Page 1: Scaffolding Systems German Handmade Manufacturer by ALFIX

ALFIX MOBILE SCAFFOLD TOWER SerIeS 5000

INSTRUCTION FOR ERECTION AND USE

Page 2: Scaffolding Systems German Handmade Manufacturer by ALFIX

2 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and UseGeneral Information

ALFIX Mobile Scaffold Towers 5001 – 5012EN 1004 8/12 XXXD

Instructions for Erection and UseEN 1298 -IM - de

Loadability:300 kg, uniformly distributed

Platform dimensions:2.60 x 0.60 m

Permissible load:p = 2.00 kN/m2

on a loaded deck surface(load class 3, DIN EN 1004)

Maximum permissible standing height:12 m indoors (without wind load)8 m outdoors (with wind load)Access via vertical ladder

GS Bau/TB 10106

BAU/TB 10106

Page 3: Scaffolding Systems German Handmade Manufacturer by ALFIX

3AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 5000Contents

Loadability:300 kg, uniformly distributed

Platform dimensions:2.60 x 0.60 m

Permissible load:p = 2.00 kN/m2

on a loaded deck surface(load class 3, DIN EN 1004)

Maximum permissible standing height:12 m indoors (without wind load)8 m outdoors (with wind load)Access via vertical ladder

1. Schematic Drawing P. 4

2. Preface P. 5

3. Areas of Application P. 6

4. General Notes P. 7 - 11

5. Preparation of Erection P. 12

6. Assembly of the Erection Sections 6.1 Assembly of chassis P. 13 - 15 6.2 Assembly of working platform P. 16 - 19 6.3 Use of auxiliary assembly decks P. 20

7. Extensions 7.1 Stabiliser P. 21 7.2 Wall support P. 22

8. Ballasting 8.1 Indoors, central P. 23 8.2 Outdoors, central P. 23 8.3 Indoors, lateral P. 24 8.4 Outdoors, lateral P. 24 8.5 Indoors, central, with two stabilisers P. 25 8.6 Outdoors, central, with two stabilisers P. 25 8.7 Indoors, lateral, with one stabiliser P. 26 8.8 Outdoors, lateral, with one stabiliser P. 26 8.9 Indoors, lateral, with wall support P. 27 8.10 Outdoors, lateral, with wall support P. 27

9. Miscellaneous 9.1 Dismantling of mobile scaffold towers P. 28 9.2 Assembly of counterweights P. 28 9.3 Operating the castor wheels P. 29 9.4 Platform with hatch P. 30 9.5 Tips & tricks P. 31 - 32

10. Technical Data P. 33 - 34

11. Components Overview P. 35

Page 4: Scaffolding Systems German Handmade Manufacturer by ALFIX

4 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use1. Schematic Drawing

The three areas of erection:

Side protection

Vertical frame

Platform with hatch-type access

Toeboard

Locking clip

Diagonal brace Vertical frame Side protection

Platform with hatch-type access Diagonal brace

Stabiliser Diagonal brace Vertical frame Side protection for bracing Counterweight Platform without hatch-type access

Rolling beam Castor wheel

Wor

king

pla

tfor

mIn

term

edia

te le

vel

Chas

sis

Page 5: Scaffolding Systems German Handmade Manufacturer by ALFIX

5AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 50002. Preface

Dear ALFIX Client,

With the ALFIX Mobile Scaffold Tower Series 5000, you have purchased a versatile and ro-bust mobile tower (Mobile Working Platform).

In order to ensure safe working, its erection, use and dismantling must be carried out in compliance with these “Instructions for Erection and Use”!

Please read this booklet carefully in advance. Take it with you prior to every single use. It clearly explains all the required steps and security measures in the most appropriate order.

When working through all the pages, the schematic drawing, shown on the left, always serves as an overview.

The types 5001-5012 correspond to all requirements of DIN EN 1004.

If you want to deviate from these Instructions for Erection and Use or if you have any ques-tions concerning our mobile scaffold towers, please do not hesitate to call us. We are al-ways happy to help!

