SCFT Procedure

Prepared by: Samsung

Page 2: SCFT-Training_v8.2-1

Course Name: SCFT Procedure

Course Objective

This module will enable participants to understand how to conduct SCFT

This module will also help to understand the Work Flow Management for SCFT(WAS-SCFT)using online portal SITFORGE.

Who should attend

Field engineers

Drive test Engineers

RF Leads / Area Managers

Session -1

Lun

ch b

reak

Session -2

Day 1

• SCFT Tests

• SCFT Tool (XCAL mobile - software version Operational Process

•SCFT -S4 Mini/ troubleshooting Guide

• Important Notes

• Hands on exercises

• SCFT WAS Workflow

•SCFT Siteforge module

Page 3: SCFT-Training_v8.2-1

Document History

Edition Date of Issue Author Remarks

Ver 5.0 14Aug2014 Samsung

Training Team

SCFT Drive test is to be done only within Best server plot of the site and only a single road towards neighbor site is to be driven

Ver 6.0 15 Oct 2014 Samsung

Training Team (HD)

Merged SCFT process and WAS into one slide Updates : Merged SCFT process and added siteforge WAS

Ver 7.0 28 Oct 2014 Samsung

Training team (HD)

Updated the SCFT issues as per guidelines for Solpars Updates : As per solpar field issues listed added and or modified slides #11, 37, 38, 39

Ver 8.0 01 Nov 2014 Samsung

Training team (HD)

Updated the SCFT issues as per guidelines for Solpars Updates : As per solpar field issues listed added and or modified slides #40, 52, 53

Ver 8.1 13 Jan 2015

Samsung Training team Ashish Shukla

Accelerating SCFT Process change recommendation From Slides 84 to 107

Page 4: SCFT-Training_v8.2-1

Good to know

Keep your mobile phone in the silent mode during the session

Need to sign attendance sheet at the start and end of each day

At the end of each training post test will be conducted

Stick to break timings

Your valuable feedback will be taken at the end to enhance training experience

For logistics support contact the co-ordinator

Page 5: SCFT-Training_v8.2-1

Agenda Health & Safety Requirements

Introduction to SCFT What is SCFT

Overview of SCFT Process

SCFT Workflow

Roles & Responsibilities

SCFT Requirements Lead time

Tools

Preparations for SCFT TSSR Review

eNB Parameter Review

Drive Route

Checklists

Page 6: SCFT-Training_v8.2-1

Agenda

Physical Site Check

Measurements of height, azimuth, tilt

Drive Test

SCFT Stationary test

SCFT Moving test

Checklist during drive

Post SCFT Drive

SCFT Tool(XCAL mobile - software version v4.09.139 ) Operational Process

Stationary test

Moving test

SCFT S4 Mini Trouble shooting guide

Important Notes

Page 7: SCFT-Training_v8.2-1

Introduction to SCFT

Page 8: SCFT-Training_v8.2-1

Single Cell Functional Test (SCFT)

Verification of

Availability and performance of desired services

Physical configuration of the eNodeB for each sector

Correct installation and configuration of the eNodeB

Testing specific services at the site and while driving around the site

(((

(((

Page 9: SCFT-Training_v8.2-1

SCFT Process

Preparation for SCFT

Physical checks of eNB site

Pass

Drive Test

Adjust Antenna Parameter and

etc. Yes

No

Submit SCFT report to RJIL

SOLPAR Scope

Instruction from SOLPAR Project Manager

Page 10: SCFT-Training_v8.2-1

SCFT Team Composition

SOLPAR PM

DT Engineer

DT Engineer

Page 11: SCFT-Training_v8.2-1

Roles & Responsibilities – SOLPAR Project Manager

Daily tracking of progress status

Extend support to circle SCFT Team for their minor & critical issues.

Interact with Samsung on Progress Management: Daily, Weekly, Monthly basis.

SCFT Team Management and site allocation to DT Engineers, Riggers & Car drivers.

Validation of drive routes, discussion of issues, site performance analysis

Support field team for troubleshooting and any other support during SCFT activity

Prepare the RF Database and data backup of all drive related tests ( including any snaps) and provide to Samsung

Page 12: SCFT-Training_v8.2-1

Roles & Responsibilities – SOLPAR DT Engineer

Perform Field Test: DT testing and data collection during - SCFT/Cluster Optimization

Check site information & change Ant. Parameters

Carry all the necessary tools in field

Rigger will check site as per the checklist

Rigger will make corrections on site and inform Drive Test Engineer

Drive Test Engineer will create the drive routes & configure the Smart S4 mini as per defined test scenarios

Drive Test Engineer will save the log file. In case of handoff fail, bad RSRP, call drop etc., inform respective teams immediately

Page 13: SCFT-Training_v8.2-1

Summary

Strictly follow all the health & safety guidelines

SCFT verifies the availability and desired performance of a site

SCFT involves physical & parameter check of eNodeB, corrections if needed, followed by a drive test around the site

SCFT team consists of an DT engineer, Rigger and Car driver with well-defined roles and responsibilities for all

Page 14: SCFT-Training_v8.2-1

Quiz

You find that the antenna azimuth is incorrect. You will _________

• Correct it, log and report the error and then proceed with drive test

• Proceed with the drive test and report it later

• Cancel the drive test

During the drive test, handover fails. You will _______

• Continue with the drive test as it is

• Report it to the respective team before continuing

• Cancel the drive test

EMF survey is conducted by rigger_______

• Before the SCFT drive

• After completion of the SCFT drive

• In parallel with the SCFT drive

Page 15: SCFT-Training_v8.2-1

SCFT Requirements

Page 16: SCFT-Training_v8.2-1

Tools Required

S.No Tool Name Description Specification

1 Vehicle with AC Driving test & power supply Must have cigarette lighter point for

connecting the power inverter

2 Power inverter DC to AC Over 500W

3 Smart phone (with D

M application) UE with XCAL

Need 2 test mobile phones

- DL, UL and VoLTE test

- SIM card to support from RJIL

- 2 EA Charger

- 2 EA Extra battery (Optional)

- 2 EA Smart phone holder

4 Compass Measurement of antenna azimuth

5 Tilt Measure Measure the antenna tilt

6 Laser meter or measu

ring tape Require to check the antenna height

If using measuring tape, above 50 m

eters

7 Multi tab

(Power extension)

Extension cable for connections of lap

top etc. Over 5 Ports

8 Spanner Adjustable spanner 1 set

9 Handset S4 Mini 2 nos

10 Tool kit Rigger tool kit, for physical changes 1 set

Page 17: SCFT-Training_v8.2-1

UE (Smart phone) Testing

Check performance of the smart tool DM at least twice a month, e.g. in the 2nd and 4th week of the month

Check at a location where following coverage criteria are met

• RSRP : better than -70dBm

• SINR : better than 23 dB

Check based on RF parameters RSRP, SINR, Throughput, MCS, CQI etc

Maintain a detailed sheet to identify the best performing Smart DM tools

Maintain performance check records with history as per the attached sheet

Appendex-Smart DM performance management.xls

Page 18: SCFT-Training_v8.2-1

Preparations for SCFT

Page 19: SCFT-Training_v8.2-1

Preparations for SCFT

S4 mini mobiles should be ready with fully charged condition along with mobile charger, Mobile holder, Inverter, 4 points spike guard

Rigger readiness along with tool kit and safety Kit (Safety belt, Safety Shoes & Helmet)

7) If wall mount antenna or Highway/Flyover mount site, then accordingly arrange extra wall mount rigger with rope etc and hydraulic vehicle (by informing SOLPAR PM and Samsung area manager) in advance respectively

SOLPAR Engineer will collect the TSSR Report & Cell ref file from SOLPAR PM who in-turn shall collect the TSSR report & Cell ref file from Samsung circle RF Lead

Check the alarm status from LSMR engineer and ensure not to have any service affected alarm on site

Check other tools readiness like magnetic compass, tilt meter and laser meter

Get Site Access Confirmation from SOLAPR PM

Important:

no Test can be carried out if the handset. Is less

than 10% charged

Page 20: SCFT-Training_v8.2-1

Preparations for SCFT…

TSSR/Cellref Review

eNB Parameter Verification from LSM-R

Drive Route Checklist

Page 21: SCFT-Training_v8.2-1

Preparations for SCFT…

Technical Site Survey Report (TSSR)/ Cell ref info

Ensure that the site is verified as per TSSR/Cell ref file, any deviation need to report Samsung immediately

Attached annexure-1 for the same to be filled up and handed over to SOLPAR PM, who later sends it over to Samsung RF manager.

