51
CONTRACT FORM INCLUDING SPECIFICATIONS FOR FIELD OBTAINED PAVEMENT CORES BY DRILLING CONTRACTORS STATE PROJECT NO. 78-92 BRIDGE NOS. 01708 & 03374 WEST ROAD UNDER ROUTE 2 MARLBOROUGH, CT TABLE OF CONTENTS Page I-1 II-1 III-1 IV-1 IV-8 V-1 I. Invitation to Bid II. Proposal for Field Obtained Pavement Cores III. Contract Agreement for Field Obtained Pavement Cores IV. Specifications for Field Obtained Pavement Cores 1. General Conditions 2. Technical Provisions V. List of Attachments

SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

CONTRACT FORM

INCLUDING SPECIFICATIONS FOR FIELD OBTAINED PAVEMENT CORES

BY DRILLING CONTRACTORS

STATE PROJECT NO. 78-92 BRIDGE NOS. 01708 & 03374

WEST ROAD UNDER ROUTE 2 MARLBOROUGH, CT

TABLE OF CONTENTS

Page

I-1II-1III-1

IV-1IV-8V-1

I. Invitation to BidII. Proposal for Field Obtained Pavement Cores

III. Contract Agreement for Field Obtained Pavement CoresIV. Specifications for Field Obtained Pavement Cores

1. General Conditions2. Technical Provisions

V. List of Attachments

Page 2: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

I-1

INVITATION TO BID

Proposals for the performance of field obtained pavement cores, including securing specimens and other work incidental thereto on and in the general vicinity of the proposed State Project No. 78-92 Bridge No. 01708 & 03374 in Marlborough, Connecticut; West Road under Route 2. Bids will be received by CME Associates, Inc., until August 5, at 8:00AM, Eastern Daylight Time. Deliver all bids to CME Associates, Inc., 101 East River Drive, 1st Floor, East Hartford, CT 06108, and via email to [email protected].

Plans, specifications, proposal form and form of contract are attached hereto.

Proposals must be made upon the form provided. The blank places in the form must be filled in as noted, and no change shall be made in the phraseology of the proposal or in the items mentioned herein. Proposals that contain any omissions, alternations, additions, or items not called for in the itemized proposal, or that contain irregularities of any kind, may be rejected as non-responsive.

A performance contract bond and payment bond, each in the sum of one hundred percent (100%) of the contract price, will be required on execution of the contract.

A Certificate of Insurance in compliance with the insurance terms set forth in the Contract Agreement for Subsurface Explorations, must be submitted with this proposal.

CME Associates, Inc. reserves the right to reject any or all bids.

Page 3: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

II-1

PROPOSAL FOR FIELD OBTAINED PAVEMENT CORES

AT THE SITE OF

STATE PROJECT NO. 78-92 BRIDGE NOS. 01708 & 03374

WEST ROAD UNDER ROUTE 2 MARLBOROUGH, CONNECTICUT

TO: CME Associates, Inc. In submitting this bid, the undersigned declares that he/she is the only person or persons interested in the said bid; that it is made without any connection to any person making another bid for the same contract; and that the bid is, in all respects, fair and without collusion, fraud, or mental reservation.

The undersigned also declares that he has carefully examined the plans, specifications and form of contract and that he has personally inspected the actual location of the work, together with the local sources of supply; has satisfied himself as to all the quantities and conditions; and understands that in signing this proposal, he waives all right to plead any misunderstanding regarding same.

The undersigned further understands and agrees that he is to furnish and provide for the respective unit bid price, all the necessary material, machinery, tools, labor, services, etc., and to do and perform all the necessary work under the aforesaid conditions, to complete the work in accordance with the plans and specifications, which plans and specifications it is agreed are a part of this proposal. The list of bid items, together with the estimated quantities thereof, is set forth in the Bid Sheet, which accompanies and forms a part of this proposal. The undersigned further agrees that his total bid prices, which shall be evaluated in comparison with the total bid prices of other bidders, shall be completed as the summation of the products of the approximate quantities shown on the Bid Sheet multiplied by the gross sum bid. In case of discrepancy between the words and the numerals giving the unit bid prices, the words shall govern.

Furthermore, the undersigned fully understands that the quantities of the items set forth in the Bid Sheets are only approximate and agrees to accept the unit price as full compensation for the actual quantities of such items required to complete the work to the satisfaction of the Engineer, be the quantities more or less than those set forth in the Bid Sheets.

The undersigned agrees to submit a schedule of progress or time chart for the work concerned if so requested by the Engineer after the opening of the bids, and to do so within three (3) days of such request. The schedule or chart will be used in consideration of the bids and after award of the contract by the Inspector in the field as a check on the actual progress.

On acceptance of this proposal for said work, the undersigned does hereby bind himself to enter into written contract with CME Associates, Inc. within five (5) days of the date of notice of award and to comply in all respects with the terms of said contract. The undersigned agrees that this proposal shall be valid for thirty (30) calendar days from the date of this proposal.

All proposal guaranties will be returned within three (3) calendar days following the award of the contract. When the award is deferred for a period of time longer than ten (10) calendar days after the opening of the proposals, all guaranties, except those of the three lowest bidders, will be returned. Should no award be made within 30 calendar days after the opening of proposals, all proposals will be rejected and the proposal guaranty returned, except that with the approval of the Bidder and the Surety, the Engineer may retain the proposal and proposal guaranty of the low bidder for as long as may be agreed upon by the Engineer, Bidder and Surety.

Page 4: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

II-2

Date ______________20______

Print Legal Name of Person, Firm, or Corporation

By (Signature)

Bidder’s Address (Not a P.O. address):

Street

City and State

Telephone Number

Email Address

If a Corporation: Name Address

President

Secretary

Treasurer

If a Firm: Name Address

Page 5: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

II-3

PROPOSAL FOR FIELD OBTAINED PAVEMENT CORES – BID SHEET

STATE PROJECT NO. 78-92 BRIDGE NOS. 01708 & 03374, IN MARLBOROUGH, CONNECTICUT

WEST ROAD UNDER ROUTE 2

TOTAL OR GROSS SUM BID, (WRITTEN IN WORDS):

** TOTAL OR GROSS SUM BID, DOLLARS/CENTS (IN FIGURES): $ ** This value will be used for comparison of Bids.

DIRECT COSTS

Item No. and Description Estimated Duration *Daily Rate *Weekly

Rate*Weekend

Rate*Monthly

Rate

6. Traffic Person(For uniformed traffic control

on non-railroad property) 5 Hours $__________ $__________ $__________ $__________

* If applicable, the Bidder should submit a rate for each category. “N/A” should be shown for non-applicable categories.

Estimated Total for Traffic Person $ __________________________________

Item No.

Approx. Quantities

Item Description – Pay Unit Unit Bid Price (in words)

Unit bid price

dollars/cents (in figures)

Amount of Bid

dollars/cents (in figures)

1 6 PAVEMENT CORINGS, 4” DIAMETER - EACH ________________________________________

2 6 CORE HOLE PATCHING (HOT-MIX) – EACH ________________________________________

3 6 CORE HOLE PATCHING (COLD-MIX) – EACH ________________________________________

4 2 STANDBY TIME – HOURS ________________________________________

5 LS MOBILIZATION AND DEMOBILIZATION – LAND ________________________________________

Page 6: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

II-4

PROPOSAL FOR FIELD OBTAINED PAVEMENT CORES – BID SHEET - Continued

STATE PROJECT NO. 78-92 BRIDGE NOS. 01708 & 03374, IN MARLBOROUGH, CONNECTICUT

WEST ROAD UNDER ROUTE 2

Item No. and Description

Estimated Duration

*Daily Rate

(8hr/per day at job site including

travel time)

*Weekly Rate

(8hr/per day at job site including

travel time)

*Weekend Rate

(8hr/per day at job site including

travel time)

*Monthly Rate

(8hr/per day at job site including

travel time)

*Over-time Hourly Rate

(for hours beyond

daily rate)

7. Traffic Control Equipment

(For work obtruding onto roadways)

_5 Hours _ $________ $________ $________ $________

$________ (weekday) $________ (weekend)

Additional Fees Describe: $ _______

* If applicable, the Bidder should submit a rate for each category. “N/A” should be shown for non-applicable categories. Estimated Total for Traffic Control Equipment $

Page 7: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

III-1

CONTRACT AGREEMENT FOR OBTAINING PAVEMENT CORES

AT THE SITE OF

STATE PROJECT NO. 78-92 BRIDGE NOS. 01708 & 03374, IN MARLBOROUGH, CONNECTICUT

WEST ROAD UNDER ROUTE 2

1. GENERAL AGREEMENTThis agreement, made and entered into this ________________, 2019, by and between CMEAssociates, Inc., hereinafter referred to as the “Engineer” or the Party of the First Part, and_______________________, hereinafter referred to as the Contractor or the Party of the Second Party,

WITNESSETH:

The Contractor shall furnish all labor, materials, equipment, supplies and other facilities, and shall perform all work necessary or proper for or incidental to obtaining field pavement cores at the locations on the plans at the site West Road under Route 2 in Marlborough, Connecticut, in strict accordance with the Specifications found herewith and the accompanying Contract Plans, and to the satisfaction and approval of the Engineer; and shall perform all other obligations and assume all liability imposed upon him by the Contract and Specifications.

In full consideration thereof, the Engineer will pay the Contractor, at the times and in the manner hereinafter provided, an amount determined by the prices named in the Clause, hereof entitled "Contract Unit Prices," and, except as otherwise provided herein, such amounts only. The prices for items named therein include full compensation to the Contractor for all labor, materials, and other things incidental to the completion of the entire work. Such payment shall be computed upon the basis of the actual quantities in the completed work, whether such quantities be more or less than those shown in the Bid Sheet bound herewith.

2. CONTRACT UNIT PRICESSubject to the provisions of this Contract, the Engineer will pay and the Contractor shall accept in fullconsideration for the performance of the Contractor's obligation hereunder, the unit prices stated on thebid sheets.

1. For PAVEMENT CORINGS, 4” DIAMETER $__________ Per Each

2. For CORE HOLE PATCHING (HOT-MIX) $__________ Per Each

3. For CORE HOLE PATCHING (COLD-MIX) $__________ Per Each

4. For STANDBY TIME $__________ Per Hour

5. For MOBILIZATION AND DEMOBILIZATION - LAND $ __________Lump Sum

TOTAL OR GROSS SUM BID, (WRITTEN IN WORDS):

_________________________________________________________________________________

TOTAL OR GROSS SUM BID, DOLLARS/CENTS (IN FIGURES):

Page 8: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

III-2

DIRECT COSTS Subject to the provisions of this Contract, the Engineer will pay, and the Contractor shall accept in full consideration for the performance of the Contractor's obligation hereunder, reimbursement as Direct Costs for the following items:

Estimated Total $_______

Estimated Total $_______

3. AUTHORIZED FEE LIMIT:

The value of the “Total or Gross Sum Bids” combined with the estimated value of all Direct Costs, submitted by the Contractor in the bid, will be the “Authorized Fee Limit” unless unexpected site conditions are encountered or a change in coring methodology is required and is approved by the Engineer. Under these circumstances’ adjustments to the “Authorized Fee Limit” may apply. If the “Approximate Quantity”, indicated on the Bid Sheets, exceeds the amount by up to ten percent (10%), authorization for additional payment by the Inspector in the field will be acceptable. If the “Estimated Duration” for Traffic Person and/or Traffic Control Equipment, indicated on the Bid Sheet, exceeds the amount by up to fifty percent (50%), authorization for additional payment by the Inspector in the field will be acceptable. If either of the authorized percentages is exceeded, authorization by the Engineer will be required. If any item on an invoice is questioned, CME Associates, Inc. may withhold payment of the amount in question, without interest, until the matter is resolved between the Parties, but shall promptly pay the amount not in question, in accordance with Payment terms of this contract.

