SCADA Documentation
and Disaster Recovery
2016 ISA Water / Wastewater and Automatic Controls Symposium
August 2-4, 2016 – Orlando, Florida, USA
Speakers:
Mike Stoup, PE, McKim & Creed
Mike Skrzypek, Pinellas County Utilities
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA 2
Presenter
• Mike Stoup, PE, I&C Group Manager
– Oversees 10 controls and SCADA engineers,
designers, programmers & technical specialists
– 22 years experience in design, implementation &
management of I&C/SCADA projects
– B.S., Electrical Engineering, University of South Florida
• Mike Skrzypek, SCADA & Security Systems Manager
– Oversees operation and maintenance of county’s SCADA
system
– 45 years experience, including regional service manager for
manufacturers
– Graduate of Northeastern University of Illinois, Computer
Science and Economics
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA 3
Presentation Outline
• Overview of the situation
• Existing conditions
• Project justification
• Project execution strategy
• Project execution
• Deliverables
• Potential project roadblocks
• Benefits of the project
• Questions
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA 4
Overview of the Situation
• Sixth most populated county in Florida
• Most densely populated county in Florida
• Using Wonderware Archestra and InTouch
• Communicate with a combination of radio,
cellular, fiber and microwave
• Homeland Security Audit in late 2015
• Deficient documentation of SCADA system
• No SCADA disaster recovery plan
• Must address items in audit
• Desired completion date 12/31/15
2 Water Plants
3 Wastewater Plants
1 Solid Waste Facility
6 Pumps Stations
330 Remote Sites
Pinellas County, FL
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
Existing Conditions
• Past practice of awarding to lowest bidder:
• Project specific documentation that wasn’t incorporated into the
overall SCADA system set
• Various levels of quality, format and thoroughness of SCADA
documentation
• Departure of most staff familiar with SCADA system
• Preparing for a major overhaul over the next 3 years.
5
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
Project Justification
• Extended downtime that could cause:
• Environmental spills
• Interruption of service
• Contaminated water distribution
• High costs to rewrite software due to insufficient backups
• Meet regulatory and Homeland Security Audit
requirements
6
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
Project Execution Strategy
• Assemble team
• Define scope and boundaries of research
• HMI system (not including the PLC)
• Ethernet networking
• Explain sensitivity
• Identify goals and schedule
7
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
Project Execution
• Assemble the team
• County Utility Managers
• Plant Managers
• SCADA Technical Resources
• Consultant
• Interview plant technical, managerial and operations staff.
• Perform field research to trace wires, interrogate devices on
networks.
• Review existing documentation.
8
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
Project Execution
• Work with Wonderware, the
HMI vendor, for backup and
restore procedures.
• Develop draft documents for
county review.
• Finalize deliverables after
review and deliver to Pinellas
County.
9
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
Deliverables
• All deliverables in native format
• Network drawings
• Operational block diagram
• System-specific backup and restore procedure
• System-specific server file location and names for backups
10
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
Network Drawings
11
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
Network Drawings
12
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
Network Drawings
13
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
Network Drawings
14
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
Operational Block Diagram
15
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
System-Specific Backup and
Restore Plan
16
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
System-Specific Server
File Locations and Names
17
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
Potential Project Roadblocks
• Technical staff refuses to share information
• Operations won’t give access to equipment
• Extensive inaccurate or missing documentation
18
2016 ISA WWAC Symposium
Aug 2-4, 2016 – Orlando, Florida, USA
Benefits of the Project
• Accurate documentation of the SCADA system
• Launching point for a larger planning effort
• Better defined scopes for future projects
• System-specific backup and restore procedure
• Documents in native format
19