Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
HSH4 QUIETCOMFORT® 14 SEER HEAT PUMP UP TO 12.2 EER COOLING • UP TO 8.2 HSPF HEATING
3-YEAR NO HASSLE REPLACEMENTTM LIMITED WARRANTY • 10-YEAR PARTS LIMITED WARRANTY*
40B 3167 HSH430GKA 14 2.5 30,000 2811/16" 313/16" 321/8" 216 Lbs
*TIMELY REGISTRATION REQUIRED FOR 10-YEAR PARTS LIMITED WARRANTY. LIMITED WARRANTY PERIOD IS 5 YEARS IF NOT REGISTERED WITHIN 90 DAYS OF INSTALLATION
HSH6 DURACOMFORT® 16 SEER HEAT PUMP UP TO 13 EER COOLING • UP TO 9 HSPF HEATING
5-YEAR NO HASSLE REPLACEMENTTM LIMITED WARRANTY • 10-YEAR PARTS LIMITED WARRANTY*
40B 3168 HSH618GKA 16 1.5 18,000 313/16" 313/16" 351/2" 213 Lbs
HSH5 QUIETCOMFORT® 14 SEER HEAT PUMP 12.5 EER COOLING • 8.5 HSPF HEATING
5-YEAR NO HASSLE REPLACEMENTTM LIMITED WARRANTY • 10-YEAR PARTS LIMITED WARRANTY*
40B 3158 HSH524GKA 15 2 24,000 335/16" 35" 35" 257 Lbs 40B 3161 HSH542GKA 15 3.5 42,000 297/8" 35" 35" 305 Lbs 40B 3163 HSH548GKA 15 4 48,000 335/16" 35" 35" 323 Lbs 40B 3164 HSH560GKA 15 5 60,000 401/8" 35" 35" 357 Lbs
HEAT PUMPS
*TIMELY REGISTRATION REQUIRED FOR 10-YEAR PARTS LIMITED WARRANTY. LIMITED WARRANTY PERIOD IS 5 YEARS IF NOT REGISTERED WITHIN 90 DAYS OF INSTALLATION
June 15, 2021 N-1
NXH5 HIGH EFFICIENCY SINGLE STAGE HEAT PUMPSPLIT SYSTEM • 208/230 V • 1 PH • 60 HZ • R-410A • SINGLE-STAGE COMPRESSOR • SINGLE-SPEED FAN MOTOR
SOLD ONLY TO HVAC PROFESSIONALS
HSH SERIES SINGLE STAGE ENERGY EFFICIENT HEAT PUMPS208/230 V • 1- PH • 60 HZ • R-410A • SINGLE-STAGE SCROLL COMPRESSOR OPERATION • SINGLE-SPEED FAN MOTOR
HEATING & AIR CONDTIONING • GAS CONNECTORS N
HSH4
HSH5
Nominal Operating Dimensions (Inches) Shipping Call For PricesSSC No. Manuf. No. Seer Tons BTU/Hr Height Width Depth Weight 785-823-2221
40B 3155 NXH530GKA 15 2.5 30,000 2811/16" 313/16" 313/16" 242 Lbs
Nominal Operating Dimensions (Inches) Shipping Call For PricesSSC No. Manuf. No. Seer Tons BTU/Hr Height Width Depth Weight 785-823-2221
HSH5
NXH5 PERFORMANCE SERIES® 15 SEER HEAT PUMP 12.5 EER COOLING • 8.5 HSPF HEATING
10-YEAR PARTS LIMITED WARRANTY*
NXH5
46B 7000 R4H436GKC 14 3 36,000 313/6" 313/6" 287/6" 170 Lbs
46B 6915 R4H418GKC 14 1.5 18,000 231/8" 231/8" 353/4" 136 Lbs
46B 6950 R4H430GKC 14 2.5 30,000 313/6" 313/6" 313/6" 158 Lbs 46B 6925 R4H424GKC 14 2 24,000 253/4" 253/4" 353/4" 144 Lbs
R4H4 EFFICIENT HEAT PUMPSPLIT SYSTEM • 208/230 V • 1 PH • 60 HZ • R-410A • SINGLE-STAGE COMPRESSOR • SINGLE-SPEED FAN MOTOR
Nominal Operating Dimensions (Inches) Shipping Call For PricesSSC No. Manuf. No. Seer Tons BTU/Hr Height Width Depth Weight 785-823-2221
R4H4 14 SEER HEAT PUMP 11.5 EER COOLING • 8.2 HSPF HEATING
10-YEAR PARTS LIMITED WARRANTY*
*TIMELY REGISTRATION REQUIRED FOR 10-YEAR PARTS LIMITED WARRANTY. LIMITED WARRANTY PERIOD IS 5 YEARS IF NOT REGISTERED WITHIN 90 DAYS OF INSTALLATION
R4H4
40B 7055 AGAGC9NPS01A NG TO LP CONVERSION KIT 1 Lb Call For Prices 46B 8515 NPLPCONV013C00 NG TO LP KIT PGD4/PGS4 1 Lb 785-823-2221 46B 9020 NAHB01001LP LP KIT 1 Lb
NPLPCONV013C00
*TIMELY REGISTRATION REQUIRED FOR 10-YEAR PARTS LIMITED WARRANTY. LIMITED WARRANTY PERIOD IS 5 YEARS IF NOT REGISTERED WITHIN 90 DAYS OF INSTALLATION
PGD4 PERFORMANCE® PACKAGE 14 SEER • 12 EER COOLING • 81% AFUE HEATING
10-YEAR PARTS LIMITED WARRANTY* • 15-YEAR HEAT EXCHANGER LIMITED WARRANTY
40B 4660 PGD430060K00D 28,600 60,000 433/4" 483/16" 325/8" 320 Lbs
Cooling Heating Capacity Input Unit Dimensions (Inches) Shipping Call For PricesSSC No. Manuf. No. BTU/Hr BTU/Hr Height Width Depth Weight 785-823-2221
40B 4670 PGD420060K00D 23,600 60,000 335/16" 35" 35" 304 Lbs 40B 4685 PGD442090K00D 40,000 90,000 297/8" 35" 35" 413 Lbs 40B 4690 PGD448130K00D 48,000 127,000 335/16" 35" 35" 438 Lbs 40B 4695 PGD460130K00D 56,000 127,000 401/8" 35" 35" 455 Lbs
PGD4 PERFORMANCE® 14 GAS FURNACE/AIR CONDITIONER COMBINATION208/230 V • 1- PH • 60 HZ • R-410A • EFFICIENT SINGLE-STAGE SCROLL COMPRESSOR • EFFICIENT MULTI-SPEED ECM BLOWER MOTOR
N-1A June 15, 2021
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
GAS FURNACE & A/C PACKAGE SOLD ONLY TO HVAC PROFESSIONALS
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
June 15, 2021 N-1B
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
SOLD ONLY TO HVAC PROFESSIONALS
*FOR OWNER OCCUPIED, RESIDENTIAL APPLICATIONS ONLY. SEE WARRANTY CERTIFICATE FOR COMPLETE DETAILS AND RESTRICTIONS, INCLUDING WARRANTY COVERAGE FOR OTHER APPLICATIONS.
Input Unit Dimensions (Inches) Shipping Call For PricesSSC No. Manuf. No. (MBTUH) Height Width Depth Weight 785-823-2221
46B 5003 N8MSN1352116A 132,000 331/3" 29" 29" 149 Lbs
N8MSN PERFORMANCE 80 GAS FURNACE - 80% AFUELIMITED WARRANTY* 10-YEAR PARTS LIMITED WARRANTY • 20-YEAR HEAT EXCHANGER LIMITED WARRANTY
*FOR OWNER OCCUPIED, RESIDENTIAL APPLICATIONS ONLY. SEE WARRANTY CERTIFICATE FOR COMPLETE DETAILS AND RESTRICTIONS, INCLUDING WARRANTY COVERAGE FOR OTHER APPLICATIONS.
46B 5070 F9MXE0801716A 80,000 35" 171/2" 291/2" 144 Lbs
Input Unit Dimensions (Inches) Shipping Call For PricesSSC No. Manuf. No. (MBTUH) Height Width Depth Weight 785-823-2221
46B 5053 F9MXE1002120A 100,000 35" 143/16" 291/2" 120 Lbs
46B 5068 F9MXE0401410A 40,000 35" 143/16" 291/2" 127 Lbs
F9MXE QUIETCOMFORT® 96 GAS FURNACE - 96% AFUELIMITED WARRANTY* 10-YEAR PARTS LIMITED WARRANTY • 20-YEAR HEAT EXCHANGER LIMITED WARRANTY
*FOR OWNER OCCUPIED, RESIDENTIAL APPLICATIONS ONLY. SEE WARRANTY CERTIFICATE FOR COMPLETE DETAILS AND RESTRICTIONS, INCLUDING WARRANTY COVERAGE FOR OTHER APPLICATIONS.
46B 5074 N9MSE0601714A 60,000 35" 171/2" 291/2" 144 Lbs
Input Unit Dimensions (Inches) Shipping Call For PricesSSC No. Manuf. No. (MBTUH) Height Width Depth Weight 785-823-2221
46B 5071 N9MSE0261408A 40,000 35" 143/16" 291/2" 120 Lbs
N9MSE PERFORMANCE 95 GAS FURNACE - 95% AFUELIMITED WARRANTY* 10-YEAR PARTS LIMITED WARRANTY • 20-YEAR HEAT EXCHANGER LIMITED WARRANTY
GAS FURNACES SOLD ONLY TO HVAC PROFESSIONALS
*FOR OWNER OCCUPIED, RESIDENTIAL APPLICATIONS ONLY. SEE WARRANTY CERTIFICATE FOR COMPLETE DETAILS AND RESTRICTIONS, INCLUDING WARRANTY COVERAGE FOR OTHER APPLICATIONS.
46B 5660 F9MVE0802120A 80,000 35" 21" 291/2" 156 Lbs
Input Unit Dimensions (Inches) Shipping Call For PricesSSC No. Manuf. No. (MBTUH) Height Width Depth Weight 785-823-2221
46B 5662 F9MVE1202422A 120,000 35" 241/2" 291/2" 190 Lbs
46B 5657 F9MVE0401410A 40,000 35" 143/16" 291/2" 121 Lbs 46B 5658 F9MVE0601714A 60,000 35" 171/2" 291/2" 142 Lbs
F9MVE COMMUNICATING 2 STAGE GAS FURNACE - 96% AFUELIMITED WARRANTY* 10-YEAR PARTS LIMITED WARRANTY • 20-YEAR HEAT EXCHANGER LIMITED WARRANTY
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
GAS FURNACES
N-1C June 15, 2021
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
SOLD ONLY TO HVAC PROFESSIONALS
*FOR OWNER OCCUPIED, RESIDENTIAL APPLICATIONS ONLY. SEE WARRANTY CERTIFICATE FOR COMPLETE DETAILS AND RESTRICTIONS, INCLUDING WARRANTY COVERAGE FOR OTHER APPLICATIONS.
46B 6660 G96CTN0802120A 80,000 35" 21" 291/2" 171.5 Lbs
Input Unit Dimensions (Inches) Shipping Call For PricesSSC No. Manuf. No. (MBTUH) Height Width Depth Weight 785-823-2221
46B 6661 G96CTN1002122A 100,000 35" 21" 291/2" 179.0 Lbs
46B 6658 G96CTN0601714A 60,000 35" 171/2" 291/2" 151.0 Lbs 46B 6659 G96CTN0801714A 80,000 35" 171/2" 291/2" 152.5 Lbs
46B 6662 G96CTN1202422A 120,000 35" 241/2" 291/2" 195.0 Lbs
G96CTN ION™ 96 VARIABLE-SPEED GAS FURNACE - 96% AFUELIMITED WARRANTY* 10-YEAR PARTS LIMITED WARRANTY • 20-YEAR HEAT EXCHANGER LIMITED WARRANTY
*FOR OWNER OCCUPIED, RESIDENTIAL APPLICATIONS ONLY. SEE WARRANTY CERTIFICATE FOR COMPLETE DETAILS AND RESTRICTIONS, INCLUDING WARRANTY COVERAGE FOR OTHER APPLICATIONS.
46B 6073 N95ESN0601412A 60,000 35" 143/16" 291/2" 129.0 Lbs
Input Unit Dimensions (Inches) Shipping Call For PricesSSC No. Manuf. No. (MBTUH) Height Width Depth Weight 785-823-2221
46B 6074 N95ESN0601714A 60,000 35" 171/2" 291/2" 138.5 Lbs
46B 6071 N95ESN0261410A 26,000 35" 143/16" 291/2" 118.0 Lbs 46B 6072 N95ESN0401410A 40,000 35" 143/16" 291/2" 120.0 Lbs
46B 6075 N95ESN0801716A 80,000 35" 21" 291/2" 146.5 Lbs
46B 6079 N95ESN1202422A 120,000 35" 241/2" 291/2" 179.5 Lbs
N95ESN PERFORMANCE 95 GAS FURNACE - 95% AFUELIMITED WARRANTY* 10-YEAR PARTS LIMITED WARRANTY • 20-YEAR HEAT EXCHANGER LIMITED WARRANTY
46B 6078 N95ESN1002120A 100,000 35" 21" 291/2" 164.5 Lbs 46B 6081 N95ESN0802120A 80,000 35" 21" 291/2" 154.5 Lbs
46B 6086 N95ESN1402422A 140,000 35" 241/2" 291/2" 189.0 Lbs
46B 6005 N80ESN1552420A 155,000 331/3" 241/2" 29" 168.0 Lbs
46B 6000 N80ESN0902116A 90,000 331/3" 21" 29" 142.0 Lbs
46B 6002 N80ESN1102420A 110,000 331/3" 241/2" 29" 161.0 Lbs
*FOR OWNER OCCUPIED, RESIDENTIAL APPLICATIONS ONLY. SEE WARRANTY CERTIFICATE FOR COMPLETE DETAILS AND RESTRICTIONS, INCLUDING WARRANTY COVERAGE FOR OTHER APPLICATIONS.
