SANITARY AND STORM TRUNK SEWER DESIGN BRIEF
KANATA RESEARCH PARK LANDS
Prepared By:
NOVATECH Suite 200, 240 Michael Cowpland Drive
Ottawa, Ontario K2M 1P6
August 8, 2014
Novatech File: 114060
Ref: R-2014-114
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
Table of Contents
1.0 Introduction .................................................................................................................. 1
1.1 Reference Material ................................................................................................ 1
2.0 Sanitary sewer ............................................................................................................. 2
2.1 Sanitary Design Flows .......................................................................................... 2 2.1.1 Office Towers ................................................................................................. 2 2.1.2 Brookstreet Hotel .......................................................................................... 3
3.0 Storm Drainage and Stormwater Management ........................................................... 4
3.1 Storm Design Flows .............................................................................................. 5 3.1.1 Newbridge Parking Lot ................................................................................. 5 3.1.2 Vacant Land (Future Parking south of Newbridge Parking Lot) ............... 5 3.1.3 Sites on the East side of Legget Drive ........................................................ 5 3.1.4 528 March Road ............................................................................................. 5
4.0 Sewer Easements ....................................................................................................... 6
5.0 MOE Approval ............................................................................................................. 6
Appendices Appendix A Current MOE C of A's for Legget Drive Sewers and KRP SWM Facilities
Appendix B Sanitary Sewer Design Sheet
Appendix C Storm Sewer Design Sheets
Appendix D Newbridge Parking Lot (Controlled Flow)
Appendix E Vacant land (Future Controlled Flow)
Appendix F Old City of Kanata and New City of Ottawa IDF Curves
List of Drawings C200 - Sanitary Drainage Area Plan
C201 - Storm Drainage Area Plan
C300 – Outlet Sewer Plan and Profile (P1)
C301 – Outlet Sewer Plan and Profile (P2)
98066-STM - Storm Drainage Area Plan (Previously Approved)
Novatech i
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
1.0 INTRODUCTION The purpose of this design brief is to provide the background and rationale for the sewer design for both the sanitary and storm trunk sewers that service part of what is known as the Kanata Research Park (KRP). Development in the KRP has progressed over the years as a private development with on-site sanitary and storm sewers. These on-site sewers were intended to become public sewers at some time in the future when areas outside the private development area connected to the private on-site sewers. In the 1990s, public sanitary and storm sewers were constructed in Legget Drive but were not connected to the private sewers on the KRP lands on the east side of Legget Drive. Ministry of Environment (MOE) Certificates of Approval (C of A) were obtained for these sewers. Refer to Appendix A for a copy of the following MOE C of A’s:
• Sanitary sewers and appurtenances (MOE C of A No. 3-0979-95-006) • Storm Sewer (MOE C of A No. 3-0979-95-007)
The existing storm sewer in Legget Drive, currently conveys drainage from the municipal right-of-way as well as drainage from some private properties. The existing Alcatel-Lucent (formerly Newbridge) parking lot, including the vacant land to the south, has been designed to contribute flows to the existing storm sewer in Legget Drive. Flow from the Legget Drive storm sewer currently outlets directly to Shirley’s Brook. This configuration was intended to be temporary until other properties were connected to the storm sewer system. The proposed development (528 March Road) will require connections to the existing sanitary and storm sewers in Legget Drive as well as an extension of the sanitary and storm sewers from Legget Drive to the private sewers on the KRP lands. As part of the proposed sewer works, storm flows from the Legget Drive storm sewer (north of the subject site) will be intercepted and directed to the private storm sewer on the KRP lands. The existing storm sewer in Legget Drive will also be capped, downstream of the new connection. Flow from the municipal right-of-way, south of the new connection will continue to outlet directly to Shirley’s Brook. As a result, MOE Environmental Compliance Approvals (ECA) will be required for the proposed sanitary and storm sewer works. Refer to the enclosed Sanitary Drainage Area Plan (114060–SAN, C200) and Storm Drainage Area Plan (114060–STM, C201) for details.
1.1 Reference Material 1 The “Shirley’s Brook and Watts Creek Subwatershed Study” prepared by Dillon Consulting in
September 1999. 2 The “Stormwater Management Plan, Kanata Research Park” prepared by Novatech
Engineering Consultants Ltd., revised in April 2000. 3 The ‘Development Servicing Study and Stormwater Management Report’ prepared by
Novatech Engineering Consultants Ltd., revised on August 8, 2014.
Novatech Page 1
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
2.0 SANITARY SEWER
The proposed development (528 March Road) will be serviced by extending a new 250mm dia. sanitary sewer from the existing 250mm dia. sanitary sewer in Legget Drive. From Legget Drive, a new 250mm dia. sanitary sewer will be routed through the KRP lands to connect to the existing 250mm dia. sanitary sewer adjacent to the Brookstreet Hotel, which in turn outlets to the 750mm dia. March Trunk Sewer on the Marshes Golf Course lands. A Sanitary Sewer Design Sheet has been provided in Appendix B for the sanitary sewer system from Legget Drive to the March Trunk Sewer. The following list of sewers identifies the sanitary sewer reaches for which a new MOE ECA is required. Refer to the enclosed Sanitary Drainage Area Plan (114060-SAN, C200) for details.
• From EX. SAN MH B to New SAN MH 3 • From New SAN MH 3 to New SAN MH 2 • From New SAN MH 2 to New SAN MH 1 • From New SAN MH 1 to EX. SAN MH D • From EX. SAN MH D to EX. SAN MH E • From EX. SAN MH E to EX. SAN MH F • From EX. SAN MH F to EX. SAN MH G • From EX. SAN MH G to EX. SAN MH H • From EX. SAN MH H to EX. SAN MH I • From EX. SAN MH I to EX. 750mm Trunk
2.1 Sanitary Design Flows The City of Ottawa design criteria were used to calculate the theoretical sanitary flows for the existing various developments (existing, proposed and future) tributary to the trunk sewer on the KRP lands. Sanitary flows shown in the Sanitary Sewer Design Sheet were determined as described in the following sections of the report.
2.1.1 Office Towers The City of Ottawa design criteria were used to calculate the theoretical sanitary flows for the existing office towers. In order to determine the design population a net floor area was taken using 9.3m2/person. Future flows from the Newbridge Parking Lot area and adjacent vacant lands have been estimated and pro-rated based on an average area of the adjacent developments (KRP Tower ‘C’ and Tower ‘D’).
The following design criteria were taken from Section 4 – ‘Sanitary Sewer Systems’ and Appendix 4-A - ‘Daily Sewage Flow For Various Types of Establishments’ of the City of Ottawa Sewer Design Guidelines:
• Average Daily Sewage Flow (Office): 75 L/person/day • Design Population (Office): 9.3m2/person • Peaking Factor (Office) = 1.5
Sanitary flows for the proposed development were taken directly from the Development Servicing Study and Stormwater Management Report3. Based on the intended use of the proposed development, a peaking factor of 1.5 was used in the calculations. A larger peaking factor (derived from the chart in Appendix 4-B of the City of Ottawa Sewer Design Guidelines) is not warranted as the sanitary flows are being generated by the employee use rather than by an
Novatech Page 2
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
‘industrial manufacturing/processing’ use. A peaking factor of 1.5 is consistent with the previous design of the KRP sanitary trunk sewer system.
