18
2021 Sauk Centre Planning Commission Meeting Tuesday, June 15, 2021 4:30 p.m.

Sauk Centre Planning Commission Meeting Tuesday, June 15

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

2021

Sauk Centre Planning Commission Meeting

Tuesday, June 15, 2021 4:30 p.m.

Staff Report 9a-

SAUK CENTRE PLANNING COMMISSION

REGULAR MEETING TUESDAY, JUNE 15, 2021 – 4:30 P.M.

AGENDA

1. Call to Order/Roll Call/Pledge of Allegiance

2. Approval of Agenda

3. Approval of Minutes None 4. Public Hearings a. City of Sauk Centre and Centra Care (P. 1-14) 5. Action Items

a. City of Sauk Centre and Centra Care (P. 15-16) 6. Reports/Presentations None 7. Unfinished Business None 8. New Business None 9. Informational Items

None 10. Adjournment

Staff Report 4a - Page 1 of 4

City of Sauk Centre - Planning Commission Staff Report

Meeting Date: June 15, 2021

Subject: Request for Variances – CentraCare/City of Sauk Centre Front (ROW), Side Street (Corner), Interior lot line setbacks, and allowed Impervious Surface

Agenda Item: 4a

Description/Summary: LUR #2021-11

On May 12, 2021 staff received an application from Tim Gillet, AIA HMA Architects Ltd. on behalf of CentraCare Sauk Centre, requesting multiple variances from the City Code.

Hearing Date: June 15, 2021

Applicant: Tim Gillet, AIA HMA Architects Ltd. on behalf of CentraCare Sauk Centre.

Proper Owner: City of Sauk Centre

Tenant: CentraCare of Sauk Centre

Property/Physical Address: The subject property is located at 425 Elm Street North, with subsequent parcels located at 536 4th Street North, and 409 Oak Street North, Sauk Centre Minnesota 56378. The property is part of the CentraCare Hospital campus.

Parcel number(s): 94.58268.0001, 94.58269.0002, 94.58272.0007 and 94.58288.0007.

Legal Description(s): Pending.

Current Zoning: Residential Commercial (R-C) Other.

Comments Received: Three inquiries seeking clarification about the variances.

60-Day Rule Summary:Application accepted: May 12, 2021 60-Day Review Deadline: July 11, 2021Extension Granted: N/A

Page 1 of 16

Staff Report 4a - Page 2 of 4

Actions Requested: The applicant is requesting multiple variances:

1. A variance of 28 feet 7 inches is sought for relief from the dimensional standardsof the required thirty (30) foot setback from a Road Right-of-Way.

2. A variance of 28 feet ten and one half inches is sought from the relief from therequired thirty (30) foot setback from a side street or corner.

3. A variance of five (5) feet is sought for the relief from the dimensional standardsof the required five (5) foot setback from an interior lot line.

4. A variance to allow an additional 30% of impervious surface where normally 50%of impervious surface is allowed in a Residential Commercial (R-C) Other zoningdistrict.

Background: The original hospital was built between 1949 and 1950, since that time a nursing home, clinic and assisted living facility have been added to the hospital campus.

Zoning analysis:

Setbacks The required and proposed setbacks for the proposed building are detailed in the following table:

Required Setbacks Minimum Requirements Proposed Front (Oak St N) 30 feet 28 foot 7 inch variance Side/Street Corner (4th St N)

30 feet 28 foot variance

Rear (North lot line) 5 feet 5 variance Lot Size N/A N/A Lot Width N/A N/A Building Height 30 feet maximum allowed to be determined Lot Coverage 50% maximum (overage

to be addressed with an approved Stormwater Management Plan or SWPPP)

80%

Section 156.103 of the City Code states that the Board shall make a decision on a variance application with consideration for the following criteria:

(a) Variances shall only be permitted when they are in harmony with thegeneral purpose and intent of the ordinance and when the variances are consistent with the Comprehensive Plan. Variances may be granted when the applicant for the

Page 2 of 16

Staff Report 4a - Page 3 of 4

variance establishes that there are practical difficulties in complying with the zoning ordinance. “PRACTICAL DIFFICULTIES”, as used in connection with granting of a variance, means that the property owner proposes to use the property in a reasonable manner not permitted by the zoning ordinance; the plight of the landowner is due to circumstances unique to the property not created by the landowner; and the variance, if granted, will not alter the essential character of the locality.

(b) Economic considerations alone do not constitute practical difficulties.

(c) Practical difficulties also include, but are not limited to, inadequateaccess to direct sunlight for solar energy systems.

(d) Variances shall be granted for earth-sheltered construction as definedin M.S. § 216C.06 subdivision 14, as it may be amended from time to time, when in harmony with this chapter.

(e) No variance may be granted that would allow any use that is notallowed in the zoning district in which the subject property is located. The Board of Adjustments may impose conditions in the granting of variances. A condition must be directly related to and must bear a rough proportionality to the impact created by the variance.

Ordinance/Statutory Requirements:

The Board of Appeals and Adjustments must find as follows in the granting of a variance from this chapter:

1. Granting a variance will not adversely affect the public health, welfare andsafety and will not be detrimental and injurious to property orimprovements in the neighborhood; No evidence has been submittedindicating granting a variance for the nursing home expansion, wouldadversely affect public health, welfare, safety or be detrimental to property orimprovements in the neighborhood. The nursing home expansion is a muchneeded service in our community.

2. There are exceptional or extraordinary circumstances or conditionsapplicable to the property, use or facilities that do not apply generally toother properties in the same district; As this area is comprised of a hospital,clinic, nursing home and assisted living facility, there are special circumstancesor exceptional characteristics applicable to the property, including size, shape,location, or surroundings. The intended use or development of the property is toprovide additional nursing home care.

3. Granting of the variance will not allow a use which is otherwise not apermitted use in the zoning district in question. Medical facilities are anallowed use in the R-C Other zoning district.

Page 3 of 16

Staff Report 4a - Page 4 of 4

4. Economic considerations alone shall not constitute a practical difficulty ifreasonable use for the property exists under the terms of this chapter.CentraCare is not seeking any economic relief with this proposal.

5. A variance granted but not used shall become void 1 year after its effectivedate.

6. No application for the same or essentially the same variance shall be madewithin 6 months of the date of denial.

Action Requested:

Action to be taken under agenda item 5b.

Action Taken:

Motion: Second:

Page 4 of 16

2021-11

5/13/2021

$375.00 (Paid)

Page 5 of 16

tgillet
Text Box
Tim Gillet 700 West St. Germain Street St. Cloud, MN 56301
tgillet
Text Box
320-251-9155 320-828-2541
tgillet
Text Box
425 Elm Street North and 536 4th Street North
tgillet
Text Box
Av
tgillet
Text Box
available at city hall
tgillet
Text Box
R/C Other
tgillet
Text Box
Architect
tgillet
Line
tgillet
Line
tgillet
Text Box
City of Sauk Centre
tgillet
Text Box
I am working with CentraCare Health and the Sauk Centre Hospital to secure modifications to the zoning requirements to the property ID_____ and ID _______ to re establish setbacks and lot coverage to accommodate an addition to the Nursing home
tgillet
Snapshot
tgillet
Text Box
Tim Gillet

6/15/2021

6/16/2021

Page 6 of 16

tgillet
Text Box
06 08 21
tgillet
Text Box
06 15 21
tgillet
Text Box
Setbacks / Impervious Surface
tgillet
Text Box
The property does not currently confirm to the R/C Other zoning requirements relating to setbacks and lot coverage. Upgrades to the nursing home need to be made to to keep its staff and residents safe and comfortable. existing nusing home house too many occupants and an icrease in ares is required to meet DOH guidelines in nursing home design.
tgillet
Text Box
No. to meet current health care regulations
tgillet
Text Box
The request is made on behalf of the medical facility to provide public safety, health and well being serving our most vulnerable population.
tgillet
Text Box
If not granted the hospital and nursing home would not be able to evolve into the kind of treatment and care center desperately needed for our aging population.
tgillet
Text Box
As mentioned initially, the property current is non conforming and the acquisition of the adjacent resident is required to provide adequate area and space to accommodate the MN DOH design requirements for nursing homes of this era.
tgillet
Text Box
The site design will incorporate water management features that will comply with the Sauk River watershed as well as the MPCA. The existing storm water collection systems will be coordinated with the new site design and improved.
tgillet
Text Box
The acquired property used for the proposed addition was a part of a single family home that was land locked next to the city owned property and by incorporating it into a new overall plat bordered by Oak Street and 4th Street.
sarahm
Line
sarahm
Line

Page 7 of 16

tgillet
Text Box
The building and parking area to accommodate a functioning Hospital and Nursing Home are bound by Oak Street, 4th Street, and 5th Street. there will be no impact to surrounding areas.
tgillet
Text Box
considering a relocation of the nursing home away from the hospital is not a viable solution to the care and well being of the residents. and if done so would not change the fact that the site is currently non conforming.
tgillet
Text Box
x
tgillet
Text Box
x
tgillet
Text Box
x
tgillet
Text Box
x
tgillet
Text Box
x
tgillet
Text Box
x
tgillet
Text Box
x

5

A3

00

6

A3

00

SA

UK

LA

KE

5T

H S

TR

EE

T N

OR

TH

OAK STREET NORTH

4T

H S

TR

EE

T N

OR

TH

24

' - 0

"

24' - 0" 11' - 0" 13 STALLS @ 9' - 0" = 117' - 0" 18' - 0"

9' -

0"9

' - 0

"9

' - 0

"2

3 S

TA

LLS

@ 9

' - 0

" =

2

07' -

0"

24

ST

AL

LS

@ 9

' - 0

" =

216

' - 0

"

23

4' -

0"

6' -

0"

42

' - 0

"

29

' - 4

"1

8 S

TA

LLS

@ 9

' -

0"

= 1

62' -

0"

13

' - 0

"4

2' -

0"

11

ST

ALLS

@ 9

' - 0

" =

99' -

0"

16

' - 0

"9

' - 0

"9

' - 0

"9

' - 0

"9

' - 0

"1

6' -

5"

13

9' -

0"

7 S

TA

LL

S @

9' -

0"

= 6

3' -

0"

18

' - 0

"

7' - 6" 24' - 0"

18' - 0"

24' - 0"

20' - 0" 20' - 0"

24' - 0"

20' - 0"20' - 0"

24' - 0"

24' - 0"

5' - 9"

24' - 0"

EX

IST

ING

HO

SP

ITA

L9

7,0

56

SF

AD

DIT

ION

TO

NU

RS

ING

HO

ME

19

,93

2 S

F

1

A3

00

2

A3

00

SETBACK

30' - 0"

SE

TB

AC

K

30

' - 0

"

SETBACK

30' - 0"

EX

IST

ING

NU

RS

ING

HO

ME

RE

NO

VA

TIO

N2

0,2

70 S

F

38' - 0"24' - 0"

28

' - 0

"

EX

IST

ING

SETBACK

30' - 0"

SETBACK

30' - 0"

SE

TB

AC

K

30

' - 0

"

HO

US

EH

OL

D #

1H

OU

SE

HO

LD

#2

HO

US

EH

OL

D #

3H

OU

SE

HO

LD

#2

RE

NO

VA

TIO

N A

RE

AA

DD

ITIO

N

295.80' (296) S00°52'12"E

592

.00

' S

89°0

5'2

9"W

65.90' (66) S89°05'29"W

180' +

/- S

89°0

5'2

9"W

(S75°3

1'3

7"W

)

787

+/-

S

89°0

7'3

5"W

EN

CL

OS

ED

PA

TIO

33

A3

00

NE

WE

XIS

TIN

G

4

A3

00

SETBACK5' - 0" PROPOSED

EX

IST

ING

NO

N

CO

NF

OR

MIN

G S

ET

BA

CK

SE

TB

AC

K1

' - 5

" P

RO

PO

SE

D

SETBACK

1' - 1 1/2" PROPOSED

ZO

NE

DR

/C O

TH

ER

PR

OP

OS

ED

NO

RT

H Y

AR

D S

ET

BA

CK

30

'1'-5"

EA

ST

Y

AR

D S

ET

BA

CK

30

'5'-0"

SO

UT

H Y

AR

D S

ET

BA

CK

30

'1'-11

1/2

"R

EA

R Y

AR

D S

ET

BA

CK

30

'N

AH

EIG

HT

30

'N

AL

OT

CO

VE

RA

GE

50

%80

%

ZO

NIN

G IN

FO

RM

AT

ION

VA

RIA

NC

E R

EQ

UIR

ED

SIT

E P

ER

CE

NT

AG

ES

SIT

E T

OT

AL

33

7,0

06

SF

BU

ILD

ING

TO

TA

L11

6,9

88

SF

35%

GR

EE

N S

PA

CE

97,5

44

SF

29%

PA

VIN

G12

2,4

74

SF

36%

TO

TA

L IM

PE

RV

IOU

S26

0,7

18

SF

77%

(IN

CLU

DE

S B

UIL

DIN

G)

1.T

HE

EX

IST

ING

BU

ILD

ING

ON

TH

E N

OR

TH

SID

E O

F T

HE

PR

OP

ER

TY

IS

AP

PR

OX

IMA

TE

LY

6' -

6"

AW

AY

FR

OM

EX

IST

ING

PR

OP

ER

TY

LIN

E.

