Scanned by CamScanner
Minutes of 40th SOAP Meeting held on 28.04.2018 Page 1
SSLLDDCC
MMIINNUUTTEESS OOFF 4400tthh
MMEEEETTIINNGG OOFF SSOOAAPP
HHEELLDD OONN 2288..0044..22001188
Minutes of 40th SOAP Meeting held on 28.04.2018 Page 2
Minutes of 40th
meeting of Sub Committee for Operation and Protection (SOAP)
held at SLDC, Raipur on 28.04.2018
The 40th
meeting of Chhattisgarh State Operation and Protection Sub
Committee of SGCC was held on 28th
April 2018 at SLDC Conference Hall.
The list of participants is enclosed in Annexure-I.
Shri S.K. Tiwari, Superintending Engineer (SO), SLDC welcomed all the
participants of 40th
SOAP meeting.
Item no. 1 Confirmation of minutes:
No comments have been received from any office. Therefore
minutes of 40th
SOAP meeting is hereby confirmed.
Sub Committee agreed and noted.
Item no. 2 Review of system operation during the month of March 2018:
Presentation and the performance of Thermal Stations and
Transmission System by SLDC, is enclosed in Annexure-II.
Sub Committee noted.
Item no. 3 State Energy Account (SEA) Data:
It is also requested to O/o CE (S/s: O&M) CSPTCL and O/o CE
(Revenue) CSPDCL to submit the required data of previous month
by 15th of every month for the calculation of Transmission Loss so
that the same can be discussed during the meeting. The loss of
Feb18 has been erratic as such both office are requested to verify
the data sent by their offices.
Item no. 4 Outage planning for the month of June 2018 & July 2018:
Outage planning of Transmission feeders, Power transformers for
the month June 2018 & July 2018, submitted by O/o CE (S/s:
O&M) is enclosed in Annexure III.
Sub Committee agreed and noted.
Minutes of 40th SOAP Meeting held on 28.04.2018 Page 3
Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal
units as on 28.03.2018:
The FGMO/RGMO of all units of Korba West is out, except unit
no.5 of KWB. This has been viewed very seriously and requested
necessary action by the authorities of KWB to put them operation or
approval of CSERC shall be obtained for exemption of RGMO/FGMO.
The committee has been apprised about the Primary
response by CG state in the last three events which are given under:-
i. Event-1 on 23/04/2018 10:42hrs when frequency of grid falls from
50.00 to 49.63 Hz (decrease of 0.37 Hz) due to loss of 3090 MW in
WR- Average response as % of ideal for CG state was 36.16%.
The Station heads of all State Thermal Stations have been requested
to intimate steps to improve FRC of State generating Stations.
For providing signal for Monitoring of Restricted Governor Mode
Operation (RGMO) at SLDC for ensuring grid security and proper
operational guide lines by concerned grid operators, the status is:
i. MTTPS – a. To extend OPC data but SCADA at SLDC has no
provisions.
Alternatively
b. The protocol convertor D 400 needs to be updated for which they
are persuading GE. GE is not responding.
However SLDC feels that the same can be extended using spare port in
BCU.
ii. HTPS: - The signal of Unit No.5 has been provided in SCADA.
iii. DSPM: - Will be taken up shortly
ED (O&M: Gen) CSPGCL has asked the present officials to visit
Sipat TPS of NTPC to update about the above issues.
ACTION: ED (O&M: Gen), CSPGCL Raipur, ED (Gen) DSPMTPS
CSPGCL Korba & CE (Gen) HTPS CSPGCL Korba. CE (Gen) MTTPS
CSPGCL Marwa.
Minutes of 40th SOAP Meeting held on 28.04.2018 Page 4
Item no.6. Details of new transmission lines, transformer or any other
transmission elements to be charged in May 2018 & June 2018:
The representative from O/o CE (S/s: O&M) has intimated the
following list of new substation for charging in May-June 2018:
Sl.No. Name of S/s Particulars EHV SUB STATION
1 132 KV S/s Mohala 132/33 KV
2 132 KV S/s Kansabel 132/33 KV
3 132 KV S/s Bakhara 132/33 KV
EHV Power Transformers
1 132/33 KV S/s Gandai 132/33 KV 40 MVA No. - II
2 132/33 KV S/s Rasmada 132/33 KV 40 MVA No. - II
3 132/33 KV S/s Kawardha 132/33 KV 40 MVA No. - II
4 132/33 KV S/s Gharghoda
132/33 KV 40 MVA No. - II
Sub Committee noted.
