1 | P a g e C u r r i c u l u m V i t a e
SALEM SAEED HUSSAIN ALYAMI
Nationality: SAUDI
Date of birth: 06/09/1975 Mobile: 0592600150 & 0553116597
Email [email protected] & [email protected]. & [email protected]
OBJECTIVE
POSITION: COMPANY:
WORK :
EXPERIENCE
I am Seeking for a better opportunity with high level that can enhance my
experience and knowledge while I’m getting those via 18 years from the
career of jobs.
Human Resources Officer
IT IS COMPANY 10/05/2106
Integrated Technologies For Industrial Services Co.
1- Following up passport office issues ( renewal, issuing and transferring if there) 2- Labor office website ( issuing sadad permits to renewal and issuing new iqamas) 3- Issuing E.R or final exit through Muqeem, iqama renewal online. 4- Following traffic police and issuing driving licenses. 5- Following labor office issue. 6- Following up HRDF. 7- Following up visit visa and invitation requests on MOFA website if there. 8- Preparing monthly salary timesheets. 9- Following up permanent visas process (sending letters to Zelal office – emailing
agencies). 10- Following up Tamm service (issuing company’s penalties – istemar’s renewal). 11- Doing medical insurance.
The attached are the most important lists which I prepared before and follow up
through them.
2 | P a g e C u r r i c u l u m V i t a e
POSITION: COMPANY:
WORK :
EXPERIENCE
POSITION: COMPANY:
WORK :
EXPERIENCE
QA/QC
POSITION: COMPANY:
WORK :
EXPERIENCE
QA/QC
IT IS COMPANY 08/02/2106
Integrated Technologies For Industrial Services Co.
NDT Technician
Inspection of pipe line with ARAMCO Co. as per the procedure
Of inspection system
1-NDT -INSPECTION
2-X-REY- INSPECTION
3-UTT-INSPECTION
As per the specifications & standard of ARAMCO.
QA/QC& Safety In charge
Modern factory of steel re bars industrial company
Supervising online of all process inspection as per procedure of products as per
ASTM & A615 , BS 4449, GS06/ISO 6935 OF BLACK BAR,CR.HR.& Coating
Standard: ASTM A775/A775M, ASTM A934/A934M AS PER ARAMCO Instruction of epoxy line process of fusion bonded epoxy
coated rebar. LAB SYSTEM:
1-Gel time testing.
2-online holiday detectors in the process during production 3- moisture contact testing
4- Surface measurement test of steel rebar 5-tensile testing
6-hardnees testing
7-microscop analysis 8-inspectro analysis of steel and iron
9- Bend test 10-Inspection of all process during production as per the procedure
Collecting reports and submitting to GM .
Conducted Training for new inspector and laboratory technician
Submitted other report as required by QA/QC & HSE DEP.
Submitted other report as closing every year, as per procedure
QC Supervisor
Group five company (GP5) FROM 04/08/2014- 10/01/2016
Procucte steel iron pipes. Supervising Online process inspection
Collecting reports and submitting to GM .
Conducted Training for new inspector and laboratory technician
Submitted other report as required by QA/QC DEP.
Submitted other report as closing every year, as per procedure
1- Milling
I controled the section of milling before start production For the application of quality standards to
3 | P a g e C u r r i c u l u m V i t a e
POSITION: COMPANY:
WORK :
EXPERIENCE
QA/QC
QA/QC
international as per specifications of Chemical mixture .
Observantion the mill during start welding as per procedure.
2 - ULTRASOUND
we are Control to solve the problems before expansion like crack or any defect from mill.
3-Bevel
we are checke the pipes Dimensional measurement as per specifications.
4-Repair Section.
Check the pipes the need repair after bevel before start hydro testing.
5- Hydro test. We are observe that the process of water pressure, according to standard . 6- UT. We are checking as per standard 7- X-REY We are checking as per standard 8- Final inspection QC. We are check all the pipes like Dimension & Marking. As per procedure. 9- LAB. We are checking the tensiale & hardness& Microstructure Analysis using microscope & spectro analysis as per specifications. 10- Chemicals Analysis & test Microstructure Analysis using microscope, Molten Chemical Composition before
and after Magnesium treatment using.
EagleBurgmann KSA.: FROM 07/07/2013 TO 09/07/2014
QC/QA Supervisor
Product Mechanical seal & Seal Supply Systems& Gaskets& Expansion Joints
Supervising Online process inspection
Collecting reports and submitting to GM .
Conducted Training for new inspector and laboratory technician
Submitted other report as required by QA/QC & HSE DEP.
Submitted other report as closing every year, as per procedure.
Follow-up with Quality Department
1. Follow-up the Quality Standard Assurance Department. 2. Collecting reports from production lines inspectors. 3. Organizing the weekly work Times for inspectors. 4. Assistant to get Certificates such as (ISO&TUV) Certificate. 5. Follow-up and Inspection ability. 6. Test the entire row Material & Analysis from the suppliers before using. 7. Supervising the spectral analysis of metals and the approval of the corresponding product
specifications as per procedure.
4 | P a g e C u r r i c u l u m V i t a e
POSITION: COMPANY:
WORK :
EXPERIENCE
QA/QC
POSITION: COMPANY:
WORK :
EXPERIENCE
QA/QC
QC/QA In charge
INDIPCO [ FAL GROUP ]
GRADE: 9
EXPERIENCE: DEC 05, 2009 up to01/02/011
DEPARTMENT QUALITY CONTROL
Duties and Responsibilities:
QA/QC head (In charge):
Supervising Online process inspection
Collecting reports and submitting to GM .
Conducted Training for new inspector and laboratory technician
Submitted other report as required by QA/QC & HSE DEP.
