INTRODUCTION Project development and planning is the initial stages in any property development process.
In order to produce knowledgeable HBP students as well as to strengthen the credibility of their profession, the students will be exposed to the real‐life experiences in project development, planning practice, tender supply process and its implementation in developing a site.
Throughout the course, the students will be exposed to experiential learning on the properties development concept, planning processes, procedures and practices in property development.
INTRODUCTION Students will have the ‘hands‐on’ know‐how in conducting site assessment and survey as part of their data collection, analyzing and evaluating the data, and ultimately preparing a Development Proposal Report for the assigned development.
This skill is very significant to the HBP students, as it will facilitate them to expand their understanding on how development is being planned and developed from the earliest stage which will benefit Building Technology, Building Surveying, Construction Management and Quantity Surveyingstudents holistically.
LEARNING OUTCOMES to comprehend the process of property development in Malaysia from land purchase application to construction and to delivery of the property to purchasers.
to execute site survey and site analysis systematically.
to produce suitable method of properties development and determine its suitability for planning works which alliance withproject requirements.
to access and prepare concept and layout plans which correspond and coherence with project necessities.
to report findings in collective way regarding the properties development which suitable with the propose location.
to prepare proposal of properties development concept in detail.
SOFT SKILLS Communication skills ‐ presenting ideas with clarity, effective and confidence, orally; listening and giving feedbacks; decision‐making; intercultural communication
Critical thinking and problem solving ‐ to identify, analyze and evaluate problems; to explain, analyze and evaluate discussion; ideas and alternative solutions
Teamwork skills ‐ to develop good relationship, effective interaction and cooperation; to understand and compromise between members and group leader; to understand and respect other member’s attitude, behaviour and trust; contribute to group works; accountable for group’s decision
Life‐long learning and information management ‐ to gather and manage information from various sources; to accept new ideas andable to learn independently; widen the search for knowledge
Professional ethics and moral ‐ understand the economic, environment, and social effect on professional practice; analysis and decision‐making in problem solving; practice ethical attitudes;
RUS105 PROJECT FLOWSetting Up a Company / Consultancy
Fundamental of Property Development
Carry out Market Study
Accomplish Feasibility Study
Prepare Concept and Layout Plans
Organize and Prepare Development Cost
Preparation of Project Contract and Tender
Project Implementation : Material, Services and Infrastructure
Design and build structure and Prepare Blueprint drawings
Accessing common building defects
Prepare Development Proposal report
Final presentation
P1
P2
P3
P4
P5
P6
P7
P8
P9
P10
P11
P11SA S
AAO AO HU M
J MJ EM
EM SA AO AO
SERIES OF PROFESSIONAL TALK
Professional Talk 1: Assoc. Prof. Sr Azlan Raofuddin Nuruddin
(The role of the quantity surveyor : Constructing the future ) Professional Talk 2:
Dr Amin Akhavan Tabassi (Commercial Management of the
Construction Industry)Professional Talk 3:
Assoc. Prof. Sr Dr. Mastura Jaafar (Integrity and ethics: towards an excellent and
sustainable construction industry) Professional Talk 4: Prof. Ir Dr. Mahyuddin Ramli
(Professional practice in construction industry: Engineering & Management Perspectives)Professional Talk 5:
Dr. Norhidayah Md Ulang (Important of Health and safety in the
construction industry)Professional Talk 6:
Prof. Sr Dr. Abdul Rashid Abdul Aziz (Internationalization of construction services)
RUS105 DETAILED STUDIO PROGRAMMEE48 A / STUDIO 100
9.00 ‐ 10.00am
Lecturer In‐Charge Description Project Name & Medium Medium
08‐Mar(Friday)
Site work
P6 Group Work (group leader)
Dr Ernawati P5
Dr. Azizan Marzuki to give briefing/overview
of P5
Dr. Mastura P6 & P7
P3 and P4 Group Work (group leader)
5
6
March 22 (Friday)March 25 (Monday)
Mid Term Break
March 29 (Friday)
April 1 (Monday)
April 5 (Friday)
Feb 22 (Friday)
7
8
3
4
2
WEEK
DEWAN KULIAH E48A
Feb 18 (Monday)
PROJECT 1 Setting Up A Consultancy : Company profile, website,
corporate video and workstation
3 set x A4 company profile ; 3 pcs x A4 size brochure ;
1 pc x CD
Brief on Academic Trip to Negeri Sembilan by Dr. Shardy
Dr. Md Azree P1 & P2
(Dr. Shardy ‐ briefing on academic trip)
Feb 25 (Monday)
March 1 (Friday)
2.00pm ‐ 3.50pm
March 11 (Monday)
March 15 (Friday)
Site work
1
NIL
P3 Group Work (group leader)
P2 Group Work (group leader)
Introduction by all Studio Masters ; Introduction to RUS105 Programme ; Setup RUS105 Studio Committee ;
Grouping for Studio Projects
Submission : Project 2 Presentation : Project 2
1 pc x A1 size board and A4 report
P3 and P4 Group Session (depends on Coordinator)
1 pc x A1 size board and A4 report
Submission : Project 1 Presentation : Project 1
March 4 (Monday)
Dr. Ernawati P3
Dr. Shardy ‐ Brief P4
Dr. Shardy P4
March 18 (Monday)
P5 Group Work (group leader)
Professional Talk 1: Assoc. Prof. Sr Azlan Raofuddin Nuruddin
(The role of the quantity surveyor : Constructing the future )
10.00am ‐ 11.50am (Monday) ; 10.00am ‐ 10.50am (Friday)
PROJECT 2 Property Development : Detailed Plan of Work &
Process of Property Development
Preparation of workstation at Top
Studio (1o groups)
2 pc x A1 size board ; A4 report
1 pc x A1 size board and A4 report
PROJECT 3 Market Study PROJECT 4
Feasibility Study
Submission : Project 5 Presentation : Project 5
PROJECT 7 Project Contract & Tendering
A3 report ; Powerpoint presentation (5 minutes)
PROJECT 5 Concept and Layout Plans
Academic Trip to Negeri Sembilan ‐ 21 until 24th March
Site work
Professional Talk 3: Assoc. Prof. Sr Dr. Mastura Jaafar
(Integrity and ethics: Towards an excellent and sustainable construction industry)
PROJECT 6 Development Cost
A3 report ; Powerpoint presentation (5 minutes)
April 6 ‐ 14
Submission : Project 3 & Project 4 Presentation : Project 3 & Project 4
RUS105 DETAILED STUDIO PROGRAMME (cont..)
17‐19
Public Holiday (Wesak Day)
RUS105 Jamboree & Awards Night (DUP or KOMCA)
All lecturers
Dr. Mastura P6 & P7
Professional Talk 6: Prof. Sr Dr. Abdul Rashid Abdul Aziz
(Internationalization of construction services)
Setting up / building structure on site Project 9 ‐ should be ready by 8.45 am
P8 Group Work (group leader)
Submission : Project 8 Presentation : Project 8
Professional Talk 4: Prof. Ir Dr. Mahyuddin Ramli
(Professional practice in construction industry: Engineering & Management Perspectives)
P8 Group Session (depends on Coordinator)
15
16
‐
13
14
April 22 (Monday)
May 10 (Friday)May 13
(Monday)May 17 (Friday)
May 6 (Monday)
11
12
9
10
P6 and P7 Group Work (group leader)
Submission : Project 6 & Project 7 Presentation : Project 6 & Project 7
1 pc x A1 size board ; structural model of
proposed development ; A4 report
April 15 (Monday)
April 19 (Friday)
P8 Group Work (group leader)
May 27 (Monday)
May 31 (Friday)
P9 and P10 Group Work (group leader)
A3 report ; Powerpoint presentation (10 minutes)
Dr. Shardy P11
Submission: Project 10Group Session of Project 11 (depends on Coordinator)
May 24 (Friday)
Dr. Azree P9 & P10
(Dr. Shardy ‐ Brief P11)
Jun 29 ‐ Sept 8
Jun 1 ‐ 9
Jun 10 ‐ 28
Semester break (10 weeks)
Study Week (1 week)
Exam Weeks (3 weeks)
Submission: Project 11 Final Group Presentation: Project 7 (Power point, all previous presentation boards)
Professional Talk 5: Dr. Norhidayah Md Ulang
(Important of Health and safety in the construction industry)
PROJECT 8 Project Implementation : Material, Building Services & Infrastructure
Dr. Hidayah P8
P8 Group Session (depends on Coordinator)
PROJECT 9 Stable structure & presentation drawing
PROJECT 11 Development Proposal
1 pc x A1 size poster ; A4 report
All lecturers