Item no. 7. Details for Installation of capacitors to be furnished to WRPC:
The data was submitted by O/o C.E. (S/s: O&M), CSPTCL
during meeting.
Date & Venue of next meeting:
The 41th
SOAP meeting is proposed to be held on 28th May 2018
(Monday) at SLDC Raipur. The time of meeting will be from
12:00 hrs sharp.
*******
Annexure-I
S.No. Participants Designation Office Name Mobile No E-mail ID
1 Shri.N.K.Bizora ED O/o ED(O&M:Gen),CSPGCL 9407739777 [email protected]
2 Shri.J.R.Patel Addl. CE O/o ED(Revenue),CSPDCL 9425212795 [email protected]
3 Shri.S.K.Tiwari SE(SO) O/o CE(SLDC), CSPTCL 9827117925 ……..
4 Shri H.K Deota SE (LD) O/o CE(SLDC), CSPTCL 9893150920 [email protected]
5 Shri.J.K.Vaidya SE O/o ED(O&M), CSPGCL 9425382836 [email protected]
6 Shri.Y.K.Rao EE O/o ED(SLDC), CSPTCL 9826518820 [email protected]
7 Shri.A.K.Sahu EE O/o ED(C&P),CSPTCL 9827114955 ……..
8 Shri.Shashank Dhabre EE O/o ED(O&M:Gen),CSPGCL 9329296556 [email protected]
9 Shri.Suchendra Uike EE O/o ED(SLDC), CSPTCL 9685554777 [email protected]
10 Shri.Sanjay Kujur EE O/o CE(S/s:O&M), CSPTCL 8435650300 [email protected]
11 Shri Vishnu Kumar Markam EE O/o ED(C&P),CSPTCL 8319124019 ……..
12 Mrs. Gayatri Kanwar EE O/o ED(C&P),CSPTCL 9406072396 [email protected]
13 Shri.K.K.Bajaj AE O/o ED(O&M:Gen),CSPGCL 9424228869 [email protected]
List of participants attended the40th SOAP (Sub-committee of Operation & Protection) Meeting.
Annexure-I
S.No. Participants Designation Office Name Mobile No E-mail ID
List of participants attended the40th SOAP (Sub-committee of Operation & Protection) Meeting.
14 Shri.S.Surya Prakash AE (LD) O/o CE(SLDC), CSPTCL 9329012913 [email protected]
15 Shri.Sourabh Pandey AE O/o CE(S/s:O&M), CSPTCL [email protected] ,
16 Shri Manish Ku. Shrivastava AE O/o SE(ET&T),HTPS,KWB 9827176193 [email protected]
17 Ms. Juvena Gomes AE O/o SE(Back-up SLDC), CSPTCL 9827495849 [email protected]
18 Ms.Amita Bara AE O/o ED(SLDC), CSPTCL 9827193201 [email protected]
5/22/2018
1
AGENDA
1. Confirmation of minutes.
2. Review of system operation during the month
of March 2018, by SLDC.
3. State Energy Account (SEA) Data.
4. Outage planning for the month of June 2018 &
July 2018.
5. Status of FGMO/RGMO in thermal units as on
28.04.2018.
5/22/2018
2
AGENDA…. Continued
6. Details of new transmission lines, transformer
or any other transmission elements to be
charged in June 2018 & July 2018..
7. Details of Installation of capacitors to be
furnished to WRPC:
8. Web Scheduling software of SLDC.
AGENDA-1.Confirmation of minutes
The Minutes of Meeting held on 29.02.2018 at
SLDC were forwarded vide letter No. 03-
02/SLDC/OPN/SOAP/171, Raipur dated
23.04.2018.
Till date no comments has been received as such
the committee may confirm the minutes of 39th
SOAP meeting.
5/22/2018
3
AGENDA-2:
Review of system operation during the
month March- 2018, by SLDC.
