Md Azree Othuman Mydin [email protected] RUS105 Studio Programme

RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

Md Azree Othuman Mydin

[email protected]

RUS105 Studio Programme

Page 2: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

INTRODUCTION Project development and planning is the initial stages in any property development process. 

In order to produce knowledgeable HBP students as well as to strengthen the credibility of their profession, the students will be exposed to the real‐life experiences in project development, planning practice, tender supply process and its implementation in developing a site.

Throughout the course, the students will be exposed to experiential learning on the properties development concept, planning processes, procedures and practices in property development. 

Page 3: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

INTRODUCTION Students will have the ‘hands‐on’ know‐how in conducting site assessment and survey as part of their data collection, analyzing and evaluating the data, and ultimately preparing a Development Proposal Report for the assigned development. 

This skill is very significant to the HBP students, as it will facilitate them to expand their understanding on how development is being planned and developed from the earliest stage which will benefit Building Technology, Building Surveying, Construction Management and Quantity Surveyingstudents holistically.

Page 4: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction and to delivery of the property to purchasers.

to execute site survey and site analysis systematically.

to produce suitable method of properties development and determine its suitability for planning works which alliance withproject requirements.

to access and prepare concept and layout plans which correspond and coherence with project necessities.

to report findings in collective way regarding the properties development which suitable with the propose location.

to prepare proposal of properties development concept in detail.

Page 5: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

SOFT SKILLS Communication skills ‐ presenting ideas with clarity, effective and confidence, orally; listening and giving feedbacks; decision‐making; intercultural communication

Critical thinking and problem solving ‐ to identify, analyze and evaluate problems; to explain, analyze and evaluate discussion; ideas and alternative solutions

Teamwork skills ‐ to develop good relationship, effective interaction and cooperation; to understand and compromise between members and group leader; to understand and respect other member’s attitude, behaviour and trust; contribute to group works; accountable for group’s decision

Life‐long learning and information management ‐ to gather and manage information from various sources; to accept new ideas andable to learn independently; widen the search for knowledge

Professional ethics and moral ‐ understand the economic, environment, and social effect on professional practice; analysis and decision‐making in problem solving; practice ethical attitudes;

Page 6: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

RUS105 PROJECT FLOWSetting Up a Company / Consultancy

Fundamental of Property Development

Carry out Market Study

Accomplish Feasibility Study

Prepare Concept and Layout Plans

Organize and Prepare Development Cost

Preparation of Project Contract and Tender

Project Implementation : Material, Services and Infrastructure

Design and build structure and Prepare Blueprint drawings

Accessing common building defects

Prepare Development Proposal report

Final presentation

P1

P2

P3

P4

P5

P6

P7

P8

P9

P10

P11

P11SA     S

AAO    AO    HU    M

J    MJ  EM

    EM   SA    AO    AO        

Page 7: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

SERIES OF PROFESSIONAL TALK

Professional Talk 1:                          Assoc. Prof. Sr Azlan Raofuddin Nuruddin   

(The role of the quantity surveyor : Constructing the future ) Professional Talk 2:                          

Dr Amin Akhavan Tabassi                  (Commercial Management of the 

Construction Industry)Professional Talk 3:                          

Assoc. Prof. Sr Dr. Mastura Jaafar           (Integrity and ethics: towards an excellent and 

sustainable construction industry) Professional Talk 4:                          Prof. Ir Dr. Mahyuddin Ramli             

(Professional practice in construction industry: Engineering & Management Perspectives)Professional Talk 5:                          

Dr. Norhidayah Md Ulang                       (Important of Health and safety in the 

construction industry)Professional Talk 6:                          

Prof. Sr Dr. Abdul Rashid Abdul Aziz            (Internationalization of construction services)

Page 8: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

RUS105 DETAILED STUDIO PROGRAMMEE48 A / STUDIO 100

9.00 ‐ 10.00am

Lecturer In‐Charge Description Project Name & Medium Medium

08‐Mar(Friday)

Site work

P6 Group Work            (group leader)

Dr Ernawati             P5                     

Dr. Azizan Marzuki to give briefing/overview  

of P5

Dr. Mastura             P6 & P7

P3 and P4 Group Work                                                          (group leader)

5

6

March 22  (Friday)March 25 (Monday)

Mid Term Break

March 29 (Friday)

April 1   (Monday)

April 5    (Friday)

Feb 22  (Friday)

7

8

3

4

2

WEEK

DEWAN KULIAH E48A

Feb 18 (Monday)

PROJECT 1                         Setting Up A Consultancy :    Company profile, website, 

corporate video and workstation

3 set x A4 company profile ; 3 pcs x A4 size brochure ;     

1 pc x CD

Brief on Academic Trip to Negeri Sembilan   by Dr. Shardy

Dr. Md Azree            P1 & P2               

(Dr. Shardy ‐ briefing     on academic trip)

Feb 25    (Monday)

March 1   (Friday)

2.00pm ‐ 3.50pm

March 11   (Monday)

March 15  (Friday)

