Susanne Theuschl - Lighting Consultant Page 1/43 Mustertunnel_E_CIE 88_2004 Tunnel Installation : Sample Project number : Int_0001 Customer : Processed by : Date : 27.08.2012 Project description: Sample Tunnel (CIE 88:2004) Assumed Value for Luminance in Interior Zone (day) = 4,2 cd/m² ( traffic = low) Assumed Value for Luminance in Interior Zone (night) = 1 cd/m² (tunnel = part of an unlit road) Assumed Value for Luminance in Threshold Zone = 150 cd/m² (L20=2500, k=0,06) The determination of the lighting results is performed on a sales support basis, with great thoroughness, using the documents at our disposal and with the aid of calculating procedures customary in the market (e.g. Relux, Dialux). A guarantee / warranty / liability for this free calculation is not provided by SITECO. In this respect, we refer to the services of the light planning and engineering office. The following values are based on exact calculations on calibrated lamps, luminaires and their arrangement. In practice, gradual divergences can occur. Guarantee claims for luminaire data are excluded. Relux and the luminaire manufacturers accept no liability for consequential damage and damage which is occasioned to the user or to third parties.

Sample Tunnel CIE 88 2004 - Siteco€¦ · Table of contents Object ... : Int_0001: 27.08.2012 Susanne Theuschl - Lighting Consultant Mustertunnel_E_CIE 88_2004 Page 2/43 First Page

Embed Size (px)

Citation preview

Susanne Theuschl - Lighting ConsultantPage 1/43Mustertunnel_E_CIE 88_2004

Tunnel

Installation : Sample

Project number : Int_0001

Customer :

Processed by :

Date : 27.08.2012

Project description:

Sample Tunnel (CIE 88:2004)

Assumed Value for Luminance in Interior Zone (day) = 4,2 cd/m² ( traffic = low) Assumed Value for Luminance in Interior Zone (night) = 1 cd/m² (tunnel = part of an unlit road)

Assumed Value for Luminance in Threshold Zone = 150 cd/m² (L20=2500, k=0,06)

The determination of the lighting results is performed on a sales support basis, with great thoroughness, using the documents at our disposal and with the aid of calculating procedures customary in the market (e.g. Relux, Dialux).A guarantee / warranty / liability for this free calculation is not provided by SITECO. In this respect, we refer to the services of the light planning and engineering office.

The following values are based on exact calculations on calibrated lamps, luminaires and their arrangement. In practice, gradual divergences can occur.

Guarantee claims for luminaire data are excluded.

Relux and the luminaire manufacturers accept no liability for consequential damage and damage which is occasioned to the user or to thirdparties.

Table of contents

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 2/43Mustertunnel_E_CIE 88_2004

First Page 1Table of contents 21 Luminaire data1.1 Siteco, TL 20 (5XA8638BCS5D1)1.1.1 Data sheet 31.2 Siteco, TS 30 S (5NA854D1TA1NW)1.2.1 Data sheet 41.3 Siteco, TS 30 S (5NA854D1SA1NW)1.3.1 Data sheet 51.4 Siteco, TS 30 S (5NA854D1PA1NW)1.4.1 Data sheet 62 Tunnel2.1 Description, Tunnel2.1.1 Project data 72.1.2 Luminaire list 92.2 Calculation results, Tunnel2.2.1 Result overview, S1: 100% 132.2.2 Result overview, S2: 83.3% 152.2.3 Result overview, S3: 66.7% 172.2.4 Result overview, S4: 50% 192.2.5 Result overview, S5: 33.3% 212.2.6 Result overview, S6: 16.7% 232.2.7 Result overview, Int.1 252.2.8 Result overview, Int.2 262.2.9 Evolution, Adaptation (L), S1: 100%, Obs. 1 272.2.10 Evolution, Adaptation (L), S2: 83.3%, Obs. 1 282.2.11 Evolution, Adaptation (L), S3: 66.7%, Obs. 1 292.2.12 Evolution, Adaptation (L), S4: 50%, Obs. 1 302.2.13 Evolution, Adaptation (L), S5: 33.3%, Obs. 1 312.2.14 Evolution, Adaptation (L), S6: 16.7%, Obs. 1 322.3 Calculation results, Tunnel2.3.1 Table, Einfahrt (L), S1: 100%, Obs. 1 332.3.2 Table, Einfahrt (E), S1: 100% 342.3.3 Table, Einfahrt (Ev, West (270°)), S1: 100% 352.3.4 Table, Einfahrt (E), Wall right, S1: 100% 362.3.5 Table, Einfahrt (L), Wall right, S1: 100%, Obs. 1 372.3.6 Table, Einfahrt (E), Wall left, S1: 100% 382.3.7 Table, Einfahrt (L), Wall left, S1: 100%, Obs. 1 392.4 Calculation results, Tunnel2.4.1 Table, Innen (E), Int.1 402.4.2 Table, Innen (Ev, West (270°)), Int.1 412.4.3 Table, Innen (E), Wall right, Int.1 422.4.4 Table, Innen (E), Wall left, Int.1 43

1 Luminaire data

1.1 Siteco, TL 20 (5XA8638BCS5D1)

1.1.1 Data sheet

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 3/43Mustertunnel_E_CIE 88_2004

Manufacturer: Siteco

5XA8638BCS5D1 Tunnelleuchte-Deckenanbau TL 20TL 20, Tunnelleuchte, primäre lichttechn. Abdeckung: Abdeckscheibe, aus Einscheiben-Sicherheitsglas,satiniert, Lichtaustritt: direkt strahlend, primäre Lichtcharakteristik: symmetrisch, Montageart: Anbau, für 4 xLED-Modul Lichtfarbe: kaltweiß, Vorschaltgerät: EVG Plus, Steuerung: Überhitzungsschutz,Leistungsreduzierung, Konstantlichtstrom-Steuerung, elektronische Leistungsreduzierung, Netzanschluss: 230V,AC, 50Hz, Ende der Lebensdauer: 156 W, Leuchtengehäuse, aus Edelstahl, 1.4571, gebeizt und passiviert,Kühlkörper, aus Al Mg 2.5, eloxiert, Schutzart (gesamt): IP66, Schutzklasse (gesamt): SK II (Schutzisoliert),Prüfzeichen: CE, ENEC in Vorbereitung, Schlagfestigkeit: IK10, Verpackungseinheit: 1 Stück,

Luminaire dataLuminaire efficiency : 100%Luminaire efficacy : 71.52 lm/W

A30 ↓ 100.0% ↑ 0.0% Classification :CIE Flux Codes : 44 81 97 100 100Control gear : EVGSystem power : 151 WLength : 253 mmWidth : 1400 mmHeight : 127 mm

Equipped withQuantity : 4Designation : LED - Modul cwPower : 38 WColour :Luminous flux : 2700 lm

