RURAL ELECTRIFICATION CORPORATION LIMITED (A Government of India Enterprise) Registered Office: Core – 4, SCOPE Complex, 7, Lodi Road, New Delhi – 110 003. Tel.: 24365161 Fax: 24360644 Gram: RECTRIC Pre-Bid Clarifications -2 Date: 24.10.2017 Tender Number - REC /PCM/DDG/RQM/2017-18/02 Details of Assignment - Appointment of REC Quality Monitors (RQM) for DDG Projects under DDUGJY Tender: Appointment of REC Quality Monitors for Decentralized Distribution Generation Projects under DDUGJY S.No. Clause No. Reference TUV SUD Query REC Reply 1. Page No.17 , Clause No.2.3 Village’s inspection/Site Inspection: Village/habitations are to be done as per approved FQP/Drawings/Technical Specifications/Datasheet/ standard format survey report. The inspection of REC Quality Monitors shall commence in a state as and when villages/ habitations are offered to them by the respective Chief Program Manager of REC Regional office(s). Kindly Share the Standard Format of Survey Report and quality assurance plan. (if any) This shall be finalized on award of contract. However a tentative format is attached as Annexure F

RURAL ELECTRIFICATION CORPORATION LIMITED (A Government · PDF file · 2017-10-24RURAL ELECTRIFICATION CORPORATION LIMITED (A Government of India Enterprise) ... for DDG Projects

Embed Size (px)

Citation preview

RURAL ELECTRIFICATION CORPORATION LIMITED (A Government of India Enterprise)

Registered Office: Core – 4, SCOPE Complex, 7, Lodi Road, New Delhi – 110 003.

Tel.: 24365161 Fax: 24360644 Gram: RECTRIC

Pre-Bid Clarifications -2

Date: 24.10.2017

Tender Number - REC /PCM/DDG/RQM/2017-18/02

Details of Assignment - Appointment of REC Quality Monitors (RQM) for DDG Projects under DDUGJY

Tender: Appointment of REC Quality Monitors for Decentralized Distribution Generation Projects under DDUGJY

S.No. Clause

No. Reference TUV SUD Query REC Reply

1.

Page No.17 , Clause No.2.3

Village’s inspection/Site Inspection: Village/habitations are to be done as per approved FQP/Drawings/Technical Specifications/Datasheet/ standard format survey report. The inspection of REC Quality Monitors shall commence in a state as and when villages/ habitations are offered to them by the respective Chief Program Manager of REC Regional office(s).

Kindly Share the Standard Format of Survey Report and quality assurance plan. (if any)

This shall be finalized on award of contract. However a tentative format is attached as Annexure F

2.

Page No.18 , Clause No.2.3.1

2.3.1. Site Inspection: The scope of works includes inspection of 100% of un-electrified villages (all associated habitations of the village should be inspected) and 10% habitations & intensive electrified villages (all associated habitations in that particular villages should be inspected) covered in the State.

Is any sampling criteria applicable for inspection of SPV system or 100% verification of all SPV systems per village is required?

Tender terms and conditions shall prevail.

3.

What would be the

quantum of minimum & maximum number of systems or average number of systems to be inspected per village as it mandatorily required for costing purpose.

In general, one Solar

Mini-grid power plant is installed in a village, however some villages based on no habitations, may have more than one Mini-grid Solar power plants (SPV).100% beneficiaries shall be visited. Revised Annexure-D enclosed

4.

Page No.5 , Clause Region-A - Material Inspection (nos.)- 0 Nos.

Kindly clarify as below: The Region-wise number represents number of visits performed by RQM agency for inspection of materials at manufacturer works

No.8.1 Region-B- Material Inspection (nos.)- 16 Nos. Whether this number indicates number of inspections to be performed or number of manufactures to be visited for inspection. If these are number of manufactures, then how many inspections per manufacturer to be performed by RQM.

Region-C- Material Inspection (nos.)- 16 Nos.

Region-D- Material Inspection (nos.)- 20 Nos.

5.

Page No.28 , Clause No.15.4

Instruments for quality checks: The agency shall arrange for such instruments as required for successful checking of the quality of works. Instruments such as clamp meter, RFID reader, solar power meter, meggar, earth tester, vernier calipers, measuring tape, rodometer, GPS device, DSLR professional camera with proper zooming (minimum 15 Mega Pixel and 4X Zoom) etc. are to be arranged by the agency. The

instrument must be calibrated on the day of inspection and calibration certificate should be possessed by operating personal.

Please clarify whether it is mandatory to use DSLR professional camera with proper zooming (minimum 15 Mega Pixel and 4X Zoom) or equivalent camera device or high quality Mobile Camera can be used during site

inspection.

Tender terms and conditions shall prevail.

6.

Page No.2, Data Sheet

Last Date & Time for bids submission 25.10.2017 at 15.00 Hrs (IST)

Deadline is very much stringent looking into bid requirements. We request extension in submission deadline as lot of activities such as arrangement of EMD through DD for all four regions, updating bio data of experts, working on costing including expenses for 3668 villages and Diwali holidays between 18th – 20th October.We request to extend last date of submission on Online Bid and Physical Support Documents to 7th November 2017.

Tender terms and conditions shall prevail.

Revised Annexure-D

S.No.

Region State Name Name of District

Plan Capacity

(KW)*

Total HHs (Inc. BPL)

Total No. of Habitations Sanctioned

Technology (SPV/SHLS)

Category (UEV /IEV)

Name of Implementing

Agency

1

Region-A

Andhra Pradesh

Vishakapatnam

XI

1402.5 8852

57 SPV _

APEPDCL Vishakapatnam

XII 183 SPV _

Srikulam XII 11 SPV _

Prakasam XII 11 SPV _ APSPDCL

Vishakapatnam

DDUGJY

464 2106

162 SPV _

APEPDCL

East Godavari

52 SPV

Rajamahendravaram

12 SPV

Eluru 3 SPV

Sub Total 1866.5 10958 491 0

2 Telangana

Adilabad XI 202 1275

19 SPV TSNPDCL

Khammam 20 SPV

Sub Total 202 1275 39 0

3 Kerala Pallakkad XII 131.5 731 7 SPV KSEB

Sub Total 131.5 731 7 0

4 Karnataka

Chamarajanagar

XII 591.2 2791

9 SPV UEV

CESC

Chamarajanagar 8

SPV CESCL

Chikkamagalore 0

SPV MESCOM

Dakshin kannada 0

SPV MESCOM

Sheribichanally 1

SPV KREDL

Madikeri 5 SPV CESC

Mysore 11 SPV UEV CESC

Mysore 2 SPV CESCL

Shimago 0 SPV MESCOM

Udupi 0 SPV MESCOM

Uttar Kannda 1 SPV KREDL

Shimoga

DDUGJY

2 SHLS UEV MESCOM

Uttar Kannada 0

SPV HESCOM

Belgaum 0 SPV HESCOM

Sub Total 591.2 2791 39

Total 2791.2 15755 576

S.No.

Region(s) State Name Name of District

Plan Capacity

(KW)

Total HHs (Inc. BPL)

Total no. of villages(Nos)

Technology(SPV/SHLS)

Category(UEV /IEV)

Name of Implementing

Agency

5 Region-B Odisha

Gajapati XII

3545.5 12157

6 SPV UEV

OREDA

Boudh

DDUGJY

21 SPV +SHLS UEV

Mayurbhanj 34 SPV +SHLS UEV

Anugul 16 SPV +SHLS UEV

BARGARH 2 SPV +SHLS UEV

Debagarh 16 SPV +SHLS UEV

Dhenkanal 3 SPV +SHLS UEV

Ganjam 39 SPV +SHLS UEV

Kalahandi 49 SPV +SHLS UEV

Kendujhar 1 SPV UEV

Keonjhar 2 SPV UEV

Koraput 44 SPV +SHLS UEV

Nabarangpur 3 SPV +SHLS UEV

Nayagarh 15 SPV +SHLS UEV

Nuapada 6 SPV UEV

Rayagada 12 SPV +SHLS UEV

Kandhamal 6 SPV UEV

Sub Total 3545.5 12157 275

6 Chhattisgarh

Sarguja XI 102 645 3 SPV UEV

CREDA

Korba 5 SPV UEV

Surajpur

XII 523 3923

13 SPV UEV

Balrampur 8 SPV UEV

Sarguja 3 SPV UEV

Balrampur

DDUGJY 4723 51322

3 SPV UEV

Balrampur 4 SPV IEV

Surguja 1 SPV UEV

Surguja 5 SPV IEV

Surguja 2 SPV UEV

Dantewada 12 SPV UEV

Gariyaband 2 SPV UEV

Gariyaband 25 SPV IEV

Jashpur 2 SPV UEV

Jashpur 20 SPV IEV

Jashpur 1 SPV UEV

Kabirdham 1 SPV UEV

Kondagaon 2 SPV +SHLS UEV

Kondagaon 1 SPV IEV

Surajpur 3 SPV UEV /IEV

Surajpur 11 SPV IEV

Surajpur 2 SPV UEV

Narayanpur 9 SPV +SHLS UEV

Narayanpur 77 SPV +SHLS UEV

Narayanpur 31 SPV +SHLS UEV

Bijapur 92 SPV +SHLS UEV

Bijapur 3 SPV +SHLS UEV

Bijapur 78 SPV +SHLS UEV

Sukma 161 SPV +SHLS UEV

Bastar 2 SPV UEV

Bastar 1 SPV UEV

Balodabazar 17 SPV IEV

Dhamtari 22 SPV IEV

Kanker 6 SPV UEV / IEV

Korba 12 SPV IEV

Koriya 70 SPV UEV / IEV

Rajnandgaon 9 SPV IEV

Sub Total 5348 55890 719

7 Madhya Pradesh

Katni

242 1151

4 SPV UEV

Umaria 6 SPV UEV

Damoh 10 SPV +SHLS UEV

Sub Total 242 1151 20

Total 9135.5 69198 1014

8

Region-C

Uttar Pradesh

Sonebhadra

XI 577 3765

6 SPV UEV

UPNEDA

Bhraich 2 SPV UEV

Hamirpur 2 SPV UEV

Lakhimpur Kheri

3 SPV UEV

Lalitpur 4 SPV UEV

Sub Total 577 3765 17

9 Uttarakhand Pithoragarh DDUGJY 402 1093 13 SPV+SHLS UEV UPCL

Sub Total 402 1093 13

10 Rajasthan

Chittaurgarh

1 SHLS UEV

AVVNL Pratapgarh 4 SHLS UEV

Udaipur 26 SHLS UEV

Barmer 19 SHLS UEV

JDVVNL Churu 2 SHLS UEV

Ganganagar 1 SHLS UEV

Jaisalmer 26 SHLS UEV

Jodhpur 7 SHLS UEV

Pali 4 SHLS UEV

Alwar 1 SHLS UEV

JVVNL

Baran

16 SHLS UEV

Bharatpur 3 SHLS UEV

Bundi 1 SHLS UEV

Dausa 1 SHLS UEV

Jhalawar 1 SHLS UEV

Karauli 7 SHLS UEV

Sub Total 0 0 120

11 Bihar

Banka

5466.4661 38052

1 SHLS UEV SBPDCL

Bhagalpur 8 SHLS UEV SBPDCL

Jamui 1 SHLS UEV SBPDCL

Kaimur 120 SHLS UEV SBPDCL

Munger 3 SHLS UEV SBPDCL

Nawada 8 SHLS UEV SBPDCL

Rohtas 11 SHLS UEV SBPDCL

Gopalganj 2 2 SHLS UEV NBPDCL

Khagaria_ 1 1 SHLS UEV NBPDCL

Samastipur 1 1 SHLS UEV NBPDCL

Supau 33 33 SHLS UEV NBPDCL

West Champaran 25 25 SHLS

UEV NBPDCL

Sub Total 5466.4661 38052 214

12 Jharkhand

Gumla

XII

7116.155 10775

23 SPV UEV

JREDA

West Singhbhum 58

SPV+SHLS UEV

Simdega 6 SPV UEV

Garhwa

DDUGJY

16 SPV UEV

Hazaribagh 6 SPV+SHLS UEV

Pakur 17 SPV+SHLS UEV

Sahebganj 43 SPV+SHLS UEV

Chatra 60 SPV+SHLS UEV

Pakur 1 SPV UEV

Sub Total 7116.155 10775 230

Total 13561.621 53685 594

13 Region-D Assam

KAMRUP

DDUGJY 8949 45520

12 SPV + SHLS

UEV

APDCL

KARBI ANGLONG

290 SPV + SHLS

UEV

LAKHIMPUR 15

SPV + SHLS

UEV

Kokrajhar 2 SPV UEV

Goalpara 45

SPV + SHLS

UEV

Barpeta 10

SPV + SHLS

UEV

Darrang 14

SPV + SHLS

UEV

Dhubri 48

SPV + SHLS

UEV

N.C. Hills 14

SPV + SHLS

UEV

JORHAT 17

SPV + SHLS

UEV

Sonitpur 18

SPV + SHLS

UEV

Tinsukia 19

SPV + SHLS

UEV

Dhemaji 3

SPV + SHLS

UEV

Dibrugarh 8

SPV + SHLS

UEV

Morigaon 5

SPV + SHLS

UEV

BONGAIGAON

1 SPV UEV

Sub Total 8949 45520 521

14 Arunachal Pradesh

Anjaw

DDUGJY

12393

21 SHLS UEV

SECI

Changlang 16 SHLS UEV

Dibang Valley 26 SHLS UEV

East Kameng 107 SHLS UEV

East Siang 4 SHLS UEV

Kurung Kumey

304 SHLS

UEV

Lohit 2 SHLS UEV

Lower Dibang Valley

46 SHLS

UEV

Lower Subansiri

176 SHLS

UEV

Papum Pare 41 SHLS UEV

Tawang 10 SHLS UEV

Upper Siang 7 SHLS UEV

Upper Subansiri

95 SHLS

UEV

West Kameng 5 SHLS UEV

West Siang 35 SHLS UEV

Sub Total 0 12393 895

16 Meghalaya

Jaintia Hills XII 154

2697

8 SPV+SHLS UEV MePDCL

Ri-Bhoi

1 SHLS UEV MePDCL

West Khasi Hills

2 SHLS UEV MePDCL

West Garo Hills

4 SHLS UEV MePDCL

Jaintia Hills 10 SHLS UEV MNREDA

West Khasi Hills

11 SHLS UEV MNREDA

East Garo Hills

2 SHLS UEV MNREDA

East Khasi Hillls

1 SHLS UEV MNREDA

West Garo Hills

2 SHLS UEV MNREDA

Ri Bhoi 16 SHLS UEV MNREDA

Ri - Bhoi 1 SHLS UEV MePDCL

Jaintia Hills 1 SHLS UEV MePDCL

West Khasi Hills

1 SHLS UEV MePDCL

East Khasi Hills

6 SHLS UEV MePDCL

West Garo Hills

1 SHLS UEV MePDCL

East Garo Hills

1 SHLS UEV MePDCL

Sub Total 154 2697 68

Total 9103 60610 1484

Grand total

34591.321 199248 3668

*Solar Standalone System capacity not included

SPV-Solar Mini-Grid Project SHLS-Solar Standalone System

UEV-Un-electrified village IEV-Intensive electrified village

Annexure-F

Quality Monitoring of Decentralized Distributed

Generation projects under DDUGJY Scheme

Index

Sl. Nos.

Description Page Nos.

1 Copy of inspection notice issued by REC

2 Joint signatures of inspectors with supervising and verifying officers in the hierarchy of the RQM

3 Brief Profile of the signatories of the report

Field inspection report

4

Abstract : Details of physical quantity of work executed Mini-grid /Standalone system, verification of Quantity awarded, Quality of work, General observation ( hrs. of supply etc.), comments on verification of test reports, verification of BPL connections

5 Annexure-I: Verification of Quantity of material w.r.t sanctioned /Awarded quantities – in tabular form

6 Annexure-II: Major deviations from Technical specification of PIA /Approved drawings Diagrams /DDG quality plan guidelines

7 Checklist for Inspection of – in tabular form showing type of defect, category, their location in photograph &

8 Annexure-III: List of BPL & APL Beneficiaries Duly certified by authorized signatory

9 Annexure-IV: Verification of BPL & APL connections by RQM – tabulated form

10 Annexure-V: Approved Drawing, SLD & BoQ of PIA

11

Annexure-VI: GPS Points Superimposed on Google Earth of infrastructure actually built in the village as seen by RQM inspector, duly indexed using GPS Device ( with nomenclature of Solar power plant as SPV1, SPV2,...... and Solar Standalone System as SS1, SS2,.......or any other identification provided by PIA to mark the location of defects )

12 Annexure-VII: Photographs ( with good resolution and zoom) with underlying text describing defects

13 Annexure-VIII: Group photograph of the inspector with leading members of villagers with SPV/SS or other prominent installation in background

14 Annexure-IX: Copy of Village Electrification certificate issued by PIA /Gram Panchayat Certificate

15 Annexure-X: Comments on TPIA inspection reports

16 Annexure-XI: Copy of test reports of major equipments like Solar Panel, Battery, Inverter/PCU/Solar Charge controller, conductor, pole, ACDB/DCDB, energy meter, cable whose test report is verified

17 Library of Photos of Solar System installed in village

Copy of

Inspection Notice

issued by REC

RURAL ELECTRIFICATION CORPORATION LIMITED

(A Government of India Enterprise)

Regd Office: Core-4, SCOPE Complex, 7 Lodi Road New Delhi

110003Tele. 24365161 Fax 24360644 Email [email protected]

Gram RECTRICWebsite www.recindia.com & www.recindia.nic.in

Inspection call No. REC/DDG/2017-18/ Date:

<Name and Address of RQM>

Kind Attn: Ms/Shri

Sub: DDG (RE) –Inspection of Rural Electrification works by REC Quality Monitors in

…………. projects of ……. State – Stage-

Ref: Our LoA No. ………………….. dated …………………

Ma’M/Sir,

This has reference to our Letter of Award (LoA) under reference nominating your agency

as National Quality Monitor under Quality Control Mechanism for DDUGJY (RE) Projects in

………… projects of ………… State under … Plan. In line with the terms of LoA, it is requested

to carryout inspection as per details given below-:

S. No. Plan

(XI/XII/DDUGJY)

District Nos. of Villages*

*The associated habitations, majra, tolaetc are also to be inspected. List of associated habitations,

majra, tolaetc covered under DDUGJY may be obtained from PIA.

The details of villages and substations to be inspected are enclosed at Annexure-I.

Further, it is requested to submit the inspection reports as per the prescribed format at

the earliest. The inspections carried out by your agency may be cross-examined by REC

team. Also, your agency is requested to review the inspections carried out by TPIA and

submit the comments on their reports. Your agency is requested to submit the report

(Hard copy as well as Scanned copy) to REC.

Thanking You,

Yours Sincerely,

()

Chief Program Manager

Copy to:

(i) <Name and Details of PIA for providing necessary assistance to RQM agency

(ii) REC CO, DDG Division, New Delhi for kind information.

List of Villages to be inspected by RQM in …………. State – Stage

S. No. Name of

Project

Name

of PIA

Name of

Village

with

census

code*

Category of

village

(UE/PE)

Infrastructure Details

SPV plant /

(kWp)

Standalone

system (Wp)

Remarks

*RQM agency is also requested to inspect all the habitations (covered under DDUGJY-RE) associated with aforementioned villages.

Joint Signatures of

RQM Agency’s

Personnel Involved

Brief Profile

of the

Signatories of the

report

Brief Profile of Finaliser and/or Reviewer of inspection report:

Name of the Person:

Date of Birth:

Designation:

Qualification:

Experience (with Details in Brief):

Brief Profile of inspecting officer:

Name of the Person:

Date of Birth:

Designation:

Qualification:

Experience (with Details in Brief):

Abstract

Of

Village Inspection

Report

DDG (RE): Village Inspection Report by RQM viz. ____________(Agency Name)

(Village include all majras/tolas/habitations under the revenue village covered under sanctioned DDUGJY-RE project)

1 Inspection Call Reference No.

2 Date of Inspection

3

(i) District (Census code) / Project (DPR Code)

(ii) Block & Census code

(iii) Details of Village Name

Census

Code Status (UE/PE)

(iv) Details of Habitation

Name Census

Code Status (UE/PE)

4 Name of the Project Implementing Agency (PIA)

5 Name of the Turnkey Contractor

6 Total No. of Households coverage as per DPR BPL APL Total

7 BPL households Latest BPL Coverage

(As per latest sanction)

BPL

Connections

Released

Actual No. of BPL

HHs Inspected

No. of BPL

HHs charged

out of the

inspected BPL

HHs

Nos.of BPL HHs yet to

be charged out of the

inspected BPL HHs

Total S

C

S

T

Oth

ers

Tot

al Total Total Total

8 APL households

No. of APL HHs applied

for connection

No. of

connecti

ons

released

to APL

HH

No. of APLs not willing to avail

connection

Reason for APL HHs not

availing connection

9 Details of Physical Quantity of executed work in inspected village

Name of the material/ equipment as per

scheme coverage in the inspection area

Unit As per

DPR/

Sancti

on

As per

approved

BOQ/as built

drawing

Quantity

verified by

RQM at

field

Variations,

if any and

remarks

I. Major physical quantities: Solar Mini-grid/Standalone system

1 Solar Mini-grid PV Plant

/Standalone System Capacity

kWp/

Wp

2 Battery Bank Capacity Volt,

Ah

3 No of Inverter/PCU /Charge

Controller & Rating KVA

4 LT circuit Length Km.

5 Array Structure /Pole (Hot dip

galvanized MS / Steel /Aluminium ) -

6 ACDB/DCDB -

7 Energy Meter -

8 LED Bulbs/Fan -

9 Control Room size Sq. m

Street light

Solar Panel Wp

Battery V,

Ah

Pole (Hot dip galvanized MS / Steel

/ Aluminium )

10 Review of Material Test Reports:

Sl.

No

Name of

Equipment/material

s of which test

report checked

Whether Pre-

dispatch

inspections

carried out

(Yes/No)

Whether All

tests

performed as

per

relevant latest

IS / Technical

Spec.

Whether Test results

are acceptable as per

IS / Technical Spec.

(Yes/No)

Discrepancies

found in test

report of

equipment/ma

terial

1 Solar Panel

2 Battery

3 No of Inverter/PCU

& Rating

4 Poles

5 Conductor

6 LED

Bulbs/Fan/etc,.

11 General Aspects

Sr.

No Component

Details (Flag with page no.)

1 No. of Hours of power supply in the village (Avg.

hours of supply per day in a month)

2 Specific comments about the difficulties/ constraints

and various reasons for not providing of power supply

3 Whether the newly developed system has been

charged/commissioned?

4 PV modules are made in India Yes/No

5 Type, Rating, Make and year of manufacturing of

Modules

6 Whether the modules contain information about

company name, serial no and year manufacturing etc

7 Inverter Type, Rating, Make & year of manufacturing

8 Battery Type, Rating, Make & year of manufacturing

9 Array Structure /Pole

(Hot dip galvanized MS / Steel /Aluminium )

10 Solar Power Plant(Mini-grid)

10A Whether the system was installed in shadow free area

or not? If not mention the details

10B Gap between rows of the modules(In case of SPV )

10C

Tilt Angle of Modules

10D Lighting arrester installed (In case of SPV )

10E Solar Irradiance sensor, Temperature sensor mounted

on Plane of the array. (In case of SPV )

10F Earthling and protections (Array Structure, PCU,

ACDB and DCDB ) -In case of SPV

10G Energy Generation during the date of visit (kWh)

10H Fire extinguishers available in Control room and Solar

Array area

10I Fencing provided for Solar Array

10J Earthing system provide

10K Lightning Arrestor installed in solar array area

11

Type of Control Room (RCC/Pre-fabricated)

11A

Whether control room constructed as per approved

drawing of PIA.

(If any defect may specifically highlight )

12

Provision of Solar Power Plant /Standalone system

Energy Generation monitoring (whether Data logger is

installed by Developer and generation data is being

recorded )

13 Whether village electrification certificate from PIA/

Gram Panchayat furnished

14

Whether Turnkey contractor /PIA operating and

maintaining the solar system

15A Did beneficiaries aware about the details to register

complaint /Any Mechanism?

15B

Is there any contact details & telephone no. to register

the faults by Beneficiary -If yes please provide the

contact details

16

Verification of Electrification of public facilities viz.,

Hospital, School, Panchayat office etc., if any:(Y/N)

Access

available

Access

available but

not charged

Electrified

17

Comment on socio-economic improvement in the

village on account of DDUGJY programme and that

due to availability of power:

18

Whether Technical Specification of PIA/DDG Quality

guidelines were followed for award of contract and

execution of project? List out major deviations from

Technical specification/guidelines including deviation

if any in e-tendering, payment terms, PQR, Quality

guidelines etc.

Yes/No

(Enclosed at Annexure - V )

19 Feedback from Public:

12

Note : RQM Agency requested to capture the details of photos in Sr. 3 to 14 in Annexure-XII

Observations:

Sl.

No.

Category No. of instances where

Deviation observed (Nos.)

Reason for deviation

1 Electrification of all BPL HHs as per

DDUGJY (RE) guidelines

2 Minimum hours of power supply to the

village

3

Physical quantity with reference to the

reported executed quantity (Refer

Annexure – I)

13 Deficiencies/Discrepancies on executed works and non-compliance of construction standards:

Sl.

No

Category No. of discrepancies

(Nos)

Nature of

Discrepanci

es/Deviatio

ns

Suggestion for corrective

action

1 Quantity of materials installed/

commissioned

Refer

Annexure - I

2

Quality of works/

workmanship/

Defects observed in checklist*

Refer

Annexure -

VII

Total No. of Discrepancies

* PIA to ensure rectification of these defects at all locations/installations in the whole project.

14 General observations including design parameters:

(i) Comments on Adequacy of battery storage/capacity with respect to installed

plant capacity.

(ii) Views on adequacy of Installed plant capacity considering the connected load

incl. HH load, common facilities load, street light load, battery autonomy etc.

(iii) Technical Comments on overall design of the systems viz. solar panel location,

tilt angle, protection and tripping mechanism, losses in the system, inverter

capacity etc.

Seal and Signature: Seal and Signature:

Name: Name:

Designation: Designation:

Date: Date:

Phone no.: Phone no.:

Annexure-I

(Verification of

Quantity of Materials)

Annexure-I

Quantity of Material

(Verification w.r.t. sanctioned/Awarded BOQ – refer Item No. 9 of village inspection report)

Solar power plant(Mini-grid) /Standalone system

Sr. No.

Description as per LoA Unit

As per BOQ/LOA

Awarded by PIA

Verification done by

RQM

Variation in

Quantity

Category of Defect

(Critical/Major/Minor)

Remarks

1. Solar Mini-grid PV Plant

/Standalone System Capacity KWp.

2. Battery Bank Capacity

V,Ah sets

3. No of Inverter/PCU /Charge

Controller & Rating kVA sets

4. LT circuit Length Mtr

5. Array Structure /Pole (Hot

dip galvanized MS / Steel

/Aluminium )

sets.

6. ACDB/DCDB No.

7 Energy Meter No.

8 LED Bulbs No.

9 Fan No.

10 Control Room size Sq.m

11 Street Light No.

11A Solar Panel Wp

11B Battery

V,Ah

Set.

11C LED Luminare No.

11D Pole No.

*Any specific items RQM, Agency may add the rows as per requirement

Definition:

Critical: 1. If number of Quantity is less than BOQ

Major: 1. If no. quantity installed is less than BOQ

Minor: 1. If sought out items are short wrt. drawings

Annexure-II

Major deviations from

Technical specification

of PIA / DDG

Quality Plan

Guidelines

Annexure-III

List of BPL & APL

Beneficiaries Certified

by

Authorized Signatory

Annexure-VIII

(Verification of BPL&

APL Connections)

Verification of BPL Connections (Connections Released)

S.

No

.

Co

nsu

mer

Nam

e

Fa

ther

’s N

am

e

Co

nsu

mer

No

.

BP

L C

ard

No.

Met

er n

o.

Da

te o

f co

nn

ecti

on

C

ate

go

ry

(SC

/ST

/Oth

er)

Wh

eth

er

Co

nn

ecti

on

pro

vid

ed

(Y /

N)

Co

nn

ecte

d L

oa

d

(Actu

all

y u

sed

by B

PL

)

Rem

ark

s /

Ob

serv

ati

on

s

Verification of APL Connections (Connections Released)

S.

No

.

Co

nsu

mer

Nam

e

Fa

ther

’s N

am

e

Co

nsu

mer

No

.

Met

er n

o.

Da

te o

f co

nn

ecti

on

C

ate

go

ry

(SC

/ST

/Oth

er)

Wh

eth

er

Co

nn

ecti

on

pro

vid

ed

(Y /

N)

Co

nn

ecte

d L

oa

d

(Actu

all

y u

sed

by

AP

L)

Wh

eth

er

DD

UG

JY

Ben

efic

iary

(Y

/N)

Rem

ark

s /

Ob

serv

ati

on

s

Seal and Signature:

Name:

Designation

Date:

Annexure-V

Copy of Approved

Drawings/

Diagram/Technical

Specification of PIA

Annexure-VI

GPS Points

Superimposed on

Google Earth

Block Name-Virat Nagar Village Name-Band Mujaffar

Code- 0002 Census Code:-1462800

Annexure-VII

(Photographs

Describing Defects)

District: Block: Village: Census Code:

1. Vegetation control is required to remove the risk of vegetation shading

modules and reducing performance

Streetlight covered with vegetation

2. Heavy soiling in desert conditions needs to be considered as part of the

O&M strategy. Shading of modules by adjacent rows can be avoided at the

design stage.

2. Poorly designed foundations and improper anchor bolts can result in mounting

structures that are not properly bolted/secured.

3. Poor DC cable management. DC cables should be kept neat and

Secured with cable ties, respecting cable-bending radii.

4. Cables should be protected from sharp metallic edges using appropriate padding

5. Glands should be used for all cables entering combiner boxes, to

Prevent cable movement and damage to cable insulation

6. Cable not crimped properly – pressed with pliers rather than cramping

tool

Annexure-VIII

(Group Photograph of

inspectors with

villagers)

Annexure-IX

(Copy of village

electrification

certificated issued by

PIA /Gram Panchayat

Certificate)

Annexure-X

Comments on TPIA

Inspection Reports

Format for Comments on TPIA reports

Name of State: Name of Project: Name of Village/habitation:

(with census code)

Name of PIA: Name of contractor:

Name of Agency TPIA:

Date of inspection TPIA: Name of the material/

equipment

Unit As per latest

DPR/RCE /

approved

BOQ/As built

drawing

Quantity

Verified by

TPIA

Quantity

Verified by

RQM

Quantity

Verified by

RQM

Deviation

w.r.t. TPIA

&

RQM/Rema

rks if, any

I. Major physical quantities

1

Solar Mini-grid

PV Plant

/Standalone

System Capacity

No.

2 Battery Bank

Capacity

No./

each

KVA

3

No of

Inverter/PCU

/Charge

Controller &

Rating

Km.

4 LT circuit Length Km.

5

Array Structure

/Pole (Hot dip

galvanized MS /

Steel /Aluminium )

Nos.

Avg. Hrs of Supply TPIA:

Newly Electrified Solar System Charged (Y/N) TPIA:

General observation: -

Sr.

No.

Description of

Defects (Pic no. &

Location)

RQM

Comments

TPIA

Comments

RQM

Comments

Attended by PIA

Yes/No Remarks

1.

2.

3.

4.

….

Annexure-XII

(Copy of Test

Reports/Inspection

Reports of Major

Materials)

Annexure-XII

Library

Of

Photos of Solar System

Installed in village

District: Block: Village: Census Code:

Solar Array Area

Module details

Mounting Structure

Junction box

Control Room

Battery Details

Power conditioning units

Rating of PCU

AC &DC Distribution Panel

Meter Reading

Earthing Connections

Street light

Beneficiary

Beneficiary

Electricity connections to Stationary shop