Yours ALFIX GmbH

ALFIX GmbHLanghennersdorfer Str. 15D-09603 GroßschirmaPhone : +49 (0) 37328 / 800-0Fax : +49 (0) 37328 / 800-80

Internet :www.alfix-systems.com

Page 6: Scaffolding Systems German Handmade Manufacturer by ALFIX

6 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use3. Areas of Application

Prior to erecting your scaffold

There are two general areas of application:

Indoors, i.e. no wind effect (without wind load)Outdoors, i.e. with the effect of wind (subject to wind load)

The representations, outlined below, are standard designs and are described in detail in these Instructions for Erection and Use.

Other erection options must be agreed upon with the manufacturer.

central

central

with stabiliser

lateral

lateral

with stabiliser

lateral

with wall support

Page 7: Scaffolding Systems German Handmade Manufacturer by ALFIX

7AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 50004. General Notes

Warranty

Scope and period of warranty are set forth in the manufacturer’s delivery and payment conditions.

Intended use

The scaffolds listed in these Instructions for Erection and Use may only be used in accordance with both the requirements of the EN 1004 standard and the structural design samples specified herein.

Unintended use

The improper use of the scaffoldings specified in the present Instructions for Erection and Use is considered to be an unintended use, as defined under the Product Safety Act [ProdSG] (as amended 01/08/1997). This also applies to the disregard of the standards and guidelines particularised in these Instructions for Erection and Use.

Overview of Mobile Scaffold Tower Series 5000 :

5001 5002 5003 5004 5005 5006

Working height [m] 3.00 3.30 4.80 5.90 6.75 7.90

Scaffold height [m] 1.40 2.40 3.95 5.05 5.95 7.00

Standing height [m] 1.00 1.30 2.80 3.90 4.75 5,90

5007 5008 5009 5010 5011 5012

Working height [m] 8.70 9.85 10.65 11.80 12.60 13.75

Scaffold height [m] 7.80 8.95 9.90 10.90 11.75 12.90

Standing height [m] 6.70 7.85 8.65 9.80 10.60 11.75

Page 8: Scaffolding Systems German Handmade Manufacturer by ALFIX

8 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use4. General Notes

Erection

1. The permissible load of the Mobile Working Platform is 2 kN/m² according to DIN EN 12811-1, load class 3.

2. Prior to the erection and use of the Mobile Working Platform, the Instructions for Erection and Use must be read carefully.

3. Only persons who are trained based on these Instructions for Erection and Use may assemble, dismantle and use the Mobile Working Platform.

4. The assembly and dismantling must be performed by at least 2 persons. For installation heights above 6 m, at least 3 persons are required.

5. The working platform’s maximum permissible height is 12 m. It is inadmissi-ble to increase height through boxes, ladders or other means.

6. The Mobile Working Platform may not be operated using foreign parts from other manufacturers. Only parts specified in the Instructions for Erection and Use must be exclusively used for assembly.

7. Prior to erection, the following issues are to be checked:

• The ground must be level and of sufficient load-bearing capacity.• There are no obstacles around the location of the mobile working plat-

form.• Damaged, defective or non-system parts must be removed.• The wind conditions must be suitable for assembly.• The Instructions for Erection and Use must be available at the site of use.

8. For assembly and dismantling, the deck surfaces or intermediate levels must be arranged so that the vertical distance between the deck/platform surfaces does not exceed 2.10 m.

9. Upon assembly, both the completeness and the tight fit of all connections must be checked.

10. If a deck surface on the first level is accessed, the distance from the ground to the top edge of the deck must not exceed 60 cm.

11. The vertical maximum distance between the different deck surfaces must not exceed 4.20 m.

2 kN/m2

load class 3DIN EN 12811-1

Max

. 4,2

0mM

ax. 0

,60m

Max

. 2,1

0mM

ax. 1

2m

Page 9: Scaffolding Systems German Handmade Manufacturer by ALFIX

9AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 50004. General Notes

Use

1. Assembly, dismantling and use of the Mobile Working Platform outside of en-closed spaces is only permitted at wind forces below 6 Beaufort.

2. Horizontal and vertical load applications, which may cause the Mobile Work-ing Platform to overturn, are to be avoided.

