Upload
dangkien
View
216
Download
1
Embed Size (px)
Citation preview
A 2015.01.12 W.H. JUNG H. LEE D.K. JI FOR APPROVAL
Rev Date Prepared Checked Approved Details of Revision
Owner
Contractor
Sub-Supplier
Project
RUTENBERG POWER STATION UNIT 1 & 2
FGD WASTE WATER TREATMENT SYSTEM
PC
S09091
UAS Code
DD03
Date Name Scale Unit Code
12
Prepared Title
PACKING PROCEDURE FOR
WWTP
KKS Code
HTQ
Checked Reg. No.
540800 Approved
Rev.
A Dept.
Document No.
S09091-DD03-12-HTQ-540800 Page-No.
1 of 28
FOR APPROVAL
THE ISRAEL ELECTRIC CORPORATION LTD.
SAMYANG ENTECH CO., LTD.