PROJECT : GROUND + ONE VILLA AREA: AL BARSHA THIR PLANNED COMPLETION DATE: 31/01/2014 DETAILS OF CONNECTED LOAD / MAX. DEMAND PLOT NO.: 375-1327 DB-REF : SUMMARY OWNER: TARIQ MAKKI HASSAN MOHD. BAHARNA PANEL LOCATION: FEED FROM : INCOMER CIRCUIT/ RATING-AMPS FAULT PVC/ LENGTH CA.SIZE ECC CONNECTED LOAD-KW PROPOSED KWH METE FEEDER SP TP ACB DUTY XLPE OF CABLE 2/3/4C SIZE R-PH Y-PH B-PH TOTAL 1-PH 3-PH DB.NO. D/O Type MCCB MCB KA SWA/PVC IN METER mm 1Cmm KW KW KW KW {1} {2} INCOMER TP 54,036 53,186 56,086 163,308 OUTGOINGS M.CAB TP 300 35 BY DEWA 1CX120 54,036 53,186 56,086 163,308 MDB CONNECTED TO :TRANSF. DB CONNECTED TO MDB TOTAL CONNECTED LOAD PER PHASE 54,036 53,186 56,086 163,308 MAX. DEMAND (3 PH): ### KW AT 85% DIVERSITY TOTAL CONNECTED LOAD (3PH) 163,308 Exist A/C No. CONTRACTOR:EMIRATE COAST CONTRACTING CO.L.L.C PROVIDE CT-METER WHEN MAX.DEMAND>100 KW. TELEPHONE:04-2976964 FAX:04-2976963 (1) 20-80A (2) 30-90/120A (3) 100-160A (4) 2400/5A

Schedule 22-09-2014 Final Without Spare Load

Embed Size (px)

DESCRIPTION

Schedule 2

Citation preview

Page 1: Schedule 22-09-2014 Final Without Spare Load

PROJECT : GROUND + ONE VILLA AREA: AL BARSHA THIRD

PLANNED COMPLETION DATE: 31/01/2014 DETAILS OF CONNECTED LOAD / MAX. DEMAND PLOT NO.: 375-1327DB-REF : SUMMARY OWNER: TARIQ MAKKI HASSAN MOHD. BAHARNA PANEL LOCATION: BOUNDRY WALLFEED FROM : INCOMER

CIRCUIT/ RATING-AMPS FAULT PVC/ LENGTH CA.SIZE ECC CONNECTED LOAD-KW PROPOSED KWH METERING

FEEDER SP TP ACB DUTY XLPE OF CABLE 2/3/4C SIZE R-PH Y-PH B-PH TOTAL 1-PH 3-PH 3-PH CT REMARKS

DB.NO. D/O Type MCCB MCB KA SWA/PVC IN METER mm 1Cmm KW KW KW KW {1} {2} {3} {4}

INCOMER TP 54,036 53,186 56,086 163,308

OUTGOINGS

M.CAB TP 300 35 BY DEWA 1CX120 54,036 53,186 56,086 163,308 1 300/5A CT METER

MDB CONNECTED TO :TRANSF.

DB CONNECTED TO MDB TOTAL CONNECTED LOAD PER PHASE 54,036 53,186 56,086 163,308 1

MAX. DEMAND (3 PH): 138,812 KW AT 85% DIVERSITY TOTAL CONNECTED LOAD (3PH) 163,308 kwExist A/C No. : 521-01086-1

CONTRACTOR:EMIRATE COAST CONTRACTING CO.L.L.C PROVIDE CT-METER WHEN MAX.DEMAND>100 KW.

TELEPHONE:04-2976964

FAX:04-2976963 (1) 20-80A (2) 30-90/120A (3) 100-160A (4) 2400/5A

Page 2: Schedule 22-09-2014 Final Without Spare Load

PROJECT : GROUND + ONE VILLA AREA: AL BARSHA THIRD

PLANNED COMPLETION DATE:31/01/2014 DETAILS OF CONNECTED LOAD / MAX. DEMAND PLOT NO.: 375-1327DB-REF : MDB OWNER: TARIQ MAKKI HASSAN MOHD. BAHARNA PANEL LOCATION: BOUNDRY WALLFEED FROM : INCOMER

