CONSENT LETTER
The Quarry Plan along with Progressive Quarry Closure Plan with
Environmental Management Plan of Flagstone Quarry village Ghodari has been
prepared by Shri Hemant Kumar (RQP No. RQP/DGMCG/91/2017) under
Chhattisgarh Minor Mineral Rules, 2015 for approval. The lease hold area is
located in Village- Ghodari, Tehsil - Mahasamund, District - Mahasamund C.G
covering an area of 0.56 hectares.
The Director Geology and Mining, Chhattisgarh / competent Authority is
hereby requested to make further correspondence regarding this Quarry Plan
with the person and address mentioned below-
Hemant Kumar
Village Raweli
P.O.Parsada District Raipur
RQP No. - RQP/DGMCG/91/2017
An undertaking in this regard is being submitted that the Quarry Plan so
prepared by the recognized person with my knowledge and consent and shall be
acceptable to me in all respects. I have clearly understood the contents of the
Quarry Plan and agree to implement.
Place: Applicant
Date: Shree Leelaram Chaudhary
3
CERTIFICATE FOR FULL CONSULTATION
This is to certify that the Quarry Plan along with Progressive Quarry Closure
Plan with Environmental Management Plan of Flagstone Quarry village
Ghodari of the applicant Shree Leelaram Chaudhary located in village- Ghodari,
Tehsil - Mahasamund, District – Mahasamund of Chhattisgarh State covering
lease hold area 0.56 hectares has been prepared by Shri Hemant Kumar., (RQP
No. RQP/DGMCG/91/2017), in full consultation with me and I have understood
its contents and agree to implement the same in accordance with the law.
Place: Applicant
Date: Shree Leelaram Chaudhary
4
CERTIFICATE OF COMPLIANCE AND CORRECTNESS
1. Certified that the provisions of related Act and rules have been
considered in the Quarry Plan of Flagstone Quarry village Ghodari area
of 0.56 hectares in village- Ghodari, Tehsil – Mahasamund, District-
Mahasamund of Chhattisgarh State, which belongs to the applicant
Shree Leelaram Chaudhary.
2. Certified further that the provisions mentioned in Act, Rules and
Regulations have been considered in the Quarry Plan and wherever
specific permissions are required, the applicant will approach to the
concerned competent authorities including D.G.M.S. for the same.
3. There is no violation against provision of Rules, Regulations of
MMR, 1961 and there is no danger to human life.
4. The information furnished in the Quarry Plan is true and correct to
the best of our knowledge.
Place- Raipur Hemant Kumar
Date ................
RQP No. - RQP/DGMCG/91/2017
5
INDEX
S.No. CONTENTS OF QUARRY PLAN PAGE No.
1 General 7
2 Location 8-10
3 Geology and exploration 11-14
4 Reserve 15-16
5 Development and production programme 17-25
6 Manpower deployment 26
7 Use of Minerals 26
8 Waste disposal Arrangement 27
9 Environmental Management Plan 28-33
10 Measures to be taken for reclamation of
land
34
11 Quarrying closure plan 35-37
12 Strategy for protection of River course,
Nalas, Water Tank, Villages, Important
monuments, if any
38
13 Any others relevant information 39
6
LIST OF PLATES
S.No. NAME OF PLATES PLATE No.
1 Toposheet 1
2 Location (Not To
Scale )
2
3 Khasra Map (Scale
1:4000)
3
4 Google Map (Not To
Scale )
4
5 Surface Geological Plan &Section
(Scale 1:1000)
5
6 1st Five Year Production Plan&Section (Scale 1:1000)
6
7 2nd Five Year Production Plan & Section
(Scale 1:1000)
7
8 Conceptual Plan & Section
(Scale 1:1000)
8
9 Progressive Quarry Closure Plan (Scale 1:1000)
9
7
CHAPTER-1
GENERAL
(a) Name of Applicant Shree Leelaram Chaudhary
S/o Shri Nanku Ram Chaudhary
Address -
Village Ghodari
Tehsil Mahasamund
District Mahasamund
State Chhattisgarh
PIN code 493445
Phone 6260856463/7697775787
(b) Status of the Applicant Individual
(c) Mineral(s) which are occurring in area and which the applicant intends to Mine
Flagstone (As per Schedule I Part C (2) of Chhattisgarh Minor Mineral Rules, 2015)
(d) Period of which mining lease is granted
LOI issued for 30 yearletter no- 938, Dated 23/04/2018
(e) Name of the Recognized Qualified Person preparing the Quarry plan
Hemant Kumar
(f) Registration No. of Recognized Qualified Person or authorization of the state government,
RQP/DGMCG/91/2017
(g) Name of prospecting agency Not Applicable.
