Rules for Construction of Nuclear Facility Components 2015 BPVC Section III-NF-2015.pdf · ASME BPVC.III.1.NF-2015 Division 1 — Subsection NF Supports SECTION III Rules for Construction

Embed Size (px)

Citation preview

  • ASME BPVC. I I I .1 .NF-2015

    Div is ion 1 Subsect ion NFSuppor ts

    SECTION I I IRules for Construct ion ofNuclear Faci l i ty Components

    2015 ASME Boiler andPressure Vessel CodeAn International Code

    reproduction or distribution is permitted.

  • IIIRULES FOR CONSTRUCTIONOF NUCLEAR FACILITYCOMPONENTS

    Division 1 - Subsection NF

    SupportsASME Boiler and Pressure Vessel Committeeon Nuclear Power

    AN INTERNATIONAL CODE

    2015 ASME Boiler &Pressure Vessel Code2015 Edition July 1, 2015

    Two Park Avenue New York, NY 10016 USA

    reproduction or distribution is permitted.

  • Date of Issuance: July 1, 2015

    This international code or standard was developed under procedures accredited as meeting the criteria forAmerican National Standards and it is an American National Standard. The Standards Committee that approvedthe code or standard was balanced to assure that individuals from competent and concerned interests havehad an opportunity to participate. The proposed code or standard was made available for public review and com-ment that provides an opportunity for additional public input from industry, academia, regulatory agencies, andthe public-at-large.ASME does not approve, rate, or endorse any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with any

    items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liabilityfor infringement of any applicable letters patent, nor assume any such liability. Users of a code or standard areexpressly advised that determination of the validity of any such patent rights, and the risk of infringement of suchrights, is entirely their own responsibility.Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as

    government or industry endorsement of this code or standard.ASME accepts responsibility for only those interpretations of this document issued in accordance with the es-

    tablished ASME procedures and policies, which precludes the issuance of interpretations by individuals.The endnotes and preamble in this document (if any) are part of this American National Standard.

    ASME collective membership mark

    Certification Mark

    The above ASME symbol is registered in the U.S. Patent Office.

    ASME is the trademark of The American Society of Mechanical Engineers.

    No part of this document may be reproduced in any form, in an electronicretrieval system or otherwise, without the prior written permission of the

    publisher.

    Library of Congress Catalog Card Number: 56-3934Printed in the United States of America

    Adopted by the Council of The American Society of Mechanical Engineers, 1914; latest edition 2015.

    The American Society of Mechanical EngineersTwo Park Avenue, New York, NY 10016-5990

    Copyright 2015 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERS

    All rights reserved

    reproduction or distribution is permitted.

  • TABLE OF CONTENTS

    List of Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viiiForeword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xStatement of Policy on the Use of the Certification Mark and Code Authorization in Advertising . . . . . . . . . . xiiStatement of Policy on the Use of ASME Marking to Identify Manufactured Items . . . . . . . . . . . . . . . . . . . . . . xiiSubmittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees . . . . . . . . . . . . . . . xiiiPersonnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xvOrganization of Section III . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxxiiSummary of Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxxvList of Changes in Record Number Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxxviiCross-Referencing and Stylistic Changes in the Boiler and Pressure Vessel Code . . . . . . . . . . . . . . . . . . . . . . . xxxviii

    Article NF-1000 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1NF-1100 Scope and General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

    NF-1110 Aspects of Construction Covered by These Rules . . . . . . . . . . . . . . . . . . . 1NF-1120 Rules for Supports and Their Classification . . . . . . . . . . . . . . . . . . . . . . . . 1NF-1130 Boundaries of Jurisdiction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

    NF-1200 Types of Supports and Attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2NF-1210 Types of Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2NF-1230 Welding Between Types of Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8NF-1240 Attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

    Article NF-2000 Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9NF-2100 General Requirements for Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    NF-2110 Scope of Principal Terms Employed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9NF-2120 Support Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9NF-2130 Certification of Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10NF-2140 Welding Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10NF-2150 Material Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11NF-2160 Deterioration of Material in Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11NF-2170 Heat Treatment to Enhance Impact Properties . . . . . . . . . . . . . . . . . . . . . 11NF-2180 Procedures for Heat Treatment of Material . . . . . . . . . . . . . . . . . . . . . . . . 11

    NF-2200 Material Test Coupons and Specimens for Ferritic Steel Material . . . . . 11NF-2210 Heat Treatment Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11NF-2220 Procedure for Obtaining Test Coupons and Specimens for Quenched and

    Tempered Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12NF-2300 Fracture Toughness Requirements for Material . . . . . . . . . . . . . . . . . . . . 13

    NF-2310 Material to Be Impact Tested . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13NF-2320 Impact Test Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16NF-2330 Test Requirements and Acceptance Standards . . . . . . . . . . . . . . . . . . . . . 17NF-2340 Number of Impact Tests Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17NF-2350 Retests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21NF-2360 Calibration of Instruments and Equipment . . . . . . . . . . . . . . . . . . . . . . . . 21

    NF-2400 Welding Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21NF-2410 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21NF-2420 Required Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22NF-2430 Weld Metal Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23NF-2440 Storage and Handling of Welding Material . . . . . . . . . . . . . . . . . . . . . . . . 25

    NF-2500 Examination and Repair of Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25NF-2510 Examination and Repair of Material Other Than Bolting . . . . . . . . . . . . . 25NF-2520 Required Examination and Acceptance Standards for Class 1 Springs . . 25

    iii

    reproduction or distribution is permitted.

  • NF-2530 Required Examination and Acceptance Standards for Coiled Wire RopeUsed as a Spring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

    NF-2580 Examination of Bolting Material and Rods . . . . . . . . . . . . . . . . . . . . . . . . . 25NF-2600 Material Manufacturers Quality System Programs . . . . . . . . . . . . . . . . . . 27NF-2610 Documentation and Maintenance of Quality System Programs . . . . . . . . 27

    Article NF-3000 Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28NF-3100 General Design Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28NF-3110 Loading Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28NF-3120 Design Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28NF-3130 General Design Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30NF-3140 General Design Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

    NF-3200 Design Rules for Plate and ShellType Supports . . . . . . . . . . . . . . . . . . . 32NF-3210 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32NF-3220 Design by Analysis for Class 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32NF-3250 Design by Analysis for Class 2 and MC . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38NF-3260 Design by Analysis for Class 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41NF-3270 Experimental Stress Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42NF-3280 Design by Load Rating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42

    NF-3300 Design Rules for LinearType Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . 43NF-3310 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43NF-3320 Design by Linear Elastic Analysis for Class 1 . . . . . . . . . . . . . . . . . . . . . . 46NF-3330 High Cycle Fatigue Design for Class 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68NF-3340 Limit Analysis Design for Class 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74NF-3350 Design by Analysis for Class 2 and MC . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77NF-3360 Design by Analysis for Class 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77NF-3370 Experimental Stress Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77NF-3380 Design by Load Rating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77

    NF-3400 Design Rules for Standard Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78NF-3410 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78NF-3420 Design by Analysis for Class 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79NF-3450 Design by Analysis for Class 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81NF-3460 Design by Analysis for Class 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81NF-3470 Design by Experimental Stress Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . 81NF-3480 Procedure for Load Rating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81

    NF-3500 Design Rules for Component Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81NF-3510 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81NF-3520 Design by Analysis for Class 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81NF-3550 Design by Analysis for Class 2, 3, and MC . . . . . . . . . . . . . . . . . . . . . . . . . 82NF-3570 Experimental Stress Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82NF-3580 Design by Load Rating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82

    NF-3600 Design Rules for Piping Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82NF-3610 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82NF-3620 Design by Analysis for Class 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83NF-3650 Design by Analysis for Class 2 and 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83NF-3670 Experimental Stress Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84NF-3680 Design by Load Rating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84

    Article NF-4000 Fabrication and Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85NF-4100 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85NF-4110 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85NF-4120 Certification of Materials and Fabrication by Support Certificate Holder 85NF-4130 Repair of Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85

    NF-4200 Forming, Fitting, and Aligning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86NF-4210 Cutting, Forming, and Bending . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86NF-4220 Support Tolerances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87NF-4230 Fitting and Aligning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87

    iv

    reproduction or distribution is permitted.

  • NF-4240 Requirements for Welded Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88NF-4300 Welding Qualifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88

    NF-4310 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88NF-4320 Welding Qualifications and Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88NF-4330 General Requirements for Welding Procedure Qualification Tests . . . . . 89

    NF-4400 Rules Governing Making and Repairing Welds . . . . . . . . . . . . . . . . . . . . . 91NF-4410 Precautions to Be Taken Before Welding . . . . . . . . . . . . . . . . . . . . . . . . . . 91NF-4420 Rules for Making Welded Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91NF-4430 Welding of Attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92NF-4440 Special Requirements for Welding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92NF-4450 Repair of Weld Metal Defects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92

    NF-4500 Brazing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94NF-4510 Rules for Brazing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94

    NF-4600 Heat Treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95NF-4610 Welding Preheat and Interpass Requirements . . . . . . . . . . . . . . . . . . . . . 95NF-4620 Postweld Heat Treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95NF-4660 Heat Treatment of Electroslag Welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99

    NF-4700 Requirements for Bolted Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100NF-4710 Bolting and Threading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100NF-4720 Bolting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100

    Article NF-5000 Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102NF-5100 General Requirements for Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . 102

    NF-5110 Procedures, Qualifications, and Evaluations . . . . . . . . . . . . . . . . . . . . . . . . 102NF-5200 Required Examination of Welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102

    NF-5210 Examination of Class 1 Support Welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102NF-5220 Examination of Class 2 and MC Support Welds . . . . . . . . . . . . . . . . . . . . . 103NF-5230 Examination of Class 3 Support Welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103NF-5240 Inertia and Continuous Drive Friction Welds . . . . . . . . . . . . . . . . . . . . . . 103

    NF-5300 Acceptance Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104NF-5320 Radiographic Acceptance Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104NF-5330 Ultrasonic Acceptance Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104NF-5340 Magnetic Particle Acceptance Standards . . . . . . . . . . . . . . . . . . . . . . . . . . 104NF-5350 Liquid Penetrant Acceptance Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . 105NF-5360 Visual Acceptance Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105

    NF-5500 Qualifications and Certification of Nondestructive Examination Person-nel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106

    NF-5510 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106NF-5520 Personnel Qualification, Certification, and Verification . . . . . . . . . . . . . . 106NF-5530 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107

    Article NF-8000 Certificates of Authorization and Certification Documents . . . . . . . . 108NF-8100 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 108

    Mandatory Appendix NF-I Additional Material for Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109

    Mandatory Appendix NF-II Design of Single Angle Members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146

    Mandatory Appendix NF-III Energy Absorbing Support Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . 153

    Nonmandatory Appendix NF-A Structural Bolt Preloading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 157

    Nonmandatory Appendix NF-B Design Allowable Stresses for Plate and Shell and Linear-Type Sup-ports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 161

    Nonmandatory Appendix NF-C Design Basis for LinearType Supports . . . . . . . . . . . . . . . . . . . . . . . . . 168

    Nonmandatory Appendix NF-D Tolerances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 174

    Nonmandatory Appendix NF-E Dampers, Energy Absorbers, and Snubbers . . . . . . . . . . . . . . . . . . . . . 180

    v

    reproduction or distribution is permitted.

  • FIGURESNF-1132-1 Typical Examples of Jurisdictional Boundaries Between Supports and the Building

    Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3NF-1214-1 Typical Standard Support Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7NF-2311(b)-1 Impact Test Exemption Curves for Materials for Class 2, 3, and MC Supports . . . . . . . . . 15NF-2331(a)-1 Required Cv Energy Values for Class 2 and MC Support Material Other Than Bolting . . . 19NF-2331(a)-2 Required Cv Energy Values for Class 3 support Material Other Than Bolting . . . . . . . . . . 20NF-2433.1-1 Delta Ferrite Content . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26NF-3226.1-1 Permissible Welded Joints for Class 1 Plate and ShellType Supports . . . . . . . . . . . . . . . 36NF-3226.1(a)-1 Typical Weld Details Referenced . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37NF-3226.1(a)-2 Butt Welding of Plates of Unequal Thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38NF-3256.1-1 Permissible Welded Joints for Class 2, 3, and MC Plate and ShellType Supports . . . . . . 40NF-3324.1(a)(1) Typical FrictionType Connections Using High Strength Bolts . . . . . . . . . . . . . . . . . . . . . . 62NF-3332.3-1 Illustrative Examples . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72NF-3426.1-1 Additional Permissible Welded Joints for Class 1 Standard Supports . . . . . . . . . . . . . . . . 80NF-3626(a)-1 Additional Permissible Welded Joints for Class 1 Piping Supports . . . . . . . . . . . . . . . . . . . 83NF-4427-1 Fillet Weld Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93NF-4441-1 Weld Joint Producing ThroughThickness Loading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94NF-II-3510 Equal Leg Single Angle Limits for Fb = 0.66Sy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150NF-A-1311 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 158NF-B-2400-1 Effective Length Factor for Various End Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 163NF-B-2400-2 Alignment Chart for Effective Length of Columns in Continuous Frames . . . . . . . . . . . . . 164

    TABLESNF-2121(a)-1 Material Tables Required for Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10NF-2311(b)-1 Exemptions From Impact Testing Under NF-2311(b)(9) and NF-2311(b)(10) for Ma-

    terial Thickness to 21/2 in. (64 mm), Inclusive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14NF-2331(a)-1 Required Cv Lateral Expansion Values for Class 1 Support Material Other Than Bolting 17NF-2331(a)-2 Required Cv Lateral Expansion Values for Class 2 and MC Support Material Other Than

    Bolting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17NF-2331(a)-3 Required Cv Lateral Expansion Values for Class 3 Support Material Other Than Bolting 17NF-2331(a)-4 Required Cv Energy Values for Class 1 Support Material Other Than Bolting . . . . . . . . 18NF-2333-1 Required Cv Values for Bolting Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21NF-2432.1-1 Sampling of Welding Materials for Chemical Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . 24NF-2432.2(a)-1 Welding Material Chemical Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24NF-3131(a)-1 Reference Paragraphs for Procedures for Design of Component Supports, Piping Sup-

    ports, and Standard Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31NF-3221.2-1 Elastic Analysis Stress Categories and Stress Limit Factors for Class 1 Plate and Shell

    Type Supports Designed by Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33NF-3225.2-1 Stress Limit Factors for Class 1, 2, 3, and MC Bolt Design by Analysis . . . . . . . . . . . . . 35NF-3251.2-1 Elastic Analysis Stress Categories and Stress Limit Factors for Class 2, 3, and MC Plate

    and ShellType Supports Designed by Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39NF-3312.1(b)-1 Elastic Analysis Stress Categories and Stress Limit Factors for Class 1, 2, 3, and MC

    Linear-Type Supports Designed by Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44NF-3322.2(e)(2)-1 Limiting Proportions for Channels and Tees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54NF-3324.5(a)-1 Allowable Stress Limits for Class 1 LinearType Support Welds . . . . . . . . . . . . . . . . . . 64NF-3324.6(a)(4)-1 Effective Slip Coefficient Versus Surface Condition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67NF-3324.6(b)(1)-1 Minimum Edge Distances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67NF-3332.2-1 Classification of Loading Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68NF-3332.3-1 Stress Categories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69NF-3332.4-1 Allowable Stress Ranges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74NF-3611-1 Suggested Piping Support Spacing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82NF-4232-1 Maximum Allowable Offset in Final Butt Welded Joints . . . . . . . . . . . . . . . . . . . . . . . . . . 88NF-4622.1-1 Mandatory Requirements for Postweld Heat Treatment (PWHT) of Welds . . . . . . . . . 96NF-4622.4(c)-1 Alternative Holding Temperatures and Times . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97

    vi

    reproduction or distribution is permitted.

  • NF-4622.7(b)-1 Exemptions to Mandatory PWHT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 98NF-4721(a)-1 Bolt Hole Sizes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100NF-4721(b)-1 Tolerances on Oversized Holes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100NF-I-2100-1 Design Stress Intensity (Sm), Maximum Allowable Stress (S), Yield Strength (Sy), and

    Tensile Strength (Su) Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111NF-I-2100-1M Design Stress Intensity (Sm), Maximum Allowable Stress (S), Yield Strength (Sy), and

    Tensile Strength (Su) Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 127NF-I-2100-2 ASTM Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 143NF-II-3532-1 Bw Values for Angles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 151NF-B-4000 Factors of Safety for a Material With a Low Value of Su/Sy Ratio . . . . . . . . . . . . . . . . . 166NF-C-4000 Design Basis for LinearType Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172NF-D-1320-1 Clamp Tolerances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 175NF-D-1330-1 Local Installation Tolerances for Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 176

    ENDNOTES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 183

    vii

    reproduction or distribution is permitted.

  • 15 LIST OF SECTIONSSECTIONSI Rules for Construction of Power Boilers

    II Materials Part A Ferrous Material Specifications Part B Nonferrous Material Specifications Part C Specifications for Welding Rods, Electrodes, and Filler Metals Part D Properties (Customary) Part D Properties (Metric)

    III Rules for Construction of Nuclear Facility Components Subsection NCA General Requirements for Division 1 and Division 2 Appendices Division 1 Subsection NB Class 1 Components Subsection NC Class 2 Components Subsection ND Class 3 Components Subsection NE Class MC Components Subsection NF Supports Subsection NG Core Support Structures Subsection NH Class 1 Components in Elevated Temperature Service*

    Division 2 Code for Concrete Containments Division 3 Containments for Transportation and Storage of Spent Nuclear Fuel and High Level RadioactiveMaterial and Waste

    Division 5 High Temperature Reactors

    IV Rules for Construction of Heating Boilers

    V Nondestructive Examination

    VI Recommended Rules for the Care and Operation of Heating Boilers

    VII Recommended Guidelines for the Care of Power Boilers

    VIII Rules for Construction of Pressure Vessels Division 1 Division 2 Alternative Rules Division 3 Alternative Rules for Construction of High Pressure Vessels

    IX Welding, Brazing, and Fusing Qualifications

    X Fiber-Reinforced Plastic Pressure Vessels

    XI Rules for Inservice Inspection of Nuclear Power Plant Components

    XII Rules for Construction and Continued Service of Transport Tanks

    * The 2015 Edition of Section III is the last edition in which Section III, Division 1, Subsection NH, Class 1 Components in Elevated TemperatureService, will be published. The requirements located within Subsection NH have been moved to Section III, Division 5, Subsection HB, Subpart Bfor the elevated temperature construction of Class A components.

    viii

    reproduction or distribution is permitted.

  • INTERPRETATIONS

    Interpretations of the Code have historically been posted in January and July at http://cstools.asme.org/interpreta-tions.cfm. Interpretations issued during the previous two calendar years are included with the publication of the applic-able Section of the Code in the 2015 Edition. Interpretations of Section III, Divisions 1 and 2 and Section III Appendicesare included with Subsection NCA.

    Following the 2015 Edition, interpretations will not be included in editions; they will be issued in real time in ASME'sInterpretations Database at http://go.asme.org/Interpretations. Historical BPVC interpretations may also be found inthe Database.

    CODE CASES

    The Boiler and Pressure Vessel Code committees meet regularly to consider proposed additions and revisions to theCode and to formulate Cases to clarify the intent of existing requirements or provide, when the need is urgent, rules formaterials or constructions not covered by existing Code rules. Those Cases that have been adopted will appear in theappropriate 2015 Code Cases book: Boilers and Pressure Vessels or Nuclear Components. Supplements will be sentor made available automatically to the purchasers of the Code Cases books up to the publication of the 2017 Code.

    ix

    reproduction or distribution is permitted.

  • 15 FOREWORD*

    In 1911, The American Society of Mechanical Engineers established the Boiler and Pressure Vessel Committee to for-mulate standard rules for the construction of steam boilers and other pressure vessels. In 2009, the Boiler and PressureVessel Committee was superseded by the following committees:(a) Committee on Power Boilers (I)(b) Committee on Materials (II)(c) Committee on Construction of Nuclear Facility Components (III)(d) Committee on Heating Boilers (IV)(e) Committee on Nondestructive Examination (V)(f) Committee on Pressure Vessels (VIII)(g) Committee on Welding, Brazing, and Fusing (IX)(h) Committee on Fiber-Reinforced Plastic Pressure Vessels (X)(i) Committee on Nuclear Inservice Inspection (XI)(j) Committee on Transport Tanks (XII)(k) Technical Oversight Management Committee (TOMC)Where reference is made to the Committee in this Foreword, each of these committees is included individually and

    collectively.The Committees function is to establish rules of safety relating only to pressure integrity, which govern the

    construction** of boilers, pressure vessels, transport tanks, and nuclear components, and the inservice inspection of nu-clear components and transport tanks. The Committee also interprets these rules when questions arise regarding theirintent. The technical consistency of the Sections of the Code and coordination of standards development activities of theCommittees is supported and guided by the Technical Oversight Management Committee. This Code does not addressother safety issues relating to the construction of boilers, pressure vessels, transport tanks, or nuclear components, orthe inservice inspection of nuclear components or transport tanks. Users of the Code should refer to the pertinent codes,standards, laws, regulations, or other relevant documents for safety issues other than those relating to pressure integ-rity. Except for Sections XI and XII, and with a few other exceptions, the rules do not, of practical necessity, reflect thelikelihood and consequences of deterioration in service related to specific service fluids or external operating environ-ments. In formulating the rules, the Committee considers the needs of users, manufacturers, and inspectors of pressurevessels. The objective of the rules is to afford reasonably certain protection of life and property, and to provide a marginfor deterioration in service to give a reasonably long, safe period of usefulness. Advancements in design and materialsand evidence of experience have been recognized.This Code contains mandatory requirements, specific prohibitions, and nonmandatory guidance for construction ac-

    tivities and inservice inspection and testing activities. The Code does not address all aspects of these activities and thoseaspects that are not specifically addressed should not be considered prohibited. The Code is not a handbook and cannotreplace education, experience, and the use of engineering judgment. The phrase engineering judgement refers to tech-nical judgments made by knowledgeable engineers experienced in the application of the Code. Engineering judgmentsmust be consistent with Code philosophy, and such judgments must never be used to overrule mandatory requirementsor specific prohibitions of the Code.The Committee recognizes that tools and techniques used for design and analysis change as technology progresses

    and expects engineers to use good judgment in the application of these tools. The designer is responsible for complyingwith Code rules and demonstrating compliance with Code equations when such equations are mandatory. The Codeneither requires nor prohibits the use of computers for the design or analysis of components constructed to the

    * The information contained in this Foreword is not part of this American National Standard (ANS) and has not been processed in accordancewith ANSI's requirements for an ANS. Therefore, this Foreword may contain material that has not been subjected to public review or a con-sensus process. In addition, it does not contain requirements necessary for conformance to the Code.