TH

E P

RO

PO

SE

D S

ET

BA

CK

IS

RE

QU

ES

TE

D T

OB

E 5

' -0".

2.T

HE

EX

IST

ING

PO

RT

ION

OF

TH

E B

UIL

DIN

G O

N T

HE

SO

UT

H S

IDE

OF

TH

E P

RO

PE

RT

Y IS

AP

PR

OX

IMA

TE

LY

5' -

5"

OV

ER

TH

EE

XIS

TIN

G P

RO

PE

RT

Y L

INE

.3

.T

HE

NE

W B

UIL

DIN

G A

DD

ITIO

N O

N T

HE

EA

ST

SID

E O

F T

HE

PR

OP

ER

TY

WIL

L B

E A

PP

RO

XIM

AT

ELY

1' -

5"

FR

OM

EX

IST

ING

PR

OP

ER

TY

LIN

E.

TH

E P

RO

PO

SE

D S

ET

BA

CK

IS

RE

QU

ES

TE

D T

OB

E 1

' -5".

A

R

C

H

I T

E

C

T

S

Pro

ject

No

:P

roje

ct

Ma

na

ge

r:D

raw

n B

y:

Da

te:

The

se

dra

win

gs a

nd

sp

ecific

atio

ns a

reth

e s

ole

pro

pert

y o

f H

MA

Arc

hitects

, L

td.

any r

ep

rodu

ction

or

reu

se o

f th

ese

docu

me

nts

is f

orb

idd

en

with

ou

t w

ritt

en

perm

issio

n f

rom

HM

A A

rchite

cts

, L

td.

Sig

natu

re:

Pri

nte

d N

am

e:

Lic

ense N

o.:

Date

:

700 W

. S

t. G

erm

ain

Str

eet

Suite 2

00

St.

Clo

ud,

MN

56301

ww

w.h

ma-a

rchs.c

om

T | 3

20.2

51.9

155

F | 3

20.2

51.4

919

hm

a@

hm

a-a

rchs.c

om

I he

reby c

ert

ify t

ha

t th

is p

lan,

sp

ecific

atio

no

r re

port

wa

s p

repa

red b

y m

e o

r un

de

rm

y d

irect sup

erv

isio

n &

tha

t I

am

a d

uly

Lic

ensed

Arc

hitect u

nd

er

the

la

ws o

f th

eS

tate

of

Min

ne

so

ta

Tim

Gill

et

510

31

PR

OP

OS

ED

SIT

E P

LA

N

A1

00

PRELIMINARY -NOT FOR CONSTRUCTION

SA

UK

CE

NT

RE

, M

N

SA

UK

CE

NT

RE

CA

RE

CE

NT

ER

SK

ILLE

DN

UR

SIN

G U

NIT

RE

NO

VA

TIO

NS

AN

DA

DD

ITIO

N T

O:

211

0T

GS

G0

5/1

0/2

021

05/1

0/2

021

PL

AN

NO

RT

H

SC

AL

E:

1"

= 3

0'-0

"A

100

PR

OP

OS

ED

SIT

E P

LA

N1

#D

ate

Description

Page 8 of 16

EL

EV

402

LO

BB

Y3

80

ST

AIR

365

EN

CL

OS

ED

PA

TIO

HO

US

EH

OL

D #

12

1 R

ES

IDE

NT

SH

OU

SE

HO

LD

#2

18

RE

SID

EN

TS

HO

US

EH

OL

D #

32

1 R

ES

IDE

NT

SH

OU

SE

HO

LD

#2

18

RE

SID

EN

TS

RE

NO

VA

TIO

N A

RE

AB

AS

E L

INE

A

RE

A A

DD

ITIO

N

EX

IST

ING

NO

WO

RK

EX

IST

ING

NO

WO

RK

ST

AIR

401

ST

OR

AG

E

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

TU

B R

M.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

DB

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

DIN

ING

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

FA

M.

DIN

ING

AS

T.

DIR

.L

TC

DIR

. LT

CS

MA

LL

CO

NF

CA

RE

CO

OR

.

CO

UR

TY

AR

D

SS

.H

OS

PIT

AL

DIE

TA

RY ELE

V

PU

BL

ICT

LT

ST

AF

FT

LT

NU

RS

E

CLE

AN

/M

ED

SE

/D

HS

KP

O2

RE

S.

LA

UN

.

RE

S.

SG

L.

EQ

.

RE

S.

SG

L.

TU

BR

OO

M

PU

BL

ICT

LT

CL.

EQ

./S

UP

.

SO

ILE

D

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

CLE

AN

/M

ED

S

NU

RS

E

SS

OF

FIC

E

AC

T.

OF

FIC

E

AC

T.

ST

OR

CLE

AN

SU

P

CA

RE

CO

OR

.

E/D

DIE

T.

SU

PP

KIT

CH

EN

DIN

ING

LIV

ING

CLE

AN

LIN

EN

HS

KP

RE

S.

LA

UN

.

RE

S.

DB

L.

CO

RR

IDO

R

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

EQ

.E

Q.

EQ

.

DIE

T.

SU

PP

KIT

CH

EN

DIN

ING

LIV

ING

RO

OM

E/D

ST

OR

AG

E

CA

RE

CO

OR

.N

UR

SE

CLE

AN

/M

ED

S

LA

UN

DR

Y

CLE

AN

LIN

EN

ST

AF

FT

LT

SO

ILE

D

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

EQ

.E

Q.

EQ

.CO

RR

IDO

R

CO

RR

IDO

RC

OR

RID

OR

KIT

CH

EN

LIV

ING

CO

RR

IDO

R

CO

RR

IDO

R

ST

AIR

ME

DIT

AT

ION

VE

ST

IBU

LE

LO

BB

Y

EQ

.E

Q.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

TU

B R

M.

HS

KP

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

VE

ST

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

TO

ILE

T

FA

M.

DIN

ING

RE

S.

SG

L.

EX

AM

ST

AIR

CO

RR

IDO

R

SA

LO

NA

CT

IVIT

YC

HA

PE

LS

TO

R.

RE

S.

SG

L.

RE

S.

SG

L.

RE

S.

SG

L.

LIB

RA

RY

ELE

C.

ME

CH

.

RE

S.

DB

L.

EQ

.E

Q.

RE

S.

SG

L.

RE

S.

SG

L.

CO

RR

IDO

R

ME

CH

442

NU

TR

ITIO

N4

43

WE

LLN

ES

S4

52

TH

ER

AP

YS

TF

.B

RE

AK

.

