    SADC(SECONDARY AIR DAMPER CONTROL)

  • 7/31/2019 Sadc Lecture

    2/15

    23 May 2012 PMI Revision 00 2

    SADC STANDS FOR

    SECONDARY AIR DAMPER CONTROL

    It consists of a number of dampers located atvarious elevations of fuel compartments anddampers in between the fuel compartments. Thesedampers are required to modulate as a function of

    certain process variables.

  • 7/31/2019 Sadc Lecture

    3/15

    23 May 2012 PMI Revision 00 3

    SADC is divided into two main classifications depending onthe type of modulation they are required to perform.

    Fuel Air Dampers : Modulated in proportion to the rate of

    fuel fired in that elevation. Auxiliary Dampers: group-controlled in proportion to the

    wind box furnace differential pressure.

    Auxiliary air dampers are modulated to maintain a fixed

    differential pressure between the wind box and the furnace,whereas the fuel air dampers are modulated in proportion tothe rate of fuel fired in that elevation.

  • 7/31/2019 Sadc Lecture

    4/15

    COAL AIR DAMPERS:

    A, B, C, D, E, F, G, H, J, K.

    OIL AIR DAMPERS :

    AB, CD, EF, GH, JK.

    AUX. AIR DAMPERS:

    AA,BC,DE,FG,HJ,KK.

    OVERFIRE DAMPERS:

    OFA(U), OFA(L).

    23 May 2012 PMI Revision 00 4

  • 7/31/2019 Sadc Lecture

    5/15

    23 May 2012 PMI Revision 00 5

  • 7/31/2019 Sadc Lecture

    6/15

    23 May 2012 PMI Revision 00 6

    EACH DAMPER IS EQUIPPED WITH A PNEUMATIC

    POWER CYLINDER SUITABLE FOR 0.2 TO 1 KSCSIGNAL INPUT.

    1-FOR 1 KSC SIGNAL INPUT -----AIR DAMPER TO CLOSE.

    2-FOR 0.2 KSC SIGNAL INPUT ----AIR DAMPER TO OPEN.

    3- LOSS OF SIGNAL ---------------- DAMPER TO OPEN.

    * THE BOTTOM ELEVATION OF S.A.D IS EXCLUDEDFROM ALL CONTROL SYSTEM EXCEPT FOR OPENPOSITION TO ID FAN START SEQUENCE ANDINTERLOCKS.

  • 7/31/2019 Sadc Lecture

    7/15

    SAD CONTROL WHEN BOILER LOAD< 3O% BLI, ALL SAD CONTROL UNITS WILL

    BE ON AUTOMATIC CONTROL (i.e. ON LOGIC OVERRIDE) TOMAINTAIN THE DESIRED D.P. BETWEEN WIND BOX TOFURNACE.

    WHEN BOILER LOAD REACHES 30% OF BLI THE BMS LOGIC WILLCOMMAND CLOSE THE DAMPER (SAD) WHICH DOES NOT HAVEAN ASSOCIATE MILL IN SERVICE .FROM 10 SEC INTERVAL BMSLOGIC CLOSE THE SAD, STARTING FROM TOP ELEVATION TOBOTTOM ELEVATION.

    OIL BURNER DAMPER:WHEN OIL GUN IS IN SERVICE, ITS DAMPER IS FULL OPEN.AFTERREMOVING OIL GUN, THE DAMPER OPENING IS SYNCHRONIZEDWITH OTHER SEC. AIR DAMPER POSITION.

    23 May 2012 PMI Revision 00 7

  • 7/31/2019 Sadc Lecture

    8/15

    COAL AIR DAMPERS: THEY ARE OPERATED AS PERAUTO DEMAND FROM FEEDER SPEED.

    AUX. AIR DAMPERS: THEY ARE OPERATED IN ORDERTO MAINTAIN WINDBOX TO FURNACE DP TO100MMWCL.

    OIL AIR DAMPERS: WHEN OIL GUN IS IN SERVICE,THEY ARE OPENED TO 30%, ELSE THEY WILL TAKETHE DEMAND OF AUX. AIR DAMPERS, WHEN OIL IS

    NOT IN SERVICE.

    OFU / OFL: THEY ARE OPERATED IN ORDER TOCONTROL SOX/NOX EMISSION FROM THE FURNACE,WHEN TOP MILL IS IN SERVICE.

    23 May 2012 PMI Revision 00 8

  • 7/31/2019 Sadc Lecture

    9/15

    23 May 2012 PMI Revision 00 9

    SYMBOLS

  • 7/31/2019 Sadc Lecture

    10/15

    23 May 2012 PMI Revision 00 10

  • 7/31/2019 Sadc Lecture

    11/15

    23 May 2012 PMI Revision 00 11

  • 7/31/2019 Sadc Lecture

    12/15

    23 May 2012 PMI Revision 00 12

  • 7/31/2019 Sadc Lecture

    13/15

    There are 88 nos. of pneumatic actuators installedin Secondary Air Damper Control (SADC) systemof each 500 MW unit which are used to maintain

    windbox to furnace DP and Fuel air support forcoal and oil elevations. These actuators areoperated through 22 nos. E/P converters, eachsupporting 4 Power Cylinders in each elevation.

    23 May 2012 PMI Revision 00 13

  • 7/31/2019 Sadc Lecture

    14/15

    23 May 2012 PMI Revision 00 14

    DOUBLE ACTING POWER CYLINDER

    IS USED FOR SADC ACTUATORS

  • 7/31/2019 Sadc Lecture

    15/15

    23 May 2012 PMI Revision 00 15