CIRCUIT/ RATING-AMPS FAULT PVC/ LENGTH CA.SIZE ECC CONNECTED LOAD-KW PROPOSED KWH METERING

FEEDER SP TP ACB DUTY XLPE OF CABLE 2/3/4C SIZE R-PH Y-PH B-PH TOTAL 1-PH 3-PH 3-PH CT REMARKS

DB.NO. D/O Type MCCB MCB KA SWA/PVC IN METER mm 1Cmm KW KW KW KW {1} {2} {3} {4}

INCOMER TP 35 XLPE 4Cx240 1CX120 54,036 53,186 56,086 163,308

OUTGOINGS

DB-GF TP 125 25 XLPE 4CX50 1CX25 20,536 17,916 20,616 59,068

DB-FF TP 160 25 XLPE 4CX70 1CX35 24,900 24,020 26,070 74,990

DB-KIT&DRIVER TP 40 25 XLPE 4CX16 1CX16 3,650 3,800 3,650 11,100

DB-PR&S. BLK TP 40 25 XLPE 4CX16 1CX16 4,150 3,750 5,250 13,150

DB-W.M ROOM TP 32 25 XLPE 4CX10 1CX10 800 3,700 500 5,000

MDB CONNECTED TO :TRANSF.

DB CONNECTED TO MDB TOTAL CONNECTED LOAD PER PHASE 54,036 53,186 56,086 163,308

MAX. DEMAND (3 PH): 138,812 KW AT 85% DIVERSITY TOTAL CONNECTED LOAD (3PH) 163,308 kwExist A/C No. : 521-01086-1

CONTRACTOR:EMIRATE COAST CONTRACTING CO.L.L.C PROVIDE CT-METER WHEN MAX.DEMAND>100 KW.

TELEPHONE:04-2976964

FAX:04-2976963 (1) 20-80A (2) 30-90/120A (3) 100-160A (4) 2400/5A

Page 3: Schedule 22-09-2014 Final Without Spare Load

PROJECT : GROUND + ONE VILLA PLOT NO.: 375-1327

DB-REF NO: DB-GF ( SHEET 1-3 ) LOAD DISTRIBUTION SCHEDULE PANEL LOCATION: GROUND FLOORFEED FROM : MDB ( 3 - PHASE )

ROOM/AREA

LTG ISO FCU H/D W/H CU

R Y B

1 R1 16 2.5 2.5 GUEST ROOM 1 1 50 50

2 Y1 16 2.5 2.5 GUEST ROOM 2 13 1 50 700

3 B1 16 2.5 2.5 MAJLIS 3 50 150

4 R2 16 2.5 2.5 GUEST ROOM 1 14 50 700

5 Y2 16 2.5 2.5 GUEST ROOM 2 12 50 600

6 B2 16 2.5 2.5 MAJLIS 12 50 600

7 R3 16 2.5 2.5 GUEST ROOM 1 14 1 50 750

8 Y3 16 2.5 2.5 GUEST ROOM 2 1 50 50

9 B3 16 2.5 2.5 MAJLIS , WASH 17 1 50 900

10 R4 16 2.5 2.5 FAMILY 12 50 600

11 Y4 16 2.5 2.5 KITCHEN, LUNDRY, STORE 14 50 700

12 B4 16 2.5 2.5 HALL 8 50 400

13 R5 16 2.5 2.5 FAMILY WASH , T&B 14 1 50 750

14 Y5 16 2.5 2.5 LOBBY 6+1 50 350

15 B5 16 2.5 2.5 HALL 12 50 600

16 R6 16 2.5 2.5 VILLA EXTERIOR 7 50 350

17 Y6 16 2.5 2.5 LOBBY 10 50 500

18 B6 16 2.5 2.5 FOCUS LIGHTS 2 100 200

19 R7 16 2.5 2.5 FAMLY 2 50 100

20 Y7 16 2.5 2.5 VILLA EXTERIOR 8 50 400

21 B7 16 2.5 2.5 HALL 1 50 50

TOTAL CONNECTED LOAD PER PHASE IN ( WATTS ) 3300 3300 2900

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

RATING OF

INCOMER

RTNG OF

ELCB

SR#

CKT. NO.

MCB RTG

IN AMPS

CCT WIRE SIZE mm²

ECC WIRE SIZE mm²

EX. FAN

C.FAN

13A SSO

45A SSO

15A SSO

SH.SO

WATT PER UNIT

160A TPN ISOL.

