  • Santos GLNG Gas Field Development project

    Coordinator-Generals evaluation report on the environmental impact statement

    December 2015

  • The Department of State Development Copyright

    This publication is protected by the Copyright Act 1968. Licence

    This work is licensed to the Department of State Development under a Creative Commons Attribution (CC BY) 3.0 Australia licence. To view a copy of this licence, visit: http://www.creativecommons.org/licenses/by/3.0/au/

    You are free to copy, communicate and adapt this publication, as long as you attribute it as follows:

    State of Queensland, Department of State Development, December 2015.

    The Queensland Government is committed to providing accessible services to Queenslanders of all cultural and linguistic backgrounds. If you have difficulty understanding this publication and need a translator, please call the Translating and Interpreting Service (TIS National) on telephone 131 450 and ask them to contact the Queensland Department of State Development on (07) 3452 7009.

    Disclaimer

    This report contains factual data, analysis, opinion and references to legislation. The Coordinator-General and the State of Queensland make no representations and give no warranties regarding the accuracy, completeness or suitability for any particular purpose of such data, analysis, opinion or references. You should make your own enquiries and take appropriate advice on such matters. Neither the Coordinator-General nor the State of Queensland will be responsible for any loss or damage (including consequential loss) you may suffer from using or relying upon the content of this report. By using or relying on such information you agree to indemnify the Coordinator-General and the State of Queensland against any loss arising out of or in relation to your use or reliance.

    Copies of this publication are available on our website at www.statedevelopment.qld.gov.au and further copies are available upon request to: Department of State Development PO Box 15009 City East, Queensland 4002. 100 George Street Brisbane Qld 4000 (Australia) Phone: 13QGOV (137468) Fax: 07 3220 6465 Email: [email protected] Web: www.statedevelopment.qld.gov.au

    Santos GLNG Gas Field Development project Coordinator-Generals evaluation report on the environmental impact statement - ii -

    http://www.creativecommons.org/licenses/by/3.0/au/http://www.statedevelopment.qld.gov.au/mailto:[email protected]://www.statedevelopment.qld.gov.au/

  • Contents Synopsis ..................................................................................................................... vi 1. Introduction ........................................................................................................ 1 2. About the project ............................................................................................... 1

    2.1 The proponent ............................................................................................ 1 2.2 Project description ...................................................................................... 1 2.3 Project rationale .......................................................................................... 7

    3. Environmental impact statement assessment process .................................. 8 3.1 Coordinated project declaration .................................................................. 8 3.2 Commonwealth assessment ....................................................................... 8 3.3 Terms of reference ..................................................................................... 9 3.4 Review of the EIS ....................................................................................... 9 3.5 Additional information to the EIS ............................................................... 12

    4. Project approvals ............................................................................................. 12 4.1 Statutory approvals ................................................................................... 12 4.2 Environmental management plans ............................................................ 16

    5. Matters of national environmental significance ............................................ 18 5.1 Assessment methodology ......................................................................... 18 5.2 Wetlands of international importance (sections 16 and 17B) ..................... 26 5.3 Listed threatened species and communities (sections 18 and 18A) .......... 26 5.4 Listed migratory species (sections 20 and 20A) ........................................ 57 5.5 Protection of water resources from CSG development and large coal mining development (sections 24D and 24E) ..................................................... 61 5.6 Ecologically sustainable development .................................................... 109 5.7 Coordinator-Generals conclusion ........................................................... 110

    6. Evaluation of environmental impacts ........................................................... 110 6.1 Matters of state environmental significance ............................................ 110 6.2 Land use, disturbance and rehabilitation ................................................. 123 6.3 Greenhouse gas emissions .................................................................... 135 6.4 Air quality ................................................................................................ 138 6.5 Noise and vibration ................................................................................. 141 6.6 Waste ..................................................................................................... 146 6.7 Traffic and transport ................................................................................ 149 6.8 Hazard and risk ...................................................................................... 153 6.9 Cultural heritage ..................................................................................... 156 6.10 Social impacts ........................................................................................ 158 6.11 Economic impacts .................................................................................. 169

    7. Conclusion ..................................................................................................... 173 Appendix 1. Stated conditions ...................................................................... 175 Appendix 2. Coordinator-Generals recommendations ............................... 217 Appendix 3. Imposed conditions .................................................................. 219

    - iii - Santos GLNG Gas Field Development project

    Coordinator-Generals evaluation report on the environmental impact statement

  • Appendix 4. Proponent commitments .......................................................... 221 Appendix 5. MNES cross reference tables ................................................... 225 Acronyms and abbreviations ................................................................................. 413 Glossary .................................................................................................................. 416

    Figures Figure 2.1 GFD project area and primary infrastructure ............................................. 3 Figure 2.2 Schematic of gas gathering, transmission, compression and treatment .... 4 Figure 2.3 A typical Santos GLNG well lease area .................................................... 4 Figure 5.1 Location of Surat Cumulative Management Area and GFD project area . 65 Figure 5.2 Regional hydrostratigraphy ..................................................................... 67 Figure 5.3 Spatial distribution of registered landholder bores and their use ............. 70 Figure 5.4 Areas of groundwater impact under the UWIR and EIS scenarios .......... 81 Figure 5.5 Great Artesian Basin springs at risk of impacts ...................................... 86 Figure 5.6 Sub-catchments studied in the GFD project area ................................. 101 Figure 6.1 Land tenure in the GFD project area .................................................... 125 Figure 6.2 GFD project disturbance lifecycle ......................................................... 132 Figure 6.3 GFD project rehabilitation framework and objectives ............................ 134 Figure 6.4 Preliminary estimate of construction workforce ..................................... 170 Figure 6.5 Preliminary estimate of operations workforce ....................................... 171

    Tables Table 3.1 Summary of public and agency submissions on the EIS ......................... 10 Table 4.1 Approval conditions sought from this Coordinator-Generals report ........ 12 Table 4.2 Subsequent approvals potentially required for the GFD project .............. 13 Table 4.3 GFD project management plans and strategies ...................................... 17 Table 5.1 Permitted activities in each constraint area............................................. 22 Table 5.2 GFD project activity descriptions ............................................................ 22 Table 5.3 Constraint categories within the GFD project area .................................. 23 Table 5.4 Brigalow TEC in the GFD project area .................................................... 28 Table 5.5 Coolibah Black Box Woodland TEC in the GFD project area ............... 31 Table 5.6 Semi-evergreen vine thickets TEC in the GFD project area .................... 34 Table 5.7 Natural Grasslands of the Queensland Central Highlands and the northern

    Fitzroy Basin TEC in the GFD project area .........................