SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops Commercial / Financial – Clarifications – Section 03 Engineering & Utilities version 4 of 4 February 2015 ECOLOG 1/10 LOG # Reference (& text if required) QUESTION REPONSE 1 PBoS 06- 04_RFP_SDB140008_Exhibit_ I_-_Part_2C_- CNS_Engineer_Utilities_PBoS _15Nov14v2_2 ECOLOG 20 Jan 2015: Sheet4 Annex 03 Water, line 11, provide an average price of 55.71 €/ Cubic Meter. Please confirm the Unit of Mesure. 27 Jan 2015: Sheet4 Annex 03 Water: Please explain why for a similar project in Afghanistan, you submitted a price of 0,85 $/Cubic Meter? 27 Jan 2015: Sheet4 Annex 03 Water: Please provide a detailed price structure of the monthly cost. 20 Jan 2015: The unit of measure is correct. However, there was an error in the excel file. We have corrected the PBoS and submitted the revised price rate of 3.69 €/ Cubic Meter. 27 Jan 2015: There are many factors that contribute to the difference in pricing between this project in Kosovo and similar operations we have with NSPA in Afghanistan. As an example we have highlighted below some key points: - The Scope of the overall contracts are different. The Kosovo Project is for 603 PAX whereas the project we have in Afghanistan is for 29,000 PAX. The economy of scale benefit within the Afghanistan project is a

SDB140008 Clarifications Commercial - Financial Eng Ecolog v4 of 4 February 2015 Original Answer

Embed Size (px)

DESCRIPTION

generator

Citation preview

  • SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops

    Commercial / Financial Clarifications Section 03 Engineering & Utilities

    version 4 of 4 February 2015

    ECOLOG

    1/10

    LOG # Reference (& text if

    required) QUESTION REPONSE

    1 PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    20 Jan 2015: Sheet4 Annex 03 Water, line 11, provide an average price of 55.71 / Cubic Meter. Please confirm the Unit of Mesure.

    27 Jan 2015: Sheet4 Annex 03 Water: Please explain why for a similar project in Afghanistan, you

    submitted a price of 0,85 $/Cubic Meter?

    27 Jan 2015: Sheet4 Annex 03 Water: Please provide a detailed price structure of the monthly cost.

    20 Jan 2015: The unit of measure is correct.

    However, there was an error in the excel file.

    We have corrected the PBoS and submitted

    the revised price rate of 3.69 / Cubic Meter.

    27 Jan 2015:

    There are many factors that contribute to the

    difference in pricing between this project in

    Kosovo and similar operations we have with

    NSPA in Afghanistan. As an example we

    have highlighted below some key points:

    - The Scope of the overall contracts are

    different. The Kosovo Project is for 603 PAX

    whereas the project we have in Afghanistan

    is for 29,000 PAX. The economy of scale

    benefit within the Afghanistan project is a

  • SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops

    Commercial / Financial Clarifications Section 03 Engineering & Utilities

    version 4 of 4 February 2015

    ECOLOG

    2/10

    major driver that dictates the cost. The labor,

    consumables and running costs within the

    Afghanistan project are able to be spread

    over a much higher volume of water

    production, significantly reducing the

    average price per cube of water.

    - The water production process /

    technology is different and has its own

    associated running costs. In Kosovo an Ultra

    Filtration process is utilized whereas in

    Afghanistan a ROWPU system is used.

    - There are further differences between the projects which would affect the

    overall pricing, however we feel that

    considering the above points and the

    overall pricing for Services Section

    03, the total pricing offered for all

    services is fair and competitive and

    reflects the quality of service that

  • SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops

    Commercial / Financial Clarifications Section 03 Engineering & Utilities

    version 4 of 4 February 2015

    ECOLOG

    3/10

    Ecolog can bring to NSPA at CNS.

    27 Jan 2015:

    Please note the attached detailed structure

    Sheet4 Annex 03 Water CLIN 0018.

    2

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    27 Jan 2015: Sheet4 Annex 03 Water CLIN 0017: Please provide a detailed price structure of the

    monthly cost.

    27 Jan 2015: Please note the attached

    detailed structure Sheet4 Annex 03

    Water CLIN 0017.

    3

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    27 Jan 2015: Sheet4 Annex 03 Water CLIN 0020: Please provide a detailed price structure of the

    monthly cost (in reference to note 12: A Pipe repair is deemed to include all materials and associated labor up to a 6m length of pipe (inclusive of any bends, elbows and Tee joints), up to FOUR couplings to existing undamaged pipe, all intermediate pipe joints of any bends, elbows and Tee joints, reconnection of any service take offs within the damaged section being replaced and all ground works required to exposed the pipe, ground works to reinstate the completed works (to original levels and surface type), all investigative works to find the fault, and all

    27 Jan 2015: Please note the attached

    detailed structure Sheet4 Annex 03

    Water CLIN 0020. The figure we put in is for 10 occurances.