Table 2.1 identifies the theoretical sanitary flows from the Office Towers based on a design population, using the above design criteria. Table 2.1 Theoretical Sanitary Office Tower Flows based on the Design Population
Site Floor Area (m2)
Design Population (Employees)
Average Flow (L/s)
Peaking Factor
Peak Flow (L/s)
Existing Tower ‘C’ 10,298 1,107 0.96 1.5 1.44
Existing Tower ‘D’ 10,298 1,107 0.96 1.5 1.44
Newbridge Parking Lot 18,125 1,949 1.69 1.5 2.54
528 March Road - 380 0.33 1.5 0.50
2.1.2 Brookstreet Hotel The City of Ottawa design criteria were used to calculate the theoretical sanitary flows for the existing Brookstreet Hotel. The following design criteria were taken from Section 4 – ‘Sanitary Sewer Systems’ and Appendix 4-A - ‘Daily Sewage Flow For Various Types of Establishments’ of the City of Ottawa Sewer Design Guidelines:
Residential Hotel
• Average Daily Sewage Flow: 225 L/person/day • Design Population: 263 rooms, 2 people/room • Peaking Factor: 4.0
Hotel Staff
• Average Daily Sewage Flow: 75 L/person/day • Design Population: 50 employees • Peaking Factor: 1.5
Restaurant
• Average Daily Sewage Flow: 125 L/person/day • Design Population: 300 seating capacity • Peaking Factor: 2.0
Recreation Centre
• Average Daily Sewage Flow: 20 L/person/day • Design Population: 300 people • Peaking Factor: 2.0
Auditorium
• Average Daily Sewage Flow: 20 L/person/day • Design Population: 600 people • Peaking Factor: 2.0
Novatech Page 3
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
Commercial
• Average Daily Sewage Flow: 5 L/m2/day • Design Population: 800m2, 9.3m2/person • Peaking Factor: 1.5
Office
• Average Daily Sewage Flow: 75 L/person/day • Design Population: 1,700m2, 9.3m2/person • Peaking Factor: 1.5 Table 2.2 identifies the theoretical sanitary flows from the Brookstreet Hotel based on a design population, using the above design criteria. Table 2.2 Theoretical Sanitary Brookstreet Hotel Flows based on the Design Population
Site Component Units Persons per
Unit Design
Population Flow per Person
(L/c/day)
Average Flow (L/s)
Peaking Factor
Peak Flow (L/s)
Hotel 263 rooms 2 526 225 1.37 4.0 5.48
Hotel Employees - - 50 75 0.04 1.5 0.06
Restaurant 300 seats 1 300 125 0.43 2.0 0.86
Recreation Centre - - 300 20 0.07 2.0 0.14
Auditorium 600 seats 1 600 20 0.14 2.0 0.28
Sub-Total = 6.82
Site Component
Floor Area (m2)
Floor Area per Person
Design Population
Flow per Person
(L/c/day)
Average Flow (L/s)
Peaking Factor
Peak Flow (L/s)
Commercial 800m2 9.3m2/person 86 5 0.001 1.5 0.01
Office 1,700 m2 9.3m2/person 183 75 0.16 1.5 0.24
Total Flow = 7.07
3.0 STORM DRAINAGE AND STORMWATER MANAGEMENT The proposed development (528 March Road) will be serviced by extending a new on-site storm sewer system to the existing storm sewer in Legget Drive. From Legget Drive, the new storm sewer will be routed through the KRP lands to connect to the existing 900mm dia. storm sewer adjacent to the Brookstreet Hotel. The storm sewer outlets to the existing stormwater management facility (SWMF) No. 1 located on the KRP lands. This SWM pond was designed to accommodate flow from the drainage areas shown on the Storm Drainage Area Plan (98066-
Novatech Page 4
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
STM). An MOE Certificate of Approval (MOE C of A No. 8125-4MTJ36) was obtained for the SWMF. Refer to Appendix A for a copy of the MOE C of A.
Storm Sewer Design Sheets have been provided in Appendix C for the on-site storm sewer system and the trunk storm sewer system from Legget Drive to the existing Stormwater Management Facility No.1. The following list of sewers identifies the storm sewer reaches for which a new MOE ECA is required. Refer to the enclosed Storm Drainage Area Plan (114060-STM, C201) for details.
• From New STM MH 4 to New STM MH 3 • From New STM MH 3 to New STM MH 2 • From New STM MH 2 to New STM MH 1 • From New STM MH 1 to New STM MH 1A • From New STM MH 1A to EX. STM MH 2 • From EX. STM MH 2 to EX. STM MH 3 • From EX. STM MH 3 to EX. STM MH D • From EX. STM MH D to EX. STM MH 6 • From EX. STM MH 6 to EX. STM MH 4 • From EX. STM MH 4 to EX. SWMF No. 1
3.1 Storm Design Flows Storm flows shown in the Storm Sewer Design Sheet were determined as described in the following section of the report. The properties on the west side of Legget Drive, including the subject site (528 March Road), require on-site detention as the developed sites exceed the allowable runoff coefficient of 0.75.
3.1.1 Newbridge Parking Lot Stormwater runoff from the paved parking lot is currently being controlled by an inlet control device (ICD) installed in the outlet pipe of CBMH 4 to a maximum release rate of 152 L/s prior to being directed into the existing storm sewer in Legget Drive. Refer to Appendix D for details regarding this previously constructed site.
3.1.2 Vacant Land (Future Parking south of Newbridge Parking Lot) Should the vacant land between the Newbridge Parking and the subject site (528 March Road) be developed in the future, flows will have to be controlled to a maximum release rate of 83.1 L/s prior to being discharged into the storm sewer in Legget Drive. Refer to Appendix E for detailed calculations.
3.1.3 Sites on the East side of Legget Drive The tributary flows from areas on the east side of Legget Drive were designed with actual runoff coefficients and did not require on-site detention. Data for these areas is provided in the enclosed Storm Sewer Design Sheets. Refer to Appendix C for details.
3.1.4 528 March Road Stormwater runoff from the subject site will be controlled by the use of multiple inlet control devices (ICD) and control flow roof drains. Site flows will be controlled to a maximum release rate of 167.7 L/s prior to being directed into the existing storm sewer in Legget Drive via a 600mm dia. storm sewer. The remainder of the flows from the subject site are not being
Novatech Page 5
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
APPENDIX A CURRENT MOE C OF A'S FOR LEGGET DRIVE SEWERS AND
KRP SWM FACILITIES
Novatech
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
APPENDIX B SANITARY SEWER DESIGN SHEET
Novatech
93063/ENTRUST/DESIGN114060-Sanitary-Trunk.xls.XLS SANITARY TRUNK
SANITARY TRUNK SEWERPROJECT : 114060 Sanitary Sewer Design SheetDESIGNED BY: SM/FST
CHECKED BY: FSTDATE: 08-Aug-14
LOCATION PROPOSED SEWER
AREA FROM MH TO MH FLOW RATE (L/s)
Infiltration Area (ha)
FLOW RATE (L/s)
Infiltration Area (ha)
PEAK FACTOR M
PEAK FLOW Q (p) (L/s)
PEAK EXTRAN.FLOW
Q(i) (L/s)
PEAK DESIGN FLOW Q (d) (L/s)
LENGTH (m)
PIPE SIZE (mm)
TYPE OF PIPE GRADE % CAPACITY
(L/s)
FULL FLOW VELOCITY
(m/s)528 March Road Site SAN MH 4 EX. SAN MH A 0.33 2.20 0.33 2.20 1.5 0.50 0.62 1.11 24.9 250 PVC 0.50 43.87 0.87
Legget Drive EX. SAN MH A EX. SAN MH B 0.00 0.00 0.33 2.20 1.5 0.50 0.62 1.11 55.1 250 PVC 0.33 35.64 0.70
Legget Drive (Newbridge) EX. SAN MH EX. SAN MH C 1.69 4.05 1.69 4.05 1.5 2.54 1.13 3.67 60.3 250 PVC 0.31 34.54 0.68Legget Drive EX. SAN MH C EX. SAN MH B 0.00 0.00 1.69 4.05 1.5 2.54 1.13 3.67 68.0 250 PVC 0.29 33.41 0.66
** Legget Drive EX. SAN MH B SAN MH 3 0.00 0.00 2.02 6.25 1.5 3.03 1.75 4.78 26.7 250 PVC 0.25 31.02 0.61
* KRP Site SAN MH 3 SAN MH 2 0.00 0.00 2.02 6.25 1.5 3.03 1.75 4.78 50.4 250 PVC 0.50 43.87 0.87* KRP Site SAN MH 2 SAN MH 1 0.00 0.00 2.02 6.25 1.5 3.03 1.75 4.78 44.0 250 PVC 0.50 43.87 0.87* KRP Site SAN MH 1 EX. SAN MH D 0.00 0.00 2.02 6.25 1.5 3.03 1.75 4.78 9.1 250 PVC 1.00 62.04 1.22
KRP Site (Tower C) TOWER C EX. SAN MH D 0.96 1.23 0.96 1.23 1.5 1.44 0.34 1.79 114.3 250 PVC 0.40 39.24 0.77
* KRP Site EX. SAN MH D EX. SAN MH E 0.00 0.00 2.98 7.48 1.5 4.47 2.09 6.57 9.5 250 PVC 1.00 62.04 1.22* KRP Site EX. SAN MH E EX. SAN MH F 0.00 0.00 2.98 7.48 1.5 4.47 2.09 6.57 48.1 250 PVC 0.67 50.78 1.00
KRP Site (Tower D) TOWER D EX. SAN MH F 0.96 3.37 0.96 3.37 1.5 1.44 0.94 2.39 34.0 200 PVC 1.30 39.01 1.20
* KRP Site EX. SAN MH F EX. SAN MH G 0.00 0.00 3.94 10.85 1.5 5.92 3.04 8.95 61.9 250 PVC 0.35 36.70 0.72
† KRP Site (Brookstreet Hotel) HOTEL EX. SAN MH G 2.21 4.49 2.21 4.49 1.5 - 4.0 7.07 1.26 8.33 22.0 200 PVC 0.90 32.46 1.00
* KRP Site EX. SAN MH G EX. SAN MH H 0.00 0.00 6.15 15.34 1.5 9.23 4.30 13.53 21.0 250 PVC 0.38 38.24 0.75
KRP Site (Parking Structure) PRKG STRUCT EX. SAN MH H 0.00 1.28 0.00 1.28 1.5 0.00 0.36 0.36 91.1 250 PVC 0.40 39.24 0.77
* KRP Site EX. SAN MH H EX. SAN MH I 0.00 0.00 6.15 16.62 1.5 9.23 4.65 13.88 88.9 250 PVC 0.38 38.24 0.75
* KRP Site EX. SAN MH I EX. 750 TRUNK 0.00 0.00 6.15 16.62 1.5 9.23 4.65 13.88 100.1 250 PVC 0.52 44.74 0.88
Notes:1. Q(d) = Q(p) + Q(i) , where Q(d) = Design Flow (L/sec) Q(p) = Population Flow (L/sec)
Q(i) = Extraneous Flow (L/sec)2. Q(i) = 0.28 L/sec/ha3. Daily Sewage Flow from Office Towers = 75 L/person/day (Appendix 4-A, Ottawa Sewer Design Guidelines)4. Commercial Peaking Factor = 1.5 (Figure 4.3 Ottawa Sewer Design Guidelines)5. Refer to Sanitary Drainage Area Plan (114060-SAN, C200) for details of drainage areas6. Refer to the 'Sanitary and Storm Sewer Design Brief' for a breakdown of Daily Sewage Flow components and applicable peaking factors from the Brookstreet Hotel
* Denotes sewers applicable to this MOE ECA appplication. All other sewers shown on this design sheet are private sewers tributary to the sanitary trunk sewer under application for MOE approval and/or have MOE approval under an existing C of A.** An existing C of A covers the sanitary stub from SAN MH B north approx. 16.1m to the existing cap. The 10.7m of proposed sewer from the cap to SAN MH 3 is applicable to the new MOE ECA application.† Total peak sanitary flow from hotel site = 8.33 L/s, including Extraneous Flows (Also refer to Note 6 above for further details)
INDIVIDUAL CUMULATIVE PEAK FLOWS
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
APPENDIX C STORM SEWER DESIGN SHEETS
Novatech
M:\2007\107044\DATA\ Calculations\114060-Storm-Trunk.xls\5yr TRUNK Page 1 of 1
PROJECT : 114060 1:5 Year Storm Sewer Design SheetDESIGNED BY: SM/FSTCHECKED BY: FSTDATE: Aug. 8, 2014
C= C = C = C = C = C = C = C = TYPE OF
PIPE SIZE PIPE ID GRADE LENGTH TIME OF
FLOWPERCENTAGE OF CAPACITY
0.20 0.30 0.45 0.55 0.75 0.83 0.85 0.90 PIPE (mm) (mm) (%) (m) (min)