(h) Whether area is prospected by the
Directorate Geology and Mining, If
yes then enclose a certified copy of
prospecting report.
Not Applicable.
8
CHAPTER-2
LOCATION
A. Detail of the Area
State ChhattisgarhDistrict MahasamundTaluka MahasamundVillage GhodariKhasra No. 352,353,354,433/4
Forest Range NoForest Division/Circle NoLease area (hectares) 0.56ha.Whether the area is recorded to be in forest (please specify whether protected, reserve etc.)
No.
Ownership/Occupancy Govt. land --Private land 0.56 haForest land --
Existence of public Road/ railway line, if any, nearby and approximate distance
The area is about 10 km from district HQ Mahasamund. The nearest railway station Belsonda is about 5.0 km. NH 6 is about 0.5km
Toposheet No with Latitude/ Longitude
Toposheet No. 64 K/4
BP. No. LATITUDE LONGITUDEA 21°10'23.56"N 82° 1'41.42"EB 21°10'25.01"N 82° 1'41.40"EC 21°10'24.96"N 82° 1'43.18"ED 21°10'25.58"N 82° 1'43.36"EE 21°10'25.19"N 82° 1'44.17"EF 21°10'25.26"N 82° 1'44.82"EG 21°10'26.12"N 82° 1'44.91"EH 21°10'26.18"N 82° 1'47.17"EI 21°10'25.81"N 82° 1'47.13"EJ 21°10'25.73"N 82° 1'46.54"EK 21°10'25.36"N 82° 1'46.50"EL 21°10'25.28"N 82° 1'45.31"E
9
M 21°10'24.51"N 82° 1'45.16"EN 21°10'23.64"N 82° 1'42.70"E
Land Use Pattern(Forest, agricultural, grading, barren, etc.)
Area of quarry lease is 0.56 ha on the Private Owned Land.It is non forest, non agriculture area.
The Khasra-wise detail of the applied lease area is as under:
Khasra No. Area Type of land
(ha) (acres)
352,353,354,433/4 0.56 1.383 Private Owned Land.
B. Attach a map showing boundaries of the mining lease, adjoining
area, roadways, railways, natural drainage system and other surface
features, if any. It is preferred that the area be marked on a Survey
of India topographical map or a cadastral map or forest map as the
case may be. However if none of these are available, the area should
be marked on a plan prepared especially for the purpose on a scale of
1: 50000 linking it with any important reference point available in
and around the area.
Key plan with demarcated area in Survey of India topographical map on
scale 1:50,000 is enclosed as Plate No.1
10
Infrastructure Facilities:
Sr. No.
Available Facilities Village Distance from the Area
1. District head quarter Mahasamund About 10 km
2. Nearest Railway Station
Belsonda About 5.0 km
3. Tehsil Mahasamund About 10 km
4. Nearest Airport Raipur About 40km
5. Nearest Forest Not available within10 km
-
6. Nearest River / Nala - Mahanadi river about 1.0 km west.
11
CHAPTER-3GEOLOGY AND EXPLORATION
A. Briefly describe the general topography explaining whether it is a Plain
land or hilly area and local geology of the mineral deposit within the
leasehold. Attach a geological plan on 1:1,000 scale with 1 m contour
intervals.
Topography
The area is almost a flat agriculture land and devoid of vegetation. It is about
0.5km from the village Ghodari in the north direction.
The maximum elevation is about 270 m from M.S.L.
The lease area has been surveyed on a scale of 1:1,000 with contour interval of
one meter.
Climate:
The climate is sub-tropical, semi arid, continental and monsoon type. Thus, it
has hot summers, cool winters and small rainy season.
Regional Geology
Regionally, the area under study comes under the Chhattisgarh basin.
Chhattisgarh basin is the largest Purana basin of Bastar craton. The craton is
several smaller basins like Khariar, Ampani, Indravati and sabari (Sukma),
besides many outliers like Keshkal, Singanpur and Chedrapal. Chhattisgarh
basin covering as area of about 36000 sq. km unconformably overlies the
basement granite-gneiss and volcanics of the Bastar Craton. The southern and
eastern margins of the basin have depositional contact with the basement,
whereas the western and northern margins of the basin are fault bounded. The
succession of the basin comprises dominantly of sandstones, shale and
12
carbonates with subordinate conglomerate and tuffs at different stratigraphic
levels. The strata are gently dipping at an angle of 2-10º, however, along the NS
faults. It is bounded by the Kotri-Dongargarh orogen in the west, Satpura
mobile belt in the north, Gondwana graben of Mahanadi in the northeast and the
Eastern Ghats mobile belt in the southeast. In the south, the basin overlies the
basement gneiss enclosing the Sonakhan greenstone belt. Chhattisgarh basin is
the third largest Purana basin after the Vindhayan and Cuddapah, and extends
for about 300 km in the E-W and 200 km in the N-S directions, with an irregular
rectangular configuration.
