11th Wing

The Chief’s Own! The Chief’s Own!

Lt Col Rockie Wilson, PE

11 CES/CC

SAME/CMAA Business

Opportunity Brief

Page 2: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

2 The Chief’s Own!

Overview

11 WG Funding Trend

Facilities Long Range Planning, Programming and

Execution Integration

MILCON

Work Orders

SRM

Presidential Aircraft Recapitalization & Airfield

Investment Plans

Page 3: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

3 The Chief’s Own!

0.0

100.0

200.0

300.0

FY10 FY11 FY12 FY13 FY14

Distribution Add'l Distributed Funds AFCEC

11 WG Funding Trend O&M – Distribution to End-of-Year

$ M

illi

on

s

3

Page 4: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

4 The Chief’s Own!

Facilities Long Range Planning,

Programming and Execution

Integration

Installation Development

Plan

SRM

MILCON P-341

NAF Projects

Long Range Planning

(1-15 Years)

Near Term Programming

Long Term Execution

(1-5 Years)

Enhanced Use Lease

Near Term Programming

Near Term Execution

(1-2 Years)

Work Orders Near-term Execution

< 1 Year

Page 5: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

5 The Chief’s Own!

MILCON

Page 6: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

6 The Chief’s Own!

Executing the Mission Leading People

Improving the Unit

Managing Resources

Page 7: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

7 The Chief’s Own!

Work Orders

Page 8: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

8 The Chief’s Own!

Approved Priority

(Information)

Work Priority Work Type Definition Timeline

1 EmergencyNeed to ensure/sustain continued

mission operationsCRA

2A Preventative MaintenanceRight work/frequency to prolong asset

life-cycleCRA

2B Troop Training Multi-craft work orders for CE training ID

3A Scheduled Sustainment Work

High mission/equip sustainment risk

PAL Tier 1 or 2

RAC 1-3

FSD 1 or 2

ID

3B Scheduled Sustainment Work

Low mission/equip sustainment risk

PAL Tier 3

RAC 4 or 5

ID

3C Scheduled Sustainment WorkLow mission/equip sustainment risk

Pal Tier 4 asset/equipID

4A Scheduled Enhancement Work Work defined and prioritized by base EOY

4B All other Enhancement WorkNon-mission priority, potentially

funded by other unitsEOY

Oct-Dec

Jan-Jul

Aug-Sep

Page 9: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

9 The Chief’s Own!

Sustainment, Restoration &

Modernization

Page 10: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

10 The Chief’s Own!

Project Scoring (Information)

MDI

MAJCOM

Priority

FCA

SIR

Facility Condition Engineering Assessment

Mission Dependency Mission Impact Assessment

Total

210

Savings

100 Points

MDI Score: 60 points available

Based on CATCODE/Mission Function

MAJCOM Priority Score: 40 points available

AFDW allotted 10 project priorities. Projects

outside of the top 10 AFDW/CC priorities get

zero priority points

10 Points Generated from Savings Calculator or BLCC

100 Points

Facilities Condition Index: From

BUILDER: Lifecycle Projections, Actual

Condition, & Functionality Assessment

(Safety, ADA, FSDCs, Space/Capacity, etc)

Pavement Condition Index: From

PAVER: Condition, FOD Potential, Skid

Potential, & Structural Index

Page 11: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

11 The Chief’s Own!

Facility Condition Assessment

(FCA) Overview

“Can’t manage what you don’t know” - BUILDER provides a tool

to track lifecycle and sustainment of Real Property

FCA teams comprise of shop personnel with experience in HVAC,

Structures, Electrical, Power Pro and WFSM

Teams assess targeted facility utilizing tablets and BRED software

for inventorying RPIE and export data into BUILDER

Facility equipment are typically directly rated and include:

Structures: Building envelope, roofs, doors and windows

HVAC: Air handlers, pumps, fans, chillers, boilers

Electric: Generators, switch gear, transformers, panels

WFSM: Toilets, sinks, interior utility linear infrastructure

Page 12: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

12 The Chief’s Own!

Facility Condition Assessment

(FCA) Overview - BUILDER

Page 13: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

13 The Chief’s Own!

Once BUILDER inventory data is collected Requirements

and Optimization (R&O) can begin to “put the pieces

together” and create a whole picture of what the facility

needs.

• Generates an overall “Health Grade” or BCI based on

rated conditions of facility various components

• Tracks Mission Dependency Index (MDI) via Real

Property Records for ranking

• Gives a system repair cost estimates based off RS

Means and lifecycle status

R&O analyzes data within BUILDER, GEOBASE, IWIMS and

ACES in order to track deficiencies, and proactively identify

trends and develop project candidates.