46B 6992 N80ESN0701412A 70,000 331/3" 143/16" 29" 114.0 Lbs
Input Unit Dimensions (Inches) Shipping Call For PricesSSC No. Manuf. No. (MBTUH) Height Width Depth Weight 785-823-2221
46B 6994 N80ESN0701712A 70,000 331/3" 171/2" 29" 120.0 Lbs
46B 6991 N80ESN0451412A 45,000 331/3" 143/16" 29" 104.0 Lbs 46B 6993 N80ESN0451712A 45,000 331/3" 171/2" 29" 119.0 Lbs
46B 6995 N80ESN0702116A 70,000 331/3" 21" 29" 142.0 Lbs
46B 6998 N80ESN1102120A 110,000 331/3" 21" 29" 146.0 Lbs
N80ESN PERFORMANCE 80 GAS FURNACE - 80% AFUELIMITED WARRANTY* 10-YEAR PARTS LIMITED WARRANTY • 20-YEAR HEAT EXCHANGER LIMITED WARRANTY
46B 6997 N80ESN0902120A 90,000 331/3" 21" 29" 140.0 Lbs
46B 6996 N80ESN0901714A 90,000 331/3" 171/2" 29" 131.0 Lbs
46B 6999 N80ESN1352420A 135,000 331/3" 241/2" 29" 167.0 Lbs
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
June 15, 2021 N-1D
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
EHK ACCESSORY ELECTRIC HEAT STRIP
Internal Circuit Size Shipping Call For PricesSSC No. Manuf. No. Protection Hgt X Lgth X Wth Weight 785-823-2221
40B 4921 EHK07AKB1 7 KW CircuIt Breaker 8" X 19" X 11" 5 Lbs 40B 4922 EHK10AKB1 10 KW CircuIt Breaker 8" X 191/3" X 11" 5 Lbs
EHIA ELECTRIC HEAT STRIP
Call For PricesSSC No. Manuf. No. 785-823-2221
46B 5102 EHIA00KN10 No Heat Single−Phase With Terminal Block (Non−Breaker) 46B 5103 EHIA05KB10 5 KW Single−Phase With Circuit Breaker46B 5104 EHIA07KB10 7 KW Single−Phase With Circuit Breaker46B 5105 EHIA10KB10 10 KW Single−Phase With Circuit Breaker46B 5106 EHIA15KB10 15 KW Single−Phase With Circuit Breaker46B 5107 EHIA20KB10 20 KW Single−Phase With Circuit Breaker46B 5608 EHIA25KB10 25 KW Single−Phase With Circuit Breaker
FURNACE ACCESSORIES
NAHA00101VC THROUGH CABINET INTERNAL VENT KIT
SSC No. Manuf No. Wgt. Lbs. Call For Price
40C 9005 NAHA00101VC Furnace Vent Kit 1.0 Lbs 785-823-2221
NAHA00401DH 4" CHIMNEY VENT KIT
SSC No. Manuf No. Wgt. Lbs. Call For Price
40C 9010 NAHA00401DH For Gas Furnaces 2.0 Lbs 785-823-2221
NAHA00101CA & NAHA00301CA COIL ADAPTER KITS
SSC No. Manuf No. Wgt. Lbs. Call For Price
40C 9029 NAHB00301CA With Double Offset 2.0 Lbs 40C 9027 NAHB00101CA With No Offset 2.0 Lbs 785-823-2221
40B 4923 EHK15AKB2 15 KW CircuIt Breaker 81/4" X 19" X 111/4" 8 Lbs 40B 4924 EHK20AKB1 20 KW CircuIt Breaker 8" X 191/3" X 111/4" 9 Lbs 40B 4931 EHK25AHCF 25 KW Fuse 9" X 153/4" X 161/2" 10 Lbs 40B 4935 EHK30AHCF 30 KW Fuse 9" X 153/4" X 161/2" 10 Lbs
N-1E June 15, 2021
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
FAN COILS SOLD ONLY TO HVAC PROFESSIONALS
Nominal Nominal Unit Dimensions (Inches) Shipping Call For PricesSSC No. Manuf. No. Tons CFM Height Width Depth Weight 785-823-2221
46B 5094 MF080014C 2 800 24" 143/16" 201/2" 58.0 Lbs46B 5650 MF160021C 4 1600 25" 21" 201/2" 75.0 Lbs
MF MODULAR ELECTRIC FURNACE FAN COIL208/230 V • 1 PH • 60 HZ • 5-YEAR PARTS LIMITED WARRANTY • UPFLOW, HORIZONTAL RIGHT OR LEFT APPLICATIONS
*TIMELY REGISTRATION REQUIRED FOR 10-YEAR PARTS LIMITED WARRANTY. LIMITED WARRANTY PERIOD IS 5 YEARS IF NOT REGISTERED WITHIN 90 DAYS OF INSTALLATION
40B 5611 FXM4X3000AL 2.5 1000 537/16" 211/8" 221/16" 197/8" x 211/2" 146 Lbs
Size Nominal Unit Dimensions (Inches) Filter Shipping Call For PriceSSC No. Manuf. No. Tons CFM Height Width Depth Size Weight 785-823-2221
40B 5612 FXM4X3600AL 3 1200 495/8" 211/8" 221/16" 197/8" x 211/2" 157 Lbs
40B 5609 FXM4X1800AL 1.5 600 495/8" 175/8" 221/16" 163/8" x 211/2" 122 Lbs 40B 5610 FXM4X2400AL 2 800 495/8" 175/8" 221/16" 163/8" x 211/2" 122 Lbs
40B 5613 FXM4X4200AL 3.5 1400 495/8" 211/8" 221/16" 197/8" x 211/2" 157 Lbs 40B 5614 FXM4X4800AL 4 1600 531/16" 2411/16" 221/16" 235/16" x 211/2" 185 Lbs
FXM4X QUIETCOMFORT MULTI POSITION FAN COILALUMINUM TUBE - ALUMINUM FIN EVAPORATOR • R-410A • LIMITED WARRANTY* 10-YEAR PARTS LIMITED WARRANTY
40B 5615 FXM4X6000AL 5 2000 533/16" 2411/16" 221/16" 235/16" x 211/2" 201 Lbs
46B 5150 MF200024C 5 2000 25" 241/2" 201/2" 79.0 Lbs
*TIMELY REGISTRATION REQUIRED FOR 10-YEAR PARTS LIMITED WARRANTY. LIMITED WARRANTY PERIOD IS 5 YEARS IF NOT REGISTERED WITHIN 90 DAYS OF INSTALLATION
Size Nominal Unit Dimensions (Inches) Shipping Call For PriceSSC No. Manuf. No. Tons CFM Height Width Depth Weight 785-823-2221
40B 5644 MV080014C 2 800 24" 143/16" 201/2" 58 Lbs 40B 5646 MV160021C 4 1600 25" 21" 201/2" 79 Lbs
MV MODULAR VARIABLE SPEED FAN COILFOR AIR CONDIONING OR HEAT PUMP • 208/230 V • 1 PH • 60 HZ • 5-YEAR PARTS WARRANTY
Size Nominal Unit Dimensions (Inches) Filter Shipping Call For PriceSSC No. Manuf. No. Tons BTU Height Width Depth Size Weight 785-823-2221
40B 5600 FMA4P1800AL 1.5 18,000 361/2" 201/2" 15" 16" x 20" 101 Lbs
FMA PERFORMANCE MULTIFAMILY HOME FAN COILALUMINUM TUBE - ALUMINUM FIN EVAPORATOR • R-410A • LIMITED WARRANTY* 10-YEAR PARTS LIMITED WARRANTY
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
June 15, 2021 N-1F
HEATING & AIR CONDTIONING • GAS CONNECTORS N
EVAPORATOR COILS SOLD ONLY TO HVAC PROFESSIONALS
5-YEAR PARTS LIMITED WARRANTY* • ADDITIONAL 5-YEAR PARTS LIMITED WARRANTY WITH TIMELY REGISTRATION • 20-YEAR HEAT EXCHANGER LIMITED WARRANTY*FOR OWNER OCCUPIED, RESIDENTIAL APPLICATIONS ONLY. SEE WARRANTY CERTIFICATE FOR COMPLETE DETAILS AND RESTRICTIONS, INCLUDING WARRANTY COVERAGE FOR OTHER APPLICATIONS.
40B 5600 EDM4X30BAL 2.5 R-410A 247/8" 155/8" 205/8" 60.0 Lbs
Size Unit Dimensions (Inches) Shipping Call For PriceSSC No. Manuf. No. Tons Refrigerant Height Width Depth Weight 785-823-2221
40B 5602 EDM4X30FAL 2.5 R-410A 247/8" 191/4" 205/8" 64.0 Lbs
40B 5603 EDM4X24BAL 2 R-410A 247/8" 155/8" 205/8" 56.5 Lbs 40B 5605 EDM4X24FAL 2 R-410A 247/8" 191/4" 205/8" 60.0 Lbs
40B 5606 EDM2X36FAL 3 R-22 293/4" 191/4" 205/8" 72.5 Lbs
40B 5676 EDM4X42JAL 3.5 R-410A 293/4" 191/4" 205/8" 78.5 Lbs
EDM4X CASED MULTI-POSITION ALUMINUM EXPANSION VALVE "A" COILSWIDTHS MATCH 151/2", 191/4", 223/4" & 241/2" ICP GAS FURNACES
40B 5612 EDM4X36JAL 3 R-410A 293/4" 227/8" 205/8" 77.0 Lbs 40B 5615 EDM4X36FAL 3 R-410A 293/4" 191/4" 205/8" 72.5 Lbs
40B 5682 EDM4X48JAL 4 R-410A 293/4" 227/8" 205/8" 86.0 Lbs
40B 5668 EDM4X60LAL 5 R-410A 35" 241/2" 205/8" 100.0 Lbs
40B 5607 EDM4X42LAL 3.5 R-410A 293/4" 227/8" 205/8" 80.5 Lbs
40B 5665 EDM4X48LAL 4 R-410A 293/4" 241/2" 205/8" 87.3 Lbs
Size Unit Dimensions (Inches) Shipping Call For PriceSSC No. Manuf. No. Tons Refrigerant Height Width Depth Weight 785-823-2221
40B 5685 EDD4X18BAT 1.5 R-410A 185/16" 155/8" 205/8" 56.5 Lbs
EDD4X CASED ALUMINUM EXPANSION VALVE "A" COILSTIN COATED COPPER TUBE & ALUMINUM FIN
5-YEAR PARTS LIMITED WARRANTY* • ADDITIONAL 5-YEAR PARTS LIMITED WARRANTY WITH TIMELY REGISTRATION • 20-YEAR HEAT EXCHANGER LIMITED WARRANTY*FOR OWNER OCCUPIED, RESIDENTIAL APPLICATIONS ONLY. SEE WARRANTY CERTIFICATE FOR COMPLETE DETAILS AND RESTRICTIONS, INCLUDING WARRANTY COVERAGE FOR OTHER APPLICATIONS.
Size Unit Dimensions (Inches) Shipping Call For PriceSSC No. Manuf. No. Tons Refrigerant Height Width Depth Weight 785-823-2221
END4X & ENH4X CASED ALUMINUM EVAPORATOR "N" COILSWIDTHS MATCH 143/16", 171/2", 21" & 241/2" ICP GAS FURNACES
5-YEAR PARTS LIMITED WARRANTY* • ADDITIONAL 5-YEAR PARTS LIMITED WARRANTY WITH TIMELY REGISTRATION • 20-YEAR HEAT EXCHANGER LIMITED WARRANTY*FOR OWNER OCCUPIED, RESIDENTIAL APPLICATIONS ONLY. SEE WARRANTY CERTIFICATE FOR COMPLETE DETAILS AND RESTRICTIONS, INCLUDING WARRANTY COVERAGE FOR OTHER APPLICATIONS.
40B 5702 END4X24L17A 2 R-410A 145/8" 171/2" 21" 40.0 Lbs 40B 5704 END4X30L14A 2.5 R-410A 17" 143/16" 21" 47.0 Lbs
40B 5701 END4X18L14A 1.5 R-410A 125/8" 143/16" 21" 36.0 Lbs 40B 5700 END4X24L14A 2 R-410A 145/8" 143/16" 21" 40.0 Lbs
40B 5706 END4X30L17A 2.5 R-410A 17" 171/2" 21" 47.0 Lbs
40B 5712 END4X42L17A 3.5 R-410A 211/8" 171/2" 21" 52.0 Lbs 40B 5711 END4X36L21A 3 R-410A 17" 21" 21" 48.0 Lbs 40B 5708 END4X36L17A 3 R-410A 17" 171/2" 21" 49.0 Lbs
40B 5710 END4X48L21A 4 R-410A 221/16" 21" 21" 66.0 Lbs
40B 5715 END4X60L2AA 5 R-410A 267/8" 241/2" 21" 78.0 Lbs
40B 5709 END4X42L21A 3.5 R-410A 19" 21" 21" 57.0 Lbs
40B 5714 END4X48L24A 4 R-410A 221/16" 241/2" 21" 62.0 Lbs
40B 5728 ENH4X36L17A 3 R-410A 171/2" 16" 187/8" 50.0 Lbs 40B 5729 ENH4X42L21A 3.5 R-410A 21" 191/2" 187/8" 59.0 Lbs
40B 5725 ENH4X24L17A 2 R-410A 171/2" 16" 187/8" 40.0 Lbs 40B 5727 ENH4X30L17A 2.5 R-410A 171/2" 16" 187/8" 50.0 Lbs
40B 5730 ENH4X48L21A 4 R-410A 21" 191/2" 187/8" 71.0 Lbs 40B 5731 ENH4X60L24A 5 R-410A 241/2" 23" 187/8" 81.0 Lbs
END4X
ENH4X
END4X VERTICAL CASED ALUMINUM EVAPORATOR "N" COILS
ENH4X HORIZONTAL CASED ALUMINUM EVAPORATOR "N" COILS
N-1G June 15, 2021
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
FURNACE ACCESSORIES AIR CONDITIONERS SOLD ONLY TO HVAC PROFESSIONALS
46B 5620 HSA618GKA 1.5 18,000 289/6" 313/16" 313/16" 213 Lbs
46B 5617 N4A348GHB 4 48,000 351/2" 313/16" 313/16" 205 Lbs
46B 5622 HSA630GKA 2.5 30,000 32" 313/16" 313/16" 223 Lbs 46B 5621 HSA624GKA 2 24,000 289/6" 313/16" 313/16" 212 Lbs
46B 5625 HSA648GKA 4 48,000 401/8" 35" 35" 340 Lbs
46B 5623 HSA636GKA 3T 36,000 297/8" 35" 35" 243 Lbs 46B 5624 HSA642GKA 3.5 42,000 401/8" 35" 35" 297 Lbs
46B 5627 N4A336GHB 3 36,000 255/16" 313/16" 313/16" 151 Lb
46B 5664 N4A324GKG 2 24,000 255/16" 231/8" 231/8" 127 Lbs 46B 5663 N4A318GKF 1.5 18,000 255/16" 231/8" 231/8" 130 Lbs
46B 5666 N4A336GKF 3 36,000 255/16" 313/16" 313/16" 151 Lbs 46B 5665 N4A330GKG 2.5 30,000 2811/16" 253/4" 253/4" 149 Lbs
46B 5668 N4A348GKG 4 48,000 351/2" 313/16" 313/16" 205 Lbs 46B 5667 N4A342GKN 3.5 42,000 325/16" 313/16" 313/16" 218 Lbs
46B 5669 N4A360GKN 5 60,000 2811/16" 313/16" 313/16" 232 Lbs
Size Nominal Unit Dimensions (Inches) Shipping Call For PriceSSC No. Manuf. No. Tons BTU/HR Height Width Depth Weight 785-823-2221
HSA6 ION™ 16 CENTRAL AIR CONDITIONER -13 SEERSPLIT SYSTEM • 208/230 V • 1 PH • 60 HZ • R-410A • SCROLL COMPRESSOR
5-YEAR PARTS LIMITED WARRANTY • ADDITIONAL 5-YEAR PARTS LIMITED WARRANTY WITH TIMELY REGISTRATION • 20-YEAR HEAT EXCHANGER LIMITED WARRANTYFOR OWNER OCCUPIED, RESIDENTIAL APPLICATIONS ONLY. SEE WARRANTY CERTIFICATE FOR COMPLETE DETAILS AND RESTRICTIONS, INCLUDING WARRANTY COVERAGE FOR OTHER APPLICATIONS.
Size Nominal Unit Dimensions (Inches) Shipping Call For PriceSSC No. Manuf. No. Tons BTU/HR Height Width Depth Weight 785-823-2221
N4A3 PERFORMANCE 13 CENTRAL AIR CONDITIONER -13 SEERSPLIT SYSTEM • 208/230 V • 60 HZ • R-410A • SCROLL COMPRESSOR
1 PHASE PERFORMANCE 13 CENTRAL AIR CONDITIONER -13 SEER
3 PHASE PERFORMANCE 13 CENTRAL AIR CONDITIONER -13 SEER
5-YEAR PARTS LIMITED WARRANTY • ADDITIONAL 5-YEAR PARTS LIMITED WARRANTY WITH TIMELY REGISTRATION • 20-YEAR HEAT EXCHANGER LIMITED WARRANTYFOR OWNER OCCUPIED, RESIDENTIAL APPLICATIONS ONLY. SEE WARRANTY CERTIFICATE FOR COMPLETE DETAILS AND RESTRICTIONS, INCLUDING WARRANTY COVERAGE FOR OTHER APPLICATIONS.