3. The Mobile Working Platform must not be lifted and displaced using a crane, forklift or the like.

4. The Mobile Working Platform must not be moved, if persons or loose items are situated on the decking.

5. In order to move the Mobile Working Platform, the wheel brake must be re-leased.

6. Upon movement, the castors are to be locked once again using the wheel brakes.

Dismantling

1. Dismantling of the Mobile Working Platform is to be carried out in reverse order.

Inspection, servicing, maintenance

1. Scaffolding components must be handled and transported carefully to avoid damage.

2. All components must be checked for damage.

3. All moving parts must be checked for proper functioning and dirt.

4. Damaged components must be replaced, sent for repair to the manufacturer or destroyed.

Caution :• Any deviations from these Instructions for Erection and Use are not allowed!• Structural changes to the Mobile Working Platform must only be carried out by the manufacturer!

Page 10: Scaffolding Systems German Handmade Manufacturer by ALFIX

10 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use4. General Notes

1. Erection, rebuilding and dismantling of the Mobile Working Platform must be carried out in accordance with the Instructions for Erection and Use or upon consultation with the manufacturer. The Instructions for Erection and Use must always be available at the site of use! When handing over the Mobile Working Platform to any third party, the Instructions for Erection and Use must be forwarded to the user as well.

2. When working, a helmet and safety shoes must be worn.

3. When using the Mobile Working Platform outdoors or in open spaces at wind forces exceeding six on the Beaufort scale (large branches in motion, whistling in overhead power lines, difficulties to use an umbrella), the platform is to be moved to a sheltered area or is to be secured against overturning through appropriate measures (e.g. a compression-resistant and tension-proof anchorage to a building structure) or is to be dismantled.

4. The scaffolding is to be placed perpendicular using the adjusting spindles.

5. Only original ALFIX counterweights may be used (no “equivalent weights”, such as canisters with water, buckets of sand, etc.), the arrangement of which is defined in these Instructions for Erection and Use.

6. The vertical frame joints are to be secured against accidental lifting using locking clips.

7. Prior to using the scaffolding, its proper and correct erection must be checked.

8. Access to the working platform shall only take place at the inside of the scaffolding. The platforms with hatch-type access are to be alternately arranged. The hatches are to be closed after climbing through.

9. Persons working on Mobile Scaffold Towers are not allowed to push themselves against the side protection.

10. During movement, one must be certain that no people or loose objects are on the Mobile Scaffold Tower.

Page 11: Scaffolding Systems German Handmade Manufacturer by ALFIX

11AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 50004. General Notes

11. Movement is allowed only on level and sufficiently load-bearing grounds and only in longitudinal direction or by pivoting on its corner. The surface slope shall not exceed 3 percent. In the event of single-sided wall support, movement is only allowed parallel to the wall. Any impact is to be avoided. Pay special attention to obstacles at high altitude! Upon movement, it must be checked whether the Mobile Scaffold Tower is vertical and all castors have ground contact. If not, the scaffolding must be realigned in accordance with Item 6.1.9.

12. The safe distance to overhead lines is 5 metres. Here, the swinging-out of the power cables and the motion space of the employees, including the materials to be moved by them, must be taken into account. Smaller distances are possible according to “Guidelines for handling working and safety scaffoldings BGI 663” of the Employer’s Liability Insurance Association for the Building Trade.

13. Upon movement, the castors must be locked by pushing down the brake levers.

14. Attachment and use of lifting equipment to mobile working scaffolds is prohibited.

15. Bridging two adjacent mobile working scaffolds or a mobile working scaffold to a building is not permitted.

16. Jumping down to the deck surfaces or throwing objects at them is not allowed.

17. The scaffold parts may not be exposed to aggressive media. They may also not be exposed to temperatures below -25 °C or above + 70 °C for extended periods of time.

18. In the event of vehicular traffic in the vicinity of the Mobile Scaffold Tower, it is to be secured and illuminated.

Page 12: Scaffolding Systems German Handmade Manufacturer by ALFIX

12 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use5. Preparation of Erection

1. Determine the required standing height and select the appropriate Mobile

Scaffold Tower with the associated component requirements according to

page 35. Although components for a higher working platform are available,

the structure depends on the required height.

