King Abdullah Petrolium Studies And Research Center (KAPSARC – Iconic Project) / Riyadh - KSA Saudi Landscaping and Contracting Company (SALCO)

SALCO Presentation (KAPSARC)

Embed Size (px)

Citation preview

Page 1: SALCO Presentation (KAPSARC)

King Abdullah Petrolium Studies And Research Center (KAPSARC – Iconic Project) /

Riyadh - KSA

Saudi Landscaping and Contracting Company (SALCO)

Page 2: SALCO Presentation (KAPSARC)
Page 3: SALCO Presentation (KAPSARC)
Page 4: SALCO Presentation (KAPSARC)

SALCO Scope

Hardscape

Landscape

Softscape Irrigation

Page 5: SALCO Presentation (KAPSARC)
Page 6: SALCO Presentation (KAPSARC)

SALCO Tasks & Milestone based on DSI time schedule

Hardscape (%) Irrigation (%) Softscape (%) Area Handed Over by DSI Area handed over by SALCO

Area 1 65.50 (m2) 23.70 19.70 1-July-13 Jan-13

51.83 (Lm)

Area 2 1.66 9.00 11.33 15 juin-13 August-13

Area 3 7.62 13.50 10.23 July-13 Sep-13

Area 4 0.00 2.50 1.77 30 Juin-13 Sep-13

Area 5 0.00 0.00 0.00 30-Apr-13 ------

Area 6 0.00 1.75 1.27 15-July-13 15-August-13

Area 7 4.46 5.22 4.23 15-Juin-13 30-July-13

Area 8 4.66 21.93 23.10 15-Juin-13 15-October-13

Area 9 16.08 (m2) 22.40 28.34 15 Juin-13 July-13

Area 1048.16 (Lm)

0.56 0.00 0.00 15-Juin-13 30-July-13

* All Starting date for SALCO scope are based on DSI and sub-contractors schedule (MEP, FCC , etc …)* Interface pending issues between MEP & SBM are not yet finished and we still waiting for their response* After installation of the Irrigation System, SALCO needs 35 to 45 days to make the final arrangement of the Controlling System

Page 7: SALCO Presentation (KAPSARC)

SALCO Materials

Hardscape

Page 8: SALCO Presentation (KAPSARC)
Page 9: SALCO Presentation (KAPSARC)

Softscape

Page 10: SALCO Presentation (KAPSARC)
Page 11: SALCO Presentation (KAPSARC)
Page 12: SALCO Presentation (KAPSARC)

On Site Construction

Page 13: SALCO Presentation (KAPSARC)
Page 14: SALCO Presentation (KAPSARC)
Page 15: SALCO Presentation (KAPSARC)
Page 16: SALCO Presentation (KAPSARC)
Page 17: SALCO Presentation (KAPSARC)

Major Site Construction faced

- LV installation; specially in Zone 9

- Underground Utilities

- Deep Excavation around the podium walls

- Scaffold

Page 18: SALCO Presentation (KAPSARC)

General Recommendations

- Prioritize the areas

- Efficient Coordination

- Start to provide access around the Iconic area