1 Luminaire data

1.2 Siteco, TS 30 S (5NA854D1TA1NW)

1.2.1 Data sheet

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 4/43Mustertunnel_E_CIE 88_2004

Manufacturer: Siteco

5NA854D1TA1NW Tunnelleuchte-Deckenanbau TS 30 STS 30 S, Tunnelleuchte, primäre Lichtlenkung mit Spiegel, aus Aluminium, Hammerschlag, primäre lichttechn.Abdeckung: Abdeckscheibe, aus Einscheiben-Sicherheitsglas, klar, Lichtaustritt: direkt strahlend, primäreLichtcharakteristik: asymmetrisch, Montageart: Anbau, für 1 x HST 400W, Überlagerungs-Zündgerät,Vorschaltgerät: VVG, parallel kompensiert, Reduzierschaltung mit Relais ohne Timer, mit Klemme, 8polig, max.10mm², Netzanschluss: 230V, AC, 50Hz, Leuchtengehäuse, aus Edelstahl, 1.4571, gebeizt und passiviert,natur, Länge: 680 mm, Breite: 460 mm, Höhe: 168mm, Schutzart (gesamt): IP65, Schutzklasse (gesamt): SK I(Schutzerdung), Prüfzeichen: CE, ENEC in Vorbereitung, Schlagfestigkeit: IK10, Norm: EN 60598,Verpackungseinheit: 1 Stück,

Luminaire dataLuminaire efficiency : 77.9%Luminaire efficacy : 98.68 lm/W

A30 ↓ 100.0% ↑ 0.0% Classification :CIE Flux Codes : 37 73 98 100 78Control gear : VVGSystem power : 446 WLength : 460 mmWidth : 680 mmHeight : 167 mm

Equipped withQuantity : 1Designation : HST (OSRAM)Power : 400 WColour :Luminous flux : 56500 lm

1 Luminaire data

1.3 Siteco, TS 30 S (5NA854D1SA1NW)

1.3.1 Data sheet

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 5/43Mustertunnel_E_CIE 88_2004

Manufacturer: Siteco

5NA854D1SA1NW Tunnelleuchte-Deckenanbau TS 30 STS 30 S, Tunnelleuchte, primäre Lichtlenkung mit Spiegel, aus Aluminium, Hammerschlag, primäre lichttechn.Abdeckung: Abdeckscheibe, aus Einscheiben-Sicherheitsglas, klar, Lichtaustritt: direkt strahlend, primäreLichtcharakteristik: asymmetrisch, Montageart: Anbau, für 1 x HST 250W, Überlagerungs-Zündgerät,Vorschaltgerät: VVG, parallel kompensiert, Reduzierschaltung mit Relais ohne Timer, mit Klemme, 8polig, max.10mm², Netzanschluss: 230V, AC, 50Hz, Leuchtengehäuse, aus Edelstahl, 1.4571, gebeizt und passiviert,natur, Länge: 680 mm, Breite: 460 mm, Höhe: 168mm, Schutzart (gesamt): IP65, Schutzklasse (gesamt): SK I(Schutzerdung), Prüfzeichen: CE, ENEC in Vorbereitung, Schlagfestigkeit: IK10, Norm: EN 60598,Verpackungseinheit: 1 Stück,

Luminaire dataLuminaire efficiency : 74.4%Luminaire efficacy : 86.67 lm/W

A30 ↓ 100.0% ↑ 0.0% Classification :CIE Flux Codes : 39 74 99 100 74Control gear : VVGSystem power : 285 WLength : 460 mmWidth : 680 mmHeight : 167 mm

Equipped withQuantity : 1Designation : HST (OSRAM)Power : 250 WColour :Luminous flux : 33200 lm

1 Luminaire data

1.4 Siteco, TS 30 S (5NA854D1PA1NW)

1.4.1 Data sheet

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 6/43Mustertunnel_E_CIE 88_2004

Manufacturer: Siteco

5NA854D1PA1NW Tunnelleuchte-Deckenanbau TS 30 STS 30 S, Tunnelleuchte, primäre Lichtlenkung mit Spiegel, aus Aluminium, Hammerschlag, primäre lichttechn.Abdeckung: Abdeckscheibe, aus Einscheiben-Sicherheitsglas, klar, Lichtaustritt: direkt strahlend, primäreLichtcharakteristik: asymmetrisch, Montageart: Anbau, für 1 x HST 150W, Überlagerungs-Zündgerät,Vorschaltgerät: VVG, parallel kompensiert, Reduzierschaltung mit Relais ohne Timer, mit Klemme, 8polig, max.10mm², Netzanschluss: 230V, AC, 50Hz, Leuchtengehäuse, aus Edelstahl, 1.4571, gebeizt und passiviert,natur, Länge: 680 mm, Breite: 460 mm, Höhe: 168mm, Schutzart (gesamt): IP65, Schutzklasse (gesamt): SK I(Schutzerdung), Prüfzeichen: CE, ENEC in Vorbereitung, Schlagfestigkeit: IK10, Norm: EN 60598,Verpackungseinheit: 1 Stück,

Luminaire dataLuminaire efficiency : 72.4%Luminaire efficacy : 71.99 lm/W

A30 ↓ 100.0% ↑ 0.0% Classification :CIE Flux Codes : 38 74 98 100 72Control gear : VVGSystem power : 176 WLength : 460 mmWidth : 680 mmHeight : 167 mm

Equipped withQuantity : 1Designation : HST (OSRAM)Power : 150 WColour :Luminous flux : 17500 lm

2 Tunnel

2.1 Description, Tunnel

2.1.1 Project data

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 7/43Mustertunnel_E_CIE 88_2004

Geometry tunnelLength of the tunnel : 600 mLength of the tunnel (calculation model) : 378 mHeight of the tunnel : 5 m

Width of the lane : 7.5 mNumber of lanes : 2Covering / material : R3, q0 = 0.07Marginal strip right : 1 mMarginal strip left : 1 m

Height of the wall (right) : 2 mCovering / material : diffus 30%

Height of the wall (left) : 2 mCovering / material : diffus 30%

Calculation specificationsSpeed : 80 km/hLength of the threshold zone : 99 mLuminance threshold zone : 150 cd/m²Luminance interior zone : 4.2 cd/m²

2 Tunnel

2.1 Description, Tunnel

2.1.1 Project data

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 8/43Mustertunnel_E_CIE 88_2004