Site work

1

NIL

P3 Group Work            (group leader)

P2 Group Work            (group leader)

Introduction by all Studio Masters ;             Introduction to RUS105 Programme ;           Setup RUS105 Studio Committee ;              

Grouping for Studio Projects                    

Submission : Project 2                                                                  Presentation : Project 2                                         

1 pc x A1 size board           and A4 report

P3 and P4 Group Session                                                                                    (depends on Coordinator)                                                                                              

1 pc x A1 size board           and A4 report

Submission : Project 1                                                                                                 Presentation : Project 1                                 

March 4   (Monday)

Dr. Ernawati             P3                     

Dr. Shardy ‐ Brief P4      

Dr. Shardy               P4        

March 18   (Monday)

P5 Group Work            (group leader)

Professional Talk 1:                          Assoc. Prof. Sr Azlan Raofuddin Nuruddin   

(The role of the quantity surveyor : Constructing the future )

10.00am ‐ 11.50am (Monday) ; 10.00am ‐ 10.50am (Friday)

PROJECT 2                         Property Development :              Detailed Plan of Work &              

Process of Property Development    

Preparation of workstation at Top 

Studio                    (1o groups)

2 pc x A1 size board ;         A4 report

1 pc x A1 size board           and A4 report

PROJECT 3                                                                      Market Study           PROJECT 4                                                                      

Feasibility Study           

Submission : Project 5                           Presentation : Project 5                         

PROJECT 7                         Project Contract & Tendering  

A3 report ; Powerpoint presentation (5 minutes)

PROJECT 5                         Concept and Layout Plans   

Academic Trip to Negeri Sembilan ‐ 21 until 24th March

Site work

Professional Talk 3:                          Assoc. Prof. Sr Dr. Mastura Jaafar           

(Integrity and ethics: Towards an excellent and sustainable construction industry)

PROJECT 6                        Development Cost 

A3 report ; Powerpoint presentation (5 minutes)

April 6 ‐ 14

Submission : Project 3 & Project 4                                                      Presentation : Project 3 & Project 4                               

Page 9: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

RUS105 DETAILED STUDIO PROGRAMME (cont..)

17‐19

Public Holiday (Wesak Day)

RUS105 Jamboree & Awards Night (DUP or KOMCA)

All lecturers

Dr. Mastura             P6 & P7

Professional Talk 6:                          Prof. Sr Dr. Abdul Rashid Abdul Aziz            

(Internationalization of construction services)

Setting up / building structure on site Project 9 ‐ should be ready by 8.45 am

P8 Group Work            (group leader)

Submission : Project 8                                                                  Presentation : Project 8   

Professional Talk 4:                          Prof. Ir Dr. Mahyuddin Ramli             

(Professional practice in construction industry: Engineering & Management Perspectives)

P8 Group Session                                                               (depends on Coordinator)

15

16

13

14

April 22   (Monday)

May 10        (Friday)May 13 

(Monday)May 17        (Friday)

May 6 (Monday)

11

12

9

10

P6 and P7 Group Work    (group leader)

Submission : Project 6 & Project 7                                                      Presentation : Project 6 & Project 7                                

1 pc x A1 size board ; structural model of 

proposed development ;     A4 report

April 15   (Monday)

April 19    (Friday)

P8 Group Work            (group leader)

May 27 (Monday)

May 31        (Friday)

P9 and P10 Group Work   (group leader)

A3 report ; Powerpoint presentation (10 minutes)

Dr. Shardy               P11                   

Submission: Project 10Group Session of Project 11 (depends on Coordinator)             

May 24        (Friday)

Dr. Azree                P9 & P10             

(Dr. Shardy ‐ Brief P11) 

Jun 29 ‐     Sept 8

Jun 1 ‐ 9

Jun 10 ‐ 28

Semester break (10 weeks)

Study Week (1 week)

Exam Weeks (3 weeks)

Submission: Project 11                                                                                                                               Final Group Presentation: Project 7 (Power point, all previous presentation boards)

Professional Talk 5:                          Dr. Norhidayah Md Ulang                       

(Important of Health and safety in the   construction industry)

PROJECT 8                        Project Implementation : Material, Building Services & Infrastructure

Dr. Hidayah             P8

P8 Group Session                                              (depends on Coordinator)                                           

PROJECT 9                                                                      Stable structure & presentation drawing

PROJECT 11                                                                    Development Proposal

1 pc x A1 size poster ;         A4 report

All lecturers

P9 Group Session         (depends on Coordinator)

May 20 (Monday)

P6 and P7 Group Session                                      (depends on Coordinator)                                           

Professional Talk 2:                          Dr Amin Akhavan Tabassi                  

(Commercial Management of the Construction Industry)

April 26    (Friday)

April 29   (Monday)

May 3         (Friday)

1 pc x A1 size board ;         one full scale of stable 

structurePROJECT 10                                                                    

Common Building Defects                                                               

Page 10: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

RUS105 STUDIO PROGRAMME – SEM II 2012/2013No. Project Studio Master Duration Start End Submission

1Project 1                                      

Setting Up A Consultancy: Company profile, website, corporate video and workstation    

18/02/2013 22/03/201325/03/2013    (7 days)

2Project 2                                      

Property Development : Detailed Plan of Work & Process of Property Development

22/03/2013 01/03/201301/03/2013    (10 days)

3Project 3                                      

Market StudyDr. Shardy Abdullah 1 week 04/03/2013 08/03/2013

29/03/2013    (25 days)

4Project 4                                      

Feasibility Study1 week 08/03/2013 15/03/2013

29/03/2013    (21 days)

5Project 5                                      

Concept and Layout Plans2 weeks 18/03/2013 29/03/2013

05/04/2013    (18 days)

6Project 6                                     

Development Cost Assoc. Prof. Sr Dr. Mastura Jaafar 1 week 01/04/2013 05/04/2013

19/04/2013    (18 days)

7Project 7                                      

Project Contract & tenderingAssoc. Prof. Sr Dr. Mastura Jaafar 1 week 05/04/2013 19/04/2013

19/04/2013    (14 days)

8Project 8                                     

Project Implementation : Material, Building Services & Infrastructure

Dr. Norhidayah Md Ulang 2 weeks 22/04/2013 03/05/201303/05/2013    (11 days)

9Project 9                                     

Stable Structure & Presentation Drawing06/05/2013 10/05/2013

17/05/2013    (11 days)

10Project 10                                    

Common Building Defects10/05/2013 17/05/2013

20/05/2013    (10 days)

11Project 11                                    

Development ProposalDr. Shardy Abdullah                  13/05/2013 31/05/2013

27/05/2013    (14 days)

12 Final Group Presentation

13 RUS105 Jamboree & Awards Night

Dr. Ernawati Mustafa Kamal

Mid‐Term Break

27/05/20132 weeks

31/05/2013

Sr Dr. Md Azree Othuman Mydin 2 weeks

All lecturers

Sr Dr. Md Azree Othuman Mydin 2 weeks

Page 11: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

OUTPUT REQUIRED / FORMATSTUDIO MASTER PROJECT DETAILS OUTPUT REQUIRED

PROJECT 2                                   Detailed Plan of Work & Process of Property 

Development  

2 pc x A1 size board ;                A4 report

Dr. Shardy Abdullah                     

Assoc. Prof. Sr Dr Mastura Jaafar

Sr Dr. Md Azree Othuman Mydin

Sr Dr. Md Azree Othuman Mydin

Dr. Norhidayah Md Ulang

Dr. Shardy Abdullah

Dr. Ernawati Mustafa Kamal

PROJECT 10                                 Common Building Defects                      

1 pc x A1 size poster ;                A4 report

PROJECT 11                                 Development Proposal                         

A3 report ;                           Powerpoint slides for final presentation (2o minutes)

PROJECT 8                                   Project Implementation : Material, Building 

Services & Infrastructure

1 pc x A1 size board ;                structural model of proposed development ;  A4 report

PROJECT 9                                   Stable structure & presentation drawing

1 pc x A1 size board ;                one full scale of stable structure

PROJECT 6                                   Development Cost 

Powerpoint presentation ;          A4 report

PROJECT 7                                   Project Contract & Tendering  

Powerpoint presentation ;          A4 report

PROJECT 4                                   Feasibility Study           

1 pc x A1 size board ;                A4 report

PROJECT 5                                   Concept and Layout Plans   

1 pc x A1 size board ;                A4 report

PROJECT 1                                   Setting Up  Consultancy / Company 

3 set x A4 company profile ;         3 pcs x A4 size brochure ;            

1 pc x CD

PROJECT 3                                   Market Study           

1 pc x A1 size board ;                A4 report

Page 12: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

OUTPUT REQUIRED / FORMATNo. Type of Output Requirement

1 A4 report / A3 report1. Use the standard cover page                                                                                                  2. Project Coordinator name : Lecturer in‐charge of the particular project               3. Each submission should attach Leader Evaluation form (separately) 

2 A1 presentation board

1. Company name & logo                                                                                                             2. Group number and members name                                                                                    3. Project number & project title                                                                                               4. Project Coordinator name : Lecturer in‐charge of the particular  project              5. Each submission should attach Leader Evaluation form (separately)  : this only apply when the project involve single submission (without A4 report)

3 Powerpoint presentation

1. Company name & logo                                                                                                             2. Group number and members name                                                                                    3. Project number & project title                                                                                               4. Project Coordinator name : Lecturer in‐charge of the particular  project              5. No. of slides : 10 (5 minutes presentation) ‐ P6 & P7                                                     6. No. of slides : 25 (20 minutes presentation) ‐ P11                                                           

4 CD1. Group number                                                                                                                             2. Attach in the report

Page 13: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

Lot 10276, Mukim 13 Timur Laut (Bukit Gambir, Penang)

PROPOSED DEVELOPMENT SITE

SITE

Page 14: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction

ACTUAL SITE

Page 15: RUS105 Studio Programme Documents/RUS105/RUS105... · LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction