1 2 3 4 5 6 7 8 9 10 Scaffold Inspection Guide Without the latest information, people are prone to make assumptions. Assumptions can lead to potentially damaging decisions made, both for your employees and your business. Therefore, the identity, maintenance and inspection status of equipment, is critically important. All scaffolding, working platforms and edge protection should be inspected: Before being used for the first time; Following significant alteration; Within seven days of the previous inspection; Following adverse weather or any event likely to have affected its strength or stability such as overloading. No work is to be undertaken on the scaffold until these inspections have taken place. Optimise equipment inspections with Safetrak Electronic inspections ensure that inspections are easily planned, generate clear inspection reports and provide a clear audit trail detailing the history of the asset. Safetrak's Scaffolding module negates the need to manually complete any register, file or double enter the information. Plan inspections by location, by inspector and report automatically - ask for a demo Visual Tagging Solutions Safety. Maintenance. Identification. Tel: 0845 089 40 60 Email: [email protected] Web: www.scafftag.co.uk www.bradyeurope.com EUR-M-518-UK 03/08/2020 WS01 Duty BS12811-1 loading Standard centres Very light duty Class 1 0.75 kN/m2 2.4m Light duty Class 2 1.50 kN/m2 2.4m General purpose Class 3 2.00 kN/m2 2.0m Heavy duty Class 4 3.00 kN/m2 1.8m As the manufacturer, Scafftag recommend that in operation it is the responsibility of the scaffold user to ensure the scaffold is within the inspection dates if being used. We reserve the right to alter without prior notice and specification of our products. SCAFFTAG Systems and Products are registered and copyright protected. Brady Scafftag ® Visual Tagging System 1 Gin wheels: To be secured on load bearing couplers with Safe Working Load clearly marked: LOAD NOT TO EXCEED 50kg 2 Guard Rails: Double (upper and lower) guardrails are required on all working lifts to prevent falls. The upper guardrail should be fixed at a minimum height of 950mm. The lower guardrail should also be fixed with the gap between the guardrails and the toe board not exceeding 470mm. 3 Toe boards: Should be fixed to all boarded platforms where there is a risk of material or a person falling. Toe boards should have a minimum height of 150mm, the gap between the top of the toe board and the lower guard rail should not exceed 470mm. 4 Boarding: The board-end transoms should be placed so that the board overhang is at least 50mm (approximately one board diameter) and does not exceed four times the thickness of the board. 5 Transoms: Are required at intermediate positions to support the boards. The maximum spacing of these intermediate transoms depends on the working load of the scaffold and the 'target span' quoted by the supplier or manufacturer. 6 Sheeting: Of any kind e.g. plastic sheets, tarpaulin, debris netting and brick guards that are subject to wind loading should NOT be installed unless they are cited in the relevant TG20 compliance sheet or approved scaffold design. 7 Standards: Centres dependent upon duty use specified in TG20. 8 Lift heights: TG20 compliance sheets in the Operational Guide are suitable for scaffolding with lift heights up to 2.0m and for base lift up to 2.7m maximum for safe pedestrian passage. The TG20 eGuide offers designs for lift heights up to 3.0m but scaffolds with features falling outside industry standards may require a specific scaffold design. 9 Suitable types of ties: Should be selected and installed as per a TG20 compliance sheet or approved scaffold design, with a minimum of 5% tested, to ensure the scaffold remains structurally stable. 10 Ledger joints: Not more than one third into a bay and be staggered throughout i.e. not in adjacent bays or lifts. Standard joints: Joints in standards should be staggered, so that adjacent standards are not joined within the same lift level. Standard/ledgers/guardrails: Fixed with right angle couplers. Base plates: Scaffold standards should be founded on a base plate 150mm x 150mm on plan. Sole boards: TG20 specifies these should be at least 0.1m 2 , with no dimension less than 220mm, and a thickness of at least 36mm (typically this will be achieved with a 450mm x 225mm x 38mm thick scaffold board). Customise your Visual Tagging Solutions We can help you custom design any insert to help you manage your specific business requirement or existing systems in place. Or simply add your logo! We have literally thousands of designs developed for other clients offering unique solutions which may be of interest to your business. Please ask for details Board specification Thickness Transom spacing Minimum overhand Maximum overhand Load class 1-3 Load class 4 BS2482 timber board 38mm 1.2m 0.9m 50mm 150mm BS2482 timber board: machine graded 38mm 1.5m 0.9m* 50mm 150mm Typical LVL board 33mm* 1.2m - 1.5m* 0.9m* 50mm 130mm* Typical plastic board 45mm* 1.2m - 1.5m* 0.9m* 50mm 180mm* * Typical values are provided for illustration, manufacters specifications may vary. Where loading requirements fall outside of TG20, these will require a specifice scaffold design. Bracing, ledger and façade: Should be erected as per the TG20 compliance sheet or the approved scaffold design. Ladders: All ladders used for access shall be long enough to extend sufficiently above the working platform, unless other measures have been taken to ensure an adequate handhold. (NASC recommend a minimum 1.0m). Ladders should be fixed at an angle of 75% (use angle indicator on ladder stiles or the 1 in 4 rule). Ladders may be external to the scaffold, with access provided via a gate. It is recommended that external ladders are restricted to the first and second lifts only. © Copyright material is reproduced with kind permission of the NASC. Any errors are solely the responsibility of Scafftag/Brady Corporation Ltd. Please visit their website for more information on guidance including on TG20 Operational Guide; A comprehensive guide to good practice for tube and fitting scaffolding: nasc.org.uk

Scaffold Inspection Guide

  • Upload
    others

  • View
    18

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Scaffold Inspection Guide

1

2

3 45 6

7

8

910

Scaffold Inspection GuideWithout the latest information, people are prone to make assumptions. Assumptions can lead to potentially damaging decisions made, both for your employees and your business. Therefore, the identity, maintenance and inspection status of equipment, is critically important.