1.1 PERFORMANCE OF CSPGCL THERMAL & HYDEL POWER PLANT :
Generation (in MU)PLANT AVAILABILITY FACTOR
PAF (in %)
PLANT LOAD
FACTOR PLF
(in %)
Genera
torCapacity
MAR-
18
Prog.
from
Apr-17
Gross
Gen.
Target*
MAR-18Prog.
from
Apr-17
Normative
Target *
MAR-18Prog.
from
Apr-17
KTPS440 MW
{4X50 +
2X120}149.45 1787.46 2325.00 44.63 45.61
60%- PH2
70%- PH345.65 46.37
DSPM500 MW
{2X250}355.68 4042.98 3723.00 101.54 96.30 85.00 95.61 92.31
HTPS 840 MW
{4X210}476.89 5297.57 6107.47 78.92 75.49 83.00 76.31 71.99
KWB
Extn
500 MW
{1X500}350.91 3986.07 3723.00 95.64 92.10 85.00 94.33 91.01
MARWA500 MW
{2X500}505.67 5719.99 --- 67.61 65.31 --- 67.96 65.29
THERMAL 3280 MW 1838.61 20834.07 --- --- --- --- 75.34 72.51
BANGO
HPS
120 MW
{3X40}3.15 216.86 274 --- --- --- --- ---
5/22/2018
4
1.2 PERFORMANCE OF CSPGCL
Generating
StationCapacity
Auxiliary Consumption (in %) No. of Forced Outage
MAR-18Progressive
from Apr-17
Target*MAR-18
Progressive
from Apr-17
KTPS440 MW
{4X50 +
2X120}12.94 13.23 11.25 6 93
DSPM500 MW
{2X250}7.69 7.91 9.00 0 8
HTPS840 MW
{4X210}9.49 9.89 9.70 5 71
KWB
Extn.500 MW
{1X500}4.17 4.41 5.25 0 11
MARWA500 MW
{2X500}6.16 6.61 5.25 2 41
THERMAL 3280 MW 7.49 7.84 --- 13 224
BANGO120 MW
{3X40} 1.77 0.331.00
--- ---
1.3 Frequency ParticularsFrequency status during Feb-18, Mar-17 & Mar-18 (As per WRLDC)
Other Frequency parameters during the month of March- 2018.
Frequency Status FEB-18 MAR-18 MAR-17
% of time % of time % of time
Between
49.90 & 50.05 Hz80.25 79.29 73.56
< 49.90 Hz 9.69 12.99 8.95
> 50.05 Hz 10.06 7.72 17.50
Frequency Status Frequency {Hz} Time
{ h:mm:ss}
Date
Average Freq. 49.97 -- --
Max Instantaneous Freq. 50.25 13:03:20 21.03.18
Min Instantaneous Freq. 49.68 21:19:30 14.03.18
5/22/2018
5
1.4 Demand Pattern.
FEB-18 MAR-18 MAR-17% Change
compared to
previous year
Max. Demand Met
3655 MW
28.02.2018
18:45
3929 MW
30.03.2018
18:45
3768 MW
29.03.2018
19:00
4.27%
Max. Unrestricted
Demand at the
time of Max.
Demand Met
3663 MW 3923 MW 3775 MW 3.92%
Min. Demand Met
1704 MW
11.02.2018
18:00
2345 MW
02.03.2018
14:30
2341 MW
13-03-17
16:00
0.17%
Max. Unrestricted
Demand
3663 MW
28.02.2018
18:45
3923 MW
30.03.2018
18:45
3917 MW
31-03-17
22:00
0.15%
2800
2900
3000
3100
3200
3300
3400
3500
3600
3700
3800
3900
4000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
MW
Date
Daily Max Demand met in the month of Mar-18, Mar-17 & Feb-18.
MAX 3929 MW on 30.03.2018 at 18:45 hrs.
Average increase of 4.27 % compared to last year.
FEB-
2018
MAR-
2017
MAR-
2018
3929 MW
on 30.3.18
at 18:45
Hrs.