Submitted other report as closing every year, as per procedure.
Follow-up with Quality Department Follow-up the Quality Standard Assurance Department. 1. Collecting reports from production lines inspectors. 2. Organizing the weekly work Times for inspectors. 3. Assistant to get Certificates such as (ISO&TUV) Certificate. 4. Follow-up and Inspection ability. 5. Test all the row Material & Analysis from the supplier before using.
6.Supervising the spectral analysis of metals and the approval of the corresponding product specifications Accordance with the procedures The ability to control the:
Laboratory. Test Mechanical (tensile-hardness) & chemicals (micro-spectro analysis -Mixture of chemicals such as nitric acid with ethanol obsolete – test pH value,
1- Clay Content, Sand Equivalent), Inspections line. The team is organized according to administration to the quality department
2- Control the production as per procedure.
Sr. QC /QA Technician SADIP [ AMAINTIT GROUP ] GRADE: 5
EXPERIENCE: March 23, 1995to 2009
DEPARTMENT QUALITY CONTROL
Duties and Responsibilities:
Collecting reports and submitting to QA/QC Engineer
Conducted Training for new inspector and laboratory technician
Dimensions and Visual Inspection of pipes, cores and moulds
Submitting report of any non-conformance in the processes
Submitted other report as required by QA/QC Engineer
Laboratory Technician:
Microstructure Analysis using microscope, Molten Chemical Composition before
and after Magnesium treatment using
spectroscopy, Analysis of raw materials such as SAND used in core making and
cement lining (Analysis consist of Granulometry, moisture content, pH value,
Clay Content, Sand Equivalent), and Bituminous Paint (Analysis consist of
Density, Dry Extract, and Ash Content), Tensile Testing and Brinell Hardness
5 | P a g e C u r r i c u l u m V i t a e
MELTING
FINISHING
Testing
Preparing mixture of Ethanol and Nitric Acid used for Microstructure analysis
As per procedure.
QC Inspector:
Dimensions and Visual Inspection of pipes, cores and moulds
Submitting report of any non-conformance in the processes
DEPARTMENT PRODUCTION
Position Duties and Responsibilities
Melting foramen: Collecting reports and submitting to Melting in charge
Conducted Training for new furnace operator and technician
Submitting report of any non-conformance in the processes
Submitted other report as required by Melting In charge
Furnace Operator : calculation for charge the marital to furnace Si.C.Mn Operate the furnace charge scrap & Pig iron than start heating to
Temp 1350 after that i get sample send to QC. Then I remove slag
To ready to discharge to casting
.
Magnesium Operator : I remove salage from the ladle then I put Mg
Inside the molten metal use plunger to treatment
There are calculation for add the Mg.
Production Visual Inspector: Visual inspection of all pipes after tri-grinding before
hydro-pressure testing
Marking the pipes with the appropriate Color
Overhead Crane Operator: Transferring pipes inside the plant
Bitumen Coating Operator : Coating the ductile pipes with bitumen as per procedure
Cement Lining Operator : Operating the Machine as per procedure
Hydro-Pressure Testing Op:. Operating the Machine as per procedure
Testing Qualified Pipes for Hydro-Pressure as per
procedure
Pipe Cutting Operator: Cutting pipes from spigot side due to some defect
Cutting sample for Ring Test and then making ring test
Prepared samples for Microstructure analysis and
Mechanical testing from fractured ring
Checking of the parameters of the machine before using
Zinc Operator:
Operating Zinc Coating Machine
Sticking Mylar sample for QC Testing of Zinc Coating
Cement lining: operate the machine of cement lining as per procedure
Bitumen coating: Operating the Machine as per procedure
Forklift 4,6 tons operator: Transfer the pipes from plant to yard& store& material.
6 | P a g e C u r r i c u l u m V i t a e
EXPERIENCE
POSITION: COMPANY:
MELTING
EDUCATION
ENGLISH
COURSES
LANGUAGE
OTHER SKILLS
MELLTER 2 NSF [ALTUERQI GROUP] FROM 2005 – 2005. 6 MONTH DEPARTMENT
MELTING:
Calculation for charge the marital to furnace SI . C. MN. Al. Operate the furnace charge scrap & iron than start heating to Temp 1500 after that I get sample send to QC. Then I remove slag To ready to discharge to casting I operate the lines machine for melt the iron , also I change the Electrode after melt I change the lines after melt I repair the lining using Mg powder lining at Shutdown time. as per procedure
Deplume of English Al khobar SEP/2002
AL Khobar Secondary High School MAY/2009
Al khaleej language institute (Direct English) OCT/1997
Vocational Institute English FEB/1999
International Language English JAN/2001
Institute in Industrial & Technology English SEP/2002
I have Certificate from IADC, basic fire fighting Dec22/2013
I ahve Certificate of (TUV) QMS. 2009
QMS. Auditor as per 9001- 2002 2013
ARABIC [ fluent ]
ENGLISH [ upper intermediate ]
I can work as quality supervisor/ Inspector/Technician or any other position
because I have the ability to learn new things.
Good presentation & communication skills in English.
Good background in reading and typing reports in English.
Ability to type both English and Arabic.
Have some knowledge in PC’s software & hardware.
Good knowledge of MS Word, Excel, power point.
Strong personality and have the ability to lead team or work alone.
7 | P a g e C u r r i c u l u m V i t a e
Ability to work under pressure of the work. With all tem
Hard worker.
Dr. Abdllumhosen Wehemer Mobile +966 568676444
Email [email protected]
Position PLANT MANAGER
Company INDIPCO
Eng. Mohammad Obeidat Mobile. +966 557512350
Email [email protected]
Position QA/QC Manager
Company INDIPCO
Be comfortable to contact me
For any farther information