Upload
others
View
7
Download
0
Embed Size (px)
Citation preview
314 PROJECTS FILLING POTHOLES AND REPAVING CRUMBLING ROADS
14 TRAFFIC CONGESTION RELIEF PROJECTS
103
20
PROJECTS IMPROVING THE SAFETY OF LOCAL ROADS AND BRIDGES
SAFETY IMPROVEMENT PROJECTS FOR PEDESTRIANS AND BICYCLES
SBl FUNDING FOR OUR CITIES AND COUNTIES:
10-YEAR TOTAL
San Diego County
Imperial County
TOTAL
$1.5 BILLION
$167.7 MILLION
$1.64 BILLION
'£ FILLING POTHOLES AND REPAVING ROADS
■ 120 miles of pavement improvements on San Diego city streets
■ 115 pavement repair and resurfacing projects throughout San Diego County
■ 71 miles of pavement improvements on SR 78 between the cities of Escondido and Banner
■ 14 miles of pavement improvements on 1-805
■ 30 miles of pavement improvements on SR 52
■ Repair and replace sections of pavement on 1-805 between San Diego and National City and on 1-5 between the San Ysidro Port and Chula Vista
■ 50 miles of pavement improvements on SR 125
■ Citywide pavement repairs and filling potholes in Chula Vista
■ 200 miles of resurfacing on unincorporated area roads
~ TRAFFIC CONGESTION RELIEF
■ Traffic congestion relief on North Coast Corridor: 27 miles of Express Lanes on 1-5 from La Jolla to Oceanside, improve more than 30 highway overpasses and upgrade rail stations and platforms
■ Improvements along 1-5 from San Diego to Oceanside
■ Install signals and ramp metering on 1-5 from San Diego to Oceanside
■ Improvements along the border to facilitate construction of new Otay Mesa East Port of Entry
■ Construct 16 miles of HOV lanes in Encinitas and 8 miles in Carlsbad
Examples of Projects Underway in the San Diego Region
, BRIDGES
■ Safety improvements to 17 bridges on 1-8 and State Routes 86, 98, 11 and 186 in Imperial County
■ Erosion control and revamp 5 bridges on SR 98 and SR 111 in Imperial County
■ Replace 2 bridges on SR 79 near Warner Springs in San Diego County
■ Seismic retrofitting for bridges across Imperial County
■ City-wide bridge restoration in San Diego
~ ROAD SAFETY
■ Adding lighting, advance curve warnings, flashing signs and rumble strips to improve safety throughout Imperial County
■ Improve medians on El Camino Real to prevent collisions in Carlsbad
■ Repair and replace drainage culverts along 1-8 from Midway Drive Undercrossing to Flinn
Springs Road Undercrossing in San Diego County
■ Construct rumble strips, upgrade guardrail and improve 23 miles on 1-8 from Viejas Creek Bridge
to Pine Valley Creek Bridge in San Diego County ■ Restripe 679 miles of 1-5 from the international
border to Riverside County line ■ Restripe 703 miles of 1-15 in San Diego to the
Orange County line ■ Construct 4 through lanes, install lighting,
construct a 250-foot bridge and signalize major
intersections in the City of Escondido
~ PUBLIC TRANSPORTATION I 'I.
■ Procure 11 zero-emission buses, 24 coach buses and
station improvements for the San Diego Metropolitan Transit System
■ Replace 10 COASTER locomotives with cleaner, more
efficient locomotives ■ Improve on-time performance and capacity for Pacific
Surfliner and Coaster Amtrak trains ■ Increased Blue Line trolley frequency and the addition of a
new Rapid Bus service connecting Imperial Beach and the
Otay Mesa International Border Crossing ■ Construct multi-modal ADA compliant improvements along
2.3 miles of University Avenue in the City of San Diego to improve service, increase ridership and improve safety for
pedestrians and bicyclists
■ Double tracking of the LOSSAN rail corridor to improve commuter travel times
■ Increased light rail service on the Blue Line Corridor, improved safety and performance, introduce new Rapid bus feeder service, and replace aging infrastructure for the San Diego Metropolitan Transit System
,i~" PEDESTRIAN SAFETY ■ Safe pedestrian routes to schools in El Cajon, National City,
Imperial Beach, and Encinitas ■ Widen sidewalk, construct 2 blocks of new sidewalk, add
crosswalks and new Americans with Disability Act (ADA) sidewalk ramps to improve safety in Imperial Beach
■ Sidewalk improvements in Del Mar to improve pedestrian
safety ■ Pedestrian improvements near National City schools to
include high visibility crosswalks, American with Disability (ADA) ramps and improved signage and sidewalks
This is a partial list ofprojects.