    ** Construction, as used in this Foreword, is an all-inclusive term comprising materials, design, fabrication, examination, inspection, testing,certification, and pressure relief.

    x

    reproduction or distribution is permitted.

  • requirements of the Code. However, designers and engineers using computer programs for design or analysis are cau-tioned that they are responsible for all technical assumptions inherent in the programs they use and the application ofthese programs to their design.

    The rules established by the Committee are not to be interpreted as approving, recommending, or endorsing any pro-prietary or specific design, or as limiting in any way the manufacturer's freedom to choose any method of design or anyform of construction that conforms to the Code rules.

    The Committee meets regularly to consider revisions of the rules, new rules as dictated by technological development,Code Cases, and requests for interpretations. Only the Committee has the authority to provide official interpretations ofthis Code. Requests for revisions, new rules, Code Cases, or interpretations shall be addressed to the Secretary in writingand shall give full particulars in order to receive consideration and action (see Submittal of Technical Inquiries to theBoiler and Pressure Vessel Standards Committees). Proposed revisions to the Code resulting from inquiries will be pre-sented to the Committee for appropriate action. The action of the Committee becomes effective only after confirmationby ballot of the Committee and approval by ASME. Proposed revisions to the Code approved by the Committee are sub-mitted to the American National Standards Institute (ANSI) and published at http://go.asme.org/BPVCPublicReview toinvite comments from all interested persons. After public review and final approval by ASME, revisions are published atregular intervals in Editions of the Code.

    The Committee does not rule on whether a component shall or shall not be constructed to the provisions of the Code.The scope of each Section has been established to identify the components and parameters considered by the Committeein formulating the Code rules.

    Questions or issues regarding compliance of a specific component with the Code rules are to be directed to the ASMECertificate Holder (Manufacturer). Inquiries concerning the interpretation of the Code are to be directed to the Commit-tee. ASME is to be notified should questions arise concerning improper use of an ASME Certification Mark.

    When required by context in this Section, the singular shall be interpreted as the plural, and vice versa, and the fem-inine, masculine, or neuter gender shall be treated as such other gender as appropriate.

    xi

    reproduction or distribution is permitted.

  • STATEMENT OF POLICY ON THE USE OF THE CERTIFICATIONMARK AND CODE AUTHORIZATION IN ADVERTISING

    ASME has established procedures to authorize qualified organizations to perform various activities in accordancewith the requirements of the ASME Boiler and Pressure Vessel Code. It is the aim of the Society to provide recognitionof organizations so authorized. An organization holding authorization to perform various activities in accordance withthe requirements of the Code may state this capability in its advertising literature.Organizations that are authorized to use the Certification Mark for marking items or constructions that have been

    constructed and inspected in compliance with the ASME Boiler and Pressure Vessel Code are issued Certificates ofAuthorization. It is the aim of the Society to maintain the standing of the Certification Mark for the benefit of the users,the enforcement jurisdictions, and the holders of the Certification Mark who comply with all requirements.Based on these objectives, the following policy has been established on the usage in advertising of facsimiles of the

    Certification Mark, Certificates of Authorization, and reference to Code construction. The American Society of MechanicalEngineers does not approve, certify, rate, or endorse any item, construction, or activity and there shall be no state-ments or implications that might so indicate. An organization holding the Certification Mark and/or a Certificate ofAuthorization may state in advertising literature that items, constructions, or activities are built (produced or per-formed) or activities conducted in accordance with the requirements of the ASME Boiler and Pressure Vessel Code,or meet the requirements of the ASME Boiler and Pressure Vessel Code.An ASME corporate logo shall not be usedby any organization other than ASME.The Certification Mark shall be used only for stamping and nameplates as specifically provided in the Code. However,

    facsimiles may be used for the purpose of fostering the use of such construction. Such usage may be by an association ora society, or by a holder of the Certification Mark who may also use the facsimile in advertising to show that clearly spe-cified items will carry the Certification Mark. General usage is permitted only when all of a manufacturers items areconstructed under the rules.

    STATEMENT OF POLICY ON THE USE OF ASME MARKING TOIDENTIFY MANUFACTURED ITEMS

    The ASME Boiler and Pressure Vessel Code provides rules for the construction of boilers, pressure vessels, and nuclearcomponents. This includes requirements for materials, design, fabrication, examination, inspection, and stamping. Itemsconstructed in accordance with all of the applicable rules of the Code are identified with the official Certification Markdescribed in the governing Section of the Code.Markings such as ASME, ASME Standard, or any other marking including ASME or the Certification Mark shall not

    be used on any item that is not constructed in accordance with all of the applicable requirements of the Code.Items shall not be described on ASME Data Report Forms nor on similar forms referring to ASME that tend to imply

    that all Code requirements have been met when, in fact, they have not been. Data Report Forms covering items not fullycomplying with ASME requirements should not refer to ASME or they should clearly identify all exceptions to the ASMErequirements.

    xii

    reproduction or distribution is permitted.

  • 15SUBMITTAL OF TECHNICAL INQUIRIES TO THE BOILER ANDPRESSURE VESSEL STANDARDS COMMITTEES

    1 INTRODUCTION

    (a) The following information provides guidance to Code users for submitting technical inquiries to the committees.See Guideline on the Approval of New Materials Under the ASME Boiler and Pressure Vessel Code in Section II, Parts Cand D for additional requirements for requests involving adding new materials to the Code. Technical inquiries includerequests for revisions or additions to the Code rules, requests for Code Cases, and requests for Code Interpretations, asdescribed below.

    (1) Code Revisions. Code revisions are considered to accommodate technological developments, address administra-tive requirements, incorporate Code Cases, or to clarify Code intent.

    (2) Code Cases. Code Cases represent alternatives or additions to existing Code rules. Code Cases are written as aquestion and reply, and are usually intended to be incorporated into the Code at a later date. When used, Code Casesprescribe mandatory requirements in the same sense as the text of the Code. However, users are cautioned that notall jurisdictions or owners automatically accept Code Cases. The most common applications for Code Cases are:

    (-a) to permit early implementation of an approved Code revision based on an urgent need

    (-b) to permit the use of a new material for Code construction

    (-c) to gain experience with new materials or alternative rules prior to incorporation directly into the Code

    (3) Code Interpretations. Code Interpretations provide clarification of the meaning of existing rules in the Code, andare also presented in question and reply format. Interpretations do not introduce new requirements. In cases whereexisting Code text does not fully convey the meaning that was intended, and revision of the rules is required to supportan interpretation, an Intent Interpretation will be issued and the Code will be revised.

    (b) The Code rules, Code Cases, and Code Interpretations established by the committees are not to be considered asapproving, recommending, certifying, or endorsing any proprietary or specific design, or as limiting in any way the free-dom of manufacturers, constructors, or owners to choose any method of design or any form of construction that con-forms to the Code rules.

    (c) Inquiries that do not comply with these provisions or that do not provide sufficient information for a committeesfull understanding may result in the request being returned to the inquirer with no action.

    2 INQUIRY FORMAT

    Submittals to a committee shall include:

    (a) Purpose. Specify one of the following:

    (1) revision of present Code rules

    (2) new or additional Code rules

    (3) Code Case

    (4) Code Interpretation

    (b) Background. Provide the information needed for the committees understanding of the inquiry, being sure to in-clude reference to the applicable Code Section, Division, edition, addenda (if applicable), paragraphs, figures, and tables.Preferably, provide a copy of the specific referenced portions of the Code.

    (c) Presentations. The inquirer may desire or be asked to attend a meeting of the committee to make a formal presen-tation or to answer questions from the committee members with regard to the inquiry. Attendance at a committee meet-ing shall be at the expense of the inquirer. The inquirers attendance or lack of attendance at a meeting shall not be abasis for acceptance or rejection of the inquiry by the committee.

    xiii

    reproduction or distribution is permitted.

  • 3 CODE REVISIONS OR ADDITIONS

    Requests for Code revisions or additions shall provide the following:(a) Proposed Revisions or Additions. For revisions, identify the rules of the Code that require revision and submit a copy

    of the appropriate rules as they appear in the Code, marked up with the proposed revision. For additions, provide therecommended wording referenced to the existing Code rules.(b) Statement of Need. Provide a brief explanation of the need for the revision or addition.(c) Background Information. Provide background information to support the revision or addition, including any data

    or changes in technology that form the basis for the request that will allow the committee to adequately evaluate theproposed revision or addition. Sketches, tables, figures, and graphs should be submitted as appropriate. When applic-able, identify any pertinent paragraph in the Code that would be affected by the revision or addition and identify para-graphs in the Code that reference the paragraphs that are to be revised or added.

    4 CODE CASES

    Requests for Code Cases shall provide a Statement of Need and Background Information similar to that defined in 3(b)and 3(c), respectively, for Code revisions or additions. The urgency of the Code Case (e.g., project underway or imminent,new procedure, etc.) must be defined and it must be confirmed that the request is in connection with equipment that willbear the Certification Mark, with the exception of Section XI applications. The proposed Code Case should identify theCode Section and Division, and be written as a Question and a Reply in the same format as existing Code Cases. Requestsfor Code Cases should also indicate the applicable Code editions and addenda (if applicable) to which the proposed CodeCase applies.

    5 CODE INTERPRETATIONS

    (a) Requests for Code Interpretations shall provide the following:(1) Inquiry. Provide a condensed and precise question, omitting superfluous background information and, when

    possible, composed in such a way that a yes or a no Reply, with brief provisos if needed, is acceptable. The questionshould be technically and editorially correct.

    (2) Reply. Provide a proposed Reply that will clearly and concisely answer the Inquiry question. Preferably, the Replyshould be yes or no, with brief provisos if needed.