The detailed lithostratigraphy of Chhattisgarh basin is as under:
GroupFormation(thickness
in m)Lithology
Raipur Group (1900 m)
Maniari Shale (70) Purple shale, dolomite, gypsum
Hirri Dolomite (70) Grey dolomite
Tarenga Shale (180)Dolomitic shale, shale-chert beds, purple shale, limestone
Chandi Limestone (670)
Stromatlitic dolomite, limestone, glauconitic sandstone, shale
Gunderdehi Shale (430)Shale with limestone interbeds, arenite-shale, ignimbrite
Charmuria Limestone (490)
Phosphatic limestone with shale interbeds, cherty limestone and phosphatic dolomite, chert-shale interbeds
------------------------------------------Unconformity----------------------------------------
Chandrapur Group (400 m)
Kansapathar Sandstone (200)
Glauconitic sandstone
Chaporadih Shale (200) Shale with areniteinterbeds
Lohardih Conglomerate(20)
Purple arkose, gritty arenite and basal conglomerate
----------------------------------------Unconformity----------------------------------------------------
13
Singhora Group (400 m)
Chhuipali Shale (300)Shale with chert, limestone, dolomite, siltstone
Bhalukona Sandstone (20)
Sandstone, siltstone, minor shale
Saraipali Shale (60)Variegated shale with siltstone, limestone, porcellanite, felsic tuff
Rehatikhol Conglomerate (20)
Felspathicarenite, arkose and basal conglomerate
----Nonconfirmity----
Crystalline basement of Bastor craton
Local Geology:
The area around Ghodari village comes under Charmuria Formation of Raipur
Group of Chhattisgarh Supergroup. Charmuria Formation comprises of
Phosphatic limestone with shale inter-beds, cherty limestone and phosphatic
dolomite, chert-shale inter-beds.
The area showing a nature and extent of the mineral body
The area around Ghodari which is situated in Tehsil Mahasamund is covered
by limestone of Charmuria formation of Raipur Group of Chhattisgarh
Supergroup. This mineral body is homogeneous in nature. On the basis of
detailed geological mapping nearby pits etc of the area and lithology of the
area following sequence can be established:
Soil
Flagstone
A Surface Geological Plan and Geological Cross Section on a scale of
1:1000 are attached, showing general topography and geology of the area.
14
B. Describe briefly prospecting / exploration work done to date viz.
geological mapping with the evidence already existing about the
mineral deposit in the area or in the vicinity.
Prospecting / exploration is not required as quarry area is less than five
hectares. More over the existence of flagstone is well established on the
basis of working pit and worked out pits near by the lease area.
C. Describe briefly, exploration proposed to be carried out year wise,
for the next five years indicating same on the geological plan.
No proposal for further prospecting /exploration in the area as the
existence of flagstone is well established in the area up to the required
depth or beyond it.
D. Spot or spots where the Quarrying operation is proposed and
proposed maximum depth of quarrying operation.
The flagstone is exposed in pit in nearby the lease area up to a depth of
about 15m therefore the ultimate depth of the quarry area will taken
12m. The area is fully covered by soil. In the instance matter the depth of
flag stone has been considered 12.0 m below soil cover for the
calculation of reserves. The proposed method of quarrying will be
manual open cast.
15
CHAPTER-4
RESERVES
The applied lease area is fresh area .The flagstone is exposed in pit in nearby
the lease area up to a depth of about 15m therefore the ultimate depth of the
quarry area will taken 12m.Thickness of soil is about 0.5 meters in this area
below which flagstone is observed. For computing the reserve of flagstone
in the quarry area with volumetric method is adopted by taking depth 12m
this and Bulk density is considered as 2.5 tones/cum.
Geological Reserve of Flagstone in Quarry as on date
Reserve on fresh land:
Area (m2) x depth = Volume (m3) x specific gravity = Tonnage
5600 x 12 = 67200 x 2.5 = 168000 tons
Available geological reserve comes to 168000 tons
The above geological reserve calculation is done on the basis of depth taken
12m in fresh area .These 12 m depth is considered on the basis of old
working pit near by the lease area.
