72
www.rwandaredcross.org

Rwanda Red Cross Annual Report 2012

Embed Size (px)

DESCRIPTION

Rwanda Red Cross Annual Report 2012 First Aid Survival Africa

Citation preview

1www.rwandaredcross.org

2

Rwanda Red Cross

Rwanda Red Cross is an autonomous organization founded in 1962 as a

humanitarian organization auxiliary to the public authorities in accordance

with the Geneva Convention. RRCS has been recognized by the Rwandan

Government in 1964 through the presidential decree number 8/13 of 29

December 1964.

Our Vision

A healthy, self-sustained and resilient community

Our Mission

We are a national humanitarian organization aimed at preventing and

alleviating human suffering for the most vulnerable people. We work in

accordance with the fundamental principles of the Red Cross to strengthen

community capacities as they respond to their own needs.

Our Strategic objectives (2012-2016)

• Improved organizational and institutional capacity to deliver

effectiveandefficientcommunityorientedservices

• A strong and well established profile for Rwanda Red Cross

Society which promotes humanitarian values and International

humanitarian law.

• Strengthened community resilience in developing effective

risk reduction and management strategies to address potential

emergency situations

• Enhanced capacity by the communities to respond and sustain

the health and social care needs of vulnerable people

3

Contents

CHAPTER

CHAPTER

CHAPTER

CHAPTER

CHAPTER

Communication Program 55Finance and Administration 66

Health & Care Program 38Orphans & Other VulnarableChildren (OVC) 49

Disaster Management 25Restoring Family Links 32First Aid 37

Planning, Monitoring & Evaluation 17Resource Mobilization 20

Highlights 4Abbreviations & Acronyms 6

Organizational Development 8Youth & Volunteer Management 11

4

In order to achieve our mission, Rwanda Red Cross Society

continue to serve the most vulnerable people by developing and

implementing programs to alleviate human suffering countrywide,

through mobilizing and supporting the most vulnerable people

as highlighted in the strategic plan 2012-2016. With support from

its partners the National Society commits itself to find out most

suitable mechanism and approaches of community resilience to

deliver effective services to the vulnerable communities. This has

strengthened the decentralized structures of the National Society

thus making them more responsive to the needs of vulnerable

persons in target areas, The concept of empowering the Red

Cross structure and the community for self sustaining is creating

community responsibility and ownership

Assistance and protection to vulnerable people is the humanitarian

mission that the Rwanda Red Cross shares with all the International

Movement of the Red Cross and Red Crescent Societies. To fulfill

this mission, Rwanda Red Cross relies on thousands of volunteers

who commit their time and share their expertise in various fields.

We are extremely grateful to them. In this period, when disasters

increase, we are required to do more and work with more people

and organizations to prevent and reduce disaster risks or rescue

those whose lives are endangered by catastrophes. To do so,

desire, commitment, voluntary service and partnership are

essential. Rwanda commendable achievements in environmental

protection and poverty reduction that we are happy to having

contributed to in the last ten years illustrate how important it is

to adhere to the same positive objectives. Thousands of trees

were planted by Red Cross volunteers but our efforts must be

sustained to reach greater results.

Mr. Apollinaire KARAMAGAThe Secretary General

“we are required to do more and work

with more people and organizations

to prevent and reduce disaster risks

or rescue those whose lives are

endangered by catastrophes. To do

so, desire, commitment, voluntary

service and partnership are essential.

Rwanda commendable achievements

in environmental protection and

poverty reduction that we are happy

to having contributed to in the last ten

years illustrate how important it is to

adhere to the same positive objectives.

Thousands of trees were planted by Red

Cross volunteers but our efforts must be

sustained to reach greater results.”

Thanks to partnership, we have also successfully contributed to giving food, NFI and homes to many families

who returned from exile and refugees from DRC or whose houses were destroyed by disasters. The branch

disaster response teams were timely ready for interventions during various events such as, different disasters

in all Districts especially in Northern, Western, Southern and Eastern provinces, while preparedness activities

Highlights

5

were increased as well. Response and recovery activities

around the targeted areas in all provinces. In 2012, the main

achievements of Disaster Management Program were focused

on preparedness of disaster response teams, the disaster risk

reduction at community level, food security initiatives in plot

villages, disaster relief, recovery, coordination and monitoring of

DM activities at all levels.

RRCS has put more emphasis on strengthening the community

resilience activities in 270 pilot cells using the ‘Model Village

approach” and increasing local committees’ capacity to meet their

duties. The Model Village Approach has proved to be an important

tool that allows active involvement of the local communities to

assess their priorities, and find effective and long lasting solutions

for their own problems. It is through the network of volunteers all

over the country that contributed to the reducing of the number

of deaths, illnesses and impact of diseases and public health

emergencies through community based health and first Aid

activities at community level as well as blood donation, nutrition

and catering for maternal and infants health.Also we much focus

on dissemination and promotion of principles and humanitarian

values with the global agenda of promoting respect for diversity

and human dignity, and reducing intolerance, discrimination and

social exclusion

The OVC program is an integrated program supporting orphans

and other vulnerable children in the country focusing on 6 minimum

“On behalf Rwanda Red Cross we express

our heartfelt gratitude and acknowledge

particularly the support provided by the

following partners: The Government of

Rwanda at central and decentralized

level, the IFRC, the ICRC, American

Red Cross, Belgium Red Cross, Chinese

Red Cross, Danish Red Cross, European

Union, Finnish Red Cross, German Red

Cross, Global Fund ,Japanese Red Cross,

Norwegian Red Cross, Spanish Red

Cross, Italian Red Cross and Swedish Red

Cross”.

Dr. Bernard NZIGIYEThe President of Rwanda Red Cross

package domains (health, nutrition, education, protection, psychosocial, socio economic) and capacity building

for Red Cross local committees. Rwanda Red Cross Society expressed its wholehearted appreciation to all

those who timely and constantly, committed their work, time and funds or any other contribution to the fulfilment

of its mission. Many people need to be assisted on a consistent basis and your contributions help to make a

difference in our interventions countrywide and meet the 2020 strategic plan ``saving lives, changing minds’’.

“The concept of community resilience and disaster risk reduction with performance contract (Imihigo) initiated

by Rwanda Red Cross Society still proves that there has been more commitment and tangible participation in

the results achieved by 2012”

6

Abbreviations and Acronyms

BCA : Branch Capacity Assessment

BDRT : Branch Disaster response Team

CBHFA : Community based Health and First Aid

BTS : Back to the Sender

DM : Disaster Management

GOR : Government of Rwanda

HIV/AIDS :Humanimmunevirus/AcquiredImmuneDeficiencySyndrome

HQ :Headquarters

ICRC :InternationalCommunityofRedCross

IFRC :InternationalFederationofRedCrossandRedCrescent

IHL :InternationalHumanitarianLaw

IT :InformationandTelecommunication

LVP :LakeVictoriaProgram

MV :Modelvillage

MINALOC :MinistryoflocalGovernment

MOH : Ministry of Health

OD : Organizational development

OVC :OrphansandVulnerableChildren

OVG :ObservatoiredeGoma

PHAST : Participatory Hygiene and Sanitation Transformation

PLWHA :PeoplelivingwithHIVandAids

PMER :PlanningMonitoringEvaluationandReporting

PNS :ParticipatingNationalSociety(ies)

RC/RC : Red Cross/Red Crescent

RCM : Red Cross Massage

STI :SexuallyTransmittedinfections

RDRT : Regional Disaster Response Team

7

RFL :RestoringFamilyLinks

RH : Reproductive Health

RRC : Rwanda Red Cross

RRCS : Rwanda Red Cross Society

STDs : Sexually transmitted diseases

VCA :VulnerabilityCapacityAssessment

NS :NationalSociety

NFI :NonFoodItems

RDHS : Rwanda Demographic Health Survey

RM : Resource Mobilization

DRR : Disaster Risk Reduction

SP : Strategic Planning

UNHCR :UnitedNationsHighCommissionforRefugees

UNICEF :UnitedNationsChildrenFund

UN :UnitedNations

WATSAN :WaterandSanitation

WASH : Water Hygiene and Sanitation

8

Overview The Rwanda Red Cross activities are implemented

through decentralized structures known as branches

using thenetworkof its volunteersandRRCSfield

officers with support from different Red Cross

staff from head quarter. And The Organizational

Development plays a key role in capacity building

andbranchcoordination. Itorganizesandsupports

all branches in different areas like, training of

members and volunteers in organizational skills

and good governance, construction of offices and

distributionofofficeequipment, Italsopromotes

the cooperation within the RRCS branches and

facilitates exchange and cooperation between RRCS

andothersisterNSintheRegion.Thedepartment

is responsible for the coordination of youth program

and it supports all other departments to implement,

coordinate, monitor and evaluate the planned

activities.

Program SummaryProgram purpose

“Improvedorganizationalandinstitutionalcapacity

todelivereffectiveandefficientcommunityoriented

services.”

The Organizational Development is one of the 4

focusareasoftheNSaccordingtotheNSStrategic

Plan 2012-2016. Under this srategic goal thre are 5

main components which are stated as follows:

1. GovernanceandLeadership;

2. Members,YouthandVolunteermanagement;

3. Planning,Monitoring,Evaluationand

Reporting(PMER);

4. Resourcesmobilization;

During the 2012 exercise, the activities have been

implemented on basis of the RRC 2012 Action plans

and in line with the new strategic plan 2012-2016.

The among priorities were the implementation of

ORGANIZATIONAL DEVELOPMENT

9

77%322

87%360

92%382

95%395

98%406

2008

year Red cross committees Percentage

1 2 3 4 5

2009 2010 2011 2012

planned model village activities in 540 pilot villages

at community level which aims at strengthening the

community resilience and disaster risk reduction

activities and increasing local committee capacity

to meet their duties.

Community members in targeted 540 model villages

are fully involved and aware of their own risks,

vulnerabilities and capacities to act on their own

issues.

Also at field level, activities have been achieved

based on annual action plans “Performance contacts

(“IMIHIGO”) developed by 30 District committees.

These plans have been developed based on the

results of VCA exercises conducted in 540 villages

country wide at the end of 2011, and analysis was

done in participatory way involving community

members, local leaders and Red Cross volunteers

fromtheproblemsidentificationphase,analysisand

planning process. These activities were supported

by:IFRCSwedishRedCrossaswellasBelgiumRed

Cross French Community.

Programme outcomes1. Strengthened governance and leadership

structuresofRRCS;

2. Improvetheprovisionofyouthleadership

opportunities and promotion of best

practices in volunteer management at all

levelsofRRCS;

3. Enhancedcapacitiestodeliverresultoriented

programs through improved planning,

monitoring, evaluation and reporting

mechanisms;

4. Increasedanddiversifiedsourcesoffundsfor

sustainabilityofRRCScoreprograms;

5. Improvedfinancial,administrativeand

management systems of RRCS.

Progress towards outcomes1.1. Programme component 1. Governance and leadership1.1.1 Strengthened governance and leadership

structures of RRCS Set up and renew of Red Cross

structures and recruitment of new members

Achievements

Inordertoreachthetargetvulnerablecommunities

at grass root level in all districts, RRC has set up and

renewed decentralized structures from cells, sectors

up to district level in accordance to the government

structures,itisinthisregardthat,1074(50%)cells

Redcrosscommittees,406(98%)sectorsRedCross

committees were set up and filled progressively

country wide.

Chart 1: Red Cross sector committees

10

RRC structures were set up and renewed according

to the country administrative structures, from

cells, sectors and then to the district level the 2012

targetwastoreach416(100%)sectorswithRedcross

committees, and Since 2008 to 2012 set up of Red

cross sector committees was progressively increased

as represented in chart 1 above.

From 2008 to 2009 Red cross committees coverage

were360(87%),2009to2010were382(92%),2010

to2011were395(95%)andin2012were406(98%)

coverage, this means that all 406 sectors in

administrative Government structures has Red Cross

committees and these structures acted as Red Cross

Bridge to achieve its 2012 objectives through net

work of Red cross volunteers existing in all cells and

villages country wide

Organisation of statutory and coordina- tion meetings at Branches and central levelEvery quarter, all branch committees organised

statutory meetings with the representatives from

sub-branches/sectors. The objectives of these

meetings are to evaluate quarterly achievements,

plans (Performances contracts) and activities

achieved and also make financial analysis as well

as challenges and sharing the information on other

strategies/ and way forward, these meetings

conducted in all 30 Red Cross branches.

Volunteerswhoareprogramfocalpoints(coaches)at

branchlevelstogetherwithfieldstaffparticipated

also in these meetings particularly to support in

clarifyingonplans,branchesnarrativeandfinancial

reports for better transparency and accountability

Quarterly coordination meetingsFour(4)Quarterlycoordinationmeetingshavebeen

organized at the RRC HQs and brings together staff

from the fieldwith the senior staff of theHQs to

evaluate branch activities implemented, during

these meetings, participants evaluated their

progress implementation of Red cross activities and

branch /District performance Contracts / Imihigo

for the improvement of the quality of services to

thecommunities.Itisalsothroughthismeetingthat

both narrative andfinancial reports are presented

by branch coordinators and branch focal points,

lessons learnt, challenges, best practices were

discussed and recommendations are taken for

further improvement, this has helped branches to

improveintheirqualityreportsandplans

Management key documents at Branch levelsDuring the statutory meeting organised at

Districts levels, participants discussed and shared

information on key documents to understand NS

rules and regulation and conduct their activities

according to theNS constitution.Threeamong six

key documents have been translated in Kinyarwanda

anddistributedtobranches(i.e.statutes,Volunteer

Policy,ProcurementManual)inthisyear

Training of board members and volunteersStructure of 10 volunteers in 540 pilot villages were

put in place and 2160 active volunteers from 216

villagesgainedskills inRedCrossmovement,VCA,

Planning and monitoring of Red Cross activities in

model villages, these trained volunteers are acting

as catalyst in community resilience activities in

model villages.

11

Organization of visits in sub-branches (sector,cell,villageandyouthcommittees)Board members at district level and branch

coordinators paid visit to RRCS sub-committees at

sector, cell and village levels as well as in different

schools to evaluate activities done and conduct

continuous training on leadership and management.

A total of 143 sectors, 270 cells, 540 villages and

96 youth sections in schools have been visited in all

30branches.Inordertomobilizeformermembers

to repay membership fees and validating their

membership cards, resolve problems found in sub

branches., 226 visits were realized in all 30 branches

and24identifiedcases/problemswereresolved

Red Cross guidelines eg volunteer management

guidelines and volunteer policy were distributed in

all 30 branches and this helped in management of

volunteers.

1.1.2Increasedcapacitytofacilitatethedeliveryofefficientandeffectivecommunity focused services at HQ and Branch levelTable showing Number of Red Cross branches that have own office

• 6RedCrossbrancheswereequippedwith5

new motorcycles to facilitate branch

coordinators in monitoring activities

• 15outof30RedCrossbrancheshaveitsown

offices

• 15wereequippewithnewnewcomputers

and their accessories

Rwanda Red Cross has managed to construct 15/30

RedCrossofficesin15districts,andthesehasalso

helped to generate branch incomes and cover some

administrationcostslikeCoordinationmeeting,office

stationary and fuel for monitoring branch activities.

1.2. Program component

YOUTHANDVOLUNTEERMANAGEMENT

Youth activities where conducted and

emphasized on mobilization of youth and volunteers to

support the most vulnerable in the community through

the following domains: Environmental protection

and Health; Community services; promotion and

dissemination of Red Cross principles and international

humanitarianlaw(IHL);CooperationandFriendship.

Outcome 2: Improve the provision of youth

leadership opportunities and promotion of best

practices in volunteer management at all levels

of RRCS

1.2.1 RRC members and volunteers recruited and

records well kept at all levels.

Achievements

Recruitment and retention of Red Cross members

‘The number of RRC youth members have increased compared to the adult members and this shows that RRC has a promising future’.

1 5Kigali

12

Sensitization of GS Kanama students by Gicumbi District committee volunteers

Chart 3Adult members recruited 2012

Total recruited Male recruited Female recruited

Youth Recruited and Retention per province

Provinces Youth members recruited Retention of old Youth members Total

Categories

Southern

West

Kigali city

Eastern

Northern

Total

Male

304

119

145

200

58

826

Female

301

153

220

121

60

855

Total New recruited

605

272

365

321

118

1681

Male

121

60

0

69

58

308

Female

128

43

0

64

60

295

Total Retention

249

103

0

133

118

603

Total

854

375

365

454

236

2284

854

Male recruited Total youth recruited Female recruited

425 429

Youth recruited per category ineach province

375179 176 145

365 220 269454

185 116 236 120

1134

2284

1150

TotalNorthEastKigali CityWestSouth

Chart 2 Youth recruited per category ineach province

The chart 3. Above shows that during 2012, A total

1044 new adult members have been registered in

all provinces a among them 520 are female and 524

are male, 912 new recruited and 132 retention/

maintained.

• 3328RedCrossmemberswererecruitedinthis

year,Amongthem;67%wereyouth,33%ofthem

adults. 50.2% female and 49.8% were male and

this shows that Rwanda Red Cross has good future

because of big percentage of youth as members

1.1.2: Increased presence of youth sections/links

in secondary and high learning institutions

AchievementsNew Youth sections in schools set in 2012 in the

secondary schools and high leaning institution, 32

news youth sections were put in place in secondary

school and 270 youth sections elected in pilot cells.

These cell committees with net work of volunteers

mobilized and involved communities in model

villages to identify their own problems and seek

for possible solutions and through this approach

different activities like sate up of hygiene facilities,

13

The youth section distributing soaps to the vulnerable community.

planting of trees, promotion of humanitarian values

etc were done.

Putting in place youth sections in the schools

26 Youth sections have been put in place in secondary

schools examples are, “Lycée de Zaza”, Ngoma

District and are dealing with activities related to

HIV, family reproduction, humanitarian values,

reforestation, hygiene and sanitation promotion in

their schools

1.2.3 Strengthened youth and capacity to

address their own needs

Achievements:Distribution of promotional materials

• 2198 Red Cross T-shirts has been distributed

as promotional materials and motivation to the

differences youth sections, volunteers and committee

to reinforce the visibility of RRC more especially in

modelvillages;

• 399youthandvolunteersparticipated inyouth

camp organized in Rubavu District, and 20 houses

were constructed in favour for the most vulnerable

families

• 150 youth students participated in Kermes

organized at Red Cross head quarter during

holidays.

Visitofyouthsectionsinschools• 6 local youth sections of Mushishiro, Kibangu,

Kabacuzi in Muhanga District and Gacurabwenge,

NyarubakaandRugalikainKamonyiDistricthasbeen

visited and mobilized in RC model villages’ activities,

to improve their support to the most vulnerable in

their community

• 94eventswereorganizedinschoolstosensitize

youth members to continue supporting the RRC

activities and respect RC principles as well as the

RRCSvalues;

• 2 Youth sections of GSNDL Byimana and ES.

Ruhango has been visited and organize the community

work in favor to the vulnerable of MUHORORO model

and distribution to them the soap collected.

Follow up of first aid youth sections trainings in

the schools

Duringthe4thquarter2012,allRRCSYouthSections,

who ended their First aid training, have received

theircertificatesoftraining.Intotal,540certificates

weredistributedatNationallevel.

Mobilizing youth in HolidaysNgomaandKireheDistrictCommitteeshavemobilized

the youth during the 2012 summer holidays. The

purpose of this activity was to sensitize youth and

organize awareness sessions for them on different

topics. And these are realized activities:

14

Ceremony of giving certificates to the students of FAWE Girls School trained in First aid

• 27sensitizationsessionsontheRRCmovement,

reproductive health, drug abuse, HIV and AIDS

andSTDswereorganized;

• 36hygieneeducationalsessionswereconducted

on the model village activities by RRC volunteers.

Sensitization of youth section on Red Cross movement and Model village activitiesTheyouthsectionsofECOSEMusambira;GSGihara;

ETEKA; ACEJ Karama, GS Nyabikenke, Bulinga SS

and ACODES (in Muhanga and Kamonyi Districts)

have been visited and mobilized to be involved

in community activities by helping the identified

most vulnerable people in model villages. During

the visits, different topics were discussed focusing

on the role of youth in RC activities, principle

activities of youth links and Red Cross Movement.

Organization of a “Kermesse” for YouthFrom 22nd to 25th of August 2012, in the Green

Park of Rwanda Red Cross, a “Kermesse” event

for youth was organized to help them enjoy

the holidays before opening of schools. The aim

of this event was to offer a leisure space, more

attractive and relaxing games and develop not

only their potential socio-cultural and sport

skills, but also educational on general knowledge.