LDC in useSiteco

1 Order No. : 5XA8638BCS5D1Luminaire name : TL 20Equipment : 4 x LED - Modul cw 38 W / 2700 lmMaintenance factor: 0.70

2 Order No. : 5NA854D1TA1NWLuminaire name : TS 30 SEquipment : 1 x HST (OSRAM) 400 W / 56500 lmMaintenance factor: 0.70

3 Order No. : 5NA854D1SA1NWLuminaire name : TS 30 SEquipment : 1 x HST (OSRAM) 250 W / 33200 lmMaintenance factor: 0.70

4 Order No. : 5NA854D1PA1NWLuminaire name : TS 30 SEquipment : 1 x HST (OSRAM) 150 W / 17500 lmMaintenance factor: 0.70

2.1 Description, Tunnel

2.1.2 Luminaire list

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 9/43Mustertunnel_E_CIE 88_2004

AdaptationLDC in use

Siteco2 58 Order No. : 5NA854D1TA1NW

Luminaire name : TS 30 SEquipment : 1 x HST (OSRAM) 400 W / 56500 lmMaintenance factor: 0.70

3 5 Order No. : 5NA854D1SA1NWLuminaire name : TS 30 SEquipment : 1 x HST (OSRAM) 250 W / 33200 lmMaintenance factor: 0.70

4 23 Order No. : 5NA854D1PA1NWLuminaire name : TS 30 SEquipment : 1 x HST (OSRAM) 150 W / 17500 lmMaintenance factor: 0.70

Row of luminairesRow 3.1Number of luminaires: 86 System power (total): 31.3kWBasic position: x=6.20m y=3.50m, z=4.80m -variable distances-Rotation: z=180.0° C0=0.0° C90=0.0°

Nr. Pos. X [m] Power level Control gr.S1 S2 S3 S4 S5 S6 Int.1 Int.21 6.20 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%2 7.80 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%3 9.40 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%4 11.00 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%5 12.60 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%6 14.20 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%7 15.80 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%8 17.40 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%9 19.00 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%

2.1 Description, Tunnel

2.1.2 Luminaire list

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 10/43Mustertunnel_E_CIE 88_2004

10 20.60 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%11 22.20 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%12 23.80 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%13 25.40 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%14 27.00 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%15 28.60 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%16 30.20 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%17 31.80 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%18 33.40 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%19 35.00 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%20 36.60 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%21 38.20 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%22 39.80 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%23 41.40 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%24 43.00 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%25 44.60 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%26 46.20 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%27 47.80 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%28 49.40 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%29 51.00 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%30 52.60 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%31 54.20 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%32 55.80 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%33 57.40 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%34 59.00 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%35 60.60 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%36 62.20 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%37 63.80 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%38 65.50 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%39 67.20 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%40 69.00 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%41 70.80 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%42 72.60 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%43 74.50 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%44 76.40 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%45 78.40 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%46 80.40 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%47 82.50 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%48 84.70 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%49 87.00 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%50 89.40 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%51 91.80 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%52 94.40 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%53 97.20 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%54 100.10 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%55 103.10 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%56 106.50 400W / 56.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%57 110.10 400W / 56.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%58 114.10 400W / 56.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%59 116.80 250W / 33.2klm 2 100% 100% 50% 50% 50% 0% 0% 0%60 119.70 250W / 33.2klm 1 100% 50% 50% 50% 0% 0% 0% 0%61 122.80 250W / 33.2klm 3 100% 100% 100% 50% 50% 50% 0% 0%62 126.20 250W / 33.2klm 2 100% 100% 50% 50% 50% 0% 0% 0%63 130.00 250W / 33.2klm 1 100% 50% 50% 50% 0% 0% 0% 0%64 132.20 150W / 17.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%65 134.50 150W / 17.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%66 136.90 150W / 17.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%67 139.50 150W / 17.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%

2.1 Description, Tunnel

2.1.2 Luminaire list

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 11/43Mustertunnel_E_CIE 88_2004

68 142.20 150W / 17.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%69 145.10 150W / 17.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%70 148.10 150W / 17.5klm 3 100% 100% 100% 50% 50% 50% 0% 0%71 151.40 150W / 17.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%72 154.90 150W / 17.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%73 158.60 150W / 17.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%74 162.60 150W / 17.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%75 166.90 150W / 17.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%76 171.60 150W / 17.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%77 176.60 150W / 17.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%78 182.10 150W / 17.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%79 188.10 150W / 17.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%80 194.10 150W / 17.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%81 200.10 150W / 17.5klm 2 100% 100% 50% 50% 50% 0% 0% 0%82 207.90 150W / 17.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%83 216.60 150W / 17.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%84 226.50 150W / 17.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%85 237.80 150W / 17.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%86 249.80 150W / 17.5klm 1 100% 50% 50% 50% 0% 0% 0% 0%

Innenbel.LDC in use

Siteco1 Order No. : 5XA8638BCS5D1

Luminaire name : TL 20Equipment : 4 x LED - Modul cw 38 W / 2700 lmMaintenance factor: 0.70

Row of luminairesRow 1.1Number of luminaires: 53 System power (total): 8.0kW (0.60 km)Basic position: x=5.00m y=3.50m, z=4.80m Constant distance: 11.30mRotation: z=0.0° C0=0.0° C90=0.0° Flicker frequency (v=80 km/h): 2 Hz

Nr. Pos. X [m] Power level Control gr.S1 S2 S3 S4 S5 S6 Int.1 Int.21 5.00 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%2 16.30 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%3 27.60 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%4 38.90 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%5 50.20 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%6 61.50 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%7 72.80 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%8 84.10 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%9 95.40 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%

10 106.70 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%11 118.00 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%12 129.30 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%13 140.60 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%14 151.90 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%15 163.20 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%

2.1 Description, Tunnel

2.1.2 Luminaire list

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 12/43Mustertunnel_E_CIE 88_2004

16 174.50 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%17 185.80 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%18 197.10 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%19 208.40 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%20 219.70 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%21 231.00 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%22 242.30 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%23 253.60 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%24 264.90 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%25 276.20 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%26 287.50 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%27 298.80 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%28 310.10 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%29 321.40 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%30 332.70 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%31 344.00 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%32 355.30 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%33 366.60 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%34 377.90 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%

: : : :49 547.40 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%50 558.70 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%51 570.00 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%52 581.30 152W / 10.8klm 5 100% 100% 100% 100% 100% 100% 100% 25%53 592.60 152W / 10.8klm 4 100% 100% 100% 100% 100% 100% 100% 25%

2 Tunnel

2.2 Calculation results, Tunnel

2.2.1 Result overview, S1: 100%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 13/43Mustertunnel_E_CIE 88_2004

Regulating step: S1: 100%Adaptation

1: 100%2: 100%3: 100%

Interior4: 100%5: 100%

Threshold zone (constant)Measuring range: 17.40 m - 33.40 m Points: nx = 7, ny = 6, nz = 3Observer (starting point coordinate) : x = -42.60 m; z = 1.50 m dx = 61.14 m (fix)

y =1.88 mRoadway (R3, q0 = 0.07)Lav : 158.59 cd/m²U0 Lmin/Lavg : 0.48Ul Llmin/Llmax: 0.98qc(av) : 0.84 cd/m²/lxqc(min) : 0.51 cd/m²/lxB Max. : 0.04