3655 MW on
28.02.18 at
18:45 Hrs
3768 MW on
29.03.17 at
19:00 Hrs
5/22/2018
6
2200
2400
2600
2800
3000
3200
3400
3600
3800
4000
MW
Date
Daywise Min and Max Demand met in the month of Mar-18,
[ Difference : Max 884 MW on 05.03.18 & Min 509 MW on 31.03.18 ]
509MW
884MW
2800
3000
3200
3400
3600
3800
4000
MW
Date
Daywise Maximum Resrticted Vs Unrestricted Demand in the month of
Mar-18,
RESTRICTED
DEMAND
UNRESTRICTED
DEMAND
5/22/2018
7
MONTH MAXIMUM MINIMUM AVERAGE
APR-17 4074 3221 3698
MAY-17 3889 1771 3239
JUN-17 3389 2499 2933
JUL-17 3722 2288 3085
AUG-17 3998 2687 3447
SEP-17 4093 2460 3422
OCT-17 3832 2274 3169
NOV-17 3406 2166 2708
DEC-17 3409 2302 2783
JAN-18 3409 2335 2876
FEB-18 3655 1704 2902
MAR-18 3929 2345 3324
YR 2017-18 4093 1704 3132
ANNUAL DEMAND PATTERN.
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
3100
3200
3300
3400
3500
3600
3700
3800
3900
4000
4100
Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18
MW
Date
ANNUAL PATTERN OF DEMAND MET OF FY: 2017-18
MAXIMUM
AVERAGE
MINIMUM
5/22/2018
8
3300
3400
3500
3600
3700
3800
3900
4000
4100
4200
4300
4400
Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18
MW
Date
MONTHLY MAXIMUM RESTRICTED V/s UNRESTRICTED DEMAND OF
FY: 2017-18
MAX.
RESTRICTED
DEMAND
MAX.
UNRESTRICTED
DEMAND
MW %
CSPGCL Thermal
(Ex Bus)2546 65%
CSPGCL Hydel 49 1%
CPP/IPP's (STOA+PPA)
Injection + Inter state STOA83 2%
Other Injection 78 2%
CS Share including BSP share in
NSPCL1450 37%
Net Import / Export -351 -9%
OD(+) / UD(-) 73 1.86%
Demand Met (MW) 3929
Availability during Monthly Peak Demand Met: (3929 MW on 30-03-2018 at 18:45 hrs)
5/22/2018
9
CSPGCL Thermal
, 2546
CSPGCL Hydel, 49
CPP/IPP's
(STOA+PPA)
Injection + Inter
state STOA, 83
Other Injection, 78
CS Share including
BSP share in
NSPCL , 1450
Net Import(+) /
Export (-), -351 OD(+) / UD(-) , 73
Break-Up of Generation / Injection at the time of monthly Peak Demand.
3929 MW on 30.03.2018 at 18:45 Hrs
Total Import at
the time of Max
Demand Met, 904
Total Export at
the time of Max
Demand Met, -
1255
Import and Export at the time of max. demand met.
3929 MW on 30.03.2018 at 18:45 Hrs.
5/22/2018
10
1.5 LOAD SHEDDING
Load Shedding during March-2018:
Load Shedding Duration
(in HH:MM)
Equivalent
Load Relief
(in MU/Day)
Max Load
Shedding
Done.
In Groups
Feeders
--- NIL ---In Industrial
feeders
TOTAL
1.6 - SOLAR POWER INJECTION (At 132 KV)From Apr-17 to Mar-18
M/s Acme
[30 MW]
M/s Azure
[3X10 MW]
M/s Parampujya
[2X50 MW]
[Infirm Power]
Total
APR-17 MU 4.624 4.650 ---- 9.274
MAY-17 MU 4.595 4.107 ---- 8.702
JUN-17 MU 3.680 3.335 ---- 7.015
JUL-17 MU 2.894 2.991 ---- 5.885
AUG-17 MU 3.288 3.243 ---- 6.531
SEP-17 MU 3.43 3.62 ---- 7.050
OCT-17 MU 3.677 4.045 2.641 10.363
NOV-17 MU 3.735 3.699 7.961 15.395
DEC-17 MU 4.076 4.137 11.774 19.987
JAN-18 MU 4.378 4.686 13.969 23.033
FEB-18 MU 3.923 4.080 16.080 24.083
MAR-18 MU 4.061 4.250 19.211 27.522
Total MU 46.361 46.843 71.636 164.84
5/22/2018
11
1.7 - TRANSMISSION LOSS
Performance of CSPTCL : Transmission Loss(%) as per data
provided by O/o of CSPGCL, CSPTCL & CSPDCL.