4. EXTRA WORK

Unforeseen work made necessary by changes in plans or work necessary to complete the pavement coring, for which no price is provided in the contract, shall be classified as extra work and done in accordance with the requirements of the specifications and as directed by the Engineer. The Engineer shall notify the Contractor of the necessity for extra work, stipulating its character and extent. Upon receipt of such notification, the Contractor shall notify the Engineer, in writing, of the compensation, either unit price or lump sum as requested, for which he proposes to perform the extra

Item Estimated Duration Daily Rate Weekly Rate

Traffic Person (For uniformed traffic control) 5 Hours

Item Estimated Duration Daily Rate Weekly Rate

Traffic Control Equipment (For work obtruding

onto roadways) 5 Hours

Page 9: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

III-3

work required. The Engineer may accept the compensation proposed by the Contractor, or if he considers the prices submitted to be excessive, he may order the work done on a "Cost Plus" basis as specified hereinafter. In either case, the character and extent of extra work, together with the accepted basis of compensation shall be communicated to the Contractor in writing. If the Engineer orders extra work performed on a "Cost Plus" basis, the Contractor shall perform the same and shall receive in payment therefor an amount equal to the actual net cost in money to him of the materials, wages of applied labor, other direct expense and insurance required for labor, plus 20 percent of the above items and plus such rental for plant and other equipment (other than small tool) as the Engineer deems reasonable, and that amount only. If the work is performed on a unit price basis, there is no markup. No work shall be considered Extra Work unless it has been ordered in writing as such by the Engineer before the said work started, or unless the Contractor shall file a written claim for Extra work with the Engineer within two (2) days from the date of instructions from the Engineer or his representative to proceed with such work.

5. PAYMENT Partial Payment(s): On or about the first day of each calendar month, the Engineer may request the Contractor to furnish information necessary to estimate the value of the work satisfactorily done up to that time. Within thirty (30) days after receipt of this information, the Engineer will request the State to pay him 90% of the value of the work thus estimated, less any previous payments made; and the Engineer, within ten (10) days after receipt of such payment from the State, will pay to the Contractor the amount thus received. Final Payment: Upon verification of the satisfactory completion of all work whatsoever required, the Contractor shall furnish to the Engineer satisfactory evidence that all just liens, claims and demands for rental of equipment, labor and material, arising out of such work, are fully satisfied, and that all of the work is fully released from liens, claims and demands, whether just or otherwise. Within thirty (30) days after receipt of such evidence, the Engineer will request the State to pay him the total value of all work satisfactorily done, less any payments previously made, and within ten (10) days of receipt of this Final Payment from the State, the Engineer will pay to the Contractor all amounts still outstanding and due him. All prior estimates and payments shall be subject to correction in this payment, which is throughout this Contract called the Final Payment.

6. CONTRACT NOT TO BE ASSIGNED The Contractor shall give his personal attention constantly to the faithful prosecution of the work. He shall not assign or otherwise dispose of the Contract, or his right, title or interest in or to the same or any part thereof.

7. MODIFICATION OF CONTRACT No modification of or change in this Contract shall be valid or enforceable against either of the parties unless it is in writing and signed by the parties or their duly authorized representatives.

8. DEFAULT OF CONTRACT When, in the opinion of the Engineer, the project or any part thereof has been abandoned, or the Contractor is willfully violating any of the covenants of this Contract, then the Engineer may declare the Contractor in default of the Contract and notify him to discontinue the project. The Engineer may then call on the Surety to complete the project.

Page 10: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

III-4

9. TERMINATION “CME” may terminate this “Agreement” for cause on one week’s written notice of default to “the Sub-consultant”. If the breach or default is capable of being cured within two weeks of receipt of the notice of default, “the Sub-consultant”, at “CME’s” discretion, shall be given up to two weeks to cure the default provided they make an immediate and substantive effort to cure the default. If the default, in “CME’s” view, will take longer than two weeks to cure or if the default places “CME” or “the Sub-consultant” in violation of the law or the “Contract” requirements, no opportunity to cure the default shall be required. Upon termination with cause, “the Sub-consultant” shall be due payment for the percentage of work completed by “the Sub-consultant” at the time the notice is given less the amount needed to cure the default. No other profit or compensation shall be due to “the Sub-consultant” for termination with cause.

10. COMMENCEMENT OF WORK Subject to weather and/or safe navigation circumstances and/or delays receiving required permits, the Contractor agrees to mobilize and actually start work on the Contract within twenty-one (21) consecutive calendar days from the date of the written notice to proceed. Failure to start the work within this timeframe will be considered a breach of this contract and may be cause for collection of the monies in the Performance and Payment bonds for completion of the work by others, unless the delayed start is authorized by the Engineer in writing.

11. PERFORMANCE CONTRACT BOND AND PAYMENT BOND The successful Bidder, at the time of the execution of the contract, shall deposit with the Engineer, a surety company bond for the satisfactory completion of the work and a surety company bond for the payment of all debts pertaining to materials, rental of equipment, and labor used or employed in the execution of the Contract. These bonds shall each be in an amount equal to the amount of the contract award and in a form acceptable to the Engineer. The Surety must be a corporate surety licensed to sign surety bonds in the State of Connecticut.

12. INSURANCE The Bidder, to whom the Contract has been awarded, shall furnish to the Engineer, prior to the commencement of any work, satisfactory proof that all provisions, herewith specified, relating to the Contractor's insurance have been fully complied with.

13. WAIVER OF RESPONSIBILITY It shall be understood that preliminary data obtained by subsurface explorations prior to this Contract and presented for examination by prospective bidders is not intended as a warranty of actual subsurface conditions to be encountered. The Engineer will bear no responsibility for the accuracy or suitability of subsurface information made available for examination and the conditions indicated by such information shall not be used by the Contractor as possible cause for subsequent revisions or waivers in the Contract.

14. NON-LIABILITY OF THE STATE AND ENGINEER'S REPRESENTATIVES No agents or employees of the Engineer, the State of Connecticut, all officers, agents and servants of the State of Connecticut, Commissioner of Transportation and his successors, shall be charged personally by the Contractor with any liability or held liable to him, under any terms or provisions of this Contract or because of its execution or attempted execution, or because of any breach thereof.

Page 11: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

III-5

15. CONTRACTOR'S WARRANTIES The Contractor represents and warrants: That he is financially solvent; that he is experienced in and competent to perform the type of work contemplated by this Contract. That he has carefully examined the specifications, plans, and the site of the work, the general and local conditions, and other matters which may in any way affect the work or its performance.

IN WITNESS WHEREOF, the parties have caused these presents to be signed and sealed the day and year first above written.

Witness

_______________________________________ By __________________________________ Witness Signature Contractor Signature _______________________________________ ___________________________________ Print Name and Title Print Name and Title _______________________________________ _________________________________________ Date Date

Witness

_______________________________________ By __________________________________ Witness Signature Engineer Signature _______________________________________ _________________________________________ Print Name and Title Print Name and Title _______________________________________ _________________________________________ Date Date

Page 12: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-1

SPECIFICATIONS FOR OBTAINING PAVEMENT CORES

SECTION 1 – GENERAL CONDITIONS

1-1 Definitions "Engineer" shall mean the firm of CME Associates, Inc., or their authorized representative. "Commissioner of Transportation" shall mean the Commissioner of Transportation for the State of Connecticut, acting directly or through his duly authorized representative. "Contractor" shall mean the person, persons, or corporation, which has executed the Contract with the Engineer for the proposed work. "Inspector" shall mean the firm of CME Associates, Inc., or their authorized representative. "State" and/or “Department” shall mean the State of Connecticut Department of Transportation

1-2 Authority and Duties of the Engineer All work shall be performed to the satisfaction of the Engineer and at such times and places, by such methods and in such manner and sequence as he may require and shall at all stages be subject to his inspection. Upon request of the Contractor, the Engineer will confirm in writing any oral order, direction or requirement.

1-3 Authority and Duties of the Inspector The Inspector is the Engineer’s representative in the field, responsible for oversight of the Contractor and ensuring that the work progresses in accordance with these Specifications. The Inspector has the authority to make decisions in the field regarding, but not limited to, core locations and quantities of pay items. The Inspector will log the cores, their thickness and general composition, and note the character of the visible subbase.

1-4 Injury to Persons or Property The Contractor shall be responsible for all injury to persons or damage to property, either directly or indirectly, that may result from his operations.

1-5 Insurance With respect to the operations performed by the Contractor under the terms of this contract and also those performed for the Contractor by its subcontractors, the Contractor will be required to carry at its own cost and for the duration of this contract, and any supplements thereto, with the State of Connecticut, National Railroad Passenger Corporation (AMTRAK), Metro North Railroad (MNRR) (when applicable on projects over/near Amtrak/MNRR), CME Associates, Inc., and other 3rd Parties necessary for the successful completion of the work, being named as additional insured parties in conjunction with paragraph (A) and (B) below, the following minimum insurance coverages at no direct cost to the State or CME Associates, Inc. In the event the Contractor secures excess/umbrella liability insurance to meet the minimum requirements specified in paragraphs (A) and/or (B) below, the State of Connecticut, Town of Marlborough, AMTRAK, MNRR, CME Associates, Inc., and other 3rd Parties necessary for the successful completion of the work, shall be named as additional insured.

Page 13: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-2

1-5a Insurance Provisions The State of Connecticut, its officers, officials, employees, agents, Boards and Commissions, CME Associates, Inc., and other 3rd Parties necessary for the successful completion of the work, shall be named as additional insured. The coverage shall contain no special limitations on the scope of protection afforded to the State. The Contractor shall assume any and all deductibles in the described insurance policies. The Contractor’s insurers shall have no right of recovery or subrogation against the State and the described insurance shall be primary coverage. Any failure to comply with the claim reporting provisions of the policy shall not affect coverage provided to the State. Each required insurance policy shall not be suspended, voided, cancelled or reduced except after 30 days prior written notice by certified mail has been given to the State. “Claims Made” coverage is unacceptable, with the exception of Professional Liability. The Contractor agrees that he/she will not use the defense of Governmental immunity in the adjustment of claims or in the defense of any suit, unless requested by the State. A. COMMERCIAL GENERAL LIABILITY The Contractor shall carry Commercial General Liability Insurance, including Contractual Liability Insurance, providing for a total limit of One Million Dollars ($1,000,000) for all damages arising out of bodily injuries to or death of all persons in any one accident or occurrence, and for all damages arising out of injury to or destruction of property in any one accident or occurrence, and, subject to that limit per accident, a total (or aggregate) limit of Two Million Dollars ($2,000,000 ) for all damages arising out of bodily injuries to or death of all persons in all accidents or occurrences and out of injury to or destruction of property during the policy period.

B. AUTOMOBILE LIABILITY The operation of all motor vehicles, including those hired or borrowed, used in connection with the Agreement shall be covered by Automobile Liability Insurance providing for a total limit of One Million Dollars ($1,000,000) for all damages arising out of bodily injuries to or death of all persons in any one accident or occurrence, and for all damages arising out of injury to or destruction of property in any one accident or occurrence. In cases where an insurance policy shows an aggregate limit as part of the aut

D. WORKERS' COMPENSATION With respect to all operations the Contractor performs and all those performed for the Contractor by subcontractors, the Contractor and subcontractor(s) shall carry Workers' Compensation Insurance and, as applicable, insurance required in accordance with the U.S. Longshore and Harbor Workers' Compensation Act, in accordance with the requirements of the laws of the State of Connecticut, and of the laws of the United States respectively.