Wall left (diffus 30%)Lav : 86.84 cd/m²U0 Lmin/Lavg : 0.94

Wall right (diffus 30%)Lav : 98.65 cd/m²U0 Lmin/Lavg : 0.96

y =5.63 m

159.19 cd/m²0.54 0.40.97 0.60.85 cd/m²/lx0.54 cd/m²/lx0.03 0.15

86.84 cd/m²0.94

98.65 cd/m²0.96

IlluminanceRoadwayEavg :1830.14 lxU0 Emin/Eav : 0.76Wall leftEavg : 909.34 lxU0 Emin/Eav : 0.94

Wall rightEavg :1033.04 lxU0 Emin/Eav : 0.96

2 Tunnel

2.2 Calculation results, Tunnel

2.2.1 Result overview, S1: 100%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 14/43Mustertunnel_E_CIE 88_2004

Interior zoneMeasuring range: 140.60 m - 163.20 m Points: nx = 7, ny = 6, nz = 3Observer (starting point coordinate) : x = 80.60 m; z = 1.50 m dx = 61.61 m (fix)

y =1.88 mRoadway (R3, q0 = 0.07)Lav : 22.45 cd/m²U0 Lmin/Lavg : 0.45Ul Llmin/Llmax: 0.74qc(av) : 0.40 cd/m²/lxTI max. Max. : 4.79 %

Wall left (diffus 30%)Lav : 12.68 cd/m²U0 Lmin/Lavg : 0.82

Wall right (diffus 30%)Lav : 14.53 cd/m²U0 Lmin/Lavg : 0.86

y =5.63 m

22.53 cd/m²0.49 0.40.75 0.60.40 cd/m²/lx4.20 %

12.68 cd/m²0.82

14.53 cd/m²0.86

IlluminanceRoadwayEavg : 301.03 lxU0 Emin/Eav : 0.65Wall leftEavg : 132.74 lxU0 Emin/Eav : 0.82

Wall rightEavg : 152.07 lxU0 Emin/Eav : 0.86

Threshold and transition zoneMeasuring range: -0.89 m - 376.26 m Points: nx = 165, ny = 6, nz = 3Observer (starting point coordinate) : x = -85.68 m; z = 1.50 m dx = 85.93 m (moving)

y =1.88 mRoadway (R3, q0 = 0.07)

Wall left (diffus 30%)

Wall right (diffus 30%)

y =5.63 m

qc: The backward reflecion of the road was calculated.

2.2 Calculation results, Tunnel

2.2.2 Result overview, S2: 83.3%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 15/43Mustertunnel_E_CIE 88_2004

Regulating step: S2: 83.3%Adaptation

1: 50%2: 100%3: 100%

Interior4: 100%5: 100%

Threshold zone (constant)Measuring range: 17.40 m - 33.40 m Points: nx = 7, ny = 6, nz = 3Observer (starting point coordinate) : x = -42.60 m; z = 1.50 m dx = 61.14 m (fix)

y =1.88 mRoadway (R3, q0 = 0.07)Lav : 132.73 cd/m²U0 Lmin/Lavg : 0.48Ul Llmin/Llmax: 0.98qc(av) : 0.81 cd/m²/lxqc(min) : 0.49 cd/m²/lxB Max. : 0.04

Wall left (diffus 30%)Lav : 72.46 cd/m²U0 Lmin/Lavg : 0.93

Wall right (diffus 30%)Lav : 82.27 cd/m²U0 Lmin/Lavg : 0.96

y =5.63 m

133.22 cd/m²0.54 0.40.98 0.60.82 cd/m²/lx0.51 cd/m²/lx0.03 0.15

72.46 cd/m²0.93

82.27 cd/m²0.96

IlluminanceRoadwayEavg :1530.08 lxU0 Emin/Eav : 0.75Wall leftEavg : 758.81 lxU0 Emin/Eav : 0.93

Wall rightEavg : 861.54 lxU0 Emin/Eav : 0.96

2.2 Calculation results, Tunnel

2.2.2 Result overview, S2: 83.3%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 16/43Mustertunnel_E_CIE 88_2004

Interior zoneMeasuring range: 140.60 m - 163.20 m Points: nx = 7, ny = 6, nz = 3Observer (starting point coordinate) : x = 80.60 m; z = 1.50 m dx = 61.61 m (fix)

y =1.88 mRoadway (R3, q0 = 0.07)Lav : 18.38 cd/m²U0 Lmin/Lavg : 0.43Ul Llmin/Llmax: 0.68qc(av) : 0.35 cd/m²/lxTI max. Max. : 4.79 %

Wall left (diffus 30%)Lav : 10.38 cd/m²U0 Lmin/Lavg : 0.8

Wall right (diffus 30%)Lav : 11.91 cd/m²U0 Lmin/Lavg : 0.83

y =5.63 m

18.45 cd/m²0.47 0.40.69 0.60.35 cd/m²/lx4.20 %

10.38 cd/m²0.8

11.91 cd/m²0.83

IlluminanceRoadwayEavg : 250.54 lxU0 Emin/Eav : 0.63Wall leftEavg : 108.63 lxU0 Emin/Eav : 0.8

Wall rightEavg : 124.68 lxU0 Emin/Eav : 0.83

Threshold and transition zoneMeasuring range: -0.89 m - 376.26 m Points: nx = 165, ny = 6, nz = 3Observer (starting point coordinate) : x = -85.68 m; z = 1.50 m dx = 85.93 m (moving)

y =1.88 mRoadway (R3, q0 = 0.07)

Wall left (diffus 30%)

Wall right (diffus 30%)

y =5.63 m

qc: The backward reflecion of the road was calculated.