Blockage of Reserve
A. Reserve Blocked in Mine Limit(7.5m) in fresh area
Area (m2) x depth x specific gravity = Tonnage
2313 x12 x 2.5 = 69390 tons
Total blocked reserve in mine limit = 69390 tons
B.Reserve Blocked in Benches
16
1. Stone blocked in bench slopes considering the pit slope to be 450
= (Perimeter x Cross section area of bench) x 2.5
= 110x 6x 6 x 0.5 x 2.5 =4950Tons
2. Stone blocked in bench slopes considering the pit slope to be 450
= (Perimeter x Cross section area of bench) x 2.5
= 210x 12x12 x 0.5 x 2.5 =37800Tons
Total Blocked reserve in benches (1+2) = 42750Tons
Total Blocked Reserve (A+B) =112140 Tons
Mineable Reserve= (Geological reserve– Blocked reserve)
=168000– 112140
= 55860Tons (22340m3)
Recoverable Reserve = 55860 x 0.75(25 % quarrying loss)
=41895 Tons (16758m3)
17
CHAPTER- 5
DEVELOPMENT AND PRODUCTION PROGRAMME
Quarrying
a) Quarrying Method
Quarrying will be carried out by semi mechanized open-cast method
adopting a system of benches maintaining it to 1.5m as per rule 61(2) (ii)of
Chhattisgarh Minor Mineral Rules, 2015. Manual labors are deployed for
quarrying and handling quarry waste. Flagstones will be loaded by labors
into trucks and tippers. Trucks and tippers will be used for transporting of
flagstone. Proposed five year quarrying layout plan has been shown in Plate
No. - 5 (Five year development and production plan) and Cross sections.
b) A tentative scheme of quarrying, annual program and plan for excavation from year to year for ten year
The lease is granted for a period of 30 years .Quarry development work by
means of removal of top soil will be taken up from eastern part of the area;
simultaneously quarry will be started from this area. The proposed method of
quarrying will be open cast.
In first year of this plan period, development work done by removing top soil
over an area of 1293 m2 will be taken up. The total soil generation will be about
646 m3, which will be stacked on the lease boundary. Production will started
from northeastern part of area. The area of working will be 600m2 in a single
bench having 1.5 m bench height. Total production quantity of flagstone in this
area will be 900m3 (2250tons).
The Bench RL will gradually be reduced from the surface RL 269.5 m to the
bottom RL 268.0m.
18
In second year of this plan period, development work by way of removing top
soil over an area of 1993 m2 will be taken up. The total soil generation will be
about 996 m3, which will be stacked on the lease boundary. The area of working
will be 610m2 (385m2in a first bench and 225 m2 in a second bench) having 1.5
m bench height. Total production quantity of flagstone in this area will be
915m3 (2287tons).
The Bench RL will gradually be reduced from the surface RL 268.0m to the
bottom RL 265.0m.
In third year of this plan period, there is no development program. The area of
working will be 614 m2 (113m2 in a first bench below second year production
and 501 m2 in a second bench in fresh area) having 1.5 m bench height. Total
production quantity of flagstone in this area will be 921m3 (2302tons).
The Bench RL will gradually be reduced from the surface RL 265.0m to the
bottom RL 263.5m below second year working pit area then bench RL will
gradually be reduced from the surface RL 269.5m to the bottom RL 268.0m in
next bench .
In fourth year of this plan period, there is no development program. The area
of working will be 620m2 in a single bench having 1.5 m bench height. Total
production quantity of flagstone in this area will be 930m3 (2325tons).
The Bench RL will gradually be reduced from the surface RL 269.5 m to the
bottom RL 268.0m.
In fifth year of this plan period, there is no development program. The area of
working will be 624m2 in a single bench having 1.5 m bench height. Total
production quantity of flagstone in this area will be 936m3 (2340tons).
The Bench RL will gradually be reduced from the surface RL 269.5 m to the
bottom RL 268.0m.
19
Plate No. – 6(Development & Production Plan of 1st 5 year) and Cross
sections.
Summary of year wise working program for first five year
Year wise 5 year’s development and production plan and sections attached as Plates no. 6.
Production Plan for first five year
YEAR-WISE
PRODUCTION
AREA in
m2
DEPTH
in (m)
VOLUME SP.
GR.