Inthisevent,125youthfromKigaliCityparticipated

and received a better coaching, through various

activities like , foot ball competitions, modern and

traditional dances, concerts and cultures games.

Youth at Kermesse activities and ceremonies

1.2.4 Increased number of volunteers serving the

communities

Achievements: InvolvementandmobilizationofYouthandVolunteers

inModelVillageactivities

Youth sections in schools organized community

works in several areas for some marginalized groups

Cyaruzingecell,NderaSector.

• 250 participants of 4 secondary schools in

RubavuDistrict(GSGenda,NyundoSS,SANZARESS)

participated in community work and sensitization on

models village activities and community resilience.

• 300 youth and volunteers of Kayonza and

Rwamagana were mobilized and sensitized in ,RC

values,VIH/SIDAandtheroleofyouthandvolunteers

inimplementationofmodelvillageactivities.Inthat

occasion, 160 sachets of blood were collected by the

BMC;

15

426 kitchens garden were constructed in Kabuye

and Murya Model Village by 79 members from 3

youth sections of ETO Mibilizi, Gishoma College,

GS Butambamo and local uthorities of Nyakarenzo

sector in Rusizi district by youth volunteers.

The youth section in kitchen garden demonstration

Redcross Staffs and partners visiting the youth activities in Rubavu

Rubavu Youth solidarity camp 2012Fromthe21stofOctobertothe21stofNovember

2012, RRCS has mobilized more than 150 youth and

Volunteers in 2012 OVC’s beneficiaries Solidarity

Camp, in order to contribute to the construction

of 20 houses for vulnerable peoples displaced on

Rubavu hill. During this period various activities

were carried out:

• 15houseswerebuiltformostvulnerablefamilies;

• 5housefoundationconstructed

• 150 youth and volunteer participated in HIV

voluntary counseling and testing awareness

sessions;

• 50youthparticipatedtothe firstaidtraining.

During this period, a team of volunteers has

managed to help a mother to give birth along

theroadwhileshewasgoingtotheclinic;

This action done by RRC Youth volunteers was greatly

appreciated by the community and the mother of

the child, said that the name of the child must be

given by the volunteers who contributed much

for the baby to come to the world. Then the name

given by volunteers was UWIMPUWE (meaning

“humanity”).

•120vegetablegardenswereconstructedand

a community nursery bed of different kinds of

vegetables has been for food security & balance

diet;

• 2000treeshavebeenplantedinordertoprotect

environment;

• Sportsandsocialeventsweresharedwiththe

community and to promote hospitality with the

beneficiaries.

The achievements of our youth solidarity camp

2012 in Rubavu are very appreciated not only by

the authorities of Rubavu District, but also by

the Honorable Minister of Youth, Information and

Technology, who appreciated the support of the

Rwanda Red Cross to the vulnerable, especially those

for Rubavu, and considered also the importance of

kitchen gardens for the community as far as nutrition

and income are concerned.

Top& Below: Visit of HonourableMinister of Youthat different youth solidarity camp Activities in site Kanembwe/Rubavu District

16

A sport event has been organized among the

volunteersfromNyarugengedistrictcommitteeand

AMUR/IslamicRedCrossyouthsection.Thefootball

match was organised for them to talk about youth

and volunteers activities, RC principles, HIV/AIDS

and reproduction health

Anumberof150 students fromGSAPEFOKandES

KANAMACatholicschoolsparticipatedinconference

session organized (in collaboration with ICRC

Rubavusub-officeandRubavuDistrictcommittee).

Sensitization was done on a trauma, RRC movement

andprincipals,andintroductiononfirstaid;youth

and model village activities

Delegation from Burundi Red Cross visited RRC youth activities in Gisagara and Huye DistrictOn the dates of 15th and 16th June 2012, a

delegation of 22 people from Burundi Red Cross

mostly OVC project beneficiaries and the Staff

including Youth Coordinator visited Rwanda Red

CrossSociety,specificallyGisagaraOVCProjectand

others youth activities. The purpose of the visit was

to share the best practices between the volunteers

ofbothNSthroughdiscussionsandfieldvisitsinthe

community.

After thefieldvisits,wehada restitution tohear

from each others’ views and experience based on

the youth activities, achievements, challenges and

lessons learnt and the way forward.

1. The Burundi delegation expressed gratitude for

the great achievements realized by the Rwanda Red

Cross in the model village areas and appreciated the

testimoniesgivenbythebeneficiaries.

2. The Burundi delegation expressed happiness of

integratedcommunityservicesandOVCcomponents

of minimum packages rendered to the OVC

beneficiaries

Delegation of Burundi RC and Rwanda RC after the restituti in Gisagara

3. The Burundi delegation was happy to see and

examine the role of the local authorities in the

realization of the RRC youth activities.

DelegationofVolunteersfromDemocraticRepublic of Congo Red Cross visiting RRC activitiesOn6th-8thofJune2012,thedelegationofvolunteers

from the DRC RC visits the RRC.

The visit came as part of exchanges of good practices

betweenthevolunteersofbothNationalSocieties.

During their stay in Rwanda, they held meetings with

thestaffofRRCandconductedfieldvisitstoobserve

the achievements of the RRC and the approaches

used to mobilize volunteers and how to conduct

assistance activities to the most vulnerable peoples

in the community.

The delegation of DRC RC in an exchange visit in Nyanza and Huye Districts

17

Football match between the youth cerebrating 8th may at Gisagara District

Constraints• Means limits to followupandsupportdifferent

youth and volunteers initiatives in models villages

accordingtotheimihigoplaned;

• Lackofpromotionalmaterialsfortheyouthand

volunteersinaction;

Recommendations and Perspectives• FocusingoureffortstomobilizemoreRRCyouth

sections and volunteers in model village activities

(createtheclubsofblooddonors,putinplaceyouth

sections, community work in favor of the most

Vulnerablepeoples)

• Updating the database of youth sections, and

maintain the statistics of youth trained in specific

domains.

• Acceleratethedistributionofyouthmembership

cards,andmembersretentionprocess;

• Initiate the good relationship and cooperation

withotheryouthgroupsbothinternalandexternal;

• Finish the constitution of the database for

the youth sections per province and District and

to statistics according to school we have in all

country;

• Put in place the news youth committees and

organizeaNationalYouthCouncil.

PLANNING,MONITORING&EVALUATION

Programme purpose

The overall objective of the unit is to enhance the

RRCS capacities to deliver result oriented programs

through improved planning, monitoring, evaluation

and reporting mechanisms.

Programme outcomes

• An effective PMER system was put in place,

accessibleandutilizedatalllevelsoftheNational

Society

• Effective Monitoring and evaluation of RRCS

programs/projects

Programme report summary

ThePMERUnithasbeenestablishedinRwandaRed

Crosssince2008.Sincethen,theNSwiththeIFRC

support organized trainings for some staff at HQs as

wellasatfieldlevel.Inthebeginningtheunithadonly

one staff but since 2011 it has been reinforced and 5

morestaffhasbeenaffectedinPMER.Although,the

The Capacity of youth committees were

Strengthened through the exchange visits and

experiences between the volunteers of the two

national societies.

1.2.5 Increased number of volunteers serving the

communities

Achievements: Mobilization and sensitization of Youth Sections

Celebration of 8th of May 2012TheInternationalRCday(8thofMay)wasorganized

in Mutete/Gicumbi District on 11 of May 2012. On this

day,RRCinauguratedthe50OVChousesconstructed

inByumbaandMutetesectorsfortheOVCassisted

by RRCS and the 9 years basic education classes built

by RRC.

A special day was celebrated on 20th of May at

INDANGABUREZI GS, and 120 students from others

schoolsfromRuhangoZonealsoparticipated.

Students of Ruhango Secondary School zone

Celebrated 8th of May on 20th of May 2012 Cereb-

rationofAfricanchildDaywasheldon16thofJune.

18

RRCShadthewilltosupportthePMER,thenumber

ofPMERstaffdecreasedprogressivelyandtheunit

was composed by only two staff in 2012.

During the reporting period, the PMER unit has

contributed a lot in designing program or project

proposals, programmes/projects evaluation as

well as capacity building in PMER.Thanks to the

BelgiumRedCross,IFRCRegionalofficeandtheRRCS

management and staff who have contributed to the

achievementsofPMERactivitiesbyprovidingeither

financialortechnicalsupporttotheunit.

30participants,25fieldstaffand5headquarterstaff

weretrainedinPMERandthishasincreasedquality

in plans and reports both at HQ level and branches

AchievementsSupport the planning process

Preparation and presentation of District

Performance Contract 2012

Performance Contract “IMIHIGO” is one of the

strategies which RRCS is implementing in order

empower the community in its self reliance through

the decentralization process. April 1st 2012 it

was for the 5th time that the district committee

representatives presented and solemnly signed the

performance contracts. They have pledged more

financial and technical support from the HQ and

other partner in order to meet the population’s main

challenges including health, nutrition, food security

matters.

Like in previous years, the process has begun by

identifying the major challenges at grassroots level

usingtheVCA.ThePerformanceContractshavebeen

developedbasedontheresultsofVCAconducted540

villages identified in 270 pilot cells. These results

havebeenfirstlysharedwithgovernancemembers,

volunteers, community leaders and administrative

authorities and each village developed its own action

plan to address the needs.

Finalisation of the Strategic Plan 2012-2016

The RRCS team composed by the Heads of

Departments,PMEROfficersandProgramManagers

havedonea5dayworkshoptofinalizetheStrategic

Plan 2012-2016. The team has given their input to

the work done by consultants and developed a logical

frame work as well proposed a 5 years action plan.

The Strategic Plan 2012-2016 has 4 areas of focus

which are the following: Organizational Capacity

Strengthening, Communication & Promotion of

HumanitarianValues,DisasterManagementaswell

as Health & Social Care.

IGA planning session in Huye District

ThePMERUnit has supported theHuyeDistrict to

prepareabusinessplaninordertostartanIGAusing

the available funds. The necessary information has

been collected and 2 planning sessions held.

TheIGAissupposedtostartinOctober2012.During

these sessions, IGA management procedures were

discussed with the district committee, resource

mobilisation commission and some field staff in

Huye District. They have given their input in order

tofinalisetheRRC-IGAmanagementguideline.

DevelopmentofPMERtoolsThePMERunitandprograms’managershavediscussed

and drafted the job description of the volunteers

who are Program focal Points at district level. These

jobdescriptionsaresupposedtobefinalizedinthe

workshopwhichwill harmonize and develop PMER

tools reported in the beginning of 2013.

1.3.2 Effective Monitoring and evaluation of RRCS

programs/projects

Project Programme evaluation• The funded IGA in OVC Bugesera Project have

been evaluated by the PMER and OCV Project

Coordinator

• Modelvillagesmonitoringvisitshavebeendone

19

in 28 districts. The aim of these visits was to see

the progress vis-à-vis the planned activities in model

villages.

• Amonitoring visit has been done by one PMER

OfficerincollaborationwiththeIFRC-M&ELOfficer

fromNairobi,in3LVPbranches(Gatsibo,Kayonza&

Kirehe).

• IFRC M & EL Officer has also conducted an

assessment on RRCS PMER capacities. All depart-

mentshavebeeninvolvedandthishelpedtheNSto

setitsprioritiesinPMER.

• A joint internal evaluation and audit has been

organisedbyPMERandInternalAuditortotheOVC

Project inNyanzaandGisagaraDistrict.The same

joint activity has been realized in LVP project.

Findings have been shared with the concerned people

atRRCSHeadquartersandfieldlevel.Thisallowed

the two Units to experiment and see if it can be

easier to make a joint activity like this because it

helpstheNStominimizecostsandallowdifferent

units to support each other.

Documenting and sharing of the best practicesLake Victoria Programme (LVP) planning and

learning workshop

TheIFRCorganisedatwodayplanningandlearning

workshopinNaivasha,Kenya.Duringtheworkshop

the participants from all 5 LVP-NS shared the

achievements, the lessons learnt, the challenges and

the ways used to overcome those challenges. They

also discussed about what can be done differently to

maximize on the successes, to reduce the challenges

orobstacles.Ithasalsobeenanoccasiontoidentify

the priorities for 2013.

Organised trainingsPMER Trainings

• TwoPMERstaffhaveparticipatedinPMERtraining

of trainers in October 2012. This training has been

very practical because almost all sessions have been

facilitated by the participants. This facilitated all

participants to share their experience especial the

adult learning methodologies.

• PMER Unit organised training for 30 RRCS staff

in Project/Programme Planning and Monitoring and

Evaluation (PPP/ME). Participants who attended

this training reported that they have improved

their knowledge and were committed to improve

their reporting and planning. During this training,

the participants also identified the PMER tools to

be developed and contributed to prepare another

workshop to develop these tools.

Constraints

• PMERstaffarenotenough

• DifferentRRCtoolsarenotenoughand

availabletoolsarenotharmonized;

• Stillhavegapsinqualityreportingat

fieldlevel.

Recommendations• PMERguidelinesandpolicyneedtobe

developed;

• Toolshavetobedevelopedandharmonisedin

2013 and distributed in all branches

• MoreRedcrossstaffandboardmembersneed

traininginPMER

20

RESOURCEMOBILIZATION Program Purpose

Resource Mobilization is one of the priority programs

of Rwanda Red Cross as stated in the Strategic Plan

2012-2016.

The overall objective of the program; istoIncrease

sustainability of RRCS’s interventions through

diversified resource mobilization activities and

supporters.

Program Outcome

The expected outcome of the RM program is stated

as follows: Increased and diversified sources of

funds for sustainability of Rwanda Red Cross Core

programs

Program Summary The 2012 Plan of Action in RM was focused on

capacity building both for the professional staff and

volunteers who constitute branch RM committees

as well as marketing, humanitarian diplomacy and

expansion of partnership in the country.

On this basis, a training in RM was organized in

a bid to increase branch capacity in domestic

income generation. To the same end marketing

and advertisement tools were developed in close

cooperation with the Communication program.

Information and advocacy events were equally

organized at HQ and branch level.

1.4.1 Expanded partnership with government

institutions, bilateral and multilateral agencies.

Achievements

Donor prospecting contacts

Inordertoseekpartnershipforimplementationof

Rwanda Red Cross programs, many public and private

institutions operating in Rwanda were contacted,

amongst others: The Rwanda Ministry in charge of

Disaster and Refugees Affairs , The Ministry in charge

ofGenderandFamilyAffairs,JapanEmbassy,JICA,

Chinese Embassy,World Vision, Chemonics , MTN,

CocaCola,Bralirwa,Nakumatetc.Buttodateit

is still hard to engage these institutions in concrete

partnerships and the current situation is such that

very few institutions in the country have agreed to

supportourprogramsandservices.Nevertheless,in

our continuous RM efforts, marketing our programs

and making known what Rwanda Red Cross does

remains crucial.

Contribution to Projects Proposals Development 1. Community Resilience Project Proposal

A three years project proposal on community

resilience and disaster risk reduction was elaborated

in cooperation with different programs and

departments and presented to different partners.

Focused on the promotion of hygiene and sanitation,

nutrition as well as environment protection, the

activities of this integrated project are oriented

to selected villages in 270 pilot cells including

Kilimbi & Gihombo model village proposal which was

submitted and is now funded.

2. Intégration socio economique des rapatriés de

la RDC à Jenda”

FollowingacallforproposalspublishedbytheEU

that both the RRCS and Belgium RC, francophone

community considered as a good opportunity for

addressing the issue of reintegration of returnees

from the DRC, a social integrated project proposal

was elaborated and submitted to the EU. The

Resource staff was part of the team who worked on

that project proposal entitled: “Integration socio-

economique des rapatriés rwandais de la RDC à

Jenda(Nyabihudistrict)

Partnership MeetingsQuarterly Partners meeting

A special meeting between RRC and its partners

21

within the RC/RC Movement was held in March 2012

Nairobi with the facilitation of the IFRC. It was

attended by representatives of the IFRCRegional

OfficeandAfricaZone,JapaneseRedCross,British

Red Cross, Germany Red Cross, Finish Red Cross,

Belgium Red Cross-French Community, Swedish Red

Cross,NorwegianRedCross,DjiboutiRedCrescent

and RRCS team including the President of Rwanda

Red Cross and the SG

Annual Partners Meeting

Lastyear,theRRCSannualpartnersmeetingwasheld

in Rubavu District on 23rd October 2012. Although

the preparation of the meeting was coordinated by

the OD departments, all departments contributed

to preparation of the meeting by preparing their

actions plans for 2013 and presentations on what has

been achieved after the previous partners meeting.

Networking events

• Attheoccasionofthe8thMay2012,incooperation

with the Communication Program, an evening party

aimed at Humanitarian Diplomacy was successfully

organized at Gorilla Hotel Kigali. For this special

event, a documentary film on RRC programs and

activities was jointly prepared.

• TheRMstaffwaspartoftheteamwhichworked

on documents proposed to the IFRC as a response

to its call for discussion papers in preparation of

the 8thPan African Conference of Red Cross and Red

Crescent Societies. Working in cooperation with

the head of the DM program, the Head of RM unit

contributed in elaborating the following document:

The effects of climate change on vulnerable

communities: building resilience through disaster

risk reduction in Rwanda.

• Inabid toexpandpartnershipwith institutions

within and outside the Red Cross Movement, on the

basis of contacts made during the 8th PAC, letters

and projects proposals were written and sent to

potential partners

Marketing Activities

• The RM and the Communication units worked

together on marketing the NS programs at the

occasionofthe8thPANAFRICANConferenceheldat

Addis Ababa. To this end, prior to the PAC a marketing

booklet was jointly produced which presents the

Rwanda Red Cross Society under this title: Rwanda

Red Cross, Striving to reduce vulnerability. During

the PAC, an exhibition on RRC programs and activities

was successfully set up.

• Marketingactivitiesdoneincooperation

with the Communication program also

include production of the following:

- 15 Poster photos displayed at the Open Day

inHuye;

- 2013Diariesincludingmarketingmessages;

- 1000leafletstopublicizetheRRCS’Meeeting

Centre and Green Park at HQs .

- Videoandaudioadvertisementspotsonthe

GreenParkKacyiru(RRCIGAatHQ);

Partnership at branch level During the second term RRCS branches (Gicumbi,

Musanze,Burera)haveparticipated inJointAction

Development Forums in their district level.

During the third term, four RRCS branches (Huye,

Ngororero, Musanze and Burera) have reportedly

participated in Joint Action Development Forums

organized by their district administrative authorities.

The aim of these meetings is to improve participation

and coordination in planning, monitoring and

evaluation of development activities in the districts

as well as improve dialogue and exchange on

development issues for efficient and effective

interventions.

Partnership agreement with the Ministry in charge

ofYouthandICT(MYICT)

To ease delivery of services provided by RIS and

promote loyalty of one of its regular client, a MOU

between the RRC and the MYICT was prepared in

cooperationwiththedirectorofRIS.

22

Intheframeworkofhumanitariandiplomacyactivities

proposedandfinanciallysupportedbytheIFRC,an

Open Day was prepared in December 2012, in close

cooperation with the Communication Program. The

firstobjectiveofthisOpenDayinitiallyplannedfor

28thDecemberbutheldlateron11thJanuary2013

was to familiarize invited leaders at national and

local level with the Rwanda Red Cross, particularly

stressing its auxiliary role to the public authorities

inthehumanitarianfieldandsocialprograms.The

second objective was to highlight challenges that

theNSiscurrentlyfacingcountrywide,particularly

in sustaining its activities in the Southern Province.

Beyond provision of information, the other objective

was to reinforce relationship and cooperation

between decision makers and Rwanda Red Cross

towards betterment of living conditions of the most

vulnerable people in the communities. This Open Day

was attended by local administrative authorities,

representativesoftheNationalPoliceandArmyas

well as the civil society.

1.4.2 Empowered branches for income generation

initiatives and management.

Achievements1. Training in resource mobilization

In order to reinforcemanagerial capacity of staff

and volunteers involved in Red Cross Resource

Mobilization activities both at branch level, a four

days training was organized at Kigali from 11th to

14thDecember2012.Thistrainingisthefirstphase

ofamoreextensivetrainingrequestedbymembers

of the resource mobilization committees in branches

which were set up a year ago. Out of 42 people

targeted, 39 participants attended the training

thoroughly. They came from the following district

branches:Nyarugenge,Gasabo,Kicukiro,Muhanga,

Gisagara, Gakenke, Musanze, Rubavu, Kayonza,

KireheandNyagatare.