Failure of the Contractor to maintain insurance coverage in accordance with the terms of the agreement shall constitute a violation of the agreement and shall subject the Contractor to liquidated damages in the amount of ten percent (10%) of the total contract price, subject to the continued commercial availability of such insurance.

Page 14: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-3

E. POLLUTION AND/OR ENVIRONMENTAL The Contractor agrees to acquire and maintain pollution and environmental impairment coverage, if such insurance is applicable to the work performed by the Contractor under this agreement.

Failure of the Contractor to maintain insurance coverage in accordance with the terms of the agreement shall constitute a violation of the agreement and shall subject the Contractor to liquidated damages in the amount of ten percent (10%) of the total contract price, subject to the continued commercial availability of such insurance.

F. CERTIFICATE OF INSURANCE In conjunction with the above, the Contractor agrees to furnish to the State a Certificate of Insurance on a form acceptable to the State, fully executed by an insurance company or companies satisfactory to the State, for the insurance policy or policies required hereinabove, which policy or policies shall be in accordance with the terms of said Certificate of Insurance. In addition, the original Railroad Protective Liability Insurance Policy must be submitted to AMTRAK/MNRR prior to commencement of operations (when applicable to projects near railroads).

The Contractor shall produce, within five (5) business days, a copy or copies of all applicable insurance policies when requested by the State. In providing said policies, the Contractor may redact provisions of the policy that are proprietary. This provision shall survive the suspension, expiration or termination of this agreement/contract.

1-5b Additional Coverage Other types of coverage may be offered by the Contractor. (I) UMBRELLA LIABILITY: In the event the Contractor secures excess/umbrella liability insurance to meet the minimum requirements specified as items A, B, C, D, E and F (when required), the State of Connecticut must be named as Additional Insured. The State of Connecticut must be the Named Insured if a separate umbrella policy is obtained to supplement the coverage specified for item A.

1-5c Certificate of Insurance The Contractor agrees to furnish to the Engineer a Certificate of Insurance in conjunction with Items A, B, C, D, E and F above, fully executed by an insurance company or companies satisfactory to the State, for the insurance policy or policies herein above, which policy or policies shall be in accordance with the terms of the Accord form. For the Workers’ Compensation Insurance and, if applicable, the U.S. Longshoremen and Harbor Workers’ Compensation Act coverage, the policy number (s) and term of the policy (ies) shall be indicated on the Certificate of Insurance. Each insurance policy shall state that the insurance company agrees to investigate and defend the insured against all claims for damage, even if groundless.

1-5d Responsibility for Claims and Liability (a) The Contractor shall indemnify and hold harmless, National Railroad Passenger Corporation

(AMTRAK), Metro North Railroad (MNRR) (when project is over/near railroad), CME Associates, Inc, and other 3rd Parties necessary for the successful completion of the work, the State and its officers, representatives, agents, servants, employees, successors and assigns from and against any and all (1) Claims arising directly or indirectly in connection with the Agreement, concerning the negligent acts of commission or omission (collectively, the “Acts") of the Contractor or Contractor Parties, and (2) liabilities, damages, losses, costs and expenses, including but not limited to attorneys' and other professionals' fees, arising directly or indirectly in connection with Claims, Acts or the Agreement, to

Page 15: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-4

the extent of the Contractor's or Contractor Parties' negligence. The Contractor's obligations under this section to indemnify and hold harmless against Claims includes Claims concerning confidentiality of any part of or all of the Contractor's bid, proposal or any Records, any intellectual property rights, other proprietary rights of any person or entity, copyrighted or un-copyrighted compositions, secret processes, patented or unpatented inventions, article or appliances furnished or used in the performance.

(b) The Contractor shall not be responsible for indemnifying or holding the State harmless from any liability arising due to the negligence of the State or any third party acting under the direct control or supervision of the State.

(c) The Contractor shall reimburse the State for any and all damages to the real or personal property of the State caused by the Acts of the Contractor or any Contractor Parties. The State shall give the Contractor reasonable notice of any such Claims.

(d) The Contractor's duties under this section shall remain fully in effect and binding in accordance with the terms and conditions of the Agreement, without being lessened or compromised in any way, even where the Contractor is alleged or is found to have merely contributed in part to the Acts giving rise to the Claims and/or where the State is alleged or is found to have contributed to the Acts giving rise to the Claims.

(e) The Contractor shall carry and maintain at all times during the term of the Agreement, and during the time that any provisions survive the term of the Agreement, sufficient general liability insurance to satisfy its obligations under this Agreement. The Contractor shall name the State as an additional insured on the policy. The Department shall be entitled to recover under the insurance policy even if a body of competent jurisdiction determines that the Department or the State is contributorily negligent.

(f) This section shall survive the termination of the Agreement and shall not be limited by reason of any insurance coverage. The Contractor shall not use the defense of Sovereign Immunity in the adjustment of claims or in the defense of any suit, including any suit between the State and the Contractor, unless requested to do so by the State. If this Agreement is between the State and a Municipality, the Municipality agrees that in the event of an adjustment of claims or in the defense of any suit between the State and the Municipality, the Municipality shall not use the defense of Governmental Immunity.

1-6 Laws To Be Enforced The Contractor, at all times, shall observe and comply with all federal and state laws and local bylaws, ordinances, and regulations in any manner affecting the conduct of the work or applying to employees on the project, as well as all orders or decrees which have been promulgated or enacted, by any legal bodies or tribunals having authority or jurisdiction over the work, materials, employees for contract.

1-7 Right of Way and Damage to Property The Contractor shall obtain all necessary permits and licenses at his own expense from the authorities having jurisdiction. The Contractor shall comply with all federal laws, state statutes and local ordinances of the city, town, or village in which the work is being done. The Contractor shall be responsible for carrying out the work in accordance with the provisions of all permits.

Page 16: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-5

The Contractor may occupy during his operations only those portions of streets or public places at the core locations for which the required permits have been obtained by him. If the Contractor desires to use additional areas outside of those required for the cores, he shall arrange for such areas at his own expense. The Contractor shall take every precaution against injuring utilities, or private properties and shall promptly repair at his own expense any damage to such utilities, or private property, to the satisfaction of the Engineer. Property, which is damaged as the result of the Contractor’s operations, shall be repaired at the Contractor's expense, including re-sodding of any areas where the grass is damaged, to the satisfaction of the Engineer. Pavement shall be repaired as specified in the Technical Provisions. The location of all stationary and mobile equipment shall be subject to the approval of the Engineer and upon the completion of the Contractor's operations at each site, he shall remove equipment therefrom and shall clear the area of all debris and restore it to the condition existing before the start of his operations. The Contractor shall carry on his operations without interference or delay to traffic, except as approved by the permit. He shall furnish all labor, material, watchmen, barricades, signs, and lights necessary to maintain traffic, to protect his work and the public during the operations, and to comply with all orders of the Engineer and of all other agencies having jurisdiction. The Contractor is cautioned that there shall be no entry of his equipment or personnel upon private property until the Engineer first notifies him that such entry is permissible in accordance with state statutes and state policy and until he, the Contractor, then informs the property owner that entry is being made pursuant to said notification. He shall, at all times, carry out his operations so as to inconvenience no resident at or near the working area. The Contractor shall make clear to all his personnel, the importance of proper public relations. The Engineer will not condone any rude or inconsiderate treatment of any citizens of the State by personnel employed on this project. The Engineer reserves the right to require the removal from the work of any persons or persons employed by the Contractor who has violated this section of the specifications, and such person or persons shall not be employed again thereon without the written consent of the Engineer.

1-8 Cleaning Up and Restoration After completing the work, the Contractor shall promptly remove all plant and other materials brought by him to the site and restore the site to its original condition. Each core hole shall be restored as specified in the Technical Provisions.

1-9 Progress and Time of Completion Subject to weather and/or safe navigation circumstances and/or delays receiving required permits, the field work under this Contract shall be commenced within twenty-one (21) consecutive calendar days from the date of the written notice to proceed. Once the actual field work is started, subject to weather and/or safe navigation circumstances, it shall be prosecuted continuously to completion within six (6) business days. If the quantities stated in the proposal are increased, as hereinafter provided, the number of calendar days allowed for completion will be similarly increased, if warranted. This increase will be in the same proportion as the increase in the total payments to the Contractor above the amount of the executed Contract. Aside from weather and/or safety navigation delays, or other delays outside of the Contractor’s control, shall the Contractor fail to complete the work hereunder in accordance with the Contract within forty-five (45) calendar days from written Notice to Proceed, he shall pay to the Engineer the sum of $500 for each

Page 17: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-6

and every calendar day that the time consumed in said completion exceeds the above-mentioned time allowed for that purpose. This sum shall not be considered as a penalty, but as the liquidated damages that the CME Associate, Inc. will suffer by reason of said delay. The Engineer shall deduct the amount of such liquidated damages from the monies, which may be due or become due to the Contractor under this Contract.

1-10 Health and Safety Plan The Contractor shall have a General Health and Safety Plan for the work to be performed and assumes full responsibility for site safety of the Contractor’s personnel. The Department or Engineer may request a copy of the health and safety plan. The purpose of this requirement is to assure proper and safe conduct of drilling operations. Items to be covered in the General Health and Safety Plan include, but are not limited to general safety practices of drill rig movement and operation:

• Protective clothing and gear • Buried and overhead utilities • Working over water • First Aid • Inclement weather policy

1-11 Railroad Safety Training – When applicable on projects over/near railroads. The Contractor and his/her personnel involved in the work to be performed shall coordinate and complete all required railroad safety training as set forth by Amtrak/Metro North requirements and assumes full responsibility for Railroad Safety Training of the Contractor’s personnel. The Engineer may request a copy of the certificate of training completion and/or copy of ID passes, if any, issued by the railroad.

1-12 Work Day

Typical allowable work hours for operations on paved surfaces of roadways are from 9:00 a.m. to 4:00 p.m. This includes the time to set up and remove sign patterns and any other devices needed for traffic control. The Order of Conditions of the project specific Encroachment Permit may shorten or lengthen the typical allowable hours. The Contractor is required to obtain an Encroachment Permit from the District before performing any work within the State ROW. The Contractor is required to obtain a Permit from the Town before performing any work within the Town ROW or easement. Typically, no work is allowed during inclement weather. Work on Interstate Highways and other Limited Access Expressways may have further restrictions, one of which may be, work requiring the closure of 2 or more lanes may need to be performed at night. The Contractor will not be permitted to work on the following Legal Holidays; New Year's Day, Washington's Birthday, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, Martin Luther King Day, Lincoln's Birthday, Columbus Day, and Veteran's Day. Also, the Contractor will not be permitted to work on the day before and the day after any of the above Legal Holidays on Interstate Highways, Limited Access Expressways, or Railroads. No additional premium will be paid for work required outside of the normal work hours. No work of any kind shall be performed by the Contractor without prior approval of the Engineer. On-site work deviating from normal work hours (restricted hours and night work) will not be required, if so, it shall be conducted as shown in the Order of Conditions of the Encroachment Permit, which the Contractor must obtain from the District or Town prior to executing the work. A list of conditions expected to be included on the Contractor’s Encroachment Permit is included in the appendices.

Page 18: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-7

Restrictions for work on West Road are expected to include the following:

1. No work that will interfere with the flow of traffic will be permitted before 9:00 a.m. and after 4:00 p.m., for any work on the paved surface.