2017-18 2016-17% Change compared
to previous year
APR 3.33% 2.99% 11%
MAY 2.88% 2.96% -3%
JUN 2.89% 2.84% 2%
JUL 2.87% 2.65% 8%
AUG 2.96% 2.36% 25%
SEP 3.11% 2.32% 34%
OCT 3.14% 2.83% 11%
NOV 2.92% 2.21% 32%
DEC 3.04% 3.04% 0.11%
JAN 3.10% (Provisional) 3.00% 3.37%
FEB 3.05% ---
MARDATA AWAITED FROM O/o CE
(Revenue) 3.30%---
AGENDA - 3
As per the directives of CSERC to the state power
companies & SLDC, under clause no. 10.1.3.2 (Page-258)
SLDC has been directed to submit quarterly report of
SEA.
It is requested to the O/o CE (Revenue) CSPDCL to
submit consumer wise EHV sales/consumptions (in MU)
for the month of March-2018 and also to O/o CE
(RA&PM) CSPDCL to submit certified copy of the energy
injected & purchased (in MU) into the system by State’s
CPPs / IPPs /Biomass /Non conventional generators (that
may include 33KV and 132 KV& above separately) for the
month of October-2017 to March-2018.
5/22/2018
12
Annexure III
Date Time Date Time
Routine Maintenance
1 400 400 KV Bus-II at 400 KV S/s Raita. 6/7/2018 8:00 6/7/2018 17:00 Daily
400 KV CVT & Isolator Maintenance
work. No interuption as power will be
managed by 400 KV Bus-I.
2 220220 KV PGCIL Ckt-I at 220 KV S/s
Raigarh6/10/2018 8:00 6/10/2018 17:00 Daily Annual Maintenance Programme.
3 220220 KV PGCIL Ckt-II at 220 KV S/s
Raigarh6/14/2018 8:00 6/14/2018 17:00 Daily Annual Maintenance Programme.
S.No KV Lines/ ICT Particulars From To Daily /
Continuous Reason
Sr. No. Name of S/S Name of feeder Date & Duration Remark
10.06.17
(08:00 hrs. to 17:00 hrs.)
14.06.17
(08:00 hrs. to 17:00 hrs.)
24.06.17
(08:00 hrs. to 17:00 hrs.)
Sr. No. Name of S/S Name of feeder/X-mer Date & Duration Remark
07.07.17
(08:00 hrs. to 17:00 hrs.)
14.07.17
(08:00 hrs. to 17:00 hrs.)
27.07.17
(08:00 hrs. to 17:00 hrs.)
1220 KV S/s
Raigarh
160 mva ,220/132 KV
X-mer-II
For preventive
maintenance
OUTAGE PLANNING MONTH OF JUNE-2018
1220 KV S/S
Raigarh220 KV PGCIL Ckt-I
For preventive
maintenance
2220 KV S/S
Ragiarh220 KV PGCIL Ckt-II
For preventive
maintenance
3220 KV S/s
Raigarh
160 mva ,220/132 KV
X-mer-I
For preventive
maintenance
OUTAGE PLANNING MONTH OF JULY-2018
2220 KV S/s
Raigarh
160 mva ,220/132 KV
X-mer-III
For preventive
maintenance
2132 KV S/s
Raigarh
40 mva ,132/33 KV X-
mer-II(BB)
For preventive
maintenance
Annexure III
From To
1 220 KV bus coupler bay 8:00 17:00 02.06.2018 30.10.2018
Bus Coupler CT &
Isolator Maintenance
work
2 400 KV Bus-II 8:00 17:00 07.06.2018 15.10.2018
400 KV CVT & Isolator
Maintenance work. No
interruption as power
will be managed by 400
KV Bus-I
3 220 KV Bus-I 8:00 17:00 13.06.2018 24.10.2018
220 KV CVT & Isolator
Maintenance work. No
interruption as power
will be managed by 220
KV Bus-II
4 220 KV Bus-II 8:00 17:00 20.06.2018 27.10.2018
220 KV CVT & Isolator
Maintenance work. No
interruption as power
will be managed by 220
KV Bus-I
PeriodS.No. Name of ICTs/Feeder
Pre-mansoon
Maintenance
Post-monsoon
MaintenanceRemark
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner