SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops
Commercial / Financial Clarifications Section 03 Engineering & Utilities
version 4 of 4 February 2015
ECOLOG
1/10
LOG # Reference (& text if
required) QUESTION REPONSE
1 PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
20 Jan 2015: Sheet4 Annex 03 Water, line 11, provide an average price of 55.71 / Cubic Meter. Please confirm the Unit of Mesure.
27 Jan 2015: Sheet4 Annex 03 Water: Please explain why for a similar project in Afghanistan, you
submitted a price of 0,85 $/Cubic Meter?
27 Jan 2015: Sheet4 Annex 03 Water: Please provide a detailed price structure of the monthly cost.
20 Jan 2015: The unit of measure is correct.
However, there was an error in the excel file.
We have corrected the PBoS and submitted
the revised price rate of 3.69 / Cubic Meter.
27 Jan 2015:
There are many factors that contribute to the
difference in pricing between this project in
Kosovo and similar operations we have with
NSPA in Afghanistan. As an example we
have highlighted below some key points:
- The Scope of the overall contracts are
different. The Kosovo Project is for 603 PAX
whereas the project we have in Afghanistan
is for 29,000 PAX. The economy of scale
benefit within the Afghanistan project is a
SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops
Commercial / Financial Clarifications Section 03 Engineering & Utilities
version 4 of 4 February 2015
ECOLOG
2/10
major driver that dictates the cost. The labor,
consumables and running costs within the
Afghanistan project are able to be spread
over a much higher volume of water
production, significantly reducing the
average price per cube of water.
- The water production process /
technology is different and has its own
associated running costs. In Kosovo an Ultra
Filtration process is utilized whereas in
Afghanistan a ROWPU system is used.
- There are further differences between the projects which would affect the
overall pricing, however we feel that
considering the above points and the
overall pricing for Services Section
03, the total pricing offered for all
services is fair and competitive and
reflects the quality of service that
SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops
Commercial / Financial Clarifications Section 03 Engineering & Utilities
version 4 of 4 February 2015
ECOLOG
3/10
Ecolog can bring to NSPA at CNS.
27 Jan 2015:
Please note the attached detailed structure
Sheet4 Annex 03 Water CLIN 0018.
2
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
27 Jan 2015: Sheet4 Annex 03 Water CLIN 0017: Please provide a detailed price structure of the
monthly cost.
27 Jan 2015: Please note the attached
detailed structure Sheet4 Annex 03
Water CLIN 0017.
3
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
27 Jan 2015: Sheet4 Annex 03 Water CLIN 0020: Please provide a detailed price structure of the
monthly cost (in reference to note 12: A Pipe repair is deemed to include all materials and associated labor up to a 6m length of pipe (inclusive of any bends, elbows and Tee joints), up to FOUR couplings to existing undamaged pipe, all intermediate pipe joints of any bends, elbows and Tee joints, reconnection of any service take offs within the damaged section being replaced and all ground works required to exposed the pipe, ground works to reinstate the completed works (to original levels and surface type), all investigative works to find the fault, and all
27 Jan 2015: Please note the attached
detailed structure Sheet4 Annex 03
Water CLIN 0020. The figure we put in is for 10 occurances.
The Unit Cost per Each is the devision of
1049.69 euro by 10 = 104.97 euro per Each.
We have corrected the the PBoS to reflect
this Unit of Measure.
SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops
Commercial / Financial Clarifications Section 03 Engineering & Utilities
version 4 of 4 February 2015
ECOLOG
4/10
pumping activities to drain the site and remove leaking liquid. Removal of replaced material from site. Pipe Line repairs will be only be billed as actual occurrences. The estimated Qty is for evaluation purposes only.)
4
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
27 Jan 2015: Sheet4 Annex 03 Water CLIN 0021: Please provide a detailed price structure of the
monthly cost of 2,462.43 (1st year) and explain why it is double the price of CLIN 0020?
27 Jan 2015: Please note the attached
detailed structure Sheet4 Annex 03
Water CLIN 0021. The extra cost is the remediation costs to
remove any spilled effluent from immediate
area.
5
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
27 Jan 2015: Sheet4 Annex 03 Water CLIN 0023: Please provide a detailed price structure of the
monthly cost.
27 Jan 2015: Please note the attached
detailed structure Sheet4 Annex 03
Water CLIN 0023.
6
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS
27 Jan 2015: Sheet2 Annex 01 Power CLIN 0001 & 0002: Please provide a detailed price structure of
the monthly cost for the operation and maintenance of
the 2 power plants?
27 Jan 2015: Please note the attached
detailed structure Sheet2 Annex 01
Power CLIN 0001 & 0002.
SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops
Commercial / Financial Clarifications Section 03 Engineering & Utilities
version 4 of 4 February 2015
ECOLOG
5/10
_15Nov14v2_2 ECOLOG
7
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
27 Jan 2015: Sheet2 Annex 01 Power CLIN 0005 : Please provide a detailed price structure of the
monthly cost.
27 Jan 2015: Please note the attached
detailed structure Sheet2 Annex 01
Power CLIN 0005.
8
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
27 Jan 2015: Sheet2 Annex 01 Power CLIN 0006 : Please provide a detailed price structure of the
monthly cost.
27 Jan 2015: Please note the attached
detailed structure Sheet2 Annex 01
Power CLIN 0006.
9
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
27 Jan 2015: Sheet2 Annex 01 Power CLIN 0009 : Please provide a detailed price structure of the
monthly cost. Please confirm your understanding the
unit of measure is Each.