In case of any deviation in the same it needs to be corrected in cell ref file/field before proceeding for the drive.

If it’s a RP1 site and On field data does not match with cell ref file then no need to rectify physical parameter at field but need to correct only cell ref file.

Page 22: SCFT-Training_v8.2-1

Preparations for SCFT…

Site information

• Site Name, and Site Address

• Site location in terms of LAT/LON

• PCI

Antenna parameters

• Antenna Azimuth, Antenna Height, Antenna Tilt(electrical tilt)

• Antenna physical blockage in main/side lobe (if any)

• Tower type (RTT, Wall mount, Pole mount, GBT) in case of wall mount arrange extra wall mount rigger with rope

Simulation (Coverage Statistics

– RSRP)

• Outdoor Analysis of signal strength for outdoor coverage

• Indoor Analysis of signal strength for indoor including penetration loss

• Worst Area Analysis by Simulation Plot

Technical Site Survey Report (TSSR/Cell ref)

Important: Check alarms before moving to site for SCFT

Page 23: SCFT-Training_v8.2-1

Preparations for SCFT…

Satellite & Vector maps

• Satellite map: Pre analysis for service area. Google earth snapshots of actual locations and populated areas

• Vector Map: Refer during drive test.

Site drawing map

• eNB installation information such as Antenna Pole Location

• Antenna direction in terms of Azimuth

• Location of ODU (outdoor unit) or shelter room of eNB

• Location of other operator Antenna Pole & Shelter room

Technical Site Survey Report (TSSR/Cellref)…

Page 24: SCFT-Training_v8.2-1

Preparations for SCFT…

TSSR /Cell refReview

eNB Parameter Verification from LSM-R

Drive Route Checklist

Page 25: SCFT-Training_v8.2-1

Preparations for SCFT…

SOLPAR Project Manger instructs solpar Field engineer to collect eNB parameters from LSM-R engineer(Samsung)

SOLPAR DT engineer will act accordingly and request status of eNB parameters from LSM-R engineer (for alarms and site readiness verification)

LSM-R engineer will instruct DT Engineer (SOLPAR) If site has service impacting alarm that need site visit by deployment team, then the DT Engineer shall move over to the next site as assigned by SOLPAR Project manager.

SOLPAR Project Manager has to keep Samsung circle RF lead in loop for all communication

eNB Parameter Verification from LSM-R

SOLPAR PM

SOLPAR DT Engineer

OPT Engr

Page 26: SCFT-Training_v8.2-1

Preparations for SCFT…

Line items to be checked by LSMR engineer before the SCFT are as follows:

Site operational status (Site should be ON)

Site should be free from service affecting alarms (like VSWR etc.)

Identify and inform the latest PCI for both the test site and the neighbor sites (if the cluster is already launched) with LSMR engineer before moving to the site. Neighbor site PCI can be taken from LSMR engineer.

SCFT site vital parameter needs to be checked like ANR enabled, Handover defined etc.

Configuration Parameters

PCI,Cell,TAC ID

TX power from LSMR

SON, ANR features

Access class barred for other UEs

MIMO Mode

(TM3/TM4) from LSM-R

MIMO Type (2x2, 4x2)

from LSM-R

Smart scheduler

OFF

Page 27: SCFT-Training_v8.2-1

Preparations for SCFT…

Service Affecting Alarms

• Site down

• High drop Rate

• Low Tx Power

• GPS Alarm

VSWR values

• VSWR should be <1.5

Tx Power

• Tx Power is transmitted power from eNB station, measured Watts or dBm. Typical value is 10W or 40dBm

eNB Parameter Verification from LSM-R

Page 28: SCFT-Training_v8.2-1

Preparations for SCFT…

RF Parameters

Handoff Parameters, PCI Parameters, ANR List - Neighbor List.

eNB Installation Information

eNB installation ATP completed

eNB Parameter Verification from LSM-R

Page 29: SCFT-Training_v8.2-1

Preparations for SCFT…

TSSR Review eNB Parameter

Verification from LSM-R

Drive Route Checklist

Page 30: SCFT-Training_v8.2-1

Drive Route Basics

All sectors to be covered during the test

Carry a hardcopy of the drive route direction, while DT reaches the

Instruct the driver to follow the drive route

Page 31: SCFT-Training_v8.2-1

Drive Route Guidelines

Best server plot Drive route to be collected by SOLPAR DT engineer from Circle RF Lead before he reaches the site.

All motorable roads covering all three sectors of the site are to be driven. The motorable roads which are not accessible or can’t be driven due to any blockage should be captured with a snapshot for proof.

If SCFT is performed on a standalone site then each sector to be driven up to serving cell RSRP as per morphology in the main lobe as defined in under mentioned table:

Morphology Type Coverage Threshold (RSRP dBm)

Dense Urban -107

Medium Urban -110

Suburban -113

Rural -116

Morphology RSRP levels

Page 32: SCFT-Training_v8.2-1

Drive Route Guidelines..

If SCFT is done on a site that is not a standalone site and the neighbor site is radiating then the drive route should be done until the handover happens with the neighbor site, but if the Neighbor site is not radiating then the drive should be done until neighbor site.

The stationary test should only be done in the main lobe of serving antenna DT Engineer will instruct the car driver for the direction to be followed based on pre-

defined drive route based on GPS location in drive test tool. Engineer will carry the drive route handmade copy, during the SCFT test.

Drive Test Route Sample

Page 33: SCFT-Training_v8.2-1

Drive Route Example

Major Road

More than one lane

Important road that leads from

one town or city to another

Minor Road

One lane

A side road may be a narrow street off a

major street

Page 34: SCFT-Training_v8.2-1

Preparations for SCFT

TSSR Review eNB Parameter

Verification from LSM-R

Drive Route Checklist

Page 35: SCFT-Training_v8.2-1

Check list for DT Engineer

Site access confirmation to be done in advance via Samsung area manager and DT should get in touch directly with the person having key to the site.

Confirmation from Samsung area manager for eNB Commissioning (ATP–11B) to be passed without any punch points before going for SCFT.

Two S4 mini mobile phones fully charged and mobile chargers should be ready.

DT and rigger ID proof and Reliance representative authorization letter (multiple photo copies) of the DT and rigger having permission from RJIL to conduct DT on behalf of RJIL (letter should not be site specific rather it should be in general so that the same can be used in all sites). This letter to taken from SOLPAR project manager who will get this letter from Samsung Area Manager.

Site TSSR/Cell ref to be checked in advance, orientation and lat/long of site and antenna location type (in case of wall mount antenna, extra riggers to be arranged one day in advance, prior to the test)

Page 36: SCFT-Training_v8.2-1

Check list for DT Engineer…

Site access confirmation to be done in advance via Samsung area manager and DT engineer should get in touch directly with the site owner

Magnetic compass to measure azimuth

Laser meter or measuring tape to measure antenna height

Tilt meter to measure the antenna tilt.

S4 mini should have adequate space to store snaps taken by mobile in case of drive getting obstructed.

Car with Cigarette lighter Inverter, spike guard and mobile holder for the mobile to stick on dashboard over the holder

Hydraulic vehicle in case of highway/road/Flyover mounted sites, request should go over to SOLPAR PM and Samsung area manager a day in advance who will gets in touch with Reliance area manager for the same.

Fill up the attached Annexure (Total 3) as in check list and handed over to SOLPAR PM, who sends it over to Samsung RF manager.

