1
Safety Stand Down 2020
20 October 2020
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
20 October 2020
2
Zero Harm Message
Daily Message website :
https://dailymessage.edfenergy.com
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
Safety Stand Down 2020 - What today is about
Today, all EDF Group entities have been mobilised by Jean-Bernard Lévy, EDF CEO, to reflect collectively onthe work related fatalities within the business.
For us here in the UK, we are asking you to:
• Take time away from your day to day tasks to reflect on these events
• Watch our very short Executive Team ‘Only Together’ video
• Use the dedicated ‘Stand Down’ pack to discuss the events and share your thoughts with your team or colleagues
• Provide feedback on your stand down conversations and the materials provided, using the dedicated #StandDown2020 Yammer feed, by emailing [email protected] or through your HESAC representative
While the circumstances surrounding each of these fatalities won’t reflect everyone’s working environment, it is still important that we use this opportunity to consider the risks you’re exposed to and what further can be done to protect ourselves and our colleagues from harm.
3 Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
4
We’ve seen 9 work related fatalities across the Group since last Safety Stand Down (3 October 2019)
Contractor Employee
Working with electricity 2
Mobile plant & vehicles 2 1
Lifting operations 2
Work at height 2
Safety Stand Down 2020 - What happened
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
Working with electricity
5 Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
6
As part of a planned pruning and felling operation forENEDIS (Power-Grid distribution subsidiary of EDF), a teamof two was carrying out operations near an overhead
Medium Voltage line, using a tractor equipped with abucket.The articulated arm came into contact with the grid closeto the working area, causing Jim AUBRY – 35 and
Frédéric GUILLAUMEY – 34 to be electrocuted on site.
Elements to consider:• Contract partners• Control of working conditions in the proximity of
energised lines• Use of tools (tractor & bucket)
• Procedures to access the site & exclusion zone• Procedures to de-energise the line
• Electric risk perception • Geographical isolation
Entity follow up actions:• Joint dynamic Risk Assessment –contractors and
employer• Strengthen independent monitoring• Review current guidance• Human factor and risk perception programme in
collaboration with contract partners
• Working closely with the national industry forum• Exploring use of drones to map to map areas and get a
better view of the state of facilities
23 October 2019 – Rimbach-près-Masevaux (France) - ENEDIS
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
#onlytogether
Safety Stand Down 2020 – Working with electricity key considerations
• Lock out/tag out
• Isolate sources
• Planning, preparation, setting to work
• Supervision
• The right material for the job
• Working within electrical line proximity
• Emergency response
• Point Of Work Risk Assessment
• Work closely with contractor partners
• Electrical Activities Company Standard
7
Always comply with the life-saving rule:
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
Mobile plant & vehicles
8 Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
9
As they left their working area (where they were performing public lighting activity), Juan Carlos VEGA PEREZ, 45 years old, aCitelum employee and his colleague, struck their truck left rear wheel on a pavement. Standing behind the vehicle, as Juan Carloswas trying to inspect the damage caused to the pneumatic system, his colleague managed to re-pressurise the vehicle. This actionrestarted the truck which crushed Juan Carlos.
Elements to consider :• Vehicle condition
• Processes and instructions • Managerial supervision• Coordination between team members
• Driving competence• Lack of procedure in case of vehicle breakdown
• Moving equipment risk perception
Initiated actions: • Enhanced maintenance of the fleet• Reinforcement of field visits by operational
managers• Additional external training for drivers • Breakdown instructions Position of Juan Carlos at the time of the event
23 August 2020 - Mexico City (Mexico) - Citelum
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
10
The event occurred at an underground power connection worksite for
the client ENEDIS. A farm had to be connected to the national grid. The job was completed, and the team were preparing to leave the site. Bruno BAUMER, 50, went to the truck cabin, started the engine and got back out of the cabin (the engine was still running), for an unknown reason. He headed towards his colleagues located down a slope. The
victim’s colleagues alerted him that the vehicle was moving down the slope. Unfortunately, the moving vehicle hit him.
Elements to consider :• Subcontractor• Compressed air handbrake not engaged • Experienced person
Initiated actions: • Official investigation is underway
Impact with driver Impact with second truck
End of travel of the truck
that hit the person.
Impact point with ditch
pile of sand to be evacuated
21 September 2020 - Ineo Réseaux Est (France) - Enedis
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
Initial parking of the truck with
tank trailer before it drives down
the slope towards the construction
site below.
11
Position présumée de la nacelle au moment de
l’accident
Supposed position of the MEWP at the time of the event
Two employees of BOIRON (a contractor for ENEDIS)
were in the cradle of mobile elevated work platform
(MEWP) to access an overhead HV line on sloping
ground. The machine overturned, killing Andres
GEORGES, 55 years old and seriously injuring his
colleague, 51 years old.
22 September 2020 – Rombach-le-Franc 68
(France) - Enedis
Elements to consider :• Subcontractor
• The track planned to run alongside the trees
allowing access to the lines, was not built
• Material procedure states the vehicle’s use on flat
surfaces
• Both employees had 30 years experience in the
job
Initiated actions: • Official investigation is underway
#onlytogether12
• Exclusion zones
• Visibility
• Stability of equipment
• Communication
• Banksmen
• Risk assessment & Point Of Work Risk Assessment
• Procedures
• Site Transport Company Standard
Safety Stand Down 2020 – Mobile plant & vehicles key considerations
Always comply with the life-saving rule:
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
Lifting operations
13 Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
14
On the morning of 10 June 2020, work had been completed and the cranecompany was in the process of disassembling the crane and loading it onto a truckfor transport. A large component of the crane, called a jib, had been loaded ontothe trailer, and the other crane on site was working on loading a second piece ofcrane onto the trailer. Eric MADRAN, an employee of the crane company, was
standing near the trailer when the jib rolled off the trailer and crushed him.