27 Jan 2015: Costs are for the total of 35
single phase meters and not each. Based on
our interpretation of the drawings and site
layout and usage, we calculated that there
was only 35 meters required, and not the 40
that was asked for on PBoS. We corrected
the calculation to reflect Price Per Each as
stipulated on the PBoS.
SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops
Commercial / Financial Clarifications Section 03 Engineering & Utilities
version 4 of 4 February 2015
ECOLOG
6/10
10
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
27 Jan 2015: Sheet2 Annex 01 Power CLIN 0010 : Please provide a detailed price structure of the
monthly cost. Please confirm your understanding the
unit of measure is Each.
27 Jan 2015: Costs are for the total of 10
three phase meters and not each. Based on
our interpretation of the drawings and site
layout and usage, we calculated that there
was only 10 meters required, and not the 40
that was asked for on PBoS. We corrected
the calculation to reflect Price Per Each as
stipulated on the PBoS.
11
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
27 Jan 2015: Sheet2 Annex 01 Power CLIN 0011 : Please provide a detailed price structure of the
monthly cost. Please confirm your understanding the
unit of measure is Each per Month.
27 Jan 2015: Please note attached Detailed Structure.
We incorrectly inserted costs are for the
whole service for 12 months period by error.
Corrected calculation per Each per Month is
Total Cost divided by 12 months divided by
80 meters. The base Unit Price remains
unchanged. We have corrected the PBoS to
reflect requested Unit of Measure.
12 PBoS 06-04_RFP_SDB140008_Exhibit_
27 Jan 2015: Sheet5 Annex 04 Waste CLIN 0029 : Please provide a detailed price structure of the
monthly cost. Please confirm your understanding the
We confirm our understanding that the unit
of measure is Litre. At present, the costs
include collection and storage on site,
SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops
Commercial / Financial Clarifications Section 03 Engineering & Utilities
version 4 of 4 February 2015
ECOLOG
7/10
I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
unit of mesure is Litre. transport to out of country to a licensed Hazardous Waste Treatment/Disposal Site.
If, upon contract award/post contract award,
we are able to find local Kosovar enterprise
that can use them as a fuel or recycling
product, then costs will be adjusted
accordingly and any cost savings will be
passed back to NATO.
13
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
27 Jan 2015: Sheet9 Assets: #0001 please explain
what is thgis screen unit in power? Screening Unit is a to remove large foreign
object from the waste water influent prior to
entering the treatment. This asset is to
replace the incumbents asset as it is not within RUTA.
This asset should have been listed under the
Annex-03 Water and Waste Water
Management section, which we have
corrected it and attached the lasted PBoS
14 PBoS 06-04_RFP_SDB140008_Exhibit_
27 Jan 2015: Sheet9 Assets: Which line include the
vehicles (if any)? Please provide details. On the assets sheets, the vehicles do not
appear as we intend to utilize second hand
stock which we anticipate to cost less than
SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops
Commercial / Financial Clarifications Section 03 Engineering & Utilities
version 4 of 4 February 2015
ECOLOG
8/10
I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
5000 euro cut off point.
Any vehicles added with a >= value of 5K
will be added to the asset list.
15
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
27 Jan 2015: Sheet9 Assets: Which line include the
water test lab (if any)? Please provide details.
3 Feb 2015: Please provide an optional cost if there is
a need to procure it. What then will be the cost
impact in CLIN 0017A
Our understanding is that the water testing
lab is integral part of the Water Treatment
Unit/Facility which is within RUTA.
Therefore, it will not show within the assets
list.
3 Feb 2015: Please note the optional costs
for provision of a Water Test Lab below.
To provide, deliver and install unit, assuming
power, water and sewage connections at no
cost
The cost impact on CLIN 0017A will be
18,495.00.
16 PBoS 06- 27 Jan 2015: Sheet9 Assets: Which line include the Spares for Water Filtration unit are not
SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops
Commercial / Financial Clarifications Section 03 Engineering & Utilities
version 4 of 4 February 2015
ECOLOG
9/10
04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
spare for the water filtration unit (if any)? Please
provide details. included within the asset sheet. However, we
have taken into account all costs for the
replacement of membrane elements.
17
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
3 Feb 2015: Sheet 4 CLIN 0025: How come the figure of 470,180.63 while the value of this equipment in Sheet9 Assets give a value of 502,200.00 .
3 Feb 2015: We assume you mean to refer here to Sheet4 CLIN 0022. If thats the case, the cost of this asset in Sheet 9 Assets (all assets combined for this service) should in fact reflect the total cost listed in the Sheet4 Annex 03 Water CLIN 0022. We have corrected the PBoS to reflect this correction.
18
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
3 Feb 2015: Sheet2 Annex 01 Power CLIN 0001 & 0002:
1. Please confirm your monthly are including all cost and anticipate sufficient worforce, consumable, equipment and spare to provide requested service.
2. Should the contract awarded, please confirm that
1) Confirmed. No additional costs will be charged.
2) Confirmed. No additional cost will be charged to NSPA if additional staff or equipment or consumable or spare
SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops
Commercial / Financial Clarifications Section 03 Engineering & Utilities
version 4 of 4 February 2015
ECOLOG
10/10
no additional cost will be charged to NSPA if additional staff or equipment or consumable or spare (below agreed threshold) are needed.
(below agreed threshold) are needed.
19
PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG
4 Feb 2015: Sheet 5 Waste CLIN 0026 to CLIN 0029: Please confirm that the prices of CLIN 0026 to CLIN 0029 are applicable for both IRL (200 and 500). If not, please provide what will be the difference.
Confirmed. Prices of CLIN 0026 thru 0029 are applicable for both IRLs (200 and 500 euro).
20
21
22