2. Prior to erection, it must be checked whether all parts (see tables on page

33) and tools required for the erection of the Mobile Scaffold Tower are avail-

able at the construction site. The same applies to eyebolts and plastic anchors

intended to be used for wall attachments. In addition, all components must

be checked for proper condition. Only undamaged original parts of the ALFIX

Mobile Scaffold Tower 5000 may be used. Damaged or defective parts must

be discarded.

3. For assembly and dismantling, at least two persons (with erection heights

above 6 m - three persons) and the following tools are required:

• Spirit level

• For standing heights above 4 m: rope with snap hook.

• Erection with tension-proof wall support: tool for setting the anchors

incl. mounting hardware (see Information of the anchor manufacturer)

4. Special features when erecting the Mobile Scaffold Towers 5001 and 5002:

• The castor wheels are to be directly plugged into the vertical frame

1.12 m (5001) and 1.96 m (5002) and connected to the side protec-

tion serving as bracing means.

• Subsequently, the platform is installed at the desired standing

height of 1 m (5001) or 1.65 m (5002).

• Access to the working level is performed using a stepladder.

• The ballasting, where appropriate, is set out on pages 23 to 27.

Page 13: Scaffolding Systems German Handmade Manufacturer by ALFIX

13AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 50006.1 Assembly of chassis

1. Assembly of rolling beam with castor wheels

• Insert two castor wheels each into the rolling beam. Tighten the winged screws at the spindle nuts and make sure that their threads engage the boreholes of the rolling beam.

2. Lock the castor wheels

• by stepping down the brake levers or by putting the castor wheel into the upright position.

3. Insert the vertical frames (1.12 m) into the rolling beams centrally …

• and secure them with locking clips …

4. … or laterally

• and secure them with locking clips ...

Page 14: Scaffolding Systems German Handmade Manufacturer by ALFIX

14 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use6.1 Assembly of chassis

5. Arrange the vertical frames in the upright position and connect them by inserting the side protection

6. … or, in the event of lateral erection: connect the rolling beams at the vertical frames’ side with the side protection.

• For the connection of couplers, see also pages 31-32 “Tips & Tricks”

7. Approximately adjusting the chassis

• To compensate for larger unevenness, rotate the spindle nuts at the height-adjustable castors, which are to be relieved by lifting up the rolling beam, to the approximately required height.

8. Insert the platform without hatch into the rolling beam.

• To install the platform, see also page 31-32 “Tips & Tricks”

Page 15: Scaffolding Systems German Handmade Manufacturer by ALFIX

15AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 50006.1 Assembly of chassis

9. Aligning the chassis

• Align the chassis horizontally and vertically in longitudinal and transverse directions using a spirit level (tolerance ± 1%). Subsequently, tighten the winged screws at the spindle nuts.

10. Suspending the counterweights

• Attach all counterweights required for the final erection!

• The distribution of counterweights is described on pages 23 to 27. On page 28, you will find the corresponding assembly instructions.

Exemplary suspended counterweights for Mobile Scaffold Tower 5005

The further erection of types 5003 and 5004 is to be carried out according to “6.2 Assembly of Working Platform”.

Page 16: Scaffolding Systems German Handmade Manufacturer by ALFIX

16 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use6.2 Assembly of working platform

1. Fixing the assembly deck

• For assembly and dismantling, the deck surfaces or intermediate platforms must be arranged so that the vertical distance between the deck/platform surfaces does not exceed 2.10 m.

2. Inserting the vertical frames 1.96 m

• Secure them with locking clips. See p. 31-32 “Tips & Tricks”

3. Bracing with diagonal braces

• The diagonal braces must be alternately hooked into the lower tube of the rolling beam.

• To install the diagonal braces, please refer to pages 31-32 “Tips & Tricks”

4. Fixing a platform with hatch-type access

• With types 5003 and 5005, the platform is to be suspended in the eighth rung above the first deck.

• With types 5004 and 5006 to 5012, the platform serves as an assembly aid and must not be hooked in at heights exceeding the seventh rung above the first deck.

Page 17: Scaffolding Systems German Handmade Manufacturer by ALFIX

17AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 50006.2 Assembly of working platform

5. Assembly of side protection

• Open the access hatch and sit on the opened hatch. The legs have to be stretched through the opening and rest on the rungs of the vertical frame.