TONNES
1st year 600 1.5 900 2.5 2250
2nd year 610 1.5 915 2.5 2287
3rd year 614 1.5 921 2.5 2302
4th year 620 1.5 930 2.5 2325
5th year 624 1.5 936 2.5 2340
Total - - 4602 - 11504
Year Ultimate Depth of pit
(mRL)
Working Area
(meter square)
1st year 269.5 – 268.0 600
2nd year 268.0 – 265.0 610
3rd year 265.0 – 263.5 614
4th year 269.5 – 268.0 620
5th year 269.5 – 268.0 624
20
c) A tentative scheme of quarrying, annual program and plan for excavation after five year
Quarry operation will continue in the 2nd five year plan period after the successfully completion of 1st five year plan period according to the details below:
In sixth year of this plan period, there is no development program. Production
will continue onwards from fifth year production. The area of working will be
610m2 in a single bench having 1.5 m bench height. Production quantity of
flagstone in this area will be 915 m3 (2287tons).
The Bench RL will gradually be reduced from the surface RL 269.5 m to the
bottom RL 268.0m.
In seventh year of this plan period, there is no development program.
Production will continue below from 6th year production. The area of working
will be 620m2 in a single bench having 1.5 m bench height. Production quantity
of flagstone in this area will be 930 m3 (2325 tons).
The Bench RL will gradually be reduced from the surface RL 268.0m to the
bottom RL 266.5m.
In eighth year of this plan period, there is no development work. Production
will continue onward seventh year production. The area of working will be
626m2 in a single bench having 1.5 m bench height. Production quantity of
flagstone in this area will be 939 m3 (2347tons).
The Bench RL will gradually be reduced from the surface RL 268.0m to the
bottom RL 266.5m.
21
In ninth year of this plan period, there is no development work. Production
will continue onwards eighth year production. The area of working will be
630m2 in a single bench having 1.5 m bench height. Production quantity of
flagstone in this area will be 945m3 (2362 tons).
The Bench RL will gradually be reduced from the surface RL 268.0m to the
bottom RL 266.5m.
In tenth year of this plan period, there is no development work. Production will
continue onwards ninth year production. The area of working will be 634m2 in
a single bench having 1.5 m bench height. Production quantity of flagstone in
this area will be 951 m3 (2377 tons).
The Bench RL will gradually be reduced from the surface RL 268.0m to the
bottom RL 266.5m.
Plate No. - 7 (Development & Production Plan after 5 year) and Cross
sections in plate-10.
Summary of year wise working program
Year wise 2nd 5 year’s development and production plan and sections attached as Plates no. 7.
Year Ultimate Depth of pit
(mRL)
Working Area
(meter square)
6th year 269.5 – 268.0 610
7th year 268.0 – 266.5 620
8th year 268.0 – 266.5 626
9th year 268.0 – 266.5 630
10th year 268.0 – 266.5 634
22
Production Plan
YEAR-WISE
PRODUCTION
AREA in
m2
DEPTH
in (m)VOLUME
SP.
GR.TONNES
6th year 600 1.5 915 2.5 2287
7th year 610 1.5 930 2.5 2325
8th year 614 1.5 939 2.5 2347
9th year 620 1.5 9452.5
2362
10th year 624 1.5 9512.5
2377
Total - - 4680 - 11698
d) A tentative scheme of quarrying, annual program and plan for excavation
Mineable reserves and anticipated life of the quarry:
(a) Estimated Mineable Reserves : 55860 tons (22344 m3)
(b) Average rate of production : 2300 tons (920m3)
per year during Five year plan
(c) Average rate of production : 2340 tons (936m3)
per year during after Five year plan
(c) Applied lease period : 30 years
(d) Anticipated life of the quarry : More than 20 years
23
e) Conceptual Mining plan:
The estimated mineable reserves from this area are of the order of 55860
tons (22344 m3)and recoverable reserve (0.75%) is 41895 tons (16758m3)
up to a depth of 12 m from soil cover. The conceptual quarry plan is
prepared for the period of 10 years.
Ultimate pit limit is fixed keeping final pit slope at the angle of 45o. This will
cover about 0.233 ha area in 1st five year and 0.243 ha area in 2nd five year
plan period (onwards & below the 1st five year production pit). (Please refer
conceptual Plan plate no. 8).
This plate also shows proposed dumping and program of afforestation. As post
quarry land use, this pit may further be converted into a water pond and used as
a natural water harvesting system for collection of rain water. This will
recharge the ground water and may be used by local people
Due to the quarrying the generated over burden / mine waste will not be
sufficient to reclaim the working pit. No any type of rehabilitation will be
required in the proposed area because there is no any important monument,
structure or villages come in the core zone. All dump of soil will be used for
afforestation.