2.2 Calculation results, Tunnel

2.2.3 Result overview, S3: 66.7%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 17/43Mustertunnel_E_CIE 88_2004

Regulating step: S3: 66.7%Adaptation

1: 50%2: 50%3: 100%

Interior4: 100%5: 100%

Threshold zone (constant)Measuring range: 17.40 m - 33.40 m Points: nx = 7, ny = 6, nz = 3Observer (starting point coordinate) : x = -42.60 m; z = 1.50 m dx = 61.14 m (fix)

y =1.88 mRoadway (R3, q0 = 0.07)Lav : 107.14 cd/m²U0 Lmin/Lavg : 0.49Ul Llmin/Llmax: 0.97qc(av) : 0.78 cd/m²/lxqc(min) : 0.48 cd/m²/lxB Max. : 0.04

Wall left (diffus 30%)Lav : 58.72 cd/m²U0 Lmin/Lavg : 0.94

Wall right (diffus 30%)Lav : 66.73 cd/m²U0 Lmin/Lavg : 0.96

y =5.63 m

107.54 cd/m²0.55 0.40.97 0.60.79 cd/m²/lx0.50 cd/m²/lx0.03 0.15

58.72 cd/m²0.94

66.73 cd/m²0.96

IlluminanceRoadwayEavg :1240.48 lxU0 Emin/Eav : 0.76Wall leftEavg : 614.91 lxU0 Emin/Eav : 0.94

Wall rightEavg : 698.76 lxU0 Emin/Eav : 0.96

2.2 Calculation results, Tunnel

2.2.3 Result overview, S3: 66.7%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 18/43Mustertunnel_E_CIE 88_2004

Interior zoneMeasuring range: 140.60 m - 163.20 m Points: nx = 7, ny = 6, nz = 3Observer (starting point coordinate) : x = 80.60 m; z = 1.50 m dx = 61.61 m (fix)

y =1.88 mRoadway (R3, q0 = 0.07)Lav : 14.18 cd/m²U0 Lmin/Lavg : 0.42Ul Llmin/Llmax: 0.65qc(av) : 0.30 cd/m²/lxTI max. Max. : 4.79 %

Wall left (diffus 30%)Lav : 7.98 cd/m²U0 Lmin/Lavg : 0.76

Wall right (diffus 30%)Lav : 9.21 cd/m²U0 Lmin/Lavg : 0.79

y =5.63 m

14.23 cd/m²0.46 0.40.66 0.60.30 cd/m²/lx4.20 %

7.98 cd/m²0.76

9.21 cd/m²0.79

IlluminanceRoadwayEavg : 201.35 lxU0 Emin/Eav : 0.58Wall leftEavg : 83.47 lxU0 Emin/Eav : 0.76

Wall rightEavg : 96.34 lxU0 Emin/Eav : 0.79

Threshold and transition zoneMeasuring range: -0.89 m - 376.26 m Points: nx = 165, ny = 6, nz = 3Observer (starting point coordinate) : x = -85.68 m; z = 1.50 m dx = 85.93 m (moving)

y =1.88 mRoadway (R3, q0 = 0.07)

Wall left (diffus 30%)

Wall right (diffus 30%)

y =5.63 m

qc: The backward reflecion of the road was calculated.

2.2 Calculation results, Tunnel

2.2.4 Result overview, S4: 50%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 19/43Mustertunnel_E_CIE 88_2004

Regulating step: S4: 50%Adaptation

1: 50%2: 50%3: 50%

Interior4: 100%5: 100%

Threshold zone (constant)Measuring range: 17.40 m - 33.40 m Points: nx = 7, ny = 6, nz = 3Observer (starting point coordinate) : x = -42.60 m; z = 1.50 m dx = 61.14 m (fix)

y =1.88 mRoadway (R3, q0 = 0.07)Lav : 81.43 cd/m²U0 Lmin/Lavg : 0.48Ul Llmin/Llmax: 0.97qc(av) : 0.72 cd/m²/lxqc(min) : 0.44 cd/m²/lxB Max. : 0.04

Wall left (diffus 30%)Lav : 44.36 cd/m²U0 Lmin/Lavg : 0.94

Wall right (diffus 30%)Lav : 50.46 cd/m²U0 Lmin/Lavg : 0.96

y =5.63 m

81.74 cd/m²0.54 0.40.97 0.60.73 cd/m²/lx0.46 cd/m²/lx0.03 0.15

44.36 cd/m²0.94

50.46 cd/m²0.96

IlluminanceRoadwayEavg : 949.64 lxU0 Emin/Eav : 0.76Wall leftEavg : 464.54 lxU0 Emin/Eav : 0.94

Wall rightEavg : 528.35 lxU0 Emin/Eav : 0.96

2.2 Calculation results, Tunnel

2.2.4 Result overview, S4: 50%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 20/43Mustertunnel_E_CIE 88_2004

Interior zoneMeasuring range: 140.60 m - 163.20 m Points: nx = 7, ny = 6, nz = 3Observer (starting point coordinate) : x = 80.60 m; z = 1.50 m dx = 61.61 m (fix)

y =1.88 mRoadway (R3, q0 = 0.07)Lav : 13.33 cd/m²U0 Lmin/Lavg : 0.45Ul Llmin/Llmax: 0.76qc(av) : 0.30 cd/m²/lxTI max. Max. : 4.79 %

Wall left (diffus 30%)Lav : 7.29 cd/m²U0 Lmin/Lavg : 0.84

Wall right (diffus 30%)Lav : 8.42 cd/m²U0 Lmin/Lavg : 0.86

y =5.63 m

13.38 cd/m²0.49 0.40.78 0.60.30 cd/m²/lx4.20 %

7.29 cd/m²0.84

8.42 cd/m²0.86

IlluminanceRoadwayEavg : 185.32 lxU0 Emin/Eav : 0.63Wall leftEavg : 76.33 lxU0 Emin/Eav : 0.84

Wall rightEavg : 88.07 lxU0 Emin/Eav : 0.86

Threshold and transition zoneMeasuring range: -0.89 m - 376.26 m Points: nx = 165, ny = 6, nz = 3Observer (starting point coordinate) : x = -85.68 m; z = 1.50 m dx = 85.93 m (moving)

y =1.88 mRoadway (R3, q0 = 0.07)

Wall left (diffus 30%)

Wall right (diffus 30%)

y =5.63 m

qc: The backward reflecion of the road was calculated.

2.2 Calculation results, Tunnel

2.2.5 Result overview, S5: 33.3%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 21/43Mustertunnel_E_CIE 88_2004

Regulating step: S5: 33.3%Adaptation

1: 0%2: 50%3: 50%

Interior4: 100%5: 100%

Threshold zone (constant)Measuring range: 17.40 m - 33.40 m Points: nx = 7, ny = 6, nz = 3Observer (starting point coordinate) : x = -42.60 m; z = 1.50 m dx = 61.14 m (fix)

y =1.88 mRoadway (R3, q0 = 0.07)Lav : 55.57 cd/m²U0 Lmin/Lavg : 0.48Ul Llmin/Llmax: 0.97qc(av) : 0.63 cd/m²/lxqc(min) : 0.38 cd/m²/lxB Max. : 0.04

Wall left (diffus 30%)Lav : 29.99 cd/m²U0 Lmin/Lavg : 0.92

Wall right (diffus 30%)Lav : 34.08 cd/m²U0 Lmin/Lavg : 0.94

y =5.63 m

55.77 cd/m²0.53 0.40.97 0.60.64 cd/m²/lx0.39 cd/m²/lx0.03 0.15

29.99 cd/m²0.92

34.08 cd/m²0.94

IlluminanceRoadwayEavg : 649.57 lxU0 Emin/Eav : 0.73Wall leftEavg : 314.01 lxU0 Emin/Eav : 0.92