In order to reinforcemanagerial capacity of staff

and volunteers involved in Red Cross Resource

Mobilization activities both at branch level, a four

days training was organized at Kigali from 11th to

14thDecember2012.Thistrainingisthefirstphase

ofamoreextensivetrainingrequestedbymembers

of the resource mobilization committees in branches

which were set up a year ago. Out of 42 people

targeted, 39 participants attended the training

thoroughly. They came from the following district

branches:Nyarugenge,Gasabo,Kicukiro,Muhanga,

Gisagara, Gakenke, Musanze, Rubavu, Kayonza,

KireheandNyagatare.

In addition to theoretical knowledge transmitted

through presentations, practical training was done

as well, under the guidance of Mr Benoit Butera

Rubambo, an experienced consultant in management

of small and medium scale IGA. Obviously, the

objective of the training was attained because the

evaluation done at the end of the training showed

that traineesacquired basic skills in analysisof

the market, writing a simple business plan, making

basic accountancy, taking advantage of possibilities

offered by Saving and Credits schemes/ institutions

in Rwanda. According to participants, this training

wasbothinterestinganduseful.Itisexpectedfrom

trainedpeoplethatwiththeacquiredcapacity,they

willproperlyaccompanyexistingIGAand/orpromote

new microenterprises needed for sustainable

Open Day for Information and Humanitarian Diplomacy

23

financialviabilityofthebranches.

Theyshouldequallybeabletoapplybestpractices

in supporting IGA implemented by associations of

vulnerablebeneficiaries.

2. Experience sharing visit by a consultant from

Mozambican Red Cross (MRC) and support of

Rubavu branch initiative

From 5th to 11th August 2012 there was a sharing of

experience with MRC in the area of RM which was

madepossiblebythevisitofMosesInguanewhose

mission to Rwanda was supported by NRC. The

Specificobjective of thismissionwas to support

staff and volunteers, including the staff in charge of

RMserviceandRCvolunteersinthefield(inRubavu

branch),toimprovetechnicalskillsinplanningand

implementation for better results. The consultancy

went well and the consultant was able to meet all

people proposed in the terms of reference. During

his mission , he also shared a wide range of MRC’s

experience in RM focusing on the changes progressively

madebytheNSinordertosetupbusinessoriented

IGA.Attheendofhismission,hesharedhisfindings

and recommendations with concerned staff and the

SG of RRCS, highlighting areas of strength and areas

in need of strengthening.

3. Collection of membership fees

During the first quarter the total amount of fees

collected from new and former members was

630,300RWF (about 1,050USD). Membership fees

foradultare500RWF(approx.1USD)and300RWF

(0.5USD)foryouth.

4. Organization of donation days at branch level

• InHuyeDistrict,volunteerscollected1,000kgof

maize in order to assist the most vulnerable people.

The estimated value of collected goods is 200,000

RWF(330USD).

• Twobranches(Karongi&Rubavu)participatedin

the District Open Day. This gave them the opportunity

toinformonandmarkettheNSactivities,especially

what RRCS is doing in the community. 27 new

members joined RRCS during these events and

amongtheoneExecutiveSecretaryofaDistrictand

one Police Commander

5. Fund raising initiatives and collection of

donations

1) In Musanze branch

Following the meeting of the RM commission in the

touristic city of Musanze and subsequent contacts

done by the commission members, 3 Banks and 1

Hotel accepted to host boxes for collection of last

francsforthebenefitofRedCrossprojects.Aswell,

four Banks accepted to become Red Cross corporate

members. This branch collected as well

715kg of beans, 468kg of maize, 171kg of millet,

191kgof Irishpotatoes,2packagesofclothesand

121.000F(used tobuy70kgof sorghumflourand9

packagesofhousematerials).ThisenabledMusanze

branch to contribute to assisting 69 most vulnerable

families victims of floods in Gataraga and Busogo

Sectors in Musanze District

2) In Rubavu branch

IncollaborationwiththeRubavuDistrictauthorities,

RRCS has organized a fundraising event on September

14th, 2012 in order to assist the most vulnerable

families relocated from Mount Rubavu to Kanembwe

andKarukogo sites (RubavuSector).Theobjective

was to start fundraising for 20 low cost houses. An

amountof329,550RWF (about500USD)hasbeen

collected and pledges worth 500.000 Rwf made.

Income Generating Activities in LVP supported

branches

Income generating activities allowed branches,

volunteers and communities to sustain themselves

in all 3 branches. These incomes have benefited

communities and the branch. In Kayonza branch,

volunteers have planted pine apple for generating

their own income.

Renting tents and plastic chairs has been also a

24

crucial support for Kayonza and Gatsibo branches.

RevenuefromthatIGAshelpedtomeetmanagement

costs like organizing statutory and coordination

meetings.IthasalsohelpedbranchtomonitorRed

Cross activities at community level

• LVP branches have reported on their income

generating activities as shown in the table bellow,

thetotalincomereceivedfromJanuaryuptoJune

was 2,063 USD.

• RRCSDistrict ResourceMobilizationCommittees

have organized meetings to evaluate and plan for

their IGA activities in Rubavu, Musanze, Huye,

NyaruguruandNyamagabebranches.

• Initiation of new income generating activities

in branches

The Belgium Red Cross-French Community supported

two IGAs to help Musanze and Rutsiro district

Committees to cover their administrative cost. The

objectivewastoenableidentifiedbranchestocover

their administrative cost at 40% at least, using their

own funds by the end of 2013.

Other Activities

• ContributiontodevelopmentoftheFirstAid

Policy

• ContributiontodevelopmentoftheBusiness

plan of RRC Meeting Centre

LessonslearntandRecommendationsforaction1. More than ever , Rwanda Red Cross is willing to

engage more effectively in Resource Mobilization in

order to make progress towards self reliance. To

reachthisgoaltheNSshouldhaveprofessionalstaff

insufficientnumbersandwithappropriateskills.

2. FortheNStosecurecorefunds,itismuchmore

profitabletoinvestindevelopmentofdomesticIGA

rather than relying on external public or private

funding.

3. Peer exchange of experience with NS more

advancedinRMshouldbepursued.Itisavaluable

capacity building mechanism.

4. There is still a need to strengthen the capacity

of all branches in business development plan and

management.

5. To target more actively and aggressively the

corporationssothatRRCbenefitfromCSR;itwould

be good to increase skilled human resources and act

as a team

General Recommendations and perspectives• Accelerate the process of developing moni-

toring and reporting tools for volunteers at

communitylevel;

• Review the volunteer management policy

especially the articles concerning volunteers’

motivation.

• Continue to maintain a database for RRC

members and volunteers both for youth

sectionsandbranchcommittees;

• Acceleratetherecruitmentprocessandmake

available membership cards.

• Revise and Set up the new strategy for recrui-

tingRRCSqualitymembersandretainingthem;

• Need to put in place the program aiming

to renew RRCS committees and give the same

briefingtoallbranches.

Growingpineapples:IGAbyvolunteersinKayonza branch

25

DISASTER MANAGEMENT

Program summaryTheDMprogramactivitiesfocusesinallNSbranches

composed of 30 administrative districts countrywide.

The aim of targeting all the district is to reduce

the impact of disasters vulnerabilty on Rwandan

local community through developing disaster risk

reduction activities, engaging the local community

in finding their own coping strategies, encourage

schoolchildrenandthelocalpopulationinfighting

against environmental protection, collaborate with

the Goma Volcanolistic on sharing the updates of

Nyiragogo volcano changes and initiate the early

warning messages, billboards for the awareness

of the local population, provide disaster response

intervention to the affected population and work

closely with the local authorities and other disaster

management stakeholders for reinforcing the

community livelihoods and integrated recovery

programforthemostaffectedpopulation.Inorder

to achieve the program target, the program is being

funded by the Belgian Red Cross / Francophone,

IFRC,GovernmentofJapanandIFRCDrefAppeal.

This report includes the achievements for the

implemented activites from January to December

2012.

The activities for DM Program were focused on the

following key areas:

• Reinforcementofcapacitiesforresponsein

case of disasters

• Reinforcementofstrategicstocks

26

• Therisksreductionactivities

• Emergencyresponsetodisasterfloodsand

refugeeinfluxandotherrelateddisasters

• TheintegratedassistancetotheRwanda

returnees coming from Tanzania and DRC

congo.

2.1. Disaster preparedness activities

Planned activities: • Conduct trainings and refresher course for

BDRT volunteers in trained branches

• Purchase and equip branch strategic stocks

withNFIStocaterfor100familieseach which

includes districts of Rusizi, Rubavu, Karongi,

Nyabihu,Ngororero, Musanze, Burera, and

Gicumbi.

• Monitor and follow up the Nyiragongo

volcano situation, by sharing information

aboutNyiragongovolcanoactivityandengage

Rubavu branch team to be in regular contacts

withOVGGoma

• Conduct sensitisation compaings with local

community members, and school children with

the help of branches volunteers on disaster

risk reduction.

• ConstructionofKayonzabranchstrategicstock

• Conduct DM coordination meetings with DM

stakeholders at branch level

• SensitisationcompaignsonSaferAccessfor

the disaster management teams

Achievements:• 123BDRTvolunteersfromthedistrictsof

(Musanze,Nyabihu,Rubavu,Gicumbi&Nyamagabe)

received disaster management refresher training

and they are able to share knowleged and

experienceandskillshavehasbeenaquiredfor

further operations.

• 75 LDRT volunteers from the districts of

(Musanze,Nyabihu and Rubavu) received disaster

management and camp management refresher

training and they are able to utilise the skills at

branch level in supporting Dref operations in the

districtsofNyamagabeandRubavu.

• 11 NDRT Watsan soft and hardware volunteers

andDM staff trained asWatSanNDRTmembers in

Bujumbura and theory part have been covered and

the team has been able to meet Burundi team during

the training and experience in WatSan intervention

shared.

• 3 Disaster Management Refresher course

conducted with support of trained BDRT teama in

their branches and a total of 118 volunteers reached

with training at branch level and skills have been

reinforced in the districts of Musanze, Burera and

Rusizi district.

• TheNorth-KivusectionoftheDRC’sRedCrossin

collaboration with Rwanda Red Cross has set up an

emergency team to monitor the situation, by sharing

informationaboutNyiragongovolcanoactivity.The

team is in regular contacts with OVG Goma (the

agency in charge of monitoring the volcanic activity

intheregion)andupdatedaboutthevolcanicstate.

So far, the situation is calm and the warning level is

YELLOW.

• 8districtsstrategicstockshavebeenequiptwith

non food items and these includes Rusizi, Karongi,

Rubavu, Nyabihu, Ngororero,Musanze, Burera and

Gicumbi district composed of 48 cartons of washing

soaps, 1842 jerrycans, 545 kitchen sets, 1296 plastic

sheetings, 50 kitenge 50 pot for children,1836 iron

sheets and 625 kgs iron nails and they have been

reinforced to provide rapid response.

• Inorder to reinforce the responseactivity, the

program has just put in place a plan to renew the

strategic stocks in the districts in order to insure that

adequatesufficientitemsareavailableinplacefor

rapid interventions and Bugesera branch has been

reachedwithNFIstocaterfor100families.

• Kayonza branch strategic stock has been

constructed and with the capacity to accommodate

NFIs for 200 families and this will reinforce the

branch capacity to respond to emergencies and

27

volunteer behaviour will be improved.

• Reinforced collaboration with the neighboring

countryRDConwellinformedofNyiragongovolcano

activity changes. When this volcano erupts, it entails

direct impact on both local population in our country

especially in the Western part of Rubavu District

(masspopulationmovements,gasevaporation,hill

and road cracks etc). Therefore the populations

and local authorities must be regularly informed

and sensitized about the volcanic risks through our

supportofearlywarningflags.

• 14 broadcasts on local community radio have

been supported for sensitising the local population

on disaster risk reduction activities at distrcit level

inthedistrictsofRusizi,Karongi,Rubavu,Nyabihu,

Ngororero,Musanze,BureraandGicumbi.

• 16sensistazationcampaignhavebeenconducted

with the help of branches on disaster risk reduction

and floods 1,680 has been reached with the

information.

• 2saferaccesssessionshasbeengiventoMusanze

district committee volunteers during the district

committee meeting and the statutory meetings. The

total number of participants was 33 that have been

called upon to respect Red Cross emblem.

• 10BranchcommitteesconductedDMcommission

meetings in these meetings, Rwanda Red Cross

committees and volunteers discuss with the local

authorities and other partners on the action plans

and share the information related to disaster

management in their respective branches thus

increasing awareness and knowledged sharing.

• 11 Coordination meetings conducted with all

districtsLDRTfocalpersonswiththefocusonhow

to improved better broadcasts on local community

radio have been supported for sensitizing the local

population on disaster risk reduction activities at

district level.

2.2. Disaster Risk Reduction/Food Security activities

Planned activities: • Preparionoffruitandforestnurserybedstreesin

all 30 district with the aim of protecting environment

and landslide insidences for the local population.

• Engage local volunteers and local community

members in planting and maintaining planted RC

trees on diffrents locations.

• Environment protection awareness and

sensitisation through support of volunteers and local

community members.

• Purchase and dtribution of vegitable gardens

and support branch model village development of

kitchen gardens in all 30 district in order to reduce

the cases of malnutrished childrens and reinforce

food security coping strategies at community level.

• Purchase, distribute, continuation and follow

up on the rotation of cows, goats, pigs and rabbits

between direct and indirect beneficiaries on the

projects of food security and DRR that have been

supported in the districts of (Gicumbi, Kayonza,

Nyamasheke,Nyamagabe,Rutsiro,Nyanza,Rubavu,

Bugesera.

Achievements:• 60 nursery beds of fruit and forest trees are

prepared in all 30 district with the aim protecting

the environment and landslides risks at community

level. In Kirehe district,Nyarubuye sector Rutsibo,

Rundonyi and Gihira cells, Rusizi district Nzahaha

sector, Nyamasheke district, Ninzi cell mixture of

fruittrees(Avocado,mango,passionFruit,Lemon)

there are in good condition and 689,357 plants

reached.

• Maintenance of 590,382 planted trees in the

location of Mahama sector, Nyarubuye, Kigarama

and Gahara,Cyahinda and there of which 2800 trees

couldgrowwell(87%)51nurserybedsoffruitand

forest trees with 573,000 mixed trees are prepared

and plants have jerminated and soon they will be

ready to be planted with the aim of protecting the

environment and landslides risks at community

level

28

• 400 JapaneseCherry thathasbeenplanted in

Gakoro pilot cell of Musanze district germinated

and branch volunteers are supporting monitoring for

better results.

• 3awarenesssessionsonenvironmentprotection

conducted with people living in Kiyovu, Kibali and

Gihembe were organized whereby 1,755 people

attended, including 971 women and 784 men

• 30 districts received kitchen garden seeds for

supporting the setup of vegitable gardens in the

selected modal villages and 573 vegetable gardens

have been established and community nutrition

is being improved and knowledge of the local

population enhanced

• 38 newborn calves, 52 pigs and 56 goats has

been distributed to 146 most vulnerable families as

a rotation scheme.

• 963vegetablegardensdevelopedinthemodel

cells and nutrition is being improved and knowledge

on the local population enhanced

• Rulindo district: volunteers together with

community members have dug trenches to fight

against erosion in model villages of Rwintare and

Kabunigu,

• 50 vegetable gardens developed in the Ngazo

site/ Ruharambuga sector of Nyamasheke district

and the nutrition is being improved and knowledged

of the local returnees population enhanced.

• InBureradistrict,532pupils in theschoolsof

Runaba Secondary school, Rutovu Secondary School,

Kagogo Secondary School and 821 community

members have been sensitized on disaster prevention

and risks reduction measures at community level.

Integrating with the LVP program, distribution of

cowsbyDMhasImprovedtheharvestforhousehold

for example abeneficiary inGatokemodel village

indicated that after receiving the cow she was not

only getting milk but after using cow dang manure

the harvest for her beans improve harvest from 2 tins

to 6 tins while sorghum increased to two harvests in

a year. The household is able to buy cloths and pay

their medical bills. Before the support, they used to

work in other peoples farms so at to be able to get

some cash for buying food.

10 water harvest ponds established in Kirehe district

and community are using it in irrigating their gardens

during the drought season. The kitchen gardens are

also aimed at improving the nutrition status of the

households.

EnvironmentprotectionThrough communal work known as “Umuganda”

in local language, The Kayonza branch together

with local authority, volunteers and community

itself planted 8,450 trees; among them 25% were

fruit trees for minimizing malnutrition cases in the

community.

To insure the good maintenance of planted trees,

volunteers and community have done follow up

of 120,000 trees planted previously in 4 sectors

(Mahama, Kigarama, Nyarubuye and Gahara) of

Kirehe District.

Inordertoreducequantityofwoodusedincooking

as a means of environmental protection, the RRC

volunteers mobilized the community in Kayonza,

Kirehe and Gatsibo branches and constructed 1080

efficient stoves in 1080 households in selected

modelvillages.AllbranchesconductedDMquarterly

meetings this helped in identifying possible risks

One of the families who was supported by Rwanda Red cross under LVP

29

implementation of DM activities in districts.

District Disaster Commission meetings were organized

inallLVPbranches.ThesemeetingsofferRwandaRed

Cross committees an opportunity to meet different

partners in order to share information and action

plans on disaster management at local level.

InKirehebranchonecommunityhasalsotrainedto

and made charcoal from organic waste as alternative

sourceofenergy;

115 goats have been distributed in 115 families in 3

selected villages and so far, 25 goats have produced

40 young ones, the rotational program will start in

june 2013

2.3. Disaster Response activities

Planned activities: • Provideemergencyressponsetothedisaster

victims through out the country

• Purchaseanddistributereliefitermstothe

disastervictimsrelatedtofloods,windstorm

and refugees

• ReceivingandorientationofDRCCongolese

refugeeinNkamiratransitandKigeme

permanent camp

• Provisionofbasicfirstaidsupport,tracing

servicestotheneedyrefugees,identifiction

of the sick patience and provide report on the

situation.

• PurchaseFirstAidkitsandprovideservicesto

the DRC Congolese refugees

• Provisionofnonfooditemsfor1500refugee

familiesinKamiraand560flooddisplaced

familiesinthedistrictsofRubavu,Nyabihuand

Musanze.

• Providesupportonshelterrehabilitation

for disaster victims in the districts of Rubavu,

Nyabihu,

• Purchaseofvolunteermaterialsforvisibilityof

RC volunteers in actions at branch level.

• ReceivingandregistrationofDRCCongolese

refugeetoNkamiratransitcampandKigeme

Camp.

• Provisionoffirstaidservices,needassessment,

water and sanitation, tracing services,

advocacy for support and care for the sick

especially the refugees.

• ProposalofDrefFloodsandDrefInfluxtoIFRC

Achievements:• 3,260familieshavebeenreachedandthersare

to be reached with non food items sensitization,

• 16pitlatrineshavebeenconstructedforthe

most vulnerable families in Flood survivors in

Nyundosector.

• 18,340Congoleserefugeehavebeenreceived

inNkamiratransitcamp

• 9,789havebeensenttoKigemeCampfor

longterm resettlement

• 50BDRTvolunteershavebeenabletosupport

theInfluxofCongoleserefugeesinceMay

2012.

• 2000familieshasbeensupportedwithNFIsby

DrefFloodsandrefugeeInfluxoperation.

• 562firstaidcasessupportedfortheDRC

refugeesinNkamiratransitcamp

• 215casesofmalnutrishedchildrenhavebeen

reported to health post and attention for care

have been given with help of volunteers.

• 103casesofinjurieshavehasbeenevacuated/

treated and transferred from boader point of

Rubavu district health post.

• 369familieshavebeenassistedwithnonfood

items in the district of Rulindo, Burera,

Ngororero,Rwamagana,KayonzaandNgoma

due to different disasters

• 55mostvulnerablefamillesofgenocide

survivor have been assisted with non food

items and agricultural tools in Rwamagana

district with the iam of reinforcing their

copying strategies at the community level.

• 2Drefappealshasbeenfundedwithhelpof

IFRCE.AZoneOffice

• Technicalsupporthassharedamongthe

volunteersandheadquarterstaffduringfield

visits.