ST

OR

AG

E

ST

OR

AG

E

EX

IST

ING

NO

WO

RK

RE

NO

VA

TIO

N A

RE

AB

AS

E L

INE

AR

EA

A

DD

ITIO

N

EX

IST

KIT

.

ELE

V

TLT

TLT

EX

IST

ING

NO

WO

RK

EX

IST

ING

NO

WO

RK

A

R

C

H

I T

E

C

T

S

Pro

ject

No

:P

roje

ct

Ma

na

ge

r:D

raw

n B

y:

Da

te:

The

se

dra

win

gs a

nd

sp

ecific

atio

ns a

reth

e s

ole

pro

pert

y o

f H

MA

Arc

hitects

, L

td.

any r

ep

rodu

ction

or

reu

se o

f th

ese

docu

me

nts

is f

orb

idd

en

with

ou

t w

ritt

en

perm

issio

n f

rom

HM

A A

rchite

cts

, L

td.

Sig

natu

re:

Pri

nte

d N

am

e:

Lic

ense N

o.:

Date

:

700 W

. S

t. G

erm

ain

Str

eet

Suite 2

00

St.

Clo

ud,

MN

56301

ww

w.h

ma-a

rchs.c

om

T | 3

20.2

51.9

155

F | 3

20.2

51.4

919

hm

a@

hm

a-a

rchs.c

om

I he

reby c

ert

ify t

ha

t th

is p

lan,

sp

ecific

atio

no

r re

port

wa

s p

repa

red b

y m

e o

r un

de

rm

y d

irect sup

erv

isio

n &

tha

t I

am

a d

uly

Lic

ensed

Arc

hitect u

nd

er

the

la

ws o

f th

eS

tate

of

Min

ne

so

ta

Tim

Gill

et

510

31

OV

ER

ALL F

LO

OR

PLA

NS

A2

00

PRELIMINARY -NOT FOR CONSTRUCTION

SA

UK

CE

NT

RE

, M

N

SA

UK

CE

NT

RE

CA

RE

CE

NT

ER

SK

ILLE

DN

UR

SIN

G U

NIT

RE

NO

VA

TIO

NS

AN

DA

DD

ITIO

N T

O:

211

0T

GS

G0

5/1

0/2

021

05/1

0/2

021

A.

CO

NT

AC

T A

RC

HIT

EC

T I

MM

ED

IAT

EL

Y I

F D

ISC

RE

PA

NC

IES

AR

E F

OU

ND

BE

TW

EE

N T

HE

AR

CH

ITE

CT

UR

AL

, S

TR

UC

TU

RA

L,

ELE

CT

RIC

AL,

ME

CH

AN

ICA

L,

PL

UM

BIN

G A

ND

CIV

IL D

RA

WIN

GS

SU

CH

TH

AT

IN

FO

RM

ED

DIR

EC

TIO

N M

AY

BE

PR

OV

IDE

D.

B.

AL

L T

RA

DE

S T

O C

OO

RD

INA

TE

WO

RK

WIT

H O

TH

ER

TR

AD

ES

TO

MIN

IMIZ

EC

ON

FL

ICT

S D

UR

ING

CO

NS

TR

UC

TIO

N.

AN

Y P

EN

ET

RA

TIO

NS

MA

DE

TH

RO

UG

HR

AT

ED

AS

SE

MB

LIE

S W

ILL N

EE

D T

O B

E P

AT

CH

ED

AN

D F

IRE

CA

UL

KE

D B

YT

RA

DE

CR

EA

TIN

G T

HE

PE

NE

TR

AT

ION

.

C.

BL

OC

KIN

G T

O B

E P

RO

VID

ED

IN

WA

LLS

RE

CE

IVIN

G W

AL

L M

OU

NT

ED

FIX

TU

RE

S, E

QU

IPM

EN

T, H

AN

DR

AIL

S O

R A

CC

ES

SO

RIE

S W

HE

TH

ER

BL

OC

KIN

G IS

ID

EN

TIF

IED

OR

NO

T O

N T

HE

AR

CH

ITE

CT

UR

AL

DR

AW

ING

S.

D.

WA

TE

R R

ES

IST

AN

T G

YP

BD

. T

O B

E U

SE

D W

HE

RE

VE

R W

AL

LS

AR

E T

OR

EC

EIV

E T

ILIN

G W

HE

TH

ER

SH

OW

N O

R N

OT

. S

HO

WE

R A

RE

AS

TO

UT

ILIZ

EC

EM

EN

T B

OA

RD

WH

EN

US

ING

ST

EE

L S

TU

D A

SS

EM

BLIE

S.

E.

AL

L S

PR

AY

FO

AM

IN

SU

LA

TIO

N IN

CO

NC

EA

LE

D S

PA

CE

S A

RE

TO

BE

PR

OT

EC

TE

D W

ITH

A R

AT

ED

AS

SE

MB

LY

.

F.A

LL W

AL

LS

TO

BE

CO

NS

TR

UC

TE

D T

O T

HE

DE

CK

AB

OV

E U

NL

ES

S N

OT

ED

OT

HE

RW

ISE

. D

EF

LE

CT

ION

HE

AD

S A

RE

RE

QU

IRE

D A

ND

GY

P B

DA

SS

EM

BL

IES

WIL

L N

EE

D T

O A

LL

OW

FO

R R

OO

F D

EC

K M

OV

EM

EN

T.

DO

NO

TC

ON

ST

RU

CT

GY

P. B

D.

TIG

HT

TO

DE

CK

.

G.V

AP

OR

BA

RR

IER

S T

ER

MIN

AT

ING

AT

RO

OF

PE

RIM

ET

ER

S A

RE

PR

OV

IDE

CO

NT

INU

OU

S S

EA

L A

T S

TE

EL

DE

CK

, F

LU

TE

S,

AN

D S

TE

EL

ME

MB

ER

S.

H.

AL

L S

TR

UC

TU

RA

L C

ON

DIT

ION

S S

HO

WN

ON

TH

E A

RC

HIT

EC

TU

RA

L P

LA

NS

AR

E F

OR

RE

FE

RE

NC

E O

NLY

. A

CT

UA

L S

TE

EL

SIZ

ES

AN

D S

HA

PE

S A

RE

RE

FE

RE

NC

ED

ON

TH

E S

TR

UC

TU

RA

L D

RA

WIN

GS

AN

D G

OV

ER

N.

I.A

LL F

IRE

EX

TIN

GU

ISH

ER

LO

CA

TIO

NS

TO

BE

VE

RIF

IED

AN

D R

EV

IEW

ED

BY

TH

E F

IRE

MA

RS

HA

LL

PR

IOR

TO

IN

ST

AL

LA

TIO

N.

J.