Exploration:
Exploration is not required as the lease area is less than 5 ha.
Drilling:
Not required.
Dumping of Waste materials:
Not required in conceptual period.
24
Afforestation:
Afforestation will be taken up in 0.231 ha over the soil dump along the lease
boundary in 1st five year plan period. About 100 saplings of the local species
will be planted in the proposed area in 1st 5 year.
The following table describes the area proposed for quarrying as a part of the
Conceptual Quarry Plan (lease applied for 10 years)-
Open-cast Quarry
Quarrying method is a type of manual Open- cast quarrying by a system
of benches. The depth of each bench will be maintained at 1.5m.
Loading:
Loading of flagstone are done by local labours.
Haulage and Transporting:
Mostly trucks/ tippers will be used for transportation of loadable flagstone from the area to consumers. Details of haulage and transport Equipments are given below:
ParticularsArea required in hectare during
1st five Years 2nd Five years
Quarrying 0.233ha0.243( below the 1st five
year production pit)
Dumping (soil)0.231 ha (Along lease boundary)
-
Afforestation0.231 ha (Along lease boundary)
-
25
Type Nos. Size/capacity
Make Motive
power
H.P.
Tipper 2 10 ton Tata Diesel 85
f) Underground Workings:
Not applicable.
g) Miscellaneous Operations:
Sharpening and tempering of excavating tools, cleaning the area of loose boulders, maintaining of quarry path, sprinkling of water for dust suppression, plantation and watering of sapling etc and also causal labors under the supervision of mate / foreman are the mandatory operations to be carried out during the quarrying operations. The quarry operation is always above the water table as water table is quite deep and there will be no chance of encountering the water table. Hence no arrangements will be required for dewatering the quarry pit, but in case of heavy rains and further seepage of water the quarry owner will have to provide a small diesel pump with the following specifications for dewatering the quarry working pit:
Motor : 5HPSuction : 50mmDelivery: 40mmTotal Head: 20m
Pumping Capacity:500 liters per minute.
26
CHAPTER- 6
MANPOWER DEPLOYMENT
State average daily employment and statutory personals:
The quarrying activity has fare chances of employment of local people. In this
quarry also about 18 unskilled labors will be required for quarrying of flagstone
and for loading the flagstones on trucks etc. At least one skilled person will be
required for supervision purpose, maintenance of record of production and
shipment etc.
CHAPTER- 7
USE OF MINERAL
Describe the utilization of mineral and type of industry.
Flagstone has the great importance in constructions of building, as it has the
property of taking good polish. This polished stone have a very good demand in
the market. The raw flagstone also has market to be used as “Farshi Pathar”.
Hence small scale mining of flagstone is a good source of earning specially for
local villagers for their livelihood.
27
CHAPTER-8WASTE DISPOSAL ARRANGEMENTS
a) Selection of dumping site:
The area selected for dumping is around the lease boundary and reclaimed
in working pit of the mine limit area. Location of the proposed dumping site
is shown in five year development and production plan (Plate no. 6).
b) Maximum height and spread of soil dump:
About 0.231 ha area will be proposed to dumping. Soil will be stack up the
height of 1.0 m along boundary.
c) Stacking of sub-grade materials:
About 25 % waste material will be generated. This sub grade material is
nothing but the broken pieces of flagstone. This is sellable material and can
be easily marketed by the mine owner. Hence it is proposed to stack this sub
grade material temporary in a suitable place.
d) Selection of site for stacking:
Not required as sub grade materials can be easily marketed by the mine
owner.
e) Height and spread of stacks:
Not applicable.
28
CHAPTER-9
ENVIRONMENT MANAGEMENT PLAN
Measures of protection of environment, especially against air and water pollution due to Quarrying operation
Land use pattern:
Articles Land use at the end of 5
years in Hect.
Forest Land
Private. Land Stony waste Land
Land use at the end of 10 years
in Hect.
A. Lease Area 0.56 Nil 0.56 Nil 0.56
B. Mining & allied
1. Area under pits
0. 233 Nil 0. 233 Nil 0. 329
2. Area for dumping
0.231
(Along lease boundary)
Nil 0.231
(Along lease boundary)
Nil 0.231
(Along lease boundary)
3. Area for road - Nil - - -
4. Area for Infrastructure
- Nil - - -
5. Plantation 0.231
(Along lease boundary
Nil 0.231
(Along lease boundary
0.231
(Along lease boundary
6. Storage of Mineral
- Nil - - -
7. Storage of fines
- Nil - - -
8. Crushing unit - Nil - - -
9. Untouched Area
0.096 Nil 0.096 - -
Total 1.37 1.37 1.37
29
Quarrying Area:
The lease area is 0.56 ha. It is a non forest, non agricultural Private Owned
land. The area is flat agriculture land devoid of vegetation.
