SAPPHIRE 08 OR4167
Upgrades Made Easy:
SureSmartKrishna Kumaraswamy (KK)
VP – SAP Services/COE
Mahesh Venkatraman
Global Head – Upgrades and BT
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 2/35
SAPPHIRE 08 OR4167
Agenda
Upgrade Intro
SURE Framework & Tools
SAP Upgrade Execution
Best Practices
References
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 3/35
SAPPHIRE 08 OR4167
What is an SAP upgrade?
• Expectation:
– Change in version of SAP software components
• Reality
– SAP version upgrades are frequently accompanied by allOR some of the following:
• Hardware Upgrade
• Operating System Version Upgrade
• Database Version Upgrade
• Conversion of 32 bit architecture to 64 bit architecture
• Conversion of single code page or multiple code pagesystems to unicode
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 4/35SAPPHIRE 08 OR4167
Upgrade Key Drivers
BUSINESS STRATEGY
Business Innovation,
competitive differentiation,
globalization and
collabaration
TOTAL COST OF OWNERSHIP
Reduction in :
• Hardware Costs
• Software Costs
• Maintenance Costs
OPERATIONAL EXCELLENCE
Continuous improvement,
process Efficiency
&
Automation, Process
standardization
INFORMATION TECHNOLOGY
Changing legal requirements,
IT system stability ,
Continuous system
maintenance
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 5/35SAPPHIRE 08 OR4167
Upgrade Aspects and Key Considerations
Technical Upgrade
Functional Upgrade
Al l systems together Strategic Upgrade
Satellite systems1st, then other
systems as
separate projects No Unicode
Unicode
No DB or OSUpgrade
Both DB and OSUpgrade
Only OS Upgrade
Only DB Upgrade
START
Key
Decisions
LanguageConsiderations
Database and OSSystem LandscapeStrategyType
Downtime Minimized
Resource Minimized
Upgrade
Initiative
Dual Maintenance
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 6/35SAPPHIRE 08 OR4167
Upgrade Challenges
• How to manage modifications?
• How to plan and manage testing?
• Do I need additional systems? What would be the source for new
Server?
• What will be the impact on future development?
• How to freeze current development and production issues to isolate
them from the upgrade?
• How will the upgrade project be resourced through several monthswithout impacting business usual and other development projects?
• All the new SAP applications will be offered only based on Unicode.What are the implications, and how will these be handled in thetransition to upgrade SAP solutions?
• What implications do upgrades have on IT infrastructure such asprocessor, memory and storage capacity?
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 7/35SAPPHIRE 08 OR4167
Agenda
Upgrade Intro
SURE Framework & Tools
SAP Upgrade Execution
Best Practices
References
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 8/35SAPPHIRE 08 OR4167
Satyam Upgrade Framework
Knowledge Repository
Release Notes, Access to SAPOSS Notes
Advisory &Expert Panel
SUREMap — Satyam’s Enriched
ASAP Methodology
Assessment
Accelerators: Templates
ToolsR/3 Resident
Proprietary — SureSmart,RBERightSourcing Model
Best PracticesCase Studies
UPGRADE
Project Management, Reviews
and Tracking
Framework and tools that support all phases of lifecycle
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 9/35SAPPHIRE 08 OR4167
SureSmart
Upgrade made easy using SureSmart
Automatic generation of the object inventory
Efficient and Accurate Data for better Decision
Making and Planning
Impact analysis
Effort estimation
Suggestions for obsolete transaction codes
Detecting potential Failure points in Custom
developments well in advance
Recommending corrective actions for the
potential failure
points
Verifying Version Consistency of all Custom and
Repaired Objects across the system landscape
Code optimization
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 10/35SAPPHIRE 08 OR4167
SureSmart — Features
SureSmart3.0SureSmart3.0
Object Inventory
Usage Analysis
Basis Information
RecommendationsImpact Analysis
Unicode Analysis
Estimation
Cutover AcceleratorsOptimization
Tcode/BDC ImpactsTable ImpactFunction Module ImpactSecurity Profiles Impact
$TMP ObjectsZ Tables not usedZ Functions not usedOutbound IDOC ImpactSyntax Errors in Z ProgramsOngoing Development List
