    THEME 2: BUILT FORM

    Refer to Built Form Precinct Plan (Figure 8) & Building Heights andSetbacks Plan (Figure 9).

    Objective 1

    To protect and celebrate the existing character and identityassociated with key heritage buildings and neighbourhoods

    Strategy 1.1Retain a generally low to mid rise building scale that ispunctuated by higher built form in appropriate locations.

    Strategy 1.2Encourage new development to reflect and respect the builtform character present in the surrounding context (Refer toFuture Character and Building Guidelines).

    Strategy 1.3Encourage new development that complements surroundingheritage buildings and areas rather than detracting from them.

    Strategy 1.4Encourage new development to make a positive contribution toexisting heritage buildings and neighbourhoods.

    Strategy 1.5Encourage the development of a consistent building height atthe footpath boundary and visually recessive upper levels inkey areas (Refer to Future Character and Building Guidelines).

    Objective 2

    To facilitate new, compact development in areas that arestrategically important and relatively unconstrained

    Strategy 2.1Facilitate the redevelopment of buildings within the retail corethat have limited heritage value where appropriate.

    Strategy 2.2Encourage the amalgamation of sites to support furtherintensification.

    Strategy 2.3Encourage higher building forms along the Yarra River Corridorbetween Punt Road and Church Street to take advantage ofamenity and views.

    Strategy 2.4Encourage high quality, denser built forms around t rain stationsto take advantage of transport infrastructure.

    Strategy 2.5Recognise that gateway locations are potentially suitable forhigher built form.

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    2/18

    SWAN STREET STRUCTURE PLAN__________________________________________________________________________________________________________________________22

    Objective 3

    To encourage new buildings that contribute to the vibrancy,safety, amenity and comfort of the adjoining public realm

    Strategy 3.1Encourage active, ground floor frontages along key activitystreets and activity nodes.

    Strategy 3.2Activate the ground floor frontage along the business areas ofPunt Road to re-establish a safe and comfortable pedestrianenvironment.

    Strategy 3.3Encourage buildings to incorporate semi-public spacesaccessible to the public realm for use as urban plazas, outdoordining, etc.

    Strategy 3.4Encourage the highest quality building design at key gatewaylocations and intersections to maximise activity and contributetowards reinforcing a positive identity for the Swan Street MajorActivity Centre.

    Strategy 3.5Encourage buildings to provide surveillance of key publicspaces through windows and balconies to improve their safety.

    Strategy 3.6Ensure that new development does not unreasonably

    overshadow key public spaces and streets.

    Objective 3 (continued)

    To encourage new buildings that contribute to the vibrancy,safety, amenity and comfort of the adjoining public realm

    Strategy 3.7Encourage the redevelopment of train stations and surroundingareas to be designed with a focus on pedestrian movementand activities.

    Strategy 3.8Encourage all buildings in key retail areas to respect thepedestrian scale of the street environment by incorporatingarticulated facades, fenestration and design detail.

    Strategy 3.9Utilise upper level setbacks to reduce the visual impactexperienced from the street and adjoining sensitive

    development such as low-rise housing.

    Strategy 3.10Facilitate the development of key strategic development sitesthat are integrated into the surrounding public realm byensuring appropriate through-site links and potential new publicspaces.

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    3/18

    _______________________________________________________________________________________________________________________________________________________________________________23

    Objective 4

    To provide a range of building types that support a mix ofactivities to encourage social and economic diversity

    Strategy 4.1Encourage the development of communal living spaces,including spaces for families and children.

    Strategy 4.2Support the development of multi-purpose, shared roof spaces.

    Strategy 4.3Encourage a range of dwelling sizes and prices in multi-unit

    developments.

    Strategy 4.4Encourage flexible buildings and spaces that are adaptable tochanges in use over time.

    Strategy 4.5Encourage the development of affordable and accessiblehousing.

    Objective 5

    To promote the integration of ESD initiatives into newdevelopment

    Strategy 4.1Encourage the incorporation of best practice ESD principlesthrough addressing the ten key environmental categories,which are:

    x Indoor environment quality

    x Energy efficiency

    x Water resources

    x Stormwater management

    x Building materials

    x Transport

    xWaste management

    x Urban ecology

    x Innovation

    x Ongoing building and site maintenance.

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    4/18

    SWAN STREET STRUCTURE PLAN__________________________________________________________________________________________________________________________24

    Objective 6

    To encourage buildings that contribute to the shared identityand character of the activity centre

    Strategy 6.1Encourage building design that complements surroundingheritage buildings and spaces to create a new, eclectic andharmonised built form character.

    Strategy 6.2Encourage unique and contemporary building design insuitable locations that makes innovative use of buildingmaterials and construction techniques.

    Strategy 6.3Encourage detailed building design and facade treatments that

    contribute to the visual interest and identity of the street.

    Strategy 6.4Encourage building design to creatively incorporate artinstallations.

    Strategy 6.5Encourage the incorporation of plantings, particularly on thestreet edge to enhance the overall aesthetic of buildings.

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    5/18

    1

    7

    9

    10

    8

    2

    4

    5

    5

    11

    36

    D O C K E R

    S T R E E T

    C H A R L E S

    S T R E E T

    M A R Y

    S T R E E T

    B E L L

    S T R E E T

    C O P P I N

    S T R E E T

    D U K E

    S T R E E T

    C U T T E R

    S T R E E T

    B U N T I N G

    S T R E E T

    B E N D I G O

    S T R E E T

    S T A W E L L

    S T R E E T

    C L I F T O N

    S T R E E T

    S T A

    N L E Y

    S T R E E T

    B O T H E R A M B O

    S T R E E T

    W E L L I N G T O N

    S T

    PUNT

    ROAD

    CHURCH

    STREET

    SWAN STREET

    TANNER STREET

    L E N N O X

    S T

    R O G E R S

    S T

    A L F R E D

    S T

    M I L L E R S

    S T

    KELSO STREET

    BENT STREET

    GORDON STREET

    BALMAIN STCOTTER STREET

    AMSTERDAM STREET

    YORKSHIRE STREET

    CHAPEL STREET

    LESNEY STREET

    NEWRY STREET

    BEISSEL STREET FARMER STREET

    GOUGHST

    G R E E N

    S T R E E T

    C H E S N U T

    S T R E E T

    M A R Y

    S T R E E T

    C O P P I N

    S T R E E T

    R O O N E Y

    S T R E E T

    A D A M

    S T R E E T

    N O R T H

    S T

    BURNLEY

    STREET

    STEPHENSONS

    TREET

    B R I G H T O N

    S T R E E T

    BARKLY AVTW

    ICKENH

    AM C

    R

    BarklyGardens

    GoschsPaddock

    CITYLINK

    YARRA

    RIVER

    YARRA RIVER

    CITYLINK

    Alan BainReserve

    RichmondP.S.

    CapitalCity Trail

    HerringIsland

    Golden SquareBicentenial Park

    Netball Courts

    St. IgnatiusChurch

    CITYLINK

    RichmondCommunity

    Learning Centre

    BURNLEY

    STATION

    EASTRICHMONDSTATION

    RICHMONDSTATION

    RICHMOND STATION

    EAST RICHMOND STATION

    BURNLEY STATION AND BURNLEY VILLAGE

    SWAN STREET CONVENIENCE RETAIL,LIFESTYLE AND ENTERTAINMENT STRIP

    SWAN STREET LARGE FORMAT RETAILAND MIXED COMMERCIAL / LIGHT INDUSTRY

    PUNT ROAD EDGE

    CREMORNE MIXED COMMERCIAL/

    LIGHT INDUSTRY

    CHURCH STREET MIXED COMMERCIAL/LIGHT INDUSTRY AND RETAIL

    MALTINGS PRECINCT

    CREMORNE SOUTH OFFICE AREA

    MADDEN GROVE SERVICE INDUSTRY AREA

    EXISTING OPEN SPACES

    TRANSPORT INFRASTRUCTURE INCLUDINGRAIL AND CITYLINK

    Please note that areas not identified in this plan

    are considered to be minimal change areas andare subject to relevant State and local policy.

    FIGURE 8 : BUILT FORM

    Built Form Precincts

    To be read in association with Future Characterand Building Guidelines.

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    *

    0 100 200m50

    25

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    6/18

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    7/18

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    8/18

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    9/18

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    10/18

    SWAN STREET STRUCTURE PLAN__________________________________________________________________________________________________________________________30

    THEME 3: PUBLIC SPACES

    Refer to Public Spaces Action Plan (Figure 10)

    Objective 2

    To develop a linked network of green spaces including localstreets and parks

    Strategy 2.1Develop a series of green links along identified streets to linkkey public uses and spaces.

    Strategy 2.2Explore opportunities for the development of new urbansquares / active open spaces within the activity centre.

    Strategy 2.3

    Provide additional street plantings including street trees, planterboxes, vines and other landscaping treatments.

    Strategy 2.4Incorporate WSUD features into street design to reducestormwater runoff, improve water quality and enhance amenity.

    Strategy 2.5Continue to improve the quality of local, public open space

    Strategy 2.6

    Develop new public open spaces in identified locationsnominated in the Yarra Open Space Strategy.

    Strategy 2.7Improve existing, and develop new, links to the Yarra RiverCorridor.

    Objective 1

    To encourage the development of accessible, diverse, vibrantand interesting public spaces that support the needs of localresidents and businesses

    Strategy 1.1Enhance the public realm to improve the shoppingenvironment, and support retail and business development.

    Strategy 1.2Develop high quality public spaces around key gatewaysincluding the train stations.

    Strategy 1.3Facilitate the development of new and enhanced event spacesto accommodate cultural activities such as farmers markets,arts displays and festivals in key locations.

    Strategy 1.4Continue to develop kerb outstands at roads intersecting withkey activity streets to create opportunities for additionallandscaping, street furniture, etc.

    Strategy 1.5Create family and child friendly public spaces such asplaygrounds and interactive art installations.

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    11/18

    _______________________________________________________________________________________________________________________________________________________________________________31

    Objective 3

    To develop a strong sense of character and identity throughthe creation of highly attractive spaces integrated with alocally specific theme

    Strategy 3.1Develop signature paving to establish an iconic footpath motifthrough key activity streets.

    Strategy 3.2Install decorative, signature lighting fixtures in key activitystreets to improve attractiveness, strengthen identity and

    improve safety.

    Strategy 3.3Underground powerlines in key activity areas to reduce visualclutter and facilitate further landscaping opportunities.

    Objective 4

    To develop a series of appropriately located, well designedand architecturally distinct community uses

    Strategy 4.1Enhance the appearance and entrance of the Richmond PublicLibrary to make it a more inviting space and give a strongercivic presence.

    Strategy 4.2Explore opportunities for the development of new community

    uses in conjunction with the development of train stations andkey strategic development sites.

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    12/18

    SWAN STREET STRUCTURE PLAN__________________________________________________________________________________________________________________________32

    Objective 5

    To support vibrant arts and cultural activities

    Strategy 5.1Investigate opportunities to use existing urban spaces such asthe East Richmond Station carpark to accommodate a range ofsocial and cultural activities.

    Strategy 5.2Establish a designated arts trail to support local arts uses andshops, and strengthen the area as a key tourism destination.

    Strategy 5.3Develop locally relevant, dynamic public art in identifiedlocations.

    Strategy 5.4Celebrate existing infrastructure such as bridges, underpassesand rail infrastructure by improving their appearance and safetyand incorporating public art opportunities.

    Strategy 5.5Develop murals on large blank walls of public assets such asalong the rail corridors at Stewart Street and StephensonStreet.

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    13/18

    BURNLEY

    STATION

    EASTRICHMONDSTATION

    RICHMONDSTATION

    Yarra Library/ Maternal Child

    & Health

    BarklyGardens

    CITYLINK

    YARRA

    RIVER

    YARRA RIVER

    CITYLINK

    Alan BainReserve

    RichmondP.S.

    CapitalCity Trail

    HerringIsland

    Netball Courts

    St. IgnatiusChurch

    CITYLINK

    GoldenSquare

    BicentenialPark

    GoschsPaddock

    RichmondCommunity

    Learning Centre

    KanganInstitute

    D O C K E R

    S T R E E T

    C H A R L E S

    S T R E E T

    M A R Y

    S T R E E T

    B E L L

    S T R E E T

    C O P P I N

    S T R E E T

    D U K E

    S T R E E T

    C U T T E R

    S T R E E T

    B U N T I N G

    S T R E E T

    B E N D I G O

    S T R E E T

    S T A W E L L

    S T R E E T

    C L I F T O N

    S T R E E T

    S T A

    N L E Y

    S T R E E T

    B O T H E R A M B O

    S T R E E T

    W E L L I N G T O N

    S T

    PUNT

    ROAD

    CHURCH

    STREET

    SWAN STREET

    TANNER STREET

    L E N N O X

    S T

    R O G E R S

    S T

    A L F R E D

    S T

    M I L L E R S

    S T

    KELSO STREET

    BENT STREET

    GORDON STREET

    BALMAIN STCOTTER STREET

    AMSTERDAM STREET

    YORKSHIRE STREET

    CHAPEL STREET

    LESNEY STREET

    NEWRY STREET

    BEISSEL STREET FARMER STREET

    GOUGHST

    G R E E N

    S T R E E T

    C H E S N U T

    S T R E E T

    M A R Y

    S T R E E T

    C O P P I N

    S T R E E T

    R O O N E Y

    S T R E E T

    A D A M

    S T R E E T

    N O R T H

    S T

    BURNLEY

    STREET

    STEPHENSONSTREET

    B R I G H T O N

    S T R E E T

    BARKLY AVTW

    ICKENH

    AM C

    R

    EXISTING OPEN SPACE

    OPPORTUNITIES FOR NEW OPEN SPACE

    EXISTING COMMUNITY USE

    PROPOSED GREEN LINK

    KEY STREETSCAPE IMPROVEMENT AREA

    PEDESTRIAN UPGRADES

    ENHANCED STREET GREENING

    ENHANCED BRIDGES

    ENHANCED GATEWAYS

    NEW/IMPROVED CIVIC SPACES

    PROPOSED ARTS TRAIL

    POTENTIAL PUBLIC ART

    TRANSPORT INFRASTRUCTURE INCLUDING

    RAIL AND CITYLINK

    FIGURE 10 : PUBLIC SPACES

    Action Plan

    0 100 200m50

    SWAN STREET STRUCTURE PLAN 33

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    14/18

    SWAN STREET STRUCTURE PLAN__________________________________________________________________________________________________________________________34

    THEME 4: ACCESS AND MOVEMENT

    Refer to Access and Movement Framework Plan (Figure 11) and ActionPlan (Figure 12)

    Objective 1

    To improve the design and management of the movementnetwork to enhance connectivity, accessibility and efficiency

    Strategy 1.1Provide strategic prioritisation of road reserve space fordifferent transport modes.

    Strategy 1.2Improve access of footpaths around transport stations /stopsand along key activity streets for people with disabilities.

    Strategy 1.3Explore opportunities to develop new links in identified

    locations that can enhance the connectivity and legibility of theactivity centre.

    Strategy 1.4Improve wayfinding and parking signage to facilitate moreefficient movement.

    Strategy 1.5Explore opportunities to manage traffic flows in a more efficientand safer way.

    Strategy 1.6

    Establish new taxi ranks to minimise on-road conflict and bettermanage vehicular activity, particularly during major events andat night time.

    Strategy 1.7Maintain or reduce the amount of public surface carparkingavailable in the study area.

    Objective 2

    To facilitate public transport use by improving stops andinterchanges

    Strategy 2.1Integrate physical improvements to train stations and tram andbus stops to improve safety, comfort and amenity including forpeople with disabilities.

    Strategy 2.2Redesign key multi-modal transit interchanges to facilitateefficient and safe modal changes.

    Strategy 2.3

    Explore opportunities for the development of tram super-stopsat key locations along the tram corridors.

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    15/18

    _______________________________________________________________________________________________________________________________________________________________________________35

    Objective 3

    To encourage walking and cycling options to enhance healthand wellbeing and reduce Carbon emissions

    Strategy 3.1Improve bike linkages to the Capital City trail.

    Strategy 3.2Investigate a new Bicycle Priority Route south of rail line tofacilitate more efficient and safe east-west bicycle movement.

    Strategy 3.3

    Provide pedestrian and bicycle priority improvements inidentified locations.

    Strategy 3.4Investigate the improved design and management of keyintersections and crossing points to facilitate safer pedestrianmovement, including the development of a new pedestriancrossing point across Punt Road at Blanche Street.

    Objective 4

    To improve the legibility of the urban fabric.

    Strategy 3.1Investigate new links in the urban fabric where appropriate tofacilitate connectivity.

    Strategy 3.2Develop improved wayfinding strategies to guide pedestriansand cyclists to key activities and destinations.

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    16/18

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    17/18

  • 8/4/2019 Save Dimmeys. Swan St Structure Plan 4.5.1.3, 4.5.1.4 & 4.5.1.5

    18/18

    SWAN STREET STRUCTURE PLAN__________________________________________________________________________________________________________________________38

    PART 4: IMPLEMENTATION

    IMPLEMENTATION MODEL

    Following the finalisation of the draft Structure Plan, a detailedimplementation plan will be prepared that will outline the actions requiredto realise the Structure Plan Vision on-the-ground.

    The Swan Street Structure Plan will be implemented in the following ways:

    x Changes to the planning scheme introducing new zones,overlays and guidelines

    x Capital works projects to enhance the public realm such astraffic measures, train / tram stop improvements, streetgreening, new street furniture, etc.

    x Further Strategic Workto be undertaken to provide moredetail to recommendations

    x Advocacy and Negotiation between Council and otherorganisations who are directly responsible to improvements in

    the study area such as Metro, Yarra Trams, DPCD, etc.The Implementation Plan will identify actions for each of these categoriesas well as who will be responsible for implementing them. It will alsoprioritise the actions so that Council and other agencies can plan for thecontinuous improvement of the Structure Plan area based on local needsand available resources.