2. No work will be allowed during inclement weather or weekends. 3. Holiday Restrictions: No permit work within the highway right of way will be permitted the day

before a legal holiday and no work shall be resumed until 12:00 noon the day following the holiday, unless otherwise approved or indicated. Weekends shall be considered as part of the holiday when the legal holiday falls on a Friday or Monday.

Page 19: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-8

SECTION 2 – TECHNICAL PROVISIONS

2-1 Scope of Work The work to be done under this contract includes the furnishing of all material, labor, equipment, water supply and all else necessary for coring holes in pavement and extracting the pavement cores as described herein and shown on the Contract Plans. The work is located on West Road, within the limits of State Project No. 78-92, Rehabilitation of Bridge Nos. 01708 & 03374, Carrying Route 2 WB/EB over West Road in Marlborough, CT.

2-2 Contract Plans The work shall conform to drawings prepared by CME Associates Inc. and titled as follows: Drawing Set Title Rehabilitation of Bridge No. 01708 & 03374 Route 2 EB/WB over West Road Proposed Pavement Core Locations

2-3 Supervision The work shall be performed under the supervision and direction of the Inspector. No pavement coring shall be done except in the presence of the Inspector. The Inspector will keep the logs of the coring to determine that the information designated herein is being obtained, and see that all specimens are properly preserved and protected against damage. If requested by the Inspector, the cores shall be boxed and stored in a suitable place or immediately turned over to the Inspector, as provided hereafter.

2-4 Existing Conditions Before any pavement coring is performed, the Contractor shall contact “Call Before You Dig” at (860) 922-4455 to obtain a request number in accordance with State and Federal laws. The request number expires in 30 calendar days; therefore, the Contractor is responsible for maintaining an active request number. The Contractor will supply the Engineer with the request number(s) prior to the start of work. During the progress of the work, the Contractor shall cooperate with the owners of the utilities and permit their representative access to the work to determine if their utilities are being endangered in any way. Any relocation of core holes shall be done with the approval of the Inspector. In addition to contacting “Call Before You Dig”, the Contractor is required to notify Mr. Mark Elliott at (860) 823-3254, of the State of Connecticut Department of Transportation, to locate all State-owned utilities.

2-5 Contractor's Plant and Equipment All plant, equipment, and methods to be used by the Contractor shall be subject to approval by the Engineer and Amtrak/MNRR (when applicable for projects over railroads) at all times during the work; however, approval of the equipment shall not be construed as including the approval of the performance thereof. Additional equipment and methods shall be provided when ordered by the Engineer if required to perform the work satisfactorily according to the Specifications.

Page 20: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-9

2-6 Schedule of Operations The Contractor shall submit in writing, upon request of the Engineer, a schedule of operations for the work. The Engineer shall be notified at least 48 hours in advance of deviations from the schedule and such deviations shall be subject to the approval of the Engineer.

2-7 Cooperation by Contractor The Contractor shall at all times have on the site, as his agent, a competent superintendent or foreman thoroughly experienced in the type of work being performed, who shall receive instructions from the Inspector. The superintendent shall have full authority to execute the orders or directions of the Inspector, without delay, and to supply promptly such materials, equipment, tools, labor and incidentals as may be required.

2-8 Character of Workmen The Contractor shall employ only superintendents, foremen, and workmen as are careful and competent, and the Engineer may demand the dismissal of any person or persons employed by the Contractor in or about the work who misconduct himself or be incompetent or negligent in the due and proper performance of his or their duties, or neglects or refuses to comply with the directions given, and such person or persons shall not be employed again thereon without the written consent of the Engineer. Should the Contractor continue to employ or again employ such person or persons, the Engineer may withhold all payments, which are due or become due, or the Engineer may suspend the work until such orders are complied with.

2-9 Line and Grade Line and grade for the entire work will be established and laid out by the Engineer or Inspector. The Contractor shall execute the work to such line and grade. 2-10 Pavement Coring – 4” Diameter At each location indicated on the plans, the Contractor shall take a continuous core specimen of the pavement to the depth of the granular subbase, or as directed by the Engineer, by means of a rotary method and a bit of such size as to yield a 4" diameter pavement core. The core bit shall be started at the pavement surface and the pavement shall be cored until the bit reaches granular subbase material. When the coring is complete, the pavement core shall be withdrawn, labeled and stored before drilling is begun at another location. The Engineer reserves the right to reduce the length of core run as necessary to effect maximum recovery. Upon removal of the pavement core, the Inspector shall be given access to the core hole in order to make a visual assessment of the subbase and measure the depth of the hole. The Contractor shall aid the Inspector in physically locating the core hole by means of 3 swing ties to prominent physical features located on the project survey. Following the Inspector’s assessment, the core hole shall be patched with bituminous concrete as described below. Core specimens shall be carefully handled and clearly labeled with a permanent marking to insure their proper identification. If the core specimen cannot be withdrawn from the hole as a continuous core specimen, then they shall be extracted in order and labeled sequentially and placed in a container in the order in which they are removed from the hole. The coring method and equipment may need be adjusted according to the field conditions, if pavement core specimens cannot be extracted as continuous specimens. The Contractor shall notify the Inspector if concrete pavement (most likely with steel reinforcing bars) is encountered under the bituminous concrete, and the coring must continue to the full thickness of the concrete pavement and until the underlying granular subbase is reached.

Page 21: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-10

Each pavement core specimen shall be placed in a suitable cardboard box. Pavement cores specimens shall be clearly labeled and arranged neatly in the boxes in the sequence in which the material was removed from the hole. The boxes shall be labeled showing the date the core was taken, town, road name, project number, coring number, depth of core, Contractor and Driller names.

2-11 Abandoned Core Holes Should the hole be abandoned without the permission of the Inspector, or should a core hole be started and for any reason not be carried to the depth required by the Inspector, or should the Contractor fail to allow the Inspector to make complete records of materials encountered, or to furnish the Inspector the required core specimens, then the Contractor will make an additional core hole at a location selected by the Inspector, and no payment will be made for either the abandoned hole or any core specimens obtained therein. However, the Contractor will make a record of abandoned core holes and note thereon the reasons for the abandonment.

2-12 Core Hole Patching

Each core hole shall be patched in accordance with the requirements of the Encroachment Permit. At the discretion of the CTDOT District that issues the Encroachment Permit or the Town, all core holes will require either hot-mix or cold-mix patching. Hot-Mix Patching The Encroachment Permit, obtained for the project may require that all core holes be patched in kind with hot-mix bituminous concrete, of the same depth as the adjacent pavement. The mix shall have an aggregate size and asphalt content similar to the ConnDOT HMA S0.5 mix or as required by the Encroachment Permit. The pavement within the core hole will be compacted in 3 inch lifts by repeated tamping with a 3.5 inch diameter implement and substantial force. The final lift will be placed to approximately ½ inch above the adjacent pavement but shall not be thicker than 3 inches total. The final lift shall be compacted by repeated tamping with an implement which includes a flat plate, with a minimum dimension of 8 inches in any direction, and with substantial force in order to compact the top of the patching material to approximately flush with the adjacent pavement surface. The Contractor shall make certain that hot-mix bituminous concrete is available at the time of year for which the work is to be completed. Cold-Mix Patching The Encroachment Permit, obtained for the project may allow for all core holes to be patched using a high-performance cold-mix compound such as Aquaphalt®, or approved equal, of the same depth as the adjacent pavement. The cold-mix compound shall be applied per the Manufacturer recommendations and shall have the top of the patch approximately flush with the adjacent pavement surface.

2-13 Standby Time Certain projects may require the Contractor to suspend operations during the normal work day, after work has already begun for the day, due to unexpected restricted working hours imposed by the Department or Town or for other reasons such as: traffic related issues (including air and rail traffic), unexpected weather conditions, or other conditions. When the work is on site of an active construction project, there may be instances that periodically require that the Contractor temporarily stop the coring operations. When a

Page 22: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-11

stoppage of work occurs for any reason, it will be determined by the Engineer as to whether or not it qualifies as Standby Time. Standby Time will not be paid when a full scheduled work day cannot be performed due to predicted adverse weather conditions, lack of qualified laborers/operators or equipment breakdown. Should the State or Engineer deem the equipment or workers to be unsafe, no Standby Time will be paid for the Contractor to furnish replacement workers or equipment. Standby Time will not be paid to assemble or remove a traffic control pattern. If more than one (1) drill rig is being used on a project this item will be paid per hour per drill rig when applicable, as determined by the Engineer. If Traffic Control services, consisting of State Troopers or Local Police, have been scheduled and confirmed with the entity on a particular work day and a Trooper or Police Officer does not show up on site, Standby Time will only be paid from the time that the Contractor normally begins work on site to the time that the Contractor leaves the site, as directed by the Inspector. If Flagmen services have been scheduled and confirmed with the Railroad on a particular work day and the Flagmen do not show up on site, Standby Time will only be paid from the time that the Contractor normally begins work on site to the time that the Contractor leaves the site, as directed by the Inspector.

2-14 Trafficpersons The Contractor shall provide the services of Trafficpersons of the type and number, and for such periods, for the control and direction of vehicular traffic and pedestrians in accordance with the State of Connecticut DOT Traffic Control Manual. Railroad Flagmen are not considered to be Trafficpersons. The Contractor shall inform the Engineer of his scheduled operations and the number and type of Trafficpersons requested and/or required by permit. If the Contractor changes or cancels any scheduled operations without prior notice of same, as required by the agency providing the Trafficperson, and such that Trafficperson services are no longer required, the Contractor will be responsible for payment, at no cost to the Engineer, of any shown-up cost for any Trafficperson not used because of the change. Exceptions may be granted for adverse weather conditions and unforeseeable causes beyond the control and without the fault or negligence of the Contractor. Trafficpersons shall consist of the following types: State Police Officers: State Police Officers shall be uniformed off-duty sworn Connecticut State Troopers. Their services will also include the use of Official State Police vehicles and associated equipment. State Police Officers will be used on all limited access highways. State Police Officers will not be used on non-limited access State highways. State Police Officers with Official State Police vehicles will be used at such locations and for such periods necessary to control traffic operations and promote increased safety to motorists through the construction sites. On limited access highways, State Police Officers will be utilized for regional work zone traffic safety and enforcement operations in addition to project-related work zone assignments. Uniformed Municipal Police Officers: Uniformed Municipal Police Officers shall be sworn Municipal Police Officers or Uniformed Constables who perform criminal law enforcement duties for the Municipality in which the project is located. Their services will also include an official Municipal Police vehicle. Uniformed Municipal Police Officers will be used on all non-limited access highways. If the Town where work is being performed does not have a municipal police force, then State Police Officers will be used on

