.

RESULTS: 102

0

50

100

150

1195 11 12

102

135

101

BASELINE YEAR 2009

Helsinn Birex Pharmaceuticals Ltd

Factors influencing 2012 target• Investigating, monitoring and targeting

system to best suit needs and help identify other energy-saving possibilities.

• After investigating option to install heat recovery on Kettle 6 for use in Raymond 5, project will finish in 2012; savings should be realised long-term.

TARGET: 91.5

Factors influencing 2011 results• As throughput declined again, start-ups

and shutdowns became more frequent, so it’s important to manage electrical and thermal loads when production is off. minimising the baseload becomes more important with declining demand for products.

• Continual focus on equipment, optimising running conditions and identifying gaps in metering and instrumentation.

RESULTS: 98

0

50

100

150

1195 11 1298

91.5

BASELINE YEAR 1999

Gypsum Industries Ltd

Page 98: SEAI LIEN

96 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• projects will continue to improve

efficiency in dub1 facility.• planned projects include air management

and thermal mapping.

TARGET: 92

Factors influencing 2011 results• Interxion’s 2nd data centre (dub2) came

on line in 2010; energy efficiency integral in the design.

• brisk customer uptake in 2010 and 2011 translated into good energy performance. Customer demand required dub2 extension, with negative impact on epI.

• Continued improvement of efficiency of dub1 centre. Retrofitting of energy-efficient lighting system completed in 2011.

RESULTS: 116.6

0

50

100

150

1195 11 12

116.6

100

92

BASELINE YEAR 2008

Interxion Ireland Ltd

0

50

100

150

1195 11 12

40.9

56

48

BASELINE YEAR 1995

Factors influencing 2012 target• full-year impact of reduction of

operations in fab 10.• Retrofit of intelligent lighting in office

areas.• fab 24 chilled water system control

improvements.

TARGET: 48

Factors influencing 2011 results• Reduction of operations in fab 10.• Commencement of facilities upgrade in

fab 14.• Certification of site to Iso 50001 enms

standard.

RESULTS: 40.9

Intel Ireland Ltd

Factors influencing 2012 target• the Ibm Intelligent building manager

software suite has been deployed and is expected to improve energy monitoring and analytics.

• Continued focus on conservation initiatives in 2012 to meet corporate annual challenge.

• Increase in consumption expected due to data-centre expansion.

TARGET: 38.2

Factors influencing 2011 results• overall, energy conservation projects for

2011 total 3.2GWh.• excellent year for reducing consumption

through conservation.

RESULTS: 32

0

50

100

150

1195 11 12

32 34.6 38.2

BASELINE YEAR 1999

IBM

Factors influencing 2012 target• upgrading to Iso 50001 will help

monitoring and review of energy usage as demand is forecasted to contract by 17% this year. specifically reviewing monitoring and measuring system under the guidelines of Iso 50001.

TARGET: 36

Factors influencing 2011 results• Achieving en 16001 in April helped

understanding of energy usage and seus in a structured way. In conjunction with other opportunities for improvement revealed by kaizen process, this enable formulation of an energy management plan which helped achieve approx. 11% gas and 8% electrical usage reduction compared with 2010.

RESULTS: 37.7

0

50

100

150

1195 11 12

37.7 36

BASELINE YEAR 1997

Honeywell Turbo Technologies

Page 99: SEAI LIEN

Section 4 Results and targets 97

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Reduction of hot water usage.• production levels.• tank insulation.• fat plant heat recovery.• turn-off of equipment when not in use.

TARGET: 99

Factors influencing 2011 results• production levels.• better management of refrigeration

compressors.• Installation of pIR sensors on lighting.

RESULTS: 100

0

50

100

150

1195 11 12

100

99

BASELINE YEAR 2011

Kepak

Factors influencing 2012 target• planned production increases will

improve effective use of steam and electricity.

• Chp operation will affect gas and electrical usage.

TARGET: 40

Factors influencing 2011 results• plant output increased (including

weekend production); increased energy consumption attributed to increased volumes.

• Air change reduction for controlled areas has been implemented where possible. Remaining areas will require capital investment to complete and have not been scheduled yet.

RESULTS: 51

0

50

100

150

1195 11 12

51

51.5

40

BASELINE YEAR 1996

Janssen Pharmaceutical Ltd

Factors influencing 2012 target• no influencing factors provided.

TARGET: 102

Factors influencing 2011 results• epI changed from kgs product

despatched to sacks of flour used in production.

RESULTS: 100

0

50

100

150

1195 11 12100

102

BASELINE YEAR 2011PRIOR DATA

Irish Pride

Factors influencing 2012 target• energy monitoring and targeting project.• Increase in production output will drive

increase in refrigeration and thermal load.

TARGET: 100

Factors influencing 2011 results• boiler automation project.• led lighting project.

RESULTS: 94.6

0

50

100

150

1195 11 12

94.6

90

100

BASELINE YEAR 2006

Kerry Foods Ltd (Shillelagh)

Page 100: SEAI LIEN

98 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Certification to Iso 50001 in march will

ensure a continual focus on energy efficiency throughout the factory.

• energy efficient projects planned for 2012 include the installation of a vsd high efficiency air compressor thermal efficiency scoping is being investigated on steam distribution and boiler efficiencies.

TARGET: 84.8

Factors influencing 2011 results• Installation of biogas Chp system

resulted in a saving of 1.25 GWh of purchased electricity.

• en 16001 enms ensured continual improvement in energy performance.

RESULTS: 85.9

0

50

100

150

1195 11 12

85.9

85.4

84.8

BASELINE YEAR 2004

Kerry Ingredients (Listowel)

Factors influencing 2011 results• Increased focus on energy management

and efficiency.• pareto analysis used to identify and

implement tasks to reduce energy consumption.

RESULTS: 98.4

0

50

100

150

1195 11 12

98.4 100

95.5

BASELINE YEAR RESET 2010PRIOR DATA

Kostal Ireland Gmbh

Factors influencing 2012 target• production responsible for 66% of KoI

energy usage. All plant equipment shut down when not in use and at weekend.

• lighting responsible for 11% of total KoI energy usage. Investment planned to review/implement energy-efficient lighting (t5 tubes).

• Review occupancy sensors for low-volume traffic areas; review/trial led lighting.

TARGET: 95.5

Factors influencing 2012 target• the organisation is currently

implementing lean six sigma methodologies with a view to further improvement.