Handset should be fully charged else no Test can be carried out by the handset

Page 37: SCFT-Training_v8.2-1

Check list for Rigger

Weather proofing kit.

Tool Kit (Spanners/Knife/Hammer/Cable Tie etc.)

Connector making tools for loose connectorization.

Safety belts

Safety shoes

Helmet

Rope with board and extra riggers (with full protective gear) in case of wall mount sites.

First aid box

Attached annexure 3 for the same to be filled up and handed over to SOLPAR PM, who sends it over to Samsung RF manager.

Page 38: SCFT-Training_v8.2-1

Check FTP Connectivity

FTP server Connectivity

Check FTP server connectivity before

leaving the site

OK

Proceed to the site

OK

Start testing

Resolved

Contact Circle Samsung RF lead team for the resolution

Check FTP server connectivity on site

Yes

Yes No

No

Yes

Yes

SOLPAR RF engineer to has confirm FTP server connectivity before leaving to the site

SOLPAR RF engineer to has confirm FTP server connectivity upon reaching to the site

Page 39: SCFT-Training_v8.2-1

Summary

Perform regular testing of drive-test UE’s

Preparations for SCFT consist of TSSR review, eNB parameter verification from LSM-R, availability of drive route and checklists. Before proceeding to the site make sure you have these

TSSR gives details about eNB physical parameters such as antenna height, azimuth, tilt, pictures of obstruction, site drawings and map views

LSM-R parameters include details such as VSWR, Tx power and PCI

Ensure FTP connectivity before proceeding to site

Cover all sectors during the drive

Page 40: SCFT-Training_v8.2-1

Physical Checks at Site

Page 41: SCFT-Training_v8.2-1

Physical checks during site survey

Physical verification of site with respect to data given in TSSR/Cell ref. Need to check under mentioned points.

Once DT engineer reaches the site he should validate the PCI as seen on field with cell ref file and then perform a walk test around the site in clockwise and anticlockwise direction for checking the inter-sector handover and correct PCI as seen in cell ref: file.

Site location in terms of Lat/Long, Site name and address, Antenna azimuth, Antenna height, Antenna Tilt (Mechanical Tilt), Antenna physical blockage in main/side lobe (if any) & Tower type.

If there is any deviation in actual versus TSSR/Cell ref then SOLPAR engineer will try to rectify it on field with due permission from Samsung RF lead and if he is unable to do so then the same shall be informed to Samsung and the DT should move over to the next site.

If the deviation cannot be corrected as confirmed by Samsung RF lead, then the same has to be updated in site forge by the DT engineer.

Page 42: SCFT-Training_v8.2-1

Physical checks during site survey

Only after completing physical verification and passing the same SOLPAR engineer will start performing SCFT activity.

In case of tower/antenna access issue from bird nests, honeybees comb etc. the corresponding Samsung area manager should be informed and DT should move to the next site.

SCFT once started should be completed within the same day, until and unless there is some constraint that is making the process shift to other day.

Physical blockage in direction of serving antenna should be noted and snapshot should be taken. The same comment with snaps has to be updated in the SCFT report by SOLPAR project manager. The SCFT has to be carried on however.

Page 43: SCFT-Training_v8.2-1

Measuring Site Co-ordinates Check the battery of GPS (72 channel GPS)

Point GPS towards clear, open skies for accuracy

GPS Setting time >5 min & GPS number of satellites > 4

Low Battery voltages and rare Geomagnetic storms may result in erroneous GPS readings

GPS should not be used for Ground Elevation readings as the inaccuracy can be well over 30m

Stand in the center of the site location (GBM, RTT,RTP)

Once the satellites are acquired, note co-ordinates for N & W in degree - decimal format.

Update this information into check list for pre-post comparison and for database tracking

Page 44: SCFT-Training_v8.2-1

Checking Antenna Azimuth

Stand in front of the Antenna

When taking compass readings, keep at least 8m distance from any magnetic, metal, or current carrying structures such as towers, vehicles, or cables for correct readings

Open compass and wait a moment till the compass needle is stationary

Check the antenna azimuth with reference to North & measure the value in degrees

Compare the observed value with the one in the TSSR

In case a mismatch is detected, make corrections on site

Mention the values in the check list for pre-post comparison and for database tracking

Page 45: SCFT-Training_v8.2-1

Check Azimuth – marking on map

Check the service direction of the antenna

Mark the main serving direction of the antenna on the map

Page 46: SCFT-Training_v8.2-1

Tower Height Measurement – Laser Meter

Stand on the edge of tower

Press start button and then press “measure” button

Wait for 2-3 minutes or check the ground or building from the built-in binoculars in the laser meter

Press the “measure” button again

Take pictures of the value in meters

Page 47: SCFT-Training_v8.2-1

Tower Height Measurement - Tape

Drop the measuring tape from the edge of the tower platform

Team member at the ground end will record the value

Page 48: SCFT-Training_v8.2-1

Antenna Height – RTP / RTT

Page 49: SCFT-Training_v8.2-1

Antenna Height – GBT / GBM

Compare the value on TSSR with actual result

Correct the Antenna Height if mismatch with TSSR Report

Page 50: SCFT-Training_v8.2-1

Antenna Mechanical Tilt Measurement

Bring tilt measure in contact with antenna on the back side & center(①)

Adjust the tilt measure (②) to level off (③)

Check tilt of antenna (④), as per the picture red line is on 3rd mark from zero, which means that the tilt is 6 degrees {one mark = 2 degree and consider the bottom scale}

Compare the value on TSSR with actual result

Correct the Mechanical Tilt in case of mismatch with the TSSR Report

Mention the values into check list for pre-post comparison and for database tracking

To change tilt, loosen all nuts, adjust tilt as desired and then tighten them

Page 51: SCFT-Training_v8.2-1

Drive Test

Page 52: SCFT-Training_v8.2-1

SCFT Drive Test

After completing physical verification, SOLPAR engineer will start performing drive test.

Drive test to be performed on all motorable roads.

The mobiles need to be attached on car dashboard while doing drive test.

Check FMS server connectivity to site by downloading test scenarios on “XCAL Auto Mobile” over mobile.

SCFT drive test activity has two type of tests.

1. Stationary Test

a. Attach

b. VOLTE Short call

2. Moving Test

a. FTP -DL

b. FTP -UL

Page 53: SCFT-Training_v8.2-1

Stationary Test ( Alpha Sector)

Drive test engineer will start the drive test activity with stationary test.

Move over to Alpha sector and perform following activities

Latch on alpha sector PCI and RSRP, it should have a stable dominant RSRP level from serving cell, and neighbor cells should not be dominant.

Check GPS status and select destination value of co-ordinates from map window.

Assign “Stationary-1” call setting with Cycle information & site details, (CYCLE should remain the same until the complete SCFT test (STATIONARY & MOVING) ends), if you have to restart the test cause of any issue then issue new and different cycle number, but it should be same for stationary and moving test (ideally it should be incremented by 1, every time you repeat the test on same site), cycle is a reference for naming the log files.

Stationary Test Procedure:

Page 54: SCFT-Training_v8.2-1

Stationary Test( Alpha Sector)…

Perform under mentioned test by pressing “AUTO CALL” over the s4 mini phone.

. Stationary Test

a. Attach

b. VOLTE Short call

At the end of “Auto call” press status as “In Progress”.

Press “Auto DRM/DRX Upload” button which is popped up & wait for upload to finish.

Page 55: SCFT-Training_v8.2-1

Stationary Test(Beta Sector)

Drive test engineer now moves over towards Beta sector and performs the following activities during stationary test: Check PCI

Assign “Stationary-2” call setting with cycle information & site details

Perform under mentioned test by pressing “AUTO CALL” over s4 mini handset.

a. Attach

b. VOLTE Short call

At the end of Auto call press status as “In Progress”.

Press “Auto DRM/DRX Upload” button which is popped up & wait for upload to finish.

Page 56: SCFT-Training_v8.2-1

Stationary Test( Gamma Sector)

Drive test engineer shall move over towards Gamma sector and perform the following activities during the stationary test

Check PCI and latch to it.

Assign “Stationary-3” call setting with cycle information & site details

Perform under mentioned test by pressing “AUTO CALL” over s4 mini handset.

a. Attach

b. VOLTE Short call

At the end of “Auto call” presses status as “Completed”.

Press “Auto DRM/DRX Upload “button which is popped up & wait for upload to finish

Page 57: SCFT-Training_v8.2-1

Moving Test

After completion of “Stationary” test now the DT has to go for the “Moving test”, drive test engineer will use two S4 mini handsets. There will be two different tests that shall be performed on these handsets. One handset for DTDL One handset for DTUL

“Moving test” call logging should start by performing a walk test around the site in clockwise and anticlockwise direction for checking the inter-sector handover within the SCFT site and checking the correct PCI as seen in cell reference file. Drive test engineer will carry out the remaining part of moving test while in car in a continuous log. Keep checking the PCI of serving cell so as to confirm handover between neighbors of same site. Move from Alpha sector to Beta sector to check handover between them. Move from Beta sector to Gamma sector to check handover between them. Move from Gamma sector to Alpha sector to check handover between them. Move from Alpha sector to Gamma sector to check handover between them. Move from Gamma sector to Beta sector to check handover between them. Move from Beta sector to Alpha sector to check handover between them. Make “Coverage footprint” of each sector in all possible drive routes based on Morphology based RSRP

Levels. After finishing the clockwise / anti-clockwise routes, You must run through DTR (Drive test route) provided

to you by Samsung RF lead

NOTE : Samsung RF lead has to provide DTR based on best server plot , as per example attached below. Or Alternately Samsung RF lead must follow procedures provided by National RF Optimization team to prepare DTR , This is Mandatory

Page 58: SCFT-Training_v8.2-1

Moving Test…

Important: If handovers are not happening between neighbor cells then stop the drive and call up LSMR engineer for handover definition or any alarms related to the same, and resume the drive, post the resolution of the same.

Press “Stop” after completion of drive on both handset( based on steps

as above) and press status as "Complete” .

Press “Auto DRM/DRX Upload” button which gets popped up in both handset & wait for upload to finish. Ask the LSMR engineer to lock the site. Inform the SOLPAR PM and Samsung area manager about the completion of the drive and move for the next drive if time permits for the day.

Page 59: SCFT-Training_v8.2-1

Checklist during drive

If any Attach fail, /Access fail, Handover fail, Sector swap are observed during drive test then call should be immediately stopped and LSMR engineer should be contacted for any running alarm. Later fresh drive for the same should be done post rectification.

During drive test and eNB physical verification if any physical obstruction due to which drive couldn’t be done on that road then SOLPAR DT engineer needs to take the snapshot and pass it over to Solpar PM.

If SOLPAR engineer can’t drive around in the clockwise or anticlockwise direction then he has to mention the reason against the same along with a snapshot proof. Also if for the stationary test, SOLPAR engineer is unable to go into the main lobe while still in car, then he must try to walk and go into major lobe of the sector, if even that is not possible then he should take snaps to support the same.

The SOLPAR engineer should not wait more than 30 mins (post escalation to LSMR and self troubleshooting) for any issue resolution at the site. If issue resolution is taking time, then he should move to the next site.

Page 60: SCFT-Training_v8.2-1

Post SCFT Drive

All snapshots post SCFT (road and antenna obstructions) should be taken and sent to SOLPAR Project Manager/ Samsung Area Manager/Circle RF Lead.

Backup of log files in memory card to be taken by the DT (this will required if any file got corrupted during upload). Same to be handed over to Circle RF Lead.

Contact LSMR Engineer to lock the site (all three sectors).

Handover the keys back to from where they were taken.

Inform the Solpar PM and Samsung RF lead about completion of the drive test.

Move over to the next site.

Page 61: SCFT-Training_v8.2-1

SCFT Tool (XCAL mobile - software version v4.09.139 )

Operational Process

Page 62: SCFT-Training_v8.2-1

SCFT Tool(XCAL mobile) -Operational Process

Please follow below step by step process, in order to conduct SCFT automation process on XCAL Auto call

Only 1 mobile is used for Stationary test.

The screenshots are only applicable to handset software version v4.09.139

Start Samsung S-4 Mini testing handset.

Stationary Test:

Page 63: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Stationary Test

Start “X-Cal Auto” on handset and wait for IP framing Message.

Press GPS unlock message (If it appears)

Page 64: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Stationary Test(Alpha Sector)

Wait for GPS to latch with satellite

Latch on Alpha PCI and start from Alpha Sector.

Page 65: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

Go to “Report mode” and select the same. As depicted in below screenshots.

Page 66: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

“GPS Selection”: Give destination value of Co-ordinates from map window of handset (if location not automatically pointed, then do it manually—by pressing “GPS value” and once map can be seen then locate your position on map, and pressing and holding the probable area where you might be based in. manual process shown below) ,green dot of GPS shall appear then press “Back” button( as shown in third screen shot) and check if GPS coordinates have appeared on screen. GPS is latched now.

Page 67: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

Download name of the cluster by pressing “Down” on Handset.

After pressing “Down”, name of cluster (MUMB-0107 here) in which the Lat/long is lying shall pop up, select it.

Page 68: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

By pressing “Setting” in main window assign under ‘Select type’, “SCFT” and then under ‘Test type’ “STATION 1” (refers to stationary 1 test) and then under ‘Site’ select “Site name” and select “Cycle number” under ‘Cycle’ and press “Save”. (CYCLE should remain the same until the complete SCFT test (STATIONARY & MOVING) ends), if you have to restart the test cause of any issue then issue new and different cycle number, but it should be same for stationary and moving test (ideally it should be incremented by 1, every time you repeat the test on same site), cycle is a reference for the log files.

By pressing “Setting” in main window assign under ‘Select type’, “SCFT”

Page 69: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

Under ‘Test type’ “STATION 1” (refers to stationary 1 test) and then under ‘Site’ select “Site name”

Page 70: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

Select “Cycle number” under ‘Cycle’ and press “Save”.

Page 71: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

In same handset by pressing “Scenario” in main window select “SCFT” and then press “OK” over the prompt “SCFT change scenario”. Now press “Start” under “Autocall”.

Page 72: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

You can see the following test happening one by one.

Page 73: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Stationary Test (Alpha Sector)…

At the end of ‘Autocall’ press status as “In Progress” (Msg which is popped up)

Press “OK” for ‘Auto DRM/DRX upload’ prompt which is popped up & wait for upload to finish.

After the upload is done for Stationary 1 test, it will prompt for “Do you want to perform Stationary 2”. Now go for stationary 2(Beta sector) test.

Page 74: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Stationary Test (BETA Sector)

Now move to Beta Sector and latch to Beta sector PCI.

Press “OK” in handset for “Do you want to perform stationary 2” prompt.

Next under ‘Autocall’ press “Start” in main window (other setting remains same

as in Stationary 1) & repeat the procedure as done in “Stationary 1” test from

Auto call “Start” up-till file upload, make sure the Cycle remains the same.

Press “In Progress” after end of auto call in beta sector and then press “Ok” for

“Do you want to upload right now” prompt.

Page 75: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Stationary Test( Gamma Sector)

Now proceed for Gamma sector, latch to Gamma Sector PCI for “Stationary-3”

test and repeat the process as done in Beta sector.

The difference here being that when the test ends the file upload status should

be selected as “Complete” instead of “In progress ” which was done while in alpha

and beta sectors.