Wall rightEavg : 356.85 lxU0 Emin/Eav : 0.94

2.2 Calculation results, Tunnel

2.2.5 Result overview, S5: 33.3%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 22/43Mustertunnel_E_CIE 88_2004

Interior zoneMeasuring range: 140.60 m - 163.20 m Points: nx = 7, ny = 6, nz = 3Observer (starting point coordinate) : x = 80.60 m; z = 1.50 m dx = 61.61 m (fix)

y =1.88 mRoadway (R3, q0 = 0.07)Lav : 9.26 cd/m²U0 Lmin/Lavg : 0.42Ul Llmin/Llmax: 0.64qc(av) : 0.23 cd/m²/lxTI max. Max. : 4.79 %

Wall left (diffus 30%)Lav : 4.99 cd/m²U0 Lmin/Lavg : 0.74

Wall right (diffus 30%)Lav : 5.80 cd/m²U0 Lmin/Lavg : 0.75

y =5.63 m

9.30 cd/m²0.45 0.40.66 0.60.23 cd/m²/lx4.20 %

4.99 cd/m²0.74

5.80 cd/m²0.75

IlluminanceRoadwayEavg : 134.82 lxU0 Emin/Eav : 0.6Wall leftEavg : 52.22 lxU0 Emin/Eav : 0.74

Wall rightEavg : 60.68 lxU0 Emin/Eav : 0.75

Threshold and transition zoneMeasuring range: -0.89 m - 376.26 m Points: nx = 165, ny = 6, nz = 3Observer (starting point coordinate) : x = -85.68 m; z = 1.50 m dx = 85.93 m (moving)

y =1.88 mRoadway (R3, q0 = 0.07)

Wall left (diffus 30%)

Wall right (diffus 30%)

y =5.63 m

qc: The backward reflecion of the road was calculated.

2.2 Calculation results, Tunnel

2.2.6 Result overview, S6: 16.7%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 23/43Mustertunnel_E_CIE 88_2004

Regulating step: S6: 16.7%Adaptation

1: 0%2: 0%3: 50%

Interior4: 100%5: 100%

Threshold zone (constant)Measuring range: 17.40 m - 33.40 m Points: nx = 7, ny = 6, nz = 3Observer (starting point coordinate) : x = -42.60 m; z = 1.50 m dx = 61.14 m (fix)

y =1.88 mRoadway (R3, q0 = 0.07)Lav : 29.98 cd/m²U0 Lmin/Lavg : 0.48Ul Llmin/Llmax: 0.94qc(av) : 0.50 cd/m²/lxqc(min) : 0.29 cd/m²/lxB Max. : 0.04

Wall left (diffus 30%)Lav : 16.24 cd/m²U0 Lmin/Lavg : 0.94

Wall right (diffus 30%)Lav : 18.53 cd/m²U0 Lmin/Lavg : 0.91

y =5.63 m

30.09 cd/m²0.53 0.40.95 0.60.50 cd/m²/lx0.29 cd/m²/lx0.03 0.15

16.24 cd/m²0.94

18.53 cd/m²0.91

IlluminanceRoadwayEavg : 359.98 lxU0 Emin/Eav : 0.72Wall leftEavg : 170.08 lxU0 Emin/Eav : 0.94

Wall rightEavg : 194.06 lxU0 Emin/Eav : 0.91

2.2 Calculation results, Tunnel

2.2.6 Result overview, S6: 16.7%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 24/43Mustertunnel_E_CIE 88_2004

Interior zoneMeasuring range: 140.60 m - 163.20 m Points: nx = 7, ny = 6, nz = 3Observer (starting point coordinate) : x = 80.60 m; z = 1.50 m dx = 61.61 m (fix)

y =1.88 mRoadway (R3, q0 = 0.07)Lav : 5.06 cd/m²U0 Lmin/Lavg : 0.38Ul Llmin/Llmax: 0.53qc(av) : 0.14 cd/m²/lxTI max. Max. : 4.79 %

Wall left (diffus 30%)Lav : 2.59 cd/m²U0 Lmin/Lavg : 0.57

Wall right (diffus 30%)Lav : 3.09 cd/m²U0 Lmin/Lavg : 0.56

y =5.63 m

5.07 cd/m²0.41 0.40.55 0.60.14 cd/m²/lx4.20 %

2.59 cd/m²0.57

3.09 cd/m²0.56

IlluminanceRoadwayEavg : 85.63 lxU0 Emin/Eav : 0.46Wall leftEavg : 27.06 lxU0 Emin/Eav : 0.57

Wall rightEavg : 32.34 lxU0 Emin/Eav : 0.56

Threshold and transition zoneMeasuring range: -0.89 m - 376.26 m Points: nx = 165, ny = 6, nz = 3Observer (starting point coordinate) : x = -85.68 m; z = 1.50 m dx = 85.93 m (moving)

y =1.88 mRoadway (R3, q0 = 0.07)

Wall left (diffus 30%)

Wall right (diffus 30%)

y =5.63 m

qc: The backward reflecion of the road was calculated.

2.2 Calculation results, Tunnel

2.2.7 Result overview, Int.1

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 25/43Mustertunnel_E_CIE 88_2004

Regulating step: Int.1Adaptation

1: 0%2: 0%3: 0%

Interior4: 100%5: 100%

Interior zoneMeasuring range: 140.60 m - 163.20 m Points: nx = 7, ny = 6, nz = 3Observer (starting point coordinate) : x = 80.60 m; z = 1.50 m dx = 61.61 m (fix)

y =1.88 mRoadway (R3, q0 = 0.07)Lav : 4.22 cd/m²U0 Lmin/Lavg : 0.44Ul Llmin/Llmax: 0.79qc(av) : 0.13 cd/m²/lxTI max. Max. : 4.79 %

Wall left (diffus 30%)Lav : 1.91 cd/m²U0 Lmin/Lavg : 0.78

Wall right (diffus 30%)Lav : 2.30 cd/m²U0 Lmin/Lavg : 0.75

y =5.63 m

4.23 cd/m²0.49 0.40.85 0.60.13 cd/m²/lx4.20 %

1.91 cd/m²0.78

2.30 cd/m²0.75

IlluminanceRoadwayEavg : 69.60 lxU0 Emin/Eav : 0.56Wall leftEavg : 19.93 lxU0 Emin/Eav : 0.78

Wall rightEavg : 24.07 lxU0 Emin/Eav : 0.75

qc: The backward reflecion of the road was calculated.