• Do not enter the platform unless both side protection components are hooked in!

• Raise the side protection up and attach it first on one side. Check whether the claw coupler is released. Then pivot the other end to the vertical frame and latch it (cf. Item 9.5.5). Remain seated during this process. Side protection components are always installed from the inside between the second and fourth rung!

• Repeat this procedure for the second side protection.

• Now, you can enter the decking and close the hatch.

Page 18: Scaffolding Systems German Handmade Manufacturer by ALFIX

18 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use6.2 Assembly of working platform

6. Bracing with diagonal braces

• Hook the diagonal braces into the same rungs where the “last” diagonal braces are attached, or, as described in Item 6.2.3, hook them into the lower tube of the rolling beam.

7. ... further vertical frames

• cf. Item 6.2.2

8. Suspending a platform with hatch-type access at heights not exceeding the seventh rung above the last platform

• The platforms must be alternately suspended!

Page 19: Scaffolding Systems German Handmade Manufacturer by ALFIX

19AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 50006.2 Assembly of working platform

9. Suspending the uppermost working platform

• The platform with hatch-type access must be alternately suspended with reference to the last attached platform. Its installation height must not exceed the fifth last rung.

• For assembling the platform, please refer to pages 31-32 “Tips & Tricks”

10. Suspending the side protection components

• The side protection above the uppermost platform must be installed from the inside, above the second and below the fourth rung.

• For assembling the side protections, please refer also to page 17 (cf. Item 6.2.5)

11. Installing and inserting the toeboards

• First, lean the two end toeboards against the frames. The attachments must be directed to the outside! Then insert the longitudinal toeboards into the slots provided by the end toeboards.

Page 20: Scaffolding Systems German Handmade Manufacturer by ALFIX

20 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use6.3 Use of auxiliary assembly decks

1. Unhook the protection components referred to under Item 6.2.5 and re-install them between second and fourth rung above the uppermost platform.

• The platforms and side protection components remain within the Mobile Scaffold Tower at a height distance of up to 4 m. The assembly decks in between are dismantled and used again at a higher level.

2. Dismantling of guardrails

• Loosen the locking of guardrails on the opposite end of the access hatch.

• Similar to the assembly process, sit on the bottom with the legs stretched through the opening and resting on the rungs of the vertical frame.

• Then, unlock the two guardrail ledgers situated in the front and pass the released, dismantled double guardrail upwards in order to continue assembling or ...

• ..., for the purpose of dismantling, downwards.

3. Dismantling the platform

• After removing the guardrail, climb down to the next intermediate deck and close the hatch of the assembly deck.

• Then, you can pass the platform upwards or downwards.

• Installation of the platform and attachment of the guardrail, cf. Item 6.2.4 or 6.2.5.

• With the assembly level, the distance between two intermediate storeys is bridged, ensuring that during assembly and dismantling the 2.10 m distance will not be exceeded.

• An assembly level is formed from a platform with hatch-type access and two side protection guardrails.

• An assembly level can be removed after the erection of the intermediate storey and can be used again further above.

Page 21: Scaffolding Systems German Handmade Manufacturer by ALFIX

21AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 50007.1 Stabiliser

1. Assembly of chassis / base jacks

• Insert one castor wheel/base jack each into the stabilisers and tighten the winged screws at the spindle nuts in a way that their thread engages the boreholes of stabilisers.

2. Assembly of vertical frames

• Connect the stabilisers with their two couplers to the vertical frame (for coupler connection, see pages 31-32 “Tips & Tricks”). In the process, one coupler of each stabiliser must abut the underside of a rung. Then, turn out the castor wheel of each stabiliser so far that it rests on the ground. Tighten the wing nut (see also page 29 “Operating the castor wheels”).

3. Bracing with side protection

• The stabilisers are (as a reinforcement for the rolling beams) to be braced horizontally with the side protection against twisting. In this case, the side protection is positioned from above onto the centre rung of the stabiliser. Mobile Working Platforms with stabilisers may not be used without this bracing!

• It is possible for the base jacks, instead of castors, to be built into the stabilisers.

• In centre-type design with 4 stabilisers, one swivel coupler per stabilizer should be installed to prevent twisting.