40A TP100mAELCB

(1)

40A TP100mAELCB

(2)

40A TP100mAELCB

(3)

40A TP100mAELCB

(4)

Page 4: Schedule 22-09-2014 Final Without Spare Load

PROJECT : GROUND + ONE VILLA PLOT NO.: 375-1327

DB-REF NO: DB-GF ( SHEET 2-3 ) LOAD DISTRIBUTION SCHEDULE PANEL LOCATION: GROUND FLOORFEED FROM : MDB ( 3 - PHASE )

ROOM/AREA

LTG ISO FCU H/D W/H CU 3300 3300 2900

22 R8 32 4.0 4.0 GUEST ROOM 1 5 200 1000

23 Y8

24 B8

25 R9 32 4.0 4.0 MAJLIS 5 200 1000

26 Y9 SPARE 500

27 B9 20 4.0 4.0 HALL 2 200 400

28 R10

29 Y10 20 4.0 4.0 KITCHEN 1 500 500

30 B10

31 R11 32 4.0 4.0 FAMILY 5 200 1000

32 Y11

33 B11 32 4.0 4.0 LOBBY 5 200 1000

34 R12

35 Y12 32 4.0 4.0 KITCHEN 7 200 1400

36 B12 30 6.0 6.0 KITCHEN COOKER 1 3000 3000

37 R13 20 4.0 4.0 GUEST ROOM 2 2 200 400

38 Y13

39 B13 20 4.0 4.0 LAUNDRY, STORE 2 200 400

40 R14 20 4.0 4.0 FCU-G1 GUEST ROOM 1 1 560 560

41 Y14

42 B14

43 R15

20

4C 1C

CU-G1 GUEST ROOM 1 1 5830

1943

44 Y15 X X 1943

45 B15 6.0 6.0 1943

TOTAL CONNECTED LOAD PER PHASE IN ( WATTS ) 9203 7143 9643

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

RATING OF

INCOMER

RTNG OF

ELCB

SR#

CKT. NO.

MCB RTG

IN AMPS

CCT WIRE SIZE mm²

ECC WIRE SIZE mm²

EX. FAN

C.FAN

13A SSO

45A SSO

15A SSO

SH.SO

WATT PER UNIT

160A TPN ISOL.

40A TP30mAELCB

(5)

40A TP30mAELCB

(6)

40A TP30mA

ELCB (7)

40A TP100mA

ELCB (8)

40A TP30mAELCB

(9)

40A TP100mAELCB(10)

R Y B

Page 5: Schedule 22-09-2014 Final Without Spare Load

PROJECT : GROUND + ONE VILLA PLOT NO.: 375-1327

DB-REF NO: DB-GF ( SHEET 3-3 ) LOAD DISTRIBUTION SCHEDULE PANEL LOCATION: GROUND FLOORFEED FROM : MDB ( 3 - PHASE )

ROOM/AREA

LTG ISO FCU H/D W/H CU 9203 7143 9643

46 R16

47 Y16

48 B16 20 4.0 4.0 FCU-G2 GUEST ROOM 2 1 200 200

49 R17

20

4C 1C

CU-G2 GUEST ROOM 2 1 4100

1367

50 Y17 X X 1367

51 B17 6.0 6.0 1367

52 R18 20 4.0 4.0 FCU-G3 KIT,LNDRY,STORE 1 560 560

53 Y18

54 B18

55 R19

25

4C 1C

CU-G3 KIT,LNDRY,STORE 1 7120

2373

56 Y19 X X 2373

57 B19 6.0 6.0 2373

58 R20

20

4C 1C

1 5500

1833

59 Y20 X X 1833

60 B20 10.0 10.0 1833

61 R21

25

4C 1C

1 7300

2433

62 Y21 X X 2433

63 B21 10.0 10.0 2433

64 R22

32

4C 1C

1 8300

2767

65 Y22 X X 2767

66 B22 10.0 10.0 2767

TOTAL CONNECTED LOAD PER PHASE IN ( WATTS ) 20536 17916 20616

TOTAL 59,068 KW

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

RATING OF

INCOMER

RTNG OF

ELCB

SR#

CKT. NO.

MCB RTG

IN AMPS

CCT WIRE SIZE mm²

ECC WIRE SIZE mm²

EX. FAN

C.FAN

13A SSO

45A SSO

15A SSO

SH.SO

WATT PER UNIT

160A TPN ISOL.