BDC→ BAPI ReplacementsUser Exit→ Badi replacements
Unicode Analysis for Z programs
Remediation EstimationSPDD, SPAU, user exitsInterface, Z programs
Layouts, Other objects functional defects correctionUnicode Conversion-ABAP
Data Integrity checkMaster and Transaction tables
Z programsLayouts — Sapscripts, SmartformsDictionary objectsWorkflow, BTE objectsSPAU, SPDD, User exitsInfo type, HR Schema, Dynamic calls
Security profile dataInterfacesClone objectsSAP Queries, background jobsTransaction variants, screen variantsZ Logical database, Lock objects
Z program usage dataZ programs not usedSAP transactions usage data
Performance AnalysisHard code analysisVersion consistencyNaming convention check
Database, OS informationSystem user, Client, App serversTimes Zones, Installed components
Installed code pages, add-on
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 11/35SAPPHIRE 08 OR4167
Assessment Steps — SureSmart
Assessmentsystem
Install
SureSmart
1
Run AnalysisGenerate
Reports
SAP ERP6.0
Impact Analysis
E.g. R/3
4.6C
Extract
Information
2 3 4
Estimation
5
@ Customer Site@ Customer Site @ Satyam Upgrade CoE@ Satyam Upgrade CoE
DEVsystem
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 12/35
Some Examples of Checklists and Templates
Checklist for Oracle
Upgrade
Quality Checklist
Preparation Phase
Change Control
Standards
Checklist foruction Server Upgr
Reports-ScriptsTemplate
ProcessSpecification
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 13/35SAPPHIRE 08 OR4167
Agenda
Upgrade Intro
SURE Framework & Tools
SAP Upgrade Execution
Best Practices
References
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 14/35
SAPPHIRE 08 OR4167
Delivering best-in-class services that leverage offshore CoE delivery
capability
Upgrade Delivery — Model
Scoping and estimation ofwork packages
Project management
Work package execution
Resource pool for SAPengagements
Shared Services Factory
Model
Common Management, and Quality Framework
Offshore Delivery Center
Work Packages
Overall projectmanagement and deliveryaccountability
Execution of on-site workcomponents
Customer interaction andchange management
Coordination andsynchronization of workpackages
On Site (Customer Site)
Delivery of Completed Work Packages
Project management
Quality management
Proven delivery methodology
Decomposition into work packages
Enablers
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 15/35
SAPPHIRE 08 OR4167
Upgrade Assessment Approach
A c t i v i t i e
s
Consolidation of theresults and finalizerecommendation[s]
Documentation
Presentation and
handover Next Steps
Start up phase
Initial contact withCustomer
Defined- Scope for
Analysis- Plan for Analysis
- Organization
Understanding of actual situation
Conduct Assessment study
Understand Project Challenges,Risks, Dependencies
Identify potential areas for
improvement – Qualitative, Quantitative and
Strategic
Perform Analysis
Initializing Findings Assessment
CustomObjects andInterfaces
FunctionalBasisDefinition ofthe scope
Plan DocumentationPresentation
and Handover
The Upgrade Assessment is typically executed in a 3- 4 week timeframe
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 16/35
SAPPHIRE 08 OR4167
Project Management and Quality Assurance
User Training Upgrade Preparation
for Production
Design of BusinessProcesses In New
Release
Refinement Of
System
Administ rat ion
Procedures
Security
RequirementsPlanning
Test Strategy
Planning
Planning Of User
Training
Technical Upgrade
of Mock System
Technical Upgradeof Dev System
Modification
Adjustment
Technical Upgrade
of QA System
Business Process
Configuration
Security Profiles Adjustment
Appl ication and
Interface Testing
User Acceptance
Testing
GLFC Analysis
Final Preparation
for Cutover Upgrade RealizationUpgrade Blueprint
Project Planning Deploy SureSmart
and RBE
Defining Project
Objectives
Preparation of Mock
System
SAP Going Live
Functional UpgradePlanning
Project Preparation Go Live and Support
Technical Upgradeof Production
Go Live Suppor t
SAP Going Live
Functional Upgrade
Verification
Work Packages — Offshore Services from SAPWork Packages — Onsite
Risk-minimized approach; Sandbox System and temporary Maintenance Landscape
Advantages: Dual maintenance period can be reduced, 3-system landscape for maintenance avai lable