Page 76: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Moving Test

Under Moving test, follow the under mentioned steps in both handsets as

depicted.( this step is same as done in stationary test)

Page 77: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Moving Test…

Select “GPS” in both handsets as was done in stationary mode. ( this step is

same as done in stationary test)

After selecting GPS, download name of the Cluster by pressing “Down” on

both handsets. After pressing “Down”, name of cluster (MUMB-0179 here) in

which the Lat/long is lying shall pop up, select it. ( this step is same as done in

stationary test)

Page 78: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Moving Test…

In both handsets Press “Setting” in main window and press “Select type” as “SCFT” and then “Test type” as “Moving” and then under “Site“ select “name of the site” and “Cycle number” and press “Save”. (CYCLE should remain the same until the complete SCFT test (STATIONARY & MOVING) ends). if you have to restart the test cause of any issue then issue new and different cycle number, but it should be same for stationary and moving test (ideally it should be incremented by 1, every time you repeat the test on same site), cycle is a reference for the log files.

Press “Setting” in main window and press “Select type” as “SCFT” and then “Test type” as “Moving”

Page 79: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Moving Test…

Under “Site“ select “name of the site”

Press “Cycle number” and press “Save”

Page 80: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Moving Test…

Press “DTDL” in one and “DTUL” in other handset respectively and then press

“OK” for ‘DTDL/DTUL change scenario on both handsets.

Press ”Start” under ‘Autocall ‘ in both handsets. Check the traffic should get

started on both handset .

Page 81: SCFT-Training_v8.2-1

SCFT Tool Operational Process – Moving Test…

Now do walk test around the site from to confirm inter sector handover from Gama

to Alpha, Alpha to Beta, Beta to Gamma and then reverse from Gamma to Beta,

Beta to Alpha, and Alpha to Gamma & then continue the drive in CAR from Gama to

Alpha, Alpha to Beta, Beta to Gamma and then reverse from Gamma to Beta, Beta

to Alpha, and Alpha to Gamma, once inter sector handover are confirmed

then continue the drive for Coverage footprint of each sector by driving all roads

within the “Best Server Plot” of the site and additional only 1 road drive in each

sector connecting SCFT and Neighbor site beyond Best server plot is to be done

until a handover happens.

Press Auto call “Stop” after completion of device on both handset and Press

"Complete” under ‘select’.

Press “Auto DRM/DRX Upload” button which is popped up in both handset & wait

for respective uploads to finish only then move from the site.

Page 82: SCFT-Training_v8.2-1

New features added…..logging file size

Logging file size can be configured....

NOTE : The size must be set to

50MB (Mandatory), Latest XCAL

ver. will automatically start new

files after 50MB.

If you don’t set it right, there will

be re-test request as logs of

improper size will cause pre-

processing issues

Page 83: SCFT-Training_v8.2-1

New features added…..log Upload - Manual

After every test scenario whenever this is prompt to upload Logs upload it

Press “OK” for ‘Auto DRM/DRX upload’ prompt which is popped up & wait for upload to finish.

This will automatically upload the logs after every test scenario.

Instead of pressing Ok if you choose to cancel or mistakenly press cancel then you need to upload logs manually as explain next slide

Page 84: SCFT-Training_v8.2-1

New features added…..log Upload - Manual

Uploading of logs can be two ways : Manual

If you missed or choose to not to upload logs auto when

there was a prompt every time then upload manually

Press “Log Upload” button and it will show list of logs

pending to be uploaded

Select the logs to be uploaded based on date &timestamp

Upon uploading the logs the file names will disappear

from pending list

NOTE : Cycle is very important in order to distinguish logs

Unless mentioned by RF Optimizer or RF lead never change

cycle number. It should be always “1” for all the log files /

test scenarios for one round on any given day. Only when

you are requested to do second round another or other day

you will be asked to change cycle number to “2” by your

RF optimizer otherwise don’t change

Page 85: SCFT-Training_v8.2-1

New features added…..log Upload - Automatic

Uploading of logs can be two ways : Manual or Automatic.

NOTE : The size must be set to

50MB (Mandatory), Latest XCAL

ver. will automatically start new

files after 50MB.

If you don’t set it right, there will

be re-test request as logs of

improper size will cause pre-

processing issues

Page 86: SCFT-Training_v8.2-1

New features added..FTP server selection

Manual selection of FTP server possible..

Page 87: SCFT-Training_v8.2-1

New features added…..VOLTE dialed call

Manual selection of dialed number possible..

Page 88: SCFT-Training_v8.2-1

SCFT -S4 Mini - troubleshooting Guide

Page 89: SCFT-Training_v8.2-1

No Network service on Handset

1) No network service on S4-Mini handset

Observed Issue:

As shown in picture below though we are able to see our network parameters

being received by the S4-Mini handset, the handset is not registering to the LTE

network.

Page 90: SCFT-Training_v8.2-1

No Network service on Handset…

1) No network service on S4-Mini handset

Root Cause:

As shown in picture below the “Mobile data” or “Data roaming” settings was

unchecked under “Mobile networks” settings.

Page 91: SCFT-Training_v8.2-1

No VoLTE service status on S4-Mini handset

2) No VoLTE service status on S4-Mini handset

Observed Issue:

As shown in picture below, though we are able to see data services are active, no

VoLTE service is being observed. The internet & FTP session are running fine as

shown. When VoLTE call is made it shows “mobile network not available”.

Page 92: SCFT-Training_v8.2-1

No VoLTE service status on S4-Mini handset…

2) No VoLTE service status on S4-Mini handset

Root Cause:

As shown in picture below, problem was caused due to change in “PDN

preference settings”. Here “Enable Internet PDN” was unchecked. Please

restart the phone after checking the “Enable Internet PDN”.

Any change to the VoLTE configuration apart from above element, can cause

this type of problem.

Page 93: SCFT-Training_v8.2-1

XCAL-Mobile Software (Not XCAL-Auto Call) doesn’t start

3) XCAL-Mobile Software (Not XCAL-Auto Call) doesn’t start

Observed Issue:

XCAL-Mobile (Not XCAL-Auto Call) stops after showing message as “License

Error (UE time setting must be automatic)”

Page 94: SCFT-Training_v8.2-1

XCAL-Mobile Software (Not XCAL-Auto Call) doesn’t start…

3) XCAL-Mobile Software (Not XCAL-Auto Call) doesn’t start

Root Cause:

This was caused since the “Automatic date & time” was unchecked in “date & time”

settings.

Page 95: SCFT-Training_v8.2-1

FTP DTUL failed on Handset

4) FTP DTUL failed on Handset

Observed Issue:

FTP DTUL call failed on a particular handset.

Page 96: SCFT-Training_v8.2-1

FTP DTUL failed on Handset…

4) FTP DTUL failed on Handset

Root Cause:

As shown below, the FTP URL in which file is going to be uploaded, does not

change as per FMS server settings. This caused FTP traffic failure on the slave

handset.

This issue could be due to XCAL-Auto Mobile Version mismatch or old version

being used on slave handset as shown, since after upgrading the XCAL

version, the issue got resolved.

Page 97: SCFT-Training_v8.2-1

Not able to download scenario

Unable to download Stationary or Moving scenario

check the FTP server connectivity in your phones, check the IP address, user id and password and server path as shown below.

5) Not able to download Stationary or Moving scenario.

Observed Issue:

Root Cause:

Page 98: SCFT-Training_v8.2-1

Important Notes

Page 99: SCFT-Training_v8.2-1

Sector Swap Verification

After Physical site parameter verification, conduct drive test in clock wise and anti-clock wise direction to identify any sector swap

If found, take corrective action before going for coverage drive test

If service-direction of PCID has changed, Data Throughput degradation and Handover Fail can be observed

Sector Swap / Call drop: During Stationary test , Engineer must verify correct PCI for every sector, This can be done by checking the Changed PCI per sector and matching it will DTR or Cell Ref file provided to him by RF Lead.