• fit float valves as against timed ones on the air receivers.

• Install energy-efficient high bay lighting.

TARGET: 83

Factors influencing 2011 results• Rationalisation of cooling towers.• Change of personnel.• Change of ownership of the company.

RESULTS: 84.9

0

50

100

150

1195 11 12

84.9 87 83

BASELINE YEAR 1997

Kraft Foods Ireland Ltd (Dublin)

Factors influencing 2012 target• production volumes will be in line with

2010 volumes which will have a negative impact on site epI.

• enms was transitioned to Iso 50001 in late 2011; this will ensure improved performance at this level of production.

TARGET: 107

Factors influencing 2011 results• Increased production volumes

contributed to an improvement in site epI performance.

• enms maintained focus on energy efficiency throughout the year.

RESULTS: 106

0

50

100

150

1195 11 12

106

105 107

BASELINE YEAR 2006

Kerry Ingredients (Charleville)

Page 101: SEAI LIEN

Section 4 Results and targets 99

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Improved efficiencies expected from

optimisation of milk powder plant use and operating parameters.

• In achieving ambitious wastewater emissions standards, there is a high energy input, which increases with the degree of purity required.

TARGET: 65

Factors influencing 2011 results• epI improved as new milk powder facility

yielded 1 full year of product; process optimisation is ongoing.

• meeting higher wastewater standards is increasingly energy-intensive and significant portion of electrical demand.

• new phe installed to replace chilled water coil in tank system, resulting in better output and efficiency.

RESULTS: 65.2

0

50

100

150

1195 11 12

65.2

74

65

BASELINE YEAR 1995

Lakeland Dairies (Bailieboro)

Factors influencing 2012 target• focus on process parameters to avoid

over-processing/over-cooling/over-heating.

• Install energy monitoring system.

TARGET: 74

Factors influencing 2011 results• upgrading pump sets to vsd control.• more use of demand-based controls.• Increase in production output has

helped to reduce cost/ton.

RESULTS: 76.8

0

50

100

150

1195 11 12

76.8 78 74

BASELINE YEAR 2009

Kraft Foods Ireland Production Ltd (Tallaght)

Factors influencing 2012 target• Implementation of energy saving

opportunities will help reduce energy consumption and cut Co2 emissions.

• ongoing high-level management commitment to energy reduction.

• Reduced production volumes will make it difficult to achieve energy targets.

TARGET: 86

Factors influencing 2011 results• Increased production volumes had a

positive influence on energy targets during 2011.

• ongoing savings realised from recent upgrade projects.

RESULTS: 85.9

0

50

100

150

1195 11 1285.9

86.4 86

BASELINE YEAR 1995

Kraft Foods Ireland Ltd (Kerry)

Factors influencing 2012 target• Continue improving through Iso 50001.• phase 1 of an energy efficiency project

includes heat recovery, lighting, motor control and fleet fuel efficiency improvements.

TARGET: 104.7

Factors influencing 2011 results• new line installations have increased

overall epI, but epI on main seu decreased.

• Iso 50001 certification in december 2011 will help sustain better energy performance in the years ahead.

• Introduction of less energy-efficient products has driven up overall epI.

RESULTS: 114.5

0

50

100

150

1195 11 12

114.5

109

104.7

BASELINE YEAR 2009

Largo Foods Ltd

Page 102: SEAI LIEN

100 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Continuous improvement through

operational control activities is expected.• Continuous monitoring of energy

performance indicators will identify further opportunities for improvement.

TARGET: 78

Factors influencing 2011 results• strong efforts to maintain energy

savings achieved in previous years through continuous monitoring and implementing more controls on main users: conveying, fixed underground pumping and ventilation.

• Continuing to upgrade control of auxiliary pumps and fans. Improved process control and installation of vfds have led to improved efficiency in process plant.

RESULTS: 77.9

0

50

100

150

1195 11 12

77.9

86

78

BASELINE YEAR 2000

Lisheen Mine

Factors influencing 2012 target• Change production lines to one

pendistor (from 2). energy savings from turning off 2 50 kW air fans. optimise compressor vsd settings. dust extraction system to be optimised. producing different-density board will lead to less material being refined and energy saving.

• new energy conservation targets for all areas.

TARGET: 60.1

Factors influencing 2011 results• Retrofit to improve compressed-air

generation efficiency. • energy conservation target during non-

production times reduced for electrical consumption.

• lower-energy refiner plates installed; segments alloy type upgraded. Wood efficiency projects will lead to less material being refined.

• since 2010, greater demand in wet wood fuel consumption.

RESULTS: 61.8

0

50

100

150

1195 11 12

61.8

60.1

BASELINE YEAR 2001

Masonite Ireland

Factors influencing 2012 target• An expected large reduction in the

numbers of cattle killed in 2012 will possibly raise epI as the other production areas of the factory will not see the same reduction.

TARGET: 98.7

Factors influencing 2011 results• Completion of upgrades to the

refrigeration system was the biggest influence on the 2011 epI.

• due to the large expenditure involved this was the only major energy saving project undertaken.

RESULTS: 98.70

50

100

150

1195 11 12

98.7

94.6 98.7

BASELINE YEAR 2009

Liffey Meats Ltd

Factors influencing 2012 target• Chp/hRsG will reduce Co2 output by

c1,800 tonnes pa. • distribution and pumping systems for

lphW and chilled water will ensure their efficient use, resulting in improved epI.

• Certification for Iso 50001 will be achieved in 2012.

TARGET: 112

Factors influencing 2011 results• As expected, epI deteriorated in 2011

as production output was lower than previous years. this deterioration will be offset by a big improvement in 2012 due to the on site infrastructural changes.

RESULTS: 113.5

0

50

100

150

1195 11 12

133.5

97

112

BASELINE YEAR 1996

LEO Pharma

Page 103: SEAI LIEN

Section 4 Results and targets 101

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Increased air conditioning.• shift pattern/overtime.• Invest in more efficient lighting.

TARGET: 75

Factors influencing 2011 results• Increased energy awareness.• KpIs by area.• Increased number of areas being

metered .• lighting efficiency audit/improvement.

RESULTS: 78.8

0

50

100

150

1195 11 12

78.8

73.6 75

BASELINE YEAR 2008

Molex Ireland

Factors influencing 2012 target• Installing sub-meters on main plant

and areas across estate for monitoring and targeting system.

• using results of hvAC survey to optimise system.

• Installing improved lighting. Reviewing/reducing cooling in communications and electrical distribution rooms.

• Replacing bms with system focusing on energy efficiency.

TARGET: 79.6

Factors influencing 2011 results• formalising enms to conform to en

16001. • setting up bms maintenance contract to

include specialist preventative measures and address issues.

• linking chillers with bms to tighten running time control.

• moving from desk-based servers to centralised, more efficient arrangements.

• expansion of main server room has increased consumption.

RESULTS: 85.7

0

50

100

150

1195 11 12

85.7

77.1

79.6

BASELINE YEAR 2008

Microsoft

Factors influencing 2012 target• energy efficiency continues to be a high

priority.• new projects identified through energy

audits will be implemented throughout 2012.

TARGET: 97.4

Factors influencing 2011 results• KpIs are reviewed monthly by the site

management team.• Increased refrigeration due to customer

requirements.

RESULTS: 104.2

Meadow Meats

0

50

100

150

1195 11 12104.2

97.7

97.4

BASELINE YEAR 2010

0

50

100

150

1195 11 12

91.1 95.5

87

BASELINE YEAR 2008

Factors influencing 2012 target• Continued projected increase in

production.• opening of new compost tunnels at

Carbury site.

TARGET: 87

Factors influencing 2011 results• Replacement of oil with gas and

refurbishment of heating infrastructure at Claremorris site.

• 16% increase in both compost and mushroom production.

• new indoor compost production facilities are using 20% more energy than previously.

RESULTS: 91.1

Monaghan Mushrooms Ltd

Page 104: SEAI LIEN

102 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• energy kaizen events should deliver low-

cost energy savings in targeted areas.• production volumes decrease in 2012 vs.

2011 will have a major influence on epI.• new nitrogen plant and chillers are

due to come online, which will cause electricity usage increase.

• further pump upgrade projects are due to be completed in 2012.

TARGET: 83.6

Factors influencing 2011 results• energy kaizen events used to identify/

implement low-cost energy savings in targeted areas.

• Rise in production volumes in 2011 had major influence on epI.

• Waste heat recovery from liquid vapour incinerator performed well.

• p6 production facility began operating. • energy studies completed; funding

approved for energy efficiency projects. energy kaizen events should deliver low-cost energy savings in targeted areas.

RESULTS: 83.9

0

100

200

400

300

1195 11 12

BASELINE YEAR 1995

84.2 82 84.3

MSD Ireland (Rathdrum) (formerly Schering Plough [Avondale] Co.)

Factors influencing 2012 target• energy projects portfolio developed for

2012 implementation.• focus on building 18 hvAC

improvements, optimisation of hvAC chillers across site and of compressed air generation in building 18.

• led lighting pilot project, purified water usage reduction, optimisation of Ro skid suite 3.

• participating in the seAI better energy Workplaces participation.

TARGET: 124

Factors influencing 2011 results• Increased focus on energy management

with appointment of new energy lead mid-2011.

• principal focus was on fermentation building (ApI), identifying and assessing possible projects under hvAC, chillers and steam distribution.

RESULTS: 128.70

50

100

150

200

250

1195

BASELINE YEAR 1995

11 12

128.7

124

MSD Ireland (Brinny) (formerly Schering Plough [Brinny] Co.)

Factors influencing 2012 target• energy manager role assumed mid 2012.• Capital projects being implemented. • benefits to show by q2. • Cooling tower and chilled water project

initiated; c175 mWh/pa cost avoidance. • Water demand drop in q3 due to water

monitoring.

TARGET: 100

Factors influencing 2011 results• Incubators/fridge loads not yet online.

RESULTS: 100

0

50

100

150

1195 11 12

100

100

BASELINE YEAR 2011

MSD Ireland (Carlow)

Factors influencing 2012 target• Working with other msd sites within

the network to identify further energy savings; coordinated kaizens on a number of seus.

• Reinvigorate energy management team and boost energy awareness onsite.

• sponsorship from onsite leadership team and offsite senior management.

• the implementation of a number of capital energy projects.

TARGET: 83.6

Factors influencing 2011 results• Capital projects identified by 2010 kaizens.• better cross-site communication has

helped identify means to streamline energy-intensive systems.

• standardised visual tools provided to seus enable daily monitoring of equipment.

• site energy baseload fairly constant 2007-2011 despite new production facility. Rise in usage offset by energy saving/management.

• further use of lss resources to identify more areas for energy reduction.

RESULTS: 83.9

0

50

100

150

1195 11 12

83.9

85.4

83.6

BASELINE YEAR 2000

MSD Ireland (Ballydine)

Page 105: SEAI LIEN

Section 4 Results and targets 103

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Continued improvement of enms,

detailed energy audit planned and energy-efficient modern dryer to be commissioned.

TARGET: 73

Factors influencing 2011 results• nutricia macroom is a member of lIen

and food & dairy sWG, working on energy reduction.

• enms installed that meets requirements of en 16001.

• energy monitoring system generates daily/weekly reports for each production area. energy KpIs set for each process.

• Change from heavy fuel oil to natural gas in nov 2011.

RESULTS: 76.5

0

50

100

150

1195 11 12

76.5

67

73

BASELINE YEAR 2009

Nutricia Infant Nutrition Ltd

Factors influencing 2012 target• Continued optimisation/consolidation

of project to increase waste solvent incineration and heat recovery to realise annual target savings of 72,000 Gj.

• site electricity usage to be maintained at 2011 levels despite 76% rise in 2012 production volumes.

• energy management initiatives will deliver savings in compressed-air use and process cooling.

TARGET: 11

Factors influencing 2011 results• site output decreased from 405 tonnes

reported for 2010 to 270 tonnes in 2011 (-33%).

• site electricity consumption decreased by 857,220 kWh (2%).

• site gas consumption decreased by 15.8 GWh (19.3%).

RESULTS: 220

50

100

150

1195 11 12

22

18.7

11

BASELINE YEAR 1996

Novartis Ringaskiddy Ltd

Factors influencing 2012 target• primary factor that influenced 2012 epI is

production activity.• Also moving from 2-shift to 3-shift cycle

in tableting area to keep up with new output requirements.

TARGET: 84.3

Factors influencing 2011 results• production volumes in 2011 were 20%

greater than in 2009.• boiler economiser and hvAC

optimisation projects, completed in 2011, will deliver full annualised savings in 2012.

RESULTS: 84.20

50

100

150

1195 11 1284.2

82 84.3

BASELINE YEAR 2005

MSD Ireland (Swords)

Factors influencing 2012 target• Installation of a biomass steam boiler,

delivering reduction in carbon footprint of operations.

TARGET: 89.8

Factors influencing 2011 results• Increased volumes.• Improvements to enms providing real-

time information on thermal energy usage.

• Installation of steam meters to monitor thermal energy consumption.

• Installation of new energy-efficient light fittings in the warehouse.

RESULTS: 89

0

50

100

150

1195 11 12

89

88.7

89.8

BASELINE YEAR 2009

Nutricia Ireland Ltd

Page 106: SEAI LIEN

104 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

0

50

100

150

1195 11 12

100

97

BASELINE YEAR 2011

Factors influencing 2012 target• no influencing factors provided.

TARGET: 97

Factors influencing 2011 results• no influencing factors provided.

RESULTS: 100

P&S Civil Works Ltd

Factors influencing 2012 target• focus on sustainability targets of

reducing energy output.• production ownership for energy use/

output.

TARGET: 56.6

0

50

100

150

1195 11 12

58.4

90

56.6

BASELINE YEAR 2009

Factors influencing 2011 results• focus on corporate sustainability targets

for reducing energy output.• production ownership for energy use/

output.

RESULTS: 58.4

P&G Manufacturing Ireland Ltd (Newbridge)

Factors influencing 2012 target• Continue replacing older equipment

with newer, more efficient technology.• maintain focus on energy efficiency.

TARGET: 70.6

Factors influencing 2011 results• optimising process cycles to use less

energy.• An increase in production output.• Removal of old, inefficient equipment.

RESULTS: 81.6

0

50

100

150

1195 11 12

81.6 86.6

70.6

BASELINE YEAR 2007

Organic Lens Manufacturing

Factors influencing 2012 target• new class 8 cleanroom in full production

throughout the year.• Implementation of full energy-efficient

design in new equipment procurement.

TARGET: 70

0

50

100

150

1195 11 12

73.6

91

70BASELINE YEAR 2010

Factors influencing 2011 results• began implementing Iso 50001.• enms energy-efficient design of 5000 sq

ft Iso class 8 cleanroom introduced in september.

RESULTS: 73.6

Nypro Ltd

Page 107: SEAI LIEN

Section 4 Results and targets 105

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• pfizer loughbeg is transitioning out of

the pfizer network in 2012.• energy intensity will depend on future

manufacturing at the facility.

TARGET: NOT SPECIFIED

Factors influencing 2011 results• migrating to Iso 50001 helped to

maintain focus on energy reduction targets.

• hvAC improvements continued to provide energy savings.

RESULTS: 76.7

0

50

100

150

1195 11 12

76.7

77.6

BASELINE YEAR 2009

Pfizer Drug Product Plant (Loughbeg)

Factors influencing 2012 target• Cleanroom air change rate reduction.• turn off office air conditioning at night.• Condensate return heat recovery.• Cooling tower fans on variable speed

control.

TARGET: 12

Factors influencing 2011 results• Cooling tower floating setpoint.• Cleanroom air change rate reduction.• boiler efficiency.• transfer from Water for Injection to

Reverse osmosis cooling.

RESULTS: 43.7

0

50

100

150

1195 11 12

43.7 53

.9

12

BASELINE YEAR 2009

Pfizer Biotechnology (Grange Castle)

Factors influencing 2011 results• Award-winning energy awareness

programme implemented.• hvAC improvement projects

implemented.• unused areas decommissioned.• lighting levels reviewed and reduced

where appropriate.

RESULTS: 75.5

Factors influencing 2012 target• optimise hvAC operation strategies incl.

night setback etc.• use Chp incl. new loads for low-grade

heat.• further consolidation of the plant.• Introduce a new monitoring system to

identify energy wastage in the hvAC systems.

TARGET: 70

0

50

100

150

1195 11 1275.7

48

70

BASELINE YEAR 2009

Pfizer (Newbridge)

Factors influencing 2012 target• the site remains focused on target to

reduce energy consumption by 4% per annum and water consumption by 2%.

• the projects being pursued will far exceed these targets and lead to a step reduction in energy spend and water consumption.

TARGET: 42.9

Factors influencing 2011 results• despite record output in 2011, 8%

reduction in gas and 20% reduction in water consumption.

• electricity consumption rose only slightly despite no summer shutdown and higher production volumes.

• focus on maintaining/optimising performance after energy reduction projects in 2010.

RESULTS: 33.4

0

50

100

150

1195 11 12

33.4

34.9 42.9

BASELINE YEAR 2000

Pfizer Ireland Pharmaceuticals (Little Island)

Page 108: SEAI LIEN

106 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• en 16001 implementation will start in q4

2012. • Replacement steam boiler proposed, with

economiser, oxygen trim and vsds on pumps and fans.

• Continuous changes to process equipment to reduce epI of kWh consumed per kg of product produced.

• energy monitoring expanded to include more energy users.

• production staff ensuring use of most energy-efficient equipment.

TARGET: 93

Factors influencing 2011 results• project to recover waste heat from

refrigeration plant has reduced energy for heating water by 47%.

• new energy monitoring/control system logs major energy users; switches off equipment when max levels reached.

• Rising film evaporator process installed; reduces steam consumption by 23+%.

• 400W light fittings replaced with 110W fittings. methods to cut energy use at home/work circulated monthly to all employees.

RESULTS: 95.9

0

50

100

150

1195 11 12

95.9

93

BASELINE YEAR 2009

Queally Group Naas

Factors influencing 2012 target• Continuous Improvement process plan

in place to increase plant reliability, minimise false air, increase pet Coke substitution and improve specific heat consumption.

• Improvements to raw material quality to increase throughput and thermal efficiencies.

TARGET: 103.6

Factors influencing 2011 results• Raw material issues leading to increased

downtime.• Reduced throughput resulting in

increased fuel consumption.

RESULTS: 103

0

50

100

150

1195 11 12

103

108.5

103.6

BASELINE YEAR RESET 2010 PRIOR DATA

Premier Periclase Ltd

Factors influencing 2011 results• In 2011 a focused approach to energy

monitoring on a monthly basis led to greater understanding of energy consumption.

• housekeeping and maintenance projects, incl. insulation and steam trap upgrades, led to thermal energy savings in 2011.

• Also embarked on specific energy saving projects, e.g. condensate heat recovery.

RESULTS: 96.9

Factors influencing 2012 target• Continue focus on understanding energy

consumption on a plant business unit basis. build sankey diagram for plant consumption.

• Continue work on energy reduction projects to achieve a 5% KpI energy saving.

• A plantwide energy awareness programme is planned for 2012.

TARGET: 97

0

50

100

150

1195 11 12

96.9 10

5

97

BASELINE YEAR 2007

Pfizer Nutritionals Ireland

Factors influencing 2012 target• epI expected to disimprove with less site

activity. Aggressive implementation of energy saving projects will continue.

• further hvAC optimisation, incl. room air-change rate optimization.

• fit electronic expansion valves to process chillers in osp 4.

• optimise htf loops in osp 1 and osp 4.• Continued leverage from tools of

‘right first time’ and technology and innovation techniques.

TARGET: 92

Factors influencing 2011 results• production rose slightly; small epI

improvement. energy management programme driven by energy master plan.

• Increased ownership and accountability through expanded enms and energy usage review at daily production meetings.

• strong efforts on hvAC optimisation will continue in 2012.

• number of projects requiring capital were implemented in 2011. main focus on hvAC, cooling towers, nitrogen systems.

RESULTS: 89.2

0

50

100

150

1195 11 12

89.2 92 92

BASELINE YEAR 1995

Pfizer Ireland Pharmaceuticals (Ringaskiddy)

Page 109: SEAI LIEN

Section 4 Results and targets 107

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2011 results• volumes reduced, emphasising need

to reduce baseload. Carry-through electrical charge cost increases are raising total unit costs.

• over 30 energy reduction projects implemented, resulting in reduction of 9m+ kWh.

• All factors affecting energy requirements at times of non-operation reviewed, to identify possible energy reductions.

RESULTS: 138

Factors influencing 2012 target• As with above, similar factors with similar

projects. • there will also be increased emphasis

on fuel monitoring in mobile plant and equipment. data obtained will be used for specific training.

• there will also be an emphasis on verification audits in line with Iso 50001 requirements.

TARGET: 165.5

0

50

100

150

200

1195 11 12

BASELINE YEAR 2008

138

111.9

165.6

Roadstone Wood Group

Factors influencing 2012 target• process – reactors heating control.• utilities – hvAC time schedules.• utilities – cleaning cooling water circuit.

TARGET: 59

Factors influencing 2011 results• steam distribution – improving

condensate collection.• Instruments – calibration of critical

temperature probe.

RESULTS: 93.1

0

50

100

150

1195 11 12

93.1 90

59

BASELINE YEAR 2010

Recordati Ireland Limited

Factors influencing 2011 results• Another tough year in the construction

sector affected efficiency because of high baseload requirements, so the epI remained above the base year.

• Current objectives and targets have a timescale of over one year, which has resulted in little improvement in 2011 epI.

RESULTS: 101.7

Factors influencing 2012 target• development of the alternative fuels

programme to substitute 55% of fossil-fuel use.

• progression on enms to ultimately achieve Iso 50001 accreditation.

TARGET: 105.8

0

50

100

150

1195 11 12101.7

103

105.8

BASELINE YEAR 2008

Quinn Cement Ltd

Factors influencing 2012 target• the enms continues to drive correct

behaviours. through the daily and monthly meeting, performance of the utilities is monitored and non-conformances are identified and resolved.

• the challenge in 2012 is to develop innovative solutions to further reduce energy consumption.

TARGET: 417.8

Factors influencing 2011 results• In 2011 production output increased,

but electrical consumption remained constant and natural gas consumption reduced by 21%.

• Improvements in the control approach for the thermal oxidiser resulted in this gas saving.

RESULTS: 3080

200

400

600

1195 11 12

308 333

417.8

BASELINE YEAR 1995

Roche Ireland Ltd

Page 110: SEAI LIEN

108 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

0

50

100

150

1195 11 12

68

62.4

BASELINE YEAR 2009

Factors influencing 2012 target• Improvement projects identified as part

of the Iso 50001 energy review.• small smart ideas programme and CApA

initiatives.

TARGET: 62.4

Factors influencing 2011 results• shift cycle was increased from one to

two-cycle shift in one process facility in feb 2011.

• extended working hours in processing and packaging throughout the year.

• two standby compressors were removed from the system, reducing the standby running power in feb 2011.

RESULTS: 68

Servier (Ireland) Industries Ltd

Factors influencing 2012 target• Calciners are fully converted from fuel oil

to gas. no use of fuel oil in this service expected in 2012, which will increase epI.

• the ongoing heat recovery upgrade programme will improve energy efficiency.

• ongoing programme to replace obsolete 3.3 kv motors with modern high-efficiency motors and vsds will optimise power use and increase reliability.

TARGET: 74.4

Factors influencing 2011 results• heat recovery upgrade programme in

digestion area continued to improve steam efficiency.

• programme to replace 3.3 kv motors and drives with modern systems continued. In 2011 two 900 kW motors with vsds installed.

• Calciners conversion from fuel oil to gas reduced Co2 emissions and energy costs but raised total energy required on a GCv basis.

RESULTS: 72.9

0

50

100

150

1195 11 12

72.9

69.5 74.4

BASELINE YEAR 1995

RUSAL Aughinish

Factors influencing 2012 target• Increased hot water storage capacity.• Reduction in hot water consumption.• lighting upgrades throughout the site

improved electrical energy performance.

TARGET: 84.1

Factors influencing 2011 results• Improvements to heat recovery systems

through insulation.• lighting upgrades throughout the site

improved electrical energy performance.

RESULTS: 100

0

50

100

150

1195 11 12

100

84.1

BASELINE YEAR 2011

Rosderra Irish Meats (Roscrea)

Factors influencing 2011 results• An increased focus on energy awareness

and energy management has led to increased energy efficiency on site.

• lighting upgrades were carried out throughout the site.

RESULTS: 100

Factors influencing 2012 target• A number of energy efficiency projects

have been identified for 2012.• A structured energy management

programme will be developed during 2012.

TARGET: 84.1

0

50

100

150

1195 11 12

100

84.1

BASELINE YEAR 2011

Rosderra Irish Meats (Edenderry)

Page 111: SEAI LIEN

Section 4 Results and targets 109

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

0

100

200

400

300

1195 11 12

BASELINE YEAR 2010

319.8

100.9

Factors influencing 2012 target• Converting extracted heat into internal

heating energy.• evaluate air compression.• determine the most efficient ways to

heat the premises Reduce energy to fans.

• Reduce cost of energy through efficiency.

TARGET: NOT SPECIFIED

Factors influencing 2011 results• Conversion from lpG to natural gas.• ducting installed to reduce air flows

heating cost reductions.• evaluating results.• determining effectiveness of

programme.

RESULTS: 319.8

Taconic International Ltd

0

50

100

150

1195 11 12

106.7

112.7

106

BASELINE YEAR 2008

Factors influencing 2012 target• ongoing operational efficiencies

expected in 2012 as in 2011.• this should mean that epI will be

maintained at a similar level.

TARGET: 106

Factors influencing 2011 results• While production is slightly down on last

year, energy performance has improved.• this was achieved by tighter control of

energy use during production stops. It was necessary to balance this with maintaining manufacturing efficiency.

RESULTS: 106.7

Sonoco Plastics (APT Ireland)

Silver Hill Foods

Factors influencing 2012 target• training and maintaining awareness with

all employees.• Improvements in site monitoring and

measurements.• Continuous improvement programme

(CIp) to highlight areas that need to be focused on in order to become more efficient or make savings.

TARGET: 69

Factors influencing 2011 results• Continuous improvement programme

(CIp) identified key areas for energy efficiency projects.

• ongoing energy monitoring and reporting to senior management maintains focus on energy reduction and awareness throughout the company.

• Annual energy training of all employees maintains awareness.

RESULTS: 90.1

0

50

100

150

1195 11 1290.1

88.2

69

BASELINE YEAR 2007

Factors influencing 2012 target• Chillers.• boilers.• Air handling units.• Compressed air.• lighting.

TARGET: 85

Factors influencing 2011 results• Chillers.• boilers.• Air handling units.• Compressed air.• lighting.

RESULTS: 95.2

0

50

100

150

1195 11 12

95.2

85

BASELINE YEAR 1999

Takeda Ireland Ltd (Bray)

Page 112: SEAI LIEN

110 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Continued focus on baseload reduction

with particular emphasis on cooling water system.

• Installation of pressure banking stats on boilers for night-time and weekend energy reduction.

• Investigating biomass boiler system to replace oil boiler system.

TARGET: 31.4

0

50

100

150

1195 11 12

33

31.4

BASELINE YEAR 1996

Factors influencing 2011 results• optimisation of significant electrical

energy users through improved control.• Increased focus on non-productive use

of energy – reducing baseload at night-time and weekends.

RESULTS: 33

Temmler Ireland Ltd

Factors influencing 2012 target• boilers.• pulp plant.• Raw material preparation plant and

machines.• Water treatment plant.

TARGET: 150

Factors influencing 2011 results• boilers.• pulp plant.• Raw material preparation plant and

machines.• Water treatment plant.

RESULTS: 144.3

0

50

100

150

200

1195 11 12

144.2 15

9

150

BASELINE YEAR 2005

Tegral Building Products

Factors influencing 2012 target• optimisation of air handling.• Working to improve chilling efficiency.• Continue energy savings through lean

six sigma programmes.

TARGET: 74.9

0

50

100

150

1195 11 12

75.4

74.9

BASELINE YEAR RESET 2010PRIOR DATA

Factors influencing 2011 results• Air changes in cleanrooms maintained

above requirements.• Introduced more electric machines as

investment in best-in-class equipment continues.

• optimised compressed air.

RESULTS: 75.4

Tech Group Europe Ltd (Dublin)

Factors influencing 2012 target• A significant increase in product output

combined with hvAC projects have resulted in a decrease in site epI.

• A dedicated energy metering system was installed in 2011. the significant electrical energy users were set up on the system. since it was commissioned, energy data is reviewed periodically and epIs for the seus have been established.

TARGET: 30

0

50

100

150

1195 11 12

36

25 30BASELINE YEAR 2008

Factors influencing 2011 results• Increase in product output; c10%

decrease in overall energy consumption.• Raising of energy awareness and plans to

implement Iso 50001. • dedicated energy metering system

installed in 2011. • seus set up on system. energy data is

reviewed periodically and epIs for seus have been established.

RESULTS: 36

Takeda Ireland Ltd (Grange Castle)

Page 113: SEAI LIEN

Section 4 Results and targets 111

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2012 target• Implemented Iso 50001.• Implemented enerit software.

TARGET: 38.3

Factors influencing 2011 results• Increase in R&d testing procedures

for units for this plant and others throughout europe has a negative impact on the epI trend.

• energy increase in 2011 vs. 2010 led to a renewed focus on improving energy management.

RESULTS:40.30

50

100

150

1195 11 12

40.3

35.5 38.3

BASELINE YEAR 1995

Thermo King Europe

Factors influencing 2012 target• upgrade of lphW boilers.• Installation of an energy tracked

monitoring system.• Compressed air system upgrade.• Installation of a mthW boiler.• upgrade of building internal and

external fabrics.

TARGET: 143.3

Factors influencing 2011 results• energy saving programme is ongoing.• shutdown activity for unit 301

successfully completed.

RESULTS: 160.5

0

100

200

300

1195 11 12

160.5

209.8

143.3

BASELINE YEAR 2008

Teva Pharmaceuticals Ireland

Factors influencing 2012 target• Commitment to reducing the carbon

footprint of stores by 50% by 2020 compared to 2006.

• to achieve this ambitious goal tesco has invested in a wide range of energy-efficient technologies such as controls optimisation, smart staff energy meters and a zero carbon store in 2011.

TARGET: 58

Factors influencing 2011 results• Commitment to reducing the carbon

footprint of stores by 50% by 2020 compared to 2006.

• to achieve this ambitious goal tesco has invested in a wide range of energy-efficient technologies such as controls optimisation, smart staff energy meters and a zero carbon store in 2011.

RESULTS: 63.1

0

50

100

150

1195 11 1263.1 62 58

BASELINE YEAR 2007

Tesco Ireland Ltd

Factors influencing 2012 target• In 2012 energy reduction programme

will continue.• process optimisation will also be a

priority.