Proposed 528 March Road CBMH 1 EX STM MH * Runoff from Area A-1 to A-4 and R-1 to R-6 to be controlled to 167.7 L/s Controlled Flow 167.7 167.7 CONC 600 609.6 0.25 18.3 320.3 1.10 0.28 52%Legget Drive** EX STM MH STM MH 4 167.7 167.7
Newbridge Prkg** EX. CBMH 4 EX. L1 13.11 Controlled Flow 152.0 152.0 CONC 525 533.4 0.18 44.0 190.3 0.85 0.86 80%Legget Drive** EX. L1 EX. L2 0.350 0.54 0.54 13.97 87.04 198.6 CONC 525 533.4 0.20 65.6 200.6 0.90 1.22 99%Legget Drive** EX. L2 STM MH 4 0.210 0.32 0.86 15.19 82.95 223.0 CONC 675 685.8 0.17 72.4 361.6 0.98 1.23 62%
16.42
Newbridge Open Space** Future STM MH 4 0.690 1.44 1.44 10.00 104.19 149.9* Runoff from Newbridge Open Space to be controlled to 83.1 L/s 83.1 83.1
* KRP Site STM MH 4 STM MH 3 0.86 0.86KRP Site 0.86 16.42 79.23 67.8
Controlled Flow 167.7KRP Site Controlled Flow 152.0
* KRP Site Controlled Flow 83.1 470.6 CONC 825 838.2 0.50 30.0 1058.9 1.92 0.26 44%* STM MH 3 STM MH 2 16.68 78.49 470.6 CONC 825 838.2 0.50 50.1 1058.9 1.92 0.44 44%* STM MH 2 STM MH 1 17.12 470.6 CONC 825 838.2 0.50 46.8 1058.9 1.92 0.41 44%* STM MH 1 New MH 1A 17.52 470.6 CONC 825 838.2 1.00 12.8 1497.5 2.71 0.08 31%
17.60
* KRP Site New MH 1A EX. MH 2 0.320 0.580 0.270 0.140 2.99 3.85 17.60 76.00 292.6KRP Site (Tower C Prkg)** Controlled Flow 167.7
Controlled Flow 152.0* Controlled Flow 83.1 695.4 CONC 900 914.4 0.27 15.3 981.3 1.49 0.17 71%
17.77
* KRP Site (Tower D Prkg)*** EX. MH 2 EX. MH 3 0.840 1.75 5.60 17.77 75.55 423.2Controlled Flow 167.7Controlled Flow 152.0
* Controlled Flow 83.1 826.0 CONC 900 914.4 0.20 37.5 844.6 1.29 0.49 98%18.26
* KRP Site (Tower D)*** EX. MH 3 EX. MH D 0.720 0.140 2.05 7.65 18.26 74.32 568.8KRP Site (Hotel) Controlled Flow 167.7
Controlled Flow 152.0* Controlled Flow 83.1 971.6 CONC 900 914.4 0.48 64.8 1308.4 1.99 0.54 74%
18.80
* KRP Site EX. MH D EX. MH 6 2.840 5.92 13.57 18.80 73.00 990.9KRP Site (Tower D Prkg)*** Controlled Flow 167.7
Controlled Flow 152.0* Controlled Flow 83.1 1393.7 CONC 975 990.6 1.20 22.5 2561.1 3.32 0.11 54%
18.91
* KRP Site EX. MH 6 EX. MH 4 18.91 1393.7 CONC 1050 1066.8 0.24 46.8 1395.6 1.56 0.50 100%* KRP Site EX. MH 4 POND 19.41 1393.7 CONC 1050 1066.8 0.44 42.9 1889.7 2.11 0.34 74%
19.75
NOTES:1) All flows are assumed to operate under non-restricted flow conditions, unless otherwise indicated. 2) Refer to Novatech DSS & SWM Report (R-2014-064) for details* 3) Refer to Novatech Engineering Dwg. No. 114060-GP for storm manhole number designation.
* Denotes sewers applicable to this C of A appplication. All other sewers shown on this design sheet are private sewers tributary to the storm trunk sewers under application for MOE approval and/or have MOE approval under an existing C of A.
FULL FLOWVELOCITY
(m/s)
INDIV2.78 AC CAPACITY
(L/s)
TIME OF CONC.(min)
ACCUM2.78 AC
CONTROLLED FLOW
Q(L/s)
STORM TRUNK SEWER
PROPOSED SEWERAREA (ha) RAINFALLINTENSITY
(mm/hr)
PEAK FLOW
Q(L/s)
FROM MH TO MHAREA
M:\2007\107044\DATA\ Calculations\114060-Storm-Site.xls\5yr SITE Page 1 of 1
PROJECT : 107044
DESIGNED BY: SM/FSTCHECKED BY: FSTDATE: 08-Aug-14
C= C = TYPE OF
PIPE SIZE PIPE ID GRADE LENGTH TIME OF
FLOWPERCENTAGE OF CAPACITY
0.20 0.90 PIPE (mm) (mm) (%) (m) (min)
A-4 Uncontrolled CBMH 5 CBMH 4 0.020 0.160 0.41 0.41 10.00 104.19 42.9 PVC 300 304.8 0.35 52.2 59.7 0.82 1.06A-4 Uncontrolled CBMH 4 CBMH 3 0.010 0.200 0.51 0.92 11.06 98.89 90.7 PVC 300 304.8 0.35 56.4 59.7 0.82 1.15A-4 Uncontrolled CBMH 3 CBMH 2 0.010 0.180 0.46 1.37 12.21 93.80 128.8 PVC 375 381.0 0.30 44.2 100.2 0.88 0.84
Controlled From A-4 A-4 controlled to 79.4 L/s by plug type orifice in CBMH 3 outlet. 79.4 79.4 PVC 375 381.0 0.30 44.2 100.2 0.88 0.84 79%
A-2 Uncontrolled CBMH 2 STM MH 7 0.010 0.030 0.08 0.08 13.05 90.43 7.3Controlled Flow (A-4) 79.4 86.7 PVC 375 381.0 0.35 42.8 108.2 0.95 0.75 80%
R-6 Uncontrolled ROOF STM MH 7 0.850 2.13 2.13 10.00 104.19 221.6Controlled From R-1 to R-6 R-1 to R-6 controlled to 17.4 L/s by 23 Roof Drains. 17.4 17.4 PVC 200 204.0 1.00 14.9 34.6 1.06 0.23 50%
A-1 Uncontrolled STM MH 7 CBMH 1 0.08 13.80 87.64 7.1Controlled Flow (A-4) 79.4 86.5
Controlled Flow (R-1 to R-6) 17.4 103.9 PVC 450 457.0 0.35 23.0 175.8 1.07 0.36 59%
A-3 Uncontrolled Trench Drain STM MH 6 0.140 0.120 0.38 0.38 10.00 104.19 39.4 PVC 300 305.0 0.35 26.9 59.8 0.82 0.55A-3 Uncontrolled STM MH 6 CBMH 1 0.38 10.55 101.39 38.3 PVC 300 305.0 0.35 15.2 59.8 0.82 0.31
Controlled From A-3 A-3 controlled to 29.4 L/s by plug type orifice in STM MH 6 outlet. 29.4 29.4 PVC 300 305.0 0.35 15.2 59.8 0.82 0.31 49%
A-1 Uncontrolled CBMH 1 EX STM MH 0.040 0.090 0.25 0.33 14.16 86.37 28.3Controlled Flow (A-4) 79.4 107.7
Controlled Flow (R-1 to R-6) 17.4 125.1Controlled Flow (A-3) 29.4 154.5 PVC 600 610.0 0.25 33.1 320.8 1.10 0.50 48%
NOTES:1) Refer to Novatech DSS & SWM Report (R-2014-64) for details* 2) Refer to Novatech Engineering Dwg. No.114060-GP for storm manhole number designation.
528 MARCH ROAD
PROPOSED SEWERAREA (ha) RAINFALLINTENSITY
(mm/hr)
PEAK FLOW
Q(L/s)
FROM MH TO MHAREA
1:5 Year Storm Sewer Design Sheet
FULL FLOWVELOCITY
(m/s)
INDIV2.78 AC CAPACITY
(L/s)
TIME OF CONC.(min)
ACCUM2.78 AC
CONTROLLED FLOW*
Q(L/s)
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
APPENDIX D NEWBRIDGE PARKING LOT (CONTROLLED FLOW)
Novatech
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
RATIONAL METHOD The Rational Method was used to determine the allowable runoff. The equation is as follows: Q=2.78 CIA Where: Q is the runoff in L/s C is the weighted runoff coefficient* I is the rainfall intensity in mm/hr** A is the area in hectares *The weighted runoff coefficient is determined for each of the catchment areas as follows: C = (Aperv x Cperv) + (Aimp x Cimp) Atot Where: Aperv is the pervious area in hectares Cperv is the pervious area runoff coefficient (Cperv=0.20) Aimp is the impervious area in hectares Cimp is the impervious area runoff coefficient (Cimp=0.90) Atot is the catchment area (Aperv + Aimp) in hectares ** In order to maintain consistency with previously approved SWM reports, the rainfall intensities used in the allowable release rate calculations were taken from the old City of Kanata IDF curves; similar to those on the previous Storm Sewer Design Sheets, using a tc=23.97 minutes and an intensity of 61.28 mm/hr (refer to KRP Tower ‘C’ Project Storm Sewer Design Sheet in this Appendix for details). As specified by the City of Ottawa, the rainfall intensities used for the post-development flow calculations are taken from the latest City of Ottawa IDF Curves. A time of concentration (tc) of 10 minutes was used for the post-development conditions, resulting in rainfall intensities of 104.2 mm/hr for the 1:5 year event and 178.6 mm/hr for the 1:100 year event. Refer to Appendix F for the IDF Curves. ALLOWABLE RELEASE RATE Drainage Area (A) = 0.81+ 0.82 +0.61 + 0.63 ha = 2.87ha Runoff Coefficient (C) = 0.75 Intensity (I5) = 61.28 mm/hr Q5= 2.78 CIA Q5= 2.78 x 0.75 x 61.28 x 2.87 Q5= 366.7 L/s Total flow from previous design sheet ...... 399.5 L/s Less site flow ........................................... -366.7 L/s Equals roadway flow (MH L1 to MH L2) ...... 32.8 L/s
Novatech
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
Pipe Capacity • Design = 200.6 L/s (525 Ø @ 0.20%) • As Built = 190.3 L/s (525 Ø @ 0.18%) see Storm Sewer Design Sheet (Appendix C)
Therefore: Pipe Capacity ................................. 190.3 L/s Less Road Flow ............................. -32.8 L/s Allowable Flow from Site ................ 157.5 L/s
Flow from Newbridge Parking Lot is 152 L/s as per attached handwritten calculations (shown on Storm Sewer Design Sheet in Appendix C)
Novatech
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
APPENDIX E VACANT LAND (FUTURE CONTROLLED FLOW)
Novatech
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
RATIONAL METHOD The Rational Method was used to determine the allowable runoff. The equation is as follows: Q=2.78 CIA Where: Q is the runoff in L/s C is the weighted runoff coefficient* I is the rainfall intensity in mm/hr** A is the area in hectares *The weighted runoff coefficient is determined for each of the catchment areas as follows: C = (Aperv x Cperv) + (Aimp x Cimp) Atot Where: Aperv is the pervious area in hectares Cperv is the pervious area runoff coefficient (Cperv=0.20) Aimp is the impervious area in hectares Cimp is the impervious area runoff coefficient (Cimp=0.90) Atot is the catchment area (Aperv + Aimp) in hectares ** In order to maintain consistency with previously approved SWM reports, the rainfall intensities used in the allowable release rate calculations were taken from the old City of Kanata IDF curves; similar to those on the previous Storm Sewer Design Sheets, using a tc=26.38 minutes and an intensity of 57.73 mm/hr (refer to KRP Tower ‘C’ Project Storm Sewer Design Sheet in this Appendix for details). As specified by the City of Ottawa, the rainfall intensities used for the post-development flow calculations are taken from the latest City of Ottawa IDF Curves. A time of concentration (tc) of 10 minutes was used for the post-development conditions, resulting in rainfall intensities of 104.2 mm/hr for the 1:5 year event and 178.6 mm/hr for the 1:100 year event. Refer to Appendix F for the IDF Curves. ALLOWABLE RELEASE RATE Drainage Area (A) = 0.69 ha Runoff Coefficient (C) = 0.75 Intensity (I5) = 57.73 mm/hr Q5= 2.78 CIA Q5= 2.78 x 0.75 x 57.73 x 0.69 Q5= 83.1 L/s When this area develops in the future, the allowable release rate should not exceed 83.1 L/s.
Novatech
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
APPENDIX F OLD CITY OF KANATA AND NEW CITY OF OTTAWA IDF CURVES
Novatech
Sanitary and Storm Trunk Sewer Design Brief KRP Lands
APPENDIX G ENGINEERING DRAWINGS
Novatech
FIRE ROUTE
FIRE ROUTE
FIRE
RO
UTE
PROPOSED2-STOREY BUILDING
FFE=80.00
PR
OP
OS
ED
R.O
.W. W
IDE
NIN
G LIM
IT
250mm
-SA
NITA
RY
SE
WE
R
250mm
-SA
NITA
RY
SE
WE
R
250mm-SANITARY SEWER
250mm-SANITARY SEWER
250mm
-SA
NITA
RY
SE
WE
R200m
m-S
AN
SE
WE
R
200mm
-SA
N S
EW
ER
200mm
-SAN
250mm
-SANITAR
Y SEWER
250mm
-SA
NITA
RY
SE
WE
R250m
m-S
AN
ITAR
Y S
EW
ER
250mm-SANITARY SEWER
250mm-SANITARY SEWER
750mm
-SA
NITA
RY
SE
WE
R750m
m-S
AN
ITAR
Y S
EW
ER
SA
N M
H 2
INV
=76.04
LEG
GE
T DR
IVE
MA
RC
H R
OA
D
BLA
CK
WO
OD
BR
OO
KS
TRE
ET
250m
m -
SAN
SEW
ER
200mmSAN
SERVICE
ISSUE DATE :
SCALE : VERIFIED BY :
DRAWN BY :
NECL FILE : DRAWING NO : REVISION :
TITLE :
SEAL : NOTE :
ARCHITECT :
STRUCTURAL ENGINEER :
MECHANICAL, ELECTRICAL ENGINEER :
CLIENT :
No DATE ÉMISSION POUR / OBJECT
CopyrightThis drawing is subject to copyright. It is not to be reproduced for any purpose orby any means, and may only be used if it bears an original stamp and signature.