CO

NT

RO

L J

OIN

TS

AR

E T

O B

E P

RO

VID

ED

IN

GY

PS

UM

BO

AR

D A

SS

EM

BLIE

SA

S S

TA

TE

D B

Y T

HE

GS

A G

UID

EL

INE

S, R

EF

ER

EN

CE

IN

TE

RIO

R E

LE

VA

TIO

NS

AN

D C

EIL

ING

PLA

NS

FO

R F

UR

TH

ER

IN

FO

RM

AT

ION

.

K.

AL

L T

RA

DE

S W

OR

KIN

G IN

EX

PO

SE

D C

EIL

ING

AR

EA

S W

ITH

VIS

IBLE

DU

CT

WO

RK

, P

IPIN

G, A

ND

LIG

HT

ING

WIL

L N

EE

D T

O C

OO

RD

INA

TE

LA

YO

UT

SW

ITH

EA

CH

OT

HE

R A

ND

WIT

H A

RC

HIT

EC

T’S

AP

PR

OV

AL

PR

IOR

TO

INS

TA

LLA

TIO

N.

IF

IN

ST

AL

LA

TIO

N O

CC

UR

S P

RIO

R T

O A

RC

HIT

EC

T’S

CO

NF

IRM

AT

ION

OF

RO

UT

ES

, E

LE

VA

TIO

NS

, LO

CA

TIO

NS

, T

HE

AR

CH

ITE

CT

HA

S T

HE

RIG

HT

TO

RE

QU

ES

T A

RE

AS

TO

BE

RE

WO

RK

ED

AS

DIR

EC

TE

D B

YT

HE

AR

CH

ITE

CT

EN

SU

RIN

G C

OD

E R

EQ

UIR

EM

EN

TS

AR

E M

AIN

TA

INE

D.

L.S

UB

ST

ITU

TIO

NS

TO

PR

OD

UC

T S

PE

CIF

ICA

TIO

NS

AR

E N

OT

ALL

OW

ED

AF

TE

RB

ID D

AT

E U

NLE

SS

DIR

EC

TE

D B

Y T

HE

OW

NE

R O

R A

RC

HIT

EC

T.

M.D

UR

ING

SP

RIN

KLE

R S

HO

P D

RA

WIN

G R

EV

IEW

, T

HE

AR

CH

ITE

CT

HA

S T

HE

RIG

HT

TO

RE

LO

CA

TE

HE

AD

S, T

RU

NK

LIN

ES

AN

D P

IPIN

G R

OU

TE

S A

SR

EQ

UIR

ED

TO

CO

OR

DIN

AT

E W

ITH

TH

E O

VE

RA

LL D

ES

IGN

OF

TH

E I

NT

ER

IOR

SP

AC

ES

. A

RC

HIT

EC

T W

ILL

WO

RK

WIT

H T

HE

CO

NT

RA

CT

OR

TO

EN

SU

RE

CO

DE

RE

QU

IRE

D C

OV

ER

AG

E I

S M

AIN

TA

INE

D.

N.

AL

L E

XT

ER

IOR

WA

LL

S C

ON

ST

RU

CT

ED

WIT

H M

ET

AL S

TU

DS

AR

E T

OIN

CLU

DE

SIL

L S

EA

L W

AT

ER

PR

OO

FIN

G U

ND

ER

RU

NN

ER

AT

CO

NC

RE

TE

FO

UN

DA

TIO

N /

SLA

B C

ON

DIT

ION

WH

ET

HE

R O

R N

OT

SH

OW

N O

N D

ET

AIL

S.

O.M

AS

ON

RY

TO

RE

CE

IVE

WA

TE

RP

RO

OF

ING

TO

BE

CL

EA

NE

D F

RO

M D

EB

RIS

AN

D P

AT

CH

ED

AN

D F

INIS

HE

D S

MO

OT

H B

Y T

HE

MA

SO

NR

Y C

ON

TR

AC

TO

R. I

FS

UR

FA

CE

IS

NO

T A

CC

EP

TE

D B

Y T

HE

WA

TE

RP

RO

OF

ING

CO

NT

RA

CT

OR

,C

ON

CR

ET

ED

CO

NT

RA

CT

OR

IS

TO

RE

TU

RN

TO

TH

E J

OB

SIT

E T

O C

LE

AN

,R

EM

OV

E, A

ND

PA

TC

H B

LE

MIS

HE

S F

OR

WA

TE

R P

RO

OF

ING

CO

NT

RA

CT

OR

AC

CE

PT

AN

CE

.

P.

AR

CH

ITE

CT

IS

NO

T R

ES

PO

NS

IBLE

TO

DO

QU

AN

TIT

Y T

AK

E O

FF

S F

OR

BID

DIN

G R

ES

PO

NS

IBIL

ITY

. C

ON

TR

AC

TO

RS

BID

DIN

G T

HE

PR

OJE

CT

S A

RE

TO

BE

CO

ME

FA

MIL

IAR

WIT

H T

HE

DR

AW

ING

S A

ND

BID

PA

CK

AG

E T

HE

Y A

RE

RE

SP

ON

SIB

LE

FO

R.

Q.A

LL I

NT

ER

IOR

DIM

EN

SIO

NS

AT

WA

SH

RO

OM

S W

ILL N

EE

D T

O B

E C

ON

FIR

ME

DP

RIO

R T

O P

LU

MB

ING

RO

UG

H-I

N T

O E

NS

UR

E A

DA

/ A

CC

ES

SIB

ILIT

YC

LE

AR

AN

CE

S A

RE

ME

T.

FLO

OR

PLA

N G

EN

ER

AL N

OT

ES

:

RE

FE

RE

NC

ED

KE

YN

OT

ES

SC

AL

E:

3/6

4"

= 1

'-0"

A200

OV

ER

ALL F

IRS

T F

LO

OR

PLA

N1

NO

RT

H

SC

AL

E:

3/6

4"

= 1

'-0"

A200

PA

RT

IAL B

AS

EM

EN

T P

LA

N2

NO

RT

H#

Date

Description

Page 9 of 16

3.0

83

.01

3.1

03

.03

3.0

2

3.0

43

.04

3.0

2

3.0

2

3.0

43

.04

3.0

43

.04

3.0

43

.04

3.0

43

.04

3.0

43

.04

3.0

43

.04

3.0

43

.05

3.0

1

3.0

2

3.1

03

.08

3.0

23

.01

3.0

43

.04

3.0

43

.04

3.0

43

.04

3.0

33

.03

3.0

33

.03

3.0

6

3.0

7

3.0

5

3.0

63

.06

3.0

6

3.0

83

.03

3.0

6

3.0

33

.06

3.0

83

.03

3.0

13

.08

3.1

0

3.0

53

.04

3.0

43

.04

3.0

43

.04

3.0

63

.05

3.0

6

3.0

4

3.0

43

.04

3.0

43

.04

3.0

43

.04

3.0

23

.02

3.0

23

.01

3.0

3

3.0

9

3.1

1

3.0

43

.04

3.0

4

3.0

33

.01

3.0

2

3.0

13

.03

3.0

43

.04

3.0

4

3.0

8

A

R

C

H

I T

E

C

T

S

Pro

ject

No

:P

roje

ct

Ma

na

ge

r:D

raw

n B

y:

Da

te:

The

se

dra

win

gs a

nd

sp

ecific

atio

ns a

reth

e s

ole

pro

pert

y o

f H

MA

Arc

hitects

, L

td.

any r

ep

rodu

ction

or

reu

se o

f th

ese

docu

me

nts

is f

orb

idd

en

with

ou

t w

ritt

en

perm

issio

n f

rom

HM

A A

rchite

cts

, L

td.