Executing Upgrade Projects
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 17/35
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 18/35
SAPPHIRE 08 OR4167
Typical Upgrade Timelines
• There are many variables which will ultimately affect the overall timeline – Number of development objects/customizations
– Current productive version
– Number of dedicated resources available – Status of test scripts
• Are they up to date? Can they be reused? – Amount of time required to procure incremental hardware, if required
– Scope of the upgrade
– Unicode Considerations
• Average durations for a technical upgrade: – 3.1x to ECC 6.0: 8-10 months
– 4.0b, 4.5b, to ECC 6.0: 6-8 months – 4.6c to ECC 6.0: 3-6 months
– 4.7, ECC 5.0 to ECC 6.0: 2-3 months
Upgrade Strategy Downtime requirements Project portfolio IT capability and skills available Testing requirements, eg., Interfaces, SOX, FDA
Business and End user involvement and availability Application landscape and dependencies
Elementsinfluencingproject planning
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 19/35
A d
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 20/35
SAPPHIRE 08 OR4167
Agenda
Upgrade Intro
SURE Framework & Tools
SAP Upgrade Execution
Best Practices
References
B t P ti d L L d
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 21/35
SAPPHIRE 08 OR4167
Best Practices and Lessons Learned
Make
early
experiences
in
the
upgrade
project
system
Technical Upgrade Procedure
Modification adjustment
Test
of
customer
developments
in
new
releaseUpgrade Customizing
Check functionality of processes in new release
Testing of core business processes
Upgrade
Strategy
“Downtime minimized” method should be used
in order to get a realistic forecast about the
expected downtime, a Sandbox‐Upgrade with
representative configuration
and
data
set
is
highly recommended.
Older the release, more effort spent on training
(Release 4.5B and below)
Take care of 3rd Party Add‐On’s early on
Distribution of new GUI version should start early
Utilize
Business
users
early
in
the
process
Check
Dependencies
and
Impact
early
OS/DB,
Country
Versions,
ITS
etc
SAP
Services
Utilize GLFC services
If needed Plan for SAP Safeguarding Service
Modification
Adjustments
and
Testing
are
key
cost
drivers
Consider
the
additional
hardware
requirements
Good
House
Keeping
drives
the
efficiency
of
UpgradesArchiving, Cleansing of unused Custom Objects,
Clients etc
A d
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 22/35
SAPPHIRE 08 OR4167
Agenda
Upgrade Intro
SURE Framework & Tools
SAP Upgrade Execution
Best Practices
References
Upgrade Experience Snapshot
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 23/35
SAPPHIRE 08 OR4167
Onsite/OffshoreOnsite/Offshore
Onsite/OffshoreOnsite/Offshore
Onsite/OffshoreOnsite/Offshore
Onsite/OffshoreOnsite/Offshore
Onsite/OffshoreOnsite/Offshore
Onsite/OffshoreOnsite/Offshore
Onsite/OffshoreOnsite/Offshore
OnsiteOnsite
TRW GlobalTRW Global 3.1 I to 4.73.1 I to 4.7
EngenEngen 4.6C to ERP 64.6C to ERP 6
The Coca Cola coThe Coca Cola co 4.6C to ECC 5.04.6C to ECC 5.0
Novo NordiskNovo Nordisk 4.6C to ECC 5.04.6C to ECC 5.0
Palm ComputersPalm Computers 4.6C to ERP 64.6C to ERP 6
InmarsatInmarsat 4.6C to ERP 54.6C to ERP 5
Goodman FielderGoodman Fielder 4.6 C to ECC 6.04.6 C to ECC 6.0
Daimler Chrysler IndiaDaimler Chrysler India 4.7 to ECC 6.04.7 to ECC 6.0
DaikinDaikin 4.6C to ECC 6.04.6C to ECC 6.0 Onsite/OffshoreOnsite/Offshore
Onsite/OffshoreOnsite/OffshoreEngenEngen BW 3.1, EP 6 toBW 3.1, EP 6 to NetWeaver NetWeaver
Upgrade Experience Snapshot
OnsiteOnsiteQ RailQ Rail 4.6C to ECC 6.04.6C to ECC 6.0
Upgrade Experience Snapshot (cont )
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 24/35
SAPPHIRE 08 OR4167
Onsite/OffshoreOnsite/Offshore
Onsite/OffshoreOnsite/Offshore
Onsite/OffshoreOnsite/Offshore
Onsite/OffshoreOnsite/Offshore
MittalMittal Steel MexicoSteel Mexico 4.0B to 4.74.0B to 4.7
World BankWorld Bank 4.0B to 4.6C4.0B to 4.6C
GM AndeanGM Andean 4.0B to 4.6C4.0B to 4.6C
AMAT AMAT 4.5B to 4.74.5B to 4.7
Onsite/OffshoreOnsite/OffshoreStSt GobainGobain Glass IndiaGlass India 4.0B to 4.74.0B to 4.7
Upgrade Experience Snapshot (cont.)
