SA#: 05-037
REVISION: Release
REVISION DATE: N/A
ISSUE DATE: 6/3/05
AUTHOR: M. Zink
Customer Engineering • Electro-Motive Diesel, Inc. • 9301 W. 55th Street • LaGrange, IL 60525
SERVICE ADVISORY -
Undesired Emergency and Penalty Brake Applications due to
Blanking ICE ScreenForm CEF-001 Rev A. 4/5//0
Page 1
Copyright Electro-Motive Diesel, Inc.. All rights reserved. Neither this document, nor any part thereof, may be reproduced or reprinted without the prior written
consent of the Electro-Motive Diesel, Inc.. Contact EMD SDO office.
Locomotive(s) Affected:
Union Pacific 8000 – 8308
Union Pacific 8500 – 8521
Purpose:
The purpose of this Service Advisory is to direct Field personnel in gathering information that will further
an investigation into why units go into an undesired penalty or emergency brake applications. This
problem has also been reported in conjunction with the Integrated Cab Electronics (ICE) Consolidated Cab
Computer (CCC) shutting down for four (4) to six (6) minutes and may also be linked to the ICE screens
going blank.
Action Required:
In the event of an ICE equipped locomotive having undesired penalty and emergency air brake applications
and is also reported as having its screens going blank, please perform the following actions while the unit
is running. A worksheet has been provided on the next page for your convenience, please fax this to Mike
Zink at (708) 387-5795.
1. Check to see if the Rockwell Train Power Supply (TPS) circuit breaker (located on the front of the
TPS) has tripped, shown in Figure 1.
2. Check the connections on the TPS to ensure a good connection.
3. Ensure that the TPS is secured in its location and tight in the Train Equipment Unit (TEU) cabinet.
4. Measure and record the ICE Blower current with a clamp-on amp meter. This can best be
accomplished by measuring the wire tagged “BLMP” connected on TB3 #3 terminal, shown in
Figure 1, inside the Rockwell TEU cabinet.
5. If ICE Blower filters are dirty, remove and return the filter elements (EMD #: 40041374) in a
plastic bag so that any captured debris is not lost to Mike Zink in LaGrange. This filter is located
on the backside of the Engineer’s console in the vestibule area, as shown in Figure 2.
6. With the ICE blower filter removed, inspect the ICE Blower for correct blower wheel rotation. The
blower wheel should rotate clockwise, as shown in Figure 3.
7. Inspect the ICE Blower ducting to ensure that there are no restrictions. The ducting runs along the
bottom and left hand side of the TEU.
8. Move the TPS from its location and feel for cooling air coming from the air manifold, shown in
Figure 4.
9. Download the event recorder and EM2000 archives. Send the event recorder download to Mike
Zink at [email protected].
10. Contact the local Wabtec representative for download of the Consolidated Cab Computer (CCC).
Send this archive to [email protected] as well.
11. If no other defects are found, replace the TPS (EMD New #: 40068673, UTEX 40103589) and ICE
Blower assembly (EMD New #: 40041319, UTEX 40064469) and call Bob Farar at (402)544-2397.
8/10/2019 SA-05-037 Undesired Emergency and Penalty Brake Applications Due to Blanking ICE Screen
http://slidepdf.com/reader/full/sa-05-037-undesired-emergency-and-penalty-brake-applications-due-to-blanking 2/4
SA#: 05-037
REVISION: Release
REVISION DATE: N/A
ISSUE DATE: 6/3/05
AUTHOR: M. Zink
Customer Engineering • Electro-Motive Diesel, Inc. • 9301 W. 55th Street • LaGrange, IL 60525
SERVICE ADVISORY -
Undesired Emergency and Penalty Brake Applications due to
Blanking ICE ScreenForm CEF-001 Rev A. 4/5//0
Page 2
Copyright Electro-Motive Diesel, Inc.. All rights reserved. Neither this document, nor any part thereof, may be reproduced or reprinted without the prior written
consent of the Electro-Motive Diesel, Inc.. Contact EMD SDO office.