40A TP100mAELCB(11)

40A TP100mAELCB(12)

40A TP100mAELCB(13)

CU-G4 PACKAGEFAMILY, HALL

40A TP100mAELCB(14)

CU-G5 PACKAGEMAJLIS

40A TP100mAELCB(15)

CU-G6 PACKAGELOBBY,HALL,S.CASE

R Y B

Page 6: Schedule 22-09-2014 Final Without Spare Load

PROJECT : GROUND + ONE VILLA PLOT NO.: 375-1327

DB-REF NO: DB-FF ( SHEET 1-4) LOAD DISTRIBUTION SCHEDULE PANEL LOCATION: FIRST FLOORFEED FROM : MDB ( 3 - PHASE )

ROOM/AREA

LTG ISO FCU H/D W/H CU

R Y B

1 R1 16 2.5 2.5 MASTER BED ROOM 1 50 50

2 Y1 16 2.5 2.5 BED ROOM 5 2 50 100

3 B1 16 2.5 2.5 BED ROOM 3 1 50 50

4 R2 16 2.5 2.5 MASTER BED ROOM 8 50 400

5 Y2 16 2.5 2.5 BED ROOM 5 9 50 450

6 B2 16 2.5 2.5 LOBBY 9 50 450

7 R3 16 2.5 2.5 MASTER BED ROOM 8 50 400

8 Y3

9 B3 16 2.5 2.5 BED ROOM 3 7 50 350

10 R4 16 2.5 2.5 MASTER BED ROOM 18 1 50 950

11 Y4 16 2.5 2.5 BED ROOM 5 12 1 50 650

12 B4 16 2.5 2.5 BED ROOM 3 10 50 500

13 R5 16 2.5 2.5 BED ROOM 4 14 1 50 750

14 Y5 16 2.5 2.5 BED ROOM 1 11 1 50 600

15 B5 16 2.5 2.5 HALL 1 50 50

16 R6 16 2.5 2.5 BED ROOM 4 8 50 400

17 Y6

18 B6 16 2.5 2.5 HALL 8 50 400

19 R7 16 2.5 2.5 BED ROOM 4 8 50 400

20 Y7 16 2.5 2.5 BED ROOM 1 12 50 600

21 B7 16 2.5 2.5 HALL 8 50 400

22 R8 16 2.5 2.5 BED ROOM 4 2 50 100

23 Y8 16 2.5 2.5 BED ROOM 5 9 50 450

24 B8 16 2.5 2.5 HALL 12 50 600

TOTAL CONNECTED LOAD PER PHASE IN ( WATTS ) 3450 2850 2800

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

RATING OF

INCOMER

RTNG OF

ELCB

SR#

CKT. NO.

MCB RTG

IN AMPS

CCT WIRE SIZE mm²

ECC WIRE SIZE mm²

EX. FAN

C.FAN

13A SSO

45A SSO

15A SSO

SH.SO

WATT PER UNIT

160A TPN ISOL.

40A TP100mAELCB

(1)

40A TP100mAELCB

(2)

40A TP100mAELCB

(3)

40A TP100mAELCB

(4)

Page 7: Schedule 22-09-2014 Final Without Spare Load

PROJECT : GROUND + ONE VILLA PLOT NO.: 375-1327

DB-REF NO: DB-FF ( SHEET 2-4) LOAD DISTRIBUTION SCHEDULE PANEL LOCATION: FIRST FLOORFEED FROM : MDB ( 3 - PHASE )

ROOM/AREA

LTG ISO FCU H/D W/H CU 3450 2850 2800

25 R9 16 2.5 2.5 ROOF 6 50 300

26 Y9 16 2.5 2.5 ROOF MACHINE ROOM 10 50 500

27 B9 16 2.5 2.5 STAIR, LOBBY, PANTARY 10 50 500

28 R10

29 Y10 16 2.5 2.5 BED ROOM 1 1 50 50

30 B10 16 2.5 2.5 BED ROOM 3 7 50 350

31 R11 16 2.5 2.5 SPARE 750

32 Y11 32 4.0 4.0 BED ROOM 5 6 200 1200

33 B11

34 R12 32 4.0 4.0 MASTER BED ROOM 6 200 1200

35 Y12

36 B12 20 4.0 4.0 BED ROOM 3 4 200 800

37 R13

38 Y13 32 4.0 4.0 BED ROOM 1 5 200 1000

39 B13

40 R14 32 4.0 4.0 BED ROOM 4 5 200 1000

41 Y14

42 B14 20 4.0 4.0 PANTRY, LOBBY 4 200 800

43 R15 20 4.0 4.0 ROOF FLOOR 4 200 800

44 Y15 20 4.0 4.0 ROOF MACHINE ROOM 3 200 600

45 B15

46 R16 32 4.0 4.0 HALL 5 200 1000

47 Y16

48 B16 32 6.0 6.0 CENTRAL WATER HEATER 1 3000 3000

TOTAL CONNECTED LOAD PER PHASE IN ( WATTS ) 7750 6200 8250

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

RATING OF

INCOMER

RTNG OF

ELCB

SR#

CKT. NO.