During clockwise and anticlockwise moving test if there is call drop &PCI is changed after call drop then redo the clockwise/anticlockwise loop if call drop occurs again. Don’t proceed with SCFT & report to RF Lead

Page 100: SCFT-Training_v8.2-1

SCFT Parameter Requirements

Min Average Max

DL Throughput 2 Mbps 20 Mbps 40 Mbps

UL Throughput 256 Kbps -- 4 Mbps

RSRP -108 dBm -- --

SINR 20 dB -- --

Legend

Throughputs for Moving in Worst condition shouldn’t go below min. as per following table when RSRP = -108dbm and SINR = 20db Please note Throughput should be better when RSRP and SINR is better * Above table is just for reference for worst condition only

Page 101: SCFT-Training_v8.2-1

Summary

eNB physical check involves checking azimuth (note free range), tilt, antenna height, tower height

SCFT consists of stationary and moving tests

Stationary tests include ping, UL & DL throughput and VoLTE connectivity check

Drive around the site clockwise & anti-clockwise for moving tests

Especially check for sector swap using PCI

Ensure RSRP, throughput and SINR ranges are met

Page 102: SCFT-Training_v8.2-1

Quiz

Average DL throughput should be at least ____

• 4 Mbps

• 20 Mbps

• 40 Mbps

Sector swap can be identified based on

• PCI

• RSRP

• VSWR

Moving test in SCFT does not include

• FTP

• VoLTE

• Either

Page 103: SCFT-Training_v8.2-1

Work Flow Management for SCFT

Page 104: SCFT-Training_v8.2-1

Introduction to Work Order Assignment Management

Work Order Assignment Management is also known as WAS.

WAS is going to help users in automating the Work Order(WO) flow in a systematic manner using a portal called SITEFORGE.

Using this portal each level of Management employees will receive and execute their WO or Task assigned to them.

Helps to trace the network status through online mode.

Provides Visual steps to guide users on progress and upcoming steps.

Improves productivity & complete visibility.

Helps users to monitor Parameter Compliance Index(Planned Vs. Actual).

Helps users to Search/Filter Sites & WO based on various parameters.

Page 105: SCFT-Training_v8.2-1

Network Lifecycle Management Flow for SCFT

(Work Allocation System)

Page 106: SCFT-Training_v8.2-1

Work Flow Management for SCFT

Samsung CH assigns the WO to respective Samsung Area Manager (AM)

AM Splits WO into tasks & assigns SCFT task to

respective Solpar PM as per the area.

SOLPAR PM Assigns of SCFT Task to SOLPAR field eng

Responsibility: GIS/SIITE FORGE; Notification: Samsung CH

Notification:Samsung AM, RJIL CTO

Notification: Samsung CH, SOLPAR PM

Notification : Samsung Area Manager, Sasmsung RF lead, RJIL RF lead, SOLPAR FE

Notification: Samsung -CH

Notification: Samsung AM, Samsung RF Lead, Samsung CH, RJIO CTO.

RFI report submit Trigger from GIS & WO Issued to Samsung Circle Head (CH)

Samsung Optimization

engineer.

Notification:Samsung AM, Samsung RF Lead, Samsung CH, RJIO CTO, RJIL RF lead

SOLPAR FE Does the SCFT test in accordance with SCFT Test Procedure and update the

siteforge server if any parameter updates are done for the site.

Notification: Solpar PM, Samsung RF Lead

Samsung Optimization

team Validates the SCFT

report(Accept/Reject)

RJIL CTO Validates

SCFT report

Task closure in SITEFORGE

All tasks (ATP11A, ATP11B, SCFT & EMF) completed, WO closure Responsibility: RJIL

Circle CTO / GIS / System Notification RJIL Circle CTO, GIS

Start

End

Accept/Reject(if SOLFE is needed to be involved Accept

Rej

ect

Accept R

ejec

t

Page 107: SCFT-Training_v8.2-1

SCFT procedure on Site Forge (WAS)

Page 108: SCFT-Training_v8.2-1

CH - Login

Circle Head can login by entering his user name & password here

Page 109: SCFT-Training_v8.2-1

CH – Dashboard, Sites

CH has logged in & he is able to view dashboard which overview of Site details

Site details are available here

Filters are available here to extract data

Page 110: SCFT-Training_v8.2-1

CH – Sites…

Click here to know details of that particular site

Siite summary,RAN,Inventory,Trasnport,Phtos,Regulatory & Documents can be viewed here

Page 111: SCFT-Training_v8.2-1

CH – Work Orders , Sign out

CH has to click here to Assign or Re-assign WO to AM

CH has to click here to Assign or Re-assign WO to AM

Select AM from drop down

Option to Sign Out

Page 112: SCFT-Training_v8.2-1

AM – Login, Dashboard

AM can login by entering username & Password here

AM can view dashboard here

AM has logged in here

Page 113: SCFT-Training_v8.2-1

AM – Sites

List of sites are displayed here

Filters can be accessed here

Reports can be downloaded here by AM

Page 114: SCFT-Training_v8.2-1

AM – Work Orders

List of Work Orders are displayed here

Filters can be accessed here

Click here to assign or re-assign Samsung engineer

After assigning engineers from drop down Click here

Page 115: SCFT-Training_v8.2-1

AM – Work Orders…. Click here to see the list of tasks available

Click here to assign the task to SOLPAR PM

Assign task start/Finish dates and select SOLPAR PM from drop down

Page 116: SCFT-Training_v8.2-1

SOLPAR PM- Sign In, Sites

SOLPAR PM logs in by entering User name & Password

SOLPAR PM has logged in

Filters for accessing data

Sites information can be accessed here

Page 117: SCFT-Training_v8.2-1

SOLPAR PM- Sites

By clicking on particular site SOLPM will be able to see details of that site

Page 118: SCFT-Training_v8.2-1

SOLPAR PM- Tasks

List of tasks are displayed here

Click here to assign the task to SOLPAR FE(DT Engineer)

select responsible SOLPAR FE(DT engineer)from dropdown

Page 119: SCFT-Training_v8.2-1

SOLPAR FE(DT Engineer) – Sign In , Sites

SOLPAR FE(DT Engineer)logs in with his user name & Password

SOLPAR FE (DT engineer)has logged in here List of sites to be

handled can be viewed here

Filters are available Here

Page 120: SCFT-Training_v8.2-1

SOLPAR FE(DT Engineer) – Tasks

FE has to click here to complete task “Perform SCFT”

Click here to edit any parameters value if DT has changed during SCFT

Page 121: SCFT-Training_v8.2-1

SOLPAR FE(DT Engineer) – Tasks

After Editing the parameter FE has to save here

Page 122: SCFT-Training_v8.2-1

SOLPAR FE(DT Engineer) – Tasks…

Parameter Changes can be viewed by clicking here

Page 123: SCFT-Training_v8.2-1

SOLPAR FE(DT Engineer) – Tasks , Sign out

By clicking here FE will be able to see Reject reason of SCFT report

Option to sign out

Page 124: SCFT-Training_v8.2-1

Samsung Optimizer – Sign In , Sites

Samsung Optimizer logs in here

Samsung Optimizer views list of sites

Page 125: SCFT-Training_v8.2-1

Samsung Optimizer – Sites

When he clicks on particular site he will be able to see Site summary & Etc.

Page 126: SCFT-Training_v8.2-1

Samsung Optimizer – Sites…

RAN details are displayed here Inventory

details are displayed here

Transport details are displayed here

Site photos are displayed here

Page 127: SCFT-Training_v8.2-1

Samsung Optimizer – Sites…

Regulatory details are displayed here

Site documents are displayed here

Site documents can be uploaded here(if any)

