  • VIETNAM ELECTRICITY

    POWER COMPANY No.3

    RURAL POWER DISTRIBUTION PROJECT

    ". RD FOR QUANG NGAI PROVINCE

    E1712 VOL. 56

    Volume 5

    ENVIRONMENTAL MANAGEMENT PLAN

    Nha Trang City, July 2009

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

  • ..

    VIETNAM ELECTRICITY

    POWER COMPANY No.3

    RURAL POWER DISTRIBUTION PROJECT

    RD FOR QUANG NGAI PROVINCE

    Volume 5

    ENVIRONMENTAL MANAGEMENT PLAN

    ON BEHALF OF POWER ENGINEERINj

    CONSULTING JOINT STOCK COMPAN~.r

  • Rural Power Distribution Project - RDfor Quang Ngai Province Feasibility Study

    REPORT FORMULATING AND CHECKING PARTICIPANTS

    No. Name Task Sign~ure I Phan Trong Thuy Chiefof Project Design ~~ 2 Hoang Trung Phong Establishing EMP report .4-lCrt~/ 3 Pham Ba Thien Establishing EMP report '7~

    4 Dang Phuong Hao Checking EMP report %~

    Report Formulating and checking participants 1

  • Rural Power Distribution Project - RDfor Quang Ngai Province Feasibility Study

    TABLE OF CONTENTS

    The Feasibility Study of project "Rural Power Distribution Project - RD for

    Quang Ngai Province" is established in 6 volumes:

    Volume 1: General Statement

    Volume 2: Basic design

    Volume 2.1: Statement of basic design

    Volume 2.2: Drawings

    Volume 2.3: Calculation appendices

    " Volume 3: Report on construction investigation results

    Volume 4: Compensation and Resettlement Plan (RP)

    Volume 5: Environmental Management Plan (EMP)

    Volume 6: Ethnic Minority Development Plan (EMDP)

    This is Volume 5: Environmental Management Plan (EMP)

    Table ofContents 2

  • Rural Power Distribution Project - RDfor Quang Ngai Province Feasibility Study

    CONTENTS

    REPORT FORMULATING AND CHECKING PARTICIPANTS ......................... 1

    TABLE OF CONTENTS .............................................................................................. 2

    CONTENTS ................................................................................................................... 3

    ACRONyMS .................................................................................................................. 4

    1. Description of the project and scope of work.......................................................... 5

    1.1. Project's objectives ......................................................................................... 5

    1.2. Project management organization ................................................................ 5

    1.3. Scope of the project ........................................................................................ 5

    1.4. Construction arrangement ............................................................................ 9

    1.5. Project implementation schedule ................................................................ 10

    2. Legal basis ................................................................................................................ 11

    2.1. Vietnamese Government's regulations and laws ...................................... 11

    2.2. WB's policies ................................................................................................. 11

    3. Environmental impact screening ........................................................................... 12

    4. Mitigation measures against negative impacts on environment ......................... 18

    5. Action plan in case of emergency ........................................................................... 24

    6. Public consultation and information dissemination ............................................. 25

    7. Environmental Monitoring Plan during construction and operation phases .... 32

    8. EMP implementation responsibility ...................................................................... 34

    9. Report form and procedures .................................................................................. 35

    10. Capacity improvement plan for environmental management .......................... 37

    11. Cost estimation ....................................................................................................... 40

    APPENDICES .............................................................................................................. 40

    Contents 3

  • Rural Power Distribution Project - RDfor Quang Ngai Province Feasibility Study

    CPC CREPMB DONRE DPC EA EIA EMP EVN HV LV MY GOV PC3 PECC4 PC PMB PAPs PARs PPC RP ROW SEMP WB

    ACRONYMS

    : Commune People's Committee : Central Rural Energy Project Management Board : Department ofNatural Resources and Environment : District People's Committee : Environmental Assessment : Environmental Impact Assessment : Environmental Management Plan : Vietnam Electricity : High voltage : Low voltage : Medium voltage : Government of Viet Nam : Power Company No.3 : Power Engineering Consulting Joint Stock Company 4 : People's Committee : Project Management Board : Project affected persons : Project affected households : Provincial People's Committee : Resettlement Plan : Right-of-Way : Site Environmental Management Plan : World Bank

    Acronyms 4

  • --- --

    Rural Power Distribution Project - RDfor Quang Ngai Province Feasibility Study

    1. Description of the project and scope of work 1.1. Project's objectives

    The objectives setting up of RD for Quang Ngai province is to meet an increase in power load demand of the project areas in the present as well as in the future, enhance the reliability in power supply, increase safety during operation process, and ensure the quality of the supplied electricity. 1.2. Project management organization

    Project manager is Power Company No.3 (its representative is Central Rural Energy Project Management Board).

    Consultancy is Power Engineering Consulting Joint Stock Company 4. 1.3. Scope of the project

    .. Topographic, geological and hydrological characteristics; and inventory of the field survey and investigation results are stated in volume 3: Report on construction investigation results.

    New-constructed substations are pole mounted-substations, thus these substations are within ROWand mounted on poles ofTIL.

    Tower foundation execution (for independent tower foundation within ROW with an area of 2.0 - 5.5 m2 each foundation) including earth-rock excavation and fill is implemented mainly by manual measure.

    Table 1.1: Description of new-constructed distribution line routes and substations (pole-mounted substations)

    15.71 Ian - Due Pho district: Due Pho town. - Son Tinh district: Tinh Phong, Tinh Thien, Tinh Hoa,

    • T otallength of line route

    Name of communes/towns where the line crossing Sinh Tan and Tinh Son

    communes.

    - Tu Nghia district: Nghia

    Phu commune.

    - Minh Long district: Thanh An communeI 6mi Width ofROW

    • Within 3km from ROW towards each side, is there any natural Yes No X- reserve or natural forest, etc ... ? Within 300m from ROW towards each side, is there any Yes No X -

    . historical monument, temple, pagoda or other cultural i heritages? - Within 300m from ROW towards each side, is there any Yes X No commune centre (where has People's Committee, school, .

    market, health station)?

    - Is there any residential area within radius of 2km from I

    ROW?

    Some sensitive objects within 300m nearly the line route site are some HHs in Ko Tu hamlet -

    Di Lang town, Thanh Mau hamlet - Thanh An commune, hamlet 5 - Duc Pho town.

    1. Description ofthe project and scope ofwork 5

  • Rural Power Distribution Project - RDfor Quang Ngai Province Feasibility Study

    T bl 1 2 D * f f the upgrad d d * t IS rl*b f ta e . .. escrlpl Ion 0 e u Ion rIDe rou e T otallength of the upgraded line route 28.215km

    Name of communes having the upgraded power distribution line route:

    - Due Pho district: Pho Khanh and Pho I Thanh communes - Ba To district: Ba To town - Son Ha district: Di Lang town and Son Thuong commune - Son Tinh district: Tinh Phong and Tinh Thien communes - Tra Bong district: Tra Xuan town and Tra Son commune

    Width of ROW 6m Is there any construction site within radius of 3km to the natural reserve or natural forest, etc ... ?

    Yes No X- ­

    Is there any construction site within radius of 300m to the historical monument, temple, pagoda, or other cultural heritage?

    Yes No X- ­

    Is there any construction site within radius of 300m to the commune centre (where has People's Committee, sch