    The Unit Cost per Each is the devision of

    1049.69 euro by 10 = 104.97 euro per Each.

    We have corrected the the PBoS to reflect

    this Unit of Measure.

  • SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops

    Commercial / Financial Clarifications Section 03 Engineering & Utilities

    version 4 of 4 February 2015

    ECOLOG

    4/10

    pumping activities to drain the site and remove leaking liquid. Removal of replaced material from site. Pipe Line repairs will be only be billed as actual occurrences. The estimated Qty is for evaluation purposes only.)

    4

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    27 Jan 2015: Sheet4 Annex 03 Water CLIN 0021: Please provide a detailed price structure of the

    monthly cost of 2,462.43 (1st year) and explain why it is double the price of CLIN 0020?

    27 Jan 2015: Please note the attached

    detailed structure Sheet4 Annex 03

    Water CLIN 0021. The extra cost is the remediation costs to

    remove any spilled effluent from immediate

    area.

    5

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    27 Jan 2015: Sheet4 Annex 03 Water CLIN 0023: Please provide a detailed price structure of the

    monthly cost.

    27 Jan 2015: Please note the attached

    detailed structure Sheet4 Annex 03

    Water CLIN 0023.

    6

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS

    27 Jan 2015: Sheet2 Annex 01 Power CLIN 0001 & 0002: Please provide a detailed price structure of

    the monthly cost for the operation and maintenance of

    the 2 power plants?

    27 Jan 2015: Please note the attached

    detailed structure Sheet2 Annex 01

    Power CLIN 0001 & 0002.

  • SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops

    Commercial / Financial Clarifications Section 03 Engineering & Utilities

    version 4 of 4 February 2015

    ECOLOG

    5/10

    _15Nov14v2_2 ECOLOG

    7

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    27 Jan 2015: Sheet2 Annex 01 Power CLIN 0005 : Please provide a detailed price structure of the

    monthly cost.

    27 Jan 2015: Please note the attached

    detailed structure Sheet2 Annex 01

    Power CLIN 0005.

    8

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    27 Jan 2015: Sheet2 Annex 01 Power CLIN 0006 : Please provide a detailed price structure of the

    monthly cost.

    27 Jan 2015: Please note the attached

    detailed structure Sheet2 Annex 01

    Power CLIN 0006.

    9

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    27 Jan 2015: Sheet2 Annex 01 Power CLIN 0009 : Please provide a detailed price structure of the

    monthly cost. Please confirm your understanding the

    unit of measure is Each.

    27 Jan 2015: Costs are for the total of 35

    single phase meters and not each. Based on

    our interpretation of the drawings and site

    layout and usage, we calculated that there

    was only 35 meters required, and not the 40

    that was asked for on PBoS. We corrected

    the calculation to reflect Price Per Each as

    stipulated on the PBoS.

  • SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops

    Commercial / Financial Clarifications Section 03 Engineering & Utilities

    version 4 of 4 February 2015

    ECOLOG

    6/10

    10

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    27 Jan 2015: Sheet2 Annex 01 Power CLIN 0010 : Please provide a detailed price structure of the

    monthly cost. Please confirm your understanding the

    unit of measure is Each.

    27 Jan 2015: Costs are for the total of 10

    three phase meters and not each. Based on

    our interpretation of the drawings and site

    layout and usage, we calculated that there

    was only 10 meters required, and not the 40

    that was asked for on PBoS. We corrected

    the calculation to reflect Price Per Each as

    stipulated on the PBoS.

    11

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    27 Jan 2015: Sheet2 Annex 01 Power CLIN 0011 : Please provide a detailed price structure of the

    monthly cost. Please confirm your understanding the

    unit of measure is Each per Month.

    27 Jan 2015: Please note attached Detailed Structure.

    We incorrectly inserted costs are for the

    whole service for 12 months period by error.

    Corrected calculation per Each per Month is

    Total Cost divided by 12 months divided by

    80 meters. The base Unit Price remains

    unchanged. We have corrected the PBoS to

    reflect requested Unit of Measure.