46B 6664 R4A324GKH 2 24,000 247/8" 231/8" 231/8" 127 Lbs
46B 6666 R4A336GKH 3T 36,000 247/8" 313/16" 313/16" 151 Lbs 46B 6665 R4A330GKH 2.5 30,000 2811/16" 253/4" 253/4" 149 Lbs
46B 6669 R4A360GKH 5 60,000 281/4" 313/16" 313/16" 218 Lbs
46B 6667 R4A342GKH 3.5 42,000 3111/16" 313/16" 313/16" 186 Lbs 46B 6668 R4A348GKH 4 48,000 351/16" 313/16" 313/16" 205 Lbs
Size Nominal Unit Dimensions (Inches) Shipping Call For PriceSSC No. Manuf. No. Tons BTU/HR Height Width Depth Weight 785-823-2221
R4A3 EFFICIENT AIR CONDITIONER -13 SEERSPLIT SYSTEM • 208/230 V • 1 PH • 60 HZ • R-410A • SCROLL COMPRESSOR
5-YEAR PARTS LIMITED WARRANTY • ADDITIONAL 5-YEAR PARTS LIMITED WARRANTY WITH TIMELY REGISTRATION • 20-YEAR HEAT EXCHANGER LIMITED WARRANTYFOR OWNER OCCUPIED, RESIDENTIAL APPLICATIONS ONLY. SEE WARRANTY CERTIFICATE FOR COMPLETE DETAILS AND RESTRICTIONS, INCLUDING WARRANTY COVERAGE FOR OTHER APPLICATIONS.
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
HEATING & AIR CONDTIONING • GAS CONNECTORS N
WHIPS WITH NON METALLIC CONNECTORS•ASSEMBLED •LIQUID TIGHT •EXTRA LONG LEADS •3 DISTINCT WIRE COLORS FOR EASE OF HOOK-UP
SSC No. Manuf No. Size Wire Price Each
44D 8595 18823/6-12-4NM 1/2" x 4' 1-STR/1-90° #10 THHN $ 10.66 44D 8600 18825/6-12-6NM 1/2" x 6' 1-STR/1-90° #10 THHN 15.58
44D 8604 18829/6-34-6NM 3/4" x 6' 1-STR/1-90° #8 THHN $ 16.45
June 15, 2021 N-2
ANTI-VIBRATION PAD•RUBBER •SOLID CROSS-RIBBED DESIGN•MAX CAPACITY 50 LBS PER SQ INCH
SSC No. Manuf No. Size Price Each
42A 0500 6434 4" x 4" x 3/8" $ 1.16
EQUIPMENT RISER•EASY LEVELING DURING & AFTER INSTALLATION•CORROSION RESISTANT BLACK PLASTIC
SSC No. Manuf No. Size Adjustable Price Each
42A 0350 4007BLK 6" To 71/4" $ 5.52
CONDENSER PAD•STRONG HIGH DENSITY POLYETHYLENE CONSTRUCTION •TEXTURED TOP TO PREVENT SLIPPING •CORNER TABS HELP KEEP PADS STACKED •GRAY COLOR
SSC No. Manuf No. Size Wgt. Lbs. Price Each
40C 5310 30303 30" x 30" x 3" 14.5 Lbs $ 38.81 40C 5320 36363 36" x 36" x 3" 18.9 Lbs 47.65
For Prices & Information on AIRQUEST Products, Call Salina Supply Company at (785) 823-2221
60 AMP METAL AIR CONDITIONER DISCONNECT•NON FUSED •240V •1 PH •10 HP •METAL •1/2", 3/4" & 1" KNOCKOUTS •CSA LISTED
SSC No. Manuf No. Size Price Each
44D 8605 13154 UO65P 5" x 71/4" NEMA 3R Enclosure – Rainproof $ 13.78
SSC No. Manuf No. Size Tubing Length Insulation Price Each
COPPER LINE SETS
40C 5050 061208150SW 3/8" - 3/4" 18-36 15' 1/2" $ 160.16 40C 5065 061208250SW 3/8" - 3/4" 30-36 25' 248.09 40C 5075 061208350SW 3/8" - 3/4" 30-36 35' 321.56 40C 5090 061208500SW 3/8" - 3/4" 30-36 50' 408.19
40C 5150 D61820500SW 3/8" Liquid Line 11/8" Suction Line 50' 1/2" $ 609.70
40C 5125 061408350SW 3/8" - 7/8" 42-60 35' 355.39 40C 5115 061408250SW 3/8" - 7/8" 42-60 25' $ 321.88
40C 5140 061408500SW 3/8" - 7/8" 42-60 50' 624.92
RAPID LOCKING SYSTEM
N-2A June 15, 2021
HEATING & AIR CONDTIONING • GAS CONNECTORS N
40C 3000 3011040400111 1/4" Coupling 10 $ 7.02 SSC No. Manuf No. Size Type Ctn Price Each
40C 3025 3011141400111 7/8" Coupling 10 28.80 40C 3020 3011121200111 3/4" Coupling 10 20.75
40C 3010 3011060600111 3/8" Coupling 10 10.73 40C 3015 3011080800111 1/2" Coupling 10 13.44
RLS BRAZE-FREE COUPLINGSPRESS END X PRESS END • 700 PSI MAX • 250° F MAX • REFRIGERANT GRADE COPPER
40C 3045 3051080600111 1/2" x 3/8" Reducing Coupling 10 $ 21.71
40C 3050 3051141200111 7/8" x 3/4" Reducing Coupling 10 36.28
3011202000111 11/4" Coupling 10 39.72 3011181800111 11/8" Coupling 10 34.56
3011101000111 5/8" Coupling 10 17.28
3011161600111 1" Coupling 10 20.07
3011222200111 13/8" Coupling 10 42.45
40C 3030 3031060600111 3/8" 90° Elbow 10 $ 21.61 SSC No. Manuf No. Size Type Ctn Price Each
3031080800111 1/2" 90° Elbow 10 23.95
RLS BRAZE-FREE 90° ELBOWSPRESS END X PRESS END • 700 PSI MAX • 250° F MAX • REFRIGERANT GRADE COPPER
3031101000111 5/8" 90° Elbow 10 24.68
40C 3035 3031121200111 3/4" 90° Elbow 10 32.76 40C 3040 3031141400111 7/8" 90° Elbow 10 30.59
3031161600111 1" 90° Elbow 10 33.74
3031202000111 11/4" 90° Elbow 10 40.61 3031222200111 11/8" 90° Elbow 10 50.66
3031222200111 13/8" 90° Elbow 10 50.66
3051121000111 3/4" x 5/8" Reducing Coupling 10 27.64
3051181400111 11/8" x 7/8" Reducing Coupling 10 44.00 3051221800111 13/8" x 11/8" Reducing Coupling 10 50.55
3081101000111 5/8" 45° Elbow 10 $ 35.26 SSC No. Manuf No. Size Type Ctn Price Each
3081121200111 3/4" 45° Elbow 10 39.01
RLS 45° BRAZE-FREE ELBOWSPRESS END X PRESS END • 700 PSI MAX • 250° F MAX • REFRIGERANT GRADE COPPER
3081141400111 7/8" 45° Elbow 10 43.71 3081181800111 11/8" 45° Elbow 10 54.78 3081222200111 13/8" 45° Elbow 10 67.89
3501060600111 3/8" 90° Street Elbow 10 $ 31.31 3501121200111 3/4" 90° Street Elbow 10 39.72 3501141400111 7/8" 90° Street Elbow 10 43.66
continued on next page
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
SSC No. Manuf No. Size Type Ctn Price Each
KJ SERIES BRAZE-FREE JAWSPRESS END X PRESS END • 700 PSI MAX • 250° F MAX • REFRIGERANT GRADE COPPER
40C 3065 399022001060 3/8" Jaw $ 266.66 40C 3070 399022001120 3/4" Jaw 266.66 40C 3075 399022001140 7/8" Jaw 266.66
40C 3055 3291040000111 1/4" Flare 10 $ 14.04 SSC No. Manuf No. Size Type Ctn Price Each
40C 3060 3291060000111 3/8" Flare 10 17.51
RLS SAE/EURO BRAZE-FREE FLARESPRESS END X FLARE END • 700 PSI MAX • 250° F MAX • REFRIGERANT GRADE COPPER
RAPID LOCKING SYSTEM
June 15, 2021 N-2B
3071100000111 5/8" Cap 10 $ 16.32 SSC No. Manuf No. Size Type Ctn Price Each
3071140000111 7/8" Cap 10 20.61
RLS BRAZE-FREE CAPSPRESS END X PRESS END • 700 PSI MAX • 250° F MAX • REFRIGERANT GRADE COPPER
3071160000111 1" Cap 10 26.51 3071180000111 11/8" Cap 10 23.16 3071200000111 11/4" Cap 10 28.01 3071220000111 13/8" Cap 10 26.43
3091101010111 5/8" Tee 10 $ 39.12 SSC No. Manuf No. Size Type Ctn Price Each
3091141414111 7/8" Tee 10 49.12
RLS BRAZE-FREE TEESPRESS END X PRESS END • 700 PSI MAX • 250° F MAX • REFRIGERANT GRADE COPPER
3091161616111 1" Tee 10 57.04 3091181818111 11/8" Tee 10 62.43 3091202020111 11/4" Tee 10 57.93 3091222222111 13/8" Tee 10 80.05
3521100800111 5/8" to 1/2" Bushing 10 $ 28.77 SSC No. Manuf No. Size Type Ctn Price Each
3521141200111 7/8" to 3/4" Bushing 10 29.63
RLS BRAZE-FREE BUSHINGSPRESS END X MALE SWEAT • 700 PSI MAX • 250° F MAX • REFRIGERANT GRADE COPPER
3521181400111 11/8" to 7/8" Bushing 10 47.80 3521221800111 13/8" to 11/8" Bushing 10 54.43
THE ORIGINAL PRESS FITTINGS SPECIFICALLYENGINEERED TO JOIN TUBE IN HIGH-PRESSUREHVAC & REFRIGERATION SYSTEMS.
Original. Patented. Proven.
GALVANIZED VENTINGN-3 June 15, 2021
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
46E 1420 666WYE 6 x 6 x 6 1 $ 20.30 SSC No. Manuf No. Size (Inches) Ctn Price Each
46E 1440 866WYE 8 x 6 x 6 1 20.86
BRANCH WYE JOINT
24 GAUGE GALVANIZED PIPE
28 GAUGE GALVANIZED PIPE
30 GAUGE GALVANIZED PIPE
SNAP LOCK GALVANIZED PIPE
SSC No. Manuf No. Size Ctn Price Each
46E 0070 14X2P24 14" x 2' 10 25.05
46E 0050 SL241024 10" x 2' 10 $ 16.56 46E 0060 12X2P24 12" x 2' 10 18.77
46E 0040 9X2P24 9" x 2' 10 21.71 46E 0030 8X2P24 8" x 2' 10 19.82
46E 0010 6X2P24 6" x 2' 10 $ 13.46 46E 0020 7X2P24 7" x 2' 10 11.07
46E 0095 6X2P28 6" x 2' 25 6.30
46E 0080 3X2P28 3" x 2' 25 $ 4.20 46E 0085 4X2P28 4" x 2' 25 5.02
46E 0920 7X2P30 7" x 2' 25 $ 5.04 46E 0930 8X2P30 8" x 2' 25 6.34
46E 0910 6X2P30 6" x 2' 25 4.45 46E 0890 5X2P30 5" x 2' 25 4.56
46E 0870 3X2P30 3" x 2' 25 $ 3.90 46E 0880 4X2P30 4" x 2' 25 4.56
46E 1120 6X10P30 6" x 10' 10 $ 21.54
46E 1030 8X5P30 8" x 5' 10 13.44 46E 1020 7X5P30 7" x 5' 10 $ 11.84
46E 0990 5X5P30 5" x 5' 10 8.92 46E 0885 4X5P30 4" x 5' 10 $ 7.34
46E 1010 6X5P30 6" x 5' 10 9.64
46E 0960 12X2P30 12" x 2' 25 12.18 46E 0950 10X2P30 10" x 2' 25 $ 9.62
SSC No. Manuf No. Size (Inches) Ctn Price Each
46E 0170 14E24 14" 4 29.57
46E 0150 10E24 10" 12 $ 29.66 46E 0160 12E24 12" 8 25.24
46E 0140 9E24 9" 12 13.32 46E 0130 8E24 8" 12 12.34
46E 0110 6E24 6" 12 $ 14.94 46E 0120 7E24 7" 12 12.84
ADJUSTABLE 90° ELL
46E 1240 10E28 10" 12 $ 9.18
46E 1230 9E28 9" 12 $ 9.60
46E 1220 8E30 8" 12 4.18
46E 1190 6E30 6" 12 2.52
46E 1210 7E30 7" 12 $ 3.78
46E 1160 3E30 3" 12 $ 2.74 46E 1170 4E30 4" 12 2.60 46E 1180 5E30 5" 12 3.00
46E 1250 12E28 12" 12 11.58
46E 0320 6E28 6" 12 6.84 46E 0105 5E28 5" 12 4.50
46E 0300 3E28 3" 24 $ 4.34 46E 0310 4E28 4" 24 3.86
24 GAUGE GALVANIZED 90° ELL
28 GAUGE GALVANIZED 90° ELL
30 GAUGE GALVANIZED 90° ELL
46E 0180 3TEE 3" 6 $ 15.18 SSC No. Manuf No. Size (Inches) Ctn Price Each
46E 0650 8TEE 8" 6 22.66 46E 0670 9TEE 9" 1 28.85
46E 0630 7TEE 7" 6 $ 14.85
46E 0610 6TEE 6" 6 15.44
46E 0190 4TEE 4" 6 18.00 46E 0200 5TEE 5" 6 13.66
90° TEE JOINT 30 GAUGE
For More Information On These Products Or On Products Not Listed, Call
Salina Supply Co. At (785) 823-2221
June 15, 2021 N-3A
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
46E 1920 2106SB 10 x 21/4 x 6 12 $ 8.34 SSC No. Manuf No. Size (Inches) Ctn Price Each
46E 2420 4106SB 10 x 4 x 6 12 $ 6.24
46E 2350 2146SB 14 x 21/4 x 6 12 9.74 46E 2330 27R2145 14 x 21/4 x 5 12 $ 10.12
46E 2310 2126SB 12 x 21/4 x 6 12 8.34
STRAIGHT REGISTER BOOT WITH 2" THROAT
46E 2485 4147SB 14 x 4 x 7 12 $ 13.88
46E 2480 4127SB 12 x 4 x 7 12 8.56 46E 2460 4126SB 12 x 4 x 6 12 $ 7.34
46E 1980 3126SSB 12 x 31/4 x 6 12 $ 20.86
GALVANIZED VENTING
46E 0681 543VC 5 x 4 x 3 1 $ 14.66 SSC No. Manuf No. Size (Inches) Ctn Price Each