4. Note :

• In the event of lateral erection, counterweights can be saved with almost all ALFIX Mobile Scaffold Towers through the use of stabilisers. See ballasting tables on pages 23 to 27.

Page 22: Scaffolding Systems German Handmade Manufacturer by ALFIX

22 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use7.2 Wall support

1. Compressive wall support as an additional measure (without dowelling)

• This type of support is used with lateral structures, e.g. on a wall. It enables the speedy movement of the Mobile Working Platform. The wall support is connected to the vertical frame in the area of the working platform using a scaffold coupler. Upon connection, the tube end of the wall support abuts against the wall. Following a movement, one must check whether the tube still abuts the wall. If this is not the case, the wall support is to be newly set up. To avoid damage to the building, we recommend the use of a suitable damping aid between the wall and the tube end of the wall support. To connect the coupler, please refer to pages 31-32 “Tips & Tricks”.

2. Fixed wall support as an additional measure

• This method is used to firmly fasten the Mobile Working Platform onto the wall. An anchor/dowel is inserted into the wall and provided with an eyebolt Ø 12 mm (e.g. with a wood screw thread for plastic anchors). Thereafter, the hook of the wall support is hooked into the eyebolt. Then, the tube of the wall support is connected to the vertical frame by means of scaffold coupler. To connect the couplers, see pages 31-32 “Tips and Tricks”.

• The selection of the anchor type and size, as well as the anchor installation is carried out in accordance with the instructions of the anchor producer, taking into account the anchor base.

Page 23: Scaffolding Systems German Handmade Manufacturer by ALFIX

23AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 50008. Ballasting

8.1 Indoors, central

Required ballasting [kg] at the corner points

Standing height [m] A B C D

> 0 to 5.90 - - - -

6.70 10 10 10 10

7.85 to 8.65 20 20 20 20

9.80 30 30 30 30

10.60 40 40 40 40

11.75 50 50 50 50

For heights over 11.75 m, an object-related proof of safety is required!

Required ballasting [kg] at the corner points

Standing height [m] A B C D

> 0 to 3.90 - - - -

4.75 30 30 30 30

5.90 50 50 50 50

6.70 70 70 70 70

7.85 90 90 90 90

For heights over 7.85 m, an object-related proof of safety is required!

8.2 Outdoors, central

A

B

C

D

Page 24: Scaffolding Systems German Handmade Manufacturer by ALFIX

24 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use8. Ballasting

A

B

C

D

8.3 Indoors, lateral

Required ballasting [kg] at the corner points

Standing height [m] A B C D

> 0 to 2.80 - - - -

3.90 - 10 10 -

4.75 - 20 20 -

5.90 - 30 30 -

6.70 - 40 40 -

7.85 to 8.65 - 50 50 -

9.80 to 10.60 - 70 70 -

11.75 10 90 90 10

For heights over 11.75 m, an object-related proof of safety is required!

8.4 Outdoors, lateral

Page 25: Scaffolding Systems German Handmade Manufacturer by ALFIX

25AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 50008. Ballasting

8.5 Indoors, central, with two stabilisers

Required ballasting [kg] at the corner points

Standing height [m] A B C D E F G H

> 0 to 11.75 - - - - - - - -

For heights over 11.75 m, an object-related proof of safety is required!

8.6 Outdoors, central, with two stabilisers

AB

CD

Required ballasting [kg] at the corner points

Standing height [m] A B C D E F G H

> 0 to 6.70 - - - - - - - -

7.85 20 - - 20 20 - - 20

For heights over 7.85 m, an object-related proof of safety is required!

EF

G

H

Page 26: Scaffolding Systems German Handmade Manufacturer by ALFIX

26 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use8. Ballasting

8.7 Indoors, lateral, with one stabiliser

Required ballasting [kg] at the corner points

Standing height [m] A B C D E F

> 0 to 10.60 - - - - - -

11.75 10 - - - - 10

For heights over 11.75 m, an object-related proof of safety is required!

8.8 Outdoors, lateral, with one stabiliser

A

B

C

D

Required ballasting [kg] at the corner points

Standing height [m] A B C D E F

> 0 to 4.75 - - - - - -

5.90 - - 10 10 - -

6.70 10 - 20 20 - 10

7.85 30 - 20 20 - 30

For heights over 7.85 m, an object-related proof of safety is required!

