Hydro power projects in Pakistan
Salient Features
Salient features of existing and proposed hydropower projects in Pakistan
DIAMER BASHA DAM PROJECT
GENERAL Government of Pakistan decided to construct 5 multi-purpose storages in the country during next 10-12 years. Diamer Basha Dam Project will be undertaken in the first phase. President of Pakistan performed the ground breaking ceremony of the project. Detailed engineering design of the dam and allied structures is completed and tender documents are ready. Prequalification of contractors has been started and contract for project implementation through five lots shall be advertised soon.
SALIENT FEATURES
• LOCATION 40 km downstream of Chilas
• MAIN DAM:
Maximum Height 272 m
Type Roller Compacted Concrete (RCC)
• DIVERSION SYSTEM 2 No. Diversion tunnels
1 No. Diversion channel
Upstream and Downstream Cofferdams
• MAIN SPILLWAY:
No. of gates 14
Size of gate 11.5 Χ 16.24 m
• RESERVOIR LEVEL 1160 m
Gross capacity 8.1 MAF (10.0 BCM)
Live capacity 6.4 MAF (7.9 BCM)
Min. operation level El. 1060 m
• OUTLETS:
Low level 2
Sluicing 5
• POWERHOUSE(S): 2
Total installed capacity 4500 MW
Location and type Two, one each under the right and left abutment
Muhammad Arslan Page 1
Hydro power projects in Pakistan
Salient Features
No. of units 12 each of 375 MW
Average generation 18,000 Gwh/year
• ESTIMATED COST US$ 11.34 Billion
• EIRR 18.1%
• Benefit/Cost Ratio 2.49
TARBELA 4TH EXTENSION PROJECT
SALIENT FEATURES Location Tarbela Dam
Existing Installed Capacity 3470 MW
Tunnel-4 (Already constructed)
• Purpose Irrigation
• Type Concrete/Steel Lined
• Diameter 45 ft to 36 ft
• Length 2997 ft
Dam (Already constructed)
• Height 485 ft (147.82 m)
• Length 9000 ft (27434 m)
Spillway (Already constructed)
• 4th Extension estimated
Installed Capacity 960 MW
• Tentative Project Cost (Million US$) 500
LAWI HYDROPOWER PROJECT
LOCATION
The project area is located on the right bank of Shishi River, a left tributary of Chitral River. The project involves diversion of Shishi River into Chitral River. The Project is about 350 km from Islamabad.
Muhammad Arslan Page 2
Hydro power projects in Pakistan
Salient Features
SALIENT FEATURES
Installed Capacity (MW) 70
Gross Head (m) 413
Design Discharge m3/sec 20
Mean Annual Energy (Mil. KWh) 303
No. & Type of Turbine 3 (Pelton)
Estimated Project Cost (MilUS$) 120
Implementation Period (Years) 4
MUNDA DAM MULTIPURPOSE PROJECT
LOCATION
This project is proposed to be constructed on Swat River about 5 Km upstream of Munda Head Work in Mohmand Agency (FATA), NWFP.
OBJECTIVES
i. Power Generation ii. Flood Control iii. Irrigation
SALIENT FEATURES
Type of Dam Concrete Faced Rock fill Dam
Height of Dam 698.820 Ft.
Gross Storage 1.290 MAF
Live Storage 0.676 MAF
Dead Storage 0.314 MAF
Flood Storage 0.081 MAF
Power Houses Installed Capacity (Peak) 740 MW (Annual Energy 2407 GWh)
Right Bank Culturable Command Area 15098 Acres
Left Bank Culturable Command Area 10057 Acres
Project Cost (Year 2000) Rs 57.450 Billion (US$ 1149 Million)
Muhammad Arslan Page 3
Hydro power projects in Pakistan
Salient Features
Kala Bagh Dam
Salient Features:
1 The Main Reservoir of the Dam
Total Storage 7.9 MAF (9,750 million cu m)
Usable Storage
Dead Storage
6.1 MAF (7,550 million cu m)
1.8 MAF( 2,200 million cu m)
Retention Level El.915-ft above MSL (278.9 m)
Min Reservoir Level El.825-ft above MSL (251.5 m)
Area at Retention Level 105,000 acres ; (164 sq.m=425 sq. km)
3 Main Dam
Crest Elevation
Crest Width
El. 940-ft above MSL (286.5 m)
50 ft (15.2 m)
Max Height 260 ft (79.2)
Length
Length (overall)
4375 ft
11000 ft 3350 m)
4 Catchment Area of the Dam 110,500 sq. miles
5 Fill Volume
Main + Closure Embankments
Intake Embankments
Right Auxiliary Embankments
Guide Bunds, Cofferdams etc
5. million cu m
5.9 million cu m
4. million cu. m
10.5 million cu m
6. Overflow Spillway
Sill Level El. 860-ft above MSL (262.1 m)
No and size of radial gates 10 No. 50ft (15.2 m ) w x 55 ft (16.8m )
Muhammad Arslan Page 4
Hydro power projects in Pakistan
Salient Features
PMF Discharge 0.98 million cusecs (1.07 million cusecs)
7. Project Cost
Based on Cost at June 1987 US $ 2.65 billion
Present Estimated Cost US $ 8-10 billion
8. Orifice Spillway
Sill level
No and size of radial gates
785 ft (239.3m) SPD
10 No. 38 ft (11.6 m) w x 22 ft
9.
10.
Convertible conduits
No & Size of Conduits
Average Length
Lining
No & Size of gates
Upstream bulkhead
Upstream radial
Downstream radial
4-36 ft (11 m) diameter
940 ft (286.5 m)
Steel with concrete encasement
1-36 ft (11 m) w x 36 ft (11m)
4-36 ft (11 m) w x 36 ft (11m)
2-35 ft (10.7m) w x 36 ft (11m)
11. Power Facilities
No and size of intake gates
Upstream bulkhead 2-36 ft (11m) w x 36 ft (11m)
8-36 ft (11m) w x 36 ft (11m)
Muhammad Arslan Page 5
Hydro power projects in Pakistan
Salient Features
Upstream radial
12. Penstocks
Size and average length
Lining
36 ft (11m) diameter, 850 ft
Steel with concrete encasement
13 Power Station
Type
No. of Units
Installed Capacity
Turbines, design head
Generators, nominal/maximum rating
Indoor
8 (initial); 12 (ultimate)
2400 MW (initial); 3600 MW (ultimate)
Francis Type, 170 ft (51.8m)
13.1 Irrigation Benefits
Increase in future annual irrigation supplies (Average)
4.5 MAF (5.500 million Cum)
13.2 Energy generation
At KBD
Extra at Tarbela
Total
Power Available (initial eight units)
11413 million kWh
236 million kWh
11749 kWh
Muhammad Arslan Page 6
Hydro power projects in Pakistan
Salient Features
13.3 Max Power
Dependable Power
2776 MW
1463 MW
Muhammad Arslan Page 7