46E 0686 763VC 7 x 6 x 3 1 $ 17.24
46E 0682 653VC 6 x 5 x 3 1 15.31 46E 0683 644VC 6 x 4 x 4 1 $ 14.78
46E 0680 544VC 5 x 4 x 4 1 13.96
VENT CONNECTOR TEE28 GAUGE
46E 0684 654VC 6 x 5 x 4 1 17.30
46E 3230 2126BBR 12 x 21/4 x 6 12 $ 8.22 SSC No. Manuf No. Size (Inches) Ctn Price Each
RIGHT END REGISTER BOOT WITH 2" THROAT
46E 3290 28RR2146 14 x 21/4 x 6 12 10.12
46E 3190 28R2125 12 x 21/4 x 5 12 $ 9.54
46E 3270 2146BB 14 x 21/4 x 6 12 $ 10.12
46E 3210 2126BB 12 x 21/4 x 6 12 10.30
46E 3380 4126BB 12 x 4 x 6 12 11.40 46E 3360 4106BB 10 x 4 x 6 12 $ 7.78
SSC No. Manuf No. Size (Inches) Ctn Price Each
CENTER REGISTER BOOT WITH 2" THROAT
46E 3220 2126BBL 12 x 21/4 x 6 12 $ 12.52 SSC No. Manuf No. Size (Inches) Ctn Price Each
LEFT END REGISTER BOOT WITH 2" THROAT
46E 3280 28RL2146 14 x 21/4 x 6 12 10.12
46E 2570 2105AB 10 x 21/4 x 5 12 $ 9.44
46E 2770 4106AB 10 x 4 x 6 12 $ 6.24
46E 2640 2126AB 12 x 21/4 x 6 12 8.08 46E 2620 2125AB 12 x 21/4 x 5 12 $ 9.44
46E 2590 2106AB 10 x 21/4 x 6 12 9.44
46E 2830 4127AB 12 x 4 x 7 12 9.10 46E 2820 4126AB 12 x 4 x 6 12 $ 8.02
46E 2660 2127AB 12 x 21/4 x 7 12 11.98
46E 2720 24R2147 14 x 21/4 x 7 12 10.12 46E 2690 2146AB 14 x 21/4 x 6 12 $ 11.09
SSC No. Manuf No. Size (Inches) Ctn Price Each
45° ANGLE REGISTER BOOT WITH 2" THROAT
46E 2850 4146AB 14 x 4 x 6 12 $ 13.88 46E 2870 4147AB 14 x 4 x 7 12 13.88
46E 4115 8DTW 8" 24 $ 11.42 SSC No. Manuf No. Size (Inches) Ctn Price Each
DUCTBOARD TWIST-IN TAKEOFF
46E 4061 6DTL 6" 12 $ 8.15 46E 4062 7DTL 7" 12 10.16
SSC No. Manuf No. Size (Inches) Ctn Price Each
DUCTBOARD TAB-LOCK COLLAR
46E 4063 8DTL 8" 12 11.38
For More Information On These Products Or On Products Not Listed, Call
Salina Supply Co. At (785) 823-2221
GALVANIZED VENTINGN-3B June 15, 2021
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
46E 4090 43TR 4" x 3" 12 $ 7.38
46E 4170 86TR 8" x 6" 12 $ 9.31
46E 4110 54TR 5" x 4" 12 9.38
46E 4190 108TR 10" x 8" 12 $ 13.94
46E 4120 64TR 6" x 4" 12 $ 8.50
46E 4150 75TR 7" x 5" 12 $ 11.06 46E 4160 76TR 7" x 6" 12 9.60
SSC No. Manuf No. Size (Inches) Ctn Price Each
TAPERED REDUCER28 GAUGE • NO CRIMP
46E 4100 53TR 5" x 3" 12 $ 9.38
46E 4140 65TR 6" x 5" 12 8.72
46E 4180 87TR 8" x 7" 12 10.06
46E 5050 26TOP 26" x 8" x 48" 30 Gauge 6 $ 22.32
SSC No. Manuf No. Size (Inches) Ctn Price Each
46E 5070 28TOP 28" x 8" x 48" 30 Gauge 6 25.18 46E 5090 30TOP 30" x 8" x 48" 30 Gauge 6 27.44
GALVANIZED RECTANGULAR DUCT30 GAUGE
46E 4450 W3102WS 10" x 31/4" x 24" 30 Gauge 15 $ 14.80 SSC No. Manuf No. Size (Inches) Ctn Price Each
46E 4470 W3122WS 12" x 31/4" x 24" 30 Gauge 15 15.82 46E 4490 W3142WS 14" x 31/4" x 24" 30 Gauge 15 18.64
GALVANIZED RECTANGULAR WALL STACK30 GAUGE
46E 4070 5RATO 5" 12 $ 11.80 46E 4080 6RATO 6" 12 8.72
SSC No. Manuf No. Size (Inches) Ctn Price Each
ROUND ADJUSTABLE TAKE-OFF
46E 4060 7RATO 7" 12 15.30
46E 4085 6TTO 6" 12 $ 11.20 46E 4082 7TTO 7" 12 15.60
SSC No. Manuf No. Size (Inches) Ctn Price Each
ZERO RISE TOP TAKE-OFF
46E 4081 8TTO 8" 12 17.18
46E 4850 W885DUCT 8" x 8" x 60" 30 Gauge 5 $ 25.02
46E 5210 W1485DUCT 14" x 8" x 60" 30 Gauge 5 $ 30.34
46E 5180 TD60128 12" x 8" x 60" 30 Gauge 5 27.36
46E 5230 W1685DUCT 16" x 8" x 60" 30 Gauge 5 $ 30.40
46E 5260 W2085DUCT 20" x 8" x 60" 30 Gauge 5 $ 37.61 46E 5270 W2285DUCT 22" x 8" x 60" 30 Gauge 5 45.40
46E 5280 W2485DUCT 24" x 8" x 60" 30 Gauge 5 $ 46.75
46E 5160 W1085DUCT 10" x 8" x 60" 30 Gauge 5 $ 25.56
46E 5250 W1885DUCT 18" x 8" x 60" 30 Gauge 5 39.10
48" GALVANIZED RECTANGULAR DUCT
60" GALVANIZED RECTANGULAR DUCT
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
June 15, 2021 N-3C
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
Price ChangeGALVANIZED VENTING
46E 5820 WSB36F 15" X 28" 10" X 25" 36" 26" 304.35
SSC No. Manuf No. Height x Length (Inches) Duct Size (Inches) A B Price Each
46E 5800 WSB30F 15" X 28" 8" X 24" 30" 20" $ 312.77
RETURN AIR SUPPORT BOX FOR FILTERS
46E 5770 2010RAD 5" 20" X 10" DUCT TO 20" X 16" FILTER 1 $ 187.92 SSC No. Manuf No. Throat Size (Inches) Ctn Price Each
20" RETURN AIR DROP20" X 10" DUCT TO 20" X 16" FILTER
46E 5780 2510RAD 5" 25" X 10" DUCT TO 25" X 16" FILTER 1 $ 215.90 SSC No. Manuf No. Throat Size (Inches) Ctn Price Each
25" RETURN AIR DROP25" X 10" DUCT TO 25" X 16" FILTER
46E 5630 148A90 14" x 8" 6 27.28 46E 5610 128A90 12" x 8" 6 26.62
46E 5640 168A90 16" x 8" 6 $ 32.46
46E 5680 208A90 20" x 8" 6 $ 37.52 46E 5730 248A90 24" x 8" 6 44.32
SSC No. Manuf No. Size (Inches) Ctn Price Each
SHORTWAY 90° DUCT ELL
46E 5600 108A90 10" x 8" 6 $ 26.58
46E 5660 188A90 18" x 8" 6 35.86
46B 9305 2520FR 20" x 25" x 1" 12 35.67 46B 9313 FR1625 16" x 25" x 1" 12 34.46
SSC No. Manuf No. Size (Inches) Ctn Price Each
FILTER RACK
46B 9310 2514FR 14" x 25" x 1" 12 $ 37.89
46E 4730 310B90 31/4" x 10" 12 $ 23.72 SSC No. Manuf No. Size (Inches) Ctn Price Each
SHORTWAY 90° STACK ELL
N-3D June 15, 2021
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
GALVANIZED VENTING
46E 6080 88SDSL 8" x 8" 6 $ 9.92 SSC No. Manuf No. Size (Inches) Ctn Price Each
46E 6098 188SDS 18" x 8" 6 13.60
46E 6100 208SDS 20" x 8" 6 $ 14.20
46E 6096 168SDS 16" x 8" 6 $ 15.00
46E 6094 148SDS 14" x 8" 6 14.02
46E 6090 108SDS 10" x 8" 6 $ 11.96 46E 6092 128SDS 12" x 8" 6 12.94
STARTING COLLAR
46E 6105 228SDS 22" x 8" 6 19.32 46E 6110 248SDS 24" x 8" 6 15.38
46E 6210 88EC 8" x 8" 12 $ 5.44 SSC No. Manuf No. Size (Inches) Ctn Price Each
46E 6260 188EC 18" x 8" 12 8.90
46E 6270 208EC 20" x 8" 12 $ 8.50
46E 6250 168EC 16" x 8" 12 $ 8.20
46E 6240 148EC 14" x 8" 12 7.50
46E 6220 108EC 10" x 8" 12 $ 6.14 46E 6230 128EC 12" x 8" 12 6.84
DUCT END CAP
46E 6280 228EC 22" x 8" 12 8.96 46E 6290 248EC 24" x 8" 12 10.38
46E 6310 21L268 26" x 8" 12 $ 11.46 46E 6320 21L288 28" x 8" 12 12.26
46E 6580 49P2436 24" x 36" 4 Sides Required For Complete Plenum 1 $ 28.02 SSC No. Manuf No. Size (Inches) Ctn Price Each
UNIVERSAL PLENUM SIDE
46E 6600 49T2424 24" x 24" 1 $ 15.94 SSC No. Manuf No. Size (Inches) Ctn Price Each
UNIVERSAL PLENUM TOP
46E 5750 72WF68 6" 8" For Round Ceiling Diffuser 6 $ 33.14 SSC No. Manuf No. Duct (Inches) Diffuser (Inches) Ctn Price Each
46E 5760 72WF66 6" 6" For Round Ceiling Diffuser 6 31.30
DIFFUSER BOX FOR ROUND CEILING DIFFUSER
46E 5762 45A66 6" 6" For Square Ceiling Diffuser $ 16.30 SSC No. Manuf No. Square (Inches) Round (Inches) Price Each
46E 5764 45A86 8" 6" For Square Ceiling Diffuser 17.50
46E 5766 45A108 10" 8" For Square Ceiling Diffuser $ 21.16
ANGLE DIFFUSER BOX FOR SQUARE CEILING DIFFUSER
June 15, 2021 N-3E
GALVANIZED VENTING
HEATING & AIR CONDTIONING • GAS CONNECTORS N
SSC No. Manuf No. Size Ctn Price Each
46E 7215 16048 16" x 47.5" Corrugated Insulation Faced With Aluminum 25 $ 107.17
THERMO PAN® RESIDENTIAL PANNINGLIGHT WEIGHT, HIGH QUALITY SHEET METAL ALTERNATIVE FOR CONSTRUCTING RETURN AIR DUCTS
46E 6980 6WACL 6" 36 $ 2.92 46E 6985 7WACL 7" 36 4.26
SSC No. Manuf No. Size (Inches) Ctn Price Each
LONG CRIMPED STARTING COLLAR
46E 6990 8WACL 8" 36 4.46
46E 7000 974 4" 36 $ 2.38 SSC No. Manuf No. Size (Inches) Ctn Price Each
46E 7100 10WAC 10" 24 $ 4.26
46E 7090 9WAC 9" 36 3.70 46E 7080 8WAC 8" 36 3.24
46E 7060 6WAC 6" 36 2.50
46E 7070 7WAC 7" 36 $ 3.08
CRIMPED STARTING COLLAR
46E 7050 975 5" 36 2.43
46E 7110 12WAC 12" 24 4.58 46E 7120 14WAC 14" 24 5.54
46E 7130 4PCC 4" 12 5.82
SSC No. Manuf No. Size (Inches) Ctn Price Each
46E 7190 10PCC 10" 12 $ 11.06
46E 7180 9PCC 9" 12 8.72 46E 7170 8PCC 8" 12 7.32
46E 7150 6PCC 6" 12 5.82
46E 7160 7PCC 7" 12 $ 5.39
CRIMPED END PIPE CAP
46E 7140 5PCC 5" 12 5.82
46E 7200 12PCC 12" 12 12.44
46E 6610 28DR 2" x 8" Deep 12 $ 8.20 46E 6630 48DR 4" x 8" Deep 12 9.32
SSC No. Manuf No. Size (Inches) Ctn Price Each
DUCT REDUCER INCREASER
46E 6650 68DR 6" x 8" Deep 12 10.02
46E 6810 8DV 8" 100 $ .56 46E 6830 60DV 60" 50 3.08
SSC No. Manuf No. Size (Inches) Ctn Price Each
DRIVE CLEAT
46E 6855 60SL 5' 50 $ 4.32 SSC No. Manuf No. Size (Inches) Ctn Price Each
S-LOCK CLEAT
SSC No. Manuf No. Size (Inches) Ctn Price Each
46E 6950 208B90 20" x 8" 6 $ 46.82
46E 6940 188B90 18" x 8" 6 42.60
46E 6920 148B90 14" x 8" 6 32.72 46E 6930 168B90 16" x 8" 6 34.62
90° DUCT ELL 2" X 2" RADIUS
46E 6910 128B90 12" x 8" 6 $ 29.34
46E 6970 248B90 24" x 8" 6 63.15
46E 7205 1741JP 32" x 35" 6 $ 9.18 SSC No. Manuf No. Size (Inches) Ctn Price Each
JOIST PANNING
46E 7125 3PCC 3" 12 $ 4.86
N-4 June 15, 2021
SSC No. Manuf No. Size Price Each
46E 7210 A-125/15053 12" to 19" Galvanized Bracket $ 1.70
BOSTITCH OUTSIDE TACKER & STAPLES•BOSTITCH CLINCH TACKER ANCHORS STAPLES INSIDE SOFT MATERIALS FROM THE OUTSIDE•9/16" STAPLE SPREADS TO FORM A STRONG, TIGHT CLINCH •STAPLES IN CARTON OF 5,000
SSC Number Manuf Number Price Each
46F 1160 STCR-5019 9/16" Staples Carton Of 5,000 $ 22.03
46F 1010 T5-8-OC Bostitch Outside Clinch Tacker $ 165.10
FLEXIBLE DUCT CONNECTOR•GENERAL PURPOSE - RESIDENTIAL & LIGHT COMMERCIAL •-40° F TO 180° F, 200° F INTERMITTENT •AIRTIGHT, WEATHER & CEMICAL RESISTANT •EXTREMELY ABRASION & CUT RESISTANT
SSC No. Manuf No. Size Price Each
46F 1360 CN-RV-100 100' 13/4" Metal, 3" Fabric, 13/4" Metal Vinylon $ 193.34 46F 1370 CN-RN-100L 100' 13/4" Metal, 3" Fabric, 13/4" Metal NeoFlex 226.06
C&S BASSET GALVANIZED BRACKET
CANFLEX FLEXIBLE DUCT CONNECTOR•HEATING, AIR CONDITIONING & VENTILATING SYSTEMS - WARM & COOL SIDES •-30° F TO 200° F •NON POROUS •FLAME RESISTANT - SELF EXTINGUISHING •MOISTURE & MILDEW RESISTANT
SSC No. Manuf No. Size Price Each
46F 1365 CN-RC-100 100' Polyester Scrim With Polyvinyl Chloride Coating $ 201.95
NASHUA® CONTRACTOR GRADE HVAC FOIL TAPE•UL 723 LISTED •2.0 MIL ALUMINUM FOIL BACKING •SYNTHETIC RUBBER ADHESIVE •KRAFT PAPER LINER
SSC No. Manuf No. Size Price Each
46F 1312 322 2" x 50 Yards 48mm x 46M $ 16.28 46F 1315 322 3" x 50 Yards 72mm x 46M 24.49
NASHUA® CONTRACTOR GRADE MULTI-PURPOSE DUCT TAPE•UL 723 LISTED •10.0 MIL PE COATED CLOTH BACKING •NATURAL RUBBER ADHESIVE •LOW VOC CONTENT
SSC No. Manuf No. Size Price Each
46F 1325 398 SIL 1.5" x 60 Yards 38.1mm x 54.9M All Weather $ 11.81
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
FLEXIBLE DUCT VENT & DUCT ACCESSORIES
SSC No. Manuf No. Size Price Each
46E 7230 BH-2/14012 For 5" or 6" Pipe Hanger $ .70
C&S BASSET GALVANIZED HANGER
POLYKEN® BLACK GENERAL/MULTI-PURPOSE DUCT TAPE•UL 723 LISTED •9.0 MIL PE COATED CLOTH BACKING •NATURAL RUBBER ADHESIVE •LOW VOC CONTENT
SSC No. Manuf No. Size Price Each
46F 1328 2280 BLK 1.89" x 60 Yards 48 mm X 55 m Multi-Purpose $ 5.60
BH-2
A-125
•LOW VOC CONTENT •MULTI-
PURPOSE
46F 1327 300 SIL 1.89" x 60 Yards 48mm x 55M Heavy Duty 14.74
June 15, 2021 N-4A
HEATING & AIR CONDTIONING • GAS CONNECTORS N
VENT & DUCT ACCESSORIES FLEXIBLE DUCT
41/2" GALVANIZED INSTANT VANE RAIL•FOR PRE-FORMED SINGLE BLADE VANES •41/2" WIDE RAIL FOR 41/2" RADIUS VANE •ROLL OUT, CUT & USE - NO TABS, NO SPECIAL TOOLS, JUST PEEN VANE TO RAIL
SSC No. Manuf No. Size Price Each
46F 4120 RA1VR-4G 100' 41/2" Wide 24 Gauge $ 132.78
SILVER JACKET FLEXIBLE AIR DUCTMETALIZED POLYESTER JACKET REINFORCED WITH FIBERGLASS SCRIMDOUBLE-PLY, BLACK POLYESTER CORE •R-6 •UL LISTED
SSC No. Manuf No. Size Price Each
46F 4440 MHP25R6 5" 25' section R-6 $ 45.16 46F 4445 MHP25R6 6" 25' section R-6 50.98 46F 4450 MHP25R6 7" 25' section R-6 55.58 46F 4455 MHP25R6 8" 25' section R-6 60.50
46F 4470 MHP25R6 10" 25' section R-6 75.90 46F 4475 MHP25R6 12" 25' section R-6 94.08
42M 4850 AD-BT-1 Cain Buttertak Duct Sealant GALLON $ 39.93
42M 4860 ADSP1 SprayTac Duct Adhesive GALLON 49.67
42M 4880 LFCMF50 1/2" Jr Grip Nails CARTON OF 1000 $ 155.92 42M 4900 LFCMF100 1" Grip Nails CARTON OF 1000 145.04
42M 4820 DWF2154875 Foil Duct Wrap Roll R 6 21/8" x 48" x 75' 300 SQ FT $ 151.33
42M 4840 R2DL12471/4M 2 Lb Duct Liner Roll R 2.1 1/2" x 400 SQ FT $ 348.96
SSC No. Product Price Each
FIBERGLASS DUCT BOARDBOARD WITH HEAVY FOIL FACE FOR FABRICATING AIR DUCT
SSC No. Size Wgt. Price Per Carton
46F 1510 148120DB 4' x 10' 6 Per Carton 96.0 $ 578.64
46F 4460 MHP25R6 9" 25' section R-6 63.65
42M 4855 4369-75 Spray N Bond Adhesive 12 OUNCE AEROSOL $ 9.63
MODIFIED CORNERSHIPLAP TOOL
SSC No. Price Each
46F 0520 ORANGE $ 66.87
MALE SHIPLAP TOOL
SSC No. Price Each
46F 0650 PURPLE $ 62.90
FEMALE SHIPLAP TOOL
SSC No. Price Each
46F 0680 GRAY $ 62.90
For More Information On These Products Or On Products Not Listed, Call
Salina Supply Co. At (785) 823-2221
-------------Fits Pipe Size-------------- Nominal Inside Wall Copper Tube Steel Pipe or TemperatureSSC No. Manuf No. Size Diameter Thickness Length Size PVC Size Range Price Each
42M 2107 34BT 5/8" .750" 3/8" 6' 5/8" 3/4" OD -330° - 210°F 2.68 42M 2105 58BT 1/2" .625" 3/8" 6' 1/2" 5/8" OD -330° - 210°F $ 2.42
42M 2115 118BT 1" 1.125" 3/8" 6' 1" 11/8" OD 3/4" 1.05" OD -330° - 210°F 3.22 42M 2110 78BT 3/4" .875" 3/8" 6' 3/4" 7/8" OD 1/2" .84" OD -330° - 210°F 2.70
42M 2130 158BT 11/2" 1.625" 3/8" 6' 11/2" 15/8" OD 11/4" 1.66" OD -330° - 210°F 4.42 42M 2120 138BT 11/4" 1.375" 3/8" 6' 11/4" 13/8" OD 1" 1.32" OD -330° - 210°F 3.62
42M 2140 218BT 2" 2.125" 3/8" 6' 2" 21/8" OD 2" 1.90" OD -330° - 210°F 5.66
N-4B June 15, 2021
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
PIPE & TUBING INSULATION
IMCOLOCK SELF-SEALING, PRE-SPLIT & PRE-GLUED INSULATION•POLYOLEFIN BASED CLOSED CELL FOAM INSULATION. FAST & EASY SEAL JOINING
SSC No. Manuf No. Size Length Price Each
42M 3880 MT05R6 6" 5' 11.84 42M 3860 MT05R6 5" 5' $ 10.44
42M 3920 MT05R6 8" 5' 14.10 42M 3900 MT05R6 7" 5' 13.10
42M 3960 MT05R6 10" 5' 16.94 42M 3940 MT05R6 9" 5' 15.98
42M 3980 MT05R6 12" 5' 21.18
PIPE INSULATION SLEEVE•METALIZED POLYESTER JACKET •STARTER CONE INCLUDED IN EACH CARTON •R-6 IF SLEEVE USED ON RELATIVELY SIZED DUCT
SSC No. Manuf No. Size Service Temperature Price Each
42E 1200 4219-12/FT-1 1/8" x 2" x 30' -15° F TO 160° F - CONTINUOUS $ 17.62
FOAM-TITE FOAM INSULATION TAPE•FOR REFRIGERATION LINES •FOR COLD OR HOT WATER LINES •SOLVES SWEATING OR CONDENSATION PROBLEMS
SSC No. Manuf No. Size Service Temperature Price Each
42M 1460 4217-12/CT-1 1/8" x 2" x 30' -20° F TO +200° F $ 19.37
CORK-TITE CORK INSULATION TAPE•FLEXIBLE •SELF ADHERING •FOR HOT & COLD WATER PIPES •SEALS TIGHTLY WITHOUT DRYING
42M 0080 I60-075 5/8" .750" 3/8" 6' 5/8" 3/4" OD -297° - 220°F 6.2142M 0050 I60-058 1/2" .625" 3/8" 6' 1/2" 5/8" OD -297° - 220°F $ 5.87
42M 0260 I60-118 1" 1.125" 3/8" 6' 1" 11/8" OD 3/4" 1.05" OD -297° - 220°F 6.85 42M 0160 I60-078 3/4" .875" 3/8" 6' 3/4" 7/8" OD 1/2" .84" OD -297° - 220°F 6.53
42M 0360 I60-158 11/2" 1.625" 3/8" 6' 11/2" 15/8" OD 11/4" 1.66" OD -297° - 220°F 9.6542M 0310 I60-138 11/4" 1.375" 3/8" 6' 11/4" 13/8" OD 1" 1.32" OD -297° - 220°F 7.78
42M 0415 I60-258 21/2" 2.625" 3/8" 6' 21/2" 25/8" OD 2" 2.38" OD -297° - 220°F 17.22
INSUL-TUBE NON-SPLIT FLEXIBLE PIPE INSULATION •RUBBER & PVC BASED CLOSED CELL FOAM INSULATION •ANTI-MICROBIAL AGENTS RETARD MOLD, FUNGAL & BACTERIA GROWTH
-------------Fits Pipe Size-------------- Nominal Inside Wall Copper Tube Steel Pipe or TemperatureSSC No. Manuf No. Size Diameter Thickness Length Size PVC Size Range Price Each
Non-UV Resistant
June 15, 2021 N-4C
FILTERS DAMPERS
1" FIBERGLASS FILTERS •STANDARD SIZES •NON CLEANABLE
SSC No. Manuf No. Size Price Each
46H 0110 274080160 1" x 8" x 16" $ 4.05
PLEATED FILTERS •MERV 8 RATED
SSC No. Manuf No. Size Price Each
46H 2200 102700012 2" x 12" x 24" $ 6.46
46H 2400 102700016 2" x 16" x 20" 6.52 46H 2430 102700017 2" x 16" x 25" 8.07
46H 2450 102700008 1" x 20" x 20" 7.12 46H 0880 102700016 1" x 20" x 16" 6.46 46H 2000 102700007 1" x 16" x 25" 6.42
46H 2100 102700009 1" x 20" x 25" 7.28
46H 2300 102042005 2" x 16" x 16" 9.96
46H 9060 102700018 2" x 24" x 18" 8.27
46H 2500 102700019 2" x 20" x 20" 7.30 46H 2600 102700021 2" x 20" x 25" 8.28
46H 0360 274100200 1" x 10" x 20" $ 4.29 46H 0410 274100250 1" x 10" x 25" 5.15 46H 0450 274100300 1" x 10" x 30" 6.11
46H 0550 274120120 1" x 12" x 12" $ 2.94 46H 0570 274120160 1" x 12" x 16" 4.72 46H 0590 274120200 1" x 12" x 20" 4.40 46H 0650 274120240 1" x 12" x 24" 4.56 46H 0670 274120280 1" x 12" x 28" 14.56 46H 0690 274120300 1" x 12" x 30" 6.13
46H 0710 274140200 1" x 14" x 20" $ 4.29 46H 0730 274140250 1" x 14" x 25" 4.56
46H 0780 274150200 1" x 15" x 20" $ 4.64 46H 0810 274150240 1" x 15" x 24" 14.35 46H 0830 274150250 1" x 15" x 25" 5.76
46H 0850 274160160 1" x 16" x 16" $ 4.48 46H 0870 274160200 1" x 16" x 20" 4.00 46H 0890 274160222 1" x 16" x 221/4" 5.68 46H 0920 274160250 1" x 16" x 25" 3.08
46H 0950 274180180 1" x 18" x 18" $ 5.57 46H 0970 274180250 1" x 18" x 25" 6.37 46H 0990 274180280 1" x 18" x 28" 16.48
46H 1030 274200200 1" x 20" x 20" $ 3.00 46H 1050 274200250 1" x 20" x 25" 3.30
46H 1090 274250250 1" x 25" x 25" $ 6.56
46H 1230 276160200 2" x 16" x 20" $ 3.84 46H 1250 276160250 2" x 16" x 25" 4.20
46H 1280 276200200 2" x 20" x 20" $ 4.24 46H 1360 276200240 2" x 20" x 24" 5.02 46H 1310 276200250 2" x 20" x 25" 4.64
46H 1340 276240240 2" x 24" x 24" $ 5.61 46H 1350 276250250 2" x 25" x 25" 7.97
SSC No. Manuf No. Price Each
46H 1770 585036240 $ 78.43
FIBERGLASS FILTER MATERIAL•36" WIDE X 240" LONG X 1" THICK
SSC No. Manuf No. Price Each
46H 1890 59103030 Washable $ 192.00
HOG HAIR FILTER MATERIAL•30" WIDE X 30' LONG X 1" THICK
2" FIBERGLASS FILTERS •STANDARD SIZES •NON CLEANABLE
SSC No. Manuf No. Size Price Each
SSC No. Manuf No. Size Price Each
46C 5060 102718202 16" H x 25" W x 3" D $ 40.08 46C 5065 102718010 16" H x 25" W x 5" D 30.75
Z-LINE SERIES AIR CLEANER FILTERS •MERV 8 RATED •GASKETED ON TOP & BOTTOM •(AIR BEAR REPLACEMENT)
46C 5068 102499030 20" H x 25" W x 4" D $ 23.19 46C 5070 102718201 20" H x 25" W x 5" D 37.07
46H 0725 102700004 1" x 14" x 25" $ 7.52
HEATING & AIR CONDTIONING • GAS CONNECTORS N
For More Information On These Products Or On Products Not Listed, Call
Salina Supply Co. At (785) 823-2221
SSC No. Manuf No. Finish Width Height Ctn Price Each
SSC No. Manuf No. Finish Size Ctn Price Each
N-5 June 15, 2021
SSC No. Manuf No. Finish Width Height Ctn Price Each
#406 STEEL BASEBOARD DIFFUSERALL-STEEL CONSTRUCTION • GOLDEN SAND OR BRIGHT WHITE ENAMEL FINISH
46G 2260 462W WHITE 24" 41/2" 10 $ 25.90
46G 1100 406GS GOLDEN SAND 18" 41/2" 10 9.63 46G 1090 406W WHITE 18" 41/2" 10 $ 9.63
#462 2' STEEL BASEBOARD DIFFUSERALL-STEEL CONSTRUCTION • AIRFOIL VALVES REDUCE RESISTANCE • BRIGHT WHITE ENAMEL
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
46G 0110 1606W WHITE 6" 10 $ 6.36 46G 0130 1608W WHITE 8" 10 8.34 46G 0150 1610W WHITE 10" 10 13.32
46G 0290 1614W WHITE 14" 10 19.80 46G 0230 1612W WHITE 12" 10 17.06
46G 0530 1206GS GOLDEN SAND 6" 20 $ 9.37 46G 0550 1208GS GOLDEN SAND 8" 20 11.22