EF

Page 27: Scaffolding Systems German Handmade Manufacturer by ALFIX

27AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 50008. Ballasting

A

B

C

D

8.9 Indoors, lateral, with compressive wall support (without dowelling)

Required ballasting [kg] at the corner points

Standing height [m] A B C D

> 0 to 5.90 - - - -

6.70 to 8.65 10 - - 10

9.80 to 10.60 20 - - 20

11.75 30 - - 30

For heights over 11.75 m, an object-related proof of safety is required!

8.10 Outdoors, lateral, with compressive wall support (without dowelling)

Required ballasting [kg] at the corner points

Standing height [m] A B C D

> 0 to 4.75 - - - -

5.90 20 - - 20

6.70 30 - - 30

7.85 50 - - 50

For heights over 7.85 m, an object-related proof of safety is required!

Page 28: Scaffolding Systems German Handmade Manufacturer by ALFIX

28 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use

1.

2.

3.

4.

9. Miscellaneous

9.1 Dismantling of Mobile Scaffold Towers

• The dismantling of ALFIX Mobile Scaffold Towers is carried out in reverse order in accordance with the above requirements.

• Even during dismantling, assembly decks are to be used at a maximum distance of 7 rungs.

• No parts may be thrown off!

9.2 Assembly of counterweights

1. Attaching the counterweight(s) ...

2. ... and suspending it/them at the rolling beam at the bottom ...

3. ... or at the top

4. Maximum ballasting at a maximum of six weights at an endpoint

5. Ballasting at the stabiliser

Page 29: Scaffolding Systems German Handmade Manufacturer by ALFIX

29AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 50009.3 Operating the castor wheels

1. Locking the brakes

• Press the brake lever down

2. Releasing the brakes

• Pull the lever upwards

3. Tightening or loosening the winged screws

• When tightening the winged screw, make sure that its thread engages the rolling beam’s borehole!

4. Align the chassis in the direction of the movement/displacement by rotating the castor wheel

• CAUTION: At first, loosen the winged screw and re-tight it upon alignment!

Page 30: Scaffolding Systems German Handmade Manufacturer by ALFIX

30 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use9.4 Platform with hatch

1. Open the hatch from below

2. Open the hatch from above

3. Note:

• With the hatch open, it is not permitted to work on the platform!

Page 31: Scaffolding Systems German Handmade Manufacturer by ALFIX

31AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 50009.5 Tips & Tricks

1. Suspending a platform

• Slide the platform over the predetermined rung ...

• ... and simply draw it back towards yourself.

• At the end of the platform, thereby securing strap fold up automatically and the hooks of the platform stage lock in the rungs.

2. Inserting the locking clip

• Put the initial straight part of the locking clip completely through the borehole of the vertical frame. Then, turn down the locking clip onto the rolling beam and vertical frame respectively.

Page 32: Scaffolding Systems German Handmade Manufacturer by ALFIX

32 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use9.5 Tips & Tricks

3. Suspending the diagonal braces

• Put the diagonal braces with their upper end onto the intended rung and drag it towards yourself until it clicks and the safety latch closes by itself. The diagonal braces must fit as close as possible with the vertical tubing.

4. Installing the couplers

• The coupler half-shells are laid around the tubes. The bolts are inserted into the recesses provided by the half-shells and tightened.

5. Functioning of claw couplers

• Assembly: Unlock the claw coupler and apply it to the vertical frame. By pressing, the claw coupler locks automatically

• Dismantling: Loosen the latch of the claw coupler and push it inwards.

Page 33: Scaffolding Systems German Handmade Manufacturer by ALFIX

33AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 500010. Technical Data

Mobile Scaffold Towers 5001 – 5004 Overview(from 5003, lateral without stabilisers)

Caution:• All figures on pages 33 and 34 are to be understood as examples!• For proper erection of the Mobile Scaffold Towers, the ballasting tables on pages 23 to 27 (cf. Item 8.1 - 8.10.) must be

taken into account!• Additional components are required for particular assembly conditions (assembly set).