All scaffolding, working platforms and edge protection should be inspected: Before being used for the fi rst time;

Following signifi cant alteration;

Within seven days of the previous inspection;

Following adverse weather or any event likely to have affected its strength or stability such as overloading.

No work is to be undertaken on the scaffold until these inspections have taken place.

Optimise equipment inspections with SafetrakElectronic inspections ensure that inspections are easily planned, generate clear inspection reports and provide a clear audit trail detailing the history of the asset. Safetrak's Scaffolding module negates the need to manually complete any register, fi le or double enter the information. Plan inspections by location, by inspector and report automatically - ask for a demo ▶

Visual Tagging SolutionsSafety. Maintenance. Identifi cation.

Tel: 0845 089 40 60Email: [email protected]

Web: www.scafftag.co.ukwww.bradyeurope.com

EUR-M-518-UK 03/08/2020 WS01

Duty BS12811-1 loading Standard centres

Very light duty Class 1 0.75 kN/m2 2.4m

Light duty Class 2 1.50 kN/m2 2.4m

General purpose Class 3 2.00 kN/m2 2.0m

Heavy duty Class 4 3.00 kN/m2 1.8m

As the manufacturer, Scafftag recommend that in operation it is the responsibility of the scaffold user to ensure the scaffold is within the inspection dates if being used. We reserve the right to alter without prior notice and specifi cation of our products. SCAFFTAG Systems and Products are registered and copyright protected.

Brady Scafftag®

Visual Tagging System

1

Gin wheels: To be secured on load bearing couplers with Safe Working Load clearly marked: LOAD NOT TO EXCEED 50kg

2

Guard Rails: Double (upper and lower) guardrails are required on all working lifts to prevent falls. The upper guardrail should be fi xed at a minimum height of 950mm. The lower guardrail should also be fi xed with the gap between the guardrails and the toe board not exceeding 470mm.

3

Toe boards: Should be fi xed to all boarded platforms where there is a risk of material or a person falling. Toe boards should have a minimum height of 150mm, the gap between the top of the toe board and the lower guard rail should not exceed 470mm.

4

Boarding: The board-end transoms should be placed so that the board overhang is at least 50mm (approximately one board diameter) and does not exceed four times the thickness of the board.

5

Transoms: Are required at intermediate positions to support the boards. The maximum spacing of these intermediate transoms depends on the working load of the scaffold and the 'target span' quoted by the supplier or manufacturer.

6

Sheeting: Of any kind e.g. plastic sheets, tarpaulin, debris netting and brick guards that are subject to wind loading should NOT be installed unless they are cited in the relevant TG20 compliance sheet or approved scaffold design.

7

Standards: Centres dependent upon duty use specifi ed in TG20.

8

Lift heights: TG20 compliance sheets in the Operational Guide are suitable for scaffolding with lift heights up to 2.0m and for base lift up to 2.7m maximum for safe pedestrian passage. The TG20 eGuide offers designs for lift heights up to 3.0m but scaffolds with features falling outside industry standards may require a specifi c scaffold design.

9 Suitable types of ties: Should be selected and installed as per a TG20 compliance sheet or approved scaffold design, with a minimum of 5% tested, to ensure the scaffold remains structurally stable.

10

Ledger joints: Not more than one third into a bay and be staggered throughout i.e. not in adjacent bays or lifts.

Standard joints: Joints in standards should be staggered, so that adjacent standards are not joined within the same lift level.Standard/ledgers/guardrails: Fixed with right angle couplers.

Base plates: Scaffold standards should be founded on a base plate 150mm x 150mm on plan.

Sole boards: TG20 specifi es these should be at least 0.1m2, with no dimension less than 220mm, and a thickness of at least 36mm (typically this will be achieved with a 450mm x 225mm x 38mm thick scaffold board).

Customise your Visual Tagging SolutionsWe can help you custom design any insert to help you manage your specifi c business requirement or existing systems in place. Or simply add your logo! We have literally thousands of designs developed for other clients offering unique solutions which may be of interest to your business. Please ask for details ▶

Board specifi cation ThicknessTransom spacing Minimum

overhandMaximum overhandLoad class 1-3 Load class 4

BS2482 timber board 38mm 1.2m 0.9m 50mm 150mm

BS2482 timber board: machine graded

38mm 1.5m 0.9m* 50mm 150mm

Typical LVL board 33mm* 1.2m - 1.5m* 0.9m* 50mm 130mm*

Typical plastic board 45mm* 1.2m - 1.5m* 0.9m* 50mm 180mm*

* Typical values are provided for illustration, manufacters specifi cations may vary.

Where loading requirements fall outside of TG20, these will require a specifi ce scaffold design.

Bracing, ledger and façade: Should be erected as per the TG20 compliance sheet or the approved scaffold design.

Ladders: All ladders used for access shall be long enough to extend suffi ciently above the working platform, unless other measures have been taken to ensure an adequate handhold. (NASC recommend a minimum 1.0m). Ladders should be fi xed at an angle of 75% (use angle indicator on ladder stiles or the 1 in 4 rule). Ladders may be external to the scaffold, with access provided via a gate. It is recommended that external ladders are restricted to the fi rst and second lifts only.