No any area of archaeological important structure, sanctuaries, reserve forest
is lying within 10 km radius.
Human Settlement:
Nearest village Ghodari is present about 0.5 km south of the lease area. No
villages or human dwelling are within the quarry lease area. So there will not
be any need for re-settlement.
Environment Impact Assessment Statement:
Quarrying in general affects the environment by way of breaking and defacing
the land, removing vegetation, generating dust etc. Following are some of the
major impacts of this quarrying on environment.
30
Land Environment:
The proposed quarrying operations will only be confined to the quarry area
of 0.706ha and it is not going to affect the surrounding areas. Inside the area,
the proposed production will be carried out by excavation and dumping of
waste material will be on the selected part within the lease area. The extents
of land use in hectare for quarrying purposes in each 10 year plan periods are
given below-
Air Environment:
Source of Air Pollution:
From the proposed open cast Quarrying operation, the main air pollutant
would be dust or particulate matter generated by rock/waste extraction,
handling operations, transportation.
ParticularsArea required in hectare during
1st five Years 2nd Five years
Quarrying 0.233ha0.243( below the 1st five
year production pit)
Dumping (soil)0.231 ha (Along lease boundary)
-
Afforestation0.231 ha (Along lease boundary)
-
31
Mitigation Measures
1. Regular water sprinkling to suppress the dust on haul roads, service
roads and mining face by sprinklers and truck mounted water tankers.
2. Grading of haul roads, service roads time to time, to remove the
accumulated dusty materials.
3. Proper maintenance of the earth moving equipments and vehicles,
checking of exhaust emission and imposing of speed restrictions on
them.
4. Avoiding of overloading of dumpers during the transportation.
5. Development of green belt along quarrying area boundary and soil
dumps.
6. Periodical monitoring of air quality to take steps to control the
pollutants.
Water Environment:
Likely impact of quarrying on water table
The area does not falls in notified area under Water Act 1974.The quarrying
activity will be confined to the lease area and there are no perennial streams or
nalas present over there. No ground water pollution will be there as the water
table that is much below the lowest mining bench level and rock or waste/soil
dump of this deposit does not contain any harmful ingredients, which could
leach down to pollute the ground water.
Details of modification/diversion of natural drainage system /Obstruction of water channels and measures taken
No modification / diversion are required.
32
Measures taken for minimizing silting and contamination of water
Not required.
Requirement of water for quarrying operations
Water is not required for quarrying operation. Although small quantity of
water is required for drinking and dust suppression purpose which will be
meet out from the bore well/river nearby.
Source of water
Nearby the area under study, Mahanadi river exist about 1.0 km in west of
the area.
Noise & Vibration:
No generation of noise and vibration as the quarrying activity and loading of
flagstone will be done manual. Transport vehicles may generate noise which
is within the permissible norm of limit.
Storage of explosive (like capacity and type of explosive magazine)
Not applicable.
Human Environment:
The contributing factors that affect the health of people are dust, gaseous
pollutants, noise in the mine. These are categorized as occupational hazards.
The various mining operations like loading/unloading and vehicle movement
involve risks and will have to be performed with safety norms.
Social Infrastructure
It is expected that the project will lead to much needed employment
opportunities in the villages which will contribute to the socio-economic
development of this area.
33
Rehabilitation and Resettlement (R & R) Plan
Not required as the area is away from village and free from rehabilitation.
Stabilization and Vegetation of dumps:
Dump slopes will be stabilized by planting saplings, grass and good root
bearing saplings such as local species. Retention wall will be made along the
dump to channelize the rainwater out of the dumping area if required.
Development of green belt will be maintained along quarry area boundary by
planting about 100 trees in 1stand 2nd year.
Sewerage System
In view of the personals engaged in the project the movable type of sewerage
system may be installed /deployed nearby the quarry area. This may avoid
polluting the land / water / air of the area.
Environmental Monitoring:
To assess the prevailing quality of the air, water, noise etc. a regular
monitoring of these parameters will be made to arrive at improvement/
protection measure.
34
CHAPTER-10
Measures to be taken for reclamation of land
Mined out land
The estimated mineable reserves from this area are of the order of 55860
tons (22344 m3)and recoverable reserve (0.75%) is 41895 tons (16758m3)
up to a depth of 12 m from soil cover. The conceptual quarry plan is
prepared for the period of 10 years.