P9 Group Session (depends on Coordinator)
May 20 (Monday)
P6 and P7 Group Session (depends on Coordinator)
Professional Talk 2: Dr Amin Akhavan Tabassi
(Commercial Management of the Construction Industry)
April 26 (Friday)
April 29 (Monday)
May 3 (Friday)
1 pc x A1 size board ; one full scale of stable
structurePROJECT 10
Common Building Defects
RUS105 STUDIO PROGRAMME – SEM II 2012/2013No. Project Studio Master Duration Start End Submission
1Project 1
Setting Up A Consultancy: Company profile, website, corporate video and workstation
18/02/2013 22/03/201325/03/2013 (7 days)
2Project 2
Property Development : Detailed Plan of Work & Process of Property Development
22/03/2013 01/03/201301/03/2013 (10 days)
3Project 3
Market StudyDr. Shardy Abdullah 1 week 04/03/2013 08/03/2013
29/03/2013 (25 days)
4Project 4
Feasibility Study1 week 08/03/2013 15/03/2013
29/03/2013 (21 days)
5Project 5
Concept and Layout Plans2 weeks 18/03/2013 29/03/2013
05/04/2013 (18 days)
6Project 6
Development Cost Assoc. Prof. Sr Dr. Mastura Jaafar 1 week 01/04/2013 05/04/2013
19/04/2013 (18 days)
7Project 7
Project Contract & tenderingAssoc. Prof. Sr Dr. Mastura Jaafar 1 week 05/04/2013 19/04/2013
19/04/2013 (14 days)
8Project 8
Project Implementation : Material, Building Services & Infrastructure
Dr. Norhidayah Md Ulang 2 weeks 22/04/2013 03/05/201303/05/2013 (11 days)
9Project 9
Stable Structure & Presentation Drawing06/05/2013 10/05/2013
17/05/2013 (11 days)
10Project 10
Common Building Defects10/05/2013 17/05/2013
20/05/2013 (10 days)
11Project 11
Development ProposalDr. Shardy Abdullah 13/05/2013 31/05/2013
27/05/2013 (14 days)
12 Final Group Presentation
13 RUS105 Jamboree & Awards Night
Dr. Ernawati Mustafa Kamal
Mid‐Term Break
27/05/20132 weeks
31/05/2013
Sr Dr. Md Azree Othuman Mydin 2 weeks
All lecturers
Sr Dr. Md Azree Othuman Mydin 2 weeks
OUTPUT REQUIRED / FORMATSTUDIO MASTER PROJECT DETAILS OUTPUT REQUIRED
PROJECT 2 Detailed Plan of Work & Process of Property
Development
2 pc x A1 size board ; A4 report
Dr. Shardy Abdullah
Assoc. Prof. Sr Dr Mastura Jaafar
Sr Dr. Md Azree Othuman Mydin
Sr Dr. Md Azree Othuman Mydin
Dr. Norhidayah Md Ulang
Dr. Shardy Abdullah
Dr. Ernawati Mustafa Kamal
PROJECT 10 Common Building Defects
1 pc x A1 size poster ; A4 report
PROJECT 11 Development Proposal
A3 report ; Powerpoint slides for final presentation (2o minutes)
PROJECT 8 Project Implementation : Material, Building
Services & Infrastructure
1 pc x A1 size board ; structural model of proposed development ; A4 report
PROJECT 9 Stable structure & presentation drawing
1 pc x A1 size board ; one full scale of stable structure
PROJECT 6 Development Cost
Powerpoint presentation ; A4 report
PROJECT 7 Project Contract & Tendering
Powerpoint presentation ; A4 report
PROJECT 4 Feasibility Study
1 pc x A1 size board ; A4 report
PROJECT 5 Concept and Layout Plans
1 pc x A1 size board ; A4 report
PROJECT 1 Setting Up Consultancy / Company
3 set x A4 company profile ; 3 pcs x A4 size brochure ;
1 pc x CD
PROJECT 3 Market Study
1 pc x A1 size board ; A4 report
OUTPUT REQUIRED / FORMATNo. Type of Output Requirement
1 A4 report / A3 report1. Use the standard cover page 2. Project Coordinator name : Lecturer in‐charge of the particular project 3. Each submission should attach Leader Evaluation form (separately)
2 A1 presentation board
1. Company name & logo 2. Group number and members name 3. Project number & project title 4. Project Coordinator name : Lecturer in‐charge of the particular project 5. Each submission should attach Leader Evaluation form (separately) : this only apply when the project involve single submission (without A4 report)
3 Powerpoint presentation
1. Company name & logo 2. Group number and members name 3. Project number & project title 4. Project Coordinator name : Lecturer in‐charge of the particular project 5. No. of slides : 10 (5 minutes presentation) ‐ P6 & P7 6. No. of slides : 25 (20 minutes presentation) ‐ P11
4 CD1. Group number 2. Attach in the report
Lot 10276, Mukim 13 Timur Laut (Bukit Gambir, Penang)
PROPOSED DEVELOPMENT SITE
SITE
ACTUAL SITE