Droit d'AuteurCe dessin est sujet au droit d'auteur. Il ne peut être reproduit pour quelquesintentions ou usages que ce soit, il ne peut être utilisé uniquement avec
l'apposition de la signature et de l'estampe originale.
T.613.695.6122F.514.861.5383
190 Somerset St. WSuite 206
Ottawa . OntarioK2P 0J4
Architects
www.rubinrotman.com
Contractorshall verify allinformation anddimensions onsite andimmediatelyreport anyerrors oromissions tothe architect.
L'entrepreneurdoit vérifiertoutes lesinformations etdimension surle site etaviserimmédiatementl'architecte detoutes erreursou omissions.
2014
528 March Rd.Kanata, Ontario
Sanmina
Date
de tr
acag
e/plo
t date
:20
14/08
/11M:
\2014
\1140
60\C
AD\D
ESIG
N\11
4060
-SAN
.DW
G
114060-SAN
PROJECT NAME :
CLÉ / KEY :
1 ISSUED WITH DSS & SWM REPORT2014.05.28
2C200FST
SM
AREA PLANSANITARY DRAINAGE
2014.08.08
1 : 750
architects
CIVIL ENGINEER :
MECHANICAL, ELECTRICAL ENGINEER :
Suite 200, 240 Michael Cowpland Drive
Ottawa, Ontario, Canada K2M 1P6
Telephone (613) 254-9643
Facsimile (613) 254-5867
Website www.novatech-eng.com
NOTE:THE POSITION OF ALL POLE LINES, CONDUITS, WATERMAINS,SEWERS AND OTHER UNDERGROUND AND OVERGROUND UTILITIESAND STRUCTURES IS NOT NECESSARILY SHOWN ON THE CONTRACTDRAWINGS, AND WHERE SHOWN, THE ACCURACY OF THE POSITIONOF SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED.BEFORE STARTING WORK, DETERMINE THE EXACT LOCATION OFALL SUCH UTILITIES AND STRUCTURES AND ASSUME ALL LIABILITYFOR DAMAGE TO THEM.
SANITARY DRAINAGE AREA BOUNDARY
LEGEND
PEAKING FACTOR
PEAK FLOW RATE (L/s), incl. Extraneous Flows
DIRECTION OF FLOW
AREA IDENTIFIER
AREA IN HECTARES
SANITARY TRUNK SEWER AND MH
*Refer to Sanitary and Storm Sewer Design Brief for detailed calculations of flow rates for each development
TRIBUTARY SANITARY SEWER AND MH
2 2014.08.08
PROPOSED2-STOREY BUILDING
FFE=80.00
PR
OP
OS
ED
R.O
.W. W
IDE
NIN
G LIM
IT
STM
MH
3IN
V=76.80
CB
MH
2IN
V=77.85
1050mm-STORM SEWER
1050mm
-STO
RM
SE
WE
R
450mm
-STOR
M SEW
ER
300mm-STORM SEWER250mm-STORM SEWER
825mm-STORM SEWER
825mm
-STO
RM
SE
WE
R
675mm
-STO
RM
SE
WE
R525m
m-S
TOR
M S
EW
ER
600mm
-STM
450mm
-STM
SE
WE
R
300mm-STORM
600mm
-STOR
M SEW
ER600m
m-STO
RM SEW
ER
900mm-STORM SEWER 900mm-STORM SEWER
200mm
-STO
RM
SE
WE
R
STM
MH
4IN
V=77.00
975mm-STM
375mm
-STOR
M SEW
ER
200mm
-STM
300mm-STM300mm-STM
825mm - STM
300m
m-STM
200mm-STM
525mm-STM SEWER
525mm
-STM
SE
WE
R
450mm-STM SEWER
525mm-STM SEWER
EX
. CB
MH
2
LEG
GE
T DR
IVE
SHIRLEY'S BROOK
MA
RC
H R
OA
D
BLA
CK
WO
OD
BR
OO
KS
TRE
ET
EX. SWM
FACILITY
200mm
-STM
SHIRLEY'S BROOK
300mm-STM
450mm
-STM
600m
m-S
TM
300mm
ALCATEL-LUCENT
ISSUE DATE :
SCALE : VERIFIED BY :
DRAWN BY :
NECL FILE : DRAWING NO : REVISION :
TITLE :
SEAL : NOTE :
ARCHITECT :
STRUCTURAL ENGINEER :
MECHANICAL, ELECTRICAL ENGINEER :
CLIENT :
No DATE ÉMISSION POUR / OBJECT
CopyrightThis drawing is subject to copyright. It is not to be reproduced for any purpose orby any means, and may only be used if it bears an original stamp and signature.
Droit d'AuteurCe dessin est sujet au droit d'auteur. Il ne peut être reproduit pour quelquesintentions ou usages que ce soit, il ne peut être utilisé uniquement avec
l'apposition de la signature et de l'estampe originale.
T.613.695.6122F.514.861.5383
190 Somerset St. WSuite 206
Ottawa . OntarioK2P 0J4
Architects
www.rubinrotman.com
Contractorshall verify allinformation anddimensions onsite andimmediatelyreport anyerrors oromissions tothe architect.
L'entrepreneurdoit vérifiertoutes lesinformations etdimension surle site etaviserimmédiatementl'architecte detoutes erreursou omissions.
2014
528 March Rd.Kanata, Ontario
Sanmina
Date
de tr
acag
e/plo
t date
:20
14/08
/11M:
\2014
\1140
60\C
AD\D
ESIG
N\11
4060
-STM
.DW
G
114060-STM
PROJECT NAME :
CLÉ / KEY :
1 ISSUED WITH DSS & SWM REPORT2014.05.28
2C201FST
SM
AREA PLANSTORM DRAINAGE
2014.08.08
1 : 750
architects
CIVIL ENGINEER :
MECHANICAL, ELECTRICAL ENGINEER :
Suite 200, 240 Michael Cowpland Drive
Ottawa, Ontario, Canada K2M 1P6
Telephone (613) 254-9643
Facsimile (613) 254-5867
Website www.novatech-eng.com
NOTE:THE POSITION OF ALL POLE LINES, CONDUITS, WATERMAINS,SEWERS AND OTHER UNDERGROUND AND OVERGROUND UTILITIESAND STRUCTURES IS NOT NECESSARILY SHOWN ON THE CONTRACTDRAWINGS, AND WHERE SHOWN, THE ACCURACY OF THE POSITIONOF SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED.BEFORE STARTING WORK, DETERMINE THE EXACT LOCATION OFALL SUCH UTILITIES AND STRUCTURES AND ASSUME ALL LIABILITYFOR DAMAGE TO THEM.