Onsite/OffshoreOnsite/OffshoreBridgestoneBridgestone 4.5B to ERP 64.5B to ERP 6
Onsite/OffshoreOnsite/OffshoreSony ChinaSony China 4.5B to ERP 64.5B to ERP 6
Onsite/OffshoreOnsite/OffshoreSony USSony US 4.7 to ERP 64.7 to ERP 6
Palm Inc Upgrade
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 25/35
SAPPHIRE 08 OR4167
PROJECT SCOPE AND TIMELINES• SPDD corrections (79)
• SPAU corrections (700)
• 3000 ABAP’s
• Technical Upgrade from R/3 4.6c to ECC 6.0 NonUnicode
• Upgrade of Oracle 9i to 10.g• SD, FICO, MM,HR, GTS
• PI Implementation aligned with Upgrade Go-Live
PROJECT HIGHLIGHTS• Met the challenge of aggressive timelines• 384.5 GB database size, 700 users
• Go Live on schedule
• 72 Hours Go-Live schedule
• Included Oracle Upgrade — 2 hour
• High number of SPAU fixes handled on-time• Almost nil post Go Live issues
• Unicode compliance for ABAP
• Seamless Integration with Palm Inc team• Team Size
• Project Management — 2
• ABAP — 3 Onsite and 6 Offshore
• BASIS/Security — 1 Offshore• Functional Consultants — 6 Onsite and 4
Offshore
• Project Timeline — Start: Aug-07 End: Jan-08
• Palm, Inc. is a global leader and innovator of easy-to-use mobile products that simplify people's lives and help them stay
connected on the go.• The company offers a range of products — including Palm® Treo™ and Centro™ smart phones, Palm handhelds, services
and accessories — to meet the needs of consumers, mobile professionals and businesses.• Has a portfolio of brands across the USA, Europe, Africa, Asia Pacific and Middle East and Mediterranean Countries.
KEY BENEFITS
• Alignment to SAP Strategy• Significant cost savings due to Off shoring• Platform to Rationalize Interfaces
Palm Inc. Upgrade
Goodman Fielder Upgrade
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 26/35
SAPPHIRE 08 OR4167
Goodman Fielder Upgrade
PROJECT SCOPE AND TIMELINES• SPDD corrections (210)
• SPAU corrections (3164)
• 6300 ABAP’s
• Technical Upgrade from R/3 4.6c to ECC 6.0 NonUnicode
• Upgrade of Oracle 9i to 10.g• SD, FICO, MM,WM, PP
PROJECT HIGHLIGHTS• Met the challenge of aggressive timelines
• 1.5TB database size, 1200 users
• Go Live on schedule
• High number of SPAU fixes handled on-time
• Almost nil post Go Live issues
• Unicode compliance for ABAP• Seamless Integration with Goodman team
• Team Size
• Project Management — 1
• ABA — 3 Onsite and 14 Offshore
• BASIS/Security — 1 Onsite 1 Offshore
• Functional Consultants — 4 Onsite
• Project Timeline — Start: May-07 End: Oct-07
• Goodman Fielder is Australasia's leading listed food company with Revenues of about AUD 1.5 billion.
• Core business involves selling of processed food products in Retail grocery market and Commercial and Food Servicesmarket.• Has a portfolio of brands across the Australian and New Zealand consumer food industries, with customers including
supermarkets, convenience stores and food service customers.• Employs over 5000 people and has about 60 plants in Australia, New Zealand, Papua New Guinea, Fiji and New Caledonia.