Page 128: SCFT-Training_v8.2-1

Samsung Optimizer – Tasks

List of tasks to be handled are displayed here Task status

is displayed here

Click here to know the reason for rejection

Parameter changes info can be seen here

Page 129: SCFT-Training_v8.2-1

Samsung Optimizer – Sign Out

Samsung Optimizer can sign out here

Page 130: SCFT-Training_v8.2-1

Accelerating the SCFT

Process change recommendation

Page 131: SCFT-Training_v8.2-1

The SCFT Process

FMS

SCFT Stationary & Drive Test Data

ActixOne

Cellref

1. PCI 2. ECGI 3. Site Location (Lat/Long) 4. BSP 5. Coverage KPI 6. Polygon name

KPI Calculation and matching with Cellref

Data

1. No report 2. Blank KPI 3. 18 KPI pass/fail

SiteForge

Report download

Data upload

Report generation

Page 132: SCFT-Training_v8.2-1

The broad causes for unsuccessful report

1. No report 2. Blank KPI 3. 18 KPI pass/fail

SiteForge

Report download

1. Actix/Site ForgeIssue 2. Missing mandatory files

1. PCI mismatch 2. Missing Lat/Long parameters in the uploaded file

Page 133: SCFT-Training_v8.2-1

KPI failure and its causes

S. No. KPI Name Drive Type Type

1 Successful UE Attach ST KPI

2 Successful VoLTE Mobile-to-Mobile Call ST KPI

3 Successful Handover from Alpha DTDL, DTUL KPI

4 Successful Handover from Beta DTDL, DTUL KPI

5 Successful Handover from Gamma DTDL, DTUL KPI

6 Coverage Objective Met ( > 80% ) DTDL, DTUL KPI

7 Sector Swap ( < 50% ) DTDL, DTUL KPI

8 Cell Overshooting Observed ( < 10% ) DTDL, DTUL Info

9 Undesired Side Lobes ( < 30% ) DTDL, DTUL Info

10 Average / Peak MAC Throughput DL

(kbps) DTDL Info

11 Average / Peak MAC Throughput UL

(kbps) DTUL Info

12 Average VoLTE Jitter (ms) ST Info

1. Incorrect Drive 2. Incorrect HO

parameters 1. Azimuth mismatch 2. Sector swap 3. Site Location mismatch 4. Lesser samples

1. Incorrect Test 2. System Issue

1. Backhaul 2. FTP Server issues 3. External Interference

Page 134: SCFT-Training_v8.2-1

ActixOne Issues

PN Capacity / File Server Capacity issue.

Processing during Cellref update in Server.

Processing issue/File Server Capacity issue.

DT done with unlocked GPS (Solpar).

Others: (Loading, Scanned, Post-Processing, Achieve & File data deleted, database load failed, Very distance serving cell etc. )

1. Insufficient Disk Space (in DriveTest Landing Zone) Process: Bi-Weekly confirmation of sufficient disk space by Actix SPOC. Upto one month back successful SCFT files/logs to be archived. Samsung to recommend.

3. File Loaded into Actix, Processing issues

2. Blank ST KPI in case of missing Lat/Long Process: Actix should not consider Lat/Long for ST KPIs.

Reprocessing corrects the error

Page 135: SCFT-Training_v8.2-1

KPI Failure rate during SCFT

SCFT KPI Fail Reason KPI Fail %

VoLTE/Attach Success (6) Stationary Test Fail 20.9%

Handover (6) Handover Fail (No Attempt, HO Fail)

19.0%

Coverage Object Met (3)

Azimuth Mismatching 13.5%

BSP Mismatching 6.6%

Coverage Objective Fail. 16.7%

Missing Route 20.4%

Sector Swap (3) Crossed Feeder or CPRI cable 2.9%

Total 100%

20.9%

19.0%

13.5%

6.6%

16.7%

20.4%

2.9%

VoLTE/Attach Success Stationary Test Fail

Handover Handover Fail (No Attempt)

Coverage Object Met Azimuth Mismatching

Coverage Object Met BSP Mismatching

Coverage Object Met Coverage Objective Fail.

Coverage Object Met Missing Route

Sector Swap Crossed Feeder or CPRI cable

Page 136: SCFT-Training_v8.2-1

Some basic changes

1. SCFT together with the 11B, upload later (after 11B), this ensures

1. The eNB is working fine that day

2. No shut down, throughput, VoLTE or alarm issue

2. Local FTP server to be used

3. Mumbai FTP server daily monitoring & cleansing

Page 137: SCFT-Training_v8.2-1

Cellref reconciliation process (PA1)

1. PCI mismatch 2. Site Location mismatch 3. ECGI mismatch

PA1 (Cellref reconciliation)

At the time of Integration (Commissioning) 1. The LSMR Engineer fetches the dump of above parameter and forwards the logs to cellref team 2. The Cellref team corrects the data in case of mismatch

Page 138: SCFT-Training_v8.2-1

Azimuth reconciliation process (PA2)

1. ATP 11A Data is considered final, Cellref & BSP to be aligned to 11A (already in progress) 2. Sites have different Azimuth in actual 3. The sector drive test does not match with cellref BSP

PA2 (Azimuth Correction at Site) – PA2-1: Where Integration is done (To be verified & corrected by SCFT Team) PA2-2: Where 11A is done, but Integration is pending (To verified & corrected by Integration Team) PA2-3: Where 11A is not done, QC2 is pending (To verified during QC2 & get corrected before 11A) PA2-4: Where change of Antenna parameters not possible site, change cellref with RJIL in loop.

At the time of SCFT, the SOLPAR team will be given a print of cellref data, containing the following:1. Azimuths 2. PCI 3. Site Lat/Long The SCFT SOLPAR Team to 1. Check the actual Azimuth, and adjust antenna to match cellref, if required. 2. Check the PCI & Site Lat/Long. 3. Record the above data and Carry out the SCFT Test. 4. SOLPAR to be penalized if Azimuth not corrected before SCFT test.

PA2-1: Where Integration is done (To be verified & corrected by SCFT Team)

Page 139: SCFT-Training_v8.2-1

Hand Over test process (PA3)

1. The HO failure is high

PA3 (HO testing process)

The SCFT SOLPAR Team to 1. Make at least two rounds in each direction (clockwise & anti clockwise).

Modification in SCFT test automation tool 1. A separate test scenario on X-CAL

Page 140: SCFT-Training_v8.2-1

Ensure sufficient Coverage Samples (PA4)

1. The coverage samples and drive routes should be ensured.

PA4 (Drive Route process)

The Drive Route Should be decided on Google Map within BSP boundaries 1. The BSP to be provided to circle RF Leads 2. It should be possible to super-impose the BSP boundaries over Google map 3. The SOLPAR co-ordinator to take print of Google map with BSP boundaries,

indicate the route on the map and provide to drive test team. 4. Drive test team to follow the map, sign-off & submit.

Page 141: SCFT-Training_v8.2-1

File upload process (PA5)

1. There is a large NO/PARTIAL REPORT issue due to incomplete upload of files.

PA5 (File Upload Process)

1. The FMS should generate an SMS for the completion of all files 2. The X-CAL should have RED/GREEN indication for upload of mandatory files

Page 142: SCFT-Training_v8.2-1

Sector Swap Confirmation process (PA6)

1. There are sites where the CPRI cable is swapped with other sector RRH.

PA6 (Sector Swap Confirmation Process)

1. The CPRI swap test will be performed during 11B.

Page 143: SCFT-Training_v8.2-1

Throughput Confirmation process (PA7)

1. There are sites the throughput observed during SCFT test is too low.

PA7 (Throughput confirmation)

1. Since the KPI is for info only, RJIL should not hold the SCFT. 2. The SOLPAR team should contact circle RF lead if the throughput is lower than

xxMbps, and should not proceed with the SCFT drive.

Page 144: SCFT-Training_v8.2-1

Stationary Test process (PA8)

1. The Attach & VoLTE KPI failure is high.

PA8 (Stationary Test)

1. There will be two attempts for Attach testing in the X-CAL itself, rather than one. 2. QC1 radio bearer should be mandatory for VoLTE call. 3. If the VoLTE is not successful, the SOLPAR should contact circle RF lead, and

should proceed for Drive Tests.

Page 145: SCFT-Training_v8.2-1

Summary of processes

PA0 Actix Processes Naveen/Madhuraj

PA1 Cellref reconciliation DS Han

PA2 Azimuth Correction at Site WJ Lee

PA3 HO testing process WJ Lee

PA4 Drive Route process WJ Lee

PA5 File Upload Process Madhuraj/Gouri

PA6 Sector Swap Confirmation Process WJ Lee, Naveen

PA7 Throughput Confirmation WJ Lee

PA8 Stationary Test WJ Lee

Process Description Process Champion

Page 146: SCFT-Training_v8.2-1

Summary of processes

PA0 Actix Processes Naveen/Madhuraj

PA1 Cellref reconciliation DS Han

PA2 Azimuth Correction at Site WJ Lee

PA3 HO testing process WJ Lee

PA4 Drive Route process WJ Lee

PA5 File Upload Process Madhuraj/Gouri

PA6 Sector Swap Confirmation Process WJ Lee, Naveen

PA7 Throughput Confirmation WJ Lee

PA8 Stationary Test WJ Lee

Process Description Process Champion

Page 147: SCFT-Training_v8.2-1

SCFT Process

SCFT Site Survey

[ SOLPAR ] [ SAMSUNG ]

Ant.Para Mismatch

Stationary Test

No

Yes

Report Verify

Make SCFT DTR

[ Circle RF Lead]

SCFT Drive Test

Make Cellref File & BSP

Change Ant. Para

Handover Test

Log file Upload

ActixOne

SiteForge

Report Submit

FMS

[ Automation System ]

Yes

No

Provide updated Cellref file & BSP to RF lead every week

Provide SCFT DTR (Map & Ant. Info) to SOLPAR team

Order Rework (Physical para., Station, Handover, Drive Test)

Provide Fail Reason

PA2

PA3

PA4,7

PA6,8

Page 148: SCFT-Training_v8.2-1

PA2 Azimuth Correction at Site

Samsung (Circle RF Team) NOPT Cellref Eng.

SOLPAR Rigger RF Lead

Submit SCFT Site Survey Check List to Samsung RF lead

Provide updated Cellref file & BSP to RF lead every week

Make DTR with Cellref file & BSP

Provide SCFT DTR (Map & Ant. Info) to SOLPAR team

Check Ant. Para with DTR on site

If mismatch, Change Ant. Para according to value

of Cellref

Submit SCFT Site Survey Check List to NOPT engineer

Make Cellref file & BSP (Ant. Para matching with

ATP11A

Page 149: SCFT-Training_v8.2-1

Samsung (Circle RF Team) SOLPAR Rigger RF Lead

Check Inter Sector

Neighbor List

Confirm Neighbor List

Handover Test

PA3 Handover Testing Process

LSMR

If missing neighbor, Add neighbor in each sector

Confirm Neighbor List

Check Neighbor List

- Do Handover test before SCFT Drive test. - First take a clockwise drive. Start from Alpha to Beta, Beta to Gamma, Gamma back to Alpha. - Then take a anticlockwise drive. Start from Alpha to

Gamma, Gamma to Beta, Beta back to Alpha. • Clockwise : Alpha -> Beta -> Gamma-> Alpha • Anti-Clockwise : Alpha -> Gamma -> Beta -> Alpha

- Observe the target PCI change without Call Drop. ※ If the PCI is changed after call drop, then try to HO again. - If call drop happened again and again, then DO NOT EXECUTE SCFT and feedback to Samsung RF Lead immediately.

NOPT Cellref Eng.

Page 150: SCFT-Training_v8.2-1

PA4 Drive Route Process

Samsung (Circle RF Team) SOLPAR Rigger RF Lead

Submit missing road with photo or comment to RF lead

Provide updated Cellref file & BSP to RF lead every week

Make Cellref file & BSP (Ant. Para matching with

ATP11A

Make DTR with Cellref file & BSP

Provide SCFT DTR (Map & Ant. Info) to SOLPAR team

Drive Test according to DTR

- Tracking and compare the Driven Route with provided SCFT DTR during SCFT Drive Test. ※ If any DT Route is non motorable, then take photo and provide it to Samsung RF Lead with comment. - Drive all the roads as per SCFT DTR provided. - Drive all the roads in main lobe of serving sector.

Submit missing road with photo or comment to NOPT engineer

NOPT Cellref Eng.

Page 151: SCFT-Training_v8.2-1

PA6 Sector Swap Confirmation Process

Samsung (Circle RF Team) SOLPAR Rigger RF Lead

Report CPRI cable changing status on Site Survey Check List

Provide updated Cellref file & BSP to RF lead every week

Make Cellref file & BSP (Ant. Para matching with

ATP11A

Make DTR with Cellref file & BSP

Provide SCFT DTR (Map & Ant. Info) to SOLPAR team

Stationary Test If sector swapped,

Change CPRI cable of swapped secoters

NOPT Cellref Eng.

- Go to stationary point in main lobe of antenna and check PCI. - Compare the detected PCI with provided PCI (SCFT DTR) - For swap between sectors, change the CPRI cable of swapped sectors. - Check PCIs before start the SCFT for all three sectors again and if OK then proceed for SCFT Drive Test.

Submit SCFT Site Survey Check List to NOPT engineer

We need to consider checking sector swap, during ATP11B also.

Page 152: SCFT-Training_v8.2-1

PA7 Throughput Confirmation

Samsung (Circle RF Team) SOLPAR Rigger RF Lead

Check Backhaul & Alarm Status

Provide eNB Health Status

Drive Test

LSMR

Check Backhaul & Alarm Status. If any issue, Report

related team

Confirm eNB Health Status

Check eNB Health Status

NOPT Cellref Eng.

- DL/UL Throughput by Speedtest.net (App.) before test - During drive test if low throughput value is observed, then stop DT and restart the test. - During DT observe the DL/UL throughput changes all the time. - If the low DL or UL T-put is observed during SCFT even though signal condition is good and PCI value is correct then stop the SCFT and make the call again. If issue still persist, contact LMSR engineer.

Check eNB Health Status

Confirm eNB Health Status

Page 153: SCFT-Training_v8.2-1

PA8 Stationary Test

Samsung (Circle RF Team) SOLPAR Rigger RF Lead

If VoLTE call fail, report to RF Lead with symptom

Provide updated Cellref file & BSP to RF lead every week

Make Cellref file & BSP (Ant. Para matching with

ATP11A

Make DTR with Cellref file & BSP Every morning, before field team start test, get confirmation from RJIL circle

team that VoLTE is working or not.

Provide SCFT DTR (Map & Ant. Info) to SOLPAR team & VoLTE Call Health Stauts

Stationary Test (UE Attach/VoLTE call

setup)

NOPT Cellref Eng.

- Go to stationary point in main lobe of antenna and check PCI. (Have to check only one PCI assigned to test sector.) ※ Many field team move from sector to sector for stationary test, but the PCI change don’t happen and they do not notice it. - Compare the detected PCI with provided PCI (SCFT DTR). - Perform the VoLTE call test. - If VoLTE call fail, report to Samsung RF lead with symptom

Raise the issue to Samsung EPC team(DP) in that circle --> RJIL

manager in that circle --> IMS team

Page 154: SCFT-Training_v8.2-1

Summary

Work Order Assignment Management is also called as WAS.

AM receives SCFT trigger once ATP11B process is completed.

AM assigns SCFT Task to Samsung Optimizer & Samsung RF Head.

AM distributes(assigns) “Perform SCFT” Task to SOLPAR PM.

SOLPAR PM will further assign “Perform SCFT” task to SOLPAR FE(DT Engineer).

SOLPAR FE has to accept this task from SOLPAR PM and follow below steps.

a)SOLPAR FE will conduct SCFT task using Mobile device(eg:S4 Mini) to complete and upload test data to FMS server(separate process)

b)SOLPAR FE will input parameter changes(if any) to siteforge server and submits it for Samsung Optimizer approval.

Samsung Optimizer will accept or reject according SCFT test data available in FMS server and flow continues.

Overall WAS Improves productivity & complete visibility.

Page 155: SCFT-Training_v8.2-1

QUIZ

Question 1:

Who will assign SCFT Task to Samsung RF head ?

Ans:

Samsung Area Manager

Question 2:

Who will assign “perform SCFT” task to DT Engineer?

Answer:

PM(SOLPAR)

Question 3:

Whether Samsung RF head can reject approved SCFT data by Samsung Optimizer?

Answer:

A) Yes

B) No

Page 156: SCFT-Training_v8.2-1