STORM DRAINAGE AREA
DIRECTION OF FLOW
LEGEND:
ALLOWABLE RUN-OFF COEFFICIENT
AREA IDENTIFIER
DRAINAGE AREA (hectares)
CATCHBASIN MANHOLE
STORM TRUNK SEWER AND MH
CATCHBASIN
STM MH 1
CB 2
CBMH 3
TRIBUTARY STORM SEWER AND MHSTM MH 5
2 2014.08.08
MAJOR SYSTEM OVERLAND FLOW ROUTE
FIRE ROUTE
LEG
GE
T D
RIV
E
BROOKSTREET HOTEL
TOWER 'D'
SWM FACILITY No.1
SHIRLEY'S BROOK
THE MARSHES GOLF COURSE
1+000 1+025
1+100
1+12
5
1+150
1+2751+300
1+05
01+
075
1+175 1+200 1+225
1+250
1+3251+350
1+3751+400
1+4251+450
STM MH 3T/G=79.481800mmØINV W=76.80INV S=76.85
STM MH 4T/G=79.501800mmØ
INV N=77.00INV W=77.29±INV SE=77.22
33.1m 610mmØ STM
STM MH 1T/G=78.751800mmØINV W=75.85INV S=76.27
30.0m 825Ø STM CONC.65D @ 0.5%
12.8m 825Ø STMCONC. 65D @ 1.0%
SAN MH 3T/G=79.50INV W=76.29INV S=76.35
9.1m 250Ø SANPVC DR35 @ 1.0%
10.7m 250Ø SANPVC DR35 @ 0.5%
SAN MH 1T/G=78.78
INV NW=75.27INV S=75.76
SAN MH 2T/G=79.22
INV N=76.04INV E=75.98
STM MH 2T/G=79.201800mmØINV N=76.50INV E=76.55
STM MH 1A
9.0m
PR
OPO
SED
SEW
ER E
ASEM
ENT
9.0m P
RO
PO
SE
DS
EW
ER
EA
SE
ME
NT
9.0m PR
OPO
SED
SEWER
EASEMEN
T
9.0m
PR
OP
OS
ED
SE
WE
R E
AS
EM
EN
T
6.0m PR
OPO
SED
SEWER
EASEMEN
T
6.0m PROPOSEDSEWER EASEMENT
9.0m PR
OPO
SED
SEWER
EASEMEN
T
9.0m PR
OPO
SED
SEWER
EASEMEN
T
0+05
00+
100
0+12
50+
150
0+17
50+
200
REMOVEEXISTING
CAP
R.O
.W. L
IMIT
R.O
.W. L
IMIT
9.0m PROPOSEDSEWER EASEMENT
18.3m 610Ø STM
CO
NC
50-
D @
0.2
5%MARCH RD
LEGGET DR
SITE
TR=76.60
TR=75.30 TR=75.32
TR=74.71
TR=73.83
TR=72.09
N 7
7.00
N 7
6.40
50.4m - 250mmØ PVC SAN @ 0.5%
825mmØ STM
825mmØ STM
900mmØ STM
1050mmØ STM
STM
MH
4
250mmØ SAN
S 7
6.85
W 7
6.80
STM
MH
3
TR=73.35
SA
N M
H 1
SA
N M
H 2
SA
N M
H 3
SA
N. C
AP
250mmØ SAN
250mmØ SAN
250mmØ SAN
250mmØ SAN
250mmØ SAN
250mmØ SAN
250mmØ SAN
STM
MH
2
825mmØ STM
STM
MH
1
STM
MH
1A
1050mmØ STM
975mmØ STM
900mmØ STM900mmØ STM
825mmØ STM
1:100 YEAR WATER LEVEL 75.11m
1:5 YEAR WATER LEVEL 74.76m
SWM FACILITY No.1
RE
FER
TO
DR
AW
ING
1040
60-P
2 (C
301)
FO
RC
ON
TIN
UA
TIO
N O
FS
AN
ITA
RY
10.7m - 250mmØ PVC SAN @ 0.5%
S 7
6.35
W 7
6.29
E 7
6.04
N 7
5.98
44.0m - 250mmØ PVC SAN @ 0.5%
S 7
5.76
NW
75.
27
SE
75.
18
9.1m - 250mmØ PVC SAN @ 1.0%
30.0m - 825mmØ CONC.65D STM @ 0.50%
50.1m - 825mmØ CONC.65D STM @ 0.50%
E 7
6.55
N 7
6.50
S 7
6.27
W 7
5.85
E 7
5.72
12.8m - 825mmØ CONC. 65D STM @ 1.0%
46.8m - 825mmØ CONC. 65D STM @ 0.50%
TP-98-6
TP-98-7
TR=76.80±TP-94017-P1
ISSUE DATE :
SCALE : VERIFIED BY :
DRAWN BY :
NECL FILE : DRAWING NO : REVISION :
TITLE :
SEAL : NOTE :
ARCHITECT :
STRUCTURAL ENGINEER :
MECHANICAL, ELECTRICAL ENGINEER :
CLIENT :
No DATE ÉMISSION POUR / OBJECT
CopyrightThis drawing is subject to copyright. It is not to be reproduced for any purpose orby any means, and may only be used if it bears an original stamp and signature.
Droit d'AuteurCe dessin est sujet au droit d'auteur. Il ne peut être reproduit pour quelquesintentions ou usages que ce soit, il ne peut être utilisé uniquement avec
l'apposition de la signature et de l'estampe originale.
T.613.695.6122F.514.861.5383
190 Somerset St. WSuite 206
Ottawa . OntarioK2P 0J4
Architects
www.rubinrotman.com
Contractorshall verify allinformation anddimensions onsite andimmediatelyreport anyerrors oromissions tothe architect.
L'entrepreneurdoit vérifiertoutes lesinformations etdimension surle site etaviserimmédiatementl'architecte detoutes erreursou omissions.
2014
528 March Rd.Kanata, Ontario
Sanmina
Date
de tr
acag
e/plo
t date
:20
14/08
/11M:
\2014
\1140
60\C
AD\D
ESIG
N\11
4060
-PR.
