SakhalinOil and Gas
Industrial Park
The project is supported by the Government of Sakhalin Oblast andSakhalin Energy
2
3
Sakhalin oil and gas operators purchasing equipment, materials and services all over the world
3
SIP project will help to eliminate barriers for new vendors
• Single infrastructure, energy sources,administrative, social and other services will beavailable for Residents
• United warehousing complex and logistic centerwill allow to reduce transportation costs andtime
Residents will be provided by all requiredinfrastructure in order to be able to focus ontheir service
Operators work with international suppliersfrom all over the world
All purchased materials and equipmentshould be in accordance with internationalstandards in HSE, integrity control andtechnological reliability
Benefits from the SIP project implementationCREATE new Russian procurement
base for the oil and gas sector
REDUCE risks and SHORTEN timeof equipment supplies in the contextof global changes in the market
RAISE the level of cooperation efficiency between the vendors of oil
and gas projects
ENSURE accessibility of recourses and services
ELIMINATE the dependenceon supplies of equipment andcomponents from abroad
IMPROVE the local skill baseand CREATE new jobs andtraining centers
REDUCE costs of repair andmaintenance works for oil and gasproject operators
IMPROVE the process oftechnical control over oil andgas facilities
ENSURE accelerated development of the Sakhalin Oblast’
4
Provide production facilities with controlled price
Exclude double costs and additional expenses
Provide single infrastructure, power resources, social and administrative facilities, etc.
Increase HSE compliance
Manage vendor’s work activity on a single administered
territory
Attract small innovative and competitive companies
Create warehouse complex and logistic center
SIP characteristics
5
Project realization suggests several legal mechanisms that allow SIPResidents to work under different Tax regimes:
Tax regimes
PSA (Production Sharing Agreement)
TASED “Yuzhnaya”(territory of advanced social and economic development)
General tax regime
6
Land plots status
4.7 ha
27.5 ha
31.5 ha
• Land owner: Land use department of Yuzhno‐Sakhalinsk
• Land holder: MC SIP
• Lease agreement was registered on 16.11.2018
• Duration: till 29.10.2028
• Land owner: AO Sovkhoz Yuzhno‐Sakhalinskiy
• Land holder: MC SIP
• Lease agreement was registered on 22.02.2019
• Duration: till 30.11.2067
• Land owner: АО Far East Development Corporation
• Land holder: SIP‐TOR, LLC
• Lease agreement was registered on 02.02.2019
• Duration: till 16.03.2086
1
2
3
1
2
3
Total area - 69,86 ha The following lease agreements have been signed for the Project implementation
*Location: Yuzhno-Sakhalinsk, Novo Aleksandrovsk, 20 Vostochnaya st.
7
Stage 1
Stage 2
Stage 1 (2020 – 2022) Maintenance and repair facilities for Sakhalin Energy
8
Current Status
Launching stage II
Archive
Logistics center + Machinery maintenance shop
Infrastructure
Launching stage IMARF Facilities Stage I:
Building 1
Building 2
Building 3
Building 4
Rotat. eqpt. repair(1978 sq.m.*)
Valves repair (1392 sq.m.*)
Drill. eqpt. repair(930 sq.m.*)
Well control(516 sq.m.*)
Electric department and laboratories (1676 sq.m.*)
Motor Transport
Department(4975 sq.m.*)
Diving eqpt.(1140 sq.m.*)
Prefab.(780 sq.m.*)
Building 5
SEIC operational warehouse
(3996 sq.m.*)
InfrastructureInfrastructureArchive
(1754 sq.m.*)
Building 1
Building 2
Building 3
Building 4
Building 5
Electrical equipment and instrumentation repairs
Laboratories (electrical, calibration, corrosion and mechanical)
Welding, turnery, painting works
Air diving equipment storage and maintenance
Blowup prevention services
Drilling equipment repairs and maintenance
Valves repairing, maintenance and calibration
Rotating equipment repairs and maintenance
Warehouse for SEIC Operational needs* ‐ effective area (area of all indoor premises)
Infrastructure
Infrastructure
Effective area : 12408 sqm*
Effective area: 6729 sqm*
Volume of investments not less than
USD 45 mln
+
+
1. To localize production capacities that Company require2. To reduce the time and costs due to simplified logistic scheme3. To adjust production capacities for Company needs and minimize risks in case of contractor replacement4. To eliminate barriers for new vendors5. To reduce direct costs of contractor activities to meet HSE requirements
Construction of Sakhalin Energy MARF will allow:
Stage 2 (2022 – 2025) Facilities for third-parties and SIP Residents
Mechanical workshop
Engineering infrastructure facilities
Medical center
Heated warehouses
Office
Workshops
Engineering center
Archives
Training center
Hotel
Data center
Green zone
Reserved facilities
Liquified Nitrogen production and storage areaChemical warehouse
Open area for storage and assembling worksWaste-storage area
Administrative and recreation zone
Hazardous area
Warehouses and workshop facilities Open area
Reserved facilities
1
2
3
4
1234
5
6
56
7
78899
10
10
11
1112
12
1314
15
13
14 15
15
15
total area of 65 ha available for construction works in 2020 localization of services not present on the islandVolume of investments not less than USD 230 mln. including infrastructure9
Localization of servicesUnited system of warehousing and materials storage– Chemical warehouse– Heated warehouse
– Open and indoor warehouses– Core samples and logging tapes storage
ARCHIVE DATA CENTER
Engineering center Training center
Laboratories– Chemical– Mycological
– Fuel and lubricants – NDA
– Low temperature tests
Maintenance, calibration and inspection– Tools– Measurement instrumentation
– Valves and power transmissions– Lifting devices and tools
Drilling equipment and consumables
Painting and sandblasting shop
Welding shopPrefabrication shop
– Electrical equipment and protection
Manufacturing– Electrical and instrumentation panelboard– Fittings, flanges and seal connection
– Transmissions and manual valves – Insulating and fireproof materials – Heating jackets and winterization equipment
Liquified Nitrogen Plant
Localization of other services
PPE CENTER
Carpenter workshop
Certification center
10