30

Nyarugenge volunteers supporting disaster victims in rebuilding new home for the vulnerable family

• Skillsandexperiencesharedamongthe

volunteers during the camp management

exerciseinNkamiraandKigemecamp

• 30mostfamiliesreceivedreliefsheltersupport

and the distribution of iron sheets and nails for

shelter still going at district level

• Volunteermaterialspurchasedincluding

T.shirts and caps based to priorities

2.4. Disaster Recovery/rehabilitation activities

Planned activities:• Siteidentification,preprationandbeneficiary

identification

• Purchaseofconstructionmaterialsfor

supporting 50 houses for the most vulnerable

and Rwandan returnee from DRC Congo in

Table that shows cumulative figures of the refugee population in Kigeme Camp

Date Families Individuals

Jan-Dec-12 3’910 14’148

The table that shows the NS local responses to disaster emergencies with the help of the strategic stock.

Items

Ironsheets

Kitchen sets

Blankets

Sleeping mats

Jerrycans

Washing soap

Clothers mixed

Pagne

Plastic sheetings

Beans seeds

Maize seeds

M.nets

Gasabo

25 pcs

212

438

438

438

876

Nil

150 pcs

Nil

Nil

Nil

Nil

Kirehe

Nil

23 sets

46 pcs

46 pcs

46 pcs

92 pcs

Nil

10 pcs

46 pcs

Nil

Nil

Nil

Kayonza

Nil

32 sets

64 pcs

64 pcs

64 pcs

128 pcs

Nil

20 pcs

Nil

185 kg

185 kg

Bugesera

600

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Rwamagana

Nil

40

80

80

160

Nil

30

200 kg

200 kg

Rusizi

Nil

100

200

200

200

400

Nil

Nil

50

Nil

SNil

100

Totals

625

407

1235

1235

1155

1656

Nil

210

96 pcs

385kg

385kg

100

Nyamashekedistrict

• Constructionof50housesforthemost

vulnerablereturneefamiliesinNyamsheke

districts

• Constructionof130housesfortheRwandan

returneesfromDRCCongoinNyamasheke

and Gatore district

• TrainingpreparationsofvolunteersinCHBFA

• Fabricationofcementbricksforthe50

housesofRwandareturneesonNganzositein

Nyamashekedistict.

• Diggingof50pitlatrinesforthe50houses

• Receptionandstockkeepingofthe

construction materials

• Recruitmentofthekeyvolunteersfor

supporting the construction work and services

31

Achievements:• Receivedlanddonation(settlementsite)

for the construction of 50 houses for Rwandan

returnee from Congo.

• Constructionmaterialspurchasedand

distribution of the materials to the site

• Identificationandreinstallationof50families

on new resettlement site in Ruharambuga

sectorNyamashekedistrict.

• 50latrinesdiggingfinishedonNganzosite.

• Availabilityofconstructionsiteforthe50

houses targeting the Rwandan returnees in

Nyamashekedistrict.

• 20volunteerstrainedandthereareableutilise

the skills gained with in the community

• 50housesunderconstructionforthe

RwandanreturneesinNyamashekedistrict.

• 80housesconstructedanddistributedto80

families in the Gatore kirehe district.

• Rehabilitationofwatersystemrehabilitated,

food security activities such as kitchen garden,

distribution of livestock, agricultural in puts.

TheBeneficiariesofthesehouseshavebeen

trained to make the charcoal from the leaves of

banana plantations.

• 50housefoundationfinished

• Availabilityofsaferdrinkingwateronthe

siteofNganzoforthereturneefamiliesand

vulnerable people.

• Verificationoftheactivitydoneonthesite

has been done and the labour charges have

been paid.

• 50kitchengardensdevelopedandcommunity

membershaveacquiredskillsandthereable

to utilise them.

• Cementbricksareunderfabricationforthe

50 houses under construction for the

RwandanreturneesinNyamashekedistrict.

• Soilpreventiongrasspurchasedandhasbeen

used by students during the closing of solidarity

camp in helping plantation of grass land

catchment in protection of landslide.

• Communitybeneficiarieshavebeengiven

labourworkonNganzoconstructionsiteand

there are able to earn income to support their

family needs and the living behaviour

improved.

• 7staffparticipatedintheprojectcoordination

meeting and a lot of information on better

management, coordination and utilisation of

tools have been shared.

Challenges: • Limitedknowledgeonhowthefundedproject

will be implemented which hinders the time

frame of the planed project activities like the

JapaneseNyamasheke.

• LimitedknowledgeandskillsofNSstaffon

the utilisation of Dref funds and purchasing

procedure which delayed the implementation

of the operation on agreed Dref timeline

• Limitedinformationandcommitmentofsome

NSbranchcommitteesduringimplementation

and support of disaster displaced families in

disaster prone areas.

• Limitedskillsofthelocallabourson

fabrication of cement bricks for construction

of 50 houses for Rwandan return and most

vulnerable families in Ruharambuga sector,

Nyamashekedistrict.

• Duetodelayofgettingconstructionsitefor

thebeneficiaries,thiswillbringdelayonthe

project timeline.

• Limitedprogramsupportfundingonthe

response actions at branch level leading to

increasing of disaster impacts at community.

RecommendationsInordertoovercomethischallenges,thereisneed

to train all the concerned members on disaster

management, emergency and support services.

This will help us to have a smooth coordination and

implementation of the Dref activites on agreed time

at all levels.

Items

Ironsheets

Kitchen sets

Blankets

Sleeping mats

Jerrycans

Washing soap

Clothers mixed

Pagne

Plastic sheetings

Beans seeds

Maize seeds

M.nets

Gasabo

25 pcs

212

438

438

438

876

Nil

150 pcs

Nil

Nil

Nil

Nil

Kirehe

Nil

23 sets

46 pcs

46 pcs

46 pcs

92 pcs

Nil

10 pcs

46 pcs

Nil

Nil

Nil

Kayonza

Nil

32 sets

64 pcs

64 pcs

64 pcs

128 pcs

Nil

20 pcs

Nil

185 kg

185 kg

Bugesera

600

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Rwamagana

Nil

40

80

80

160

Nil

30

200 kg

200 kg

Rusizi

Nil

100

200

200

200

400

Nil

Nil

50

Nil

SNil

100

Totals

625

407

1235

1235

1155

1656

Nil

210

96 pcs

385kg

385kg

100

32

The overall goal of the Red Cross Movement restoring

family services is of reuniting and alleviating moral

sufferings for those separated from their family

members due to armed conflicts, disasters and

other humanitarian situations and thus, contributing

to lasting reconciliation among communities and

contributing to lasting socio-economic development

at national, regional and/ international levels.

Inthisregardandsince2002,theRRCS/RFLservice

in functional cooperationwith the ICRC hasmuch

contributed in facilitating RFL services for those

separated especially via exchanging family news

through RCMs and TRs mainly between Rwandan

refugees and their relatives living in Rwanda as

RESTORING FAMILY LINKSwell as between Congolese refugees established in

Rwanda and theirs scattered around the world.

Moreover, other activities related to the local

RRCS/ RFL network capacity strengthening and to

partnership promotion have been carried out as

well.

For 2012 reporting purpose, progress towards

outcomes and outputs is compiled in 3 main programme

objectives which are, inter alia: maintenance and

capacitystrengtheningoftheRFLnationalnetwork,

making use of the Movement strategy in the area of

RFLandpartnershippromotion.

The services offered include Restoration and

Maintenance of Family Links using the Red Cross

33

messages, Tracing Requests and orientation of

othercasestothethirdpartiesandRFLactivities’

promotion within and outside the Movement.

Main achievements TheRFLProgrammerecordsinthenationalnetwork

maintenance were namely distribution, collection

and treatment of RCMS and TRS.

43yearsold,Iamseparatedfrommyfather,Mother

and sister in 1997when Iwas repatriated andmy

beloved ones remained in South Kivu- DRC.

Since then I m living lonely in Rwanda and

fortunately, thanks to the RRCS/RFL services and

sinceJuly2012,mymoralsufferingsaresomehow

alleviatedbecauseIamintouchwithallofmylost

family members via exchanging family news with

them through RCMS and that with the precious help

ofAugustine,theRRCS/RFLlocalvolunteer”

38

” I m Maria UWUMUKIZA, 43 years old, I am separated from my father, Mother and sister in 1997 when I was repatriated and my beloved ones remained in South Kivu- DRC. Since then I m living lonely in Rwanda and fortunately, thanks to the RRCS/RFL services and since July 2012 , my moral sufferings are somehow alleviated because I am in touch with all of my lost family members via exchanging family news with them through RCMS and that with the precious help of Augustine , the RRCS/RFL local volunteer” 2012 RFL annual statistics ‘summary

District

RC

MS

rece

ived

at t

he H

Q le

vel (

from

the

ICR

C)

Rec

eive

d R

CMS

at th

e D

istr

ict l

evel

Emitt

ed R

CMS-

RFL

Emitt

ed R

CMS-

MFL

tota

l em

itted

Dis

trib

uted

RC

MS-

RFL

Dis

trib

uted

RC

MS-

MFL

% d

istr

ibut

ion

Col

lect

ed R

espo

nses

RC

MS-

BTS

free

refu

sal t

o re

spon

d

% re

spon

ses,

resp

onse

s &

/fre

e re

fusa

l to

resp

ond

RC

MS-

Reo

rient

ed

Sent to the ICRC RCMS sent to District Relays

RC

MS

emitt

ed Col

lect

ed R

espo

nses

RC

MS-

BTS

TOTA

L

Gap

bet

wee

n R

CM

S se

nt

and

rece

ived

to D

istr

ict

leve

l

Bugesera 73 167 5 0 5 48 43 55 90 11 0 111 2 4 63 9 72 -95

Burera 45 61 3 2 5 31 36 110 68 2

115 8 3 48 3 62 1

2012 RFL annual statistics summary

34 39

Gakenke 31 40 0 0 0 11 27 95 42 2 116 12 0 32 9 61 21

Gasabo 57 73 7 13 20 29 18 64 21 16 51 14 4 24 22 78 5

Gatsibo 66 23 11 0 11 5 20 109 5 3 32 0 31 58 5 86 63

Gicumbi 64 46 20 64 84 10 18 61 29 12 1 91 16 97 24 9 70 24 Gisagara 35 33 3 1 4 9 23 97 17 3 63 4 4 32 0 53 20 Huye 130 146 5 7 12 11 95 73 102 6 1 75 10 15 118 15 167 21

Kamonyi 24 19 0 0 0 15 8 121 11 2 1 61 0 1 12 7 25 6

Karongi 372 216 126 75 201 54 162 100 194 10 94 7 290 279 13 440 224

Kayonza 39 44 0 6 6 7 34 93 24 4 68 0 7 23 3 42 -2 Kicukiro 41 32 2 0 2 15 6 66 19 8 84 1 5 6 7 54 22

Kirehe 36 24 8 14 22 12 8 83 25 0 125 3 19 29 0 45 21

Muhanga 31 25 11 1 12 13 9 88 17 1 72 3 0 19 8 36 11

Musanze 215 227 1 2 3 104 126 101 138 20 0 69 28 0 6 141 26

-201

Ngoma 77 65 7 0 7 55 10 100 54 5 1 92 2 7 62 5 67 2

Ngororero 212 294 21 2 23 203 91 100 209 11 1 75 21 21 146 18 234 -60

Nyabihu 142 220 12 8 20 130 67 90 156 11 4 78 4 6 181 18 188 -32

Nyagatare 42 41 4 2 6 13 29 102 29 4 79 2 18 24 2 53 12

Nyamagabe 100 65 58 2 60 35 28 97 67 4 1 111 19 33 67 7 126 61

`Nyamasheke 62 80 7 3 10 32 40 90 75 12 4

126 10 7 62 8 99 19

Nyanza 77 106 2 1 3 35 43 74 68 23 5 91 9 6 45 32 101 -5

Nyarugenge 33 39 3 0 3 5 9 36 4 25 207 0 3 2 19 41 2

Nyaruguru 47 60 14 3 17 21 23 73 49 6 2 95 7 14 49 9 67 7 Rubavu 433 446 23 3 26 371 62 97 261 44 3 71 58 36 285 60 429 -17

Ruhango 47 43 0 0 0 42 1 100 24 0 56 7 1 37 10 52 9

Rulindo 41 45 21 4 25 19 22 91 39 3 102 2 27 61 3 54 9

Rusizi 180 173 10 14 24 77 82 92 156 5 931 7 35 155 8 199 26

Rutsiro 147 149 0 5 5 84 63 99 158 5 3 113 3 10 133 12 145 -4

Rwamagana 17 30 1 0 1 5 11 53 14 1 50 6 2 14 3 21 -9

Total/average 2916 3032 385 232 617 1501 1214 90 2163 259 27 81 265 712 2231 350 3385 353

Referring to the above table, the statistics’ main features are drawn out as in the following: 2916 RCMS have been received within the RFL local network and comparatively to the previous year, there is a decreased trend of 17%1. Most of received RCMS (i.e. 90%) have been distributed to their addressees while 81 % of their subsequent responses, BTS and/ free refusals to respond to received RCMS have been collected within the reporting period.

1 We apologize for the gap observed between the RCMS workload evolution trend statistics presented during the 3rd December 2012 annual RFL coordination meeting and the current statistics. This fact is due to inaccurate calculation linked to the 3rd December 2012 annual RFL coordination meeting.

35

617 RCMS have been emitted from Rwanda for

distribution and treatment in the foreign NS and

comparatively to 2011, there is a decreased trend of

20 % while only a portion of 20 % of emitted RCMS

have been given a feedback from concerned foreign

NS.

Meanwhile, the majority of the combined number

of received and emitted RCMS were come /sent

from/to the DRC (83%) followed by Burundi (6%),

Congo-Brazzaville,KenyaandUganda(respectively

with3%byeachof them)andTanzania (1%)while

Zimbabwe, Malawi, the Republic of South Africa,

Malawi,NamibiaandCanadasharethetinyremaining

(i.e.1%).

The recorded number of RCMS BTS is 259 and there

is a decreased trend of 14 % comparatively to 2011

while that one related to free refusal to respond

toreceivedRCMS(byaddressees)is27andthereis

decreased trend of 31 % comparatively to 2011 and

that one related to RCMS reoriented within the local

network is 265 and there is a decreased trend of 30

% comparatively to 2011.

Generally and comparatively to 2011, the combined

number of received and emitted RCMS’ statistics,

there is an average decreased trend of 13% .

This relatively decline trend of RCMS workload is

mainly due to the fact of the constant population

transfrontaliarmovementsduemainlytotheEastern

of DRC instability and thus, either most of the RCMS

beneficiariesareininsecureregionssothattheyget

unable to exchange family news.

Also, the number of RCMS-MFL is higher than the

numberofRCMS-RFL(57%vs.43%)becausemostof

theRFLbeneficiariesuse toexchange familynews

with addressees who are more stable and to whom

they know the exact address prior to the break of

armed conflictwithin the Eastern DRCwhich host

most of the Rwandese refugee community, mostly

beneficiariesofRFLservices.

Moreover and as usually, for gender and sex

aggregated data related information; males are

used to exchange family news via RCMS more than

females(i.e.respectivelytherateof64%malesvs.

36%femaleforsendersaswellas foraddressees).

This imbalanced trend is due to the prone males’

attitude to be more involved within conflict

situations and thus, are more used to be far from

their families and to exchange family news with

their beloved ones remaining within and/ outside

the country.

Even though , above statistics comprise RCMS

received and emitted within and from the refugee

camps and for information only, refugee camps rated

asfollowsinemittingRCMSduring2012:Kiziba(385),

Gihembe(131),Nyabiheke(76),Kigeme(52)and

Nkamiratransitcentre(5)withageneralincreased

of 121 % comparatively to 2011 annual related

statistics. Among other reasons for this tremendous

trend, beside remarkable volunteers’ dynamism in

encouraging refugees to have more recourse to

RFL services especially in emitting RCMS within

Gihembe refugee camp, there are the outbreak

of armed conflict’ consequences in the Eastern of

theDRCandwhichhas forcedpeople tofleeand

become new refugees in Rwanda alongside with the

existing Congolese refugees established in Rwanda

since a long time. Thus, they are more anxious to

know the whereabouts of theirs newly scattered as

aconsequenceofthementionedarmedconflictand

thereforetheyhadmorerecoursetoRFLservicesin

order to restoring and/ maintaining family links.

In addition, 3 TRS have been received within the

local network for treatment and all have been closed

eitherpositively(1)ornegatively(2).Itistoremind

that , contrary to RCMS statistics related to gender

and sex aggregated data, there is a parity between

male and female enquirers (i.e. 50% female’s

36

vs.50%males)while100%ofsoughtpersonsare

exclusively men.

The hypothesis for this gender unbalanced trend

is that following the ongoing conflict situation in

theEasternoftheDRCand,therefore,womanand

children are used to be more repatriated and men

are used to be scattered within the asylum country

sothattheymaybecomemoreenquirersandsought

persons at the same time.

Furthermore,38othercasesrelatedtoRFLservices

‘seekers have been received at the RFL national

coordination office either for treatment (i.e.5

cases)ororientationtothe3rdinstitutionforbetter

assistance(i.e.34cases).Referringtogenderand

sex aggregated data and correlatively to mentioned

statistics,thetypicallyRFLservices‘seekersatthe

HQaremostlymalesmore than females (53% vs.

47%) and there is also largely male stream trend

linkedto”soughtpersons”(i.e.83%malesvs.17%

females).

ConcerningRFLnetworkcapacitystrengthening: There has been money transfer equivalent to

16,448,639 RWF and promotional material such

as: 231 t-shirts, 231 hats, 12 raincoats, 15 pairs

of boots, 30 bicycles and 1 motorcycle have been

bought and distributed to sector and district RFL

volunteers and Relays and local committee members

for field activities’ implementation and follow-up

facilitationaswellasRFLservicespromotionwithin

communities;

Organisation of 30 decentralised meetings by each

district committee which have been gathering a

number of local Committee members, all District

RelaysandallSectorVolunteersforRFLactivities’

implementationfollow-upandtacklingchallenges;

RFL Field activities ‘follow-up visits within all

the RRCS district committees by the RFL national

coordination staff for mainly sharing on and tackling

challenges linked to RCMS/TRS distribution,

collection and/treatment and other related issues as

well as for promotional and transportation material

distribution;

Organisation of RFL annual coordination 1 session

meetinggatheringall30RFLDistrictRelays,30local

committees’ members representing all 30 district

committees and all 16 RRCS District Coordinators

and/FocalPersonsaswellasRFLinformationand

lessons learned sharing with the HQ senior staff

during coordination meetings in order to review

RFLactivities’performanceandtacklechallengesas

wellasreviewingtheRFLstrategyimplementation

performancewithintheNS.

Joint participation (by national coordination

staff, localmembers and volunteers) in 6 sessions

of partners’ meetings within the refugee camps

settlements;

Moreover, enabling mechanisms have been put in

place and /strengthened (standardised planning

and reporting formats) in order to facilitate local

committees’ members and RFL District Relays for

effectively writing and submitting their monthly

statisticalandnarrativereports;

Identification and training of 6 volunteers for RFL

efficient response for the benefit of Congolese

refugeesnewlyinstalledwithinKigemecamp;

Training of all RFL 30 District Relays in the area

of RFL effective integration and management in

emergencies and as impact, the RRCS/RFL local

network well equipped with practical skills and

knowledge;

As impact of capacity building and/ strengthening

ofthelocalcommitteesbyfinancial,materialand/

technical support, there is a correlative excellent

trend performance in distributing and collecting

RCMS/TRS as well as increased RFL Programme

ownership and accountability within the NS local

structures.

Concerning the RFL strategy implementation and

37

partnership promotion, the following activities have

been implemented as well:

Organisation and implementation of sessions

aimedatRFLservices‘needs,capacityandimpact

assessmentwithintheRFLlocalnetworkanduntil

the end of the reporting period, their outcomes

are still under analysis and their publication are

expectedduring2013;

Organisationof 2 sensitisation sessionson theRFL

strategyforthebenefit36HQandbranchexecutive

members, 30 governance members as well as all

30RFLDistrictRelays.Asimpact,there’sagreater

ownership and understanding as well as accountability

withintheNScross-cuttingstructures;

Training of all RFL 30 District Relays in the area

of RFL effective integration and management in

emergencies and as impact, the RRCS/RFL local

network well equipped with practical skills and

knowledge for an effective RFL response during

emergencies;

RFL services ‘profileandpartnerships‘promotion

within and outside the Movement and as impact,

the RRCS/RFL services are more competent and

well positioned as a key factor in all humanitarian

contexts;

Mentoring and experience sharing of/ by the Haitian

Red Cross/ RFL Coordinator within the RRCS/RFL

local network structures and as impact, there

were capacity and performance, coordination and

cooperationimprovementaswellassupportingRFL

global network services within the Movement as a

whole and it is suggested more involvement of the

RRCS/RFLnetworkhumanresourceswithintheRFL

global network support and operations’ response as

well.

