Jukka-Peka Joensuu
Sea Lion Project Update
Barents meeting
Jukka-Pekka Joensuu
Executive Vice President
15.10.2015
10/21/2015 1
Jukka-Pekka Joensuu Confidential
Finnish Government decides to invest to the future with a new 20 M€
capital injection followed by institutional investors and debt
financers for a 100 M€ transaction
2 10/21/2015
” New investments create a growth path for the Finnish and European economy”
“Increased connectivity enables new innovations and provides new opportunities
for global companies in industrial internet”
“European Commission has approved the Finnish state’s capital investment on the
Finland-Germany sea cable project”
“Wholesale: Access to the network will be offered on transparent and non-
discriminatory terms to all interested third-party operators”
Jukka-Pekka Joensuu Confidential 3 10/21/2015
Cinia Group Legal and Operational Structure
Board of Directors, Group Executive Team and Cyber Security Advisory Board
Software Services Business Line
Connectivity Services Business Line
System Services Business Line
Owners of the company: • State of Finland (government) 77,5 % -- since 2013 • Private financial investors 22,5 % -- since 2014
Key characteristics: • Over 10.000 km’s of own backbone network – additional 3.000 km’s under construction • Over 200 own professionals to build and operate nationally critical systems in open system environment • Serving many major Finnish traffic and energy distribution operators • Has a strategical ambition:
• To build and expand the Cloud Backbone to fuel the Finnish and European economy • To internationally offer system solutions created for Finnish private and public sector customers
Jukka-Pekka Joensuu Confidential
Highlights to invest in Finland and European cross border services
4 10/21/2015
Competitive advantages why investing in Finland
Legislation to reduce the energy taxes for data centers
Lower cooling-energy requirements due to the cold weather
Availability of large base of qualified human resources; both
technical and operational
Most reliable power grid in Europe and the availability of multi-
source power (fossil, hydro & nuclear)
Relatively strong international telecom connectivity infrastructure
Facilitating High speed connections enables clustered services and
new services
Cutting edge connectivity services
Highly growing hosting services market
Independent company with strong public-private ownership structure
Trusted bridge
between East and West
Strong commitment
towards privacy and
data protection
Stable political system
Clear legislative
system and transparent
telecom regulatory framework
Jukka-Pekka Joensuu Confidential 5 10/21/2015
Sea Lion Facts and Figures
• The Sea Lion, Cinia’s submarine
cable system from Helsinki in Finland
to Rostock in Germany
• 8 fiber pairs
• Total submarine cable length:
approximately 1,172 km
• 15 repeaters along the submarine
system
Jukka-Pekka Joensuu Confidential 6 10/21/2015
Sea Lion system carries 120 Terabits/seconds
• The repeatered Sea Lion system
is designed to carry
• up 15 Tb/per fiber pair equals
to 120 Terabits/seconds for
the whole system
• Using current technology the
system is capable to transport
• up to 100 wavelengths
• 100 Gb/s per wavelength
Jukka-Pekka Joensuu Confidential 7 10/21/2015
Sea Lion - shortest route from East to West
• Low latency, high quality and cyber security
• RTD
Helsinki – Frankfurt 19,36 ms
• A separate, diverse beach manhole in Rostock
• A diverse cable from BMH to backbone routes in Rostock
• Backhaul available both in Helsinki and in Rostock
Jukka-Pekka Joensuu Confidential 8 10/21/2015
Available services from the Sea Lion
• Fiber pairs (limited amount)
• Spectrums (1/3, 1/6, 1/8)
• Wavelengths
• Potential further connections:
Baltics, UK, Benelux and France,
Eastern Europe, Russia and the
planned Arctic cable
Jukka-Pekka Joensuu Confidential
Cinia and Hetzner partnership promotes the direct
connectivity and DC-to-DC market
9 10/21/2015
- German market is a very important market for Cinia
- Hetzner Online business model is a very good partnering model for Cinia
- Digital factories and high level of automization are building the winning case for the next wave of industrialisation
- SME market is playing a vital role in the Single market concept for Europe
Jukka-Pekka Joensuu Confidential
SeaLion – key dates within the next months
10 10/21/2015
• Starting date for cable laying October 12th, 2015
• Commissioning and acceptance January - February 2016
• Ready for Service estimate Q1/2016
Jukka-Pekka Joensuu Confidential 11 10/21/2015 21.10.2015 11
To Middle East and Asia
To Asia
To USA
“Global cities power the world economy”
Enabling big data, corporate customers and operators to bring connectivity and high speed services all over Europe
Establish high speed networks connecting all the major metropoles
Establish 20 Points of Presence (PoP) around Europe
To Asia
CINIA will connect
Finland to the
European Hubs and
beyond
Cinia network will extend across Europe in the future
Jukka-Pekka Joensuu Confidential
Bridging Asia and Europe with high speed networks is essential
12 10/21/2015
Aki Uljas Confidential
Jukka-Pekka Joensuu
Executive Vice President
Cinia Group Oy