46G 0590 1212GS GOLDEN SAND 12" 10 22.82 46G 0570 1210GS GOLDEN SAND 10" 10 14.18
46G 0620 1214GS GOLDEN SAND 14" 10 25.37
46G 0350 1108GS GOLDEN SAND 8" 10 14.71 46G 0330 1106GS GOLDEN SAND 6" 10 $ 11.93
#16 ROUND STEEL CEILING DIFFUSERALL-STEEL CONSTRUCTION • STEP-DOWN DIFFUSER RINGS DEFLECT AIR STREAM 360° • BRIGHT WHITE FINISH
#11 ROUND STEEL DUCT RING FOR #16 DIFFUSER • ALL-STEEL CONSTRUCTION
#12 ROUND STEEL BUTTERFLY DAMPER FOR #16 DIFFUSER • ALL-STEEL CONSTRUCTION
SSC No. Manuf No. Finish Width Ctn Price Each
46G 0900 2406W WHITE 6" 10 $ 51.32 46G 0910 2408W WHITE 8" 10 61.42 46G 0920 2410W WHITE 10" 5 69.01
46G 0940 2414W WHITE 14" 5 109.27 46G 0930 2412W WHITE 12" 5 86.64
46G 0830 2208GS GOLDEN SAND 8" 20 $ 18.07 46G 0850 2210GS GOLDEN SAND 10" 10 19.10
46G 0890 2214GS GOLDEN SAND 14" 10 30.02 46G 0870 2212GS GOLDEN SAND 12" 10 24.62
#24 SQUARE 4-WAY ALUMINUM CEILING DIFFUSER LESS DAMPEREXTRUDED ALUMINUM CONSTRUCTION • 4-WAY AIR DIFFUSION • FOR SIDEWALL OR CEILING • BRIGHT WHITE FINISH
#22 SQUARE BUTTERFLY DAMPER FOR #24 DIFFUSER • ALL-STEEL CONSTRUCTION
DIFFUSERS
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
SSC No. Manuf No. Finish Width Height Ctn Price Each
46G 1760 420 1202GS GOLDEN SAND 14" 2" 24 6.24 46G 1740 420 1202GS GOLDEN SAND 12" 2" 24 $ 5.31
June 15, 2021 N-5A
46G 1880 421 0212W WHITE 12" 2" 24 5.93 46G 1850 421 0210GS GOLDEN SAND 10" 2" 24 $ 5.86 SSC No. Manuf No. Finish Width Height Ctn Price Each
#421 STEEL FLOOR REGISTERALL-STEEL CONSTRUCTION • MULTI-ANGLE FIN SETTING • FOOT-OPERATED DIAL CONTROL • GOLDEN SAND OR BRIGHT WHITE ENAMEL FINISH
46G 1970 421 0214GS GOLDEN SAND 14" 2" 24 6.77
46G 2110 421 0412GS GOLDEN SAND 12" 4" 24 6.10
46G 1870 421 0212GS GOLDEN SAND 12" 2" 24 4.45
46G 2105 421 0412W WHITE 12" 4" 24 8.78 46G 2050 421 0410GS GOLDEN SAND 10" 4" 24 5.83 46G 2045 421 0410W WHITE 10" 4" 24 $ 6.54
46G 2170 421 0414GS GOLDEN SAND 14" 4" 24 8.57
HEATING & AIR CONDTIONING • GAS CONNECTORS N
#420 STEEL TOE KICK REGISTERALL-STEEL CONSTRUCTION • HEAVY-GAUGE STAMPED FACE • MULTI-ANGLE FINS • GOLDEN SAND ENAMEL FINISH
46G 2660 265 0612GS GOLDEN SAND 6" 12" 4 20.06 46G 2610 265 0610GS GOLDEN SAND 6" 10" 4 $ 18.98
46G 2760 265 0624GS GOLDEN SAND 6" 24" 4 33.05 46G 2690 265 0614GS GOLDEN SAND 6" 14" 4 21.74
46G 2840 265 0812GS GOLDEN SAND 8" 12" 4 $ 23.87
46G 2810 265 0630GS GOLDEN SAND 6" 30" 4 38.38
46G 2910 265 0824GS GOLDEN SAND 8" 24" 4 39.33 46G 2870 265 0814GS GOLDEN SAND 8" 14" 4 26.33
46G 3030 265 1014GS GOLDEN SAND 10" 14" 4 $ 33.05
46G 2950 265 0830GS GOLDEN SAND 8" 30" 4 42.82
46G 3200 265 1214GS GOLDEN SAND 12" 14" 4 $ 32.21
46G 3160 265 1030GS GOLDEN SAND 10" 30" 4 63.10
46G 3230 265 1224GS GOLDEN SAND 12" 24" 4 48.77 46G 3210 265 1220GS GOLDEN SAND 12" 20" 4 44.69
46G 3290 265 1430GS GOLDEN SAND 14" 30" 4 $ 67.25
46G 3260 265 1230GS GOLDEN SAND 12" 30" 4 58.18
46G 3320 265 1830GS GOLDEN SAND 18" 30" 4 84.38
SSC No. Manuf No. Finish Width Height Ctn Price Each
#265 HEAVY DUTY ALL-STEEL FLOOR GRILLEFREE AREA AVERAGES OVER 75% • EXTREMELY RIGID • FIRM, SMOOTH SURFACE • GOLDEN SAND ENAMEL FINISH
46G 2570 210 1012GS GOLDEN SAND 12" 10" 5 $ 44.76 SSC No. Manuf No. Finish Width Height Ctn Price Each
#210 HEAVY DUTY ALL-STEEL FLOOR REGISTERFREE AREA AVERAGES OVER 75% • SMOOTH & EXTREMELY RIGID• TOE OPERATED, VALVE CONTROL
continued on next page
REGISTERS GRILLES
N-5B June 15, 2021
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
#650 ALL-STEEL WHITE RETURN AIR GRILLE1/3" SPACED FINS SET AT 20° • EXCEPTIONAL FREE AREA • 5/16" MARGIN TURNBACK • WHITE FINISH
46G 4220 650 1204W 12" 4" 20 $ 9.22 46G 4240 650 1206W 12" 6" 20 4.75 46G 4270 650 1208W 12" 8" 20 5.62 46G 4310 650 1210W 12" 10" 12 21.51 46G 4340 650 1212W 12" 12" 12 9.39
46G 4010 650 0804W 8" 4" 20 $ 9.24
46G 4030 650 0808W 8" 8" 20 9.91 46G 4020 650 0806W 8" 6" 20 10.20
SSC No. Manuf No. Width Height Ctn Price Each
46G 4160 650 1008W 10" 8" 20 12.96 46G 4110 650 1006W 10" 6" 20 $ 5.26
46G 4180 650 1010W 10" 10" 12 7.37
46G 4370 G35W1404 14" 4" 20 $ 11.78 46G 4420 650 1406W 14" 6" 20 3.85 46G 4460 650 1408W 14" 8" 20 7.30 46G 4510 650 1410W 14" 10" 12 10.04
46G 5520 650 2416W 24" 16" 12 44.75
46G 4540 650 1412W 14" 12" 12 11.21 46G 4570 650 1414W 14" 14" 12 12.48
46G 4790 650 1806W 18" 6" 12 $ 16.79 46G 4840 650 1808W 18" 8" 12 18.62 46G 4860 650 1810W 18" 10" 12 19.99 46G 4950 650 1816W 18" 16" 12 17.64 46G 4980 650 1818W 18" 18" 12 45.50
46G 4590 G35W1604 16" 4" 12 $ 17.59 46G 4630 650 1606W 16" 6" 12 14.99 46G 4650 650 1608W 16" 8" 12 9.77
46G 4690 650 1612W 16" 12" 12 19.04 46G 4720 650 1614W 16" 14" 12 30.00 46G 4760 650 1616W 16" 16" 12 19.61
46G 4670 650 1610W 16" 10" 12 26.64
46G 5010 650 2006W 20" 6" 12 $ 17.23 46G 5050 650 2008W 20" 8" 12 18.42 46G 5090 650 2010W 20" 10" 12 10.93
46G 5160 650 2014W 20" 14" 12 17.28 46G 5180 650 2016W 20" 16" 12 41.11
46G 5260 650 2020W 20" 20" 12 19.18 46G 5230 650 2018W 20" 18" 12 39.55
46G 5130 650 2012W 20" 12" 12 29.68
46G 5290 650 2404W 24" 4" 12 $ 16.49 46G 5330 650 2406W 24" 6" 12 7.84 46G 5370 650 2408W 24" 8" 12 9.73
46G 5440 650 2412W 24" 12" 12 14.16 46G 5470 650 2414W 24" 14" 12 17.26
46G 5410 650 2410W 24" 10" 12 34.37
46G 5550 650 2418W 24" 18" 12 45.74 46G 5580 650 2420W 24" 20" 12 55.08 46G 5630 650 2424W 24" 24" 12 26.09
46G 5680 650 3004W 30" 4" 12 $ 20.40 46G 5720 650 3006W 30" 6" 12 8.40 46G 5750 650 3008W 30" 8" 12 11.51
46G 5820 650 3012W 30" 12" 12 29.78 46G 5860 650 3014W 30" 14" 12 42.40 46G 5890 650 3016W 30" 16" 12 54.26
46G 5960 650 3020W 30" 20" 12 70.68 46G 5990 650 3024W 30" 24" 12 67.44
46G 5930 650 3018W 30" 18" 12 81.00
46G 5780 650 3010W 30" 10" 12 13.59
46G 6040 650 3606W 36" 6" 5 $ 49.46 46G 6080 650 3612W 36" 2" 5 40.78
RETURN AIR GRILLES
SSC No. Manuf No. Width Height Ctn Price Each
SSC No. Manuf No. Finish Width Height Ctn Price Each
46G 6250 657 1404W WHITE 14" 4" 24 $ 18.31
46G 6230 657 1206W WHITE 12" 6" 24 $ 8.26
46G 6290 657 1408W WHITE 14" 8" 24 10.10 46G 6270 657 1406W WHITE 14" 6" 24 6.42
46G 6350 657 2408W WHITE 24" 8" 5 30.07 46G 6330 657 2406W WHITE 24" 6" 5 $ 11.90
46G 6430 BG31W3008 WHITE 30" 8" 5 18.41 46G 6380 657 3006W WHITE 30" 6" 5 $ 13.78
#657 STEEL WHITE BASEBOARD RETURN GRILLE1/3" SPACED FINS SET AT 20° • EXCEPTIONAL FREE AREA • 7/8" MARGIN TURNBACK • BRIGHT WHITE ENAMEL FINISH
June 15, 2021 N-5C
HEATING & AIR CONDTIONING • GAS CONNECTORS Ncontinued on next page
SSC No. Manuf No. Finish Width Height CFM@400 FPM Ctn Price Each
#659 ALL-STEEL WHITE RETURN AIR FILTER GRILLE1/3" SPACED FINS SET AT 20° • EFFECTIVELY CONCEALS 1" THICK FILTER (NOT INCLUDED)ADJUSTBLE FILTER RETAINERS • REMOVABLE HINGED FACE • BRIGHT WHITE FINISH
46G 6440 659 2016W WHITE 20" 16" 555 1 $ 37.96
46G 6435 659 1212W WHITE 12" 12" 264 1 $ 31.28
46G 6455 659 2516W WHITE 25" 16" 705 1 $ 49.04
46G 6450 659 2020W WHITE 20" 20" 720 1 40.02
46G 6470 659 3020W WHITE 30" 20" 1082 1 $ 52.80
46G 6460 659 2520W WHITE 25" 20" 901 1 47.57
46G 3500 631 1204W WHITE 12" 4" 24 $ 10.97 SSC No. Manuf No. Finish Width Height Ctn Price Each
#631 STEEL 3-WAY SIDEWALL OR CEILING REGISTERALL-STEEL CONSTRUCTION • 1/3" SPACED FINS SET AT 20° • 3-WAY DEFLECTION • MULTI-SHUTTER VALVENTERLOCKING VALVE LOUVERS • FOR HEATING OR COOLING • BRIGHT WHITE FINISH
46G 1005 304 0808W WHITE 8" 8" 10 12.42 46G 1000 304 0606W WHITE 6" 6" 10 $ 11.44
46G 1010 304 1010W WHITE 10" 10" 10 $ 21.30
SSC No. Manuf No. Finish Width Height Ctn Price Each
#304 STEEL 4-WAY SIDEWALL OR CEILING REGISTERONE PIECE STAMPED CONSTRUCTION • CURVED BLADES • 4-WAY DEFLECTION • 4-WAY AIR PATTERNGALVANIZED MULTI-SHUTTER VALVE • FOR SIDEWALL OR CEILING • BRIGHT WHITE ENAMEL FINISH
GRILLES REGISTERS
46G 6870 661 0805W WHITE 8" 5" 24 35.59 46G 6850 661 0804W WHITE 8" 4" 24 $ 7.91
46G 6890 661 1004W WHITE 10" 4" 24 $ 6.94
46G 6880 661 0806W WHITE 8" 6" 24 11.42
46G 6930 661 1008W WHITE 10" 8" 24 12.53 46G 6920 661 1006W WHITE 10" 6" 24 8.53
46G 6970 661 1205W WHITE 12" 5" 24 19.97 46G 6950 661 1204W WHITE 12" 4" 24 $ 5.95
46G 7020 661 1208W WHITE 12" 8" 24 13.88 46G 6980 661 1206W WHITE 12" 6" 24 8.58
46G 7030 661 1404W WHITE 14" 4" 24 $ 10.78
46G 7080 661 1408W WHITE 14" 8" 16 14.88 46G 7050 661 1406W WHITE 14" 6" 24 11.33
SSC No. Manuf No. Finish Width Height Ctn Price Each
#661 STEEL 2-WAY SIDEWALL OR CEILING REGISTERALL-STEEL CONSTRUCTION • 1/3" SPACED FINS ARE SET AT 20° • 2-WAY DEFLECTION • GALVANIZED MULTI-SHUTTER VALVE15/8" DEPTH WHEN FULLY OPENED • INTERLOCKING VALVE LOUVERS • FOR HEATING OR COOLING • BRIGHT WHITE FINISH
N-5D June 15, 2021
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
46G 7640 821 1004W WHITE 10" 4" 24 $ 27.38 46G 7670 821 1006W WHITE 10" 6" 24 29.81 46G 7710 821 1008W WHITE 10" 8" 24 34.25
SSC No. Manuf No. Size Finish Ctn Price Each
46G 7610 821 0804W WHITE 8" 4" 24 $ 30.10
46G 7730 821 1204W WHITE 12" 4" 24 $ 32.11 46G 7760 821 1205W WHITE 12" 5" 24 29.47
46G 7850 821 1212W WHITE 12" 12" 1 40.73 46G 7830 821 1208W WHITE 12" 8" 16 43.82 46G 7790 821 1206W WHITE 12" 6" 24 31.15
46G 7860 821 1404W WHITE 14" 4" 24 $ 39.60 46G 7890 821 1406W WHITE 14" 6" 24 37.34 46G 7930 821 1408W WHITE 14" 8" 16 41.93
#821 STEEL REGISTER WITH VERTICAL FINSALL-STEEL CONSTRUCTION • ADJUSTABLE VERTICAL FACE BARS • HORIZONTAL MULTI-SHUTTER VALVE • BRIGHT WHITE FINISH