Background:
There have been several reports from the Union Pacific of instances where units have gone into either
penalty brake applications (if lead unit in conventional mode or distributed power lead consist) or
emergency brake applications (if in lead unit of distributed power remote consist). Event recorder
downloads of these events show that the event recorder had lost power and then later shows the CCC
powering back up. For these reasons and the reported screen blanking mentioned earlier, the investigation
has focused on the TPS and environmental factors that may affect its performance.
Figure 1: TPS and TB3 in TEU
Figure 2: ICE Blower Filter Location
Figure 3: ICE Blower Squirrel Cage Figure 4: TPS Air Manifold Outlet
TPS
Circuit
Breaker
Terminal
Board #3
Rotation
Air Flow
8/10/2019 SA-05-037 Undesired Emergency and Penalty Brake Applications Due to Blanking ICE Screen
http://slidepdf.com/reader/full/sa-05-037-undesired-emergency-and-penalty-brake-applications-due-to-blanking 3/4
SA#: 05-037
REVISION: Release
REVISION DATE: N/A
ISSUE DATE: 6/3/05
AUTHOR: M. Zink
Customer Engineering • Electro-Motive Diesel, Inc. • 9301 W. 55th Street • LaGrange, IL 60525
SERVICE ADVISORY -
Undesired Emergency and Penalty Brake Applications due to
Blanking ICE ScreenForm CEF-001 Rev A. 4/5//0
Page 3
Copyright Electro-Motive Diesel, Inc.. All rights reserved. Neither this document, nor any part thereof, may be reproduced or reprinted without the prior written
consent of the Electro-Motive Diesel, Inc.. Contact EMD SDO office.
Unit: _______________ Inspected By: ________________________________
Location: __________________________________ Date: ____________
Initials Item
Did the TPS circuit breaker trip? Yes No
TPS connections good? Yes No
TPS secured in correct location? Yes No
Measured ICE Blower current. Amps
ICE Blower filters removed? (EMD #: 40041374) Yes No
ICE Blower has correct rotation? Blower rotates clockwise. Yes No
Any ICE Blower duct restrictions? Yes No
Good air flow from TPS air manifold? Yes No
Event recorder downloads sent? Yes No
EM2000 downloads sent? Yes No
CCC download sent? Yes No
TPS replaced? (EMD New #: 40068673, UTEX 40103589) Yes No
ICE Blower replaced? (EMD New #: 40041319, UTEX 40064469) Yes No
Comments:
Please fax sheet to Mike Zink at (708)387-5795
(Please circle)
Train Power Supply (TPS) and Intergrated
Cab Electronics (ICE) Inspection Sheet
8/10/2019 SA-05-037 Undesired Emergency and Penalty Brake Applications Due to Blanking ICE Screen
http://slidepdf.com/reader/full/sa-05-037-undesired-emergency-and-penalty-brake-applications-due-to-blanking 4/4
SA#: 05-037
REVISION: Release
REVISION DATE: N/A
ISSUE DATE: 6/3/05
AUTHOR: M. Zink
Customer Engineering • Electro-Motive Diesel, Inc. • 9301 W. 55th Street • LaGrange, IL 60525
SERVICE ADVISORY -
Undesired Emergency and Penalty Brake Applications due to
Blanking ICE ScreenForm CEF-001 Rev A. 4/5//0
Page 4
Copyright Electro-Motive Diesel, Inc.. All rights reserved. Neither this document, nor any part thereof, may be reproduced or reprinted without the prior written
consent of the Electro-Motive Diesel, Inc.. Contact EMD SDO office.
(For EMD Office Use Only)
Approvals (Required):
Approval
Needed
Y N
Approver Approved
Y N N/A
Approved By Date
CES/CEM Chris Harkness 6/3/05Warranty
Marketing
Service Advisory – General Classification (Select All that Apply):
GENERAL INFORMATION: This document is being issued to provide general information to the Customer Care Field Organization.
REQUEST FOR FIELD SUPPORT: This document is being issued to request Customer Care Field resources for the purpose of information/data
collection in support of a current field issue investigation.
PRELIMINARY: This document is being issued to provide notable preliminary findings with regard to a current field issue. It will be followed by the
issuance of an appropriate revision, or revisions, as the investigation progresses through closure, or more information becomes available.
FINAL: This document is being issued to provide final findings and recommendations on the proper handling of a current field issue. This document is
intended to provide official closure of the subject field issue.