TARGET: 74.8

Factors influencing 2011 results• In 2011 a 67% drop in power usage to

ovens was achieved.• Water consumption per lens is also down

– 7 litres per lens to 3 litres per lens.• Global expectations are a -5% annual

drop per year.

RESULTS: 78.30

50

100

150

200

1195 11 12

78.3

78.6

74.8

BASELINE YEAR 1998

Transitions Optical Ltd

Page 114: SEAI LIEN

112 SEAI large Industry energy network Annual Report 2011

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2011 results• production increases put pressure on

energy usage.• Approx. 400m lenses manufactured as

part of line developments which do not form part of output (epI figure) but which required energy to manufacture.

RESULTS: 78.9

Factors influencing 2012 target• some energy projects were cancelled

due to production constraints but a number are well progressed this year – and planned for completion in q4 2012.

• volume of lenses for development lines expected to be lower this year.

TARGET: 72.10

50

100

150

1195 11 12

78.9

74.1

72.1

BASELINE YEAR 2005

Vistakon Ireland

Factors influencing 2011 results• less fish quantities in 2011 gave rise to

shorter production runs. A more frequent start-stop operation led to decrease in overall plant efficiency.

• low expenditure in 2011 on energy-reducing projects.

RESULTS: 115

Factors influencing 2012 target• more than doubled budget for 2012 to

implement three energy saving projects.• some fish quotas are up in 2012 so this

will help keep the plant running for longer continuous spells.

• both factors should help in reducing energy use per tonne of material processed.

TARGET: 100

0

50

100

150

1195 11 12

115

107.7

100

BASELINE YEAR 2008

United Fish Industries Ltd

Factors influencing 2012 target• Continue to install additional meters and

target high energy uses across site.• Continue to implement energy saving

initiatives as identified in Resource plan.

TARGET: 49.4

Factors influencing 2011 results• Central energy Reporting – set up

standard reports.• Continue to implement energy saving

initiatives as identified in Resource plan.

RESULTS: 50

0

50

100

150

1195 11 12

50

49.4

BASELINE YEAR 2009

UCB Pharma Ltd

Factors influencing 2012 target• energy action plan in place to reduce

energy consumption by 5%.• build on Iso 50001 systems in place.• 2,500 m2 of refurbished space to come

on line.• target to meet public sector obligations

of 33% reduction by 2020

TARGET: 50.5

Factors influencing 2011 results• energy projects implemented in q4,

2010 delivered savings in 2011.• Intensive energy campaign completed

in 2011.• Iso 50001 certification obtained.

RESULTS: 53

0

50

100

150

1195 11 12

53

80.3

50.5

BASELINE YEAR 2009

Tyndall National Institute

Page 115: SEAI LIEN

Section 4 Results and targets 113

ACTUAL EPI TARGET EPIACTUAL EPI PERIOD OF MISSING DATA

Factors influencing 2011 results• Weekly focus on energy usage – part of

KpI.• Corrective actions from energy Audit

survey.

RESULTS: 88.1

Factors influencing 2012 target• Continuous monitoring of KpIs.

TARGET: 87

0

50

100

150

1195 11 12

88.1 86 87

BASELINE YEAR 2000

Western Proteins

Factors influencing 2011 results• Replacing reciprocating compressor with

fixed and variable-speed screw machines increased efficiency. Relocation of other compressors and air receivers gave better performance.

• sont high bay lighting in 2 warehouses replaced with induction lighting to increase efficiency. occupancy controls installed. modifications led to 70% energy saving.

RESULTS: 88.4

Factors influencing 2012 target• Wellman plan on replacing a number

of sont high bay lighting fittings and controls in warehouse and production areas with induction lighting following success of pilot programme last year.

• Air meters will be installed on the dense air raw material transportation systems to aid in optimising the performance of the equipment.

TARGET: 88.4

0

50

100

150

1195 11 12

88.4

89.1

88.4

BASELINE YEAR 1995

Wellman International Ltd

Factors influencing 2011 results• energy-efficient lighting to be installed

across 3 stores.• 3 stores to be closed but as these

are smaller stores the reduction in consumption will be minimal.

RESULTS: 117.2

Factors influencing 2012 target• energy-efficient lighting to be installed in

most stores in 2012.• 2 stores to be closed.

TARGET: 105

0

50

100

150

1195 11 12117.2 126

105

BASELINE YEAR 2008

Vodafone

Factors influencing 2012 target• new product energy efficiency

improvement.• Investigation of impact of raw material

variability on energy efficiency.

TARGET: 57.9

Factors influencing 2011 results • Achieved Iso 50001 certification• new energy-intensive product line

introduced, affecting overall efficiency.• enforced changes to raw material supply

affecting efficiency.

RESULTS: 57.9

0

50

100

150

1195 11 12

57.9 58 57.9

BASELINE YEAR 2005

Xerox (Europe) Ltd

Page 116: SEAI LIEN

114 SEAI large Industry energy network Annual Report 2011

Non Responding Members 2011

Abbott vascular devices Ireland ltd

Analog devices bv

boston scientific Ireland ltd (Clonmel)

Celtic Anglian Water

Celtic linen

Cognis Ireland ltd

College proteins Group

Covidien (mulhuddart)

diageo Ireland (Waterford)

elan pharma

eli lilly sA

Genzyme Ireland ltd

Glanbia Consumer foods ltd (Inch)

Green Isle foods (naas)

Iarnród Éireann

Irish Cement ltd

micro-bio Ireland ltd

pfizer biotechnology Ireland (shanbally)

Page 117: SEAI LIEN

SEctIoN 5 About seAI

Page 118: SEAI LIEN

116 SEAI large Industry energy network Annual Report 2011

the sustAInAble eneRGy AuthoRIty of IRelAnd, seAI, foRmeRly the IRIsh eneRGy CentRe, WAs set up by the GoveRnment In 2002 As IRelAnd’s nAtIonAl eneRGy AGenCy.

Our Mission

to play a leading role in transforming Ireland into a society based on sustainable energy structures, technologies and practices.

Our Key Strategic Objective

Energy efficiency first

Implementing strong energy efficiency actions that radically reduce energy intensity and usage.

Low carbon energy sources

Accelerating the development and adoption of technologies to exploit renewable energy sources.

Innovation and integration

supporting evidence-based responses that engage all actors, supporting innovation and enterprise for our low-carbon future.