Furthermore, most of planned activities have been

achieved within approved budget except some

occurred overspending on some budgetary lines are

due to the implementation of some unbudgeted

activities but judged crucial for the effectiveness

andefficiencyofRFLserviceswithinandoutsidethe

local network. These activities are for, organisation

RFLneeds,capacityandimpactassessmentsessions,

RFLemergency‘responseforthebenefitofthenewly

Congolese refugees as well as the organisation of

mentoring and experience sharing of the Haitian Red

Cross/RFL Coordinator within the RRCS/RFL local

network structures.

FIRSTAIDPROGRAM

11 instructors in First Aid were trained and facilitate

supervisionandqualitycontrolofbasicfirstaidand

first aid emergency intervention especially during

theperiodoftheNationalmorninginApril.

36receivedtherefreshercoursesinfirstaidandit

was a good occasion to earn and perform teaching

methods techniques handy for first aid, especially

for adults.

Those trainers in First Aid facilitate the training of

24LocalDisasterResponseTeams.

476 Volunteers for 24 LDRT for 8 Districts were

trained in firstAid and initiated to organize the

simulations.Thefirstaidequipmentswereprovided

tothetrainedLDRTtofostertheircapability.

Occupationalfirstaidtraining,709employeesfrom

different institutions/ enterprises were trained in

firstaidthrough28trainingsessions.And188first

aidkitsweresold.Emergencyfirstaidinterventions;

157firstaidinterventionswereorganized.

38

HEALTH AND CAREProgram purpose To reduce the number of deaths, illnesses and impact

from diseases and public health emergencies and to

help communities increase their capacity to deal

with diseases and public health emergencies.

Program summaryThe health service in Rwanda Red Cross Society is

designed to address the major health problems and

health emergencies of the most vulnerable people

by sensitizing, mobilizing and health educating on

preventionandcontrolofdiseaseslike,Malaria,HIV/

AIDS, diarrhea, intestinal parasite, skin diseases,

malnutrition and immunisable diseases.

The RRCS trained volunteers in community based

first aid (CBHFA), planned and implemented

health activities within their local communities

under coordination of district committees. These

volunteers also assisted the community to identify

major health problems, analyze and plan for their

sustainable solutions.

TheHealthServicestaffandfieldworkersassured

supervision and provided all relevant support in

order to achieve stronger impact. This report is

mainly based on 2012 planned activities in line with

theobjectivesanddefinedperformance indicators

District

Kigali town

East

North

West

South

Total

Kitchen garden established

186

1688

136

1445

987

4442

Tip Tap installed

339

1171

0

453

695

2658

Latrineconstructed

10

200

0

509

139

858

NumberofEducationsession

38

57

4

23

18

60

Pop reached by themessage

3034

9728

599

4378

16807

23148

Drying rack

97

63

0

389

99

648

refuse Pit/ rubbishbin

0

769

0

341

749

1655

39

District

Kigali town

East

North

West

South

Total

Kitchen garden established

186

1688

136

1445

987

4442

Tip Tap installed

339

1171

0

453

695

2658

Latrineconstructed

10

200

0

509

139

858

NumberofEducationsession

38

57

4

23

18

60

Pop reached by themessage

3034

9728

599

4378

16807

23148

Drying rack

97

63

0

389

99

648

refuse Pit/ rubbishbin

0

769

0

341

749

1655

in following health programs.

CBHFA,HIV/AIDS,WATSAN/PHAST,NUTRITIONand

BLOODDONATION

Community Based Health and First Aids in ActionHealth promotion and disease prevention were about

effectively communicating healthy messages and

practices to individuals and the community. Health

communication was successful when the information

provided helps a person begin a new healthy behavior

or change an unhealthy behavior.

The main learning points were used in community

health education and promotion: using pictures to

share information about healthy behaviors, behavior

change communication was most effective when it

includes simple messages, delivered in a clear way

and repeated often.

Outcome 1: Rwanda Red Cross was supported to

effectively implement the CBHFA approach in order

to reduce morbidity and mortality caused by health

priorities through an integrated community based

approach to disease prevention and promotion.

Achievements• 80volunteershavebeentrainedonPSBC

• 60VolunteershavebeentrainedinPHAST

approachatNyamashekedistrict

• 20volunteershavebeentrainedonHIVand

Nutrition

• Differenteducationsessionshavebeendone

as mentioned in the table under, the peoples

have been reached by the message

Model village activities: ThroughtheModelVillage,

RRC intends to make its modest contribution in

solving the challenges set out in the community

including hygiene and sanitation, food security, and

thereby initiate positive change and participatory

community.

AsspecificobjectivetopromoteCommunityHealth

specifically geared to the hygiene and sanitation,

different activities related to hygiene are done

by community. Through the Model Village, RRC

intends to make its modest contribution in solving

the challenges set out in the community including

hygiene and sanitation, and thereby initiate positive

change and participatory of community.

Through the report from district level, with model

villages approach, the activities below have been

done in all model villages during this year 2012.

Onbasedofreportfromthefield,werealisedthat:

• On60HygieneCommunityeducationsessions

done in all RRC/braches braches 23148

population have been reached by the message

• 600toiletteshavebeenconstructed

• 3592Kitchengardenhavebeenestablished

• 2324Tiptaphavebeenestablished

40

• 1655composterhavebeenestablished

• 471Dryrinkestablished

• 730Newblooddonorsmobilised

Outcome 2:Increaseaccesstoprevention,care

andsupportservicesforpeopleaffectedbyHIVand

AIDS

Achievements:2.1. Training:

Achievement:

As mention in the tableau below, different kinds of

training have been organized and target group have

been reached by Rwanda Red Cross through the

funds from global funds

• Twotrainingshavebeendoneandthefirstwas

Training of association’s members in participatory

lifeskills-basedHIV/AIDSeducationandthesecond

was 3 day training of 15 members per associations/

cooperativesonIGAandcooperativesmanagement

at Gicumbi District.

• Throughthesupportreceivedbycooperatives,

someofbeneficiariesbecameabletorespondto

their basic needs as:

• 507peoplepaidthemedicalinsurancefor2012

due to income-generating project in the district of

Nyamasheke

2.2. People living with HIV and AIDS receive care

and support according to needs

AchievementThrough funding from the Global fund, twelve

cooperativeswerefinanciallyassistedfortheir

income-generating activities and among all, nine

cooperatives are the `cows` s and three other have

been assisted by pigs.

• Distribution of 27 cows and 39 pigs for 12

cooperatives and this startup capital is distributed

asfollows:(i)9cooperativeshavereceived27cows

andeachonehasreceived3cows;(ii)3cooperatives

havereceived39pigs(ofwhich36femalepigsand

3malepigs)andeachonehasreceivedfemale13

pigs. This event of distribution has been done at

Kageyo sector and the cooperatives members and

local authorities were present, while RRC President,

DRBernardNZIGIYEwastheGuestofHonor.

Before distribution, beneficiaries and local

authorities representatives participated in selection

of livestock, together with the technicians from

RAB(RwandaAgricultureBoard)inordertoensure

qualityofthelivestock.Thebloodstatusofcattle

and pigs was checked under supervision of a RAB

doctor assisted by 2 veterinaries from Nyamiyaga

and Kageyo sectors before delivery.

• Nine(9)sectorsteeringcommitteesinthenine

sectors have been established (one per sector) in

order to contribute for planning / monitoring of

project activities. These committees are headed by

theofficerinchargeofsocialaffairsatsectorlevel

and the composition of them is:

• Officerinchargeofsocialaffairsatsectorlevel

who is president of comity

• PresidentofRwandaRedCrosslocal

committee at sector level who is vice

president

No.

01

02

03

Training done Participatorylifeskills-basedHIV/AIDSeducationProvide management and governance training to cooperativesCommunity Health Workers Training

Target group

association’s members

Cooperative’s members

Health Workers

Number of participants trained70

135

40

41

• Focalpointvolunteerofprojectwhois

secretary of the committee

• AllthePresidentsofbeneficiarycooperatives

in the sector

• Theagronomistofthesector

• Theexecutivesecretariesofcells

• Thejobdescriptionoffocalpointsvolunteers

was elaborated, discussed with the steering

committee, explained to and then signed by

all concerned focal points. All the appointed

focal point volunteers were selected based on

the following criteria:

• Availabilityandlivinginoperationalsector

• Levelofeducation:atleastsecondaryschool

level

• ExperienceinRedCrossespeciallyskilledin

participatoryapproaches(VCA,PHAST.)

• Astrongspiritofvolunteerism

• Participationinthe8thannualpediatric

conference among adolescent and children

infectedandaffectedbyHIV/AIDSheldin

Musanze district

• Participationinthecelebrationofthe

internationaldaytofightHIVheldinGicumbi

district. RRC volunteers were mobilized to

providefirstaidservices.

• Monitoringvisitsweredoneforall

cooperatives by the focal points and project

staff. The actual situation in detail is

mentionedintheattachedtable,butbriefly

up to now we have 81 cooperatives with 2025

members with 1053 female and 972 male and

the situation of startup capital supported is:

Distribution of cow and pigs to beneficiaries at Gicumbi

district

Startup capital Quantity Quantity

Cows 90 104

Pigs 93 162

Goats 113 146

Sheep 27 38

in nature supported actually

2.3. Reduction of risk sexual transmission of

HIV infection in the community

Achievements:• Selection and training of 15 health workers

fromcellsofMurama,NgondoreandNyarutarama

in Byumba sector and 15 Healthworkers Jamba,

Kabuga and Karambo cells in Nyamiyaga sector

on family planning, HIV / AIDS and circumcision

of males during 3 days. After training, the health

workers trained have sensitized house to house

during twentydayson familyplanning,HIV/AIDS

and circumcision of males.

•Organizecampaignhousetohouseforpopulation

of Byumba sector on family planning, HIV / AIDS

and circumcision during 20 days. More than 1500

households have been sensitized on family planning,

HIV/AIDSandcircumcisionofmales

Outcome 3: Develop the capacity of target

communities to increase access and management

of safe water, sanitation and hygiene at individual,

household and community levels

Achievement:

• 17Watertanks,24waterfountainsand2pipe

linefirstof16kmsandsecondedof3kms

havebeenrehabilitated;

• Alltheseworksusedtosupplydrinkingwater

42

to 4,129 households with 20,645 people on

averageinthesectorsofGihombo;

• Atotalof654additionalhouseholdshave

accesstoadequatelatrinefittedthrough

sensitization of volunteers in hygiene and

sanitationinNyamureSector;

• 3awarenesssessionsdoneonhealthand

sanitationhadreached776peoples;

• The60volunteerstrainedinPHAST;

• 60volunteershavebeentrainedonPHAST

approachinNyamashekedistrict,10of

Rubavu,10ofNyabihu,10ofmusanzeand35

ofNyamagabe

• 2Awarenesssessionswithcommunities

inkaziramireandRwabashenyi(Bugesera)on

PHAST a by CRR model village focal person

was held

• AfterawarenesssessionsonPHAST

communities assisted by CRR volunteer and

local leaders, made groups of 10-15

households as a result 8 groups were formed

at the start and each group elected 2 group

leaders and named their groups

• 7toiletteshavebeenbuiltbythevolunteersin

Kansi sector Gisagara district

3.NUTRITION

Summary In the context of the execution of the project

Health/Nutrition supportedby theJapaneseRed

Cross through the International Federation of Red

Cross/ZoneEasternAfrica(IFRC),astudyismade

to meet the data basis of which we will use as a

reference throughout the life of the project. This

study is conducted in two districts which Kamonyi

and Rulindo andmore specifically in model cells

(dependingontheapproachCRR).

The target population of the survey was children

aged 6 to 59 months, and their families, and the

survey was conducted from 26 September until 02

October 2012 in collaboration with the Health Center

of Gihara in Kamonyi and Kinini Health Center in

Rulindo District .

Atthetimeofthesurvey,thefinalsamplesizeis

composedof832childrenaged6-59months(witha

heightof65cm–115cm).

This sample has been taken to provide the estimates

of the prevalence of malnutrition.

After training of 20 volunteers including 10 from

Kamonyi and 10 from Rulindo on prevention and

management of malnutrition in Community, a visit

on the fieldwas organized and trained volunteers

collectdifferentdatainmodelvillagelevel(practical

training).

Based on these data received, we have planned

an anthropometric survey for the target group of

children under 5 years in this framework to get an

idea of their nutritional status and it will guide us

to the choice of interventions conducted and clarify

thedirectbeneficiaries.

Inbothdistrict,thisinterventionfocusesfourmodel

cellswith796childrenunderfiveincluding383girls

and 413 boys. Two preparatory meetings have been

held, one in the H C of Kinini in Rulindo district and

the other HC was Gihara in Kamonyi district .Because

thematerialsarenot sufficient,wehadorganized

this activity as follows:

•FromSeptember26to28,2012,volunteersfrom

Rulindo district have make the screening of children

under 5 years of model villages targets

•From1thto4thOctober2012,volunteersfrom

Kamonyi have screened Children under 5 years of

model villages targeted

After the data collection, a time entries using the

software SPSS have take 5 days and analysis after

the production of the statistics tables is in process.

Objectives of the Survey• Determinetheprevalenceofglobalacute

malnutrition among children aged 6 to 59

months in cell models and Rulindo Kamonyi

• Assessthenutritionalstatusofchildrenless

43

than 59 months model cells of Kamonyi and

Rulindo

• Assessthecoverageofbasichealthservices

3: vaccination against measles, deworming

MebendazoleandVitaminAsupplementation

in model cells of Rulindo and Kamonyi

• Toevaluatethenutritionalstatusofthe

sampled children using MUAC

• Toidentifygroupsathigherriskof

malnutrition: age group and sex.

Mode of data collection and variables measured

Data have been collected by volunteers trained and

supervisebyMrErnestastrainerwhodistributethe

questionnairestothevolunteersandeverydaythe

data collected are reported to the coordination of

project.

The nutritional status of children aged 6 to 59 months

is considered to be the most sensitive in terms of

population and is therefore used as an indicator.

Anthropometric variables usedWeight: The children will be measured with a bare

Salter type scale of 25 kg with accuracy of 0.1 kg.

Size: Children over 85 cm have been measured

standing. Children less than 85 cm have been

measured in the supine position. The size is taken to

an accuracy of 0.1 cm.

MUAC(PB):isanindicatorofmalnutritioninchildren

morethanorequalto65cm.Ithasbeenmeasured

to the nearest mm on the left arm in the middle of

the elbow and shoulder.

Oedema: The presence of oedema is assessed thumb

pressure applied to the top of the child’s foot for 3

seconds to highlight the sign of the bucket. To be

considered as signs of malnutrition, they must be

bilateral and symmetrical.

Age:Itisoftendifficulttodeterminetheexactage

of a child, the date of birth is not always accurate.

Calendar of events and / or guide age determination

is essential to help assess the date of birth.

Sex: Itallowsustoseetheproportionofchildren

affected by the disease and type.

Immunization coverage against measles: A

vaccinationcardwillberequestedfromthemother.

In the absence of the map, the investigators ask

the mother if the child has been vaccinated before.

Thecoverage isdefinedasthenumberofchildren

immunized with and without a map, compared

to the total number of school-age children to be

vaccinated.

The coverage of vitamin A supplementation: We ask

the mother even if the child has received vitamin A

supplementation in the last 6 months.

CoverageofdewormingMebendazole(Vermox):On

even ask the mother if the child has been suppressed

to Mebendazole during the last 6 months.

IndicatorsThere are three indicators of nutrition status based

onanthropometry(physicalmeasurements)

• Chronicmalnutrition(alsocalled“stunting”)isa

measureofheightrelativetoage.Itisperhapsthe

most relevant indicator for the overall well-being

of a community. High levels of chronic malnutrition

reflectdeprivationoveraperiodofmonthsoryears.

Children who are chronically malnourished may

suffer irreversible disability in mental and physical

development, causing poor performance in school

and reduced physical productivity for the rest of

their lives.

• Acutemalnutrition (or“wasting”) isameasure

of weight relative to height. It is associated with

temporary shocks, such as famine or episodes of

illness.

• Underweightisameasureofweightrelativeto

age. It ismostoftenusedtomonitorthenutrition

status of individual child.

Achievement:Enhancedcommunitycapacitytodetectmalnutrition

and resolve problems and death with malnutrition

cases

• 2 Orientation meetings with local authorities

44

and Rwanda Red Cross local branches are done in

order to select the model village for implementation

project.

20 volunteers, 10 per district are trained in order

to increase the community awareness by organizing

nutrition sessions on balanced diet and cooking

demonstration

890 vulnerable households with 4328 total

population among them 2134 male and 2189 female

areidentifiedbytrainedvolunteers.

Baseline survey is conducted in the 4 model villages,

among them 2 are in Rulindo district and 4 are in

Kamonyi district. Baseline survey has been done in

order to implement the nutrition project at Rulindo

and Kamonyi district, and this survey has give an

idea on Household capacity and nutritional status.

The data collected are still in analysis for report.

After collection of data for HH, a screening has done

by volunteers trained in nutrition and 832 children

have been screened.

Thisfigureshowsthescreeningmadeatcommunity

level by trained volunteers.

• After baseline survey, 2 meetings are done at

district level in order to present the results of baseline

and orient the volunteers and local authorities to

identify the needs of community related to nutrition

and hygiene.

Result of survey:Characteristics of the population:

HOUSEHOLDSThis study has allowed us to have an idea of the

economic level of households and nutritional status

of children under 5 years in these model cells

affected by the project.

Distribution of population study by sex

Distribution of population by district up to model village

District Sector Cell Village Population %

Kamonyi Runda Gihara Kabasanza 254 28.5

Kaniga 168 18.9

Kaniga Bimba 157 17.6

Rulindo Kirenge Rusiga Ntaruka 15417.3

Rebero 157 17.6

Total 890 100

House Hold Pop Percent

Male 2134 49.4

Female 2189 50.6

Total 4323 100.0

House Holds capacity:Figure 01: Frequency distribution of HH having cow

45

Distribution of population by district up to model village

District Sector Cell Village Population %

Kamonyi Runda Gihara Kabasanza 254 28.5

Kaniga 168 18.9

Kaniga Bimba 157 17.6

Rulindo Kirenge Rusiga Ntaruka 15417.3

Rebero 157 17.6

Total 890 100

Basedonthefigurenumber01showthat

among the total HH:

67.7 % of them don’t have a cow

23.4 % of them have 1 cow

8.5 % of them have 2 cows

2.1 .% of them have 3 cows

0.3% of them have 4 cows

0.6% of them have 5 cows

0.1 % of them have messing during the survey

The figure number 02, show that, on 100% of

households that were eligible for the survey, 693

Which equivalent to 77.8% don’t have any goat,

105HHwhichequivalentto11.6.%have1goat,48

HH which equivalent to 5.3.% have 2 goat, 31HH

whichequivalentto3.4.%Have3goats,8HHwhich

equivalent0.8%have4goats,6HHwhichequivalent

to 0.6% have 5 goats

Figure 02: Frequency distribution of households having goat

The results of households surveyed shows that 817

Whichisequivalentto91.8%don’thaveanysheep,

45HHwhichisequivalentto5.1%have1sheep,21

HHwhichisequivalentto2.4%have2sheep’s,4HH

which is equivalent to 0.4%Have 3 sheep’s, 2 HH

whichisequivalent0.2%have4sheep’s,1HHwhich

isequivalentto0.1%havemessedtorespondduring

the survey

Figure 03:Frequency distribution of households having pigs

The 100% of households that were eligible for the

survey, 813Which equivalent to 91.3% don’t have

anypig,67HHwhich isequivalentto7.5%have1

pig,6HHwhich isequivalentto2.7%have2pigs,

1HHwhich isequivalentto0.1%Has3pigs,1HH

whichisequivalent0.1%has4pigsand1HHwhich

isequivalentto0.1%has9pigs

Frequencies distribution of HH having the Hen

Out of 100% of households that were eligible for the

survey, 82% of them don’t have any hen, 17 % of them

have 1 to 5 hens, 1% of them has 5 to 10 hens.

Figure 04: Distribution of population by poverty categories (Ubudehe)

Ubudehe is a community based system that assesses

thefinancialsituationsofcitizenslivinginvillages

throughout Rwanda. The community evaluates each

household’sfinancialsituationandplaces it inone

the of six categories: Umutindi nyakujya, Umitindi,

Umekene, Umukungu, na Umukire (meaning the

poorestofthepoor,poor,therichandtherichest).

Baseline survey was conducted in the model villages, in order to identify major health issues and nutrition problems

46

HYGIENNE: Figure 06. Frequency distribution of households having convenient Toilettes

The figure number 05 show that 28, 5% of households don’t have the toilette

The fugure number 08 shwo that 81.7% of

households they have the toielle but all those are

non coniente.

Kitchen Garden is the main activitiy to be promoted

in order to improve on the nutritional status of the

community. The Gouvernment policy recommends

that each house hold must have the kitchen garden.

But on this survey we founded that 51.4% of housholds

don’t have the kitchen gardens and 49.6% who have

the kithcen gardens, theiy must be renewed for

continous production.

Meanwhilethefrequencydistributionofhouseholds

having kitchen garden, shows that out of 100% house

hold survey, 65.1% don’t have a kitchen gardens

at home and 34.6% households have the kitchen

gardens. 0.3% missed to respond during the survey

Figure 7: House Holds with utensil drying racks

Distribution of households with dust bins.

Out of the 890 households surveyed, 63% of them,

don’t have a dust bins. only 36.9% of households

have the dust bins and 0.1% of households during the

survey missed out to respond.

890 of households survey, 45.5% don’t have drying

lines for drying of the clothes after washing them,

54.3% have them at home and 0.3% households

missed to respond during the survey.

The figure number 7 shows that 74.1% of

households survey don’t have the utensil drier

(etalage)fordryingofhouseholdutensils.

NUTRITION STATUS OF CHILDRENS UNDER 5 YEARS OLD

Based on population survey, the histogram below

shows that 80.2% of children are from Kamonyi

district and 19.8% are from Rulindo district.

This difference is caused by the number of villages in

which this study was conducted in the district and

Fugure 08.

47

Rulindo 2 villages were targeted while Kamonye

Thereare4asshownbelowinthefigure

Figure 9. Vitamin A

Thefigurenumber9showsthatoutof100%,87%

of children, their parents responded yes, meaning

that their children got the vit A during the six last

months before the survey, 12% of parents during the

surveyrespondedNO,meaningthattheirchildren

don’t have the vit A during the six last month before

the survey and 1% of parents missed to respond this

questionduringthesurvey.

The children under five years are vulnerable on

disease due to poor hygiene and it is recommend

to give them vermox dewarmer on time. But this

figureshowsthat100%ofchildrensurveyed,16%

of parents responded that their children don’t

get a vermox during the last six months before the

survey and 1% of parents missed to respond during

the survey.

Figure 10.Measles vaccination coverage for children investigated

Accordingthefigurenumber10,thisshowsthat,the

coverage of measles vaccination is not attended by

100%. This has been said because out of 832 children,

1.4%ofthechildren,theirparentsrespondedNO,

during the survey, that means their children lost the

measles vaccine.

48

Figure 20. Proportion of children with malnutrition during Survey

The figure number 11 shows that 15% of children

survey have oedem type of malnutrition. This sign

indicates the acute malnutrition.

The Brachial circumference change slowly among

the children between 6 to 59 month indeed can be

used without reference indicator. These values can

be used in order to identify the children with high

Figure 12. Brachial Circumference (B C as indicator of malnutrition):

• In this groups identified, two more vulnerable

willbeselectedtoreceivethelivestock(pigs,goat)

as first recipients and the rotation systemwill be

followed by the volunteers and theirs colleges in

order to ensure to reach all members.

Outcome 4: Increase community mobilization for

donation of safe and adequate blood for those in

need of transfusion.

Achievement:

Through community mobilization by Red Cross

Volunteersthebloodunitscollectedaredistributed

as follow:

risk of malnutrition and mortality.

• Inordertopromoteofgoodnutritionandhygiene

at community, the households are regrouped and

each group is composed by ten households nearest,

and each group has prepare the nursery bed for

implantation of legume seeds received, after that

each households will prepare the kitchen garden

where will be the fruits tree, green vegetables

(cabbages,carrot,epinardetc)

• Eachgroupisorganizedinordertomakefollow

up in theirs households according the improvement

level of Hygiene and nutrition promotion.

Blood Units collected through community

Mobilisation done by RRC volunteers in 7

branches.

• 76BloodunitshavebeencollectedatKamonyi;

• 89BloodunitshavebeencollectedatMuhanga;

• 123BloodunitshavebeencollectedatGasabo;

• 852BloodunitshavebeencollectedatKarongi;

• 778BloodunitshavebeencollectedatRutsiro;

• 46BloodunitshavebeencollectedatKirehe;

• 50 Blood units have been collected at Ngoma;

• 96BloodunitshavebeencollectedatNgororero

• 81 New blood donors have been recruited and

givethebloodinNgororerodistrict

• Mobilized 200people to giveblood inBusasam-

anasectorofNyanzadistrict.

Challenge• Bing area to be covering by the program with

insignificantfunds

• Vulnerable needs high according the capacity

of program

• Implication of volunteers at field level is not

sufficient

Recommendation• Strengthen the advocacy in order to mobilize

the fund for program

• SensitizethelocalcommitteesofRRCforactive

Implicationintheprogram.

49

ORPHANS & VULNARABLE CHILDRENProgram SummaryTheOVCprogramismeanttosupportreintegrationof

orphans and other vulnerable children in the country

and is implemented by Rwanda Red Cross within

sevendistricts:Gisagara,Nyanza,Huye,Nyamagabe

and Nyaruguru of Southern Province; Bugesera of

EasternProvinceandGicumbiinNorthernProvince.

Through the fund from different partners the main

achievementsofOVCwerebasedontheminimum

package defined by the Ministry of Gender and

Family Promotion and they are as well as :

• Ensuringbasichealthservicestobeneficiaries

through education on diseases prevention

and installation of hygiene and sanitation

facilities,

• Assistthebeneficiariesforfoodsecurityby

provision of livestock, seeds, installation

of kitchen gardens, as well as provision of

appropriate technical assistance

• Meetingwithprimaryandsecondaryschools

students on results evaluation

• Reinforcingchildprotectionmechanismin

the living communities through education,

home visits and provision of shelter

• Provisionofappropriatepsychosocialsupport

• Strengthenbeneficiaries’mechanismgearedto

long term economic self reliance

As well, some support was extended to communities

in model villages for sustainable livelihoods.

In addition, supervision technical support was

providedtofieldstaff,RRCdistrictcommitteesand

the volunteers through coordination meetings and

fieldvisits,soastostrengthentheircapacitiesand

preparation of ending projects.

Progress towards outcomesOutcome1: Identified orphans and other vulnera-

ble children (OVC) assisted through provision of

50

minimum package services.

Output 1: Promotion of good health and Hygiene

for project beneficiaries and increase HIV / AIDS

awareness in the Community.

1. HIV/AIDSpreventionThrough community education, beneficiaries and

communities in general are involved in fighting

against HIV and AIDS. As well, two community

awarenesssessionsonHIV/AIDSandVCTandfamily

planninginMuheromodelvillageinNyanzaDistrict

have been organized. The participants knew the

ways of transmission of HIV/AIDS. They have also

learned the ways of prevention as well as abstinence

for single, Fidelity for married and correct use of

condoms. About 190 persons attended, 58have been

tested and knew their serological status. The same

activity has been done in Muyira specifically for

students.

The sponsored event organized in Muyira sector at

Nyagasozisecondaryschool,hadattendanceof150

students and the topic was focused on voluntary

conselling and Testing as one way to be aware with

self status serology.50 students of them accepted to

doVCTandnobodyisHIV-positive.

InGisagara,20peereducatorshavemeetandmake

action plan relating to visit the people living with

HIV/AIDS and the victims of HIV. They received

supportive materials which will be used during those

visits.

2. PHAST ActivitiesInGisagaraDistrict,2communityawarenesssessions

on promotion of hygiene practices and prevention of

poor hygiene related illnesses was done in Agacyamo

/kansisectorwith98attendants(51femalesand

47 females) as well as 250 persons(116 male and

134female)inRugarama,Muyenzi,Nkomaneand

GakindoofNtyazoSectorf/NyanzaDistrict.Thiswas

very much liked by the community as it illustrates

the dangers of poor hygiene practices in homesteads

as like uses of non clean water, uses of non clean

latrines, etc. In this way 216 washing soap were

distributed to selected participants.

Household basic materials (30blankets, 30kitchen

set, and 30 jerrycans) have been provided to 30

more vulnerable families in Katarara, Bugali and

Kagunga Cells.

72 Family toilets were constructed replacing the

very hazardous ones on both health and accident

risks in Kansi and Kibilizi sectors/Gisagara District.

Volunteers and beneficiaries were involved and

participated in that activity.

Gisagara project has provided to 500 more vulnerable

families, 999 blankets in terms of 2 blanket by

family, this was decided after assessment done by

volunteers in different cells and seen that some

households even if they haven’t houses in good

situation they haven’t also blankets.

Output 2: Promote community awareness on use of

balanced diet, care and preservation of food stuffs.

1) FoodproductionDuring the reporting period, 10 kgs of vegetable

seeds(carrots,cabbages,onion)weregivento156

OVChouseholdsand98 families in modelvillages

for the renovation of kitchen gardens and increased

food quality in the community by OVC Gisagara

Project.

300 fruit plants were distributed to families of

Ndora,GikonkoandKansisectorstoimproveonthe

nutritional values and act as wind breaks.

98 households in the Mbeho model have enough

cassava ready for consumption and all their kitchen

gardens are being renewed. The photo bellow shows

one of kitchen.

51

A family kitchen garden in Gisagara

Vagetableseedsaswellcabbages,oignons,carrot,

etc, and supermetrine(crops medicine)have been

provided to 127 families in Muhero model village

and 200 other families in terms of promoting kitchen

gardensandfightingagainstmalnutrition

2) NutritioneducationFive practical community awareness sessions on use

ofbalancediet;conducted inMuheroandMuyenzi

model villages, Nkombe and Rugarama model

villagesofKatararaandBugalimodelcellinNtyazo

Sector.186persons(73maleand113female)have

participated in these sensitizations. The participants

knew now how to prepare balanced diet with food

locally available. They have also been sensitized to

maintain their kitchen gardens around their home.

1 session on the use of kitchen garden products and

prevention of Child malnutrition through proper

feeding, were held in Muganza sector and 53 people

participated in balance diet practical exchange and

kids have been given cow milk during the session.

1150 families have been sensitized to maintain

the kitchen gardens; 25OVCwho received house,

420 OVC in Mutete, 730 OVC in Byumba sector

and received amaranths, cabbage, onion seeds. In

Bugesera District: 195 families have received seeds

of amaranth, onion and cabbage.

15OVChouseholdrepresentativesweretrainedon

malnutrition and related illnesses, prevention and

management of these illnesses in Gisagara.

Output 3: Support in education and provision of

professional skills to the many children who had not

afforded continuing with normal education.

Schooling support• Outof302OVCpupilssupportedGisagara38in

P6 passed national examination as well as 94 out of

396OVCpupilsinNyanza

• Out of 122 secondary students supported in

school materials and fees in Gisagara, 17 in Senior

3 and 47 in Senior 6 passed national examination

as well as 36 in Senior 3 and 36 Senior 6 out of 229

supported inNyanza and they are allwaiting for

results.

• 2holidaymeetings(inGisagaraandNyanya)have

been held with all sponsored students on different

sharing sessions regarding education, sponsorship

conditions,schoolperformance(marksreport),and

to plan for holidays activities.

The school fees have been paid for 121 secondary

students (47 boys, 74 girls) where 40 students of

Mutete sector and 81 students of Byumba sector.

As this above table, 18 students finish their first

cycleinsecondaryschooland42(29girls,13boys)

finishtheirsecondaryschool.Astheschoolreport,

the average annual performance (2012 academic

year)for121studentsis65.8%.

In Byumba 60 OVC who started the training in

driving, 11 have already got their driving license, 18

provisionalpermit.Intailoring,allofthemfinished

their training and have started their own business.

OVC Beneficiaries per project

No Name of OVC Project Male Femele Total 1 GISAGARA 843 843 16862 NYANZA 478 478 9563 HUYE 354 320 6744 NYAMAGABE 389 306 6955 NYARUGURU 335 335 6706 BUGESERA 571 616 11877 GICUMBI 677 606 1283

Grand Total 3647 3504 7151

52

Schooling support figures( Secondary and professional studies

PROJECTS

Class NYANZA GISAGARA

S1 2 -

S2 5 3

S3 36 17

S4 51 14

S5 99 41

S6 36 47

Total 229 122

Vocational 19 116

training (30fordivingschool,86fortailoringtraining)

The table bellow shows the last term performance by secondary OVC students (September-November 2012)

Marks/100% Nyanza(outof229 Gisagara(out

< 49 1 1

50 - 59 51 20

60 - 69 115 73

70 - 79 59 23

80 - 89 3 4

90 - 100 0 0

students)122 ofstudents)

houses to do the self business in the generation of

income through putting in practice what they have

been learn.7outof19OVC invocational training

supportedbyOVCNyanzahavefinishedtheircourses

as well as 19out of 30 in driving school in Gisagara

project.

• 1 tailoringhouse has beenconstructed tobe

usedbythoseOVCwhohavefinishedinthetailoring

business, this house together with others already in

useareveryusefulforthephasedoutOVC,theyfeel

much comfortable with them and look for customers.

They have also formed a cultural dance team as

wellasonewaytorecreate(leisureactivities)

Output 4: Provision of accommodation facilities to

child households and protection of child right

Child rights promotion

In collaboration with district authorities, Gisagara

project have participated in 2 days exposition of

OVCactivitiesandRRCactivitiesingeneral,where

a serious accession was taken to various child rights

advocacy, using child testimonies and photos.

ConstructionofhousesforOVC

In 2012, The construction of 25 houses in Mutete

andByumbasector(13inMuhororovillage,Musenyi

celland12inKabezacell,Mutetesector)hasbeen

finished.

Doing the advocacy for child protection during the expo.

• 86OVChavefinishedtheironeyeartrainingin

thetailoringschoolsofKansiandNyanza,thesewill

join the rest in the newly constructed tailoring

53

1 sponsored event was held in kansi sector/

Gisagara district, this was on one hand meant to

bring more children together, to play various games

aimedatmakingthemhappyandfeellovedandfit

in the society and assume their rights as children.

Participants (230 children) decided to be the

observers in their respective communities in order

tofightagainstinkindofchildrightviolation

By 10 Mamankundabana and 15 volunteers, one

communityawarenessconductedinNtyazosector/

Nyanza District on child right protection in their

community after doing home visits to 15 families

where assessed non respect of child right as well as

6 cases of drooping out school and 9 cases of non

appropriate child care.

With an objective of integrating gender approach

in daily activities, 20 volunteers fromNyanza and

20 others from Gisagara were trained on Gender

aspects. The participants exchange on gender and

other related concepts, its consideration in their

community and what must be done

or how to integrated it in daily project activities.

Output 5: Put in place effective outreach programs

on child home visits aimed at strengthening and

rehabilitation of traumatized children, physically

and mentally

1)Homevisitsandtrainings

Nyanzaprojectsocialworkerincollaborationwith20

volunteersconducted80OVChome(20householdsin

eachsectorMuyira,Ntyazo,KibiriziandBusoro) in

order to help them to express their emotions and

to check if there is no special case which needs the

advocacy to staff project or to local authorities. For

this visit, there is no special case.

4 households of very poor people in Kansi Sector,

Akaboti Cell, were assisted with finishing their

houses during the volunteers and OVC community

work.Doorsandwindowswerealsofixedto these

houses.

2) Leisureactivities

Leisureactivitiesarepartoftheprogramgearedto

psychological support and community integration

of the assisted children .In that way, 2 foot ball

competitions were held in both kansi and kibilizi

between the OVC sponsored by project and other

youths in the community. The Red Cross sponsored

youths arewell equipped and feel so comfortable

and cared for when they go out to play with other

teams, and in most cases, they win.

3) Solidaritycamp

RRC society have organize un extended of a solidarity

camp with objective of combining volunteers and

beneficiaries efforts for one work of constructing

housesforvictimsofflooddisasterinRubuvuDistrict/

Western province. Reason why each ovc project

including Nyanza and Gisagara selected 8 OVC to

participate in that solidarity camp of one month

in November-December 2012. As achievements 20

houses have been constructed in Cyanzarwe sector

to the most vulnerable families selected by local

administration. On Agenda, there were also leisure

activities in order to break them and to help them

to initiate different kinds of games and exchange on

their daily life and vision. With the visit of Minister

ofYouthandIT,theparticipantsgottimetoexplain

themselves their opinions.

Output 6: Improve OVC the capacities through

establishment of small-scale project

1) Incomegeneratingactivities

The aim of the program is to help the children in order

to achieve progressively economic self reliance by

mobilizing their energy in productive pare activities.

Ultimately, this program contributes to preparation

of the beneficiaries for smooth phase out and

promotes the spirit of working together and being.

Theproductionisfirstusedforhomeconsumption,

and the remaining is sold to the market and allows

thebeneficiariestocater fortheirotherneeds. In

54

the way of sustainable activities, Gisagara project

hadbought3newlandsto5OVCcooperatives,and

Nyanzabought3 lands to3associations (Duterane

inkunga,TwisunganeandTuzamurane)forreinforcing

them and phasing them out of the project. Those

cooperatives received also 20 pigs as one of the

smalldomesticanimalswhichproducequickly.Their

testimonies and involvement showing remarkable

willing of economic improvement through cultivating

more crops in the available lands.

Rice cultivation activity in the swamp by Gisagara OVC cooperative

EightassociationsofOVCs(TWIKUREMUBWIGUNG

E,TWISUNGANERUBYIRUKO,DUHOZANYECouture,

TUBUMWE,DUTERANINKUNGA,DUHOZANYEAgr,

TWISUNGANE,andDUFATANYERUBYIRUKO)have

beenvisitedbyVolunteersandSocialWorkerin

order advises them how to work together and

tomanagetheirresources.Inthisperiod,they

were busy by crops planting and expect to harvest

incomingseason.Thetailoringassociation(8

members)isnowworkinginthenewkiosqueand

has30000rfwonaccount.Theyarefittingoknow

because as they said, the minimum daily needs are

satisfiedduetothatworkandtheytrytolookfor

clients.

Outcome 2: RRC district committees and field

officers empowered for effective and efficient

monitoring and implementation of the projects

activities in respective communities.

Output 1: Capacity building for district

committees and staff

During this period the coordination and supervision

activities have been characterized by technical

and financial support to projects staff through

field visit, coordination meeting and phasing out

thebeneficiaries. Sommeof theseactivities is the

following:

• Providing 15 bicycles to active volunteers in

Gisagara district for facilitating them the

follow up of project ongoing activities

• Also, Secretary General organized a meeting

with staff and local comities from 2 districts

for explaining and giving them the responsi-

bilities of projects continuation.

• Preparing and doing the hand over and hand

inwithprojectstaff(NyanzaandGisagara)

• Conducting internal audit and monitoring by

PMERofficerandinternalauditor

• Participation in Workshop organized by

the National Commission for Children aiming

preparingOVCNationaldatabase.

Constraints GisagaraandNyanzaProject fundsarenowended

andsomeoftheprojectbeneficiarieswerenotyet

phased out

The local committee (Nyanza District) doesn’t

their own income generating activities to continue

or to insure the delayed projects activities.

55

COMMUNICATION PROGRAM

Program Purpose

The global objective of the Information and

Dissemination program is the following as specify in

2012-2016 Rwanda Red Cross strategic plan:

‘’Strengthen the capacity of RRCS to raise its

profileandintegratethedisseminateinformationon

international humanitarian values’’

Program report summaryThis report is an account of the main activities

achieved in 2012 both in communication and

dissemination components.

This year has been dominated by the organization

of Public relations activities such as evening

information meeting, open days, Photo exhibition,

FundraisingeventsinordertopromotetheNational

Society mission towards most vulnerable as well as

thecelebrationoftheInternationalRedCrossand

Red Crescent day.

