Paradise UnifiedSchool DistrictMaster Plan – Board Presentation April 25, 2018
Paradise Unified School District Master Plan – Board Presentation
Agenda
1. Overview of the Master Plan Process to Date
2. District Wide Priorities
3. District Wide Phasing by Project Priority
4. Project Phasing at each Campus
5. Schedule Moving Forward
Paradise Unified School District Master Plan – Board Presentation
Overview of the Process to Date
1. Facilities Conditions Assessment July 2017• BCA and their consultants visited all PUSD
campuses and develop a conditions report cataloging the current conditions of the campuses
2. Visionary Meeting August 2017• BCA hosted a Visionary Meeting with members of
PUSD and the public to address the needs of the District long term
3. Facilities Planning Advisory Committee Meetings September – January 2018• BCA met with members of the PUSD FPAC to
develop the master plan goals and priorities
4. Technology Task Force Meeting February 2018• BCA hosted the technology task force at PUSD to
review priorities for technology and furniture in 21st Century Classroom and Specialty Spaces
5. Board Review and Approval March - June 2018• BCA will present, incorporate comments and seek
approval of the Board of Trustees
Paradise Unified School District Master Plan – Board Presentation
District Wide Priorities
Priority 1: Complete the PHS Gym, Demonstration Classrooms (PHS & PINT), Stadium Improvements at PHS, PHS Science Labs, Begin PHS CTE Program improvements, Safety Improvements at all sites
Priority 2: Code and Health Improvements at all remaining Campuses (Roofing, Painting, HVAC, Asphalt Repair, etc.), Begin 21st Century Classroom Improvements at all Campuses, New and Modernized Facilities at Paradise ES, Develop additional robust CTE programs at Paradise HS
Priority 3: Complete 21st Century Classroom Improvements at all Campuses, Create equity amongst STEAM and Learning Commons at all campuses
Future Priorities (Unfunded): Portable to Permanent initiatives at those campuses that have portable facilities (Ridgeview to be addressed in Priority 1)
Paradise Unified School District Master Plan – Board Presentation
District Wide Phasing by Project Priority
*The estimates above are conceptual estimates – project cost are subject to change as additional information is gathered.
Paradise Unified School District Master Plan – Board Presentation
1. LED Device(s)/ Site to
Stand Furnishings
2. Interactive Projector(s)
3. Floor to Ceiling
Magnetic/ Dry Erase Wall
4. Custom AV Control
5. Agile Furniture
6. Soft Seating
7. Mobile Storage
8. New Flooring
1
23
4
5
6
7
8
21st Century Demonstration Classrooms
Planned at PHS and PINT campuses:
*Approximately $80,000 to be utilized to create demonstration classrooms at PHS and PINT.
Paradise Unified School District Master Plan – Board Presentation
Cedarwood Elementary School
*The estimates above are conceptual estimates – project cost are subject to change as additional information is gathered.
Paradise Unified School District Master Plan – Board Presentation
Phase 3 Projects (2025)Learning Resource Center RemodelNew STEAM Lab Facility
Cedarwood Elementary School
Phase 2 Projects (2022)Site Accessibility UpgradesRepaint SchoolRoof ReplacementHVAC Equipment Upgrades
Phase 1 Projects (2019)Site Safety/Security
Future Projects (2028)Non-Permanent Building Replacement (includes Admin)
N
Paradise Unified School District Master Plan – Board Presentation
Paradise Elementary School
*The estimates above are conceptual estimates – project cost are subject to change as additional information is gathered.
Paradise Unified School District Master Plan – Board Presentation
Paradise Elementary School
Phase 3 Projects (2025)Permanent Classroom 21st Century UpgradesAccommodate Honey Run ProgramSite Accessibility Upgrades
Phase 1 Projects (2019)Site Safety/Security
Phase 2 Projects (2022)New Administration, Multipurpose, Learning Resource Center, and STEAM buildingPermanent Classroom 21st Century UpgradesSite Accessibility Upgrades
N
Future Projects• None
Paradise Unified School District Master Plan – Board Presentation
Pine Ridge Elementary School
*The estimates above are conceptual estimates – project cost are subject to change as additional information is gathered.
Paradise Unified School District Master Plan – Board Presentation
Phase 2 Projects (2022)Site Accessibility UpgradesAsphalt ReplacementRepaint SchoolRoof ReplacementRestroom UpgradesGutter / Downspout RelocationPermanent Classroom 21st Century Upgrades
Pine Ridge Elementary School
Phase 3 Projects (2025)Learning Resource Center RemodelSTEAM Lab RemodelPermanent Classroom 21st Century Upgrades
Future Projects Non-Permanent Building ReplacementN
Phase 1 Projects (2019)Site Safety / Security
Paradise Unified School District Master Plan – Board Presentation
Ponderosa Elementary School
*The estimates above are conceptual estimates – project cost are subject to change as additional information is gathered.