Page 23: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-12

non-limited access State Highways and in some cases on local roads as determined by the Town’s traffic authority. Uniformed Municipal Police Officers and requested Municipal Police vehicles will be used at such locations and for such periods deemed necessary to control traffic operations and promote increased safety to motorists through the work site. Uniformed Flaggers: Uniformed Flaggers shall be persons who have successfully completed flagger training by the American Traffic Safety Services Association, National Safety Council or other programs. Services of Uniformed Flaggers shall include the following equipment: garments (including high visibility headgear) so as to be readily distinguishable as a Flagger in accordance with Standard 6E-3 of the MUTCD, and these specifications, and a STOP/SLOW paddle that is at least 18 inches in width and with letters at least 6 inches high, mounted on a handle of sufficient length so that the bottom of the sign will be 6 feet above the ground, and conforms to Standard 6E-4 of the MUTCD and catalog number 387-80-9950 of the Catalog of Signs Connecticut DOT. Uniformed Flaggers will only be used on non-limited access highways when authorized by the Traffic Control Manual. Uniformed Flaggers will be used at such locations and for such periods necessary to control traffic operations. Any work on Railroad property shall require the use of Railroad Flaggers and be governed by the flagging regulations as described in the Railroad Company’s “Permit To Enter Upon Railroad Property”. General: Uniformed Law Enforcement Personnel being used as Trafficpersons may conduct motor vehicle enforcement operations in and around work areas. Trafficpersons shall wear a high visibility safety garment that complies with OSHA, MUTCD, ASTM Standards and the following: Uniformed Law Enforcement Personnel shall wear the high visibility safety garment provide by their law enforcement agency. If no high visibility safety garment is provided, the Contractor shall provide the law enforcement personnel with a garment meeting the requirements stated below for the Uniformed Flaggers’ garment. Uniformed Flagger − The base material for the safety garment shall be a fluorescent color of orange, yellow, or strong yellow-green. The garment shall have vertical and horizontal stripe markings of contrasting color to the base material to enhance noticeability of the wearer. These markings shall be made of retroreflective or combination of retroreflective and non-retroreflective materials. The retroreflective material shall be orange, yellow, white, silver, strong yellow-green, or a fluorescent version of one of these colors and shall have a minimum width of 5/8”. A minimum area of 40 square inches of retroreflective material must be visible when the garment is viewed from either the front or back and a minimum of 12 square inches of retroreflective material must be visible from any other normal observation angle. The safety garment shall have the words “Traffic Control” clearly visible on the front and rear panels (minimum letter size 2 inches). Worn/faded safety garments that are no longer highly visible shall not be used. The Inspector shall direct the replacement of any worn/faded garment at no additional cost to the State. A Trafficperson shall assist in implementing the traffic control specified in the Maintenance and Protection of Traffic contained elsewhere in these specifications or as directed by the Engineer. Any situation requiring Trafficpersons to operate in a manner contrary to the Maintenance and Protection of Traffic Specification shall be authorized in writing by the Engineer.

Page 24: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-13

Prior to the start of operations on the project requiring the use of Trafficpersons, a meeting will be held with the Contractor, Trafficperson agency, and Inspector to review the Trafficperson operations, lines of responsibility, and operating guidelines which will be used on the project. In the event of an unplanned, emergency, or short-term operation, the Inspector may approve the use of properly clothed, non-certified Trafficpersons until such time as a certified Trafficperson may be obtained. In no case shall this temporary use exceed 8 hours for any particular operation.

2-15 Traffic Control Equipment When the Contractor’s operations obtrude onto any part of the roadway, the Contractor is to adhere to the requirements of the Department's publication "Traffic Control During Maintenance Operation” latest edition (revised 2013 included in attachments). The requirements of this publication generally include the furnishing and use of traffic control equipment such as; signs, cones, barrels and sometimes crash trucks.

2-16 Mobilization and Demobilization – Land This item shall include the initial mobilization of a single drill rig at the project site and the final demobilization after all coring is complete. The Contractor is required to furnish the drill rig and tools, in good condition and all other equipment necessary to carry on and complete the work properly and all the required labor. The Contractor may be required to mobilize and dismantle his equipment at existing highway structures and other difficult sites. The Contractor shall have the necessary equipment and personnel to assemble his drilling equipment at the desired coring locations. The work hours, permits or any other requirements made by the Town of Marlborough or other public transportation authority shall be complied with by the Contractor and any costs shall be considered as part on the unit price of Mobilization and Demobilization – Land and no additional compensation will be allowed. No additional compensation will be made to the Contractor for preparing the application for and acquiring the entry permit and its associated fee. This item shall also include full compensation for all traffic control devices, cones, signs, light plants, Traffic Attenuation Vehicle, etc. when provided and used directly by the Contractor. All material or equipment furnished under this item shall remain the property of the Contractor and shall be maintained and disposed of by him. This item shall carry all charges incident to such plant setup and removal, in order that the charges need not be distributed among the more variable items of the contract. This item shall also include full compensation for all traffic control devices, cones, signs, light plants, etc. when provided and used by the Contractor, whether within the Railroad right-of-way or when necessary for accessing the Railroad right-of-way from an adjacent roadway. All material or equipment furnished under this item shall remain the property of the Contractor and shall be maintained and disposed of by him. This item shall carry all charges incident to such plant setup and removal, in order that the charges need not be distributed among the more variable items of the contract.

2-17 Records The Inspector shall be allowed ample time to keep complete, neat, accurate and legible daily reports. The records shall be made at the site as the work progresses and shall be shared with the Contractor at the completion of each day so that quantities for payment can be agreed upon and signed-off to by both parties. The records shall contain the following information: General

Page 25: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-14

Name of Inspector, Contractor and Lead Driller Date of start and date of finish. Town, State Project Number, Route Number/Name, and Bridge Number when applicable Core Hole Number Quantities completed for each pay Item Field Receipts for Direct Costs

2-18 Submission of Reports and Specimens The Inspector shall meet with the Contractor at the completion of all work for a final review of the quantities measured for payment and Direct Costs. A copy of the Inspector's daily reports shall be given to the Engineer at the completion of the job. The Contractor shall maintain possession of pavement cores specimens until the job is completed, unless otherwise directed by the Inspector. Core holes where the Inspector was not allowed to inspect the pavement core and the material at the bottom of the hole and/or was not given the opportunity to take the pavement core specimen will be considered as not drilled and no payment will be made by the Engineer for those pavement cores.

2-19 Measurement and Payment a. General The contract items include all services, labor, equipment, transportation, material and supplies for the complete work. Payment for these items shall include compensation for obtaining, packing, marking and submitting specimens and recording and submitting data incidental to each item. No other payments for any specified or indicated work, nor for any work implied therefrom, shall be made. Payment will not be made for abandoned core holes, without authorization of the Inspector, or for such holes for which satisfactory specimens and/or data cannot be obtained. The quantities stated in the proposal are approximate only and are for the specific purpose of comparing bids. The Engineer does not guarantee that these items or quantities will be performed. The Engineer and Inspector reserve the right to vary the quantities or delete items in their entirety, and the Contractor shall not be entitled to any extra payment due to such amended quantities or deleted items. b. Pavement Cores 1. This work will be measured for payment as the total number of Each core holes drilled and

from which intact pavement core specimens are retrieved and accepted. 2. This work will be paid for at the contract unit price per Each for "Pavement Core" of the size

specified, which price shall include compensation for all work incidental to drilling and retrieving the core specimen and not covered under other contract items.

c. Core Hole Patching l. This work will be measured for payment by the total number of Each accepted core hole, that

is suitably patched with either compacted hot-mix bituminous material or cold-mix compound, as required by the Encroachment Permit.

2. This work will be paid for at the contract unit price per Each for "Core Hole Patching" of the required material type, which price shall include compensation for all work incidental to the patching and not covered under other contract items.

3. If one type of patching material is not used, the quantity will be recorded as zero and no payment will be made for that item, nor will the Contractor be compensated for any effort required to determine the bid price not loss of profit.

Page 26: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-15

d. Standby Time 1. The item Standby Time will be measured for payment by the actual number of hours each drill

rig is required by the Engineer to Standby. Standby Time will be measured to the nearest quarter of an hour interval.

2. The item will be paid at the contract unit price per Hour for “Standby Time.”

f. Mobilization and Demobilization—Land 1. This item being paid for as a Lump Sum will not be measured for payment. This item will be

due for payment at the time of final payment after removal of all materials and equipment from the project.

2. This work will be paid for at the contract Lump Sum price for “Mobilization and Demobilization—Land”. This item will also include full compensation for all traffic control patterns, cones, light plants, and all other materials, equipment, tools, labor and work incidental thereto that were provided and used by the Contractor.

g. Trafficpersons 1. Only Trafficperson services in accordance with the State of Connecticut DOT Traffic Control

Manual will be measured for payment. Services of Trafficpersons will be measured for payment by the actual number of hours for each person rendering services in accordance with these specifications. Services of Trafficpersons utilized by the Contractor not necessary for the proper completion of the project or at locations where traffic is unnecessarily restricted by the Contractor’s method of operation, will not be measured for payment.

The minimum hours of payment for each Trafficperson supplied by a law enforcement agency or Trafficperson subcontractor in any one day shall be four hours. No Uniformed Trafficperson shall work more than twelve hours in any one-day. In case such services are required for more than twelve hours, the Contractor may request additional Trafficpersons. In cases where the Trafficperson is an employee on the Contractor’s payroll, payment for the Trafficperson will be made only for those hours when the Contractor’s employee is performing Trafficperson duties. Travel time charged by State Police Officers, up to one hour per day, will be measured for payment. No travel time will be allowed or paid for Uniformed Municipal Police Officers or Uniformed Flaggers. Safety garments and STOP/SLOW paddles will not be measured for payment.

2. The Estimated Total sum of money shown in the itemized proposal for this work will be used

as a budget value to set aside project funds and will not be used for bid comparison. Payment will be made as described below.

“Trafficperson” will be paid for at the actual hourly rate charged for the Trafficperson service

(monthly statement or receipted bills) by the entity which actually provide the service plus a five percent (5%) markup. Use of a Municipal police vehicle will be paid at the actual rate charged by the Municipality plus a five percent (5%) markup. The rate charged by the Municipality for use of a Uniformed Municipal Police Officer and/or an official Municipal Police vehicle shall not be greater than the rate it normally charges others for similar services.

Page 27: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

IV-16

h. Traffic Control Equipment 1. The Estimated Total sum of money shown in the itemized proposal for this work will be used

as a budget value to set aside project funds and will not be used for bid comparison. Payment will be made as described below.

2. Traffic Control Equipment, including operators, which is provided by a Subcontractor or is rented, will be measured for payment by the actual time that the equipment was in place for traffic control on the roadway. The unit of time, i.e. Days, Weeks, Months, shall be that included in the Subcontractor of Rental agreement. This item will be due for payment at the time of final payment after removal of all materials and equipment from the project.

3. Traffic Control Equipment will be paid for at the actual daily, weekly, or monthly rate billed by the sub-consultant / rental company providing the traffic control services. The sub-consultant / rental company’s invoice shall be included with the Contractor’s invoice as backup for direct costs. Rental equipment will be paid for at actual cost with no mark-up.

Page 28: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

V-1

V LIST OF ATTACHMENTS 1. Pavement Coring Locations2. Conditions Expected to be included in the Contractor’s Encroachment Permit3. Anticipated Pavement Composition and Thickness Information.4. Proposed Core Hole Location Plan5. Traffic Control During Construction Operations 2018

Page 29: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

35.9

6’

PIERFACE OF

DH IN

FL = 431.63’ (NE)

BOT = 429.73’

TOP = 436.33’

TYPE "C"CB

FL = 413.63’ (SE)

BOT = 411.13’

TOP = 416.43’

TYPE "C" CB

FL = 415.74’ E

FL = 415.74’ W

BOT = 413.54’

TOP = 419.19’

TYPE DBL "C" CB

FL=414.85’

FL=412.62’

B.M. 406

Elev. 437.533

NAVD 1988

FL = 430.83 (S)

BOT = 428.73’

TOP = 434.58’

TYPE "C" CB

FL = 430.24’ (N)

BOT = 428.24’

TOP = 433.64’

TYPE "C" CB

FL = 429.34’ (S)

BOT = 427.14’

TOP = 432.89’

TYPE "C" CB

FL = 412.83’ (SE)

FL = 412.98’ (SW)

FL = 412.98’ (NW)

BOT = 410.98’

TOP = 415.98’

TYPE "CL" CB

FL = 416.56’ (E)

BOT = 414.46’

TOP = 419.81’

TYPE "CL" CB

FL = 427.46’ (N)

FL = 427.76’ (S)

BOT = 425.76’

TOP = 435.26’

TYPE "C" CB

FL = 412.79’ (NE)

FL = 412.89’ (NW)

BOT = 410.59’

TOP = 416.39’

TYPE "C" CB

FL = 427.73’ (N)

FL = 427.73’ (S)

BOT = 425.68’

TOP = 430.18’

TYPE "C-G" CB

FL = 417.71’ (S)

BOT = 415.71’

TOP = 420.11’

TYPE "C-L" CB

2

FL = 416.01’ (E)

FL = 416.25’ (N)

FL = 418.56’ (E. THROAT)

FL = 418.27’ (W. THROAT)

BOT = 415.97’

TYPE "D-G" ENDWALL

FL=418.67’

18’’ RCP

15’’ C

MP

15’’ C

MP

FL=420.93’

15’’ RCP

15’’ R

CP

15’’ R

CP

BC

LC

15’’ R

CP

24’’

CMP

24’’ RCP

24’’ RCP

BC

LC

C.P.-11

C.P.-12

C.P.-13

C.P.-14

"C" CB

"C" CB

"C" CB

DELIN.