The Communication Unit has continued to

support Rwanda Red Cross Programs in the area of

communication especially media coverage and the

productionofdocumentaryfilmofimportantevents

as well as dissemination of humanitarian values.

Furthermore media houses publicized information

on Rwanda Red Cross activities through different

channels:radios,TV,newspapersandwebsites.

A continuous support was also given to info/

disseminationvolunteers throughfield tripsby the

communications staff and coordination meetings.

As part of capacity building, the communication

staffs have received trainings and an exchange visit

56

which will enable the team to improve its daily

work.

Program Component 1: DisseminationSpecific objectives:

1. Enhanced knowledge, understanding and

application of fundamental principles and

humanitarian values

2. Strengthen the capacity and skills of Info/

Dissemination volunteers in promotion of

humanitarian values work of RRC and life saving

gestures

1.SupporttoInfo/Disseminationvolunteers at branch levelExpected results:

• Communicationactivitiesarebetterimplemented

and monitored by RRC branch committees and

volunteers.

• Info / Dissemination volunteerswork is better

known by RRC committee members and carried out

accordingtoperformancecontracts(Imihigo).

Achievements: Support to info/dissemination activities provided in

different ways:

• Financial support provided: 30 branches and

3 youth sections (Info/Disseminations volunteers

in universities) received 128,000 Francs each as

financial support for Information/ Dissemination

activities implementation and follow up.

• Promotionalmaterialprovidedtovolunteers:All

Info/Disseminationvolunteersatdistrictreceived

available materials including information brochures

in Kinyarwanda, RRC bulletin and calendars .

• Thevolunteersalsoreceivedtheofficeequip-

ment in order to allow them to produce their

reports

2. Decentralization Meeting at districts levelsExpected result:

• Info / Dissemination volunteers work is better

known by the members of committees and the

activitiesaccordingtoImihigowellevaluated

Achievements: Decentralization meetings were carried out in all

provinces.

Participated in these meetings, the representatives

of committees, districts coordinators, Info/

Dissemination volunteers, Communication Unit,

andtheICRCTeam.Wehadtheopportunitytovisit

high schools that were included in the volunteer’s

reportsinordertoconfirmtheirroleandpresences

in suchfield.Wehadalso theopportunity tovisit

some universities: National University of Rwanda,

Kigali Institute of Education in order to monitor

their activities.

The aim of these meetings was to assess if the service

derived (incommunication)meet theobjectiveas

statedintheRRCstrategicplan.Isthevolunteers’

network contributed to the branch’s needs in

communication matter? Did they collaborate with

other departments / committee members?

Itwasalsoanoccasionofassessingthecommit-ment

as well as support provided by district committee

members to communication activities included in

the districts performance contracts. At the end of

the meetings, recommendations were presented to

volunteers and committees as part of maximizing

the implementation of activities as described in the

Imihigo.

These recommendations were part of 2013 plan

of action. Decentralization meetings were carried

grouping Kigali city and 3 Universities.

57

Decentralization meetings at Gasabo, Huye and Ruhango

3. Regular Dissemination sessionsExpected results

RRC mission and activities towards vulnerable people

are well understood by the general public

AchievementsWith the support provided to all RRCS branches

committees and 3 universities, dissemination

sessions were held by volunteers on RRC activities,

fundamental principles, RC/RC International

Movement history, the RRC mission and vision as

well as programs and activities.

The people who benefited those disseminations

were: the general public, local authorities, youth

insecondaryschools,aswellasthebeneficiariesof

model villages.

Around24000people(countrywide)benefitedfrom

these dissemination sessions.

The good result is that 410 have become members

and accepted to pay membership card. The

communications Unit received also 68 articles from

volunteers that have been published in the RRC

quarterlyNewsletters

4. Annual coordination meetingExpected result:

• Communicationactivitiesarebetterimpleme-

nted and monitored.

Achievements:The meeting was attended by Info/Dissemination

volunteers, Communications Unit staff and the

ICRC cooperation officer. The aim was to recycle

volunteers on Red Cross movement and RRCS in

particular, life saving gestures as well as to give

them presentation techniques. It was also an

occasion for info/Dissemination volunteers to share

their experience.

Furthermore, the meeting enabled the participants

to look where they come from and how they can

improve their work.

Insummary,attheendofthemeeting,thefollowing

points were once again considered:

• Thevolunteershavetoorganizethedisse-

mination plan in order to allow the

DisseminationOfficertoassistthem

constantly;

• Inadditiontothetargetgroupswhich

are the youth in secondary schools, transport

associations,RRCSbeneficiaries,RRCSnew

members, local authorities in 2013 we will

target also members of different cooperatives

available at districts levels.

• Thethemestobedisseminatewillstill:RRC

and it activities as well as fundamental

principles;

• Havinganobjectiveofeachdissemination

session;forexample:recruitment

• Preparingyourdisseminationsessionbefore

58

tobepresentedtoyouraudience;

• Savinggesturestomaintainduring

dissemination session still : Hemorrhage, and

abrokenarm;

• Conveningonascenariowhichcanhelpto

include the saving gestures and fundamental

principles;

• volunteersmustandshouldusealways

didactic materials when conducting a

dissemination sessions

ProgramComponent2:Information

Specific objective:

IncreaseRRCvisibilityandstrengthenlinkswithlocal

and international media to maintain a high public

pro-fileandpositivepublicimagefortheRwandaRed

CrossandtheInternationalRedCross/RedCrescent

Movement at national and regional levels

1. Support the RRC branches to produce radio programmesExpected Result

36 radio programmes produced and broadcasted on

local radios.

Achievements:65 radio programmes have been broadcasted on the

followinglocalradios:RadioIzuba,RCRusizi,Radio

Isangano,RadioIshingiro,RadioHuguka,RCRubavu,

RCNyagatare, RCMusanze, Radio Salus andRadio

Maria Rwanda.

Radio Izuba: 5 radio programmes

The topics were: First aid in our community,RRC

activities in Model Villages,Construction of houses

for returnees from Tanzania, Role of RRC in the

resettlementofreturneesfromTanzania,Importance

of knowing life saving gestures”

RC Nyagatare: 5 radio programmes

Thetopicswere:Thevoluntaryservice(2times),RRC

activities ,History of RC/RC Movement,The role of

RC/RC Movement in DM

RC Rusizi: 5 Radio programmes

The topics were about:,RRC activities in secondary

schools, Sensitization about prevention of disasters in

the community,RRC activities in model villages,The

role of RRC in Disaster Management, History of Red

Cross Movement

Radio Isangano: 7 Radio programmes

The topic were about:RRC activities”., History

of RC Movement,RRC activities in model villages,

Recruitment of RRC members, RRC interventions

when there are disasters, RRC activities in its

different programs, RC/RC principles

RC Rubavu: 6 Radio programmes

The topics were: RRC activities, Sensitization

about prevention of disasters in the community,

Sensitization of the community about the fundraising

organized for building houses of vulnerable people

displaced from Rubavu Mountain., Sensitization

about prevention of disasters in the community, RRC

activities intransitcampsofNkamiraandKigeme,

Sensitization about fundraising for building houses of

vulnerable people displaced from Rubavu Mountain

Radio Huguka: 4 Radio programmes

The topics were: RRC activities in model villages,

RRC activities in general, RRC activities in model

villages(2times)

Radio Maria Rwanda: 3 Radio programme

The topics were: RRC activities in model villages,

RRC activities in general,RRC activities face to

disasters

Radio Salus: 6 Radio programmes

Thetopicwas:RRCactivities(6times)

59

Radio Ishingiro: 19 Radio programmes

The topics were;

• RCemblemsandtheiruse,Describingdisasters,

Classificationofdisasters,Howtopreventdisasters,

Activities of OVC project in Gicumbi, History of

RC Movement(2 times),RC principles, Role of

RRC volunteers, Describing disasters, Geneva

Conventions, RRC role in blood donation, How RRC

intervenes when there are disasters, Sensitization

on environment protection , RRC activities in Model

Villages. Role of youth in RRC activities, Seville

agreement, RRC activities in Gicumbi District, RRC

and its partners

RC Musanze: 5 radio programmes

The topics were: How to fight against disasters,

RRC activities, RC Movement, Sensitization relating

the fundraising, How to fight against disasters,

Furthermore, some radios have broadcasted news

on RRC activities. Among others we mention Radio

Rwanda, Radio Salus, Huguka,RC Musanze and RC

Rubavu.

2. Produce and send press releases to various media. Expected Result:

12 press releases on RRC activities produced and

sent to different media

Achievements:18 Press releases have been produced. The press

releases were sent to private and public media on

the following subjects:

• 8maycelebration

• RRCactivitiesinmodelvillages

• DREFappealforthefloodsoccurredin

Northernandwesternprovinces

• RRCoperation/AssistancetowardsCongolese

refugees

• RRCactivitiesinmodelvillagesofBurera

district(July3,2012)

• Inaugurationofwaterconveyanceprojectin

Nyanzadistrict(July13,2012)

• Distributionofpigstovulnerablepeoplein

KanamaandNyundosectorsinRubavu

district(July26,2012).

• Distributionofcowsandcommunitywork

supporting vulnerable people building toilets

inGisagaradistrict(July31,2012)

• ClosingceremonyofatrainingonFirstAidin

Rulindodistrict(August10,2012).

• Distributionofpigstovulnerablepeoplein

GisenyisectorinRubavudistrict(August21,2012).

• ClosingceremonyofatrainingonFirstAidin

RuhangodistrictAugust24,2012).

• DREFappealforthefloodsoccurredinthe

western province.

• InformationmeetingorganizedinRubavu

towardsdifferentpartners(September14,2012

• RRCoperation/Assistancetowardsflood

victimsinRubavudistrict(September15,2012).

• ClosingceremonyofatrainingonFirstAidon

IwawaislandRutsirodistrict(October18,2012).

• Partners’meetingheldinRubavudistrict

(October26,2012)

• DistributionofgoatsinNyarugengeDistrict

(November30,2012).

• JournaliststourinKirehedistrict(December7,2012)

3. Production of RRC BulletinExpectedResult:

Production and dissemination of RRC bulletin in

Kinyarwanda

AchievementsIn order to promote RRC activities the RRC

newsletter in Kinyarwanda issue 106, 107 and 108

were produced. We collected and edited stories

and followed up designing and printing work.4500

copies were distributed to the different targeted

groups. Among them they were high authorities:

Ministers, members of Parliament, partners, Districts

authorities, RRCmembers, Volunteers and private

institutions.

60

4. Productionofdocumentaryfilmson RRC activitiesExpected Result:

• Produceandbroadcast4documentaries

filmsonRTVanddistributedigitalvideo

(DVD)todifferentpartners.

• TopromoteRRCanditsactivitiesthrough

shortdocumentaryfilms

Achievements

4 documentaries films were produced:

• A documentary film on RRC achievements for

2011 has been produced. Images and testimonies

have been collected.

• A documentary film on 2007-2011 RRC

achievements has been produced and broadcast at

theNationalTelevisionunderthethemedeveloped

of “Rwanda Red Cross strengthening community

resilience and disaster risk reduction” 50 Digital

VideoDiscs(DVD)havebeenproducedanddistributed

to different partners, ambassadors as well as key

Institutions.

• Adocumentaryfilmentitled“RwandaRedCross

steps up to prevent natural catastrophes and find

a lasting solution to life-threatening problems” has

beenproducedandbroadcastedatRTV.

• A dissemination lesson has been produced

and edited.

Among the activities done in the context of

productionofdocumentaryfilmsare:

• Collecting Images and testimonies in models

villages, OVC projects and Abasigajwe inyuma

n’amateka.

5. Media coverage of all RRC important activities and events Expected result:

Great visibility of RRC through media coverage of

Rwanda Red Cross multi sartorial activities

AchievementsMedia houses: newspapers, radios, National

Television and different websites have broadcast

information on Rwanda Red Cross.

• Newspapersthathaveproducedarticleson

RRCactivitiesare:TheNewTimes,Imvaho

Nshya,IzubaRirashe,LanouvelleRelève,The

Rwanda Focus,

• RadiosthatbroadcastnewsonRRCare:Radio

Rwanda, Radio 10, Radio Salus, Huguka radio,

RC Huye, RC Musanze, RC Rubavu, Radio

Ishingiro

• Television;RwandaTelevision

• Websites

• Igihe.com

• Kigalitoday.com

Eventscoveredare:• Distribution of goats in Ruhango district, The

ceremony of giving certificates to OVC (Bugesera

district), Distribution of goats inGakenkedistrict,

DistributionofgoatsinNgororerodistrict,Distribution

ofrabbitsinKamonyidistrict,Informationmeeting,

CelebrationofInternationalDayofRC/RCMovement,

RRCactivities inBugeseradistrict (model village),

RRC activities in Gisagara and Ngoma (model

village),RRCactivities inRuhango(modelvillage),

RRCactivities inGasabo,NyanzaandHuye(model

villages),InaugurationofGatoresite,RRCactivities

in Nyaruguru, Nyamagabe and Gicumbi (model

villages), The ceremony of signing performance

contracts, RRC activities in model villages / Kayonza

andKirehedistricts,Distributionofassistancetoflood

victims in Rubavu district, Sensitization on disaster

prevention, Inauguration of water conveyance in

61

Nyanza District ,Distribution of pigs to vulnerable

people in Kanama and Nyundo sectors in Rubavu

district., RRC activities in model villages of Burera

district, Distribution of pigs to vulnerable people in

GisenyisectorinRubavudistrict.,DREFappealfor

the floods occurred in the western province, RRC

operation/Assistance (fundraising) towards flood

victims in Rubavu district.

• Closing ceremony of a training on FirstAid in

Rulindo district., Closing ceremony of a training on

First Aid in Ruhango district., Kermesse for youth,

ClosingceremonyofatrainingonFirstAidonIwawa

islandRutsirodistrict(October18,2012),Partners’

meeting held in Rubavu district (October 26,

2012) ,Distribution of goats inNyarugengeDistrict

(November 30, 2012), Journalists tour in Kirehe

district(December7,2012),RRCactivitiesinmodel

villagesGisagaraandNyanzadistricts,Youthcamp

(November), Sensitization on disaster prevention

(november), Distribution of cows in Gicumbi and

distributionofgoatsinNyagataredistrict

EveninginformationmeetingExpected results:

• EveningInformationmeetingheld

• RRCmission,status,achievementsand

challenges towards vulnerable people understood

by political leaders, partners and potential

partners

• Extensionofpartnership

Top & Below: Dr Agnes Binagwaho, Minister of Health (Guestofhonor)andGuestswatchingadocumentaryfilmonRwandaRedCross2007-2011addressingherremarks on achievements

Achievements:The evening information meeting was held on 8th

may at the Gorilla hotel. This day coincided with

the celebration of the international Red Cross and

Red Crescent day. Were invited to this event, the

Minister of Disaster Management, ambassadors and

consular representatives,UN agencies, NGOs, RRC

board members as well as the staff.

The theme of this information meeting was:

strengthening community resilience and Disaster

Risk Reduction.

The event had two objectives namely:• Presentationofthemajoractionsand

challenges facing by RRCS through its mission

of assisting the most vulnerable

• PartnershipwiththeRRC

90% of those invited have responded to the

invitation. Among the evening’s activities, there

62

wasapresentationofadocumentaryfilmonRRCS

achievements in the past 4 years under the theme of

‘’strengthening community resilience and Disaster

Risk Reduction” Guests had the opportunity to hear

abeneficiarytestimonyofRRCprograms.

As a result to the event, some of the participants who

were present during the event met the Secretary

General and the RRCS technical staff for a future

partnership.

7. Celebration of the International RC/RCday(8may)

Expected result:

• Celebrationof8may

• Visibilityincreasedthroughthe8thMay

celebration

Achievements: Great visibility at the occasion of the Red Cross Week

and 8th May celebration. This was made possible by

organization of a variety of activities in different

placesandtheparticipationofjournalistsfromTV,

radio and newspapers.

The main activities realized are:

• The Red Cross week during which volunteers

country wide conducted activities such as, Blood

donation, building houses for the most vulnerable

people, initiate the volunteers and the communities

on life saving gestures, making kitchen garden,

mobilizing communities on the following themes:

reproductive health, HIV/AIDS, malaria, Hygiene

and sanitation

• Collectionanddistributionoffoodandclothesto

the most vulnerable people in model villages.

A joyful ceremony was held on the 11th May at Mutete

sector Gicumbi District where RRC inaugurated 50

houses for Orphans and other Vulnerable Children

(OVC),andaschoolof12yearseducation.

8.PRInformationmeetingExpectedresult:Explain the mission and vision of RRC towards

vulnerable people to different partners

AchievementsIncollaborationwithResourceMobilisationProgram,

on September 14, 2012 we organized an information

meeting in Rubavu where a fundraising took place

for supporting vulnerable people displaced from

Rubavu Mountain.

9. Training on capacity building in Beijing (China)Through the Rwandan Ministry of Foreign Affairs,

Chinese Red Cross invited us for training on capacity

building for African and Asian National societies.

RRCS Secretary General andtheheadofICRCdelegation in Rwanda speaking to the guests at the evening information meeting

63

This training was held in Beijing from 5th April to 25

April 2012.

We learned a lot on all programs. The Chinese

RedCross is a strongNational Society in disaster

management andhealthfield. It has strong teams

able to respond during emergencies effectively if

thereisneed.Incommunicationandpublicrelations

domain, we have learned strategies that Chinese

Red Cross uses to reach a large number of people

able to serve as volunteers during its interventions.

The Chinese Red Cross has specific strategies for

approaching and reaching institutions and corporate

that financially supports its programs. We shared

best practices learned with our colleagues and with

the top management, we will see the possibility and

adoptsomeChinesestrategiesourNationalSociety.

Open days and exhibition Objectives: • ShareRwandaRedCrosslessonslearntand

bestpracticesinresiliencefield,DRRand

youth involvement with RC/RC movement

andraiseNationalsocietyprofile.

• ExternallypositionRwandaRedCrossasa

respected partner investing in Africa’s

sustainable development by strengthening

community resilience and empowering

locally-lead solutions.

Expected outcomes: • RwandaRedCrossmission,bestpractices,

achievements and challenges towards

vulnerable people well understood

• RRCSvisibilityincreased;

• Goodpartnershipforcommunitybased

programs

• ImprovedcapacityofRwandaRedCrossto

manage and respond to disasters with

knowledge and skills sharing with the RC/RC

Movement.

• ImprovedinformationsharingamongNSand

within RC/RC movement by disseminating

lessons learnt and best practices through

communication materials.

• Extensionofpartnership

AchievementsThe communications unit has participated in 4 open

days organized by the Joint Action Development

Forum its partners and the private sector in order to

promote RRCS and its programs.

Over 18500 people visited the stands held by the

RRCS and appreciated actions carried out by RRCS

towards the most vulnerable as stated in the visitors

book. It was also an occasion to distributed our

publishing issues such as: Kinyarwanda newsletter,

Fact sheet, some brochures on RRCS programmes, etc

InOctober,RRCSheldaphotoexhibitionstandduring

the 8th Panafrican Conference in Addis Ababa. The

RRCS stand has received several audiences than

other national societies who were present. All

partners and guests of the RC/RC movement who

visited our stand were impressed by our actions and

congratulated RRC for its successful activities.

Indeed, some partners have expressed the wish

of coming in Rwanda to see how we can create

partnership for community based programs.

Exhibition stand held by RRC during the 8th PAC in Ethiopia

64

11. Guided tour and lunching of world disaster report

Achievements:TheLaunchingofworlddisasterreportwasheldon

7thnovemberatKireheintheEasternProvincel.

This day coincided with the journalist guided. Were

invited to this event , the Ministry of Disaster

Management, administrative authorities in the

Easternprovince,NGOsandjournalists.

The event had two objectives namely:• TomakeknownRRCmission,status,

achievements and challenges towards

vulnerable people

• ToraiseawarenessonDisasterriskreduction

(migrationanddisplacementissues)and

sensitize key stakeholders, media on the

role and the mandate of Rwanda Red Cross

and having support from them.

• Tocallgovernmenttoensurethatmigrants

and refugees have access to the support they

need and that they are treated at all times with

respect and dignity.

The theme was: strengthening community

resilience and Disaster Risk Reduction.

Theeventstartedbyafieldvisitontheresettlement

projects for people expelled from Tanzania assisted

by the RRCS. Thereafter, a press conference was

held on risk reduction focusing on migration and

displacement.