    (3) Background Information. Provide any background information that will assist the committee in understandingthe proposed Inquiry and Reply.(b) Requests for Code Interpretations must be limited to an interpretation of a particular requirement in the Code or a

    Code Case. The committee cannot consider consulting type requests such as the following:(1) a review of calculations, design drawings, welding qualifications, or descriptions of equipment or parts to de-

    termine compliance with Code requirements;(2) a request for assistance in performing any Code-prescribed functions relating to, but not limited to, material

    selection, designs, calculations, fabrication, inspection, pressure testing, or installation;(3) a request seeking the rationale for Code requirements.

    6 SUBMITTALS

    Submittals to and responses from the committees shall meet the following:(a) Submittal. Inquiries from Code users shall be in English and preferably be submitted in typewritten form; however,

    legible handwritten inquiries will also be considered. They shall include the name, address, telephone number, fax num-ber, and e-mail address, if available, of the inquirer and be mailed to the following address:SecretaryASME Boiler and Pressure Vessel CommitteeTwo Park AvenueNew York, NY 10016-5990As an alternative, inquiries may be submitted via e-mail to: [email protected] or via our online tool at

    http://go.asme.org/InterpretationRequest.(b) Response. The Secretary of the appropriate committee shall acknowledge receipt of each properly prepared in-

    quiry and shall provide a written response to the inquirer upon completion of the requested action by the committee.

    xiv

    reproduction or distribution is permitted.

  • 15 PERSONNELASME Boiler and Pressure Vessel Standards Committees,

    Subgroups, and Working GroupsJanuary 1, 2015

    TECHNICAL OVERSIGHT MANAGEMENT COMMITTEE (TOMC)

    T. P. Pastor, ChairR. W. Barnes, Vice ChairJ. S. Brzuszkiewicz, Staff SecretaryR. J. BasileJ. E. BateyT. L. BedeauxD. L. BergerD. A. CanonicoA. ChaudouetD. B. DeMichaelR. P. DeublerP. D. EdwardsJ. G. FeldsteinR. E. GimpleM. GoldT. E. HansenG. W. Hembree

    J. F. HenryR. S. Hill IIIG. G. KarcherW. M. LundyJ. R. MacKayW. E. NorrisG. C. ParkM. D. RanaR. F. Reedy, Sr.B. W. RobertsS. C. RobertsF. J. Schaaf, Jr.A. SelzB. F. ShelleyW. J. SperkoR. W. SwayneC. Withers

    HONORARY MEMBERS (MAIN COMMITTEE)

    F. P. BartonR. J. CepluchT. M. CullenW. D. DotyG. E. FeigelO. F. HeddenM. H. Jawad

    A. J. JustinW. G. KnechtJ. LeCoffT. G. McCartyG. C. MillmanR. A. MoenR. F. Reedy, Sr.

    ADMINISTRATIVE COMMITTEE

    T. P. Pastor, ChairR. W. Barnes, Vice ChairJ. S. Brzuszkiewicz, Staff SecretaryR. J. BasileJ. E. BateyT. L. BedeauxD. L. Berger

    J. F. Henry

    R. S. Hill III

    G. C. Park

    M. D. Rana

    B. F. Shelley

    W. J. Sperko

    MARINE CONFERENCE GROUP

    J. G. Hungerbuhler, Jr.G. Nair

    N. ProkopukJ. D. Reynolds

    CONFERENCE COMMITTEE

    D. A. Douin Ohio, SecretaryM. J. Adams Ontario, CanadaJ. T. Amato MinnesotaB. P. Anthony Rhode IslandR. D. Austin ArizonaR. J. Brockman MissouriM. A. Burns FloridaJ. H. Burpee MaineC. B. Cantrell NebraskaD. C. Cook CaliforniaB. J. Crawford GeorgiaE. L. Creaser New Brunswick,Canada

    J. J. Dacanay HawaiiC. Dautrich North DakotaP. L. Dodge Nova Scotia, CanadaD. Eastman Newfoundland andLabrador, Canada

    J. J. Esch DelawareC. Fulton AlaskaR. J. Handy KentuckyD. R. Hannon ArkansasE. S. Kawa MassachusettsJ. C. Klug WisconsinM. Kotb Quebec, CanadaT. C. Hellman OklahomaE. G. Hilton VirginiaD. T. Jagger OhioK. J. Kraft MarylandL. C. Leet WashingtonA. M. Lorimor South DakotaM. Mailman NorthwestTerritories, Canada

    D. E. Mallory New HampshireW. McGivney New YorkU. Merkle IowaM. S. Moore MichiganS. V. Nelson ColoradoC. C. Novak IllinoisT. Oda WashingtonR. P. Pate AlabamaM. K. Perdue OregonM. Poehlmann Alberta, CanadaJ. F. Porcella West VirginiaA. Pratt ConnecticutC. F. Reyes CaliforniaM. J. Ryan IllinoisM. H. Sansone New YorkT. S. Scholl British Columbia,Canada

    G. L. Schultz NevadaT. S. Seine North DakotaC. S. Selinger Saskatchewan,Canada

    D. Slater Manitoba, CanadaN. Smith PennsylvaniaR. Spiker North CarolinaR. K. Sturm UtahS. R. Townsend Prince EdwardIsland, Canada

    R. D. Troutt TexasM. J. Verhagen WisconsinM. Washington New JerseyK. L. Watson MississippiC. J. Wilson III Kansas

    INTERNATIONAL INTEREST REVIEW GROUP

    V. FelixY.-G. KimS. H. LeongW. LinO. F. Manafa

    C. MinuT. S. G. NarayannenY.-W. ParkR. ReynagaP. Williamson

    xv

    reproduction or distribution is permitted.

  • COMMITTEE ON POWER BOILERS (BPV I)

    D. L. Berger, ChairR. E. McLaughlin, Vice ChairU. D'Urso, Staff SecretaryJ. L. ArnoldS. W. CameronD. A. CanonicoK. K. ColemanP. D. EdwardsP. FalloueyJ. G. FeldsteinG. W. GalanesT. E. HansenJ. F. HenryJ. S. HunterW. L. LowryF. Massi

    L. MoedingerP. A. MolvieY. OishiE. M. OrtmanJ. T. PillowB. W. RobertsJ. M. TanzoshD. TompkinsD. E. TuttleJ. VattappillyR. V. WielgoszinskiY. Li, DelegateH. Michael, DelegateD. N. French, Honorary MemberT. C. McGough, Honorary MemberR. L. Williams, Honorary Member

    Subgroup on Design (BPV I)

    J. Vattappilly, ChairD. I. Anderson, SecretaryD. DeweesP. DhorajiaH. A. Fonzi, Jr.J. P. GlaspieG. B. Komora

    P. A. Molvie

    D. A. Olson

    S. V. Torkildson

    M. Wadkinson

    C. F. Jeerings, Contributing Member

    J. C. Light, Contributing Member

    Subgroup on Fabrication and Examination (BPV I)

    J. T. Pillow, ChairJ. L. Arnold, SecretaryP. BeckerD. L. BergerS. W. CameronS. FincherG. W. GalanesP. F. Gilston

    J. Hainsworth

    T. E. Hansen

    C. T. McDaris

    R. E. McLaughlin

    R. J. Newell

    Y. Oishi

    R. V. Wielgoszinski

    Subgroup on General Requirements and Piping (BPV I)

    T. E. Hansen, ChairE. M. Ortman, Vice ChairF. Massi, SecretaryP. BeckerD. L. BergerP. D. EdwardsG. W. GalanesW. L. LowryR. E. McLaughlin

    B. MollitorJ. T. PillowD. TompkinsS. V. TorkildsonD. E. TuttleM. WadkinsonR. V. WielgoszinskiC. F. Jeerings, Contributing MemberR. Uebel, Contributing Member

    Subgroup on Heat Recovery Steam Generators (BPV I)

    S. V. Torkildson, ChairJ. L. ArnoldJ. P. BellB. G. CarsonJ. GertzT. E. Hansen

    G. B. KomoraC. T. McDarisY. OishiE. M. OrtmanD. TompkinsB. C. Turczynski

    Subgroup on Locomotive Boilers (BPV I)

    L. Moedinger, ChairS. M. Butler, SecretaryP. BoschanJ. BraunR. C. Franzen, Jr.D. W. GrinerS. D. JacksonM. A. Janssen

    S. A. Lee

    G. M. Ray

    J. E. Rimmasch

    R. B. Stone

    M. W. Westland

    R. Yuill

    R. D. Reetz, Contributing Member

    Subgroup on Materials (BPV I)

    G. W. Galanes, ChairK. K. Coleman, Vice ChairJ. S. Hunter, SecretaryS. H. BowesD. A. CanonicoP. FalloueyK. L. HayesJ. F. Henry

    M. Lewis

    O. X. Li

    F. Masuyama

    D. W. Rahoi

    B. W. Roberts

    J. M. Tanzosh

    J. Vattappilly

    Subgroup on Solar Boilers (BPV I)

    J. S. Hunter, ChairS. V. Torkildson, SecretaryG. W. GalanesR. E. HearneP. Jennings

    D. J. KozaF. MassiE. M. OrtmanM. J. SlaterJ. C. Light, Contributing Member

    India International Working Group (BPV I)

    H. DalalI. KalyanasundaramS. MathurA. J. PatilA. R. PatilG. V. S. Rao

    U. Revisanakaran

    N. Satheesan

    G. U. Shanker

    D. Shrivastava

    S. Venkataramana

    Task Group on Modernization of BPVC Section I

    D. I. Anderson, ChairU. DUrso, Staff SecretaryJ. L. ArnoldS. W. CameronD. DeweesG. W. GalanesJ. P. GlaspieT. E. Hansen

    J. F. HenryR. E. McLaughlinP. A. MolvieE. M. OrtmanJ. T. PillowB. W. RobertsD. E. TuttleJ. Vattappilly

    xvi

    reproduction or distribution is permitted.

  • COMMITTEE ON MATERIALS (BPV II)

    J. F. Henry, ChairD. W. Rahoi, Vice ChairN. Lobo, Staff SecretaryF. AbeA. AppletonJ. CameronD. A. CanonicoA. ChaudouetP. FalloueyJ. R. FouldsD. W. GandyM. H. GilkeyM. GoldJ. F. GrubbJ. A. HallK. M. HottleM. KatcherO. X. LiF. MasuyamaR. K. NanstadB. W. Roberts

    E. ShapiroM. J. SlaterR. C. SutherlinR. W. SwindemanJ. M. TanzoshD. TylerO. Oldani, DelegateH. D. Bushfield, ContributingMember

    M. L. Nayyar, Contributing MemberE. G. Nisbett, Contributing MemberE. Upitis, Contributing MemberT. M. Cullen, Honorary MemberW. D. Doty, Honorary MemberW. D. Edsall, Honorary MemberG. C. Hsu, Honorary MemberR. A. Moen, Honorary MemberC. E. Spaeder, Jr., HonoraryMember

    A. W. Zeuthen, Honorary Member

    Executive Committee (BPV II)

    J. F. Henry, ChairD. W. Rahoi, Vice ChairN. Lobo, Staff SecretaryA. AppletonA. ChaudouetJ. R. FouldsM. Gold

    J. F. Grubb

    R. W. Mikitka

    B. W. Roberts

    R. C. Sutherlin

    R. W. Swindeman

    J. M. Tanosh

    Subgroup on External Pressure (BPV II)

    R. W. Mikitka, ChairD. L. Kurle, Vice ChairJ. A. A. Morrow, SecretaryL. F. CampbellH. ChenD. S. GriffinJ. F. Grubb

    J. R. Harris IIIM. H. JawadC. R. ThomasM. WadkinsonM. Katcher, Contributing MemberC. H. Sturgeon, ContributingMember

    Subgroup on Ferrous Specifications (BPV II)

    A. Appleton, ChairK. M. Hottle, Vice ChairP. Wittenbach, SecretaryH. ChenB. M. DingmanM. J. DosdourianP. FalloueyJ. D. FritzT. GrahamJ. M. GrockiJ. F. GrubbC. Hyde

    D. S. Janikowski

    L. J. Lavezzi

    S. G. Lee

    W. C. Mack

    A. S. Melilli

    K. E. Orie

    J. Shick

    E. Upitis

    J. D. Wilson

    R. Zawierucha

    E. G. Nisbett, Contributing Member

    Subgroup on International Material Specifications (BPV II)

    A. Chaudouet, ChairO. X. Li, Vice ChairT. F. Miskell, SecretaryS. W. CameronD. A. CanonicoH. ChenP. FalloueyA. F. GarbolevskyD. O. Henry

    M. Ishikawa

    W. M. Lundy

    A. R. Nywening

    E. Upitis

    F. Zeller

    D. Kwon, Delegate

    O. Oldani, Delegate

    H. Lorenz, Contributing Member

    Subgroup on Nonferrous Alloys (BPV II)

    R. C. Sutherlin, ChairM. H. Gilkey, Vice ChairH. AnadaJ. CallandD. B. DenisJ. F. GrubbA. HeinoM. KatcherJ. A. McMasterL. Paul

    D. W. RahoiW. RenE. ShapiroM. H. SkillingbergD. TylerJ. WeritzR. WrightR. ZawieruchaW. R. Apblett, Jr., ContributingMember

    Subgroup on Physical Properties (BPV II)

    J. F. Grubb, ChairH. D. BushfieldD. B. Denis

    P. FalloueyE. Shapiro

    Subgroup on Strength, Ferrous Alloys (BPV II)

    J. M. Tanzosh, ChairM. J. Slater, SecretaryF. AbeH. AnadaD. A. CanonicoA. Di RienzoP. FalloueyJ. R. FouldsM. GoldJ. A. HallJ. F. HenryK. Kimura

    S. W. KnowlesF. MasuyamaC. PearceD. W. RahoiB. W. RobertsM. S. SheltonJ. P. ShingledeckerR. W. SwindemanW. R. Apblett, Jr., ContributingMember

    H. Murakami, ContributingMember

    Subgroup on Strength of Weldments (BPV II & BPV IX)

    W. F. Newell, Jr., ChairS. H. BowesK. K. ColemanP. D. FlennerJ. R. FouldsD. W. GandyM. GoldK. L. Hayes

    J. F. HenryJ. PensoD. W. RahoiB. W. RobertsJ. P. ShingledeckerW. J. SperkoJ. P. Swezy, Jr.J. M. Tanzosh

    Working Group on Materials Database (BPV II)

    R. W. Swindeman, ChairN. Lobo, Staff SecretaryF. AbeJ. R. FouldsJ. F. HenryM. KatcherB. W. Roberts

    R. C. SutherlinD. Andrei, Contributing MemberJ. L. Arnold, Contributing MemberW. Hoffelner, Contributing MemberT. Lazar, Contributing MemberD. T. Peters, Contributing MemberW. Ren, Contributing Member

    xvii

    reproduction or distribution is permitted.

  • Working Group on Creep Strength Enhanced Ferritic Steels (BPV II)

    J. F. Henry, ChairF. AbeS. H. BowesD. A. CanonicoK. K. ColemanG. CuminoP. D. FlennerJ. R. FouldsD. W. Gandy

    M. Gold

    F. Masuyama

    W. F. Newell, Jr.

    B. W. Roberts

    W. J. Sperko

    R. W. Swindeman

    J. M. Tanzosh

    R. G. Young

    Working Group on Data Analysis (BPV II)

    J. R. Foulds, ChairF. AbeM. GoldJ. F. GrubbJ. F. HenryM. Katcher

    F. MasuyamaW. RenB. W. RobertsM. SubanovicM. J. SwindemanR. W. Swindeman

    China International Working Group (BPV II)

    B. Shou, ChairYong Zhang, Vice ChairX. Tong, SecretaryW. FangQ. C. FengS. HuoH. LiJ. LiS. LiZ. RongcanS. TanC. Wang

    X. Wang

    F. Yang

    G. Yang

    R. Ye

    L. Yin

    H. Zhang

    X.-H. Zhang

    Yingkai Zhang

    Q. Zhao

    S. Zhao

    J. Zou

    COMMITTEE ON CONSTRUCTION OF NUCLEAR FACILITYCOMPONENTS (BPV III)

    R. S. Hill III, ChairR. B. Keating, Vice ChairJ. C. Minichiello, Vice ChairA. Byk, Staff SecretaryT. M. AdamsA. AppletonR. W. BarnesW. H. BorterC. W. BrunyT. D. BurchellJ. R. ColeR. P. DeublerA. C. EberhardtB. A. ErlerG. M. FosterW. HoffelnerR. M. JesseeR. I. JetterC. C. KimG. H. KooV. KostarevK. A. ManolyD. E. Matthews

    R. P. McIntyreM. N. MitchellM. MorishitaD. K. MortonT. NagataR. F. Reedy, Sr.I. SaitoC. T. SmithW. K. Sowder, Jr.W. J. SperkoK. R. WichmanC. S. WithersY. H. Choi, DelegateT. Ius, DelegateH.-T. Wang, DelegateM. Zhou, Contributing MemberE. B. Branch, Honorary MemberG. D. Cooper, Honorary MemberW. D. Doty, Honorary MemberD. F. Landers, Honorary MemberR. A. Moen, Honorary MemberC. J. Pieper, Honorary Member

    Subcommittee on Design (BPV III)

    R. P. Deubler, ChairD. E. Matthews, Vice ChairG. L. Hollinger, SecretaryT. M. AdamsG. A. AntakiR. L. BrattonC. W. BrunyP. R. DonavinR. S. Hill IIIP. HirschbergM. H. JawadR. I. Jetter

    R. B. Keating

    R. A. Ladefian

    K. A. Manoly

    R. J. Masterson

    M. N. Mitchell

    W. J. ODonnell, Sr.E. L. Pleins

    T.-L. Sham

    J. P. Tucker

    K. Wright

    J. Yang

    Subgroup on Component Design (SC-D) (BPV III)

    T. M. Adams, ChairR. B. Keating, Vice ChairS. Pellet, SecretaryG. A. AntakiS. AsadaJ. F. BallJ. R. ColeR. P. DeublerP. HirschbergH. KobayashiR. A. LadefianK. A. ManolyR. J. MastersonD. E. MatthewsJ. C. MinichielloD. K. Morton

    T. M. MustoT. NagataA. N. NguyenE. L. PleinsI. SaitoG. C. SlagisJ. R. StinsonG. Z. TokarskiJ. P. TuckerP. VockK. R. WichmanC. WilsonJ. YangC. W. Bruny, Contributing MemberA. A. Dermenjian, ContributingMember

    Working Group on Core Support Structures (SG-CD) (BPV III)

    J. Yang, ChairJ. F. Kielb, SecretaryL. C. HartlessD. KeckT. LiszkaiH. S. Mehta

    M. Nakajima

    M. D. Snyder

    A. Tsirigotis

    R. Vollmer

    J. T. Land, Contributing Member

    Working Group on Design of Division 3 Containments(SG-CD) (BPV III)

    D. K. Morton, ChairD. J. AmmermanG. BjorkmanG. BrozS. HorowitzD. W. LewisJ. C. Minichiello

    E. L. Pleins

    C. J. Temus

    I. D. McInnes, Contributing Member

    R. E. Nickell, Contributing Member

    H. P. Shrivastava, ContributingMember

    Working Group on HDPE Design of Components (SG-CD) (BPV III)

    T. M. Musto, ChairJ. Ossmann, SecretaryT. M. AdamsT. A. BaconC. BasavarajuD. BurwellS. Choi

    P. KrishnaswamyM. MartinJ. C. MinichielloD. P. MunsonF. J. Schaaf, Jr.R. StakenborghsH. E. Svetlik

    xviii

    reproduction or distribution is permitted.

  • Working Group on Piping (SG-CD) (BPV III)

    G. A. Antaki, ChairG. Z. Tokarski, SecretaryT. M. AdamsT. A. BaconC. BasavarajuJ. CatalanoF. ClaeysJ. R. ColeC. M. FaidyR. G. GiladaN. M. GrahamM. A. GrayR. W. HauptA. HiranoP. HirschbergM. KassarJ. Kawahata

    R. B. KeatingV. KostarevY. LiuJ. F. McCabeJ. C. MinichielloI.-K. NamA. N. NguyenM. S. SillsG. C. SlagisN. C. SutherlandE. A. WaisC.-I. WuJ. J. Martinez, Contributing MemberN. J. Shah, Contributing MemberE. C. Rodabaugh, HonoraryMember

    Working Group on Pressure Relief (SG-CD) (BPV III)

    J. F. Ball, ChairA. L. Szeglin

    D. G. Thibault

    Working Group on Pumps (SG-CD) (BPV III)

    R. A. Ladefian, ChairP. W. BehnkeR. E. Cornman, Jr.M. D. EftychiouA. FraserM. A. GaydonR. Ghanbari

    M. Higuchi

    S. Mauvais

    R. A. Patrick

    J. Sulley

    R. Udo

    A. G. Washburn

    Working Group on Supports (SG-CD) (BPV III)

    J. R. Stinson, ChairU. S. Bandyopadhyay, SecretaryK. AvrithiT. H. BakerF. J. BirchR. P. DeublerN. M. GrahamR. J. Masterson

    S. PelletI. SaitoH. P. ShrivastavaC. StirzelT. G. TerryahG. Z. TokarskiP. WisemanC.-I. Wu

    Working Group on Valves (SG-CD) (BPV III)

    P. Vock, ChairJ. O'Callaghan, SecretaryM. C. BuckleyG. A. JollyJ. KleinT. A. McMahon

    C. A. MizerK. E. Reid IIH. R. SondereggerJ. SullyI. TsengJ. P. Tucker

    Working Group on Vessels (SG-CD) (BPV III)

    D. E. Matthews, ChairR. M. Wilson, SecretaryC. BasavarajuJ. V. Gregg, Jr.W. J. HeilkerA. KalninsR. B. KeatingD. KeckJ. KimO.-S. Kim

    K. Matsunaga

    M. C. Scott

    P. K. Shah

    J. Shupert

    C. Turylo

    D. Vlaicu

    W. F. Weitze

    T. Yamazaki

    R. Z. Ziegler

    Subgroup on Design Methods (SC-D) (BPV III)

    C. W. Bruny, ChairS. McKillop, SecretaryK. AvrithiW. CulpP. R. Donavin, Jr.J. V. Gregg, Jr.H. T. Harrison IIIK. HsuM. Kassar

    D. KeckM. N. MitchellW. J. ODonnell, Sr.P. J. OReganW. D. ReinhardtP. SmithS. D. SnowW. F. WeitzeK. Wright

    Working Group on Design Methodology (SG-DM) (BPV III)

    S. D. Snow, ChairM. R. Breach, SecretaryK. AvrithiC. BasavarajuR. D. BlevinsD. L. CaldwellD. DeweesC. M. FaidyH. T. Harrison IIIP. HirschbergM. KassarR. B. KeatingJ. KimH. Kobayashi

    T. LiszkaiJ. F. McCabeA. N. NguyenW. D. ReinhardtD. H. RoartyP. K. ShahR. VollmerS. WangT. M. WigerK. WrightJ. YangM. K. Au-Yang, ContributingMember

    Working Group on Environmental Effects (SG-DM) (BPV III)

    W. Culp, ChairB. D. Frew, SecretaryK. AvrithiP. J. DobsonW. J. Heilker

    C. JonkerJ. E. NestellT. SchrieferM. S. SheltonY. H. Choi, Delegate

    Working Group on Environmental Fatigue Evaluation Methods(SG-DM) (BPV III)

    K. Wright, ChairM. A. Gray, Vice ChairW. F. Weitze, SecretaryT. M. AdamsS. AsadaK. AvrithiR. C. CipollaJ. R. ColeT. M. DamianiC. M. Faidy

    T. D. GilmanS. R. GosselinY. HeP. HirschbergH. S. MehtaJ.-S. ParkD. H. RoartyI. SaitoD. VlaicuR. Z. Ziegler

    Working Group on Fatigue Strength (SG-DM) (BPV III)

    P. R. Donavin, ChairT. M. DamianiD. DeweesC. M. FaidyS. R. GosselinR. J. GurdalC. F. Heberling IIC. E. HinnantP. HirschbergK. HsuS. H. KleinsmithS. Majumdar

    S. N. Malik

    D. H. Roarty

    M. S. Shelton

    G. Taxacher

    A. Tsirigotis

    K. Wright

    H. H. Ziada

    G. S. Chakrabarti, ContributingMember

    W. J. O'Donnell, Sr., ContributingMember

    xix

    reproduction or distribution is permitted.

  • Working Group on Graphite and Composites Design(SG-DM) (BPV III)

    M. N. Mitchell, ChairM. W. Davies, Vice ChairC. A. Sanna, Staff SecretaryT. D. Burchell, SecretaryA. AppletonR. L. BrattonS. CadellS.-H. ChiA. CovacS. W. Doms

    S. F. Duffy

    S. T. Gonczy

    Y. Katoh

    J. Ossmann

    M. Roemmler

    N. Salstrom

    T. Shibata

    S. Yu

    G. L. Zeng

    Working Group on Probabilistic Methods in Design(SG-DM) (BPV III)

    P. J. O'Regan, ChairM. Golliet, SecretaryT. AsayamaK. AvrithiM. R. Graybeal

    D. O. HenryR. S. Hill IIIM. MorishitaN. A. PalmI. Saito

    Special Working Group on Computational Modeling for ExplicitDynamics (SG-DM) (BPV III)

    G. Bjorkman, ChairD. J. Ammerman, SecretaryM. R. BreachG. BrozJ. JordanD. MolitorisJ. Piotter

    W. D. Reinhardt

    P. Y.-K. Shih

    S. D. Snow

    C.-F. Tso

    M. C. Yaksh

    U. Zencker

    Subgroup on Elevated Temperature Design (SC-D) (BPV III)

    T.-L. Sham, ChairT. AsayamaC. Becht IVF. W. BrustP. CarterJ. F. CervenkaB. F. HantzW. HoffelnerA. B. HullM. H. JawadR. I. Jetter

    G. H. Koo

    M. Li

    S. Majumdar

    J. E. Nestell

    W. J. O'Donnell, Sr.

    R. W. Swindeman

    D. S. Griffin, Contributing Member

    W. J. Koves, Contributing Member

    D. L. Marriott, ContributingMember

    Working Group on Allowable Stress Criteria (SG-ETD) (BPV III)

    R. W. Swindeman, ChairR. Wright, SecretaryJ. R. FouldsK. KimuraM. LiS. N. Malik

    J. E. Nestell

    W. Ren

    B. W. Roberts

    M. Sengupta

    T.-I. Sham

    Working Group on Analysis Methods (SG-ETD) (BPV III)

    P. Carter, ChairM. J. Swindeman, SecretaryM. AndoM. R. Breach

    R. I. JetterS. KrishnamurthyT.-I. ShamD. K. Williams

    Working Group on Creep-Fatigue and Negligible Creep (SG-ETD)(BPV III)

    T. Asayama, ChairM. Li, SecretaryF. W. BrustP. CarterR. I. Jetter

    G. H. KooB.-L. LyowS. N. MalikH. QianT.-I. Sham

    Working Group on Elevated Temperature Construction (SG-ETD)(BPV III)

    M. H. Jawad, ChairB. Mollitor, SecretaryD. I. AndersonR. G. BrownD. DeweesJ. P. GlaspieB. F. Hantz

    G. L. HollingerR. I. JetterS. KrishnamurthyA. MannD. L. MarriottM. N. MitchellC. Nadarajah

    Working Group on High Temperature Flaw Evaluation (SG-ETD)(BPV III)

    F. W. Brust, ChairN. BroomP. CarterW. HoffelnerS. N. Malik

    D. L. RudlandP. J. RushD.-J. ShimS. X. Xu

    Subgroup on General Requirements (BPV III)

    R. P. McIntyre, ChairL. M. Plante, SecretaryV. ApostolescuA. AppletonS. BellJ. R. BerryB. K. BoboJ. DeKleineJ. V. GardinerG. GrattiJ. W. HighlandsG. V. ImbroK. A. Kavanagh

    Y.-S. KimM. R. MinickE. C. RenaudD. J. RoszmanC. T. SmithW. K. Sowder, Jr.G. E. SzabaturaT. G. TerryahD. M. VickeryC. S. WithersH. Michael, DelegateG. L. Hollinger, ContributingMember

    Working Group on Duties and Responsibilities (SG-GR) (BPV III)

    J. V. Gardiner, ChairG. L. Hollinger, SecretaryS. BellJ. R. BerryJ. DeKleineN. DeSantisY. Diaz-CastilloE. L. Farrow

    G. Gratti

    B. N. Juarez

    K. A. Kavanagh

    J. M. Lyons

    L. M. Plante

    D. J. Roszman

    T. G. Terryah

    xx

    reproduction or distribution is permitted.

  • Working Group on Quality Assurance, Certification, and Stamping(SG-GR) (BPV III)

    C. T. Smith, ChairC. S. Withers, SecretaryV. ApostolescuA. AppletonB. K. BoboS. M. GoodwinJ. GrimmJ. W. HighlandsY.-S. KimB. McGloneR. P. McIntyre

    M. R. Minick

    R. B. Patel

    E. C. Renaud

    T. Rezk

    J. Rogers

    W. K. Sowder, Jr.

    J. F. Strunk

    G. E. Szabatura

    D. M. Vickery

    C. A. Spletter, Contributing Member

    Special Working Group on General Requirements Consolidation(SG-GR) (BPV III)

    J. V. Gardiner, ChairC. T. Smith, Vice ChairS. BellM. CusickY. Diaz-CastilloJ. GrimmJ. M. LyonsM. McGloneR. PatelE. C. Renaud

    T. RezkJ. RogersD. J. RoszmanB. S. SandhuG. J. SoloveyR. SpuhlG. E. SzabaturaC. S. WithersS. F. Harrison, ContributingMember

    Subgroup on Materials, Fabrication, and Examination (BPV III)

    R. M. Jessee, ChairB. D. Frew, Vice ChairS. Hunter, SecretaryW. H. BorterT. D. BurchellG. R. CannellR. H. DavisG. M. FosterG. B. GeorgievS. E. GingrichM. GollietJ. GrimmJ. Johnston, Jr.C. C. KimM. Lashley

    T. MelfiH. MurakamiJ. OssmannJ. E. OSullivanC. PearceN. M. SimpsonW. J. SperkoJ. R. StinsonJ. F. StrunkK. B. StuckeyR. WrightS. YeeH. Michael, DelegateR. W. Barnes, Contributing Member

    Working Group on Graphite and Composite Materials (SG-MFE)(BPV III)

    T. D. Burchell, ChairA. AppletonR. L. BrattonS. CadellS.-H. ChiA. CovacM. W. DaviesS. W. DomsS. F. DuffyS. T. Gonzcy

    M. G. Jenkins

    Y. Katoh

    M. N. Mitchell

    J. Ossmann

    M. Roemmler

    N. Salstrom

    T. Shibata

    S. Yu

    G. L. Zeng

    Working Group on HDPE Materials (SG-MFE) (BPV III)

    M. Golliet, ChairM. A. Martin, SecretaryW. H. BorterM. C. BuckleyE. M. FochtB. HaugerJ. Johnston, Jr.P. Krishnaswamy

    E. W. McElroyT. M. MustoS. PattersonS. SchuesslerR. StakenborghsT. TiptonM. TroughtonZ. J. Zhou

    Joint ACI-ASME Committee on Concrete Components for NuclearService (BPV III)

    A. C. Eberhardt, ChairC. T. Smith, Vice ChairA. Byk, Staff SecretaryJ. F. ArtusoC. J. BangF. FarzamP. S. GhosalB. D. HovisT. C. InmanO. JovallN.-H. LeeJ. McLeanJ. MunshiN. OrbovicJ. F. Strunk

    T. TonyanT. J. Ahl, Contributing MemberN. Alchaar, Contributing MemberB. A. Erler, Contributing MemberJ. Gutierrez, Contributing MemberM. F. Hessheimer, ContributingMember

    T. E. Johnson, ContributingMember

    T. Muraki, Contributing MemberB. B. Scott, Contributing MemberM. R. Senecal, ContributingMember

    M. K. Thumm, ContributingMember

    Working Group on Design (BPV III-2)

    J. Munshi, ChairN. AlchaarM. AllamS. BaeL. J. ColarussoA. C. EberhardtF. FarzamP. S. GhosalB. D. HovisT. C. InmanO. JovallN.-H. Lee

    M. Diaz, Contributing Member

    S. Diaz, Contributing Member

    M. F. Hessheimer, ContributingMember

    A. Istar, Contributing Member

    T. E. Johnson, ContributingMember

    B. R. Laskewitz, ContributingMember

    Z. Shang, Contributing Member

    M. Sircar, Contributing Member

    Working Group on Materials, Fabrication, and Examination(BPV III-2)

    P. S. Ghosal, ChairT. Tonyan, Vice ChairM. AllamJ. F. ArtusoJ.-B. DomageA. C. EberhardtC. Jones

    C. T. Smith

    J. F. Strunk

    D. Ufuk

    J. Gutierrez, Contributing Member

    B. B. Scott, Contributing Member

    Z. Shang, Contributing Member

    Special Working Group on Modernization (BPV III-2)

    J. McLean, ChairN. Orbovic, Vice ChairA. AdediranN. AlchaarO. JovallC. T. Smith

    M. A. Ugalde

    S. Wang

    S. Diaz, Contributing Member

    J.-B. Domage, Contributing Member

    U. Ricklefs, Contributing Member

    xxi

    reproduction or distribution is permitted.