2.2 Calculation results, Tunnel

2.2.8 Result overview, Int.2

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 26/43Mustertunnel_E_CIE 88_2004

Regulating step: Int.2Adaptation

1: 0%2: 0%3: 0%

Interior4: 25%5: 25%

Interior zoneMeasuring range: 140.60 m - 163.20 m Points: nx = 7, ny = 6, nz = 3Observer (starting point coordinate) : x = 80.60 m; z = 1.50 m dx = 61.61 m (fix)

y =1.88 mRoadway (R3, q0 = 0.07)Lav : 1.05 cd/m²U0 Lmin/Lavg : 0.44Ul Llmin/Llmax: 0.79qc(av) : 0.13 cd/m²/lxTI max. Max. : 4.79 %

Wall left (diffus 30%)Lav : 0.48 cd/m²U0 Lmin/Lavg : 0.78

Wall right (diffus 30%)Lav : 0.58 cd/m²U0 Lmin/Lavg : 0.75

y =5.63 m

1.06 cd/m²0.49 0.40.85 0.60.13 cd/m²/lx4.20 %

0.48 cd/m²0.78

0.58 cd/m²0.75

IlluminanceRoadwayEavg : 17.40 lxU0 Emin/Eav : 0.56Wall leftEavg : 4.98 lxU0 Emin/Eav : 0.78

Wall rightEavg : 6.02 lxU0 Emin/Eav : 0.75

qc: The backward reflecion of the road was calculated.

2.2 Calculation results, Tunnel

2.2.9 Evolution, Adaptation (L), S1: 100%, Obs. 1

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 27/43Mustertunnel_E_CIE 88_2004

10

20

30

40

50

60

70

80

90

100

110[%]

20 40 60 80 100 120 140 160 180 200 220 240 260[m]

[cd/m²]150

60

8.4

2.2 Calculation results, Tunnel

2.2.10 Evolution, Adaptation (L), S2: 83.3%, Obs. 1

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 28/43Mustertunnel_E_CIE 88_2004

10

20

30

40

50

60

70

80

90

100

110

[%]

20 40 60 80 100 120 140 160 180 200 220 240[m]

[cd/m²]124.95

49.98

8.4

max: 137.5 cd/m²

2.2 Calculation results, Tunnel

2.2.11 Evolution, Adaptation (L), S3: 66.7%, Obs. 1

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 29/43Mustertunnel_E_CIE 88_2004

10

20

30

40

50

60

70

80

90

100

110

[%]

20 40 60 80 100 120 140 160 180 200 220[m]

[cd/m²]100.05

40.02

8.44.2

max: 111.4 cd/m²

2.2 Calculation results, Tunnel

2.2.12 Evolution, Adaptation (L), S4: 50%, Obs. 1

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 30/43Mustertunnel_E_CIE 88_2004

10

20

30

40

50

60

70

80

90

100

110

[%]

20 40 60 80 100 120 140 160 180 200[m]

[cd/m²]75

30

8.4

4.2

max: 83.8 cd/m²

2.2 Calculation results, Tunnel

2.2.13 Evolution, Adaptation (L), S5: 33.3%, Obs. 1

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 31/43Mustertunnel_E_CIE 88_2004

10

20

30

40

50

60

70

80

90

100

110

120[%]

20 40 60 80 100 120 140 160 [m]

[cd/m²]49.95

19.98

8.4

4.2

max: 58.4 cd/m²

2.2 Calculation results, Tunnel

2.2.14 Evolution, Adaptation (L), S6: 16.7%, Obs. 1

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 32/43Mustertunnel_E_CIE 88_2004

10

20

30

40

50

60

70

80

90

100

110

120

130[%]

20 40 60 80 100 120 140[m]

[cd/m²]25.05

10.02

8.4

4.2

max: 32.3 cd/m²

2 Tunnel

2.3 Calculation results, Tunnel

2.3.1 Table, Einfahrt (L), S1: 100%, Obs. 1

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 33/43Mustertunnel_E_CIE 88_2004

Observer location 1 : x = -42.6, y = 1.88, z = 1.5 (dx = 61.14)Average luminance Lav : 159 cd/m²Minimum luminance Lmin : 76.9 cd/m²Overall uniformity U0 Lmin/Lm : 0.48Longitudinal uniformity UI Llmin/Llmax : 0.98Average contrast revealing coefficient Lr/Ev (av) : 0.844Minimum contrast revealing coefficient Lr/Ev (min) : 0.511

qc: The backward reflecion of the road was calculated.

104 105 105 105 107 105 107

174 177 176 175 178 174 178

264 267 268 264 [269] 264 [269]

195 200 201 199 204 200 206

121 124 125 124 127 124 128

(77) 78 78 78 80 78 80

18.54 20.83 23.11 25.40 27.69 29.97 32.26[m]

0.63

1.88

3.13

4.38

5.63

6.88[m]

2.3 Calculation results, Tunnel

2.3.2 Table, Einfahrt (E), S1: 100%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 34/43Mustertunnel_E_CIE 88_2004

Height of the reference plane : 0.00 mAverage illuminance Eav : 1830 lxMinimum illuminance Emin : 1390 lxMaximum illuminance Emax : 2230 lxUniformity g1 min/average : 1 : 1.32 (0.76) Uniformity g2 min/max : 1 : 1.61 (0.62)

1550 1600 1570 1580 1650 1570 1640

1900 1980 1960 1940 2060 1900 2030

2020 2120 2140 2060 [2230] 2020 2180

1970 2080 2080 2030 2190 1990 2140

1770 1830 1860 1800 1910 1760 1870

(1390) 1410 1400 1400 1450 (1390) 1440

18.54 20.83 23.11 25.40 27.69 29.97 32.26[m]

Illuminance [lx]

0.63

1.88

3.13

4.38

5.63

6.88[m]

2.3 Calculation results, Tunnel

2.3.3 Table, Einfahrt (Ev, West (270°)), S1: 100%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 35/43Mustertunnel_E_CIE 88_2004

Vertical illuminanceHeight of the reference plane : 0.10 mfrom direction : West (270°)Average illuminance Eav : 183 lxMinimum illuminance Emin : 132 lxMaximum illuminance Emax : 240 lxUniformity g1 min/average : 1 : 1.38 (0.72) Uniformity g2 min/max : 1 : 1.82 (0.55)

155 167 159 146 159 161 178

189 211 198 174 192 193 223

196 227 215 180 204 201 [240]

191 222 208 178 201 199 235

174 191 186 160 176 175 201

141 148 144 (132) 143 142 157

18.54 20.83 23.11 25.40 27.69 29.97 32.26[m]

0.63

1.88

3.13

4.38

5.63

6.88[m]

2.3 Calculation results, Tunnel

2.3.4 Table, Einfahrt (E), Wall right, S1: 100%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 36/43Mustertunnel_E_CIE 88_2004