Sig

natu

re:

Pri

nte

d N

am

e:

Lic

ense N

o.:

Date

:

700 W

. S

t. G

erm

ain

Str

eet

Suite 2

00

St.

Clo

ud,

MN

56301

ww

w.h

ma-a

rchs.c

om

T | 3

20.2

51.9

155

F | 3

20.2

51.4

919

hm

a@

hm

a-a

rchs.c

om

I he

reby c

ert

ify t

ha

t th

is p

lan,

sp

ecific

atio

no

r re

port

wa

s p

repa

red b

y m

e o

r un

de

rm

y d

irect sup

erv

isio

n &

tha

t I

am

a d

uly

Lic

ensed

Arc

hitect u

nd

er

the

la

ws o

f th

eS

tate

of

Min

ne

so

ta

Tim

Gill

et

510

31

EX

TE

RIO

R E

LE

VA

TIO

NS

A3

00

PRELIMINARY -NOT FOR CONSTRUCTION

SA

UK

CE

NT

RE

, M

N

SA

UK

CE

NT

RE

CA

RE

CE

NT

ER

SK

ILLE

DN

UR

SIN

G U

NIT

RE

NO

VA

TIO

NS

AN

DA

DD

ITIO

N T

O:

211

0T

GS

G0

5/1

0/2

021

05/1

0/2

021

A.

AL

L E

XT

ER

IOR

WA

LLS

CO

NS

TR

UC

TE

D W

ITH

ME

TA

L S

TU

DS

AR

E T

O I

NC

LU

DE

SIL

LS

EA

L W

AT

ER

PR

OO

FIN

G U

ND

ER

RU

NN

ER

AT

CO

NC

RE

TE

FO

UN

DA

TIO

N / S

LA

BC

ON

DIT

ION

WH

ET

HE

R O

R N

OT

SH

OW

N O

N D

ET

AIL

S.

B.

MA

SO

NR

Y T

O R

EC

EIV

E W

AT

ER

PR

OO

FIN

G T

O B

E C

LE

AN

ED

FR

OM

DE

BR

IS A

ND

PA

TC

HE

D A

ND

FIN

ISH

ED

SM

OO

TH

BY

TH

E M

AS

ON

RY

CO

NT

RA

CT

OR

. IF

SU

RF

AC

EIS

NO

T A

CC

EP

TE

D B

Y T

HE

WA

TE

RP

RO

OF

ING

CO

NT

RA

CT

OR

, C

ON

CR

ET

ED

CO

NT

RA

CT

OR

IS

TO

RE

TU

RN

TO

TH

E J

OB

SIT

E T

O C

LE

AN

, R

EM

OV

E,

AN

D P

AT

CH

BL

EM

ISH

ES

FO

R W

AT

ER

PR

OO

FIN

G C

ON

TR

AC

TO

R A

CC

EP

TA

NC

E.

C.

EX

TE

RIO

R F

INIS

H S

EL

EC

TIO

NS

AR

E M

AT

ER

IALL

Y S

HO

WN

, F

INIS

H C

OL

OR

S A

ND

MA

NU

FA

CT

UR

ES

AR

E A

S S

PE

CIF

IED

.

EX

T. E

LE

VA

TIO

N G

EN

ER

AL

NO

TE

S:

RE

FE

RE

NC

ED

KE

YN

OT

ES

3.0

1F

AC

E B

RIC

K T

O M

AT

CH

EX

IST

ING

3.0

2P

RE

FIN

ISH

ED

ME

TA

L P

AN

ELS

- P

LA

NK

3.0

3P

RE

FIN

ISH

ED

ME

TA

L C

AP

FL

AS

HIN

G , C

OO

RD

INA

TE

WIT

H E

XIS

TIN

G P

RO

FIL

E A

ND

CO

LO

R

3.0

4N

EW

ALU

MIN

UM

WIN

DO

W A

SS

EM

BLY

3.0

5N

EW

ALU

MIN

UM

ST

OR

EF

RO

NT

/ C

UR

TA

IN W

AL

L E

NT

RA

NC

E A

SS

EM

BLY

3.0

6N

EW

ALU

MIN

UM

ST

OR

EF

RO

NT

/ C

UR

TA

IN W

AL

L A

SS

EM

BLY

3.0

7E

XIS

TIN

G C

AN

OP

Y T

O B

E R

EU

SE

D A

T N

EW

EN

TR

Y C

ON

FIG

UR

AT

ION

3.0

8E

IFS

WA

LL A

SS

EM

BLY

3.0

9N

EW

BA

CK

LIT

RA

ISE

D L

ET

TE

R S

IGN

AG

E

3.1

0M

ET

AL F

AC

ED

CA

NO

PY

ST

RU

CT

UR

E

3.1

1H

OL

LO

W M

ET

AL

DO

OR

AN

D F

RA

ME

AS

SE

MB

LY

SC

AL

E: 1

/8"

= 1

'-0"

A300

EX

TE

RIO

R E

LE

VA

TIO

N -

AD

DIT

ION

-H

H3 -

EA

ST

5

SC

AL

E: 1

/8"

= 1

'-0"

A300

EX

TE

RIO

R E

LE

VA

TIO

N -

AD

DIT

ION

-H

H3 -

SO

UT

H6

SC

AL

E: 1

/8"

= 1

'-0"

A300

EX

TE

RIO

R E

LE

VA

TIO

N -

EN

TR

Y -

AD

DIT

ON

1

SC

AL

E: 1

/8"

= 1

'-0"

A300

EX

TE

RIO

R E

LE

VA

TIO

N -

AD

DIT

ION

-N

OR

TH

2

SC

AL

E: 1

/8"

= 1

'-0"