  • Subgroup on Containment Systems for Spent Fuel and High-LevelWaste Transport Packagings (BPV III)

    D. K. Morton, ChairG. M. Foster, Vice ChairG. R. Cannell, SecretaryG. AbramczykD. J. AmmermanG. BjorkmanS. HorowitzD. W. LewisP. E. McConnellR. E. NickellE. L. Pleins

    R. H. Smith

    G. J. Solovey

    C. J. Temus

    W. H. Borter, Contributing Member

    R. S. Hill III, Contributing Member

    A. B. Meichler, ContributingMember

    T. Saegusa, Contributing Member

    N. M. Simpson, ContributingMember

    Subgroup on Fusion Energy Devices (BPV III)

    W. K. Sowder, Jr., ChairD. Andrei, Staff SecretaryD. J. Roszman, SecretaryR. W. BarnesB. R. DoshiM. HiguchiG. HoltmeierM. KalseyK. A. KavanaghH. J. KimK. Kim

    I. KimihiroS. LeeG. LiX. LiP. MokariaT. R. MuldoonM. PortonY. SongM. TrosenC. WaldonI. J. Zatz

    Working Group on General Requirements (BPV III-4)

    W. K. Sowder, Jr., Chair

    Working Group on In-Vessel Components (BPV III-4)

    M. Kalsey, Chair

    Working Group on Magnets (BPV III-4)

    K. Kim, Chair

    Working Group on Materials (BPV III-4)

    M. Porton, Chair

    Working Group on Vacuum Vessels (BPV III-4)

    I. Kimihiro, Chair B. R. Doshi

    Subgroup on High Temperature Reactors (BPV III)

    M. Morishita, ChairR. I. Jetter, Vice ChairT.-L. Sham, SecretaryN. BroomT. D. BurchellW. Hoffelner

    G.-H. KooD. K. MortonJ. E. NestellN. N. RayX. Li, Contributing MemberL. Shi, Contributing Member

    Working Group on High Temperature Gas-Cooled Reactors(BPV III-5)

    J. E. Nestell, ChairM. Sengupta, SecretaryN. BroomT. D. BurchellR. S. Hill IIIE. V. ImbroR. I. JetterY. W. Kim

    T. R. Lupold

    S. N. Malik

    D. L. Marriott

    D. K. Morton

    T.-L. Sham

    X. Li, Contributing Member

    L. Shi, Contributing Member

    Working Group on High Temperature Liquid-Cooled Reactors(BPV III-5)

    T.-L. Sham, ChairT. Asayama, SecretaryM. ArcaroR. W. BarnesP. CarterM. E. CohenA. B. HullR. I. Jetter

    G. H. Koo

    M. Li

    S. Majumdar

    M. Morishita

    J. E. Nestell

    X. Li, Contributing Member

    G. Wu, Contributing Member

    Executive Committee (BPV III)

    R. S. Hill III, ChairA. Byk, Staff SecretaryT. M. AdamsC. W. BrunyR. P. DeublerA. C. EberhardtR. M. JesseeR. B. Keating

    R. P. McIntyre

    J. C. Minichiello

    M. Morishita

    D. K. Morton

    C. A. Sanna

    T.-L. Sham

    W. K. Sowder, Jr.

    China International Working Group (BPV III)

    J. Yan, ChairW. Tang, Vice ChairC. A. Sanna, Staff SecretaryY. He, SecretaryH. GeZ. HanJ. JianY. JingF. KaiD. KangX. LiY. LiB. LiangH. LinS. LinJ. LiuS. LiuW. LiuK. MaoW. Pei

    G. SunG. TangY. TuY. WangH. WuX. WuZ. WuS. XueZ. YanC. YeZ. YinS. ZaozhanG. ZhangK. ZhangW. ZhangG. ZhaoW. ZhaoY. ZhongZ. ZhongG. Zhu

    xxii

    reproduction or distribution is permitted.

  • Germany International Working Group (BPV III)

    C. Huttner, ChairH.-R. Bath, SecretaryB. ArndtM. BauerG. DaumL. GerstnerG. HaenleK.-H. HerterU. JendrichG. KramarzC. KrumbW. MayingerD. Moehring

    D. OstermannG. RoosJ. RudolphC. A. SannaH. SchauC. A. SpletterR. TrieglaffP. VllmeckeJ. WendtF. WilleM. WinterN. Wirtz

    India International Working Group (BPV III)

    B. Basu, ChairG. Mathivanan, Vice ChairC. A. Sanna, Staff SecretaryS. B. Parkash, SecretaryV. BhasinP. ChellapandiS. Jalaldeen

    D. Kulkarni

    S. A. Kumar De

    N. M. Nadaph

    M. Ponnusamy

    R. N. Sen

    A. Sundararajan

    Korea International Working Group (BPV III)

    G. H. Koo, ChairS. S. Hwang, Vice ChairO.-S. Kim, SecretaryH. S. ByunS. ChoiJ.-Y. HongN.-S. HuhJ.-K. HwangC. JangI. I. JeongH. J. KimJ. KimJ.-S. KimK. KimY.-B. KimY.-S. Kim

    D. KwonB. LeeD. LeeSanghoon LeeSangil LeeD. J. LimH. LimI.-K. NamB. NohC.-K. OhC. ParkJ.-S. ParkT. ShinS. SongO. Yoo

    Special Working Group on Editing and Review (BPV III)

    D. K. Morton, ChairR. L. BrattonR. P. DeublerA. C. EberhardtR. I. Jetter

    J. C. MinichielloL. M. PlanteR. F. Reedy, Sr.W. K. Sowder, Jr.C. Wilson

    Special Working Group on HDPE Stakeholders (BPV III)

    D. Burwell, ChairS. Patterson, SecretaryT. M. AdamsS. BruceS. ChoiC. M. FaidyE. M. FochtM. GollietJ. GrimesR. M. JesseeJ. Johnston, Jr.D. Keller

    M. LashleyT. R. LupoldK. A. ManolyD. P. MunsonT. M. MustoJ. E. OSullivanM. A. RichterV. RohatgiF. J. Schaaf, Jr.R. StakenborghsM. TroughtonZ. J. Zhou

    Special Working Group on Honors and Awards (BPV III)

    R. M. Jessee, ChairA. AppletonR. W. Barnes

    J. R. ColeD. E. MatthewsJ. C. Minichiello

    Special Working Group on Industry Experience for New Plants(BPV III & BPV XI)

    G. M. Foster, ChairJ. T. Lindberg, ChairH. L. Gustin, SecretaryJ. Ossmann, SecretaryT. L. ChanD. R. GrahamP. J. HennesseyD. O. HenryJ. HoncharikE. V. ImbroC. G. KimO.-S. Kim

    Y.-S. Kim

    K. Matsunaga

    D. E. Matthews

    R. E. McLaughlin

    E. L. Pleins

    D. W. Sandusky

    D. M. Swann

    T. Tsuruta

    E. R. Willis

    R. M. Wilson

    S. M. Yee

    Special Working Group on International Meetings (BPV III)

    C. T. Smith, ChairA. Byk, Staff SecretaryT. D. BurchellS. W. CameronJ. R. ColeR. L. Crane

    G. M. Foster

    R. S. Hill III

    M. N. Mitchell

    R. F. Reedy, Sr.

    C. A. Sanna

    Special Working Group on New Advanced Light Water Reactor PlantConstruction Issues (BPV III)

    E. L. Pleins, ChairM. C. Scott, SecretaryA. CardilloP. J. CocoB. GilliganJ. HoncharikG. V. ImbroO.-S Kim

    M. KrisJ. C. MinichielloD. W. SanduskyC. A. SannaR. R. StevensonR. TroficantoM. L. WilsonJ. Yan

    Special Working Group on Regulatory Interface (BPV III)

    G. V. Imbro, ChairS. Bell, SecretaryA. CardilloA. A. DermenjianB. N. JuarezK. Matsunaga

    D. E. MatthewsA. T. Roberts IIIR. R. StevensonD. TeraoM. L. WilsonR. A. Yonekawa

    COMMITTEE ON HEATING BOILERS (BPV IV)

    T. L. Bedeaux, ChairJ. A. Hall, Vice ChairG. Moino, Staff SecretaryB. CalderonJ. CallandJ. P. ChicoineC. M. DoveA. HeinoB. J. IskeP. A. Molvie

    R. E. Olson

    M. Wadkinson

    R. V. Wielgoszinski

    H. Michael, Delegate

    D. Picart, Delegate

    S. V. Voorhees, ContributingMember

    J. L. Kleiss, Alternate

    W. L. Haag, Jr., Honorary Member

    xxiii

    reproduction or distribution is permitted.