Paradise Unified School District Master Plan – Board Presentation
Phase 3 Projects (2025)AB300 Seismic MitigationHVAC Equipment UpgradesLearning Resource Center RemodelSTEAM Lab RemodelPermanent Classroom 21st Century Upgrades
Ponderosa Elementary School
Phase 2 Projects (2022)AB300 Seismic MitigationSite Accessibility UpgradesRepaint SchoolRestroom UpgradesCafeteria UpgradeHVAC Equipment UpgradesPermanent Classroom 21st Century Upgrades
Future ProjectsNon-Permanent Building Replacement
N
Phase 1 Projects (2019)Site Safety / Security
Paradise Unified School District Master Plan – Board Presentation
Paradise Intermediate School
*The estimates above are conceptual estimates – project cost are subject to change as additional information is gathered.
Paradise Unified School District Master Plan – Board Presentation
Future ProjectsNon-Permanent Building Replacement
Phase 3 Projects (2025)HVAC Equipment UpgradesStudent Hub / Teacher Resource RemodelLearning Resource Center RemodelSTEAM Lab RemodelPermanent Classroom 21st Century Upgrades
Paradise Intermediate School
Phase 1 Projects (2019)Demonstration Classroom – Room 206Site Safety / Security
Phase 2 Projects (2022)Site Drainage RepairsSite Accessibility UpgradesAsphalt ReplacementRepaint SchoolHVAC Equipment UpgradesRestroom UpgradesStudent Hub / Teacher Resource RemodelPermanent Classroom 21st Century Upgrades
Future ProjectsNon-Permanent Building Replacement N
Paradise Unified School District Master Plan – Board Presentation
Paradise High School
*The estimates above are conceptual estimates – project cost are subject to change as additional information is gathered.
Paradise Unified School District Master Plan – Board Presentation
Phase 2 Projects (2022)Site Drainage RepairsSite Accessibility UpgradesAsphalt ReplacementRestroom and Locker Room UpgradesSite PaintingHVAC Equipment UpgradesAB300 Seismic MitigationCTE Program ImprovementsPermanent Classroom/ AP Lab 21st Century Upgrades
Paradise High School
Phase 1 Projects (2019)Demonstration Classroom – Room 506Site Safety / SecurityScience Lab RemodelCTE Program ImprovementsAB300 Seismic MitigationStadium Improvements (Bleachers, Lighting, Turf, Support Bldgs., and ADA Restrooms)Field Improvements (Baseball / Softball Lighting, Softball dugouts, and ADA Restrooms)
Phase 3 Projects (2025)HVAC Equipment UpgradesLearning Resource Center RemodelPermanent Classroom 21st Century Upgrades
N
Paradise Unified School District Master Plan – Board Presentation
Paradise High School (Stadium Improvements)
*The estimates above are conceptual estimates based upon work completed at Summerville HS in 2014 – project cost are subject to change as additional information is gathered.
Paradise Unified School District Master Plan – Board Presentation
Ridgeview High School
*The estimates above are conceptual estimates – project cost are subject to change as additional information is gathered.
Paradise Unified School District Master Plan – Board Presentation
Phase 3 Projects (2025)Non-Permanent Building Replacement
Phase 2 Projects (2022)Permanent Classroom 21st Century Upgrades
Phase 1 Projects (2019)Site Accessibility UpgradesAB300 Seismic MitigationSite Safety / SecurityAsphalt ReplacementSite PaintingPermanent Classroom 21st Century Upgrades
Ridgeview High School
N
Paradise Unified School District Master Plan – Board Presentation
Schedule Moving Forward
Seek Approval of the Master Plan May/ June 2018Pilot Classroom Construction Summer 2018Bond Measure Ballot November 2018Construction Delivery Selection Dec 2018 – January 2019Phase 1 Bond Sale February 2019Construction of Gym Begins March 2019Phase 1 Project Implementation March – October 2019 Phase 1 Agency Approval Nov 2019 – March 2020Phase 1 Bidding April – May 2020Phase 1 Construction Begins June 2020
*Subsequent phase implementation will begin in 2022 and 2025 respectively
Paradise Unified School District Master Plan – Board Presentation
Q&ABrian Whitmore, AIA, LEED [email protected] 916-254-5602 President
Michele Gargano, AIA, LEED [email protected] 916-254-5609Educational Client Leader