SCATTERGOOD STEAM PLANTLOS ANGELES DEPARTMENT OF WATER AND POWER
,-'-
I
I
Dedication of the Scattergood Steam Plant is a tribute tothe genius and leadership of Ezra F. Scattergood, the fatherof the municipal Power System of Los Angeles. From hisearliest association with the City of Los Angeles in 1906,he devoted more than 40 years to the unselfish service ofthe people of this city, having as his constant goal the providing of ample low cost power to enable the communityto grow and prosper. Through his labors, the citizen-ownedPower System was established and became one of the mostimportant factors in the remarkable growth and deveiopment of Los Angeles.
The date of September 10, 1959, for the dedication of theScattergood Steam Plant is significant as the 50th Anniversary of the establishment of the Bureau of Los AngelesAqueduct Power, with Mr. Scattergood as Chief ElectricalEngineer. This marked the beginning of a program by thecity to develop the 'power potential of the Los AngelesOwens River Aqueduct, then in construction. In the nexttwo years, the people of Los Angeles gave their enthusiastic
IN
MEMORY
AND
HONOR
OF
EZRA F.
SCATTERGOOD
Ezra F. Scattergood 1871-1947Founder and First Chief Electrical Engineerand General Manager of the Power Systemof the City of Los Angeles.
support by approving a $3,500,000 bond issue for construction of power plants on the aqneduct and by voting overwhelmingly in favor of the city establishing its own powersystem to distribute electricity to the community. The city'snew Department of Public Service, established in 1911,included a Bureau of Power and Light under Mr. Scattergood along with a Bureau of Water Works and Supply underWilliam Mulholland. This organization became the Department of Water and Power in 1925.
Mr. Scattergood was one of Southern California's staunchestleaders in the struggle to win Federal government approvalfor the Boulder Canyon Project which resulted in construction of Hoover Dam and its great power plant serving LosAngeles and the Southwest.
As an interesting comparison, the Scattergood Steam Plantwhen fully developed as planned will have a total powercapacity almost equal to the mighty Hoover Dam PowerPlant which Mr. Scattergood worked so hard to bringinto being.
SCATTERGOOD STEAMTHURSDAY, SEPTEMBER 10, 1959
PLANT
VVELCOME AND INTRODUCTIONS BURTON S. GRANT
Assistant General Manager and Chief EngineerDepartment of Water and Power
EULOGY: EZRA F. SCATTEHGOOD'S
HISTOHIC CONTRIBUTION WILLIAM S. PETERSON
General Manager and Chief EngineerDepartment of Water and Power
PHESENTATION OF SCATTERGOOD STEAM PLANT
TO THE CITIZENS OF Los ANGELES J. C. MOLLER, JR.President
Board of Water and Power Commissioners
ACCEPTANCE FOH TH'E CITIZENS OF Los A1':GELES JOHN S. GIBSON, JR.President
Los Angeles City Counciland Acting Mayor of Los Angeles
UNVEILI1':G OF MEl\IOHIAL PLAQUE
AKD DEDICATION MISS ELISABETH SCATTERGOOD
GUIDED TOURSGuided tours of the Scattergood Steam Plant will be available to guests at the dedication,preceding the luncheon program, and immediately following, starting at 2 p.m. Time requiredfor tour approximately one-half hour.
Guided tours will be available to the general public during Open House at Scattergood'SteamPlant, Friday and Saturday, September 11 and 12, from 10 a.m. to 9 p.m., and Sunday,September 13, from 10 a.m. to 6 p.m.
BOARD OF WATER AND POWER COMMISSIONERS
J. C. MOLLER, JR., PresidentW. BALLENTIKE HENLEY, Vice-PresidentW. A. Sn.IPSON, JR.
J. A. THOMPSC)NLOYD WHIGHT
JOSEPH L. WILLIAMS, SecretaryDEPARTMENT OF WATER AND POWER
\VILLIAM S. PETERSON
General Manager and Chief EngineerBURTON S. GRANT
Assistant General Manager and Chief EngineerSAMUEL B. NELSON
Chief Engineer of 'Vater Works and Assistant M allagerIv AK L. BA TEMAK
Chief Electrical Engineer and Assistant ManagerFRANK TWOHYControllerGEOHGE C. SoppJoint System Head and Assistant ManagerGILMORE TILLMAN
Chief Assistant City Attorney for 'Vater and PowerPOWER SYSTEM
IVAN L. BATEMAN, Chief Electrical EngineerBHADLEY COZZEKS, Assistant Chief Electrical EngineerA. L. VVILLIAMS, Assistant Chief Electrical EngineerE. L. KAKOUSE, Engineer in ChargeDesign and Construction DivisionT. !\1. BLAKESLEE, Engineer in ChargeOperating and Maintenance DivisionCLA YTON M. ALLEN, Engineer in ChargeGeneral Plant Division
ROBEHT H. COCKFIELD, ManagerGeneral Sales Division
LOS ANGELES CITY-OWNEr.>
DEPARTMENT OF WATER & POWER
.~
••..--•
DESIGN AND CONSTRUCTION:STEAM DESIGN B. G. HUME
A.F.FRENCHH. E. BURKE
J. C. HERRICK
ELECTRICAL DESIGN ... J. P. STRATFORDC. M. SHORTR. A. ERWINK. O. CARTWRIGHT
CIVIL & STRUCTURALDESIGN ANDADMII>:ISTHATIVE ..... L. T. MAHlNER
W. A. HUNSUCKERG. H. LITTLEL. H. ENGEL
CO::-JSTHUCTIOI>: J. F. MARISCAL\V. C. MASONH. M. WILLIAMSD.B.ALLEND. E. SPARKMANS. P. HIVERS
T. J. KEANEY
OPERATION AND MAINTENANCE:OPEHATIOI>: A. C. WINGO
F. L. GossB.. C. ALEXANDERW. C. POE
GENERAL PLANT:R E. HOWLEYF. R. GOULDR.G.BOOTHA. W. HOWELL