    12 PBoS 06-04_RFP_SDB140008_Exhibit_

    27 Jan 2015: Sheet5 Annex 04 Waste CLIN 0029 : Please provide a detailed price structure of the

    monthly cost. Please confirm your understanding the

    We confirm our understanding that the unit

    of measure is Litre. At present, the costs

    include collection and storage on site,

  • SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops

    Commercial / Financial Clarifications Section 03 Engineering & Utilities

    version 4 of 4 February 2015

    ECOLOG

    7/10

    I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    unit of mesure is Litre. transport to out of country to a licensed Hazardous Waste Treatment/Disposal Site.

    If, upon contract award/post contract award,

    we are able to find local Kosovar enterprise

    that can use them as a fuel or recycling

    product, then costs will be adjusted

    accordingly and any cost savings will be

    passed back to NATO.

    13

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    27 Jan 2015: Sheet9 Assets: #0001 please explain

    what is thgis screen unit in power? Screening Unit is a to remove large foreign

    object from the waste water influent prior to

    entering the treatment. This asset is to

    replace the incumbents asset as it is not within RUTA.

    This asset should have been listed under the

    Annex-03 Water and Waste Water

    Management section, which we have

    corrected it and attached the lasted PBoS

    14 PBoS 06-04_RFP_SDB140008_Exhibit_

    27 Jan 2015: Sheet9 Assets: Which line include the

    vehicles (if any)? Please provide details. On the assets sheets, the vehicles do not

    appear as we intend to utilize second hand

    stock which we anticipate to cost less than

  • SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops

    Commercial / Financial Clarifications Section 03 Engineering & Utilities

    version 4 of 4 February 2015

    ECOLOG

    8/10

    I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    5000 euro cut off point.

    Any vehicles added with a >= value of 5K

    will be added to the asset list.

    15

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    27 Jan 2015: Sheet9 Assets: Which line include the

    water test lab (if any)? Please provide details.

    3 Feb 2015: Please provide an optional cost if there is

    a need to procure it. What then will be the cost

    impact in CLIN 0017A

    Our understanding is that the water testing

    lab is integral part of the Water Treatment

    Unit/Facility which is within RUTA.

    Therefore, it will not show within the assets

    list.

    3 Feb 2015: Please note the optional costs

    for provision of a Water Test Lab below.

    To provide, deliver and install unit, assuming

    power, water and sewage connections at no

    cost

    The cost impact on CLIN 0017A will be

    18,495.00.

    16 PBoS 06- 27 Jan 2015: Sheet9 Assets: Which line include the Spares for Water Filtration unit are not

  • SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops

    Commercial / Financial Clarifications Section 03 Engineering & Utilities

    version 4 of 4 February 2015

    ECOLOG

    9/10

    04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    spare for the water filtration unit (if any)? Please

    provide details. included within the asset sheet. However, we

    have taken into account all costs for the

    replacement of membrane elements.

    17

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    3 Feb 2015: Sheet 4 CLIN 0025: How come the figure of 470,180.63 while the value of this equipment in Sheet9 Assets give a value of 502,200.00 .

    3 Feb 2015: We assume you mean to refer here to Sheet4 CLIN 0022. If thats the case, the cost of this asset in Sheet 9 Assets (all assets combined for this service) should in fact reflect the total cost listed in the Sheet4 Annex 03 Water CLIN 0022. We have corrected the PBoS to reflect this correction.

    18

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    3 Feb 2015: Sheet2 Annex 01 Power CLIN 0001 & 0002:

    1. Please confirm your monthly are including all cost and anticipate sufficient worforce, consumable, equipment and spare to provide requested service.

    2. Should the contract awarded, please confirm that

    1) Confirmed. No additional costs will be charged.

    2) Confirmed. No additional cost will be charged to NSPA if additional staff or equipment or consumable or spare

  • SDB140008 : The provision of an Integrated Logistics Support at Camp Novo Selo (Kosovo) in support of KFOR troops

    Commercial / Financial Clarifications Section 03 Engineering & Utilities

    version 4 of 4 February 2015

    ECOLOG

    10/10

    no additional cost will be charged to NSPA if additional staff or equipment or consumable or spare (below agreed threshold) are needed.

    (below agreed threshold) are needed.

    19

    PBoS 06-04_RFP_SDB140008_Exhibit_I_-_Part_2C_-CNS_Engineer_Utilities_PBoS_15Nov14v2_2 ECOLOG

    4 Feb 2015: Sheet 5 Waste CLIN 0026 to CLIN 0029: Please confirm that the prices of CLIN 0026 to CLIN 0029 are applicable for both IRL (200 and 500). If not, please provide what will be the difference.

    Confirmed. Prices of CLIN 0026 thru 0029 are applicable for both IRLs (200 and 500 euro).