MCB RTG

IN AMPS

CCT WIRE SIZE mm²

ECC WIRE SIZE mm²

EX. FAN

C.FAN

13A SSO

45A SSO

15A SSO

SH.SO

WATT PER UNIT

160A TPN ISOL.

40A TP100mAELCB

(5)

40A TP30mAELCB

(6)

40A TP30mAELCB

(7)

40A TP30mAELCB

(8)

R Y B

Page 8: Schedule 22-09-2014 Final Without Spare Load

PROJECT : GROUND + ONE VILLA PLOT NO.: 375-1327

DB-REF NO: DB-FF ( SHEET 3-4) LOAD DISTRIBUTION SCHEDULE PANEL LOCATION: FIRST FLOORFEED FROM : MDB ( 3 - PHASE )

ROOM/AREA

LTG ISO FCU H/D W/H CU 7750 6200 8250

49 R17 20 4.0 4.0 FCU-F1 BED ROOM 1 1 200 200

50 Y17 32 10.0 10.0 CU-F1 BED ROOM 1 1 3500 3500

51 B17

52 R18 20 4.0 4.0 FCU-F2 BED ROOM 3 1 200 200

53 Y18

54 B18 32 10.0 10.0 CU-F2 BED ROOM 3 1 3500 3500

55 R19 20 4.0 4.0 FCU-F3 BED ROOM 5 1 560 560

56 Y19

57 B19

58 R20

20

4C 1C

CU-F3 BED ROOM 5 1 5830

1943

59 Y20 X X 1943

60 B20 6.0 6.0 1943

61 R21 20 4.0 4.0 FCU-F4 BED ROOM 4 1 560 560

62 Y21

63 B21

64 R22

20

4C 1C

CU-F4 BED ROOM 4 1 5830

1943

65 Y22 X X 1943

66 B22 6.0 6.0 1943

67 R23 20 4.0 4.0 FCU-F5 MASTER BED ROOM 1 560 560

68 Y23

69 B23

70 R24

25

4C 1C

CU-F5 MASTER BED ROOM 1 7200

2400

71 Y24 X X 2400

72 B24 6.0 6.0 2400

TOTAL CONNECTED LOAD PER PHASE IN ( WATTS ) 16116 15986 18036

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

RATING OF

INCOMER

RTNG OF

ELCB

SR#

CKT. NO.

MCB RTG

IN AMPS

CCT WIRE SIZE mm²

ECC WIRE SIZE mm²

EX. FAN

C.FAN

13A SSO

45A SSO

15A SSO

SH.SO

WATT PER UNIT

160A TPN ISOL.

40A TP100mAELCB

(9)

40A TP100mAELCB(10)

40A TP100mAELCB(11)

40A TP100mAELCB(12)

40A TP100mAELCB(13)

R Y B

Page 9: Schedule 22-09-2014 Final Without Spare Load

PROJECT : GROUND + ONE VILLA PLOT NO.: 375-1327

DB-REF NO: DB-FF ( SHEET 4-4) LOAD DISTRIBUTION SCHEDULE PANEL LOCATION: FIRST FLOORFEED FROM : MDB ( 3 - PHASE )

ROOM/AREA

LTG ISO FCU H/D W/H CU 16116 15986 18036

73 R25

32

4C 1C

1 10700

3567

74 Y25 X X 3567

75 B25 10.0 10.0 3567

73 R26

32

4C 1C

1 8400

2800

74 Y26 X X 2800

75 B26 10.0 10.0 2800

76 R27

40

4C 1C

LIFT 1 5000

1667

77 Y27 X X 1667

78 B27 16.0 16.0 1667

79 R28 20 6.0 6.0 BOOSTER PUMP 1 750 750

80 Y28 16 SPARE 1000

81 B28

TOTAL CONNECTED LOAD PER PHASE IN ( WATTS ) 24900 24020 26070

TOTAL 74,990 KW

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

RATING OF

INCOMER

RTNG OF

ELCB

SR#

CKT. NO.