DELIN.

B.M.

NO NAME/#

"C" CB

DELIN.

"C" CB

DELIN.

DELIN.

STR. MH

MTL. POSTDELIN.

18"ASH

"C-G" CB

"C" C

B

DELIN.

"C-L" CB

"C" CB

I.P.(FND)

DELIN.

DELIN.

DELIN.

"C" CB

"C" CB

"C" CB

CTRL. BOX.

ANCHOREND

ANCHOREND

ANCHOREND

DELIN.’S

CL&P#391

ANCHOREND

POSTSWOOD

CL&P#90

"C" CBDBL

(FND)CHD

CEDAR11" MH

STR.

MARKERMILE

BA

R

ST

OP

BA

R

ST

OP

ASH18"

NO NAME/#

#1924CL&P

#923CL&P

ANCHOREND

ANCHOREND

#1407CL&P

CL&P#1183

CL&P#1925

POSTSMTL.

#1184CL&P

H.H.’S

POSTSWOOD

ANCHOREND

CB"C-L"

/#NO NAME

/#NO NAME

POLETEMP.

BOXELEC.

#1920CL&P

CB"C-L"

CB"C"

ANCHOREND

ANCHOREND

(RANDOM B9001)C.P.-3

(RANDOM B2173)C.P.-6

APPROX. NON-ACCESS HIGHWAY LINE

APPROX. NON-ACCESS HIGHWAY LINE

APP

RO

X. S

TR

EE

T

LIN

E

APPROX. STREET LINE

APPROX. STREET LINE

PRELIMINARY

SHEET NO. 3 OF 7

REFERENCE : ROW MAP NO. 78-03

PRELIMINARY

SHEET NO. 3 OF 7

REFERENCE : ROW MAP NO. 78-03

J&S ENTERPRISES, INC.

N/F

DEPARTMENT OF TRANSPORTATION

STATE OF CT.

CAMPELLI

PIETRO A. & NARCO P.

N/F

MIRABITO HOLDINGS CONNECTICUT LLC

N/F

D.R.O.W.15’

FISH & GAME INC.

EAST GLASTONBURY

N/F

#1028

CL&P

2

2

VETERANS OF FOREIGN WARS HIGHWAY

VETERANS OF FOREIGN WARS HIGHWAY

EAST BOUND

WEST BOUND

PO

RT

LA

ND

RO

AD

WES

T

RO

AD

ON-RAMP

2

OFF-RAMP

(CONC. PAVEMENT W/ BIT. CONC. OVERLAY)

(CONC. PAVEMENT W/ BIT. CONC. OVERLAY)

(BIT CONC. PAVEMENT)

(BIT CONC. P

AVEMENT)

(BIT

CO

NC. P

AV

EM

EN

T)

ST

RE

ET

LIN

E

APP

RO

X.

(BIT

CO

NC. P

AV

EM

EN

T)

TO CT. 66

(BIT CONC. PAVEMENT)

NORTH MAIN STREET

DBL YELLOWSOLID WHITE

SOLID WHITE

WHIT

E

SO

LID

BAR

STOP

SOLID WHITE

SOLID YELLOW

SOLID YELLOW

SOLID WHITE

SOLID WHITE

DASHED WHITESOLID YELLOW

SOLID WHITE

DASHED WHITE

SOLID YELLOW

SOLID WHITE SOLID YELLOW

SOLID WHITESOLIDYELLO

W

SO

LID

WHIT

E

SO

LID

WHIT

E

SO

LID

WHIT

E

SO

LID

WHIT

E

SO

LID

WHIT

E

DB

L

YE

LL

OW

DB

L

YE

LL

OW

DB

L

YE

LL

OW

SO

LID

WHIT

E

SOLID WHITE

DASHED WHITE

SOLID YELLOW

SOLID WHITE

SOLID YELLOW

DASHED WHITE

B.M. 405

Elev. 439.240

NAVD 1988

WALL OF BRIDGE #03374

OF BRIDGE #01708

BRASS BOLT IN S.W. PARAPET WALL

FL = 427.82’ (N)

BOT = 425.72’

TOP = 431.37’

TYPE "C"CB

FL=429.41’

FL=418.67’

B.M. 404

BRASS BOLT IN "DG" ENDWALL

Elev. 419.50

NAVD 1988

APP

RO

X.

LO

C. (C

O.) D

UC

T

FL=412.88’

BCLC

ENDWALL

WIRE ROPE

MILLINGS

MILLINGS

GRASS

WIRE

GUY

BCLC

BC

LC

BCLC

NO NAME/#

MILLINGS

GRASS

MBR

MBR

GRASSGRASS

MILLINGS

MILLINGS MBR

BCLC

BCLC

MBR

MBR

MBR

PAVED DITCH

WIRE ROPE

MILLINGS

GRASS

GRAVEL

BCLC

BCLCBCLC

BCLC

BCLC

4’ CH LNK FENCE

DELIN.

GRASS

CONC CURB (TYP.)#16A

WOOD FRAME

1 STORY

AREA

CULT

BIT

BIT

BIT

GATE

GATE

6’ CH LNK FENCE

CONC RET WALL

ENDWALL

ENDWALL

MKR.OBJ.

(FND)

CHD

4’ BOXWIRE FENCE

MBR

MBR

MBR

BCLC

BCLC

MILLINGS

GRAN CURB

GRAN CURB

MBR

GRAN CURB

GRAN CURB

MBR

MBR

MBR

BCLC

BCLC

4’ BOXWIRE FENCE

ENDWALL

ENDWALL

CO

NC.

CU

RB

GRAN CURB

GRAN CURB

BCLC

BCLC

PARAPETCONC.

PARAPETCONC.

PARAPETCONC.

PARAPETCONC.

BC

LC

BA

LL

AS

T (T

YP.)

S

TO

NE

CONC.WALK

WAL

K

CO

NC.

GR

ASS

CURBCONC.

ENDWALL

BRASS BOLT IN N.E. PARAPET

#7012CHORDLOW

#7008CHORDLOW

#7004CHORDLOW

#7011CHORDLOW

#7007CHORDLOW

#7003CHORDLOW

#7010CHORDLOW

#7006CHORDLOW

#7002CHORDLOW

#7009CHORDLOW

#7005CHORDLOW

#7001CHORDLOW

EAST ENDTEST PIT E-2

E-3TEST PIT

H.H.

H.H.

BC

LC

GRASS

GRASS

GR

ASS

GR

ASS

JOIN

T

JOIN

T

JOIN

T

15’’ RCP

JOIN

T

BCLC

JOIN

T

JOIN

T

JOIN

T

JOIN

T

BC

LC

APP

RO

X.

LO

C. (C

O.) D

UC

TC

ON

C

WA

LK

CO

NC

CU

RB

18’’ R

CP

15’’ R

CP

15’’ RCP

15’’ C

MP

N 797600 N 797600E 107

2000

E 107

28

00

EAST ENDTEST PIT E-4

WEST ENDTEST PIT E-4

15’’ R

CP

"C-L" CB

24’’ RCP

WEST ENDTEST PIT E-2

ST

OP

BA

R

15’’ R

CP

STOP BAR

15’’ RCP

15’’ R

CP

15’’ R

CP

STR. MH

ST

OP

BA

R

15’’ C

MP

15’’ C

MP

"C" CB

DELIN.

DELIN.

OBJ. MKR.

DELIN.

DELIN.DELIN.

DELIN.

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

SCALE 1"=40’

40 800

SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

4/24/2019

BLOCK:

SIGNATURE/

...\Plan\HW_MSH_78-92_PLN-01.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

PRELIMINARY DESIGN REVIEW

078-92

116 WASHINGTON AVENUE | NORTH HAVEN, CT 06473 | 203.234.7862

Traffic � Infrastructure � Planning

REHABILITATION OFRG

RL

MARLBOROUGH

BRIDGE NO. 01708 AND 03374

RT.2 EB/WB OVER WEST ROAD

596+00597+00

598+00599+00

600+00601+00

602+00603+00

604+00605+00

606+00607+00

608+00

10+00

11+00

12+00

13+00

14+00

15+00

16+00

E 10

7222

8.30

N 79

7407.69

10+00

.00

POB

E 10

7245

8.61

N 79

7847.69

14+96

.63

PI

CO

NN

EC

TIC

UT

CO

OR

DIN

AT

E

GRID

HIGHWAYPLN-01

LEGEND

TRAFFIC DIRECTION

ENTRANCE RAMP

97.47’

70.3

8’

3.9

8’TO

CP-7

TO CP-13

W.R.R POSTDH IN

END ANCHORCONC.DH IN

16" CEDARNAIL IN

N= 797,876.33

E=1,072,021.69

CP#14 (STEEL PIN)

13.4

6’

17.0

0’

9.19’

RO

AD

PO

RT

LA

ND

#1407CL&PNAIL IN

ENTRANCE RAMP

ENTRANCE RAMP

40.0

2’

65.35’

35.9

6’

PIERFACE OF

DH IN

PIERFACE OF

DH IN

TO CP-11

TO CP-13

CP-12TO

CONC. CURBDH IN

CONC. CURBDH IN

SIGN BASECONC.DH IN

RO

AD

WES

T

CP-14TO

N= 797,632.93

E=1,072,303.29

CP#12 (STEEL PIN)

N= 797,922.33

E=1,072,450.03

CP#13 (STEEL PIN)

#1028

CL&P

NAIL IN

EXIT RAMPTO

CP-3

TO

CP-12

48.6

9’

11.3

5’

24.9

6’

"C" CBDBL

DH IN

RO

AD

PO

RT

LA

ND

(BM#404)

IN ENDWALL

BRASS BOLT

N= 797,316.83

E=1,072,155.62

CP#11 (STEEL PIN)

C.P.-14

C.P.-13C.P.-13

C.P.-12

C.P.-11

WES

T

RO

AD

NO

RTH MAIN

STREET

WES

T

RO

AD

ROUTE 2 WESTBOUND

ROUTE 2 EASTBOUND

ROUTE 2 PLAN

(SEE BRIDGE PLANS)

BRIDGE NO. 03374

(SEE BRIDGE PLANS)

BRIDGE NO. 01708

RECONSTRUCTION

BEGIN FULL DEPTH

STA. 11+50.00

} WEST ROAD

RECONSTRUCTION

END FULL DEPTH

STA. 16+10.00

} WEST ROAD

} RT. 2

} WEST ROAD

12’

12’

12’

12’

12’

12’

12’

12’

11’

4’

6’

4’

8’

12’

8’

4’

10’

NOTE:

PERFORMED ALONG ROUTE 2.

