Safety, Health and Environmental
Professional
From Safety Leader to Business Partner
William Lenczuk, MPH, CSP, CIH
SENY 04.10.2013
Hurricane Sandy
4/11/2013
NYC Rapid Repairs Program
• Mobilized at Floyd Bennet Field (Brooklyn)
11/19/2013
– NYC Craft: electricians, plumbers, laborers,
steamfitters,
– TPC employees from nearly all BU’s and
– Medical facility (D/A Testing and
medical/case management)
• Within 2 weeks ~ 500 people on the ground with
~ 200 vehicles. 4/11/2013
NYC Rapid Repairs Program
• Shelter in Place (within 4 days)
– Assessment (including ES&H)
• Plus – if needed, Hazard communication,
Asbestos, lead paint and mold etc.*
– Provide heat
– Provide hot water
– Restore electrical service
– Temporary home/apartment exterior, e.g.
roofing system. 4/11/2013
NYC Rapid Repair Program
• 4 month program provided service to
19,000 families
~ 16, 000 homes/apartments
Returned ~ 158 families/day
NYC DEP Safety metrics of the 6 plus
contractors with over a million hours worked
DART Cases – 0.79 (non cii adj) 26%
Total Recordable Case Rate – 2.62 (non cii adj)
43% (CII, 2003)4/11/2013
Suspect ACM
4/11/2013
Steam Boiler circa 1930’s
4/11/2013
Basement not cleared for work…
4/11/2013
Debris everywhere…
4/11/2013
ACM …
4/11/2013
Debris containing mixed waste in addition to other
hazards present…
4/11/2013
New Hot Water Heater – ACM and Lead Paint
4/11/2013
Resilient Floor tile containing (ACM)
4/11/2013
Risk Management
• Hazards
– The usual suspects + Asbestos, Mold and Lead
Paint.
• Vulnerability
– Increased injuries and severity (work day/week
schedule) timely reporting severity of injury,
motivation
4/11/2013
Risk Management
Risk = Hazard x Vulnerability
Risk Perception = Hazard x Outrage
4/11/2013
Opportunity
• To demonstrate safety does not have to be
sacrificed to a achieve production and visa
versa by SHE Professional providing
leadership in 4 key areas…
– Strategic
– Situational
– Tactical
– Emergent
4/11/2013
Disaster/Hazard Communication
• On site Medical facility,
• Respiratory Protection,
• Hazards anticipated
• Unknown hazards questions concerns,
evaluation and frequent updates
4/11/2013
SHE - Value
• Performance is in alignment (level of
effort) with client and corporate goals and
objectives with regard to risk mitigation
• Communication
– Uncertainty
– Mixed messages
– Conflicting and contradicting information
– 10% of the population with preconceived
4/11/2013
SHE - Value
Innovation distinguishes between a leader
and follower…
Steve Jobs
4/11/2013
Questions?
• Thank You!
4/9/2013
References
Portions of the modified Kaiser Model for Emergency Response
Hazard Vulnerability Analysis (HVA) was used for a reality
check using modified Kaiser Model
http://www.calhospitalprepare.org/hazard-vulnerability-analysis
The Construction Industry Institute (cii, 2003) Owners’ Role in
Construction Safety, Research Summary 190-1, University of
Texas, Austin.
http://construction-institute.org/catalog.htm
Some portions of the modified Kaiser Model for Emergency Response Hazard Vulnerability Analysis (HVA) was used for a reality check the modified Kaiser Model http://www.calhospitalprepare.org/hazard-vulnerability-analysis