Elements to consider:• Crane jib was not secured to transport trailer before crane crew began next task
• Lack of Procedure• Primary contractor did not oversee the actions of their subcontractor• Job Hazard Analysis or Job Safety Analysis completion
Entity follow up actions : • Written procedure for loading/unloading crane components
• Contractor will develop an improved process for managing their subcontractors and employ that process on future EDFR projects
• Both contractor and subcontractors are continuing to reevaluate their own internal practices, identifying gaps and working together to correct any safety deficiencies
• Improved processes for pre-qualification and management of contractors and subcontractors
• Contractor Black list
10 June 2020 – Lac Alfred Wind Farm, Quebec (Canada) – EDF Renewables
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
15
Antonio Giovanni Magrone, 49, was working on the disassembly of an existing primary water treatment plant. He was cutting
the bottom of a steel tank with a colleague. The tank had been set at an angle to facilitate the cutting operation and the fall of
the concrete bottom towards the outside. The accident occurred during the cutting of the fourth tank where in the final
moment of the cut of the concrete bottom, it fell on the opposite side to what was expected, hitting the person and crushing
his lower limbs. Following complications at the hospital, he died on 12 September.
Elements to consider :• Subcontractor
• Safety design for the specific job
• Availability of HSE documents
• Supervision availability
• Different methodologies of cutting
operations between the first three tanks
and the final one
• Contractor qualification process
• Trained and specialised person (20 years
experience)
Initiated actions: • Official investigation is underway
12 September 2020 – Fenice Mirafioni Site, Turin (Italy) - Edison
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
#onlytogether16
• Risk assessment & Point Of Work Risk Assessment
• Exclusion Zones
• Clear and relevant information and instructions
• Prior to any lift ensure that checks have been carried out and signed off by a competent Supervisor (permit)
• Communication
Safety Stand Down 2020 – Lifting Operations key considerations
Always comply with the life-saving rule:
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
Work at height
17 Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
18
As part of a solar panels installation at a customer’s home, Franck Boulant, 60, fell from a ladder.
Following his lunch break, he noticed that a tile was incorrectly positioned and went to fix it, using the lower
part of the ladder to access it. The ladder slipped with him on it, causing him to fall on his head.
Elements to consider:• Subcontractor
• Person: 40 years experience, 1 week in that company• Site: Not always possible to build a scaffold (private property; B2C)• Rainy conditions
• State of the ladder• Point of work Risk Assessment
• Work at height and risk perception
Entity follow up actions:• Doubling audits and site SHEQ visits by internal supervisors and external audit
provider• Sub-contractors Safety scores status followed up with potential sanctions (breaches)• Risk perception and work at height programme
• Helmet with chin strap - mandatory• Innovative ways of secure anchor points with catapult system
27 January 2020 – Plaisir (France) - EDF ENR
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
19
Lon LUGA, an independent roof worker for MB Construct (a subcontractor for Luminus Insaver), fell from a roof
(12 meters) while working on a B2B solar panels installation.
After their lunch break, the team of five went back on the roof to finish the last part of the roof. Shortly after
afterwards, Mr Luga went to a corner of the roof to continue the work, and fell off.
Elements to consider:• Lack of formal approval from Insaver regarding the use of a
subcontractor • No appointed external safety coordinator • Lack of risk assessment and dynamic point of work risk assessment
• Site inspections and inspector• Planning, Control & Responsibilities
• Work at Height Risk perception
Entity follow up actions :• Contract partner relationships: charter, review of contracts• Empower project supervisors by management to stop work if unsafe
situations detected• Site visits by Insaver management (together with project supervisor)• W@Height task force• 2020 EDF Group Fall From Height Learning Expedition sponsor
10 April 2020 – Boon-weets building (Belgium) – Luminus Insaver
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
#onlytogether20
• Adequate supervision in place for all work activities
• Safe access / egress assessed at the place of work via the Point of Work Risk Assessment
• Think collective protection prior to Personal Protective Equipment (PPE)
• Where the risk of a fall from height cannot be
eliminated, ensure adequate means of protecting people
• Ladder V scaffolding
• The right material for the job
• Material procedure
Safety Stand Down 2020 – Work at height key considerations
Always comply with the life-saving rule:
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
What we can all do
21 Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
#onlytogether
Be proactiveKeep focus on Zero Harm, Life Saving Rules and Simple ActionsKeep switched on to these very real and relevant risksEveryday actions - Reporting near missesFeeding useful information into your working group contactsLearning from events a sharing learning locallyKeep in touch through your local HESAC or safety teamVisit the eNZO pages to view event briefs and comment
22
Safety Stand Down 2020 – What can we all do
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
23 Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
24
Share your feedback :
Yammer #2020StandDown feed
Speak to your HESAC representative
Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved
25 Safety Stand Down 2020 #onlytogether | © 2020 EDF Energy Ltd. All rights Reserved