DWG
114060-PR (P1)
PROJECT NAME :
CLÉ / KEY :
1 ISSUED WITH SERVICING DESIGN BRIEF2014.08.08
1C300FST
SM
PLAN AND PROFILEOUTLET SEWER
2014.08.08
1 : 500
architects
CIVIL ENGINEER :
MECHANICAL, ELECTRICAL ENGINEER :
Suite 200, 240 Michael Cowpland Drive
Ottawa, Ontario, Canada K2M 1P6
Telephone (613) 254-9643
Facsimile (613) 254-5867
Website www.novatech-eng.com
KEY PLANN.T.S.
NOTE:THE POSITION OF ALL POLE LINES, CONDUITS, WATERMAINS,SEWERS AND OTHER UNDERGROUND AND OVERGROUND UTILITIESAND STRUCTURES IS NOT NECESSARILY SHOWN ON THE CONTRACTDRAWINGS, AND WHERE SHOWN, THE ACCURACY OF THE POSITIONOF SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED.BEFORE STARTING WORK, DETERMINE THE EXACT LOCATION OFALL SUCH UTILITIES AND STRUCTURES AND ASSUME ALL LIABILITYFOR DAMAGE TO THEM.
LEGENDPROPOSED SANITARY MH & SEWER
PROPOSED STORM MH & SEWER
MH 101
MH 201
PROPOSED SEWER EASEMENT LIMIT
LIMIT OF WORK AREATHROUGH KRPC PARKING LOT
SWM FACILITY No.1
SHIRLEY'S BROOK
THE MARSHES GOLF COURSE
1+350
1+3751+400
1+4251+450
9.0m PR
OPO
SED
SEWER
EASEMEN
T
N 7
7.00
STM
MH
4
610mmØ STMINV.SE=77.22
TR=76.80±TP-94017-P1
250mmØ SAN SE
SE
76.
64
750mmØ STM675mmØ STM 675mmØ STM
525mmØ STM
250mmØ SAN250mmØ SAN250mmØ SAN
TR=75.96±
TR=78.10±
TR=77.70±TR=77.50±
TR=73.54
1:100 YEAR WATER LEVEL 74.46m
1:5 YEAR WATER LEVEL 74.05m
250mmØ SAN
RE
FER
TO
DR
AW
ING
104
060-
P1
(C30
0)FO
R C
ON
TIN
UA
TIO
N O
F S
AN
ITA
RY
FIRE
RO
UTE
FIR
E R
OU
TE
LEGGET DRIVE
1+0001+025
1+100
1+125
1+0501+075
STM
MH
3T/G
=79.481800m
mØ
INV
W=76.80
INV
S=76.85
STM
MH
4T/G
=79.501800m
mØ
INV
N=77.00
INV W
=77.29±IN
V S
E=77.22
33.1m 610mmØ STM
PVC DR35 @ 0.25%
STM
MH
1T/G
=78.751800m
mØ
INV
W=75.85
INV
S=76.27
30.0m 825Ø
STM
CONC.
65D @
0.5%
12.8m 825Ø
STM
CO
NC
. 65D @
1.0%
SA
N M
H 3
T/G=79.50
INV
W=76.29
INV
S=76.35
9.1m 250Ø
SAN
PV
C D
R35 @
1.0%
10.7m 250Ø
SAN
PV
C D
R35 @
0.5%
SA
N M
H 1
T/G=78.78
INV
NW
=75.27IN
V S
=75.76
SA
N M
H 2
T/G=79.22
INV
N=76.04
INV
E=75.98
STM
MH
2T/G
=79.201800m
mØ
INV
N=76.50
INV
E=76.55
24.9m 250mmØ SAN
PVC DR35 @ 0.5%
9.0m PROPOSED
SEWER EASEMENT
9.0m PROPOSEDSEWER EASEMENT
0+0000+050 0+100
0+125 0+150 0+1750+200 0+2250+025
RE
MO
VE
EX
ISTIN
GC
AP
R.O.W. LIMIT
R.O.W. LIMIT
9.0m P
RO
PO
SE
DS
EW
ER
EA
SE
ME
NT
18.3m 610Ø STMCONC 50-D @ 0.25%
ISSUE DATE :
SCALE : VERIFIED BY :
DRAWN BY :
NECL FILE : DRAWING NO : REVISION :
TITLE :
SEAL : NOTE :
ARCHITECT :
STRUCTURAL ENGINEER :
MECHANICAL, ELECTRICAL ENGINEER :
CLIENT :
No DATE ÉMISSION POUR / OBJECT
CopyrightThis drawing is subject to copyright. It is not to be reproduced for any purpose orby any means, and may only be used if it bears an original stamp and signature.
Droit d'AuteurCe dessin est sujet au droit d'auteur. Il ne peut être reproduit pour quelquesintentions ou usages que ce soit, il ne peut être utilisé uniquement avec
l'apposition de la signature et de l'estampe originale.
T.613.695.6122F.514.861.5383
190 Somerset St. WSuite 206
Ottawa . OntarioK2P 0J4
Architects
www.rubinrotman.com
Contractorshall verify allinformation anddimensions onsite andimmediatelyreport anyerrors oromissions tothe architect.
L'entrepreneurdoit vérifiertoutes lesinformations etdimension surle site etaviserimmédiatementl'architecte detoutes erreursou omissions.
2014
528 March Rd.Kanata, Ontario
Sanmina
Date
de tr
acag
e/plo
t date
:20
14/08
/11M:
\2014
\1140
60\C
AD\D
ESIG
N\11
4060
-PR.
DWG
114060-PR (P2)
PROJECT NAME :
CLÉ / KEY :
1 ISSUED WITH SERVICING DESIGN BRIEF2014.08.08
1C301FST
SM
PLAN AND PROFILEOUTLET SEWER
2014.08.08
1 : 500
architects
CIVIL ENGINEER :
MECHANICAL, ELECTRICAL ENGINEER :
Suite 200, 240 Michael Cowpland Drive
Ottawa, Ontario, Canada K2M 1P6
Telephone (613) 254-9643
Facsimile (613) 254-5867
Website www.novatech-eng.com
NOTE:THE POSITION OF ALL POLE LINES, CONDUITS, WATERMAINS,SEWERS AND OTHER UNDERGROUND AND OVERGROUND UTILITIESAND STRUCTURES IS NOT NECESSARILY SHOWN ON THE CONTRACTDRAWINGS, AND WHERE SHOWN, THE ACCURACY OF THE POSITIONOF SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED.BEFORE STARTING WORK, DETERMINE THE EXACT LOCATION OFALL SUCH UTILITIES AND STRUCTURES AND ASSUME ALL LIABILITYFOR DAMAGE TO THEM.
LEGENDPROPOSED SANITARY MH & SEWER
PROPOSED STORM MH & SEWER
MH 101
MH 201
PROPOSED SEWER EASEMENT LIMIT
LIMIT OF WORK AREATHROUGH KRPC PARKING LOT
SANITARY CONNECTION TO TRUNK SEWERON THE MARSHES GOLF COURSE LANDSLEGGET DRIVE