MCB RTG

IN AMPS

CCT WIRE SIZE mm²

ECC WIRE SIZE mm²

EX. FAN

C.FAN

13A SSO

45A SSO

15A SSO

SH.SO

WATT PER UNIT

160A TPN ISOL.

40A TP100mAELCB(14)

CU-F6 PACKAGEHALL

40A TP100mAELCB(15)

CU-R1 PACKAGEROOF FLOOR

40A TP300mAELCB(16)

40A TP30mAELCB(17)

R Y B

Page 10: Schedule 22-09-2014 Final Without Spare Load

PROJECT : GROUND + ONE VILLA PLOT NO.: 375-1327

DB-REF NO: DB-KIT ( SHEET 1-1) LOAD DISTRIBUTION SCHEDULE PANEL LOCATION: KITCHEN BLOCKFEED FROM : MDB ( 3 - PHASE )

ROOM/AREA

LTG ISO FCU H/D W/H CU

R Y B

73 R1 16 2.5 2.5 KITCHEN 6 1 50 350

74 Y1 16 2.5 2.5 DRIVER ROOM 5 1 1 50 /100 400

75 B1 16 2.5 2.5 BOUNDRY WALL 7 50 350

76 R2

77 Y2 32 6.0 6.0 KITCHEN 1 3000 3000

78 B2 16 2.5 2.5 BOUNDRY WALL 6 50 300

79 R3 20 4.0 4.0 KITCHEN 4 200 800

80 Y3 16 SPARE 500

81 B3 20 4.0 2.5 MOTORIZED BACK GATE 1 500 500

82 R4

83 Y4 20 4.0 4.0 DRIVER ROOM 2 200 400

84 B4

85 R5

86 Y5

87 B5 25 6.0 6.0 CU-KIT 1 2500 2500

88 R6 25 6.0 6.0 CU-DRIV 1 2500 2500

89 Y6

90 B6

TOTAL CONNECTED LOAD PER PHASE IN ( WATTS ) 3650 3800 3650

TOTAL 11,100 KW

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

RATING OF

INCOMER

RTNG OF

ELCB

SR#

CKT. NO.

MCB RTG

IN AMPS

CCT WIRE SIZE mm²

ECC WIRE SIZE mm²

EX. FAN

C.FAN

13A SSO

45A SSO

15A SSO

SH.SO

WATT PER UNIT

40A TPN ISOL.

40A TP100mAELCB

(1)

40A TP100mAELCB

(2)

40A TP30mAELCB

(3)

40A TP100mAELCB

(4)

40A TP100mAELCB

(5)

Page 11: Schedule 22-09-2014 Final Without Spare Load

PROJECT : GROUND + ONE VILLA PLOT NO.: 375-1327

DB-REF NO: DB-PR&S. BLK ( SHEET 1-1) LOAD DISTRIBUTION SCHEDULE PANEL LOCATION: PUMP ROOMFEED FROM : MDB ( 3 - PHASE )

ROOM/AREA

LTG ISO FCU H/D W/H CU

R Y B

1 R1 16 2.5 2.5 PUMP ROOM, TOILET 6 1 50 350

2 Y1 16 2.5 2.5 BOUNDRY WALL 8 50 400

3 B1 16 2.5 2.5 SERVICE ROOM, TOILET 16 1 50 850

4 R2

5 Y2 16 2.5 2.5 BOUNDRY WALL 5 50 250

6 B2 16 2.5 2.5 SERVICE ROOM, ROOF 4 50 200

7 R3 20 4.0 4.0 PUMP ROOM, WASH 4 200 800

8 Y3

9 B3 32 4.0 4.0 SERVICE ROOM 5 200 1000

10 R4

11 Y4 32 6.0 6.0 CU-SERVICE BLOCK 1 2600 2600

12 B4 32 6.0 6.0 CU-PUMP 1 2200 2200

7 R5 32 6.0 6.0 SWIMMING POOL PUMP 1 2500 2500

8 Y5

9 B5 20 6.0 6.0 MOTORIZED FRONT GATE 1 500 500

10 R6

20

4C 1C

WATER PUMP 1 1500

500

11 Y6 500

12 B6 4.0 4.0 500

TOTAL CONNECTED LOAD PER PHASE IN ( WATTS ) 4150 3750 5250

TOTAL 13,150 KW

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

RATING OF

INCOMER

RTNG OF

ELCB

SR#

CKT. NO.

MCB RTG

IN AMPS

CCT WIRE SIZE mm²

ECC WIRE SIZE mm²

EX. FAN

C.FAN

13A SSO

45A SSO

15A SSO

SH.SO

WATT PER UNIT

40A TPN ISOL.

40A TP100mAELCB

(1)

40A TP30mAELCB

(2)

40A TP100mAELCB

(3)

40A TP30mAELCB

(2)

40A TP30mAELCB

(3)

Page 12: Schedule 22-09-2014 Final Without Spare Load

PROJECT : GROUND + ONE VILLA PLOT NO.: 375-1327

DB-REF NO: DB-W.M ROOM ( SHEET 1-1) LOAD DISTRIBUTION SCHEDULE PANEL LOCATION: FEED FROM : MDB ( 3 - PHASE )

ROOM / AREA

LTG ISO FCU H/D W/H CU

R Y B

1 R1 16 2.5 2.5 W.M ROOM &B&T & KIT. 5 1 50 300

2 Y1 20 4.0 4.0 W.M ROOM &B&T & KIT. 4 200 800

3 B1 20 4.0 4.0 BATH ROOM 1 500 500

4 R2 20 4.0 4.0 W.M ROOM 1 500 500

5 Y2 20 6.0 6.0 CU 1 2900 2900

6 B2

TOTAL CONNECTED LOAD PER PHASE IN ( WATTS ) 800 3700 500

TOTAL 5,000 KW

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

RATING OF

INCOMER

RTNG OF

ELCB

SR#

CKT. NO.

MCB RTG

IN AMPS

CCT WIRE SIZE mm²

ECC WIRE SIZE mm²

EX. FAN

C.FAN

13A SSO

45A SSO

15A SSO

SH.SO

WATT PER UNIT

32A TPN ISOL.

40A TP100mA

ELCB (1)

40A TP30mA

ELCB (2)

40A TP100mA

ELCB (3)

Page 13: Schedule 22-09-2014 Final Without Spare Load

GROUND FLOOR

REMARKS

SEE PAGE 2

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

Page 14: Schedule 22-09-2014 Final Without Spare Load

GROUND FLOOR

REMARKS

RING CKT.

RING CKT.

RING CKT.

RING CKT.

RING CKT.

SEE PAGE 3

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

UVR + TIMER + CONT

Page 15: Schedule 22-09-2014 Final Without Spare Load

GROUND FLOOR

REMARKS

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

UVR + TIMER + CONT

UVR + TIMER + CONT

UVR + TIMER + CONT

UVR + TIMER + CONT

UVR + TIMER + CONT

Page 16: Schedule 22-09-2014 Final Without Spare Load

FIRST FLOOR

REMARKS

SEE PAGE 2

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

Page 17: Schedule 22-09-2014 Final Without Spare Load

FIRST FLOOR

REMARKS

RING CKT.

RING CKT.

RING CKT.

RING CKT.

RING CKT.

SEE PAGE 3

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

Page 18: Schedule 22-09-2014 Final Without Spare Load

FIRST FLOOR

REMARKS

SEE PAGE 4

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

UVR + TIMER + CONT

UVR + TIMER + CONT

UVR + TIMER + CONT

UVR + TIMER + CONT

UVR + TIMER + CONT

Page 19: Schedule 22-09-2014 Final Without Spare Load

FIRST FLOOR

REMARKS

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

UVR + TIMER + CONT

UVR + TIMER + CONT

Page 20: Schedule 22-09-2014 Final Without Spare Load

KITCHEN BLOCK

REMARKS

UVR + TIMER + CONT

UVR + TIMER + CONT

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

Page 21: Schedule 22-09-2014 Final Without Spare Load

PUMP ROOM

REMARKS

RING CKT.

UVR + TIMER + CONT

UVR + TIMER + CONT

NOTE : EX. FAN - EXHAUST FAN ; H/D - HAND DRYER ; W/H - WATER HEATER ; CU - CONDENSING UNIT ; FCU - FAN COIL UNIT ; SH. SO - SHAVER SOCKET OUTLET

Page 22: Schedule 22-09-2014 Final Without Spare Load

W.M ROOM

REMARKS

UVR + TIMER + CONT