Participants to the lunching of world disaster report

At the end of the press conference, the journalists

have set up a forum of humanitarian journalists and

made a statement that they will always support the

mission of Rwanda Red Cross.

12.RC/RCEastAfricacommunicationworkshop in KenyaInordertoenhancecommunicators’capacity,from

13to15November,inNairobi,EANationalSocieties

communicators, ICRC and IFRC meet to network,

discuss priorities, challenges, exchange knowledge

and best practices.

Objectives:• Assesscommunicationsneedsandpriorities

inEANSsandexploretoolsonhowtoimprove

information sharing and coordination

• Supportskillsandknowledge/Strengthen

capacity in key communications areas

(Emergencycommunications,socialmedia,

branding,Beneficiarycommunicationetc)

• EnhancethepositioningofRCRCasakey

humanitarian and development organisation

with a cutting-edge team of communicators

• StrengthenlinkagesbetweenHumanitarian

Diplomacy;PMERandCommunication

• Leverageourcollectiveforceasone

communicationnetworkinEastAfricaregion.

Lessonslearnt• Therelationshipbetweenplanning,

monitoring, evaluation, reporting and

communications.

• Tomakeagoodpressrelease.

• Howtocommunicatetoourvariousaudiences

when big disasters strike.

• ThegooduseofSocialmedia.

• Totakepicturesofpeoplerespectingtheir

dignity.

• Thegooduseoftheemblemincaseofarmed

conflict.

65

13.ExchangevisitinKenyaInordertoreinforcetheNationalSocietyactivities

in Public Relations and Resource Mobilization, the

Communications Manager went to Kenya Red Cross

for an exchange visit from 17th to 20th December.

The visit allowed me to learn from the experience

and outstanding performance of Kenya Red Cross

IhadtheopportunitytoseeandlearnhowtheKenya

RedCrossSocietyPRUnitworkstoincreasetheNS

visibilityandpromoteitsimage;

How the PR team works to position the national

society as an active and innovative humanitarian

organization and how it work supports the resource

mobilization program.

Iwas very impressedby the resourcemobilization

strategies used by the PR team in order to generate

their own funds.

They have an audio-visual studio and other

institutionscometoacquiretheirservices.

TheITTeamalsosellsservicesbycreatingwebsites

for individuals or corporate.

The money raised goes directly to the account of

PR and support initiatives that were not funded by

donors or salaries for the staff assigned to the unit.

Rwanda Red Cross could also adopt such strategies

Conclusion2012 year was fruitful in terms of public relations

and communication, thanks to good cooperation

with the media and understanding of our colleagues

from other programs.

Main events were covered by media (radios,

newspaperswebsitesandnationaltelevision).

Comparing to the last year, 2012 many events in

branches were covered by the local media.

We thank very much some branches that have

taken the initiative to work with the media and

promotetheiractivitiesinthelocalmedia.In2013,

we encourage others to do the same in order to

maximizeNationalSocietyvisibility.

Concerning the dissemination, the network of

Information and dissemination volunteers held

dissemination sessions. RRCS has 410 new members

thanks to our volunteers.

The field trips made allowed us to know the

branches needs and priorities in the dissemination

and communication domains.

Itwillbebettertoencouragethisexerciseeachtime

when the program will start the planning process.

WeappreciatetheparticipationofICRCteamduring

ourfieldvisits,theirpresencewereimportantand

beneficialtous.

Lastly,theGuidedtourorganizedforjournalistshas

strengthened the relationship we have with media.

We appreciate and welcome the journalists’ idea

of set up a forum for humanitarian journalists. This

networkwillallowtheNationalSocietytoreinforce

itsvisibilityandraiseitsprofile.

In2013,wewillputalotofeffortintheuseofsocial

media and updating the RRCS web site.

66

Program summary The program is divided into the following 3 units:

• Accountantunit

• Logisticsunit

• Humanresourceandmanagementunit

Themainobjectiveofthefinanceandadministration

department is to offer an efficient and effective

support services to other programs by putting in place

proper structures and mechanisms that allow timely

innervations to the needy populations and bring

about accountability throughout the operations

Focussing on diversifying its income sources and

consolidating its financial sustainability, the RRC

increased the percentage of total income generated

from domestic sources from 14 % in 2008 to 17 % in

2009to23% in2010,Eventhoughthepercentage

decreased to 19 % in 2011, it again rose to 22.25%

in 2012 of the total income , as shown in line 2 in

tablebelow.Thisincreasehoweverisreflectedin

reduction of total income to RRCS which decreased

by 24% from 2011 to 2012 mainly explained by

partner contributions’ decrease.

Administration and Finance

Global Fund

ration Fees

Table showing Composition of funding sources for the period of 2009- 2012

No Donor 2009 2010 2011 2012

1 Government 52,069,211 63,961,190 54,185,299 76,000,000

2 RRCFUND 481,850,776 667,812,201 657,683,714 586,203,843

3 Federation 309,835,747 188,059,419 343,818,117 557,636,025

4 ICRC 132,869,035 116,583,859 146,222,830 219,744,403

5 PNS 2,286,551,479 1,775,848,696 2,105,993,200 951,625,055

6 Other Funds / 43,339,105 8,825,595 71,109,164 182,706,596

7 10% Administ 104,953,091 68,626,708 88,687,727 60,562,732

TOTAL 3,411,468,444 2,889,717,668 3,467,700,051 2,634,478,654

67

The chart below shows the RRC different source of funds and Budget for 2012

To increase further domestic income, the RRC has,

with funding from the Federation, elaborated a

master business plan to exploit the RRC assets in

Kigali (where a large area has been donated by

the government).At decentralised level, the IGA’s

funded from 2008 have helped the branches to cover

somebasicneedssuchasofficerent,stationeries,

water and electricity, and meeting fees.

Furthermore, a Resource Mobilisation Unit was set

up during 2010 aiming at developing key guiding

documents such as a strategic plan, annual plans and

frameworks in addition to trainings in communication

and social media. Initial contacts have also been

established with potential private donors in order to

increase income from domestic sources.

The following results were attained:

More emphasis was put by the NS on Resource

Mobilization strategies and activities both at HQ

and branch level and clear targets stated in the

Strategic Plan 2012-2016. Due to the emphasis put on

ownership, resource mobilization and sustainability

inmanymeetingsatHQandduringfieldvisits,anew

mindset is arising among branch committees which

is more conducive to income generating activities

and fundraising for self reliance and sustainability.

Asaconsequence,allbranchcommitteemembers

have a better understanding of the importance of

local income generation. For the year 2013, all

branches set annual goals for income generation in

the framework of the Annual performance contracts

“Imihigo”

In2012,managerialcapacitiesof13brancheswere

reinforced through practical training of key people

involved in IGA management and follow up visits

were done in these branches. At least 60 people

acquiredbasicknowledgeandskillsonanalysisof

the market, elaboration of simple business plans,

basic accountancy, working with Saving and

CreditsInstitutionsinRwandasoastoimprovethe

management of existing IGA and/or promote new

microenterprises for sustainable financial viability

of branches.

As a result of the support provided over the last

year,threebranchesincreasedsignificantlyyearly

income, the best performing being the Rubavu

branch which has started an investment worth

20,000,000RwF (ahouse for rent) andhas so far

disbursed 7,000,000 Rwf on their own. A third of

branchcommittees(10outof30)arenowableto

cover their basic core costs by their own income

which contributes to increasing self reliance and

sustainability of RRC humanitarian activities from

the grassroots

Rwanda Red Cross income generating services

are better known to the general public thanks to

marketing activities done in cooperation with other

NSservices,particularlytheCommunication,First

Aid, Youth services and the Rwanda Red Cross Training

Centre (Exhibitions days organized, documentary

films broadcasted, commercial pub. and other

marketing tools like brochures and other products to

promote Rwanda Red Cross Green Park paid services

(trainingfacilities,accommodation,restoration)

Greater search for partnership and funding

opportunities within and out of the RC/RC Movement

led the NS to submitting 8 projects proposals to

partners out of which 5 were funded. Following the

8th PAC meeting held in October 2012, new contacts

with potential partners were made and among them

68

INTERNALAUDITUNITProgram purpose TheInternalAuditisanindependentandobjective

service that allows the organization to provide

assuranceonthedegreeofcontroloveroperations;

it provides advice for improving performance in all

areas.

Program report summary

This report is a summary of the main activities

achieved in this year 2012 at RRC headquarters

as well as RRC branches. The main objective was

verifying if rules, regulations, financial manuals,

management tools are used and verifying the

eligibility and regularity of the expenditures of the

theAustrianRedCross,theJapaneseRedCrossand

the American Red Cross were interested on partnering

with Rwanda Red Cross on a long term basis.

Main achievementsAccounting

• 9Auditswereconductedandreportssentto

the respective donors

• In2012financialreportsweresubmittedin

time to the donors and Government

Challenges• AmongtheNavisionpackages,onlyRRCuse

financialmanagementpackage

• Thelicenseisalsoexpensive

• Staffsneedtobetrainedinotherpackagesof

COMPOSITION OF FUNDING SOURCES FOR PERIODE 2012

GOVEMENT 76,000,000

RRC FUND 586,203,843

FIRC 557,636,025

ICRC 219,744,403

PNS 951,625,055

GLOBAL FUND 182,706,596

10% ADMNISTRATION FEES 60,562,732

TOTAL 2,634,478,654

Navision

Human Resource unit• RwandaRedCrosshas116employees

• Medicalinsuranceandsocialsolidarity

supported by staff and RRCs has proved as

means of social well fair among staffs

• AllRwandRedCrossstaffdosportsevery

Friday

Challenges• 8OVCstaffcontractterminatedbecauseofthe

end of projects

• HumanaResourcestaffneedskillsin

appropriate software

• Improvestaffincareerbyusingappropriate

software

Logistics

Achievements• Thetotalvaluesofitemsboughtfromoutside

through the tender process is 1,000,664,467 fw

• RRChasactualinventoryof435,543,452

frw until December 2012 and it has helped us

to operate in case of emergency, disaster

assistance and reinforce the branch strategic

stocks.

• Theleasingprogramreducethecostof

maintenance and repair of vehicles.

• Evaluationandmeintenanceof32vehiclesand

59 motor cycles.

ChallengeThe logistics unit needs a software for purchase of

warehousesandfleetmanagement.

ITachievementThe Internet at the RRC headquarter is stable

and has the rate of speed of 512 uploading/256

downloading. We did, Installation of Router three

timesayear,Userscablingmaintenance,CaseofRIS

Jyambere roms Internet installation. Contact MTN

as our Internet Service Provider for any Internet

downcases(6casespresented.2casesforinvoices

ratepayment,2caseswastorepairtheopticfiber

broken on the demark point in RRC and 2 cases was

generalproblems).

WeupgradedeverymonthoftheyeartheNavision

server program. We are in process of establishing

the security of our website as every three months

after repairing codes, there is a presence of hacker

on it.

69

Achievements TheInternalAuditUnithascompletedthefollowing

activities during 2012:

1. Conduct the internal audit of Model Village

NYAMASHEKE, the project is funded by the

Belgian Red Cross and located at the District

ofNyamasheke;

2. Conduct the joint internal audit and evalua-

tion of OVC GISAGARA and NYANZA, the

projects was funded by the Norwegian Red

Cross and located at the district of

GisagaraandNyanza;

3. Conduct the joint internal audit and evalua-

tion of Lake Victoria Program, the project are

funded by the Swedish Red Cross and located

attheKAYONZA,GATSIBOand

KIREHEdistricts;

4. Conduct the joint internal audit with OD

departmentinRULINDOandGAKENKE

districts, with purpose of analyzing and veri-

fiedthebankstatementfortheassociation

withIGAprojects.

5. ConducttheinternalauditintheAMAGANA,

NGOMA, HUYE and GICUMBI districts, with

the purpose of verifying the functioning of

committee’s districts and the management of

their income generating activities.

Keyfindings:• The funds received were used in accordance

with the conditions of the financing agreement,

inachievingefficiencyandpurposes forwhich the

fundingwasprovidedfor;

• The financial reports were established on a

quarterly basis and give the information relevant

specificallytotheprojects;

• Weconcludedthattheexpensesduringtheperiod

were in accordance with the financing agreement

and recorded in the books of the project’s.

• The bookkeeping procedures are proper and

appropriate with respect to the completeness,

existence and accuracy of the registered amounts in

thesoftwareNavision;

individualproject,thefinancialmanagementsystem

and accounting, advice and recommend the program

managers to improve management procedures and

implementation of activities.

It should be noticed that, the achievement of

these activities was made possible with the support

and collaboration of project managers, district

coordinators and district committee members.

Program outcomes

The Internal Audit Unit expects to improve the

financial management and monitoring of the

recommendation at HQ as well as at branch levels.

The following are 4 main outcomes:

• Outcome1:Conductinginternalauditfor

various projects and analyzing the

authenticity of the supporting documents

• Outcome2:Ensurebettermanagement

of Human Resource for the achievement of

performance contract at the HQ as well as at

the district committee.

• Outcome3:Identifythemostimpactachieved

by the projects at the districts committees

• Outcome4:Followuptherecommendations

of previous report

Progress toward outcomes

During the audit mission, the internal audit was

conducted for various projects and a strong analysis

wasmadeforallimplementedactivitiesatthefield

andits impacttobeneficiarieswasevaluated.The

role of the committee at branch level in supporting

and pressing RRC staff in engaging expenditures and

providing supporting documents on time was not

ignored.

Outcome 1: Implementation of the internal audit

for various projects at both HQ and branch levels

and analyzing the authenticity of supporting

documents.

70

• We noticed that there are improvement in

justifyingofsupportsdocuments;

Outcome2:EnsurebettermanagementofHRforthe

achievement of performance contract at the HQ as

well as at the district committee.

Achievements

We have conducted our audit mission with main

purpose:

• Toverifythecompliancewithlawsand

regulationandproceduressetupinRRC;

• Tochecktheexistenceofemployment

contract;

• Tocheckthatthestaffpaidbyeachproject/

programareontheRwandaRedCrosspayroll;

• Tocheckthatifthestaffhastheperformance

contractandjobdescription;

Keyfindings:• Compliancewithtaxregulationsisinlinewith

due date for submission of return and

payment

• Theproject’sstaffhavethenecessary

qualifications;

• Thereisexistenceofemploymentcontracts;

• Therearesomecaseswhereislackof

performance contract and the job description

forstaffindifferentprograms;

Outcome 3: Identify themost impact achieved by

the projects at the districts committees

AchievementsDuring the year 2012, different projects implemented

in 12 districts committees have been audited. One of

the objectives of the internal audit mission was also

to check whether the resources were correctly used

and have allowed the project to achieve the impact

expected in different areas.

The following activities have been done:• Thevisittoassociationsandcooperatives

supportedinincomegeneratingactivities;

• Discussion/meetingswiththebeneficiaries

of different projects and other stakeholders

to evaluate how they appreciate the project

activities;

• Visitstothehealthcenterwhoprovide

medicalinsurance;

• Discusswiththebranchcommitteesto

evaluate how the activities are implemented

and the main challenges.

Keyfindings• During our meeting with the members of

different cooperatives and the head of households

beneficiaries, theyensuredusof their satisfaction

of the work done by the RRC project without

whichtheyhaveunabletofindtheadequateliving

conditions. They fill muchmore integrated in the

community because they have now livestock and

otherseconomicactivitiesdoneincooperatives;

• Ingeneral,theprojects’activitiesareadequately

implemented. The branches use to plan and evaluate

all activities during the statutory meetings. Some

activities to support theprojectsbeneficiaries are

done in the way which allows the project to assist

morebeneficiariesusingtherotationschemelikefor

instance the assistance with livestock, micro-credit

Recommendation:o The district committees and the concerned

units at HQs should put an effort to have official

documents of different assets acquired and help

OVCcooperativestoberegistered.

o The effort has to be made in the follow up of

the rotation scheme of the livestock distributed

in different communities by identifying earlier

new beneficiaries and elaborating the adequate

monitoring format.

71

Capacity building: The internal audit unit provided technical support

to the Resource Mobilization unit in capacity

building. Three members in 10 districts committee

were trained in income generating activities and

financialmanagement.Allparticipantsappreciated

the training as they found it more useful for all

managersandrequestedarefreshmenttrainingand

evaluation of the implementation of what they were

thought.

Outcome 4: Follow up the recommendations of

various auditors

The recommendations formulated by different

auditors allow the improvement of the quality of

delivery service at HQ and at the district level.

AchievementTheInternalAuditUnithasconductedthefollowup

of the recommendations made by internal auditor

during the year 2012 and those made by external

auditors for the year 2011. To achieve this, a

template has been developed and it is in use in

order to help program managers to deal with the

recommendations. This responds to the problem

whichhasbeen identifiedpreviouslywhere inone

project the same recommendation could be given

consecutively.

Challenges• The short duration to audit the project’s

activities and the functioning of the committee

districtatthefield;

• Theimplementationofrecommendationbythe

programmanagersstillneedtobeimproved;

RecommendationsProgramshavetoconsidertheauditfindingswhen

planning and include in their plans the activities which

aim to respond to the audit recommendations.

FUNDING PROGRAM FOR YEAR 2012

HEALTH PROGRAM 282,433,171.00

DISASTER MANAGEMENT 499,243,283.00

OD PROGRAM 137,409,005.00

SOCIAL PROJECT 714,054,796.00

CONSTRUCTION PROJECT 34,890,927.00

INFO-DIFFUSION PROGRAM 90,601,288.00

TRACING PROGRAM 59,859,609.00

PRODUCTS UNITS 315,802,415.00

CORE COST 500,184,160.00

TOTAL 2,634,478,654.00

PROGRAM EXPENDITURES 2012

HEALTH PROGRAM 209,105,020.00

DISASTER MANAGEMENT 414,797,875.00

OD PROGRAM 125,075,140.00

SOCIAL PROJECT 853,648,090.00

CONSTRUCTION PROJECT 37,276,106.00

INFO-DIFFUSION PROGRAM 92,075,728.00

TRACING PROGRAM 59,275,790.00

PRODUCTS UNITS 355,692,537.00

CORE COST 438,442,106.00

TOTAL 2,585,388,392.00

209,105,020.00 414,797,875.00

125,075,140.00

853,648,090.00

37,276,106.00

92,075,728.00

59,275,790.00

355,692,537.00

438,442,106.00

2,585,388,392.00

PROGRAM EXPENDITURES 2012

HEALTH PROGRAM

DISASTER MANAGEMENT

OD PROGRAM

SOCIAL PROJECT

CONSTRUCTION PROJECT

INFO-DIFFUSION PROGRAM

TRACING PROGRAM

PRODUCTS UNITS

CORE COST

TOTAL

282,433,171.00

499,243,283.00 137,409,005.00

714,054,796.00

34,890,927.00

90,601,288.00

59,859,609.00

315,802,415.00

500,184,160.00

2,634,478,654.00

HEALTH PROGRAM

DISASTER MANAGEMENT

OD PROGRAM

SOCIAL PROJECT

CONSTRUCTION PROJECT

INFO-DIFFUSION PROGRAM

TRACING PROGRAM

PRODUCTS UNITS

CORE COST

TOTAL

72

THE SEVEN FUNDAMENTAL PRINCIPLES OFTHE RED CROSS MOVEMENT

HumanityThe Red Cross Movement aims at providing assistance to the vulnerable withoutdiscrimination to prevent and ensure respect for human dignity. The movementalso promotes mutual understanding and lasting cooperation among all people.

ImpartialityItmakesnodiscriminationastonationality,race,religiousbeliefs,classorpoliticalopinions. It endeavours to relieve the suffering of individuals, being guided solelyby their needs, and to give priority to the most urgent cases of distress.

NuetraltyToeran theconfidenceofall, themovement takesno sides inhostilitiesnordoesit engage in controversies of a political, racial, religious, or ideological nature.

IndependenceThe National Societies, while auxiliaries in the humanitarian services of theirgovernments and subject to the laws of their respective countries, must alwaysmaintain their autonomy so that they may be able at all times to act in accordancewith the principles of the movement.

Voluntary ServiceAs a humanitarian organization, the Red Cross is a voluntary relief movement notprompted in any manner by desire for gain.

UnityThere can be only one Red Cross, one Red Crescent Society in any one contry.It must be open to all and carry on humanitarian work throughout its rerritory.

UniversalityThe International Red Cross and Red Crescent Movement, in which all societieshave equal status and share equal responsibilities and duties in helping eachother, is worldwide.

Layout & Print:PRESS-MULTIPACK (R) lTD