A300

EX

TE

RIO

R E

LE

VA

TIO

N -

AD

DIT

ON

-W

ES

T33

SC

AL

E: 1

/8"

= 1

'-0"

A300

EX

TE

RIO

R E

LE

VA

TIO

N -

AD

DIT

ION

-E

AS

T4

#D

ate

Description

Page 10 of 16

AC

G

E

FFE=

1256.52

FFE=

1256.50

FFE=

1256.45

DS

DS

CO

CO

CO

CO

ST

S

ST

S

S

S

ST

ST

S

S

ST

S

ST

E

E

E

E

E

E

X

X

X

X

X

XX

XX

X

X

X

X

X

X

X

X

X

XX

X

X

X

XX

FO

FO

FO

FO

FO

FO

PU

G

PU

G

PU

G

PU

G

PU

G

FO

FO

FO

FO

FO

FO

PUG

PUG

PUG PUG

PUG

GA

S

GA

S

GA

S

GA

S

GA

SG

AS

GAS

GAS

GASGAS

GAS

GAS

GASGAS

GASGAS

GASGAS

GAS

GAS

PUG

PUG

PUG

PUG

P

U

G

PU

G

PU

G

PU

G

PU

GP

UG

PU

G

PU

G

PU

G

PU

GP

UG

PU

G

PU

G

PUG

PUG

PUG

PUG

PU

G

PU

G

PUG

PUG

PU

G

P

U

G

PUG

PUG

PUG

PUG

PUG

PU

G

PU

G

P

U

G

PU

G

P

U

G

P

U

G

P

U

G

PUG

PUG

PUG

PUG PUG

PUG

HA

ND

RA

ILS

WOOD FENCE

ENCLOSURE

WITH CANOPY

MO

NU

MEN

T

SIG

N

BIR

D

HO

USE

BIR

D FEED

ER

S

MEM

OR

IA

L

SIG

N

CLO

TH

ESLIN

E

SIG

N

HELIP

AD

SIG

N

W

A

L

L

EX

ISTIN

G

BU

ILD

IN

G

WA

LL

EXISTING

BUILDING

SH

ED

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

NSA

N

SA

N

SA

NSA

N

SA

N

SA

N

SA

NSA

NSA

NSA

NSA

NSA

NSA

NSA

NSA

N

S

A

N

1/2" O

PEN

P

IP

E

(D

ISTU

RB

ED

)

1/2" O

PEN

P

IP

E

3/8" R

EB

AR

1 1/2" X

4 B

AR

REB

AR

CA

P N

O. 45873

REB

AR

CA

P N

O. 45873

REB

AR

CA

P N

O. 45873

BEN

CH

MA

RK

:

TO

P N

UT H

YD

RA

NT

ELEV

.=

1250.31

GA

S

GA

S

REB

AR

CA

P N

O.

42620

66.00

66.00

IR

ON

P

IP

E

CA

P N

O. 45873

S8

9°0

5'2

9"W

4

32

.0

0

N8

9°0

7'3

5"E 5

61

.1

8

N00°52'13"W 395.35

S00°52'13"E 295.80

S8

9°0

5'2

9"W

1

60

.0

0

N00°52'13"W 295.80

N8

9°0

5'2

9"E 1

60

.0

0

66.00

66.00

66.00

66.00

66.00

66.00

E

E

E

RE=

1249.01

IN

V=

1236.46

RE=

1251.20

IN

V=

1245.69

RE=

1250.97

IN

V=

1235.45

RE=

1250.84

IN

V=

1235.35

IN

V N

W=

1246.04

RE=

1251.01

IN

V=

12.38.18

RE=

1250.29

IN

V W

=1239.04

IN

V E=

1240.89

RE=

1250.84

IN

V=

1247.94

RE=

1249.45

IN

V=

1237.15

RE=

1249.34

IN

V=

1242.79

RE=1248.84

INV=1243.04

RE=

1254.66

IN

V=

1248.05

RE=

1255.42

IN

V=

1238.92

RE=

1254.88

IN

V=

1246.20

RE=

1253.62

IN

V=

1240.45

RE=

1252.72

IN

V=

1241.72

RE=1252.91

INV=1244.11

RE=

1252.21

IN

V E=

1245.51

IN

V S=

1239.66

RE=

1256.31

IN

V=

1253.71 8" P

VC

T

RE=1253.25

INV E/W=1239.93

INV N=1243.05

RE=

1252.05

IN

V=

1249.50

OV

ER

HA

NG

C

A

N

O

P

Y

C

A

N

O

P

Y

SANSAN SAN

SANSAN SAN

SANSAN

SAN SANSAN

SAN SANSAN

SANSAN

STO

STOSTO STO

STOSTO

STO STOSTO

STOSTO STO

STOSTO

STO

SAN

WA

TW

AT

WA

TW

AT

WA

TW

AT

WA

TW

AT

WA

T

WA

T

WA

T

WA

T

WA

TW

AT

WATWAT

WATWAT

WATWAT

WATWAT

WATWAT

WATWAT

WATWAT

WATWAT

WA

T

WA

T

WA

T

WA

T

WA

T

WA

T

WA

T

WA

T

WA

T

8" PVC

8" PVC

WA

T

8" P

VC

10" P

VC

SAN

SA

N

SA

NSA

N

SA

N

S

A

N

WA

T

WA

T

WA

T

WA

T

WA

T

WA

T

8" P

VC

8" P

VC

WAT

WAT

8" P

VC

8" P

VC

18" RCP

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

STO

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

NSA

N

STO

STO

STOSTO

WA

LL

24" R

CP

24" R

CP

24" R

CP

21" R

CP

18"

RC

P

S

SAN

6"

15"

6"

8"

12"

1

2

4

9

1

2

5

0

1

2

5

1

1

2

5

2

1

2

5

3

1

2

5

4

1255

1255

1

2

5

4

1253

1

2

5

3

1

2

5

4

1

2

5

5

1

2

5

6

1

2

5

4

1

2

5

4

1255

1256

1

2

5

7

1255

1

2

5

6

1257

1

2

5

5

1

2

5

5

1254

1254

1

2

5

3

1

2

5

2

1

2

5

3

1252

1253

1

2

5

2

1

2

5

1

1

2

5

0

1

2

5

1

1

2

5

1

1

2

5

0

1249

1

2

5

0

1

2

4

9

1

2

4

9

1

2

5

3

WA

TER

HA

ND

HO

LE

SH

EET N

UM

BER

:

DA

TE: 05/13/2021

PR

EP

AR

ED

FO

R:

OF

FIELD

W

OR

K D

ATE:

04/26/21

MD

S/JLB

FIELD

C

REW

:

DR

AW

N:

CH

EC

KED

:

BJY

CR

F

11

To

po

grap

hic Su

rvey

Ph

on

e(3

20

) 2

53

-94

95

37

01

12

th S

tre

et

No

rth

, Su

ite

20

6F

ax

(32

0)

35

8-2

00

1S

t. C

lou

d, M

N 5

63

03

To

ll

F

re

e(8

00

) 2

70

-94

95

0002784.04-V

-TO

PO

.d

wg

N:\0002784.04\DWG\SURVEY\0002784.04-V-TOPO.DWG

Sau

k C

en

ter, M

NSt C

lo

ud

, M

N

CEN

TR

AC

AR

EH

MA

A

RC

HIT

EC

TS

REV

ISIO

NS:

0'

30

60

90

1" =

30

SC

ALE IN

FEET

1.