  • Subgroup on Care and Operation of Heating Boilers (BPV IV)

    M. Wadkinson, ChairT. L. BedeauxJ. Calland

    J. A. HallP. A. Molvie

    Subgroup on Cast Iron Boilers (BPV IV)

    J. P. Chicoine, ChairT. L. Bedeaux, Vice ChairC. M. Dove

    J. M. DownsJ. A. HallJ. L. Kleiss

    Subgroup on Materials (BPV IV)

    J. A. Hall, ChairM. Wadkinson, Vice ChairJ. CallandJ. M. Downs

    A. HeinoB. J. IskeJ. L. KleissE. Rightmier

    Subgroup on Water Heaters (BPV IV)

    J. Calland, ChairJ. P. ChicoineB. J. Iske

    R. E. OlsonT. E. Trant

    Subgroup on Welded Boilers (BPV IV)

    J. Calland, ChairT. L. BedeauxB. CalderonJ. L. Kleiss

    P. A. MolvieR. E. OlsonM. WadkinsonR. V. Wielgoszinski

    COMMITTEE ON NONDESTRUCTIVE EXAMINATION (BPV V)

    G. W. Hembree, ChairF. B. Kovacs, Vice ChairJ. S. Brzuszkiewicz, Staff SecretaryS. J. AkrinC. A. AndersonJ. E. BateyA. S. BirksP. L. BrownM. A. BurnsB. CaccamiseN. Y. FaranssoN. A. FinneyA. F. GarbolevskyJ. F. Halley

    J. W. HoufS. A. JohnsonR. W. KruzicC. MayA. B. NagelT. L. PlasekF. J. SattlerG. M. Gatti, DelegateX. Guiping, DelegateB. D. Laite, AlternateH. C. Graber, Honorary MemberO. F. Hedden, Honorary MemberJ. R. MacKay, Honorary MemberT. G. McCarty, Honorary Member

    Subgroup on General Requirements/Personnel Qualifications andInquiries (BPV V)

    F. B. Kovacs, ChairJ. W. Houf, Vice ChairS. J. AkrinC. A. AndersonJ. E. BateyA. S. BirksC. EmslanderN. Y. Faransso

    N. A. Finney

    G. W. Hembree

    S. A. Johnson

    D. I. Morris

    A. B. Nagel

    J. P. Swezy, Jr., ContributingMember

    Special Working Group on NDE Resource Support (SG-GR/PQ & I)(BPV V)

    N. A. Finney, ChairD. AdkinsJ. AndersonT. G. BollhalterC. T. BrownN. Carter

    J. L. Garner

    M. Ghahremani

    J. W. Mefford, Jr.

    M. Sens

    D. Van Allen

    Subgroup on Surface Examination Methods (BPV V)

    S. A. Johnson, ChairJ. Halley, Vice ChairS. J. AkrinJ. E. BateyA. S. BirksP. L. BrownB. CaccamiseN. Y. FaranssoN. FarenbaughN. A. Finney

    G. W. Hembree

    R. W. Kruzic

    B. D. Laite

    C. May

    L. E. Mullins

    A. B. Nagel

    F. J. Sattler

    P. Shaw

    G. M. Gatti, Delegate

    Subgroup on Volumetric Methods (BPV V)

    A. B. Nagel, ChairN. A. Finney, Vice ChairS. J. AkrinJ. E. BateyP. L. BrownB. CaccamiseN. Y. FaranssoA. F. GarbolevskyJ. F. HalleyR. W. Hardy

    G. W. HembreeS. A. JohnsonF. B. KovacsR. W. KruzicC. MayL. E. MullinsT. L. PlasekF. J. SattlerM. TorokG. M. Gatti, Delegate

    Working Group on Acoustic Emissions (SG-VM) (BPV V)

    N. Y. Faransso, ChairJ. E. Batey, Vice Chair

    S. R. DoctorR. K. Miller

    Working Group on Radiography (SG-VM) (BPV V)

    B. Caccamise, ChairF. B. Kovacs, Vice ChairS. J. AkrinJ. E. BateyP. L. BrownC. EmslanderN. Y. FaranssoA. F. GarbolevskyR. W. HardyG. W. Hembree

    S. A. Johnson

    R. W. Kruzic

    B. D. Laite

    S. Mango

    C. May

    R. J. Mills

    A. B. Nagel

    T. L. Plasek

    M. Torok

    Working Group on Ultrasonics (SG-VM) (BPV V)

    N. A. Finney, ChairJ. F. Halley, Vice ChairB. CaccamiseK. J. ChizenJ. M. DavisN. Y. FaranssoP. T. HayesS. A. Johnson

    R. W. Kruzic

    B. D. Laite

    C. May

    L. E. Mullins

    A. B. Nagel

    F. J. Sattler

    M. Torok

    xxiv

    reproduction or distribution is permitted.

  • Working Group on GuidedWave Ultrasonic Testing (SG-VM) (BPV V)

    N. Y. Faransso, ChairJ. E. Batey, Vice ChairD. AlleyneN. AmirJ. F. Halley

    S. A. JohnsonG. M. LightP. MudgeM. J. QuarryJ. Vanvelsor

    COMMITTEE ON PRESSURE VESSELS (VIII)

    R. J. Basile, ChairS. C. Roberts, Vice ChairS. J. Rossi, Staff SecretaryT. Schellens, Staff SecretaryG. Aurioles, Sr.V. BogosianJ. CameronA. ChaudouetD. B. DeMichaelJ. P. GlaspieJ. F. GrubbL. E. Hayden, Jr.G. G. KarcherD. L. KurleK. T. LauM. D. LowerR. MahadeenR. W. MikitkaU. R. MillerT. W. NortonT. P. PastorD. T. PetersM. J. Pischke

    M. D. RanaG. B. Rawls, Jr.F. L. RichterC. D. RoderyE. SoltowD. A. SwansonJ. P. Swezy, Jr.S. TeradaE. UpitisP. A. McGowan, DelegateH. Michael, DelegateK. Oyamada, DelegateM. E. Papponetti, DelegateD. Rui, DelegateT. Tahara, DelegateM. Gold, Contributing MemberW. S. Jacobs, Contributing MemberK. Mokhtarian, ContributingMember

    C. C. Neely, Contributing MemberA. Selz, Contributing MemberK. K. Tam, Contributing Member

    Subgroup on Design (BPV VIII)

    D. A. Swanson, ChairJ. C. Sowinski, Vice ChairM. Faulkner, SecretaryG. Aurioles, Sr.S. R. BabkaO. A. BarskyR. J. BasileM. R. BreachF. L. BrownD. ChandiramaniB. F. HantzC. E. HinnantC. S. HinsonM. H. JawadD. L. KurleM. D. LowerR. W. MikitkaU. R. Miller

    T. P. PastorM. D. RanaG. B. Rawls, Jr.S. C. RobertsC. D. RoderyD. SrnicJ. VattappillyR. A. WhippleK. XuK. Oyamada, DelegateM. E. Papponetti, DelegateW. S. Jacobs, Contributing MemberP. K. Lam, Contributing MemberK. Mokhtarian, ContributingMember

    A. Selz, Contributing MemberS. C. Shah, Contributing MemberK. K. Tam, Contributing Member

    Working Group on Design-By-Analysis (BPV III)

    B. F. Hantz, ChairT. W. Norton, SecretaryR. G. BrownD. DeweesR. D. DixonZ. GuC. E. HinnantR. JainM. H. Jawad

    S. KrishnamurthyA. MannG. A. MillerC. NadarajahM. D. RanaT. G. SeippM. A. ShahS. TeradaD. Arnett, Contributing Member

    Subgroup on Fabrication and Inspection (BPV VIII)

    C. D. Rodery, ChairJ. P. Swezy, Jr., Vice ChairB. R. Morelock, SecretaryL. F. CampbellD. I. MorrisO. MuletM. J. PischkeM. J. RiceB. F. Shelley

    P. L. Sturgill

    E. A. Whittle

    K. Oyamada, Delegate

    W. J. Bees, Contributing Member

    W. S. Jacobs, Contributing Member

    J. Lee, Contributing Member

    R. Uebel, Contributing Member

    E. Upitis, Contributing Member

    Subgroup on General Requirements (BPV VIII)

    M. D. Lower, ChairJ. P. Glaspie, Vice ChairF. L. Richter, SecretaryR. J. BasileV. BogosianD. T. DavisD. B. DeMichaelM. FaulkenerL. E. Hayden, Jr.K. T. Lau

    A. S. OlivaresT. P. PastorS. C. RobertsJ. C. SowinskiP. SperanzaD. B. StewartD. A. SwansonR. UebelK. Oyamada, DelegateC. C. Neely, Contributing Member

    Task Group on U-2(g) (BPV VIII)

    S. R. BabkaR. J. BasileD. K. ChandiramaniR. MahadeenU. R. MillerT. W. NortonT. P. Pastor

    R. F. Reedy, Sr.S. C. RobertsM. A. Shah, Jr.D. SrnicD. A. SwansonR. UebelK. K. Tam, Contributing Member

    Subgroup on Heat Transfer Equipment (BPV VIII)

    G. Aurioles, Sr., ChairP. Matkovics, SecretaryD. AngstadtS. R. BabkaM. BahadoriJ. H. BarbeeO. A. BarskyI. G. CampbellA. ChaudouetM. D. ClarkS. JeyakumarG. G. KarcherD. L. KurleB. J. Lerch

    R. MahadeenS. MayeuxU. R. MillerT. W. NortonK. OyamadaD. SrnicA. M. VoytkoR. P. WibergF. E. Jehrio, Contributing MemberJ. Mauritz, Contributing MemberF. Osweiller, Contributing MemberR. Tiwari, Contributing MemberS. Yokell, Contributing MemberS. M. Caldwell, Honorary Member

    Task Group on Plate Heat Exchangers (BPV VIII)

    M. J. Pischke, ChairS. R. BabkaS. FlynnJ. F. GrubbF. HamtakJ. E. Lane

    R. MahadeenP. MetkovicsD. I. MorrisC. M. RomeroE. SoltowD. Srnic

    xxv

    reproduction or distribution is permitted.

  • Subgroup on High Pressure Vessels (BPV VIII)

    D. T. Peters, ChairR. D. Dixon, Vice ChairR. T. Hallman, Vice ChairA. P. Maslowski, Staff SecretaryL. P. AntalffyR. C. BielP. N. ChakuR. CordesL. FridlundD. M. FryerA. H. HonzaJ. A. KappJ. KeltjensA. K. KhareN. McKieS. C. Mordre

    G. T. NelsonE. A. RodriguezE. D. RollK. C. Simpson, Jr.D. L. StangF. W. TatarS. TeradaJ. L. TraudR. WinkK.-J. YoungK. Oyamada, DelegateR. M. Hoshman, ContributingMember

    G. J. Mraz, Contributing MemberD. J. Burns, Honorary MemberE. H. Perez, Honorary Member

    Subgroup on Materials (BPV VIII)

    J. F. Grubb, ChairJ. Cameron, Vice ChairP. G. Wittenbach, SecretaryA. Di RienzoJ. D. FritzM. KatcherM. KowalczykW. M. LundyJ. PensoD. W. Rahoi

    R. C. Sutherlin

    E. Upitis

    K. Xu

    K. Oyamada, Delegate

    G. S. Dixit, Contributing Member

    M. Gold, Contributing Member

    J. A. McMaster, ContributingMember

    E. G. Nisbett, Contributing Member

    Subgroup on Toughness (BPV II & BPV VIII)

    D. L. Kurle, ChairK. Xu, Vice ChairR. J. BasileW. S. JacobsM. D. RanaF. L. RichterK. SubramanianD. A. Swanson

    J. P. Swezy, Jr.

    E. Upitis

    J. Vattappilly

    K. Oyamada, Delegate

    K. Mokhtarian, ContributingMember

    C. C. Neely, Contributing Member

    Subgroup on Graphite Pressure Equipment (BPV VIII)

    E. Soltow, ChairG. C. BechererT. F. BonnF. L. Brown

    M. R. MinickA. A. StupicaA. Viet

    Italy International Working Group (BPV VIII)

    G. Pontiggia, ChairA. Veroni, SecretaryB. G. AlboraliP. AngeliniR. BoattiA. CamanniP. ContiP. L. DinelliF. FincoL. GaetaniA. Ghidini

    M. Guglielmetti

    P. Mantovani

    M. Maroni

    M. Massobrio

    L. Moracchioli

    L. Possenti