KEY BENEFITS
• Alignment to SAP Strategy• Significant cost savings due to Off shoring• Platform to Rationalize Interfaces
Upgrading Becomes Even Easier
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 27/35
SAPPHIRE 08 OR4167
Upgrading Becomes Even Easier
Tools and methodologies honed
through
years
of
experience SureSmart for Impact Analysis
RBE for Functional inputs
SAP Solution Manager for project
planning and execution
SURE Framework
to
support
upgrade life cycle
Proven Approach and
Tools
Backed by Delivery
Capability
Expert team of consultants
Upgrade
CoE Focused upgrade service offerings
SAP GLFC Services
Proven upgrade methodology
PMG consulting support
What Next
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 28/35
SAPPHIRE 08 OR4167
What Next …
FINANCIALS
HUMAN CAPITALMANAGEMENT
CORPORATESERVICES
OPERATIONS
ANALYTICS
Substantially Extending Functionality With Highly Integrated Analytical Functions
FINANCIALS:Financial Supply Chain Management
(FSCM) Business consolidation Business planning and budgeting Risk management Balanced scorecard
Corporate Governance Sarbanes-Oxley and Basel II
compliance Shareholder protection Reduced cost of compliance, risk of
noncompliance Management of Internal Controls Audit Information System
Whistle-blower Complaints
New General Ledger (G/L) Fast Close Parallel set of Books International Accounting Standards
HUMAN CAPITAL MANAGEMENT:
SAP Learning Solution Learner Role Learning Management System Authoring Environment Content Management e-Recruiting
Requisition management Job-posting
Applicant tracking
Document management
Recruiting Analytics
Shared Services and BPO
Employee Interaction Center
CORPORATE SERVICES :
Travel Management Travel requests, planning, and expenses Integration of external services
Environment, Health and Safety Integrated health and environmental protection Waste management and industrial safety
Real Estate Management
Manage complex Use and Renting conditions Contract management Linkage with FIBU, Controlling, maintenance
OPERATIONS:Value-Generating functions: Self-Service Requisitioning Adaptive Manufacturing Lean Manufacturing, Six Sigma CAD Integration Internet Sales
Auto-ID Infrastructure (RFID)
Collaborative Projects (cProjects) Manage projects, resources and
documents across organizationalboundaries
Real-time collaboration
Procurement
Desktop e-Procurement
BUSINESS INTELLIGENCE AND
ANALYTICS: Data Warehousing, ETL, Data Mining
Comprehensive Business Content
Dashboards
Information Broadcasting
Strategic Enterprise Management (SEM):
Balanced Scorecard
Value-Based Management
Risk Management
Business Planning/Simulation
Scenario Analysis
After Upgrade — What Next
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 29/35
SAPPHIRE 08 OR4167
After Upgrade What Next
The Value of Service-Enabling SAP
Improved Usability Extends reach to business users (Analytics, Roles, Duet) Customer can respond to business change faster — on their own
Broad selection of complementary solutions (xApps, Partner Eco-system Solutions) Enables enterprise process standardization (shared-services
strategy) Opens the enterprise for greater collaboration with business
partners
Lower TCO through Consolidation and reduced Integration cost
ESOA enablement Hundreds of built-in enterprise services are now available with new
SAP releases — SAP continues to add to its enterprise servicesrepository
Organizations can compose and enhance applications rapidlyusing these enterprise services
Ability to reach out to available web services beyond boundariesfor exchanging information in a heterogeneous environment withSAP and Non SAP applications
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 30/35
SAPPHIRE 08 OR4167
Thank You
Upgrading with SAP Solution Manager
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 31/35
SAPPHIRE 08 OR4167
Upgrade RoadmapUpgrade Roadmap
Upgrading with SAP Solution Manager
Project
Preparation
Define upgrade
project
Define upgrade
project
Analyze as-is
IT landscape
Analyze as-is
IT landscape
Delta trainingDelta training
FinalPreparationfor Cutover
SAP Solution Manager SAP Solution Manager — Supporting upgrade features
Production
Cutover & Support
Upgrade SupportUpgrade Support
Issue Tracking / Monitoring / ReportingIssue Tracking / Monitoring / Reporting
Upgrade
Blueprint
Define exist./to-be
core processes
Define exist./to-be
core processes
Verify existing
testing material
Verify existing
testing material
Upgrade
Realization
Configure new
processes
Test processes
Configure new
processes
Test processes
System Landscape
Reporting
System Landscape
Reporting
Identify release
process and function
deltas
Identify release
process and function
deltas
Create Learning materialCreate Learning material
Upgrade IMG, Identify
upgrade-relevant
config. settings
Upgrade IMG, Identify
upgrade-relevant
config. settings
Plan and execute
tests
Plan and execute
tests
Queensland Rail Upgrade
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 32/35
SAPPHIRE 08 OR4167
Queensland Rail Upgrade
PROJECT SCOPE AND TIMELINES
• SPDD corrections (180)• SPAU corrections (1875)
• 3000 ABAPs
• Technical Upgrade from R/3 4.6c to ECC 6.0 NonUnicode
• Re Architecture of Portal Server to compliance the
Integrated WEB ITS.• SD, FICO, MM,WM, PP,PM,PS,HR
• Testing for BI , Web method , XI , Mobile Interfaceetc…as other Ancillary system extensively used inQR
PROJECT HIGHLIGHTS
• Met the challenge of aggressive timelines• 3.4TB database size, 14000 users
• Go Live on schedule with Mock Go live
• High number of SPAU fixes handled on-time
• Almost nil post Go Live issues
• Seamless Integration with Queensland rail team
• Team Size
• Project Management — 1
• ABAP — 7 Onsite
• BASIS/Security — 1 Onsite
• Functional Consultants — 4 Onsite
• Project Timeline — Start: June-07 End: Dec-07• Downtime: 2.5 days
• QR Ltd is a $3 billion a year business, and one of Australia’s largest and most modern transport providers.
• Core business involves rail base transport services and Coal Mining (Coal Revenue).• Has been spread across Queensland and planning to spread wings across Australia.• Employs over 14,000 Plus people and has strong presence in the state of Queensland.
KEY BENEFITS
• Alignment to SAP Strategy• Significant all system in QR are on latest version (R/3,BI,Portal etc…)• Key driver for CRM implementation
Engen Upgrade
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 33/35
SAPPHIRE 08 OR4167
g pg
PROJECT SCOPE AND TIMELINES• Technical Upgrade BW 3.1 to BW 7.0
• BW Unicode Conversion
• Technical Upgrade 4.6C to ECC 6.0
• R/3 Unicode Conversion
• 1000 Custom Objects for HR All SAP Modules incore
• Migration from EP 6.0 to EP 7.0
• Project Timeline: HR — 4 Months, BW — 4months, EP — 4 months
PROJECT HIGHLIGHTS• Combined Upgrade and Unicode Conversion
• Use of Mock system
• Phased Approach. Upgrade of HR system firstfollowed by Upgrade of Core R/3
• Upgrade Assessment Service carried out
• Project completed on time
• Team Size
• Onsite — 11
• Offshore — 13
• Engen is the largest petrochemical company in South Africa with a 27% market share and Net sales of ZAR29.6 billion.
• Core businesses involve refining of crude oil, marketing of refined petroleum products and provision of convenienceservices.
• Employs about 2,538 people and has about 1,400 service stations, 600 Quick shops, 66 depots and 7 terminals.
• Presence in 14 countries and is represented by agents and distributors in a further 11 countries.
KEY BENEFITS
• Alignment to SAP’s Strategy and Engen’s IT Strategy
• Provide a Platform for Collaborative Solutions
Upgrade Tools
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 34/35
SAPPHIRE 08 OR4167
•• SureSmartSureSmart•• RBERBE
•• SURE Framework SURE Framework
Upgrade AssessmentUpgrade Assessment
•• SAMTSAMT
•• UCCHECK UCCHECK
•• SNOTESNOTE
•• SureSmartSureSmart•• Remediation KitRemediation Kit
ABAP Remediation ABAP Remediation
•• K K --WindowWindow
•• K PortalK Portal
Knowledge ManagementKnowledge Management
ARMS ARMS
(Associate Resource Management(Associate Resource Management
System)System)
Resource Management ToolsResource Management Tools
•• MS ProjectMS Project•• Project DashboardsProject Dashboards
•• Solution ManagerSolution Manager
Project Management toolsProject Management tools
•• WebQualifyWebQualify
•• SAP Solution ManagerSAP Solution Manager
Process Monitoring ToolsProcess Monitoring Tools
TechnicalTechnical
UpgradeUpgrade
pg
Access SAPPHIRE ’08
8/18/2019 SAPPHIRE_US_OR4167_2008_05
http://slidepdf.com/reader/full/sapphireusor4167200805 35/35
Orlando Online
www.sap.com/us/sapphire
Watch video recordings, download audio filesin MP3 format, and view the slides fromall keynotes and presentation sessions.