Ultimate pit limit is fixed keeping final pit slope at the angle of 45o. This will
cover about 0.233 ha area in 1st five year and 0.243 ha area in 2nd five year
plan period (onwards & below the 1st five year production pit). (Please refer
conceptual Plan plate no. 8).
Storage and prevention of topsoil
The topsoil to be encountered in this plan period will be selectively removed
and stacked in the area of 0.231 ha along the lease boundary. Further this will
be planned to utilize for afforestation purposes. For preventing of erosion of soil
a retention wall will be made along the soil dump. Height of dump will be
maintained up to 1 m along boundary.
Proposal for reclamation of land affected by quarrying activities during
and at the end of the quarry lease
At the cessation of quarrying operations after the extraction of mineral, on
the consolidated waste dumps step benches will be made and plantation will
be done. The area will be stabilized. Care will be taken to transfer the topsoil
preserved separately to put it back on the mined out area and the dump
surfaces along with the grass cover.
35
CHAPTER-11
Quarrying Closure Plan
Introduction
The area applied of 0.56 hectare falls between the Latitude 21°10'23.56"N, to
21°10'26.18"N and Longitude 82° 1'41.42"E, to 82° 1'47.13"E in the survey
of India Toposheet No. 64K /4. The area comes under Mahasamund Tehsil of
District Mahasamund (C.G.).
This Quarry Plan is prepared along with Progressive Quarry Closure Plan.
Land Use:
The estimated mineable reserves from this area are of the order of 55860
tons (22344 m3)and recoverable reserve (0.75%) is 41895 tons (16758m3)
up to a depth of 12 m from soil cover. The conceptual quarry plan is
prepared for the period of 10 years.
Ultimate pit limit is fixed keeping final pit slope at the angle of 45o. This will
cover about 0.233 ha area in 1st five year and 0.243 ha area in 2nd five year
plan period (onwards & below the 1st five year production pit).
Method of Quarrying Operation:
Quarrying will be carried out by semi mechanized open – cast method using
wheel loader and trucks/tippers etc. the bench height will be maintained at
average 1.5 m.
Reasons for closure
Quarry depth will be no blocked and the quarry owner may exploit the same and proceed further deep.
36
Statutory Obligation:
Any legal statutory obligations from state Government, mineral resource
department, ministry of Environment & Forest, state and central pollution
control board or by any other Government organization will be implemented.
Closure Plan Preparation:Applicant
Shree Leelaram Chaudhary
District-Mahasamund
(C.G.)
RQP:
Hemant Kumar
RQP/DGMCG/91/2017
Mine Description
Geology: Please refer chapter 3.0 of the quarry plan.
Reserves: Please refer chapter 4.0 of the quarry plan.
Environmental Parameters: Please refer chapter 9.0 of the quarry plan
Infrastructure:
Statutory Buildings will be built of temporary structures, which can be dismantled easily and sold as scrap at the final stage of closure.
Quarry Machinery:
Most of the Quarry machinery deployed will be hired. After the mine closure, these will be returned back to their respective owners.
Safety and Security:
The total area excavated will be fenced properly with single opening left for the workers engaged in closure plan work.
37
Disaster Management & Risk Assessment:
No high risk accidents are anticipated, as the project is an open cast semi mechanized type of quarry operation in a fairly stable area and free from land subsidence, earthquake etc. no tailing dam is proposed and risks associated with it will not come into picture.
However, in case anything happens then the designated Mines Manager will take care and manage the situation. A communication and transport facility owner will be provided to them at their disposal which will help in evacuating persons involved in any accidents.
Care and maintenance during temporary discontinuance:
During such time, the area will be fenced and temporary staff will be arranged for taking care and maintenance.
38
CHAPTER 12
STRATEGY FOR PROTECTION OF RIVER COURSE,
NALAS, WATER TANK, VILLAGES, IMPORTANT
MONUMENTS, IF ANY
Briefly outline the proposed strategies (if any) for protection of following:
• River Courses: Any strategy for protection to save river course is not required.
• Nalas: Not required as the area is sufficiently away from sensitive man made
land uses like water tanks, hospitals.
• Village/ houses /hutments/agriculture land: The project will have no affect
on any type class of vulnerable people and being no requirement of agricultural
material during any phase of project, no wastes will be generated.
• Important monuments: there is no important monument within the 10 km
radius from the lease area.
39
CHAPTER 13
ANY OTHERS RELEVANT INFORMATION
No other relevant information is required.
***
Signature Signature
(Applicant Signature) (Recognized Qualified Person)