46G 7960 821 1606W WHITE 16" 6" 8 $ 59.86 46G 7990 821 1608W WHITE 16" 8" 8 62.83
46G 8020 821 1806W WHITE 18" 6" 8 $ 67.73 46G 8050 821 1808W WHITE 18" 8" 8 62.95
46G 8070 821 2006W WHITE 20" 6" 8 $ 84.58 46G 8110 821 2008W WHITE 20" 8" 8 70.01 46G 8140 821 2010W WHITE 20" 10" 1 81.55
46G 8160 821 2406W WHITE 24" 6" 8 $ 82.58
46G 8155 821 2012W WHITE 20" 12" 1 90.58
46G 8190 821 2408W WHITE 24" 8" 8 78.94 46G 8220 821 2410W WHITE 24" 10" 1 93.86 46G 8230 821 2412W WHITE 24" 12" 1 99..02
46G 8240 821 3006W WHITE 30" 6" 8 $ 153.91 46G 8260 821 3008W WHITE 30" 8" 8 131.76 46G 8265 RVMLW3012 WHITE 30" 12" 1 159.24
46G 8340 821 3612W WHITE 36" 12" 1 $ 102.36
REGISTERS
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
46G 8500 RD 10 For 5400 Series Collar 10" 10 14.57 46G 8490 RD 08 For 5400 Series Collar 8" 12 11.59 46G 8480 RD 06 For 5400 Series Collar 6" 5406 12 $ 10.33
RD ADJUSTABLE RADIAL DAMPERGALVANIZED STEEL • FACE-ADJUSTABLE • FOR ROUND NECK DIFFUSERS • MILL FINISH
SSC No. Manuf No. Size Ctn Price Each
June 15, 2021 N-5E
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
HVS STEEL 4 WAY T-BAR HIGH VOLUME DIFFUSERCOMMERCIAL • 3 CONE • 360° AIR DIFFUSION • FIXED CORE • FORMED STEEL BACK PANELFIBERGLASS INSULATION WITH VAPOR BARRIER FOIL • BRIGHT WHITE FINISH
46G 8650 HVSW WHITE 233/4" x 233/4" 1 $ 51.94 SSC No. Manuf No. Finish Size Ctn Price Each
659T STEEL LANCED RETURN AIR FILTER GRILLESTEEL CONSTRUCTION • LANCED-FACE DESIGN WITH 1/3" SPACED FINS • HINGED REMOVABLE FACE USES STANDARD 1" DISPOSABLE FILTERS (NOT FURNISHED) • BRIGHT WHITE FINISH
46G 8750 659T WHITE 233/4" x 233/4" 3 $ 57.77 SSC No. Manuf No. Finish Overall Size Ctn Price Each
RE5 ALUMINUM EGGCRATE RETURN AIR GRILLEALL-ALUMINUM • MOUNT FLUSH WITH T-BAR CEILINGS • GRID CORE 1/2" X 1/2" X 1/2"SQUARE CORE DESIGN WITH EXTRUDED ALUMINUM FRAME • BRIGHT WHITE FINISH
46G 8700 RE5T 2222W WHITE 233/4" x 233/4" 1 $ 68.40 SSC No. Manuf No. Finish Overall Size Ctn Price Each
444 RENOVATOR SERIES 4 WAY T-BAR CEILING DIFFUSERCOMMERCIAL • 4-WAY THROW PATTERN • ALUMINUM FACE • FORMED GALVANIZED STEEL BACK PANELFIBERGLASS INSULATION WITH FOIL VAPOR BARRIER BLANKET • BRIGHT WHITE FINISH
46G 8600 444W For 6" To 12" Collar 24" x 24" 4 $ 60.62
46G 8470 5410 For T-Bar Diffuser 10" 10 11.71 46G 8460 5408 For T-Bar Diffuser 8" 12 10.95 46G 8450 5406 For T-Bar Diffuser 6" 12 $ 10.82
SSC No. Manuf No. Size Ctn Price Each
GALVANIZED COLLAR & DAMPER SOLD SEPARATELY BELOW
5400 SERIES SNAP-IN RETURN AIR COLLAR RINGGALVANIZED STEEL • UNIQUE SNAP-IN DESIGN • 2" HIGH COLLAR PERMITS EASY FLEX CONNECTIONS
SSC No. Manuf No. Size Ctn Price Each
COMMERCIAL DIFFUSERS & GRILLES
46G 8525 3810 GS For 5400 Series Collar 10" 050294 10 24.48 46G 8520 3808 GS For 5400 Series Collar 8" 050292 12 22.48 46G 8510 3806 GS For 5400 Series Collar 6" 050290 12 $ 22.48
3800 ROUND BUTTERFLY DAMPER WITH REMOVABLE HANDLEFOR T-BAR DIFFUSERS • ADJUSTABLE • GOLDEN SAND FINISH
SSC No. Manuf No. Size Ctn Price Each
N-5F June 15, 2021
HEATING & AIR CONDTIONING • GAS CONNECTORS N
CEILING DIFFUSER WITH 4 WAY SQUARE GRILLESQUARE GRILLE • DAMPER • BOX • INSTALLS EASILY IN 9" DIAMETER HOLE ADAPTABLE TO 6,7 OR 8" DIAMETER DUCTS • NO EXTRA HOLES TO DRILL
SSC No. Manuf No. A B C D E F G Price Each
46G 8800 MV4 11.25" 9.25" .75" 1.38" 3.25" 5.25" 7.25" $ 37.74
CEILING DIFFUSER WITH 3 WAY SQUARE GRILLESQUARE GRILLE • DAMPER • BOX • INSTALLS EASILY IN 9" DIAMETER HOLE ADAPTABLE TO 6,7 OR 8" DIAMETER DUCTS • NO EXTRA HOLES TO DRILL
SSC No. Manuf No. A B C D E F G Price Each
46G 8795 MV3 11.25" 9.25" .75" 1.38" 3.25" 5.25" 7.25" $ 37.87
CEILING DIFFUSER WITH 2 WAY SQUARE GRILLESQUARE GRILLE • DAMPER • BOX • INSTALLS EASILY IN 9" DIAMETER HOLE ADAPTABLE TO 6,7 OR 8" DIAMETER DUCTS • NO EXTRA HOLES TO DRILL
SSC No. Manuf No. A B C D E F G Price Each
46G 8790 MV2 11.25" 9.25" .75" 1.38" 3.25" 5.25" 7.25" $ 34.54
ROUND CEILING DIFFUSER OUTLET ASSEMBLY & DAMPER IN ONE • INSTALLS EASILY IN 9" DIAMETER HOLE ADAPTABLE TO 6,7 OR 8" DIAMETER DUCTS • NO EXTRA HOLES TO DRILL
SSC No. Manuf No. A B C D E F G Price Each
46G 8805 MV360 12.5" 9.25" .75" 1.38" 3.25" 5.25" 7.25" $ 37.74
RETURN/EXHAUST CEILING DIFFUSERGRILLE • BOX • (NO DAMPER) • INSTALLS EASILY IN 9" DIAMETER HOLE ADAPTABLE TO 6,7 OR 8" DIAMETER DUCTS • NO EXTRA HOLES TO DRILL
SSC No. Manuf No. A B C D E F G Price Each
46G 8815 MVE 11.25" 9.25" .75" 1.38" 3.25" 5.25" 7.25" $ 34.54
DIFFUSERS & ACCESSORIES
DROP CEILING FLANGE FOR MV CEILING DIFFUSERS
SSC No. Manuf No. Size Price Each
46G 8810 DCF-1 235/8" L X 12" W X 2" H 91/4" Hole 87963 $ 8.71
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
HUMIDIFIERS
June 15, 2021 N-6
HEATING & AIR CONDTIONING • GAS CONNECTORS N
SSC No. Manuf No. Voltage Wgt. Lbs. Price Each
46I 0052 1042 LH 24 V Delivers 19.2 Gallons Water Per Day 13 Lbs $ 204.23
LEGACY SERIES MODEL 1042 LH BYPASS FLOW THROUGH HUMIDIFIER•MHX3 HUMIDISTAT INCLUDED •6" DIAMETER BYPASS DUCT (COLLAR SUPPLIED) •UNIT SIZE 15" W X 111/2" H X 9" D •PLENUM OPENING 101/4" W X 91/2" H •USES EVAPORATOR PAD # 990-13
SSC No. Manuf No. Wgt. Lbs. Price Each
42E 0008 UMX-1902T Compact 2 Lamp System 5 Lbs $ 487.23
ULTRAVIOLET AIR DISINFECTION SYSTEMWITH MICROPROCESSOR CONTROLLED UVLAMPMONITORTM SYSTEM 10 YEAR SYSTEM WARRANTY • EASY TO INSTALL • HORIZONTAL OR VERTICAL INSTALLATION2 16" LAMPS • 55° F. MIN & 120° F. MAX OPERATING TEMPERATURE • 11 UV WATTS @ 1 METER
42E 0009 LP-PP-002 16" Ultraviolet Lamp For UVS-2036 1 Lb 102.70 42E 0007 UMX16URL 16" Ultraviolet Lamp For UMX-2036 1 Lb $ 115.60
ULTRAVIOLET SYSTEM
HUMIDIFIER REPLACEMENT EVAPORATOR PADS
46I 0055 990-13 Pad for SL-16, 1042 LH & 1137 Humidifiers 1.00 Lb $ 17.63 SSC No. Manuf No. Wgt. Lbs. Price Each
46I 0057 1099-20 Pad for 1099 General Filter Humidifier 1.12 Lbs 22.78
G-206-6 Pad for G-200 Humidifier 9" X 11" X 2" $ 19.38
990-13
1099-20
G-206-6
REPLACEMENT PAD FOR ARCOAIRE G-200 BYPASS HUMIDIFER
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
52C 5350 BTU150 150,000 124,500 2400 47° 1/4 5" 16" 195 $ 1,490.40 52C 5380 BTU200 200,000 166,000 3200 47° 1/3 5" 18" 251 1,843.96
BTU SERIES HEATERS •83% EFFICIENCY
BRT SERIES LOW PROFILE HEATERS •UP TO 82%+ EFFICIENCY
Total Total Air Std Ship BTU/Hr BTU/Hr Temp Vent Fan Wgt SSC No. Manuf No. Input Output CFM Rise HP Size Dia Lbs Price Each
52C 4507 BRT105N 100,000 80,000 1480 60° 1/10 4" 16" 115 $ 1,323.14
52C 4502 BRT045N 45,000 37,350 920 60° 1/20 4" 10" 75 $ 1,012.64 52C 4504 BRT075N 75,000 61,500 1100 60° 1/12 4" 14" 95 1,107.86
52C 5300 BRT120N 120,000 98,400 1650 60° 1/10 4" 16" 120 1,414.22
TUBULAR DESIGN GAS-FIRED UNIT HEATERS•10 YEAR WARRANTY ON HEAT EXCHANGER, FLUE COLLECTOR & BURNERS •UP TO 82%+ EFFICIENCY•GAS-FIRED PROPELLER UNIT HEATERS •REDUNDANT SINGLE STAGE GAS VALVE •RESIDENTIAL CERTIFICATION •POWER VENTED •120/24V CONTROL TRANSFORMER •115/1/60 FAN MOTOR WITH OVERLOAD PROTECTION •DIRECT SPARK IGNITION •20 GA ALUMINIZED HEAT EXCHANGER •20 GA BAKED ENAMEL CABINET •OSHA FAN GUARD •AIR PRESSURE SWITCH •RIGHT HAND CONTROL ACCESS - FIELD CONVERTIBLE TO LEFT HAND •HIGH LIMIT SWITCH •NATURAL OR PROPANE GAS •GAS CONVERSION KIT INCLUDED •FIELD CONVERTIBLE TO SEPARATED COMBUSTION
SSC No. Manuf No. BTU/Hr Type Of Gas Wgt. Lbs. Price Each
52C 7120 K-1 K-50-TAN 50,000 Natural Gas 30 Lbs $ 672.72 52C 7130 K-1 K-50-TAL 50,000 LP Gas 30 Lbs 696.65
K1 MANUAL IGNITION INFRA-RED HEATERS•NATURAL OR LP GAS •MILLIVOLT CONTROL •THERMOSTAT & WIRE
N-7 June 15, 2021
BRT120N
SSC No. Manuf No. BTU/Hr Type Of Gas Wgt. Lbs. Price Each
52C 7100 K-1 K-50-QSAN 50,000 Natural Gas 30 Lbs $ 516.60
K1 DIRECT IGNITION INFRA-RED HEATER•NATURAL GAS •100% SHUTOFF •24 VOLT •DIRECT SPARK IGNITION
HEATING & AIR CONDTIONING • GAS CONNECTORS N
GAS FIRED HEATERSBeacon/Morris
INFRA-RED HEATERS
BRT045N
BTU150
INFRA-RED TUBE HEATERS ARE AVAILABLE
For More Information On Tube Heaters Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
June 15, 2021 N-8
HEATING & AIR CONDTIONING • GAS CONNECTORS N
GAS HEATING PRODUCTS
GRAVITY WALL FURNACESMODEL
NUMBER WALL TYPECONTROL
TYPEGAS
HEATINPUT BTU
VENTSIZE
GASINLET
FINISHED DIMENSIONS SHIPPINGWEIGHTWIDTH HEIGHT DEPTH
W255F SINGLE MV NAT 25,000 4" 1/2" 161/2" 683/8" 61/2" 90 LBSW505F DUAL MV NAT 50,000 4" 1/2" 161/2" 683/8" 61/2" 134 LBS
WFF81-C AUTOMATIC FAN KIT FOR GRAVITY WALL FURNACE 10 LBS40542-A REAR REGISTER KIT FOR GRAVITY WALL FURNACE 5 LBS407RR-A REAR REGISTER KIT MOUNT FOR GRAVITY WALL FURNACE306SR-1 SIDE CASE GRILL KIT FOR GRAVITY WALL FURNACEFSK-A FREE STANDING KIT FOR GRAVITY WALL FURNACE 16 LBS
VENTED CLOSED FRONT CONSOLE HEATERSMODEL
NUMBERCNTR VENT TO FLOOR
TYPECONTROL
TYPEGAS
HEATINPUT BTU
VENTSIZE
GAS INLET/OUTLET
FINISHED DIMENSIONS SHIPPINGWEIGHTWIDTH HEIGHT DEPTH
VC201A 161/4" MB NAT 20,000 3" 1/2" - 3/8" 20" 24" 151/4" 62 LBSVC351A 213/4" MB NAT 35,000 4" 1/2" - 3/8" 26" 30" 151/4" 94 LBSVC352A 213/4" MB LP 35,000 4" 1/2" - 3/8" 26" 30" 151/4" 94 LBSVC501A 213/4" MB NAT 50,000 4" 1/2" - 3/8" 26" 30" 191/4" 111 LBSVC502A 213/4" MB LP 50,000 4" 1/2" - 3/8" 26" 30" 191/4" 111 LBS
VC701A-BM 251/2" MB NAT 70,000 5" 1/2" - 3/8" 30" 36" 191/4" 139 LBSCHB3 AUTOMATIC VARIABLE SPEED BLOWER FOR VENTED CLOSED FRONT CONSOLE HEATERS
CHALLENGER CONVENTIONAL VENT FLOOR FURNACEMODEL
NUMBERCNTR VENT TO FLOOR
TYPECONTROL
TYPEGAS
HEATINPUT BTU
VENTSIZE
PIPE SIZEAT FURN.