Type of Mobile Scaffold Tower

5001 5002 5003 5004 5005 5006 5007 5008 5009 5010 5011 5012

Working height (m) 3,00 3,30 4,80 5,90 6,75 7,90 8,70 9,85 10,65 11,80 12,60 13,75

Scaffold height (m) 1,40 2,40 3,95 5,05 5,95 7,00 8,95 8,95 9,90 10,90 11,75 12,90

Standing height (m) 1,00 1,30 2,80 3,90 4,75 5,90 7,85 7,85 8,65 9,80 10,60 11,75

Individual parts required for erection

Vertical frame1.96 x 0.75 m - 2 2 2 4 4 6 6 8 8 10 10

Vertical frame1.12 x 0.75 m 2 - 2 4 2 4 2 4 2 4 2 4

Side protectionfor MST* 5000 / 6000 1 2 2 2 3 5 5 5 5 7 8 8

Platform without hatch-type access2.60 x 0.60 m

1 1 - 1 1 1 1 1 1 1 1 1

Platform with hatch-type access2.60 x 0.60 m

- - 1 1 1 2 2 2 2 3 3 3

Diagonal braces - 1 2 4 4 6 6 8 8 10 12 12

Longitudinal ledger - 1 2 2 2 - - 2 2 2 2 2

Hinged pin - - 8 12 12 16 16 20 20 24 24 28

Toeboard for MST* bay length 2.60 m - - 2 2 2 2 2 2 2 2 2 2

Toeboard for MST* width 0.85 m - - 2 2 2 2 2 2 2 2 2 2

Rolling beam for MST* 5000 - - 2 2 2 2 2 2 2 2 2 2

Stabiliser - - - - - - - - - - 2 2

Base jacks - - - - - - - - - - 2 2

Castor wheel with thread Ø 200 mm / 6 kN Loadable up to 600 kg

4 4 4 4 4 4 4 4 4 4 4 4

Instructions for Erection and Use 1 1 1 1 1 1 1 1 1 1 1 1

*MST = Mobile Scaffold Tower

Page 34: Scaffolding Systems German Handmade Manufacturer by ALFIX

34 AuV ALFIX Mobile Scaffold Tower Series 5000

Instructions for Erection and Use10. Technical Data

Mobile Scaffold Towers 5005 – 5008 Overview(lateral, without stabilisers)

Mobile Scaffold Towers 5009 – 5012 Overview(lateral, without stabilisers, from 5011 – with stabilisers)

Page 35: Scaffolding Systems German Handmade Manufacturer by ALFIX

35AuV ALFIX Mobile Scaffold Tower Series 5000

ALFIX Mobile Scaffold Tower Series 500011. Components overview

Platform without hatch-type accessArticle No. 30 02 031

Platform with hatch-type accessArticle No. 30 02 030

Rolling beamArticle No. 30 07 500

Side protectionArticle No. 30 03 000

Vertical frame 1.12 mArticle No. 30 01 512

Vertical frame 1.96 mArticle No. 30 01 596

Diagonal braceArticle No. 30 04 560

Castor ø 200 mm / 5 kNArticle No. 30 06 201 Base jack

Article No. 11 51 060

Mobile scaffold tower coupler Article No. 30 20 000

Locking clipArticle No. 14 50 000

StabiliserArticle No. 30 09 001

Counterweight 20 kgArticle No. 30 20 002

Weight holderArticle No. 30 20 015 Universal weight

Article No. 30 20 011

Wall supportArticle No. 13 61 040

Toeboard 2.60 m / 0.85 mArticle No. 30 05 610 / 30 05 520

Hinged pinArticle No. 30 06 250

Page 36: Scaffolding Systems German Handmade Manufacturer by ALFIX

ALFIX GmbHLanghennersdorfer Straße 15D-09603 Großschirma

Phone +49 (0) 37328 / 800-0Fax +49 (0) 37328 / 800-80eMail: info@alfi x-systems.com

www.alfi x-systems.com

SELLING — Work & Safety scaffoldings — Mobile scaffold towers — Construction site equipment — Roofing systems — Chimney scaffolds — Shelves — Accessories

LEASING — Work & Safety scaffoldings — Mobile scaffold towers — Roofing systems