Bearin

gs based on

th

e Stearn

s C

ou

nty coordin

ate system

, (N

AD

83 - 1996 A

dju

stm

en

t).

2.

Ben

ch

mark: Top N

ut H

ydran

t - Sou

th

side of 4th

street N

orth

at th

e sou

th

west corn

er of th

e site.

Elevation

=

1250.31 ft. (N

AV

D88)

GEN

ER

AL N

OT

ES

LEG

EN

D

SA

NITA

RY

M

AN

HO

LE

CA

TC

H B

ASIN

SEW

ER

C

LEA

NO

UT

ELEC

TR

IC

B

OX

ELEC

TR

IC

M

ETER

SIG

N

NA

TU

RA

L G

AS M

ETER

LIG

HT P

OLE

GA

TE V

ALV

E

HY

DR

AN

T

STO

RM

M

AN

HO

LE

TELEP

HO

NE B

OX

AIR

C

ON

DITIO

NER

FLA

G P

OLE

GA

S

PU

G

SA

N

STO

WA

T

FO

S

CO

ST

E E T

G

AC

X

DO

WN

SP

OU

TD

S

PO

WER

U

ND

ER

GR

OU

ND

WA

TER

MA

IN

FIB

ER

O

PTIC

SA

NITA

RY

SEW

ER

STO

RM

SEW

ER

GA

S LIN

E

FEN

CE LIN

E

CU

RB

&

G

UTTER

CO

NC

RETE SU

RFA

CE

BITU

MIN

OU

S SU

RFA

CE

PA

VER

S

Page 11 of 16

37

01

12

th S

tre

et

No

rth

, Su

ite

206

St.

Clo

ud

, MN

563

03

PH

ON

E3

20

-25

3-9

495

FA

X3

20

-25

3-8

737

TOLL

FR

EE1

-80

0-2

70

-94

95

Page 12 of 16

Exis

ting

Cen

traC

are

Hos

pita

l Cam

pus

04/2

9/20

21

Vacated Street

5th

St N

4th

St N

Oak St N

Elm St N

Elm St N

Lake Shore Dr

Page 13 of 16

City of Sauk Centre Notice of Public Hearing

Variance Request

Notice is hereby given that the Sauk Centre Planning Commission acting as the Board of Appeals and Adjustments will conduct public hearings on Tuesday, June 15, 2021 at 4:30 p.m. or shortly thereafter as practical, in the Council Chambers of City Hall, to considermultiple variances, on behalf of CentraCare of Sauk Centre.

Proper Owner: City of Sauk Centre Applicant: Tim Gillet, AIA HMA Architects Ltd. on behalf of CentraCare Sauk Centre. Property Location: 425 Elm Street North, 536 4th Street North, and 409 Oak Street North, Sauk Centre Minnesota 56378. Parcel number(s): 94.58268.0001, 94.58269.0002, 94.58272.0007 and 94.58288.0007. Zoning District: Residential Commercial (R-C) Other. Legal Description: The legal descriptions are available at City Hall.

A variance of 28 feet 7 inches is sought for relief from the dimensional standards of the required thirty (30) foot setback from a Road Right-of-Way. A variance of 28 feet ten and one half inches is sought from the relief from the required thirty (30) foot setback from a side street. A variance of five (5) feet is sought for the relief from the dimensional standards of the required five (5) foot setback from an interior lot line. A variance to allow an additional 30% of impervious surface where normally 50% of impervious surface is allowed in a Residential Commercial (R-C) Other zoning district.

Any persons having an interest in this matter will have the opportunity to be heard. Written comments will be accepted until the time of hearing. Materials related to this request can be reviewed within the Planning & Zoning Office of City Hall.

/s/ Sarah Morton City Planner/Zoning Administrator

Submitted to the Sauk Centre Herald on Monday, May 24, 2021. Published in the Sauk Centre Herald on Thursday, May 27, 2021. Posted on Monday, May 24, 2021.

Page 14 of 16

Staff Report 5a Page 1 of 2

City of Sauk Centre - Planning Commission Staff Report

Meeting Date: June 15, 2021

Subject: Request for Variances – CentraCare/City of Sauk Centre Front (ROW), Side Street (Corner), Interior lot line setbacks, and allowed Impervious Surface

Agenda Item: 5a

Description/Summary LUR #2021-11

See agenda items 4a, Hearing Notice was published in the Sauk Centre Herald on Thursday May 27, 2021 and was posted as required by law. See attachments, variance application, copy of Hearing Notice, staff report, and any correspondence received. As of Tuesday June 8, 2021 three neighboring property owner had requested clarification concerning the variances.

As stated during the Public Hearing for this request, the Planning Commission, acting as the Board of Adjustment, should take action to approve or deny the Conditional Use Permit request.

The action should include Findings of Fact to support the decision to be recommended to the City Council. Conditions on the approval may also be detailed to mitigate the impact of the increased use of the property such as screening, color limitations, increased setbacks, erosion control, reduction of stormwater runoff etc.

Findings:

The Planning Commission shall consider the following findings in their deliberations. Any findings deemed appropriate should be attached to the action taken. Findings 1 – 6 are listed in Agenda Item 4a.

Conditions:

1. Applicant shall coordinate with city staff and the City Engineer, as to the designand installation of a Stormwater Management Plan or Stormwater PollutionPrevention Plan (SWPPP).

2. All lighting used for exterior illuminate (including off-street parking area) shallbe shaded or diffused so as to reflect the lights away from adjoining property andaway from abutting traffic flow.

Page 15 of 16

Staff Report 5a Page 2 of 2

Planning Commission Recommendation:

Planning Commission may choose to Approve/Amend/Table or Deny the Conditional Use Permit request.

Planning Commission to Recommend the City Council to approve Resolution No 2021-XXX, with Findings 1through 6 and Conditions 1 and 2.

Motion: _______________________Second: _______________________

Approval:______ Tabled:______ Denial: _____ No Action: ______

Page 16 of 16