About the sustAInAble eneRGy AuthoRIty of IRelAnd

Page 119: SEAI LIEN

Section 5 About seAI 117

Our Roles

• supporting Government decision-making through advocacy, analysis and evidence

• driving demand reduction and providing advice to all users of energy

• driving the decarbonisation of energy supply

• Raising the standards in sustainable energy products and services

• building markets based on quality, confidence and proven performance

• fostering innovation and entrepreneurship

• Improving the coherence of Irish energy research and development.

SEAI Funding

seAI is financed by Ireland’s eu structural funds programme co-funded by the Irish Government and the european union.

Page 120: SEAI LIEN

118 SEAI large Industry energy network Annual Report 2011

Members List

Abbott Ireland diagnostics division

Abbott Ireland ltd (Cootehill)

Abbott Ireland ltd (longford)

Abbott Ireland pharmaceutical operation

Abbott vascular devices Ireland ltd

Allergan pharmaceuticals ltd

Analog devices bv

Arigna fuels

Arkil ltd

Arvato digital services Ireland

Astellas Ireland Co ltd (dublin)

Astellas Ireland Co ltd (Kerry)

bank of Ireland

bausch & lomb Ireland ltd

baxter healthcare sA

bd medical

boliden tara mines limited

bord na móna energy ltd

boston scientific Ireland ltd (Clonmel)

boston scientific Ireland ltd (Cork)

boston scientific Ireland ltd (Galway)

bristol-myers squibb (Cruiserath)

bristol-myers squibb (swords)

britvic Ireland

bt

bulmers ltd

Cara partners

Carbery milk products ltd

Celtic Anglian Water

Celtic linen

CG power systems Ireland ltd

Charleville foods

CItAdel100 datacentres limited

Citi

Cognis Ireland ltd

College proteins Group

Connacht Gold ltd (shannonside)

Connolly’s Red mills

Conocophillips Whitegate Refinery ltd

Covidien (Athlone)

Covidien (mulhuddart)

Cuisine de france ltd

dairygold Co-op society

dawn meats (Grannagh)

dawn meats ltd (ballyhaunis)

depuy (Ireland) ltd

diageo bailey’s Global supply

diageo Ireland (dundalk)

diageo Ireland (Kilkenny)

diageo Ireland (st james’s Gate)

diageo Ireland (Waterford)

donegal meat processors

dublin Airport Authority

ebay/paypal

edenderry power ltd

eircom

elan pharma

eps Group

element six ltd

eli lilly sA

emC Information systems International

fournier laboratories Ireland ltd

Genzyme Ireland ltd

Glanbia ballitore

Glanbia Consumer foods ltd (Inch)

Glanbia drogheda

Glanbia Ingredients ltd (ballyragget)

Glanbia Ingredients ltd (virginia)

GlaxosmithKline ltd (Cork)

GlaxosmithKline ltd (dungarvan)

Glen dimplex

Google Ireland

Green Isle foods (Gurteen)

Green Isle foods (longford)

Green Isle foods (naas)

Green Isle foods (portumna)

Gypsum Industries ltd

helsinn birex pharmaceuticals ltd

hewlett-packard (manufacturing) ltd

hj heinz frozen & Chilled foods ltd

honeywell turbo technologies

Iarnród Éireann

Ibm

Intel Ireland ltd

Interxion Ireland ltd

Irish Cement ltd

Irish pride

janssen pharmaceutical ltd

Kepak

Kerry foods ltd (shillelagh)

Page 121: SEAI LIEN

Section 5 About seAI 119

Kerry Ingredients (Charleville)

Kerry Ingredients (listowel)

Kostal Ireland Gmbh

Kraft foods Ireland ltd (dublin)

Kraft foods Ireland ltd (Kerry)

Kraft foods Ireland production ltd (tallaght)

lakeland dairies (bailieboro)

largo foods ltd

leo pharma

liffey meats limited

lisheen mine

masonite Ireland

meadow meats

micro-bio Ireland ltd

microsoft

molex Ireland

monaghan mushrooms ltd

msd Ireland (ballydine)

msd Ireland (brinny)

msd Ireland (Carlow)

msd Ireland (Rathdrum)

msd Ireland (swords)

novartis Ringaskiddy ltd

nutricia Infant nutrition ltd

nutricia Ireland ltd

nypro ltd

organic lens manufacturing

p&G manufacturing Ireland ltd (newbridge)

p&s Civil Works ltd

pfizer (newbridge)

pfizer biotechnology (Grange Castle)

pfizer biotechnology Ireland – shanbally

pfizer drug product plant (loughbeg)

pfizer Ireland pharmaceuticals (little Island)

pfizer Ireland pharmaceuticals (Ringaskiddy)

pfizer nutritionals Ireland

premier periclase ltd

queally Group naas

quinn Cement ltd

Recordati Ireland limited

Roadstone Wood Group

Roche Ireland ltd

Rosderra Irish meats (edenderry)

Rosderra Irish meats (Roscrea)

RusAl Aughinish

sanmina-sCI

servier (Ireland) Industries limited

silver hill foods

sonoco plastics (Apt Ireland)

taconic International ltd

takeda Ireland ltd (bray)

takeda Ireland ltd (Grange Castle)

tech Group europe ltd (dublin)

tegral building products

temmler Ireland ltd

tesco Ireland ltd

teva pharmaceuticals Ireland

thermo King europe

transitions optical ltd

tyndall national Institute

uCb pharma ltd

united fish Industries ltd

vistakon Ireland

vodafone

Wellman International ltd

Western proteins

xerox (europe) ltd

Page 122: SEAI LIEN
Page 123: SEAI LIEN

11603_LIEN_Cov_LR.indd 2 23/04/2013 11:30

Page 124: SEAI LIEN

Lar

ge in

du

stry en

erg

y n

etwo

rk

An

nu

Al Repo

Rt 2011

Large industry energy networkAnnuAl RepoRt 2011

t +353 1 808 2100f +353 1 808 2002

e [email protected] www.seai.ie

Sustainable Energy Authority of IrelandWilton park House Wilton place Dublin 2 Ireland

The Sustainable Energy Authority of Ireland is partly �nanced by Ireland’s EU Structural Funds Programme co-funded by the Irish Government and the European Union.

12mm

11603_LIEN_Cov_LR.indd 1 23/04/2013 11:29