Alberta Construction Safety Association
SAFE WORK PRACTICE
TITLE Cold Cutting Plant Piping
GENERAL Protecting workers from injuries associated with cold cutting process
APPLICATION When required to cold cut a line, necessary steps must be taken tominimize risk to personnel and enironment!
PROTECTIVEMECHANISMS
Safe work procedure"round disturbance process#nironmental legislationPP##$P %#mergency response plan &'S(SW)'*S
SELECTION
AND USE
As per safe work procedure#nironmental legislation
SUPERVISOR
RESPONSIBILITY
Superisors are responsible to facilitate and+or proide properinstruction to their workers on protection requirements and training
)azard assessmentWORKER
RESPONSIBILITY
! #nsure barricades and warning signs in place!-! #nsure line is secured and properly supported!.! #nsure proper body position for cutting!/! #nsure proper cold cutter is utilized!0! Contain product seepage!1! #nsure pipe segment is remoed from area!2! #nsure to remoe sharp edges as soon as pipe segment is taken
out!3! Protector caps or plastic thread protectors to be utilized!4! #nsure adequate method for plugging line based on site specific
work process and product!5 6he information presented in this publication is intended for general use and may not apply to eery circumstance! *t isnot a definitie guide to goernment regulations and does not reliee persons using this publication from theirresponsibilities under applicable legislation! 6he Alberta Construction Safety Association does not guarantee the accuracyof, nor assume liability for, the information presented here! *ndiidual counselling and adice are aailable from the
Association!
SWP777048+