SDR Forum Document Development Process. What is covered in this presentation…. Project Initiation Document Development Project Tracking Voting Rights. Project Initiation. SDR Forum Policy 002. “Projects” in the SDR Forum are Initiated through the Project Approval Committee. Partner - PowerPoint PPT Presentation

Citation preview

Page 1: SDR Forum Document Development Process

Copyright © 2008 Software Defined Radio Forum, Inc. All Rights ReservedCopyright © 2008 Software Defined Radio Forum, Inc. All Rights Reserved

SDR Forum Document Development Process

Page 2: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

What is covered in this presentation…

Project InitiationDocument DevelopmentProject TrackingVoting Rights

Page 3: SDR Forum Document Development Process

Copyright © 2008 Software Defined Radio Forum, Inc. All Rights ReservedCopyright © 2008 Software Defined Radio Forum, Inc. All Rights Reserved

Project Initiation

SDR Forum Policy 002

Page 4: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

“Projects” in the SDR Forum are Initiated through the Project Approval Committee

Regulatory Committee

Reports &Recommendations

Reports, Specifications &

Recommendations

3rd PartySpecifications &

Standards

MemberProject

Requests

Technical Committee

PartnerProject

Requests

Project Requests,Business Models,

Requirements & Use Cases

Project Approval Committee

Projects Projects Projects

PartnerProject

Requests

Reports &RecommendationsMarket Data

RegulatoryProceedings

Markets Committee

Page 5: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

Key players in the project approval process

Project Champion – Representative of a member organization who wishes to initiate a project

PAC Representative – Person on the PAC assigned to help the Project Champion in preparing the proposal and gaining approval

Page 6: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

The PAC Process Occurs in 4 StagesProposal introduction

• Champion contacts the PAC with project title and states intent to propose project.

• PAC assigns a disposition date for the proposal. • PAC assigns a representative to the proposal.

Proposal preparation • Champion prepares the proposal with the help of the

PAC representative. • All persons listed as committed contributors in the

proposal must approve it before submission. • The proposal is due to the PAC chair 2 weeks before the

disposition date. Proposal Consideration Proposal Disposition

Page 7: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

What is Considered in Evaluating a Proposal

Is the proposal well definedWhat is the expected impact of the proposed

projectWhat is the probability of successWhat will be the impact of this project on

other projects within the ForumIs there evidence of committed participation

by Forum membersIs the project relevant to the SDR Forum

Strategic Plan

Page 8: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

Proposal Distribution

PAC discusses and votes for one of the following options. • Approval • Approval contingent on specified conditions • Request for modification and resubmission • Disapproval

Two types of conditions may be attached to a contingent approval: 1. Initiation conditions – conditions that must be met

before the project can be initiated. 2. Execution conditions – conditions that must be met

during execution of the project.

Page 9: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

More Information

The PAC procedures policy can be found at: http://www.sdrforum.org/pages/aboutTheForum/PACprocedures-2008-02-07.pdf

For additional discussion, Contact John Chapin,

Chair of the SDR Forum Project Approval Committee, or Lee Pucker, CEO of the SDR Forum

Page 10: SDR Forum Document Development Process

Copyright © 2008 Software Defined Radio Forum, Inc. All Rights ReservedCopyright © 2008 Software Defined Radio Forum, Inc. All Rights Reserved

Document Development Process

SDR Forum Policy 001

Page 11: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

The Document Process Occurs in 3 stages

Work Group DevelopsProposed Document

(Minimum time 3 Weeks)

Committee BallotingAnd Approval

(Minimum Time4 Weeks)

SDR Forum BallotingAnd Approval

(Minimum Time 24 Hours)

Document Contributions

Document returned work group with comments

Key Point – the term “Work Group here refers to any individual or group developing a document for SDR Forum approval

•Work Group, Task Group, SIG, etc.

Page 12: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

Task Group Develops Document

Work Group ChairInitiates Ballot

Work Group ChairReviews Comments

Document Contributions

BallotSuccessful?

Last Call and Balloting

(3 Weeks)

If No, Document is returned to task group with comments

Document Sent to Committee

“Work Group” Develops Proposed Document

Page 13: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

SDR Forum Document TypesSpecifications (S)

• Documents designed to provide an SDRF-supported definition of a specific architectural element or interface within a software defined radio system. Specifications represent voluntary standards with respect to an SDR application or operation.

Reports (P)• Formally present the current state of some relevant topic with the Software

Defined Radio community (regulations, markets, business, etc.)Recommendations (R)

• Documents provided by the Forum to other organizations, such as the FCC or the JPEO, to provide guidelines or opinions.

Information (I) • Documents that act as inputs to the Forum from member companies or other

organizations, and may include reports, articles, specifications, etc. that are considered important to the SDR Forum and its members.

Historical (H) • Documents that have lost their value to the SDR Forum. They are documents that

were previously determined to be Specification, Reports, or Information documents.

Page 14: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

Solicited Submissions

The process supports 3 types of submission solicitations• Request for Market Information (RMI) • Request for Information (RFI) • Request for Proposal (RFP)

A Key point – RMI, RFI, and RFP’s of this type do not require full SDR Forum approval• But they do require committee approval

Page 15: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

Control Points in the Work Group Development Stage

Control Point 1• Submission is made by the Document Champion• Sponsoring “Work Group” evaluates the Submission • Submission is accepted as input in support of an approved project• Committee Chair is notified in writing

Control Point 2• Project is initiated by the Sponsor Chair• Policies and Procedures are Established • Document is “Registered” with Publications Manager• Document number “V0.2.0” assigned (used for new document)

Control Point 3• Development work complete, document is stable• Voted for promotion by the “work group” sponsoring development• Document number “0.3.0” assigned

Control Point 4• Three weeks elapsed since Last Call• “Work Group” Chair initiates ballot• Successful ballot at “work group” level• Document number “0.4.0” assigned • Document Configuration Management transferred to the Publications Manager

Page 16: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

Rights and Privileges at the Group Level

Representative of SDR Forum

Member Organizations

Non-Members

Can hold leadership position

Yes No

Can participate in meetings and discussions

Yes Yes, if invited by the group

chair

Can make input

contributions

Yes No

Can vote Yes, if meets eligibility

requirements set by the chair

No

Page 17: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

Coordination with

Committee’sChairs

Committee Chair

Initiates Ballot

Committee Chair

Reviews Comments

Proposed Document submitted to Committee Chair

BallotSuccessful?

Balloting(4 Weeks)

If No, Document is returned to work group with comments

Document Sent to SDR Forum Chair

Committee Balloting and Approval

DocumentAccepted?

Review by Committee Chair

Page 18: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

Control Points in the Committee Balloting Stage

Control Point 5• Accepted by Committee Chair• Document number “0.5.0” assigned

Control Point 6• Committee Balloting complete• Document number “0.6.0” assigned (may not have 0’s if not

a new document)• Forum Chair notified that the document is ready for Plenary

Ballot

Page 19: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

Forum Chair Reviews Comments

Forum ChairInitiates Ballot

Plenary Presentation

Document Received by Forum Chair

BallotSuccessful?

Balloting is Eligible Members Only, 1 Vote per Company

Appeals go to the board of directors, who can advance the document to an approved state, reject the document, or return it to any control point within the process

Document is Promoted to Approved

SDR Forum Balloting and Approval

Appeal??

Page 20: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

Control Points in the SDR Forum Balloting Stage

Control Point 7• Plenary Presentation made• 24 hours since Last Call• Successful Plenary ballot• Document number “1” assigned

Page 21: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

Plenary Approval Requires a “Quorum”

Section 5.6 of the bylaws states:• One-third (1/3) of the voting power of all

members shall constitute a quorum for the transaction of business at any meeting of members.

Page 22: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

Fast Track Process AllowsQuick Turn Around on Time Critical

Recommendations

Committee BallotingAnd Approval

(Minimum time unspecified)

SDR Forum Board of Directors

Balloting And Approval(Minimum time unspecified)

Document Contributions

Document returned to committee with comments

Page 23: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

Document NumbersDocument numbers will be in the following format: SDRF-YY-C-NNNN-

V.J.K.L• SDRF - The letters SDRF, a designator that this is an SDRF document number.• YY - Last two digits of the year of submission.• C - Document Category Identifier

• I Input/Information documents• R Recommendations• H Historical documents• P Reports• S Specifications

• NNNN – Document serial number, a unique number for each year assigned by the Publications Manager

• V.J.K.L - The Version number. • V = the letter V• J = 0 until the document is first released (passes control point 7); after that, it is

incremented each time is has been revised and that revision has been approved for release.

• K = the control point the document has passed• L= incremented for each new draft at the current control point• J, K, and L are separated by a decimal point (aka period). Each J, K, and L may be

single or double digits.

Page 24: SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved

Where to find out more

The document process can be found at:

http://www.sdrforum.org/pages/aboutTheForum/documentProcess.asp

For more information, please see Lee Pucker or Al Margulies