P.M. DMH. P.M. DA. P.M. DCC. P.M. DE. P.M. DCM. P.E. Rolling process. Process Coordinator. P.E. Combustion process. P.C. WTP process. P.E. Meltshop process. P.E. Substation, HV - LV power distrib. P.E. Civil & structural des. P.E. Mech. Equipment eng. P.E. L.V. Distribution. - PowerPoint PPT Presentation
Citation preview
Safety Officier
Planning & quantity Survey
Quality Assurance Eng.Accounting & Cost control
Building erection
Mechanical equipment
Reheating furnacePiping and aux. Systems
HV / LV power distribution & Automation system
Mechanical
Electrical
Piping
Director, Projects
Sales Manager
Export Finance & L/C Manager
Legal Dept. Manager
Procurement Manager
Quality Manager
Client Project Manager & Project Management Staff
P.M. DMH
P.E. Rolling process
P.E. Mech. Equipment eng.P.E. Hydraulics Lubrication
P.E. Piping Utilities
P.E. Instrumentation
P.M. DCC
P.E. Combustion processP.E. L.V. Distribution
P.E. Automation
P.M. DE
P.C. WTP process
P.E. Civil & structural des.
P.E. Interconnecting pipingP.E. InstrumentationP.E. HVAC
P.E. Firefighting system
P.E. Compressed air system
P.C. Workshop laboratory eq.
P.C. Cranes
P.M. DA
Process CoordinatorP.E. Substation, HV - LV power distrib.P.E. Interconnecting cablingP.C. Automation system level 1
P.C. Automation system level 2
P.M. DCM
P.E. Meltshop process
P.E. Mech. Equipment engin.
P.E. Hydraulics lubrication
P.E. Piping utilitiesP.E. Instrumentation
Site Technical Office Field Engineers
Civil and infrastructure construction Supervisor
Erection Supervisors
Startup and commissioning Team
Material Man
Client Site manager & Staff
P.C. Spare parts
P.C. Packing & Shipping
P.C. Training
P.C. Operation, maintenance & safety manuals
P.C. Expediting / testing (E LE) P.C. Quality Control
P.C. Manufacturing & expediting
P.C. Procurement cc
Danieli Construction & Commissioning (UMAC)P.M. Construct Erection & Commiss.
Site Manager
Deputy Site Manager
Danieli Engineering (DE) Project Manager
Project Planning & Control
Contract Administr.
Automation
Aux. Systems
Turn-key project Key-Personnel Organisation chart
SCHEDULE (LEV. III)
WORK BREAKDOWN
PRICE BREAKDOWN
JOB POSITION (TPC/JET)
INSPECTION TEST SCHEDULE (ITS)
CASH FLOW
(PART 2) (PART 3)
RESPONSIBILITY
CONTRACT & FINANCING TOOLS REQUIREMENTS
MASTER PLANT LIST
TECHNICAL SPECIFICATIONCONTRACT SCHEDULE PAYMENT METHOD/FORMALITIES
PICS (PROJECT INTEGRATED CONTROL SYSTEM)
General Management Flow Chart (part 1)
OUTSIDE (E/LE) INSIDE (I)
(PART 3)
ENGINEERING (DOCUMENT MANAGEMENT SYSTEM - DMS)
TECHN. DOCUMENTS
JOB POSITION (TPC / JET) from part 1
MATERIAL REQUIR.
PROCUREMENT
PURCHASE & ORDERS
MANUFACTURING
General management Flow Chart (part 2)
INSPECTION & TESTING (NOI/IRE/LOC/QCTM)
OUTSIDE (E) INSIDE (I/LE)
INSPECTION TEST SCHEDULE (ITS)
(FROM PART 1)
CERTIFICATIONS (IRE)
SHIPPING & INVOICING
CERTIFICATION (IRP)
PACKING LIST
INSPECTION PLANNING
NOTICE OF SURVEILLANCE (NOS)
PACKING
COMMISSIONING
JOB POSITION (TPC/JET) (FROM PART 1)
RELEASE CERTIFICATE (RC)
PRICE BREAKDOWN (FROM PART 1)
MANUFACTURING (FROM PART 2)
INSPECTION PLANNING
NOTICE OF INSPECTION (NOI)
CONSTRUCTION & ERECTION WORKS SITE PROGRESS MANAGEMENT (SPM)
General management Flow Chart (part 3)
Master Plant List (esempio)
Estratto Livello 3: Plant Unit 31 (Typical)
Programmazione di Livello 3 (Typical)
Programmazione di Livello 4 (Typical)
Cut-off date: Progress (Typical)
planned progress
0
10
20
30
40
50
60
70
80
90
100
2002 2003 20042001
%
N D J MF A M J J A S O N D J MF A M J J A S O N D J MF A
Valide per tutte le discipline e attività
Curve pianificate di avanzamento (typical)