Average illuminance Eav : 1030 lxMinimum illuminance Emin : 988 lxMaximum illuminance Emax : 1080 lxUniformity g1 min/average : 1 : 1.05 (0.96) Uniformity g2 min/max : 1 : 1.1 (0.91)

1000 (988) 1010 990 1020 993 1010

1070 1060 1070 1070 [1080] 1070 1070

1020 1030 1010 1040 1020 1040 1020

18.54 20.83 23.11 25.40 27.69 29.97 32.26[m]

Illuminance [lx]

0.33

1.00

1.67[m]

2.3 Calculation results, Tunnel

2.3.5 Table, Einfahrt (L), Wall right, S1: 100%, Obs. 1

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 37/43Mustertunnel_E_CIE 88_2004

Observer location 1 : x = -42.6, y = 1.88, z = 1.5 (dx = 61.14)Average luminance Lav : 98.7 cd/m²Minimum luminance Lmin : 94.3 cd/m²Overall uniformity U0 Lmin/Lm : 0.96Longitudinal uniformity UI Llmin/Llmax : 0.98 (1.00m)

96 (94) 96 95 97 95 96

102 102 102 102 [103] 102 102

97 99 97 99 98 99 97

18.54 20.83 23.11 25.40 27.69 29.97 32.26[m]

0.33

1.00

1.67[m]

2.3 Calculation results, Tunnel

2.3.6 Table, Einfahrt (E), Wall left, S1: 100%

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 38/43Mustertunnel_E_CIE 88_2004

Average illuminance Eav : 909 lxMinimum illuminance Emin : 854 lxMaximum illuminance Emax : 955 lxUniformity g1 min/average : 1 : 1.07 (0.94) Uniformity g2 min/max : 1 : 1.12 (0.89)

912 907 914 909 927 909 918

941 952 940 [955] 952 953 949

857 872 (854) 876 864 875 862

18.54 20.83 23.11 25.40 27.69 29.97 32.26[m]

Illuminance [lx]

0.33

1.00

1.67[m]

2.3 Calculation results, Tunnel

2.3.7 Table, Einfahrt (L), Wall left, S1: 100%, Obs. 1

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 39/43Mustertunnel_E_CIE 88_2004

Observer location 1 : x = -42.6, y = 1.88, z = 1.5 (dx = 61.14)Average luminance Lav : 86.8 cd/m²Minimum luminance Lmin : 81.5 cd/m²Overall uniformity U0 Lmin/Lm : 0.94Longitudinal uniformity UI Llmin/Llmax : 0.98 (1.00m)

87.1 86.6 87.3 86.8 88.5 86.8 87.6

89.8 90.9 89.7 [91.2] 91 91 90.7

81.8 83.3 (81.5) 83.6 82.5 83.6 82.3

18.54 20.83 23.11 25.40 27.69 29.97 32.26[m]

0.33

1.00

1.67[m]

2 Tunnel

2.4 Calculation results, Tunnel

2.4.1 Table, Innen (E), Int.1

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 40/43Mustertunnel_E_CIE 88_2004

Height of the reference plane : 0.00 mAverage illuminance Eav : 69.6 lxMinimum illuminance Emin : 39.1 lxMaximum illuminance Emax : 87.7 lxUniformity g1 min/average : 1 : 1.78 (0.56) Uniformity g2 min/max : 1 : 2.24 (0.45)

62.6 48.7 54.9 64.9 54.9 48.7 62.6

78.9 71.5 76.5 79.3 76.5 71.5 78.9

84.2 84.5 [87.7] 87.3 [87.7] 84.5 84.2

82.5 81.1 84.8 84.5 84.8 81.1 82.5

74 62.6 68.6 74.6 68.6 62.6 74

51.9 (39.1) 45 54.6 45 (39.1) 51.9

142.21 145.44 148.67 151.90 155.13 158.36 161.59[m]

Illuminance [lx]

0.63

1.88

3.13

4.38

5.63

6.88[m]

2.4 Calculation results, Tunnel

2.4.2 Table, Innen (Ev, West (270°)), Int.1

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 41/43Mustertunnel_E_CIE 88_2004

Vertical illuminanceHeight of the reference plane : 0.10 mfrom direction : West (270°)Average illuminance Eav : 34.4 lxMinimum illuminance Emin : 14.4 lxMaximum illuminance Emax : 62.3 lxUniformity g1 min/average : 1 : 2.39 (0.42) Uniformity g2 min/max : 1 : 4.33 (0.23)

30.7 35.7 24.7 16.3 37.5 30.6 19.8

38 52.7 33.1 18.8 52.2 44.2 24.4

40.3 [62.3] 36.8 19.9 59.8 51.2 26

39.5 59.8 36.1 19.5 57.6 49.5 25.7

35.8 46.4 30.1 17.8 46.9 38.7 22.8

25.9 29.2 21.1 (14.4) 30.9 24.9 17.4

142.21 145.44 148.67 151.90 155.13 158.36 161.59[m]

0.63

1.88

3.13

4.38

5.63

6.88[m]

2.4 Calculation results, Tunnel

2.4.3 Table, Innen (E), Wall right, Int.1

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 42/43Mustertunnel_E_CIE 88_2004

Average illuminance Eav : 24.1 lxMinimum illuminance Emin : 18 lxMaximum illuminance Emax : 30.3 lxUniformity g1 min/average : 1 : 1.33 (0.75) Uniformity g2 min/max : 1 : 1.68 (0.59)

28.9 21.5 24.6 [30.3] 24.6 21.5 28.9

28 20.8 23.6 29.7 23.6 20.8 28

24 (18) 20.4 25.6 20.4 (18) 24

142.21 145.44 148.67 151.90 155.13 158.36 161.59[m]

Illuminance [lx]

0.33

1.00

1.67[m]

2.4 Calculation results, Tunnel

2.4.4 Table, Innen (E), Wall left, Int.1

ObjectInstallationProject numberDate

: Tunnel: Sample: Int_0001: 27.08.2012

Susanne Theuschl - Lighting ConsultantPage 43/43Mustertunnel_E_CIE 88_2004

Average illuminance Eav : 19.9 lxMinimum illuminance Emin : 15.6 lxMaximum illuminance Emax : 24.6 lxUniformity g1 min/average : 1 : 1.28 (0.78) Uniformity g2 min/max : 1 : 1.58 (0.63)

23.4 18.5 20.5 [24.6] 20.5 18.5 23.4

22.4 17.8 19.8 23.8 19.8 17.8 22.4

19.6 (15.6) 17.2 20.7 17.2 (15.6) 19.6

142.21 145.44 148.67 151.90 155.13 158.36 161.59[m]

Illuminance [lx]

0.33

1.00

1.67[m]