Facility Condition Assessment

(FCA) Overview - BUILDER

Page 14: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

14 The Chief’s Own!

Project Execution Timeline

For Official Use

Only

1

4

Page 15: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

15 The Chief’s Own!

JBA Proposed Work

Contracting Org Project Title Cost

USACE Repair Taxiway >$5M

11 CONS Design/Repair Deluge System >$5M

USACE Replace Storm Drains On Airfield >$5M

11 CONS Repair Drainage Multi Areas <$1M

11 CONS Replace Floor In PMEL Lab <$1M

11 CONS Upgrade Crane & Electrical <$1M

11 CONS Airfield Rubber Removal/Striping >$1M<$5M

AFCEC Repair Deluge System <$1M

AFCEC Design East Side Deluge System <$1M

AFFES Repair/Renovate For Clothing Sales <$1M

11 CONS Repair Squad Ops >$1M<$5M

11 CONS Replace AHU <$1M

11 CONS Add/Alter Facility >$1M<$5M

USACE Replace HVAC Sys <$1M

USACE Replace Feeders Basewide >$1M<$5M

USACE Repair Transformers >$1M<$5M

AFCEC Design Paynes Branch and Outfalls <$1M

11 CONS Repair Roof & HVAC >$1M<$5M

11 CONS Repair Roof West Fitness Ctr <$1M

AFCEC Design Fire Station <$1M

USACE Repair Electrical & Generator Systems <$1M

USACE Repair Fire Suppression System >$1M<$5M

USACE Repair Fire Suppression System >$1M<$5M

USACE Repair Fire Suppression System >$1M<$5M

11 CONS Install Antenna <$1M

11 CONS Repair Offices & Restrooms >$1M<$5M

11 CONS Repair Roof Parachute Loft <$1M

11 CONS Repr Roof, Gutter, Mold >$1M<$5M

USACE Install Fire Protection <$1M

Page 16: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

16 The Chief’s Own!

JBA Proposed Work

Contracting Org Project Title Cost

11 CONS Repair/Reno Bldg <$1M

11 CONS Rpr/Replace 3 Cranes With Jack Load Tester <$1M

11 CONS Repair Roof <$1M

USACE Install Fiber Duct <$1M

11 CONS Construct EOD Proficiency Range <$1M

USACE Repair Electrical Panel <$1M

11 CONS Repair HQ Bldg <$1M

11 CONS Repair Bldg >$1M<$5M

11 CONS Replace Water Cooled Chiller <$1M

11 CONS Replace Vault Door <$1M

USACE Convert Hgr To Fuel Cell >$1M<$5M

11 CONS Repair Road <$1M

USACE Repair Dorms >$1M<$5M

USACE Repair Spalls & Joint Sealant <$1M

11 CONS Repair/Install Fire Alarm <$1M

11 CONS Repair Hvac, Elec & Install Walls >$1M<$5M

11 CONS Repair Entrapment in Bldg <$1M

USACE Replace Transformers <$1M

USACE Replace Oil Fire Burner <$1M

11 CONS Repair Chaplain/EO Bldg <$1M

USACE Repair Parking Lot <$1M

11 CONS Repair 3 Boilers <$1M

11 CONS Construct Security Guard Booth <$1M

11 CONS Construct Storage <$1M

11 CONS Renovate Bldg <$1M

AFCEC Add/Alter Facility >$1M<$5M

11 CONS Demolish Bldg <$1M

11 CONS Demolish Multi Bldg <$1M

AFCEC Study/Design/Repair Gate Traffic <$1M

11 CONS Renovate Base Theater <$1M

11 CONS Repair Airfield Sinkhole <$1M

Page 17: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

17 The Chief’s Own!

Major Initiatives

Page 18: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

18 The Chief’s Own!

Rebuild America’s Airfield

18

Page 19: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

19 The Chief’s Own!

New Presidential Aircraft

• Preparing for potential replacement of VC-25 with Boeing 747-8i • Requires new 2-bay/3-bay hangar to accommodate larger aircraft

• Existing Hangars not sufficient to house new aircraft

• Relocation of Critical Functions

• Taxiway Improvements required

Page 20: SAME/CMAA Business Opportunity Brief - SAME DC Postsamedcpost.org/docs/CMAA_Andrews_Business_Opportunity_Slides.pdfSAME/CMAA Business Opportunity Brief . 2 The Chief’s Own! Overview

20 The Chief’s Own!

Questions