FLOOR OPENING OVERALLHEIGHT
SHIPPINGWEIGHTWIDTH LENGTH
90N50A 22" MV NAT 50,000 4" 1/2" 221/2" 321/2" 291/4" 126 LBS90N65A 22" MV NAT 65,000 5" 1/2" 241/2" 381/2" 297/8" 152 LBS
49210 LP CONVERSION KIT FOR CHALLENGER CONVENTIONAL VENT FLOOR FURNACE 1 LB
HI-EFFICIENT DIRECT VENT WALL FURNACEMODEL
NUMBERCNTR VENT TO FLOOR
TYPECONTROL
TYPEGAS
HEATINPUT BTU
VENTSIZE
GASINLET
FINISHED DIMENSIONS SHIPPINGWEIGHTWIDTH HEIGHT DEPTH
CDV155B 22" MV NAT 15,000 9" 1/2" 18" 293/4" 93/4" 65 LBS
TOP VENT COUNTERFLOW WALL FURNACEMODEL
NUMBER CFM TYPECONTROL
TYPEGAS
HEATINPUT BTU
OVAL VENTSIZE
GASINLET
FINISHED DIMENSIONS SHIPPINGWEIGHTWIDTH HEIGHT DEPTH
CF553C 440 24 V NAT 55,000 4" 1/2" 155/16" 815/16" 101/4" 107 LBS
DIRECT VENT COUNTERFLOW WALL FURNACEMODEL
NUMBER CFM TYPECONTROL
TYPEGAS
HEATINPUT BTU
OVAL VENTSIZE
GASINLET
FINISHED DIMENSIONS SHIPPINGWEIGHTWIDTH HEIGHT DEPTH
DVCF557B 440 24 V NAT 55,000 - 1/2" 145/16" 875/16" 113/4" 144 LBS
16VE-A 16" VENT ENCLOSURE KIT FOR DIRECT VENT COUNTERFLOW WALL FURNACE406RR-A FLUSH MOUNT REAR REGISTER KIT FOR DIRECT VENT COUNTERFLOW WALL FURNACE30SRB-A SIDE OUTLET KIT WITH 10" BOOTS FOR DIRECT VENT COUNTERFLOW WALL FURNACE
GAS HEATING PRODUCTS
For More Information On These Products Or For Prices & Availability, Call Salina Supply Company At (785) 823-2221
N-8A June 15, 2021
Amana DigiSmart R410A PTAC UnitsQuiet 2-Fan Design With Ultra-Quiet Indoor Tangential 2-Speed Blower
Electric Heat/PTC Cooling BTUH Voltage Electric Heat EER COP Amps
PTC073E35AXXX 7,600/7,500 230/208 3.5/2.9 kW 11.4/11.7 n/a 20
PTC093E35AXXX 8,700/8,500 230/208 3.5/2.9 kW 11.2/11.4 n/a 20
PTC093E50AXXX 8,700/8,500 230/208 5.0/4.1 kW 11.2/11.4 n/a 30
PTC123E35AXXX 11,500/11,200 230/208 3.5/2.9 kW 10.3/10.1 n/a 20
PTC123E50AXXX 11,500/11,200 230/208 5.0/4.1 kW 10.3/10.1 n/a 30
PTC153E35AXXX 14,000/13,600 230/208 3.5/2.9 kW 9.8/9.8 n/a 20
PTC153E50AXXX 14,000/13,600 230/208 5.0/4.1 kW 9.8/9.8 n/a 30
Reverse CycleHeating BTUHHeat Pumps/PTH Cooling BTUH Voltage Electric Heat EER COP Amps
PTH073E35AXXX 7,600/7,500 230/208 3.5/2.9 kW 11.3/11.4 3.3/3.3 20 6,800/6,800
PTH093E35AXXX 9,000/8,900 230/208 3.5/2.9 kW 11.1/11.1 3.3/3.3 20 8,300/8,100
PTH093E50AXXX 9,000/8,900 230/208 5.0/4.1 kW 11.1/11.1 3.3/3.3 30 8,300/8,100
PTH123E35AXXX 11,500/11,100 230/208 3.5/2.9 kW 10.2/10.1 3.1/3.1 20 10,900/10,500
PTH123E50AXXX 11,500/11,100 230/208 5.0/4.1 kW 10.2/10.1 3.1/3.1 30 10,900/10,500
PTH153E35AXXX 14,000/13,900 230/208 3.5/2.9 kW 9.6/9.5 2.9/2.9 20 13,500/13,300
PTH153E50AXXX 14,000/13,900 230/208 5.0/4.1 kW 9.6/9.5 2.9/2.9 30 13,500/13,300
For More Information On
These Electric
Heating/CoolingUnits or
For Prices & Availability,
Call
Salina Supply
Company At
(785) 823-2221
HEATING & AIR CONDTIONING • GAS CONNECTORS N
ELECTRIC HEATING/COOLING UNITS
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
June 15, 2021 N-9
HEATING & AIR CONDTIONING • GAS CONNECTORS N
GAS VALVES
BLACK IRON BODY FLAT HEAD GAS COCKFNPT END CONNECTIONS • TAMPERPROOF • LESS CHECK • BRONZE RELUBABLE PLUGFOR AMBIENT TEMPERATURES -20ºF TO 150ºF
SSC No. Manuf No. Size PSIG Price Each
36C 1150 4812-164 10685B 1/2" FNPT X 1/2" FNPT 175 PSIG $ 30.52 36C 1160 4812-168 10685B 3/4" FNPT X 3/4" FNPT 175 PSIG 36.76 *
36C 1170 4812-173 10685B 1" FNPT X 1" FNPT 175 PSIG 47.06
36C 1180 4812-179 10685B 11/4" FNPT X 11/4" FNPT 175 PSIG 62.55 36C 1190 4812-182 10685B 11/2" FNPT X 11/2" FNPT 175 PSIG 86.92
36C 1210 4812-187 10685B 2" FNPT X 2" FNPT 175 PSIG 123.40
36C 1370 4212-185 10598 3/8" FNPT X 3/8" FNPT 2 PSIG $ 15.7236C 1380 4212-191 10598 1/2" FNPT X 1/2" FNPT 5 PSIG 19.3136C 1390 4212-194 10598 3/4" FNPT X 3/4" FNPT 5 PSIG 23.75
36C 1410 4212-122 10598 1" FNPT X 1" FNPT 2 PSIG 47.78
36C 1420 4212-126 10598 11/4" FNPT X 11/4" FNPT 2 PSIG 63.71 36C 1430 4212-130 10598 11/2" FNPT X 11/2" FNPT 2 PSIG 78.38
36C 1440 4212-134 10598 2" FNPT X 2" FNPT 2 PSIG 153.90
REDTOP QUARTER TURN GAS VALVENPT FEMALE CONNECTIONS • BRASS 2-PIECE BODY CONSTRUCTIONTEE HANDLE • MAX W.P. 5 PSI • TEMPERATURE RANGE 29ºF TO 125ºF
SSC No. Manuf No. Size Price Each
36C 1500 PGB1020 0545003 1/2" FNPT X 1/2" FNPT 5 PSIG $ 6.68 *36C 1510 PGB1020 0545005 3/4" FNPT X 3/4" FNPT 5 PSIG 13.10 *
BRASS WING HANDLE GAS BALL VALVEFNPT END CONNECTIONS • FOR INDOOR INSTALLATIONS
SSC No. Manuf No. Size PSIG Price Each
36C 2000 51-GB3-01 A51GB301 1/2" FNPT X 1/2" FNPT To 5 PSI $ 9.84 *36C 2010 51-GB4-01 A51GB301 3/4" FNPT X 3/4" FNPT To 5 PSI 13.40 *
BRASS LEVER HANDLE GAS COCK WITH CHECKFNPT END CONNECTIONS • PLUG STYLE • LOW PRESSURE • BRONZE RELUBABLE PLUGFOR AMBIENT TEMPERATURES 32ºF TO 125ºF
SSC No. Manuf No. Size PSIG Price Each
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
continued on next page
N-10 June 15, 2021
continued on next page
HEATING & AIR CONDTIONING • GAS CONNECTORS N
GAS REGULATORS
RV-48 GAS PRESSURE REGULATOR
SSC No. Manuf No. Size Max Pressure Spring Range CFH @ .3" W.C. Drop Price Each
52E 0050 RV-48 1/2" x 1/2" 1/2 PSI 3" - 6" W.C. 130 $ 36.65 52E 0110 RV-48 3/4" x 3/4" 1/2 PSI 150 35.52
325-3 LEVER ACTING DESIGN REGULATOR•CAPACITIES BASED ON 1" W.C. PRESSURE DROP •CFH CAPACITIES BASED ON 7" W.C. OUTLET •STANDARD SPRING RANGE IS 4" - 12" W.C. •EMERGENCY EXPOSURE INLET PRESSURE UP TO 65 PSI
SSC No. Manuf No. Size Inlet PSI /Outputs (CFH) Price Each
52E 0260 325-3 w/12A09 1/2" 1/2 - 120 1-180 2-220 5-290 $ 27.77
325-5A LEVER ACTING DESIGN REGULATOR•CAPACITIES BASED ON 1" W.C. PRESSURE DROP •CFH CAPACITIES BASED ON 7" W.C. OUTLET •STANDARD SPRING RANGE IS 4" - 12" W.C. •EMERGENCY EXPOSURE INLET PRESSURE UP TO 65 PSI
SSC No. Manuf No. Size Inlet PSI /Outputs (CFH) Price Each
52E 0263 325-5A 3/4" 1/2 - 245 1-340 2-480 5-600 $ 65.66 52E 0160 325-5A 1" 1/2 - 245 1-340 2-480 5-600 70.07
325-7A LEVER ACTING DESIGN REGULATOR•CAPACITIES BASED ON 1" W.C. PRESSURE DROP •CFH CAPACITIES BASED ON 7" W.C. OUTLET •STANDARD SPRING RANGE IS 4" - 12" W.C. •EMERGENCY EXPOSURE INLET PRESSURE UP TO 65 PSI
SSC No. Manuf No. Size Inlet PSI /Outputs (CFH) Price Each
52E 0266 325-7A 11/4" 1/2 - 780 1-1060 2-1500 $ 172.87
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
MODELPIPESIZE
(INCHES)
OUTLETPRESSURESET POINT
CSAMAXCFH
OPERATING INLET PRESSURE MAXINDIV.LOAD
0.5 PSI(3.4 kPa)
0.75 PSI(5.2 kPa)
1 PSI(6.9 kPa)
2 PSI(13.8 kPa)
325-33/8" x 3/8"1/2" x 1/2"
4.0" w.c. (1.0 kPa) 150 (4.2) 160 (4.5) 190 (5.4) 220 (6.2) 220 (6.2)
100CFH
7.0" w.c. (1.7 kPa) 150 (4.2) 120 (3.4) 150 (4.2) 180 (5.1) 220 (6.2)
10.0" w.c. (2.5 kPa) 150 (4.2) 100 (2.8) 120 (3.4) 150 (4.2) 220 (6.2)
325-5
1/2" x 1/2"3/4" x 3/4"
1" x 1"
4.0" w.c. (1.0 kPa) 325 (9.2) 340 (9.6) 390 (11.0) 450 (12.7) 560 (15.9)
325CFH
7.0" w.c. (1.7 kPa) 325 (9.2) 260 (7.4) 360 (10.2) 410 (11.6) 530 (15.0)
10.0" w.c. (2.5 kPa) 325 (9.2) 240 (6.8) 320 (9.1) 360 (10.2) 500 (8.5)
325-7A11/4" x 11/4"
11/2" x 11/2"
4.0" w.c. (1.0 kPa) ------ 850 (24.0) 1060 (30.0) 1190 (33.7) 1600 (45.3)
1,250CFH
7.0" w.c. (1.7 kPa) ------ 780 (22.0) 950 (26.9) 1060 (30.0) 1500 (42.5)
10.0" w.c. (2.5 kPa) ------ 650 (18.4) 860 (24.4) 990 (28.0) 1300 (36.8)
52E 1585 30C-3132-24 1/2" M.I.P. x 1/2" F.I.P. 24" 1/2" 150,000 25.60 52E 1580 30C-3132-18 1/2" M.I.P. x 1/2" F.I.P. 18" 1/2" 164,200 $ 22.34
SSC No. Manuf No. Size Length NOM ID BTU/HR Cap. (NG) Price Each
52E 1330 30C-4246-24 3/4" M.I.P. x F.I.P. Angle Valve 24" 1/2" 150,000 $ 64.44 52E 1335 30C-4246-36 3/4" M.I.P. x F.I.P. Angle Valve 36" 1/2" 125,000 67.32
June 15, 2021 N-10A
SafetyShield® COATED STAINLESS STEEL GAS CONNECTORS•APPROVED FOR INDOOR & OUTDOOR USE WITH STATIONARY GAS APPLIANCES & EQUIPMENT •100% LEAK TESTED •TEMPERATURE RATING WITH ADAPTERS: -40°F TO 150°F • TEMPERATURE RATING WITH VALVES: -40°F TO 125°F
SSC No. Manuf No. Size PSI Price Each
52E 3310 G64-015 3/4" FPT INLET 15# $ 29.96
15 LB GAS TEST PRESSURE GAUGE SET•2" STEEL CASE GAUGE ON HEXAGON PLATED BODY •BRASS AIR VALVE •MARKED IN 1/10 LB. INCREMENTS
SSC No. Size Length Price Each
20J 7760 0817004 1/4" OD 50' Coi l $ 56.79
SSC No. Manuf No. Price Each
42A 0200 4183-24/LDL-1Q 1 Quart Bottle Easy To See Fluorescent $ 20.98
SOFT ALUMINUM PILOT TUBING KIT
CAL-BLUE LT LOW TEMPERATURE LEAK DETECTOR•FREEZE-PROTECTION DOWN TO -20ºF •IDEAL VISCOSITY - WON'T RUN OFF •SENSITIVE ENOUGH TO FIND SMALLEST LEAKS
HEATING & AIR CONDTIONING • GAS CONNECTORS N
GAS CONNECTORS WOODSTOVE ACCESSORIES
SSC No. Manuf No. Inlet Size Price Each
52E 3345 C-64CP 1/2" With Hearth Key $ 84.23
3-WAY GAS LOG LIGHTER VALVE •CHROME PLATED ESCUTCHEON •HEAVY CAST BRASS VALVE BODY •WITH 1/2" BRASS PLUG
SSC No. Size Price Each
52E 3350 L75-081 14" L x 13/4" H x 21/4" W 2 Leg Burner $ 37.71
LOG LIGHTER BURNER FOR NATURAL GAS•TAPPED 1/2" IPS ON BOTH ENDS & 1 LEG •(2) 1/2" PLUGS •NIPPLE ORIFICE
52E 1340 30C-4246-48 3/4" M.I.P. x F.I.P. Angle Valve 48" 1/2" 106,000 75.37
52E 1560 20C-3132-12 1/2" M.I.P. x F.I.P. 12" 3/8" 102,000 $ 17.69 52E 1565 20C-3132-18 1/2" M.I.P. x F.I.P. 18" 3/8" 93,100 21.40 52E 1570 20C-3132-24 1/2" M.I.P. x F.I.P. 24" 3/8" 85,000 24.47
52E 1465 40C-4142-24 3/4" M.I.P. x F.I.P. 24" 3/4" 290,900 52.09
52E 1575 20C-3132-36 1/2" M.I.P. x F.I.P. 36" 3/8" 71,000 28.89
30C-4246
20C-3132
30C-3132
N-11 June 15, 2021
FLEXIBLE GAS PIPING SYSTEM MUST BE CERITIFIED TO PURCHASE
HEATING & AIR CONDTIONING • GAS CONNECTORS N
For More Information On These Products Or On Products Not Listed, Call Salina Supply Company At (785) 823-2221
SSC No. Manuf No. Size MFJ X NPT Price Each
52F 2020 XR3FTG-11-24 3/4" x 3/4" 25.89 52F 2030 XR3FTG-16-12 1" x 1" 40.01 52F 2077 XR3FTG-20-6 11/4" x 11/4" 76.55
52F 2010 XR3FTG-8-24 1/2" x 1/2" $ 18.83
BRASS MALE FITTINGMALE NPT ADAPTER • SPLIT BUSHING • NUT
SSC No. Manuf No. Size NPT Length Max Operating Pressure Price Each
52F 5025 FS-8-25 1/2" 25' Coil 25 PSI $ 127.00
52F 5035 FS-8-250 1/2" 250' Coil 25 PSI 1,187.41 52F 5030 FS-8-50 1/2" 50' Coil 25 PSI 250.93
52F 5040 FS-11-25 3/4" 25' Coil 25 PSI $ 154.31
52F 5050 FS-11-250 3/4" 250' Coil 25 PSI 1,543.08 52F 5045 FS-11-50 3/4" 50' Roll 25 PSI 325.42
52F 5055 FS-16-50 1" 50' Coil 25 PSI $ 469.92 52F 5057 FS-16-150 1" 150' Coil 25 PSI 1,318.20
52F 5060 FS-20-50 11/4" 50' Coil 25 PSI $ 589.23 52F 5062 FS-20-150 11/4" 50' Coil 25 PSI 1,650.06
FLASH SHIELDTM FS-X CSST FLEXIBLE GAS PIPING COILSCORRUGATED STAINLESS STEEL • ELECTRICALLY INSULATIVE POLYMER COVER • METALLICALLY SHIELDED • LIGHTWEIGHT & FLEXIBLEPIPING PRE-MARKED BY THE FOOT • 25 PSI MAXIMUM OPERATING PRESSURE • -40°F TO 160°F OPERATING TEMPERATURE RANGECSA CERTIFICATE 2728525 • ICC-ES REPORT NO. PMG 1066 AND PMG 1155 • IAPMO: FILE NO. C-3250 AND REPORT NO. 0239
SSC No. Manuf No. Size MFJ X NPT Price Each
52F 2085 XR3TRM-11-12 3/4" x 3/4" 28.44 52F 2117 XR3TRM-16-6 1" x 1" 45.94
52F 2098 XR3TRM-8-12 1/2" x 1/2" $ 25.76
TERMINATION FITTINGMALE NPT ADAPTER • BUSHING • TERMINATION NUTCORROSION RESISTANT SQUARE STEEL FLANGE
SSC No. Manuf No. Size Price Each
52F 2009 STRP3-16 1" 13.31 52F 2005 STRP3-8 1/2" $ 29.28
JACKET STRIPPING TOOLPOLYPROPYLENE BODY • STAINLESS STEEL BLADESFOR USE ON BOTH GASTITE® & FLASHSHIELDTM CSST
SSC No. Manuf No. Size Price Each
52F 2120 STUB-01-10 1/2" $ 20.53
ANGLE STUB-OUT1/2" M X 41/2" LONG X 72.5° ANGLE
SSC No. Manuf No. Price Each
52F 2125 XR3-APSTUB-11-11-10 $ 51.89
APPLIANCE STUB-OUT3/4" M X 3/4" M X 11/2" STUB LENGTH WITH 3/4" FEMALE FITTING