2
STEP 3 Hang side rail and secure each anchor bolt with nut ' x4 x12 Ensure square bracket is pointing towards inlet pipe Upstream [2] x4 [3] P/N 009 x8 P/N 010 x8 P/N 011 Varies [5] U R streaTechnologies UpstreamTechnologies.us REV #033018 © 651.237.5123 I 8am - 5pm CST 600 County Road D West, Suite 14 New Brighton, MN 55112 inf[email protected] Box knife Measuring tape Adjustable wrench or pliers Ladder STEP 1 - - - ,_ _c_ - STEP 2 Hammer drill 3/8" (9.53 mm) drill bit Bubble level Marker Hammer 1. Set height of first side rail (found in detail or plan set) 1. Insert anchor bolt into drilled hole P/N 004 2. Mark holes on manhole with marker 3. Drill six, 2" deep, 3/8" diameter holes to match rail holes + The two hinged top rails should be pre-assembled. In the case they are not, assemble them with them, ensuring the square tubing aligns flush with the "U" shaped bracket and the nut is pointing upwards. Hinged top rail 2. Hammer anchor bolt pin until flush with the bolt threads 3. Repeat for remaining anchor bolts Nut 0--------------------- P/N 008 [1] [4] [6] Installation Manual SAFL BAFFLE US PATENTS: #8715507B2 #8663466B2 #9506237B2 CANADIAN PATENT: #2742207

SAFL BAFFLE URstrearq Technologies · ensuring the nuts are pointing upwards. 2.Slide the bottom frame into the square sleaves on each side rail. P/N 002 P/N 003 P/N 001 P/N 005 P/N

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SAFL BAFFLE URstrearq Technologies · ensuring the nuts are pointing upwards. 2.Slide the bottom frame into the square sleaves on each side rail. P/N 002 P/N 003 P/N 001 P/N 005 P/N

STEP 3

Hang side rail and secure each anchor bolt with nut

'

x4

x12

Ensure square bracket is pointing towards inlet pipe

Upstream

[2]

x4 [3]

P/N 009

x8 P/N 010

x8 P/N 011

Varies

[5]

URstrearq� Technologies

UpstreamTechnologies.us REV #033018

© 651.237.5123 I 8am - 5pm CST

600 County Road D West, Suite 14 New Brighton, MN 55112

[email protected]

Box knife

Measuring tape

Adjustable wrench or pliers

Ladder

STEP 1

- - -

,ii)_ _c_ -

STEP 2

Hammer drill

3/8" (9.53 mm) drill bit

Bubble level

Marker

Hammer

1. Set height of first side rail (found in detail or plan set)

1. Insert anchor bolt into drilled hole

P/N 004

2. Mark holes on manhole with marker

3. Drill six, 2" deep, 3/8" diameter holes to match rail holes

+

The two hinged top rails should be pre-assembled. In the case they are not, assemble them with them, ensuring the square tubing aligns flush with the "U" shaped bracket and the nut is pointing upwards.

Hinged top rail

2. Hammer anchor bolt pin until flush with the bolt threads

3. Repeat for remaining anchor bolts

Nut

0h---------------------------'

P/N 008

[1]

[4]

[6]

Installation Manual

SAFL BAFFLE

US PATENTS: #8715507B2 #8663466B2 #9506237B2

CANADIAN PATENT: #2742207

Page 2: SAFL BAFFLE URstrearq Technologies · ensuring the nuts are pointing upwards. 2.Slide the bottom frame into the square sleaves on each side rail. P/N 002 P/N 003 P/N 001 P/N 005 P/N

STEP 4 Slide one stainless steel square rod into one of the hinged top rails, and slide the other top rail into the opposite end of the stainless steel square rod. Ensure the two nuts of the top rails are pointing upwards.

P/N 008

STEP 6

Secure top frame

STEP 8

STEP 11 Connect panels with bolts, nuts (P/N 011) and slotted bar

P/N 003 P/N 007

P/N 005

Hang remaining panels, starting with the outside panels first

In some installations, panels will overlap. If they overlap, skip this step.

[7]

[9]

[11]

[13]

STEP 5 •O O ------------

1. Temporarily place the second side rail at the opposite end of the sump, at the same bottom elevation as the first side rail.

2. Slide the top frame into the two side rails. Use the level to make sure the top frame and second side rail are aligned correctly.

3. Mark the locations of the anchor bolts for the second side rail. Remove the top frame and install the second side rail.

Hang panels on upstream side of frame

STEP 9 1. Assemble bottom frame by sliding the stainless steel square rod into the two bottom rails, ensuring the nuts are pointing upwards.

2. Slide the bottom frame into the square sleaves on each side rail.

P/N 002 P/N 003 P/N 001

P/N 005

P/N 004

Mark Holes

STEP 7

STEP 10 Secure bottom frame with eye-bolts

[8]

(10]

[12]

SAFL BAFFLE PATENTS: US #8715507B2, #8663466B2, #9506237B2

CANADA #2742207