NO ROADWAY WORK TO BE

(CALCULATED)

FLOOD LINE EL. 419

FEMA 100 YEAR

(CALCULATED)

FLOOD LINE EL. 419

FEMA 100 YEAR

(CALCULATED)

FLOOD LINE EL. 417

FEMA 100 YEAR

(CALCULATED)

FLOOD LINE EL. 417

FEMA 100 YEAR

dquezada
Callout
Pavement Core
dwurst
Ellipse
dwurst
Ellipse
dwurst
Ellipse
dwurst
Ellipse
dwurst
Ellipse
dwurst
Ellipse
dwurst
Ellipse
Page 30: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

V-2

CONDITIONS EXPECTED TO BE INCLUDED IN THE CONTRACTOR’S ENCROACHMENT PERMIT (Note: The Contractor must obtain an Encroachment Permit from the Department prior to the start of work)

a. A copy of the Encroachment Permit must be available on site at all times. b. Vehicular and pedestrian traffic must be adequately protected through the use of appropriate traffic

control patterns. Uniformed police officers or personnel who are certified for traffic control to a level equivalent to the National Safety Council shall be utilized to direct traffic through the work area. All traffic control signing and appurtenances shall be in accordance with the latest edition of the "Manual on Uniform Traffic Control Devices" and must meet NCHRP 350 requirements. Traffic Plans are attached.

c. No work that will interfere with the flow of traffic will be permitted before 9:00 a.m. and after

4:00 p.m. for any work on the paved surface. d. No work will be allowed during inclement weather or weekends. e. Holiday Restrictions: No permit work within the highway right of way will be permitted the day

before a legal holiday and no work shall be resumed until 12:00 noon the day following the holiday, unless otherwise approved or indicated. Weekends shall be considered as part of the holiday when the legal holiday falls on a Friday or Monday.

f. Vehicles must be parked off the roadway whenever possible to avoid impeding traffic flow or

distracting the traveling public. g. Appropriate work zone signs must be set out to alert the traveling public of activity in the area.

Page 31: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

V-3

ANTICIPATED PAVEMENT COMPOSITION AND THICKNESS INFORMATION The primary information gathered by Connecticut Department of Transportation, Pavement Management Division indicates that the mainline pavement sections consists of approximately 14” of Gravel Subbase, 4” Processed Aggregate Base and overlaid by a minimum of 4” of Hot Mix Asphalt. Concrete pavement is not anticipated at this site.

Page 32: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

V-4

CORE HOLE WORK PLAN (TO BE PROVIDED BY CONTRACTOR AFTER SELECTION)

Page 33: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

TRAFFIC CONTROL DURING CONSTRUCTION OPERATIONS

The following guidelines shall assist field personnel in determining when and what type of traffic

control patterns to use for various situations. These guidelines shall provide for the safe and

efficient movement of traffic through work zones and enhance the safety of work forces in the

work area.

TRAFFIC CONTROL PATTERNS

Traffic control patterns shall be used when a work operation requires that all or part of any

vehicle or work area protrudes onto any part of a travel lane or shoulder. For each situation, the

installation of traffic control devices shall be based on the following:

Speed and volume of traffic

Duration of operation

Exposure to hazards

Traffic control patterns shall be uniform, neat and orderly so as to command respect from the

motorist.

In the case of a horizontal or vertical sight restriction in advance of the work area, the traffic

control pattern shall be extended to provide adequate sight distance for approaching traffic.

If a lane reduction taper is required to shift traffic, the entire length of the taper should be

installed on a tangent section of roadway so that the entire taper area can be seen by the motorist.

Any existing signs that are in conflict with the traffic control patterns shall be removed, covered,

or turned so that they are not readable by oncoming traffic.

When installing a traffic control pattern, a Buffer Area should be provided and this area shall be

free of equipment, workers, materials and parked vehicles.

Typical traffic control plans 19 through 25 may be used for moving operations such as line

striping, pot hole patching, mowing, or sweeping when it is necessary for equipment to occupy a

travel lane.

Traffic control patterns will not be required when vehicles are on an emergency patrol type

activity or when a short duration stop is made and the equipment can be contained within the

shoulder. Flashing lights and appropriate trafficperson shall be used when required.

Although each situation must be dealt with individually, conformity with the typical traffic

control plans contained herein is required. In a situation not adequately covered by the typical

traffic control plans, the Contractor must contact the Engineer for assistance prior to setting up a

traffic control pattern.

Page 34: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

Rev. Date 5/18/2018

ITEM #0971001A 2

PLACEMENT OF SIGNS

Signs must be placed in such a position to allow motorists the opportunity to reduce their speed

prior to the work area. Signs shall be installed on the same side of the roadway as the work area.

On multi-lane divided highways, advance warning signs shall be installed on both sides of the

highway. On directional roadways (on-ramps, off-ramps, one-way roads), where the sight

distance to signs is restricted, these signs should be installed on both sides of the roadway.

ALLOWABLE ADJUSTMENT OF SIGNS AND DEVICES SHOWN ON THE TRAFFIC

CONTROL PLANS

The traffic control plans contained herein show the location and spacing of signs and devices

under ideal conditions. Signs and devices should be installed as shown on these plans whenever

possible.

The proper application of the traffic control plans and installation of traffic control devices

depends on actual field conditions.

Adjustments to the traffic control plans shall be made only at the direction of the Engineer to

improve the visibility of the signs and devices and to better control traffic operations.

Adjustments to the traffic control plans shall be based on safety of work forces and motorists,

abutting property requirements, driveways, side roads, and the vertical and horizontal curvature

of the roadway.

The Engineer may require that the traffic control pattern be located significantly in advance of

the work area to provide better sight line to the signing and safer traffic operations through the

work zone.

Table I indicates the minimum taper length required for a lane closure based on the posted speed

limit of the roadway. These taper lengths shall only be used when the recommended taper

lengths shown on the traffic control plans cannot be achieved.

TABLE I – MINIMUM TAPER LENGTHS

POSTED SPEED LIMIT

MILES PER HOUR

MINIMUM TAPER LENGTH IN FEET FOR

A SINGLE LANE CLOSURE

30 OR LESS

35

40

45

50

55

65

180

250

320

540

600

660

780

Page 35: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

Rev. Date 5/18/2018

ITEM #0971001A 3

SECTION 1. WORK ZONE SAFETY MEETINGS

1.a) Prior to the commencement of work, a work zone safety meeting will be conducted with

representatives of DOT Construction, Connecticut State Police (Local Barracks),

Municipal Police, the Contractor (Project Superintendent) and the Traffic Control

Subcontractor (if different than the prime Contractor) to review the traffic operations,

lines of responsibility, and operating guidelines which will be used on the project. Other

work zone safety meetings during the course of the project should be scheduled as

needed.

1.b) A Work Zone Safety Meeting Agenda shall be developed and used at the meeting to

outline the anticipated traffic control issues during the construction of this project. Any

issues that can’t be resolved at these meetings will be brought to the attention of the

District Engineer and the Office of Construction. The agenda should include:

Review Project scope of work and time

Review Section 1.08, Prosecution and Progress

Review Section 9.70, Trafficpersons

Review Section 9.71, Maintenance and Protection of Traffic

Review Contractor’s schedule and method of operations.

Review areas of special concern: ramps, turning roadways, medians, lane drops, etc.

Open discussion of work zone questions and issues

Discussion of review and approval process for changes in contract requirements as they

relate to work zone areas

SECTION 2. GENERAL

2.a) If the required minimum number of signs and equipment (i.e. one High Mounted

Internally Illuminated Flashing Arrow for each lane closed, two TMAs, Changeable

Message Sign, etc.) are not available; the traffic control pattern shall not be installed.

2.b) The Contractor shall have back-up equipment (TMAs, High Mounted Internally

Illuminated Flashing Arrow, Changeable Message Sign, construction signs, cones/drums,

etc.) available at all times in case of mechanical failures, etc. The only exception to this

is in the case of sudden equipment breakdowns in which the pattern may be installed but

the Contractor must provide replacement equipment within 24 hours.

2.c) Failure of the Contractor to have the required minimum number of signs, personnel and

equipment, which results in the pattern not being installed, shall not be a reason for a time

extension or claim for loss time.

2.d) In cases of legitimate differences of opinion between the Contractor and the Inspection

staff, the Inspection staff shall err on the side of safety. The matter shall be brought to

Page 36: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

Rev. Date 5/18/2018

ITEM #0971001A 4

the District Office for resolution immediately or, in the case of work after regular

business hours, on the next business day.

SECTION 3. INSTALLING AND REMOVING TRAFFIC CONTROL PATTERNS

3.a) Lane Closures shall be installed beginning with the advance warning signs and

proceeding forward toward the work area.

3.b) Lane Closures shall be removed in the reverse order, beginning at the work area, or end

of the traffic control pattern, and proceeding back toward the advance warning signs.

3.c) Stopping traffic may be allowed:

As per the contract for such activities as blasting, steel erection, etc.

During paving, milling operations, etc. where, in the middle of the operation, it is

necessary to flip the pattern to complete the operation on the other half of the

roadway and traffic should not travel across the longitudinal joint or difference in

roadway elevation.

To move slow moving equipment across live traffic lanes into the work area.

3.d) Temporary road closures using Rolling Road Blocks (RRB) may be allowed on limited

access highways for operations associated with the installation and removal of temporary

lane closures. RRB may be allowed for the installation and removal of lead signs and

lane tapers only and shall meet the following requirements:

• RRB may not start prior to the time allowed in the contract Limitations of Operation

for sign pattern installation. Sign pattern removal must be complete prior to the time

indicated in the Limitations of Operation for restoring the lanes to traffic.

• On limited access highways with 4 lanes or more, a RRB may not start until the

Limitations of Operation Chart allows a 2 lane closure. In areas with good sight lines

and full shoulders, opposite side lead signs should be installed in a separate operation.

• Truck-Mounted Impact Attenuators (TMAs) equipped with arrow boards shall be

used to slow traffic to implement the RRB. State Police Officers in marked vehicles

may be used to support the implementation of the RRB. The RRB shall start by

having all vehicles, including Truck-Mounted Impact Attenuators TMAs and police

vehicles leave the shoulder or on-ramp and accelerate to a normal roadway speeds in

each lane, then the vehicles will position themselves side by side and decelerate to

the RRB speed on the highway.

• An additional Truck-Mounted Impact Attenuator TMAs equipped with a Portable

Changeable Message Sign shall be utilized to advise the motorists that sign pattern

installation / removal is underway. The Pre-Warning Vehicle (PWV) should be

initially positioned in the right shoulder ½ mile prior to the RRB operation. If a

traffic queue reaches the PWV’s initial location, the contractor shall slowly reverse

the PWV along the shoulder to position itself prior to the new back of queue. A Pre-

Page 37: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

Rev. Date 5/18/2018

ITEM #0971001A 5

Warning Vehicle, as specified elsewhere in the contract, shall be utilized to advise the

motorists that sign pattern installation / removal is underway.

• The RRB duration shall not exceed 15 minutes from start of the traffic block until all

lanes are opened as designated in the Limitation of Operation chart. If the RRB

duration exceeds 15 minutes on 2 successive shifts, no further RRB will be allowed

until the Contractor obtains approval for a revised installation procedure from the

respective construction District.

• RRB should not be utilized to expand a lane closure pattern to an additional lane

during the shift. The workers and equipment required to implement the additional

lane closure should be staged from within the closed lane. Attenuator trucks (and

State Police if available) should be used to protect the workers installing the taper in

the additional lane.

• Exceptions to these work procedures may be submitted to the District Office for

consideration. A minimum of 2 business days should be allowed for review and

approval by the District.

• The RRB procedures (including any approved exceptions) will be reviewed and

discussed by the inspection team and the Contractor in advance of the work. The

implementation of the agreed upon plan will be reviewed with the State Police during

the Work Zone Safety meeting held before each shift involving temporary lane

closures. If the State Police determine that alternative procedures should be

implemented for traffic control during the work shift, the Department and Contractor

will attempt to resolve any discrepancies with the duty sergeant at the Troop. If the

discrepancies are unable to be resolved prior to the start of the shift, the work will

proceed as recommended by the Department Trooper. Any unresolved issues will be

addressed the following day.

3.e) The Contractor must adhere to using the proper signs, placing the signs correctly, and

ensuring the proper spacing of signs.

3.f) Additional devices are required on entrance ramps, exit ramps, and intersecting roads to

warn and/or move traffic into the proper travelpath prior to merging/exiting with/from the

main line traffic. This shall be completed before installing the mainline pattern past the

ramp or intersecting roadway.

3.g) Prior to installing a pattern, any conflicting existing signs shall be covered with an

opaque material. Once the pattern is removed, the existing signs shall be uncovered.

3.h) On limited access roadways, workers are prohibited from crossing the travel lanes to

install and remove signs or other devices on the opposite side of the roadway. Any signs

or devices on the opposite side of the roadway shall be installed and removed separately.

SECTION 4. USE OF HIGH MOUNTED INTERNALLY ILLUMINATED FLASHING

ARROW

Page 38: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

Rev. Date 5/18/2018

ITEM #0971001A 6

4.a) On limited access roadways, one Flashing Arrow shall be used for each lane that is

closed. The Flashing Arrow shall be installed concurrently with the installation of the

traffic control pattern and its placement shall be as shown on the traffic control plan. For

multiple lane closures, one Flashing Arrow is required for each lane closed. If conditions

warrant, additional Flashing Arrows should be employed (i.e.: curves, major ramps, etc.).

4.b) On non-limited access roadways, the use of a Flashing Arrow for lane closures is

optional. The roadway geometry, sight line distance, and traffic volume should be

considered in the decision to use the Flashing Arrow.

4.c) The Flashing Arrow shall not be used on two lane, two-way roadways for temporary

alternating one-way traffic operations.

4.d) The Flashing Arrow board display shall be in the “arrow” mode for lane closure tapers

and in the “caution” mode (four corners) for shoulder work, blocking the shoulder, or

roadside work near the shoulder. The Flashing Arrow shall be in the “caution” mode

when it is positioned in the closed lane.

4.e) The Flashing Arrow shall not be used on a multi-lane roadway to laterally shift all lanes

of traffic, because unnecessary lane changing may result.

SECTION 5. USE OF TRUCK MOUNTED OR TRAILER MOUNTED IMPACT

ATTENUATOR VEHICLES (TMAs)

5.a) For lane closures on limited access roadways, a minimum of two TMAs shall be used to

install and remove traffic control patterns. If two TMAs are not available, the pattern

shall not be installed.

5.b) On non-limited access roadways, the use of TMAs to install and remove patterns closing

a lane(s) is optional. The roadway geometry, sight line distance, and traffic volume

should be considered in the decision to utilize the TMAs.

5.c) Generally, to establish the advance and transition signing, one TMA shall be placed on

the shoulder and the second TMA shall be approximately 1,000 feet ahead blocking the

lane. The flashing arrow board mounted on the TMA should be in the “flashing arrow”

mode when taking the lane. The sign truck and workers should be immediately ahead of

the second TMA. In no case shall the TMA be used as the sign truck or a work truck.

Once the transition is in place, the TMAs shall travel in the closed lane until all

Changeable Message Signs, signs, Flashing Arrows, and cones/drums are installed. The

flashing arrow board mounted on the TMA should be in the “caution” mode when

traveling in the closed lane.

5.d) A TMA shall be placed prior to the first work area in the pattern. If there are multiple

work areas within the same pattern, then additional TMAs shall be positioned at each

Page 39: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

Rev. Date 5/18/2018

ITEM #0971001A 7

additional work area as needed. The flashing arrow board mounted on the TMA should

be in the “caution” mode when in the closed lane.

5.e) TMAs shall be positioned a sufficient distance prior to the workers or equipment being

protected to allow for appropriate vehicle roll-ahead in the event that the TMA is hit, but

not so far that an errant vehicle could travel around the TMA and into the work area. For

additional placement and use details, refer to the specification entitled “Truck-Mounted

or Trailer-Mounted Impact Attenuator”. Some operations, such as paving and concrete

repairs, do not allow for placement of the TMA(s) within the specified distances. In

these situations, the TMA(s) should be placed at the beginning of the work area and shall

be advanced as the paving or concrete operations proceed.

5.f) TMAs should be paid in accordance with how the unit is utilized. If it is used as a TMA

and is in the proper location as specified, then it should be paid at the specified hourly

rate for “Truck-Mounted or Trailer-Mounted Impact Attenuator”. When the TMA is

used as a Flashing Arrow, it should be paid at the daily rate for “High Mounted Internally

Illuminated Flashing Arrow”. If a TMA is used to install and remove a pattern and is

also used as a Flashing Arrow in the same day, then the unit should be paid as a “Truck-

Mounted or Trailer-Mounted Impact Attenuator” for the hours used to install and remove

the pattern, typically 2 hours (1 hour to install and 1 hour to remove). If the TMA is also

used as a Flashing Arrow during the same day, then the unit should be paid at the daily

rate as a “High Mounted Internally Illuminated Flashing Arrow”.

SECTION 6. USE OF TRAFFIC DRUMS AND TRAFFIC CONES

6.a) Traffic drums shall be used for taper channelization on limited-access roadways, ramps,

and turning roadways and to delineate raised catch basins and other hazards.

6.b) Traffic drums shall be used in place of traffic cones in traffic control patterns that are in

effect for more than a 36-hour duration.

6.c) Traffic Cones less than 42 inches in height shall not be used on limited-access roadways

or on non-limited access roadways with a posted speed limit of 45 mph and above.

6.d) Typical spacing of traffic drums and/or cones shown on the Traffic Control Plans in the

Contract are maximum spacings and may be reduced to meet actual field conditions as

required.

SECTION 7. USE OF (REMOTE CONTROLLED) CHANGEABLE MESSAGE SIGNS

(CMS)

7.a) For lane closures on limited access roadways, one CMS shall be used in advance of the

traffic control pattern. Prior to installing the pattern, the CMS shall be installed and in

Page 40: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

Rev. Date 5/18/2018

ITEM #0971001A 8

operation, displaying the appropriate lane closure information (i.e.: Left Lane Closed -

Merge Right). The CMS shall be positioned ½ - 1 mile ahead of the lane closure taper. If

the nearest Exit ramp is greater than the specified ½ - 1 mile distance, than an additional

CMS shall be positioned a sufficient distance ahead of the Exit ramp to alert motorists to

the work and therefore offer them an opportunity to take the exit.

7.b) CMS should not be installed within 1000 feet of an existing CMS.

7.c) On non-limited access roadways, the use of CMS for lane closures is optional. The

roadway geometry, sight line distance, and traffic volume should be considered in the

decision to use the CMS.

7.d) The advance CMS is typically placed off the right shoulder, 5 feet from the edge of

pavement. In areas where the CMS cannot be placed beyond the edge of pavement, it

may be placed on the paved shoulder with a minimum of five (5) traffic drums placed in

a taper in front of it to delineate its position. The advance CMS shall be adequately

protected if it is used for a continuous duration of 36 hours or more.

7.e) When the CMS are no longer required, they should be removed from the clear zone and

have the display screen cleared and turned 90 away from the roadway.

7.f) The CMS generally should not be used for generic messages (ex: Road Work Ahead,

Bump Ahead, Gravel Road, etc.).

7.g) The CMS should be used for specific situations that need to command the motorist’s

attention which cannot be conveyed with standard construction signs (Examples include:

Exit 34 Closed Sat/Sun - Use Exit 35, All Lanes Closed - Use Shoulder, Workers on

Road - Slow Down).

7.h) Messages that need to be displayed for long periods of time, such as during stage

construction, should be displayed with construction signs. For special signs, please

coordinate with the Office of Construction and the Division of Traffic Engineering for

the proper layout/dimensions required.

7.i) The messages that are allowed on the CMS are as follows:

Page 41: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

Rev. Date 5/18/2018

ITEM #0971001A 9

Message No. Frame 1 Frame 2 Message No. Frame 1 Frame 2

1 LEFT

LANE

CLOSED

MERGE

RIGHT

9 LANES

CLOSED

AHEAD

REDUCE

SPEED

2 2 LEFT

LANES

CLOSED

MERGE

RIGHT

10 LANES

CLOSED

AHEAD

USE

CAUTION

3 LEFT

LANE

CLOSED

REDUCE

SPEED

11 WORKERS

ON

ROAD

REDUCE

SPEED

4 2 LEFT

LANES

CLOSED

REDUCE

SPEED

12 WORKERS

ON

ROAD

SLOW

DOWN

5 RIGHT

LANE

CLOSED

MERGE

LEFT

13 EXIT XX

CLOSED

USE

EXIT YY

6 2 RIGHT

LANES

CLOSED

MERGE

LEFT

14 EXIT XX

CLOSED

USE YY

FOLLOW

DETOUR

7 RIGHT

LANE

CLOSED

REDUCE

SPEED

15 2 LANES

SHIFT

AHEAD

USE

CAUTION

8 2 RIGHT

LANES

CLOSED

REDUCE

SPEED

16 3 LANES

SHIFT

AHEAD

USE

CAUTION

For any other message(s), approval must be received from the Office of Construction prior to

their use. No more than two (2) displays shall be used within any message cycle.

Page 42: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

Rev. Date 5/18/2018

ITEM #0971001A 10

SECTION 8. USE OF STATE POLICE OFFICERS

8.a) State Police may be utilized only on limited access highways and secondary roadways

under their primary jurisdiction. One Officer may be used per critical sign pattern.

Shoulder closures and right lane closures can generally be implemented without the

presence of a State Police Officer. Likewise in areas with moderate traffic and wide,

unobstructed medians, left lane closures can be implemented without State Police

presence. Under some situations it may be desirable to have State Police presence, when

one is available. Examples of this include: nighttime lane closures; left lane closures

with minimal width for setting up advance signs and staging; lane and shoulder closures

on turning roadways/ramps or mainline where sight distance is minimal; and closures

where extensive turning movements or traffic congestion regularly occur, however they

are not required.

8.b) Once the pattern is in place, the State Police Officer should be positioned in a non-

hazardous location in advance of the pattern If traffic backs up beyond the beginning of

the pattern, then the State Police Officer shall be repositioned prior to the backup to give

warning to the oncoming motorists. The State Police Officer and TMA should not be in

proximity to each other.

8.c) Other functions of the State Police Officer(s) may include:

• Assisting entering/exiting construction vehicles within the work area.

• Enforcement of speed and other motor vehicle laws within the work area, if

specifically requested by the project.

8.d) State Police Officers assigned to a work site are to only take direction from the Engineer.

Page 43: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

ITEM #971001A

Page 44: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

ITEM #971001A

Page 45: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

ITEM #971001A

Page 46: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

ITEM #971001A

Page 47: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

ITEM #971001A

Page 48: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

ITEM #971001A

Page 49: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

ITEM #971001A

Page 50: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

ITEM #971001A

Page 51: SAMPLE CONTRACT FORM - Connecticut€¦ · Plans, specifications, proposalf orm and form of contract are attached ereto. h Proposals must be made upon the form provided. The blank

ITEM #971001A